FIELD QUALITY ASSURANCE PLAN FOR COAL MILL

Package : COAL MILL

TEYNAMPET, CHENNAI- 600 018.


Sl.No

Component & Operation

1.0

Receipt of Material

1.1

Coal Mill Equipments

1.2

Receipt Inspection

2.0

Storage of Materials

2.1

Coal Mill Equipments

3.0

Erection of coal mill

Characteristics

Rev No

: 00

Date

:20.10.2010

Class of
Quantum
Type of Check
Check
of check

Ref Document &


Accepatance Std

Inspected By

Format of
Record

Vendor

BGR

Customer

Physical verification of materials for any Major


transit damage

Visual

100%

As per Purchase Order

Log Book

--

--

Verification of despatch documents


Verification of all components

Major
Major

Verification
Verification

100%
100%

---

P
P

---

Verification of test reports and


inspection report

Major

Verification

100%

As per Purchase Order


Log Book
As per Purchase Order/As per GRN
approved Drg
As per Purchase Order/As per GRN
approved Drg

--

--

Check for dimensions and transit


damage

Major

Measurement

100%

As per Approved Drawing

--

Ensure the material are properly


stored/Stacked
Check the foundation top level with
respect to bench mark level & ensure
the cleanliness

Major

Verification

--

Major

Visual/

As per Purchase Order


Log Book
Periodic
Inspection
100%
Log Book
As per Approved Drg &
Document No:FQS-Coal mill01

Check the mill & motor foundation


pocket dimensions as per drawing

Major

Visual/

100%

As per Approved Drg &


Log Book
Document No:FQS-Coal mill01

Check the distance of mill & motor


centre line with respect to boiler
furnace axis

Major

Visual/

100%

As per Approved Drg &


Log Book
Document No:FQS-Coal mill01

Check the uneveness of gear box &


motor base plate

Major

Visual/

100%

--

Ensure the grouting material


grade,mixing ratio,pouring of grouting
as required level&curing period

Major

Visual/

100%

As per Approved Drg &


Log Book
Document No:FQS-Coal mill01
As per Approved Drg
Log Book

Check the apply of MoS2 grease on the Major


gear box plates

Visual

100%

As per Approved Drg

Log Book

--

Check the alignment of gear box center Major


with respect to mill center

Visual /
Measurement

100%

As per Approved Drg &


Log Book
Document No:FQS-Coal mill01

--

Check the levelness of gear box top


surface & horizontality of the shaft

Major

Visual/
measurement

100%

As per Approved Drg &


Log Book
Document No:FQS-Coal mill01

--

Check the installation of gear box on


the mill base & alignment of the plinth

Major

Visual

100%

As per Approved Drg

Log Book

Check the vertical distance between


gear box crown face and bottom
housing crown face

Major

Visual/
Verification

100%

Log Book
As per Approved Drg &
Document No:FQS-Coal mill01

Check the parallelism between gear box Major


crown face and bottom housing crown
face

Visual /
Measurement

100%

Log Book
As per Approved Drg &
Document No:FQS-Coal mill01

Major

Visual /
Measurement

100%

Log Book
As per Approved Drg &
Document No:FQS-Coal mill01

Check the clearance between mill gear


box & base plate

Page 1 of 3

GRN

Remarks

FIELD QUALITY ASSURANCE PLAN FOR COAL MILL


Package : COAL MILL

TEYNAMPET, CHENNAI- 600 018.


