Professional Documents
Culture Documents
14
Having Experience Of
Years. In The Field of Construction And
Maintenance of Which Are In The Field Of Oil & Gas Petrochemical Off Shore Construction
Like Equipment Skids Package Well Head, And Interpret Analog And Digital Logic Diagram
Schematic Diagram, P& ID, Instrument Location And General Arrangement Operating Floor
Plant, USE For Start-Up Calibration All Types Of Instrument, Testing Commissioning And
Trouble Shooting With The Help Of Some Equipment Acquired The Ability To Operate DCS
Console Prior To Loop Checking, Having Construction Experience As Forman For Tray Work,
Conduit Work, Fabrication, Installation, Of Instrument, Cable Gladding & Termination Of
Power And Control Co-Ordination With The Client. Inspection & Witnessing According To
Project Specification & QCP & ITP. Establish Field Inspection & Testing Procedure For E&I
Work With Assistance Of Site Project Engineers Inspection For Installation Of Field Mounted
Instrument Junction Boxes, Local Panels, Pneumatic Leak Test Of Air Line Tubing/Impulse
Line Tubing Insulating Resistance Test & Continuity Check For Instrument Cables Inspection
For The Installation Of DCS Panel, ESD Panel, Fire & Gas System Panel, Console,
Inspection for Electrical &Instrument Cable Trenches Prior to Cable PULLING to Release For
the Next Activity Inspection FOR the Installation Of Grounding CABLE & Bus Bar in the field
& Building & Connection to the Equipment As PER the APPROVED Drawing & Specification.
Also Responsible for witnessing Combined Instrument LOOP Check &CALIBRATION
Of Pressure Transmitter FLOW,LEVEL,TEMPRETURE CONTROL VALVE SAFETY
RELIEVE VALVE,PRESSURE SWITCH, ALSO CORDINATE WITH CLIENT PROJECT
INSPECTION UNIT FOR PROJECT INSPECTION&STAGE WISE ACTIVITIES OF HOLD
POINTS
Responsibilities
Inspect materials upon the delivery on site prior to installation. Preparation of weekly and
monthly project accomplishment reports. Inspection and verification of materials,
Preparation of MIR.
Identifying the materials as per the material take off list during the installation.
Identify the electrical materials & fittings as per specification and code.
Identify equipments location as per General Arrangement Drawing.
Site surveillance to check the construction work and giving comments, if
necessary to maintain the quality and accuracy
Verification and checking the category B items of the punch list.
Preparing Final Inspection Reports.
Preparing Final QC Punch list.
Co-Ordination with Client.
Preparation of Bill of Material and Estimation.
Prepare work schedule, arranging materials at right time for new equipments
erection and commissioning.
Positive Material Identification (PMI) survey of electrical materials
PERSONAL INFORMATION
Date And Place of Birth
Citizen
Marital Status
Passport No.
Date of Issue
Date of Expire
Place of Issue
Language Known
Fathers Name
E-Mail Address
:
:
:
:
:
:
:
QUALIFICATION
Educational Qualification
Technical Qualification
.
Permanent Address :
:
:
INTERMIDIATE PASSED
Diploma In INSTRUMENTATION
Present Address:
ZARAR AHMAD
ZARAR AHMAD
AT/POST. CHASNALLA SOUTH COLONY BC-1 DIST-DHANBAD
- Mobile No. 00919771700934 ,00919973954664 ,00919934196701
(Jharkhand)
India 828135.
EXPERIENCE SUMMARY
YANSAB (POLYOlEFINS)
2) NATIONAL PETROLEUM CONSTRUCTION COMPANY
(NPCC) ABUDHABI ( OFFSORE& ONSHOR)
INSTRUMENT QA/QC INSPECTOR
Period Of Duration
Instrument Technician
PERIOD OF DURATION
Project Assignment
5) QATAR KENTZ
01ST MARCH 1999,
:
:
Project Assignment
:
Arab D Gas recycling Project in Dukhan for
BROWN&ROOT and Raslaffan onshore facilities Project RAS GAS QATAR
Instrument Technician
Date Of Joining
Project Assignment
:
:
Installation Of The New System Equipment Instrument Control Panel, Data Acquisition,
Network Link Net Panels.
Supervision Of Calibrating New Instrument.
I Am Responsible Person Who Is Keeping All The Record And All The Calibration
Cable Pre- Commissioning Report Sheet.
TECHNIMOUNT ICB LTD.
Instrument Technician
SITE :
Date of Joining
:
14th February 1994
Date of Leaving
:
29th February 1996
Daeliem - ONGC, Hazira, Surat, Gujarat (India)
PROCESS CONTROL TECHNOLOGY (INDIA) PVT. LTD.
Instrument Technician
Period Duration
SITE:
I hereby certify that the above information is true and correct to the best of my
knowledge.
ZARAR AHMAD
APPLICANT
Deals with reviewing of all ITP's/QCP/Method Statement/ Material Approval prior for project
plan preparation.
Coordinating with Construction Engineer project plan drawing review-having AFC drawing
officially approved documentation.
Represent Company during weekly meeting concerning schedule plan activity and project plan
on all tools and equipment needed for construction.
Assigned to Review all Subcontractor Technical Documentation Circulation prior approval to all
concerned lead official.
Ensured instrument equipment works complied with project specifications, company
procedures, method statements and quality assurance and controls documentation (strictly
implementing the ISO 2000 and ISO 9000).
Supervised and monitoring the flow of inspection on-site and calibration prior to meet the
project deadline.
Tasks to monitor all subcontractor activity priors for deadline start of Instrumentation Workload.
Able to analyzed every area to be survey and witness prior for RFI to be offered to the main
client for inspection.
Assigned to witnessing repair and calibration of instrumentation, commissioning of the following
equipment: Smart Flow, pressure, temperature, level transmitters, different control valves,
pressure gauges and Fire & Gas alarms.
Analogue and digital controllers Fire & Gas detection/protection systems,
ESD (Emergency shutdown), Pneumatic and hydraulic shutdown panels and control systems.
Project Duties included review of loop folders for final acceptance by the QA/QC Dept. before
transferring to Commissioning.
To undertake inspection of vendor skids before final acceptance by client.
Followed all safety practices and procedures and corrected unsafe work practices.
Fully conversant with relevant International (ANSI, ASTM, API, BSI, IP, ISO, IEC, IEEE etc.)
standards.
Responsible for the Factory Acceptance Tests (FATs), Site Acceptance Tests (SATs),
Prepaid weekly and monthly report for NGPIU.
Prepare project record book for BI-10-00057