Table of Contents
1.0
Working Hours......................................................................................................3
2.0
Hazards Identified.................................................................................................3
5.0
Environmental Protection....................................................................................3
6.0
Personnel Involved...............................................................................................3
7.0
Briefing Arrangements.........................................................................................3
8.0
Equipment.............................................................................................................3
9.0
Methodology..
Company logo
1.
Working Hours
Works will be carried out during normal working hours. 08.00 17.00
2.
Hazards Identified
Task specific hazards include
Slips, trips and falls
Manual handling
Electricity
Hand tools
Stored Energy
Contact with hot / cold surfaces
Compressed Gas
5.
Environmental Protection
All waste will be removed from site and returned to licensed disposal site for
o disposal in compliance with current legislative demands.
No waste products will be allowed to enter any watercourse (including drains).
6.
Personnel Involved
7. Briefing Arrangements
The contents of the global and task specific method statements will be briefed to all
engineers by Supervisor to ensure understanding and compliance with the
methodologies.
The Supervisor will brief the team at site on the nature and duration of the task and
equipment to be used.
Should the content of any relevant generic risk assessments not cover any site
specific hazards, a site specific risk assessment shall be completed by the
Supervisor and briefed to all team members before the commencement of works.
After works are complete, any such site specific risk assessments must be handed to
the HSQE Manager for retention and to allow any relevant generic risk assessments
to be updated if required.
8. Equipment
Hand Tools
Electrical Test Equipment
Company logo
Compressed Nitrogen, hoses and gauges
All equipment will be taken to the work site by hand when the work site is clear or
protection arrangements are in place and have been confirmed.
All equipment will be checked prior to use to ensure that it is in safe working order.
(As per Provision and Use of Work Equipment Regulations. HSE 1998)