Sl.No

Component & Operation

Characteristics

:20.10.2010

Class of
Quantum
Type of Check
Check
of check
Major

Ref Document &


Accepatance Std

Inspected By

Format of
Record

Vendor

BGR

Customer

100%

Log Book
As per Approved Drg &
Document No:FQS-Coal mill01

--

Ensure the erection of tension rods seat Major

Visual

100%

As per Approved Drg

Log Book

--

Major

Visual

100%

As per Approved Drawing

Log Book

--

Major

Visual/

100%

As per Approved Drawing

Log Book

Major

Visual

100%

As per Approved Drg

Log Book

--

Check top level of the mill housing after Major


installation on the plinth

Visual /
Measurement

100%

As per Approved Drg &


Log Book
Document No:FQS-Coal mill01

Check the distance between external


Major
dia of gear box stop mouth and internal
dia of bottom housing upper plate hole

Visual/

100%

As per Approved Drg &


Log Book
Document No:FQS-Coal mill01

Check the installation of bottom


housing sealing device

Major

Visual

100%

As per Approved Drawing

Log Book

--

Recheck the alignment & concentricity


of the plinth after attachment of plinth
bottom seal

Major

Visual/

100%

As per Approved Drg &


Log Book
Document No:FQS-Coal mill01

Visual

100%

As per Approved Drawing

Log Book

Visual/

100%

Log Book
As per Approved Drg &
Document No:FQS-Coal mill01

Visual /
Measurement

100%

Log Book
As per Approved Drg &
Document No:FQS-Coal mill01

Visual/

100%

Log Book
As per Approved Drg &
Document No:FQS-Coal mill01

Visual

100%

As per Approved Drawing

Log Book

--

100%

Log Book
As per Approved Drg &
Document No:FQS-Coal mill01

Check the direction of rotation of the


gear box
Recheck the levelness of gear box top
surface & shaft horizontalness
Check the welding of gear box bottom
flange,under lay & slot steel together

Erection of coal mill

: 00

Date

Visual /
Measurement

Check the concentricity of plinth with


respect to mill center line

3.0

Rev No

Major
Check the installation & alignment of
the grinding table carrier on the output
flange the gap between grinding track Major
Chech
carrier middle seal stop mouth and
external dia of bottom housing baffle
ring
Major
Check & ensure the closefit of the
grinding table at the interference
Major
Ensure the installation of scrap board
on the grinding table & check the
clearance between the upper surface of
the plinth & the bottom of the scrap
board
Major
Ensure orientation of hot air inlet
opening of mill upper housing

measurement

Check the concentricity between the


upper and lower housing

Major

measurement
Visual/

Check the horizontal distance between


housing inwall and Max external dia of
grinding track carrier upper part

Major

Visual/

100%

Check the radial gap between grinding


table carrier & outer nozzle ring

Major

measurement
Visual/

Log Book
As per Approved Drg &
Document No:FQS-Coal mill01

100%

As per Approved Drg &


Log Book
Document No:FQS-Coal mill01

measurement

measurement
Page 2 of 3

Remarks

FIELD QUALITY ASSURANCE PLAN FOR COAL MILL


Package : COAL MILL

TEYNAMPET, CHENNAI- 600 018.


Sl.No

3.0

Component & Operation

Erection of coal mill

Characteristics

Rev No

: 00

Date

:20.10.2010

Class of
Quantum
Type of Check
Check
of check

Ref Document &


Accepatance Std

Inspected By

Format of
Record

Vendor

BGR

Customer

Check the clearance between rotary


nozzle & guide ring

Major

Visual/

100%

Log Book
As per Approved Drg &
Document No:FQS-Coal mill01

Check the clearance between the


rollers and grinding table

Major

Visual/

100%

Log Book
As per Approved Drg &
Document No:FQS-Coal mill01

Check the gap between loading frame


and bearing side front guide plate
location suface

Major

Visual/

100%

Log Book
As per Approved Drg &
Document No:FQS-Coal mill01

Check the gap between loading frame


and non bearing side guide plate
location suface

Major

Visual/

100%

Log Book
As per Approved Drg &
Document No:FQS-Coal mill01

Check the alignment of the motor with


gear box in axial & radial direction

Major

Visual/

100%

Log Book
As per Approved Drg &
Document No:FQS-Coal mill01

Page 3 of 3

Remarks