INVITATION TO TENDER

IRSHAD

Ref: CD/14/L/1578/AS
Date: 6 th January 2015

1
Sub: Tender No. CD/34/14
Enterprise Content Management

Implementation

Dear Sirs,

Company (IRSHAD) intends to appoint a qualified Service


provide complete Enterprise Content Management Implementation and invites firm
the Bidders for conducting the said SERVICES as detailed herein Annexure I (Scope

Abu Dhabi Petroleum Ports Operating


Provider to

Offers from

of Work).
Bidders to submit their Technical Un-Priced Offers (ORIGINAL + 1 copy) in fullest
compliance with this enquiry in a SEALED ENVELOPE bv 14.00 hrs of 19th Januarv 2015,
addressed to:
The Tender Board Secretary
IRSHAD

Floor, TAKREER Tower


Sheikh Khalifa Energy Complex, Near AI Ain Palace Hotel
Sth

Abu

Dhabi,

UAE

Note 1: A complete set of Tender Document shall be emailed to the Bidders addressed to the
Email ID's present in our records. Bidders are advised to write to abubacker@irshad.ae &
mashood@irshad.ae or call 02 6028098/86 in case they do not receive the Tender Document by
11:00 AM, 08th of January 2015,

Tender Clarifications: Bidder's may submit all requests for clarifications & additional information
in writing to the undersigned by fax on 02 6740511 or by email to: abubacker@irshad.ae &
mashood@irshad.ae
th
Note 2: A Mid Tender Meeting has been scheduled at 10:00 AM, 12 of January
outlined in ArticleFof Attachment 1 (Instruction to Bidders).

2015,

as

Please acknowledge receipt of the Tender Documents & confirm your attendance for the
Mid-Tender meeting by return fax: 02-6740511 or by email to abubacker@irshad.ae &

mashood@irshad.ae.

IRSHAD wishes best of luck to each bidd

AQL*.

e=***D;
JAN 2015

Saeed AI Jasmi
Tender Board Secretary

r-7vrrtry

u-KU-

r-7. YA...

JU

Abu Dhabi Petroleum Ports

:J.ltl

L,JI *&l.YI

?-.k?+i- 7,

Operating CO. {IRSHAD)

y.u-

(?Lb?1) i.*10,J.?.Il

07

Commercial Depzirtment
U:.il,-Jl jl,U ,,?.+L6*?i 2:6,-J

POBox 61 -Abu Dhabl-U.A.E. -Tel. :02-6028000-Fax : 02-6/Z2422 Website www.ltshad.ae


-

?%}?ZL,=dg.-5442*=Z2-?r

L?J i

IA SHA

ABU DHABI PETROLEUM PORTS OPERATING


COMPANY
P.O.BOX 61 ABU DHABI

TENDER No.

CD/34/ 14

ENTERPRISE CONTENT MANAGEMENT


IMPLEMENTATION

TENDER No.:

CD/34/14
=

Lk, '

IASHAO

ENTERPRISE CONTENT MANAGEMENT IMPLEMENTATION


1

INDEX
Sl.No.

Document Ref. No.

ITT

Description
INVITATION TO TENDER

Attachment 1

Instruction to Bidders

Attachment 2

Form ofTender

FC

(ITB}

DRAFT FORM OF CONTRACT

Annexure I

Scope of Works

Annexure II

Commercial Bid

Annexure III

HSE

Prequalification Questionnaire

EXHIBITS

Exhibit 1 : Bid Bond


Annexure IV

Exhibit 2 : Performance Bank Guarantee


Exhibit 3 : Release Letter

Exhibit 4

Completion Certificate

IASHAO

1,

Attachment 1
1

Tender No.

CD/34/14

Enterprise Content Management


Implementation

Instruction To Bidders

Tender No.

CD/34/14

Enterprise Content Management Implementation

Attachment 1

Instruction to Bidders

1-t J '

IASHAO

ATTACHMENT-1
INSTRUCTION TO BIDDERS

Tender No.

CD/34/14

ENTERPRISE CONTENT MANAGEMENT IMPLEMENTATAION


1. Abu Dhabi Petroleum Ports Operating Company, [RSHAD (hereinafter referred to as
COMPANY} invites competent service providers from the Emirate of Abu Dhab for
submitting Technical Un-Priced proposals for ENTERPRISE CONTENT MANAGEMENT
IMPLEMENTATION as per IRSHAD requirements including Post Implementation Support
is required for minimum of l(one) year.
2. The bidder shall carefully study all the tender documents and obtain all information that
it may require to submit a complete tender. No claim whatsoever shall be admitted
arising out of bidder's failure to study the project sites, surrounding, local conditions,
COMPANY's and Governmental regulations affecting the WORKS/Services. No tender
shall be conditional on the availability of resources and other things required to be
provided by the Contractor.
NOTES: CONTRACTOR is deemed to have examined the Tender Document as a whole with all reference
& cross-references thereof with respect to the contents of all Sections {viz. Annexures, Exhibits,
Attachments, Draft Form of Contract, Tender Bulletins, any other elements of the tender documents &
correspondences thereof etc} noted the correctness and discrepancies of the contents if any, corrected
all such discrepancies, and build-up the Contract Prices taking into account all such facts.

