Service bulletin
Version: RUT2013-001-01

Date: 5 July 2013

Subject:

Replacement existing DMM G2 by new DMM model RUT-02590-DA.

Event:

End of life current DMM RUT-00412-DA model.

Cause:

Components for assembling original DMM became obsolete.

Tools required:

Small Philips (flat) and Torx (T20x4) and (T9x60) Screwdriver.


Replacement kit containing:
1. Modified bottom plate RUT-02549.
2.

2 x white ferrules RUT-00394, spare 4 x GMI-00949


(M4x10) and Windows License key.

3. New Com1 extension

cable RUT-00890.

4. New power extension

cable RUT-0891.

5. 24v DC to

6. New

12c DC power converter RUT-07001.

DMM
RUT-02590-AA.

Description
The existing DMM model (RUT-00412-DA) has reached his end-of-life and for that
reason we need to replace it with its successor RUT-02590-DA.
This technical bulletin describes how to replace the existing DMM module with the new
DMM. The new DMM needs 12V DC instead of 24V DC, so a power converter is
required (included in the replacement kit).

Service bulletin RUT2013-001-01 G2 new DMM replacement procedure


Page 1 of 7

Maritime Information Solutions

Steps to be executed:

Initial steps
1. Retrieve the vdrparams.ini / vdr-cfg.txt and the vidchan1(2,3,4).ini files for the
subject vessel in order to replace when the DMM has been changed.
2. When you dont have the files in hand please be sure to ask them before your
attendance from our service department.
3. Shut off the AC breaker on board.
4. Shut off the Battery breaker inside the DPU.

Insertion of Power converter RUT-07001

1. Remove the End Terminal Terminator.

2. Insert Power converter


RUT-07001 on the DIN-rail.
3. And re-insert the End
Terminal Terminator.

Service bulletin RUT2013-001-01 G2 new DMM replacement procedure


Page 2 of 7

Maritime Information Solutions

Modification power cable

1. Cut the wires at the end of the power plug of


the existing DMM.

2. Place the 2 supplied white ferrules (RUT-00394) at the end of the wires (black
and yellow) and insert them into the connector of the power converter as shown
below. Black to V & yellow to +V.

3. Insert the supplied connector with the power cable


for the new DMM as shown on the left.

Service bulletin RUT2013-001-01 G2 new DMM replacement procedure


Page 3 of 7

Maritime Information Solutions

Replacement DMM module

1. Remove all cables from the


original DMM module.

2. Remove the 4 screws that


hold the DMM.

3. Mount the new DMM with the


bottom plate on top of the stand-offs
and fix the plate with the original
screws to the existing stand-offs.

Service bulletin RUT2013-001-01 G2 new DMM replacement procedure


Page 4 of 7

Maritime Information Solutions

Cable connections

1. Connect the power plug as shown on the


left.

2. Insert the COM2 plug as shown.


3. Secure the connector with the screws.

4. Insert the RJ45 plug into the DMM and


connect the other side of the cable to the existing
COM1 plug (do not insert this Rj45 plug in LAN
connectors).
Note: In case com plug screw fixing is not possible
then use a tyrap to hold plugs together.

5. Insert the Ethernet cables corresponding


the labeled connectors. Note: The combined
NMEA/VIDEO Ethernet cable needs to be inserted in
the VIDEO connector.

Service bulletin RUT2013-001-01 G2 new DMM replacement procedure


Page 5 of 7

Maritime Information Solutions

6. When installed, put in between the existing EBI connectors .

Finalize installation
1. After your hardware installation is finished; first switch on the battery breaker then
switch on the AC breaker on the bridge.
2. Connect via remote desktop and check if the system is performing well (No errors).
3. Stop the rec app.
4. Connect as administrator
5. Map via E: drive to replace the vdrparams.ini / vdr-cfg.txt files on the C:/WINDOWS
drive
6. Put the vidchan1(,2,3,4).ini files in the vdr apps folder on the C: drive
7. Update the Product Key and perform a commit.
8. After the commit, the system will reboot and run in the MyUser account.
9. Check if all the NMEA/Video and Audio has been recorded in a correct way.
10. Always send the error log with the new vdrparams.ini / vdr-cfg.txt and the correct
vidchan1 (2.3.4).ini file(s), to Netwave Service Department to comply with APT
regulations.

Note: Do not execute VDR Config Suite in any of the steps above

Service bulletin RUT2013-001-01 G2 new DMM replacement procedure


Page 6 of 7

Maritime Information Solutions

11. The Windows License key sticker should be placed on the outside of the G2 system (if
not done yet) as shown below.

Note:
If there are any questions please dont hesitate to contact our service department.
service@netwavesystems.com
24 hour mobile support number: +31 (0)6 52869682

Service bulletin RUT2013-001-01 G2 new DMM replacement procedure


Page 7 of 7