You are on page 1of 5

CURICULUM VITAE of ZARAR AHMAD

INSTRUMENT QA/QC -INSPECTOR CUM Sr INSTRUMENT


TECHNICIAN MOBILE NO. INDIA-00919771700934, 00919973954664
00919934196701 Zararhmd@yahoo.com.in
PERSONAL PROFILE

14

Having Experience Of
Years. In The Field of Construction And
Maintenance of Which Are In The Field Of Oil & Gas Petrochemical Off Shore Construction
Like Equipment Skids Package Well Head, And Interpret Analog And Digital Logic Diagram
Schematic Diagram, P& ID, Instrument Location And General Arrangement Operating Floor
Plant, USE For Start-Up Calibration All Types Of Instrument, Testing Commissioning And
Trouble Shooting With The Help Of Some Equipment Acquired The Ability To Operate DCS
Console Prior To Loop Checking, Having Construction Experience As Forman For Tray Work,
Conduit Work, Fabrication, Installation, Of Instrument, Cable Gladding & Termination Of
Power And Control Co-Ordination With The Client. Inspection & Witnessing According To
Project Specification & QCP & ITP. Establish Field Inspection & Testing Procedure For E&I
Work With Assistance Of Site Project Engineers Inspection For Installation Of Field Mounted
Instrument Junction Boxes, Local Panels, Pneumatic Leak Test Of Air Line Tubing/Impulse
Line Tubing Insulating Resistance Test & Continuity Check For Instrument Cables Inspection
For The Installation Of DCS Panel, ESD Panel, Fire & Gas System Panel, Console,
Inspection for Electrical &Instrument Cable Trenches Prior to Cable PULLING to Release For
the Next Activity Inspection FOR the Installation Of Grounding CABLE & Bus Bar in the field
& Building & Connection to the Equipment As PER the APPROVED Drawing & Specification.
Also Responsible for witnessing Combined Instrument LOOP Check &CALIBRATION
Of Pressure Transmitter FLOW,LEVEL,TEMPRETURE CONTROL VALVE SAFETY
RELIEVE VALVE,PRESSURE SWITCH, ALSO CORDINATE WITH CLIENT PROJECT
INSPECTION UNIT FOR PROJECT INSPECTION&STAGE WISE ACTIVITIES OF HOLD
POINTS

I Am co-ordination with QA/QC Related to All Documentation Work Each And


Every Loop. .

Responsibilities

Quality control of material inspection testing,


Inspection of all electrical instruments and material etc; correlation of mill test
certificate,
Condition of materials, documenting and reporting of non conformity (if any) to
specification.

Responsible for incoming Material Inspection.

Witness and review of PMI reports.


Inspection of installed line as per the drawing.

Electrical materials joint inspection for release with the client.


Perform inspection on erection and installation of cables trays and all electrical
equipments.
Check on the material and installation as per the quality specification and codes,

Inspect materials upon the delivery on site prior to installation. Preparation of weekly and
monthly project accomplishment reports. Inspection and verification of materials,
Preparation of MIR.

Identifying the materials as per the material take off list during the installation.
Identify the electrical materials & fittings as per specification and code.
Identify equipments location as per General Arrangement Drawing.
Site surveillance to check the construction work and giving comments, if
necessary to maintain the quality and accuracy
Verification and checking the category B items of the punch list.
Preparing Final Inspection Reports.
Preparing Final QC Punch list.
Co-Ordination with Client.
Preparation of Bill of Material and Estimation.
Prepare work schedule, arranging materials at right time for new equipments
erection and commissioning.
Positive Material Identification (PMI) survey of electrical materials

Responsible for incoming Material Inspection.


Site supervision on different phases of works.

Witness and review of PMI reports.

Inspect materials upon the delivery on site prior to installation.


Preparation of weekly and monthly project accomplishment reports and billings.
Inspection and verification of raw materials, Preparation of MIR.

Giving technical assistance and technical reports.


Quality inspection and certifying contract jobs, works allusion to sub ordinates
and
guiding.
Identifying the materials.
Inspection of types, direction, tag number and size of valves, flow instruments,
orifice, etc
Inspection of pre commissioning work.
Submit inspection punch list clearing in order to close some categories that will
affect the holing over of dossier prior to start commission.
Coordinate with all sub-contractor for all works done are executed properly in accordance
with the plans and specifications.

Loops examination and related equipment connection checking and P& ID


diagrams.

PERSONAL INFORMATION
Date And Place of Birth
Citizen
Marital Status
Passport No.
Date of Issue
Date of Expire
Place of Issue
Language Known
Fathers Name
E-Mail Address

:
:
:
:
:
:
:

14th March 1973, Chasnalla


Indian
Married
:
F-0468457
:
10-10-2004
09-10-2014 (F)
:
Abudhabi (U. A. E.)
English, Hindi, Urdu & Arabic
AKBAR MALLICK
zararhmd@yahoo.com.in

QUALIFICATION
Educational Qualification
Technical Qualification
.
Permanent Address :

:
:

INTERMIDIATE PASSED
Diploma In INSTRUMENTATION
Present Address:

ZARAR AHMAD
ZARAR AHMAD
AT/POST. CHASNALLA SOUTH COLONY BC-1 DIST-DHANBAD
- Mobile No. 00919771700934 ,00919973954664 ,00919934196701
(Jharkhand)
India 828135.