3. BIDDER shall be

fully familiar with the conditions to the CONTRACT and execution of the
Services. No claim from the bidder whatsoever on grounds o f lack of information would
be entertained at any time & constitute to claim for reimbursement, changes of prices/
rates. Since the scope involves Contractor's personnel visiting on shore/off shore sites,

therefore Bidders to make

sure

that he personnel

assigned for this Contract are

holders of Abu Dhabi Visas. Please note that the Trade License should bear "Onshore
& Offshore oil & gas fields and facilities services" under the activity list.
All cost incurred by the bidder in the preparation of the tender, further clarification
meetings, site visit if any etc. shall be solely to the bidder s account.
-

4. TENDER CLOSING: 14.00 hrs. of 19th

January 2015.

No request for extensions to submission ofthis bid will be entertained except for
justifiable reasons related to the tender itself explicitly submitted in writing.

Technical Unpriced Bids


IRSHAD

Office,

8th

Floor,

only shall be submitted in 1 (one) SEALED ENVELOPE at


Commercial Dept. & addressed to:

CD/34/14
Enlerprise Content Management Implementation

Tender No.

Attachment

1: Instruction to Bidders

1 of4

LtJ '

IASHAO

The Tender Board Secretary


IRSHAD, P.O. Box 61

Sheikh Khalifa Energy Complex


Takreer Tower, Corniche Road,
Abu Dhabi, UAE
5.

MID TENDER MEETING: A Mid Tender Meeting is scheduled at 10:OOam of 12th


January 2015 at IRSHAD Head Office, 8th Floor, TAKREER Tower, SKEC Complex, Abu
Dhabi. Note: Each Bidders' attendance shall be limited to 2(two} attendees.

6. The Mid-Tender Meeting is intended to provide the Bidders with all information &
clarifcations that may be needed to enable fullest understanding of the Tender
requirements & submission.

7. No changes & alteration to any element of the Tender Documents shall be made by the
Bidders. Any changes or alterations shall be made by the COMPANY in writing & issued
to the Bidders as Tender Bulletins.
8.

TENDER SUBMISSION:
Bidders to submit Technical/Unpriced offers only in 1 (one} properly sealed
envelope. The Envelope shall be properly sealed by red molten sealing wax. No
Price information to be submitted in the Technical Bid. Commercial/Priced
Bids shall be requested at a Znd stage from Bidders who are found to be
technicalIy acceptable after the Technical Evaluation of the
Technical/Unpriced Bids submitted in response to this invitation.
Note: The Tender No., Tender Title, Technical/Un priced Bid shall be properly mentioned on
each

a.

Envelope.

TECHNICAL BID : Original +1( copy ), containing the Covering Letter on


Bidder's Letterhead and all tender submittals : all pages duly signed &
stamped inc[uding all tender bulletins & any other interim documents/
correspondence during the mid-tender stages. Technical Bid to contain the
BID BOND ofAED 50,000 as outlined in Exhibit 1.
Note: No price information shall be furnished in the Technical Bid.

b. Bidders to note that

evaluation.
C.

incomplete or

incorrect Bids shall not be considered for

that the Tender Submittals, as indicated in the list below is


with
as a minimum requirement to evaluate the Bids
fully complied
submitted; any shortfalls in tender submittals shall risk the Bidder to

Bidders to

technical

ensure

disqualifications:

CD/34/14
Enterprise Content Management Implementation

Tender No.

Attachment

1: Instruction to Bidders

2 of 4

'
=LtJ
IASHAO
TENDER SUBMITTALS:
1

Company Profile

Relevant Experience & Past Performance

Details of Technology and System Architecture

Product Functionahty

Technical Details

Business

Project Planning Schedule

Service and

g
10

Scope of Works requirements


Project Scope Execution Strategy

11

Compliance Sheet for Annexure I-Scope of Works (Sl. No. 1.0 to 2.6}

12

Organization Chart & CVs o f personnel proposed for this agreement

13

Approved Health, Safety Environment Management System

14

Comprehensive list of Equipment and tools to be used for this project

15

HSE Plan

Capability
Support Model

18

HSE Prequalification Questionnaire duly filled up (Soft Copy provided


Annexure -11I)
Copy of the Trade License and Chamber of Commerce Registration
Certificate & TRA certificates
Other certifications like ISO, etc.

19

Power of Attorney

20

Project management and quality control

21

5 Years Audited Financial Reports

22

Form oftender

23

Bid Bond

16
17

Note: The above Suhmittals

as

deemed to be the minimal requirements. Bidders are encouraged to


submit more documents and credentials to support their capability of meeting the Services ofthe Tender.
Tender No. CD/34/14
3 of4
Enterprise Content Management Implementation

Attachment

1: Instruction to Bidders

are

LCEJ I
IRSHAO

d. Bidders shall

initial, stamp and submit all the Tender Documents, Tender


Bulletins and correspondences that may have developed up to the date of
Tender Submission along with the Form of Tender (n Bidder's Letterhead
Refer ATTACHMENT 2) as a token of receipt and acceptance of the Tender
itself.
9. VALIDITY OF BIDS: The bid shall be valid for 150 days from the closing date of this
-

tender.

10. Bid shall be

clearly type written, with no erasures.

11.Each page of the bid shall be initialed and

representative.
12. lRSHAD may
whatsoever.

reject

any Tender

or

stamped by

the bidder's authorized

cancel the Tender without assigning any

reason

13.ALTERNAT[VE OFFERS: Bidder may submit ALTERNATIVE OFFERS if any distinct


meritorous alternatives are available with them specifically highlighting its features
and advantages to IRSHAD. Such alternative proposal shall be included in discrete
section in the tender mentioning specificalIy ALTERNATE PROPOSAL.
The
ALTERNATE PROPOSAL, if any, shall be submitted similar to the submission
explained above along with the Base Bid.

14. Bidders not registered with IRSHAD are requested to apply for registration by filling
the standard pre-qualification form, which can be obtained from our office.
15.DECLINE TO SUBMIT THE BID: Selected Bidders, upon receipt of their Expression of
Interest to participate in this tender, have been invited to provide the Services.
However, if any Bidder upon receipt & examining the detailed requirements outlined
in the Tender Documents is unable to submit an offer in full compliance to its
requirements, may DECLINE to submit the Tender by submission of justifiable
reasons

in

writing.

Bidders to note that not submitting the Tender without any written & justifiable
reason may risk the Bidder to not being invited to future requirements of IRSHAD.

Tender No. CD/34/14


Enterprise Content Management Implementation
Attachment 1: instruction to Bidders
-

of4

9
=L,# j '

IASHAD

Attachment 2
1

Tender No.

CD/34/14

Enterprise Content Management


Implementation

Form of Tender

CD/34/14
Enterprise Content Management Implementation

Tender No.

Attachment 2

Form ofTender

LZU'

=
IRSHAO

FORM OF TENDER

(to be typed & submitted on bidder's letter head, signed by authorized


representative holding the power of attorney & submitted separately in
the Technical Bid & Commercial Bid.)
Ref. No.:

Date:

The Tender Board Secretary


IRSHAD
P.0. Box No. 61

Abu Dhabi, UAE.

CD/34/14
Enterprise Content Management Implementation

Sub: Tender No.

Dear Sir,
1.

(name of the bidder, exactly as per the


trade license, have the fullest understanding of the Scope of SERVICES and
undertake to perform the whole of the requirements comprised in the call for
Tender No. CD/34/14 in accordance with the conditions therein.
We,

by the Tender terms & conditions outlined in the tender


documents. Our proposal shall remain valid and binding on us for a period of
150 days from the closing date of the Tender, during which you may choose to
accept our proposal. In this regard we submit herewith the required BID BOND
of AED 50,000 (UAE Dirhams Fifty Thousand only) No................issued by.................
(bank).

2. We agree to abide

3. ORIGINAL of the Bid Bond is submitted in the TECHNICAL BID; copy submitted
in the Commercial Bid.

4. We also agree that we shall not withdraw our proposal during the said validity
period of 150 days. Furthermore, we agree with the Conditions of CONTRACT

together with the attachments enclosed therewith.

5. If awarded the Contract in writing vide a Letter of Award and till formal
agreement is prepared and executed, this Tender, together with your written
acceptance thereof, shall constitute a binding Contract between IRSHAD and us.

Page
Tender No.

CD/34/14

Enterprise Content Management Implementation

Attachment 2 Form of Tender


-

1 of 2

LIU I

=
IFIS HACB

6. We confirm the prices quoted by us shaI remain FIRM & FIXED for the whole
duration of the CONTRACT and have built-up our prices in compliance to the
fullest understanding of the Scope of SERVICES.
7. We confirm that the Prices

quoted shall be fully inclusive of all costs without


limitation, mobilization, demobilization, tools & equipments, lodging & boarding
and any other allowances, training (inside UAE & outside UAE region}, visa
charges, air tickets, transportation, loading/unloading, taxes & duties,
overheads, premiums, profit, depreciation, etc.