EXPERIENCE SUMMARY

1) .SAUDIA ARABIAN KENTZ CO ltd. INSTRUMENT


QA/QC- INSPECTOR ( 08th FEBUARY 2007 to 27th
NOVEMBER 2008 Work WITH AKER KVAERNER
(Netherlands) SINOPEC (CHINA).PP, PE,PHU AKSI (YANBO
KSA) .

YANSAB (POLYOlEFINS)
2) NATIONAL PETROLEUM CONSTRUCTION COMPANY
(NPCC) ABUDHABI ( OFFSORE& ONSHOR)
INSTRUMENT QA/QC INSPECTOR
Period Of Duration

15TH JUNE 2003 TO 09TH APRIL 2006.

3) THE NATIONAL COMPANY (KHARAFI NATIONAL)

Instrument Foreman Process Control


Period of Duration :
Project Assignment

15th January 2001 to 28th April 2003


:
SHUIBA REFENRY KNPC
(MAINTANANCE) KUWAIT

DUTIES AND RESPONSIBILITIES


DUTIES AND RESPONSIBILITIES

Involved With Instrument Maintenance And Changeover Instrument


Installation, Commisioning And Maintenance Of Process Instrument
Loop checking Of Instrument Through DCS
Shutdown Maintance Of Instrument
Trouble shooting Of Process Instrument
RE-calibrating Of All Kinds Instrument

4) KENT OVERSEAS LTD.

Instrument Technician
PERIOD OF DURATION
Project Assignment
5) QATAR KENTZ
01ST MARCH 1999,

:
:

04TH APRIL 2000 TO 31ST AUGUST 2000


MINA AL AHMADI REFINARY
RMPGRTA SHUTDOWN (KUWAIT)

WLL PERIOD OF DURATION

12TH MARCH 1998 TO

Project Assignment
:
Arab D Gas recycling Project in Dukhan for
BROWN&ROOT and Raslaffan onshore facilities Project RAS GAS QATAR

DUTIES AND RESPONSIBILITIES

Calibration Of Level, Temp, Flow, Pressure, Like, Foxboro, Rosemount, Honywell,


Magnitoll, Fisher, Mansoneilan, Drugavalve
Pressure, Differential Pressure, And Temperature Switches Like, Switzer, Delta, Infos,
Nuova Fima, And Yew Etc.
Control Valve Of All Popullar Makes Like ABB Taylors And Mil Control Etc.
Solenoid Operated Valves, Shut Off Valve.

6) ASAHI GEN TREDING CO. WLL

Instrument Technician
Date Of Joining
Project Assignment

:
:

05th April 1997 to 07th August 1997


EQUATE PETROCHEMICAL ( POLYPROPYLENE)
SHUAIBA (KUWAIT)

DUTIES AND RESPONSIBILITIES


DUTIES AND RESPONSIBILITIES

Installation Of The New System Equipment Instrument Control Panel, Data Acquisition,
Network Link Net Panels.
Supervision Of Calibrating New Instrument.
I Am Responsible Person Who Is Keeping All The Record And All The Calibration
Cable Pre- Commissioning Report Sheet.
TECHNIMOUNT ICB LTD.

Instrument Technician
SITE :

Date of Joining
:
14th February 1994
Date of Leaving
:
29th February 1996
Daeliem - ONGC, Hazira, Surat, Gujarat (India)
PROCESS CONTROL TECHNOLOGY (INDIA) PVT. LTD.

Instrument Technician
Period Duration

SITE:

17th December 1992 to 10th August 1993

IPCL BARODA (GUJRAT)


DECLARATION

I hereby certify that the above information is true and correct to the best of my
knowledge.

ZARAR AHMAD

APPLICANT

AS INSTRUMENT QC ENGINEER (SAUDI ARAMCO APPROVED)

Deals with reviewing of all ITP's/QCP/Method Statement/ Material Approval prior for project
plan preparation.
Coordinating with Construction Engineer project plan drawing review-having AFC drawing
officially approved documentation.
Represent Company during weekly meeting concerning schedule plan activity and project plan
on all tools and equipment needed for construction.
Assigned to Review all Subcontractor Technical Documentation Circulation prior approval to all
concerned lead official.
Ensured instrument equipment works complied with project specifications, company
procedures, method statements and quality assurance and controls documentation (strictly
implementing the ISO 2000 and ISO 9000).
Supervised and monitoring the flow of inspection on-site and calibration prior to meet the
project deadline.
Tasks to monitor all subcontractor activity priors for deadline start of Instrumentation Workload.
Able to analyzed every area to be survey and witness prior for RFI to be offered to the main
client for inspection.
Assigned to witnessing repair and calibration of instrumentation, commissioning of the following
equipment: Smart Flow, pressure, temperature, level transmitters, different control valves,
pressure gauges and Fire & Gas alarms.
Analogue and digital controllers Fire & Gas detection/protection systems,
ESD (Emergency shutdown), Pneumatic and hydraulic shutdown panels and control systems.
Project Duties included review of loop folders for final acceptance by the QA/QC Dept. before
transferring to Commissioning.
To undertake inspection of vendor skids before final acceptance by client.
Followed all safety practices and procedures and corrected unsafe work practices.
Fully conversant with relevant International (ANSI, ASTM, API, BSI, IP, ISO, IEC, IEEE etc.)
standards.
Responsible for the Factory Acceptance Tests (FATs), Site Acceptance Tests (SATs),
Prepaid weekly and monthly report for NGPIU.
Prepare project record book for BI-10-00057

You might also like