8. We agree with all the terms & conditions outlined of the Draft Form of
CONTRACT enclosed in the Invitation to Tender document.

9. We have compiled the Technical Bid in fullest compliance to the ITTs & have
enclosed all documents requested for Technical Evaluation of our Bid; we also
unconditionally agree to present ourselves diligently during the Tender
Evaluation stages immediately upon request by 1RSHAD.
10. We understand that IRSHAD is not bound to accept the Lowest Bid
provide any justifications for acceptance or rejection of our offer.

or

liable to

11. We have

fully considered in our proposal the following addendum/additional


clarifications/ Tender Bulletins issued byyou.
No.

& date
No.......................... & date..........
& date
NO.
No...........................& date

..........

...........

----.

12. We wouId also like to propose

provided
13. We

in this

confirm

an

Alternative Bid for your consideration

proposal (..........delete

deviations to the Tender terms &


conditions/specifications (.............only if Alternative Bid is not applicable.......).

We confirm that

that

we

we

have

as

if not applicable...........).

no

have NO DEVIATIONS

or

other PRE-QUALIFICATIONS to

the Tender terms & conditions/specifications other than that listed


specifically in our Technical Proposal/Bid.

Thanking you,
Date'

..................

Place:

..........:..:.

Authorized Signatof....<..*.........
Namp'
Position:

(Bidder's company Seal)


CD/34/14
Enterprise Content Management Implementation

Tender No.

Attachment 2 Form ofTender


-

Page 2 of 2

1
=Uj
IASHAO

Draft Form of Contract


THIS AGREEMENT BEARING THE CONTRACT NO.: CD/34/14 FOR COMPLETE ENTERPRISE
CONTENT MANAGEMENT [MPLEMENTATION, IS MADE IN ABU DHABI, U.A.E EFFECTIVE
FROM XXTH DAY OF XXXX 2014 (hereinafter referred to as the EFFECTIVE DATE).
BY AND BETWEEN

ABU DHABI PETROLEUM PORTS OPERATING COMPANY [[RSHAD} duly organized under
the laws of Abu Dhabi, having its postal address as P.0. Box 61, Abu Dhabi, U.A.E [hereinafter
referred to as "COMPANY" which expression shall, where the context so permits, include its
successors-in-interests and assignees) of one part;
AND

M/s (Successful Bidder), duly organized under the laws of United Arab Emirates having its
postal address P.O. Box XXXX,Abu Dhabi, UAE (hereinafter referred to as "CONTRACTOR",
which in expression shall, where the context so permits, include its successors-in-interest
and assignees} of the other part.
WHEREAS
1.

The COMPANY desires to enter into a firm Price AGREEMENT with the
CONTRACTOR for complete Enterprise Content Management Implementation,
more

2.

specifically described hereinafter.

CONTRACTOR having fully understood the nature and extent of the works and
services, represents that it has the necessary resources, expertise, experience,
competent personnel and skill and is willing and able to perform said works
under the terms and conditions herein contained,

NOW, THEREFORE IN CONSIDERATION OF THE


CONTAINED, IT IS HEREBY AGREED AND DECLARED

MUTUAL COVENANTS HEREIN


BY AND BETWEEN THE PARTIES

HERETO AS FOLLOWS:

This page space intentionally left blank.

Tender No. CD/34/14


Enterprise Content Management
Draft Form of Contract

1 o f 30

Implementation

LIAJ'

IA.HAO

INDEX

ARTICLE
ARTICLE
ARTICLE

ARTICLE

1
2
3
4
5
6
7
8
9

ARTICLE
ARTICLE

10
11

ARTICLE
ARTICLE

12

ARTICLE
J

ARTICLE
ARTICLE
ARTICLE
ARTICLE

ARTICLE
ARTICLE

ARTICLE
ARTICLE
ART]CLE
ARTICLE

ARTICLE
ARTICLE
ARTICLE
ARTICLE

13
14
15
16
17
18
19
20
21
22

23

ARTICLE

24

ART CLE

DEFINITION
HEADINGS AND NOTES
DEFINITION OF DATES
CONTRACT DURATION & SCHEDULE
DOCUMENTS MUTUALLY EXPLANATORY
DOCUMENTS COMPRISING THE CONTRACT
NOTICES AND STATEMENTS OF FACT
SCOPE OF WORK
INDEPENDENCE AND RESPONSIB[LITY OF
CONTRACTOR AND SUB CONTRACTING
COMPANY'S OBLIGATIONS
CONTRACTOR'S OBLIGATIONS
COMPANY'S RIGHTS AND PRIVILEGES
CONTRACTOR'S UNDERSTANDING OF THE
NATURE AND DETAILS OF THE WORK
TAXES AND DUTIES
CHANGES AND MODIFICATION

REMUNERATION
CONTRACT PR]CE
CONDITIONS OF PAYMENT
SUSPENSION OF PAYMENT
CURRENCY
PERFORMANCE BANK GUARANTEE
FINAL PAYMENT, F[NAL ACCEPTANCE & BANK
GUARANTEE RELEASE
DEDUCTION FROM PAYMENT
SUSPENSION CAUSED BY FORCE MAJEURE
SUSPENSION FOR FAULT OF CONTRACTOR
TERMINATION ON ACCOUNT OF FORCE MAJEURE
TERMINATION FOR FAULT OF CONTRACTOR
TERMINATION AT CONVENIENCE OFCOMPANY
LIABILITIES, INDEMN[TIES & WARRANTY

ARTICLE

25
26
27
28
29
30

ARTICLE

31

CONFLICT OF INTEREST

ARTICLE
ARTICLE

32
33

CONFIDENTIALITY
APPLICABLE LAW AND ARBITRATION

ARTICLE

34

ARTICLE

HEALTH, SAFETY AND SECURITY

35

ASSIGNMENT

ARTICLE

36

WAIVER OF DEFAULT

ARTICLE

37
38

LANGUAGE

ART
ART
ART
ART

CLE

CLE
CLE

CLE

ARTICLE

Tender No.

CD/34/14

INSURANCE

ENTIRE AGREEMENT

Enterprise Content Management Implementation


Draft Form of Contract

2 of 30

-4=LA? I
IAIHAO

ARTICLE 1

DEFINITIONS

1.1

For the purpose of this CONTRACT, the words and


expressions listed hereunder, shall have the meaning
assigned to them respectively.

1.1.1

AGREEMENT or CONTRACT
Means this signed document describing the relationship
between the COMPANY and CONTRACTOR, comprising
Articles 1 through 38 both inclusive together with all its
attachments, appendices, exhibits and documents referred
therein.

1.1.2

APPEND1CES
Means the contents

1.1.3

as

outlined in the Index.

APPROVAL
Means authorization in writing given by COMPANY to the
CONTRACTOR to proceed with the performance of a specific
part of the WORK without releasing in any way
CONTRACTOR from any of his obligation and liabilities
under the CONTRACT or at law.

1.1.4

CONTRACT PRICE
Means the sum to be paid to CONTRACTOR
under this AGREEMENT, as per Article 17.

1.1.5

by COMPANY

CHANGE/ VARIATION ORDER


Means any and all kinds of CHANGES to the CONTRACT
mutually agreed upon in writing by the PARTIES, according
to procedure set out in the CONTRACT.

1.1.6

EFFECTIVE DATE
The EFFECTIVE DATE shall be the date referred herein this
CONTRACT and thus the CONTRACTOR's remuneration.

1.1.7

COMPANY
Means "ABU DHABI PETROLEUM PORTS OPERATING

COMPANY"
1.1.8

(IRSHAD)

COMPANY REPRESENTATIVE.

Tender No. CD/34/14


Enterprise Content Management Implementation
Draft Form of Contract

3 of 30

1=J I

IAIHAO

COMPANY shall appoint:


COMPANY (IRSHAD) CONTRACT Holder as overall authority
a.
of the CONTRACT.
b. COMPANY (IRSHAD) Representative the person appointed
by the Contract Holder to supervise the execution of this
-

CONTRACT.

(IRSHAD) SITE Representative(s) The person(s)


appointed by the Contract Holder to assist the Company
Representative in supervising the activities of this CONTRACT
at any given site or sites.
COMPANY

c.

The above nominated shall be authorized to act on behalf of COMPANY and with whom
CONTRACTOR may consult at any reasonable time and whose instructions, requests and
decisions will be binding upon COMPANY & CONTRACTOR as to all matters pertaining to
this AGREEMENT and the performance of the PARTIES hereunder.

1.1.9

COMPLETION DATE
The COMPLETION DATE shall be the date referred herein this

CONTRACT
1.1.10

CONTRACTOR REPRESENTATIVE

Upon coming into force of this AGREEMENT, CONTRACTOR shall designate a competent
authorized representative acceptable to COMPANY to represent and act for CONTRACTOR:
a.

Contract Manager: CONTRACTOR's overall

Incharge

of this

CONTRACT.
b. Contractor
c.

Representative: the person appointed by the


Contract Manager to supervise the execution of this CONTRACT.
Contractor Site Representative: the person(s} appointed by the
Contract Manager to assist the Contractor Representative in
supervising the activities of this CONTRACTOR at any given site
or

sites.

All notices, determinations, directions, instructions and other communications given to


CONTRACTOR Representative by COMPANY shall be deemed to be given to CONTRACTOR as
to all matters pertaining to this AGREEMENT and the performance of the PARTIES
hereunder. COMPANY reserves the right to accept such representatives or seek suitable &
approved replacements within 14 (fourteen} days. Emergency Leaves of appointed
representatives under this Contract shall be granted by the COMPANY on submission of
credible & verifiable evidence. Replacement of personnel who proceed on approved
Emergency Leave shall be accomplished by the CONTRACTOR within 14 (fourteen) days.

1.1.11

DAY

Means calendar day.


CD/34/14
Enterprise Content Management Implementation

Tender No.

Draft Form of Contract

40f30

itbh
IAIHAO

1.1.12

FORCE MAJEURE
Means strikes, excluding strikes occurring among the employees of
CONTRACTOR or his SUBCONTRACTORS, or other industrial

disturbances of a general nature, acts of a public enemy, wars,


blockades, insurrection, riots, epidemics, landslides, earthquakes,
lightning, civil disturbances, explosions, and any other occurrences
similar to the kind herein enumerated, not within control of either
PARTY and which
able to overcome.
1.1.13

by

exercise of due

diligence

neither PARTY is

PARTY/PARTIES
Shall

mean

COMPANY

or

CONTRACTOR

or

both

as

dictated

by the

text.

1.1.14

SITE

Means locations where SERVICES

CONTRACTOR.
1.1.15

are

to

be

performed by

STATEMENT OF FACT

significant event, recorded in the


the
COMPANY,
provided by
signed by CONTRACTOR and
countersigned by COMPANY REPRESENTATIVE as a time record of
Shall

mean

the record of any

form

events.

1.1.16

OPERATIONAL PERIOD
Shall be the period from COMMENCEMENT DATE to the
COMPLETION DATE measured through in calendar days.

1.1.17

WORK

Refer collectively to all services and all obligations to be fulfilled


by CONTRACTOR pursuant to the CONTRACT.
ARTICLE 2

HEADINGS AND NOTES

and Notes" in this CONTRACT are inserted and included solely for
convenience and shall not be considered of given any effect in connectjon with the
duties, obligations or liabilities of the respective PARTIES hereto, or in ascertaining
the intent of the PARTIES hereto, if any question of intent should arise, it being the
intention of the PARTIES that this CONTRACT shall be construed as a whole and

"Headings

terms

Tender No.

mutually explanatory.

CD/34/14

Enterprise Content Management


Draft Form of Contract

5 o f 30

Implementation

IAIHAO

ARTICLE 3

DEFINITION OF DATES

The OPERATIONAL PERIOD OF THE CONTRACT is XX

Days (XXXX

XXXXX XXXXX

Days).
ARTICLE 4

CONTRACT DURATION AND SCHEDULE

4.1 This AGREEMENT shall come into force on the EFFECTIVE DATE above written
and shall be valid from the EFFECTIVE DATE, subject to the provision for earlier
termination contained in Article 27 & 28.

the COMPANY & subject to acceptance of both the PARTIES, the


agreement may be renewed for subsequent periods on annual basis at the same
rate, terms & conditions.

4.2 If

required by

1. COMMENCEMENT DATE
2. COMPLETION DATE

Note:

XX of XXXX 2 0XX
XX of XXXX 2 0XX

Project Schedule attached (ref.: )

ARTICLE 5 DOCUMENTS MUTUALLY EXPLANATORY


5.1

conflict, discrepancy or inconsistency among any of the


documents comprising the CONTRACT, they shall rank in priority in
accordance with the following order:
In the event of any

/L
//L

This AGREEMENT & ARTICLES


ANNEXURES (with ExhibitsJ
All Pre Contract Correspondences

the AGREEMENT and APPENDICES forming this


CONTRACT are intended to be correlative and mutually explanatory, and any
WORK required in one document and not mentioned in another shall be
performed to the same extent and purpose as though required by all.

Subject

5.2

to the

foregoing,

misplacement, addition or omission of a word or character shall not


change the intent of any part of the CONTRACT from that set forth by the
CONTRACT as a whole. CONTRACTOR shall be solely responsible for
requesting any interpretation or clarification of the CONTRACT and shall bear
any costs and expenses arising from his failure to do so.
The

If CONTRACTOR discovers any conflicts, ambiguities, errors, omissions or


discrepancies between the documents forming the CONTRACT, the matter
shall be submitted immediately by CONTRACTOR in writing to COMPANY for
6 of 30
Tender No. CD/34/14
Content
Implementation
Enterprise
Management

5.3

Draft Form of Contract

L...j l

=
IASHAO

clarification.

Any work affected by such conflicts, ambiguities, errors,


discrepancies which is performed by CONTRACTOR subsequent
to discovery but prior to clarification by COMPANY shall be at CONTRACTOR's
omissions or

risk.

5.4

All determinations, instructions, clarifications from COMPANY related to the


CONTRACT shall be rendered in writing by letter or fax within fifteen (15)
days from the date of such submission and shall be final unless appealed by
CONTRACTOR in writing, within ten (10) days from the receipt of such
determination, instruction and/or clarification. Any dispute thereafter may
be settled pursuant to the provisions of ARTICLE 33 hereof.

5.5

At all time, CONTRACTOR shall proceed with related work in accordance with
such determination, instruction and/or clarification. Notwithstanding the
foregoing, if any of the questions concerning interpretation or clarification
relate to the need for a CHANGE ORDER, neither PARTY to the CONTRACT
shall be deemed to have waived its rights pursuant to ARTICLE 15.

5.6

All dates and time


calendar.

5.7

Words

implying

requires

and

periods

the

referred to in the CONTRACT relate to

singular

include also the

plural, where the

Gregorian
context so

vice versa.

ARTICLE 6 DOCUMENTS COMPRISING THE CONTRACT


6.1

The contractual documents binding COMPANY and CONTRACTOR and


constituting the CONTRACT are the AGREEMENT, its ARTICLES and the
various ANNEXURES and APPENDICES attached thereto as follows and the
referred documents therein & clearly defined as outlined in the Contract

Index.

6.1.1

The AGREEMENT and its ARTICLES describes the General, Special,


Commercial and Contractual terms and obligation between the PARTIES and
the execution of CONTRACT between the PARTIES.

ARTICLE 7 NOTICES AND STATEMENT OF FACT


7.1 Notices

Any notice

to

be given hereunder may be

sent

by registered letter

class postage pre-paid or hand delivered or sent by facsimile


addressed to the other PARTY in the following address:

with first

transmission,

To CONTRACTOR:

M/s. (Successful Bidder)


CD/34/14
Enterprse Content Management Implementation

Tender No.

7 of 30

Draft Form of Contract

<r
Lt, I
IRIHAO
O

P.0 Box XXX


Abu Dhabi, UAE

Attn: M r. XXXXXXXXXXXX
Fax No. 02 XXXXXXX

To COMPANY

Abu Dhabi Petroleum Ports


P. 0 Box 61
Abu Dhabi, UAE

Operating Co. (IRSHAD}

Attn.: XXXXXXXXXXXXX

Fax No : 02 XXXXXXXXXX

7.2

STATEMENT OF FACT

Any STATEMENT OF

FACT

as

CONTRACTOR and returned


instance of his agreement.

defined in ARTICLE 1 herein shall be

signed by

to the COMPANY REPRESENTATIVE in the

Copies

of all STATEMENTS OF FACT shall be maintained


CONTRACTOR at the SITE.

first

separately by

ARTICLE 8 SCOPE OF WORK

Subject to the terms and conditions of this AGREEMENT, CONTRACTOR undertakes to


provide COMPANY the following WORKS. The CONTRACTOR is deemed to have
taken fullest consideration ofthe Scope of WORKS and built up his offered prices
accordingly,
8.1 SCOPE OF WORK:

Scope of Work outlines the tasks required for the CONTRACTOR to provide
complete Enterprise Content Management System as per IRSHAD requirements in
order to avoid any data loss & enable process automation electronically and
minimize the operation time, including Post Implementation Support is required
for minimum of l(one) year, as detailed in the Annexure 1 (17 pages}.
The

8.2 HEALTH & SAFETY REGULATIONS:

8.2.1

Tender No.

The entire scope of Services under this Contract shall be performed in line
with all applicable UAE, Abu Dhabi Authorities, Land Lord and COMPANY
HSE Regulations.

CD/34/14

Enterprise Content Management Implementation


Draft Form of Contract

8 of 30

Ln,1

IAIHA

8.2.2

The CONTRACTOR shall


No. 24 of 1999. 13,

8.2.3

comply with

UAE

regulations such as Federal Law

All services shall be fully compliant to ADNOC Sheikh Khalifa


Complex and Company's Health, Safety, Security, Environment and

requirements.

8.2.4

Energy
Quality

CONTRACTOR shall be fully acquainted with ADNOC Sheikh Khalifa Energy


Complex and COMPANY's Health, Safety, Security and Environmental
regulations and requirements.

8.3 WARRANTIES:
CONTRACTOR shall obtain from his vendors and suppliers for the benefit of
COMPANY all possible warranties in respect to materials, spare parts, tools and
supplies delivered or installed by them, and such warranties shall be assigned to
COMPANY or to such entity as shall be designated by COMPANY.

ART[CLE 9 INDEPENDENCE AND RESPONSIBILITY OF CONTRACTOR


9.1

CONTRACTOR shall be an independent contractor and as such he shall


manage, control and direct his own resources in the provision of the
SERVICES and other facilities. However, COMPANY REPRESENTATIVES shall
be entitled to direct the execution of the WORK, without relieving the
CONTRACTOR in any manner from its obligations and responsibilities under
the CONTRACT.

9.2

employee, servant or agent of CONTRACTOR


employee, servant or agent of COMPANY.

9.3

Sub-Contractor: CONTRACTOR shall not sub-contract any major part of this


AGREEMENT or appoint any major SUPPLIERS without the written consent of
the COMPANY.

No

shall be deemed to be

an

ARTICLE 10 COMPANY's OBLIGATIONS


10.1

COMPANY REPRESENTATIVES
COMPANY shall appoint a representative, hereinafter called COMPANY
REPRESENTATIVE who shall have all rights and duties, to perform all
functions of COMPANY required under this CONTRACT.

COMPANY shall inform CONTRACTOR in writing of the name of COMPANY


REPRESENTATIVE and any change hereof. COMPANY REPRESENTATIVE shall
have the right to obtain any assistance that he considers advisable to perform
his function and may at any time and for any reason delegate in writing any or
Tender No. CD/34/14
Enterprise Content Management Implementation
Draft Form of Contract

9 of 30

1=J I

IRIHAO

all of his

rights, powers and duties and/or functions to any other person.


promptly inform CONTRACTOR in writing ofsuch delegation.

COMPANY shall

COMPANY REPRESENTATIVE shall direct and instruct CONTRACTOR with


regard to the requirements ofthe WORK to be executed.

COMPANY REPRESENTATIVE shall approve and

FACT, reports issued by CONTRACTOR.


CONTRACTOR may be either rejected
REPRESENTATIVE.

10.2

or

sign all

STATEMENTS OF
Incorrect submissions by
corrected by COMPANY

INTERIM PERFORMANCE ASSESMENT:

CONTRACTOR's

Performance shall be monitored by COMPANY


Representative by way of Weekly Meetings supported by Weeky Progress
Reports. However to secure the best interests of the COMPANY IRSHAD
reserves the fullest right to perform random/surprise audits etc.
10.3

PENALTIES:

10.3.1 PENALTY FOR DELAY

Penalty of 0.1% of the Contract Value per day of delay shall be applicable for
not achieving fullest project completion the stipulated Completion Period
however the penalty shall be limited to a maximum of 10% of the Contract

Value.

10.3.2

PENALTY FOR NON- DELIVERY & NON-COMPLIANT SERVICES:

The Services provided or intended to be provided by the CONTRACTOR vide


this Contract is categorized to be critical & of high importance to the
COMPANY. The CONTRACTOR is obliged to perform the Services most
diligently & without any interruption and compromise to the Quality & Safety
Standards as applicable. Should there be any shortfall in the Contractual
Deliverables in performance or standards, the COMPANY reserves the full
rights to initiate alternative actions and engage alternative resources, with or
without any notification to the CONTRACTOR, and debit the incurred cost to
the CONTRACTOR at'Cost +10%' basis.

10.4

Emergency Medical Evacuation


COMPANY may, to the extent available, assist CONTRACTOR, by providing
medical evacuation at the time of any medical emergency at Contractor's cost,

10.5

Facilities Provided by COMPANY


COMPANY shall

provide to the CONTRACTOR such facilities as letters to assist


CONTRACTOR in getting security passes for personnel, equipment to the SITE
n connection with this AGREEMENT.
Tender No. CD/34/14
10 of 30
Enterprise Content Management Implementation
Draft Form of Contract

OUJI
IRSHAO
ARTICLE 11 CONTRACTOR's OBLIGATIONS
11.1

CONTRACTOR warrants that it will perform the SERVICES in a professional


and highly skilled manner consistent with such good industry practices as are
customarily employed and are in accordance with estabished codes and
standards and meet the requirements stated herein.

11.2

CONTRACTOR and its personnel shall

strictly comply with COMPANY Health,


and Regulations. Any CONTRACTOR

Safety and Environmental Rules


personnel entering COMPANY premises or SITE shall be familiar with and
shall obey relevant safety rules and regulations at all times. Any person
required to drive a vehicle for the performance of the SERVICES shall be in
possession of a valid U.A.E driving license for the type ofvehicle to be driven.

11.3

In the event of misconduct, violation of safety regulations, persistent ill health


negligence of the personnel, CONTRACTOR shall, within two days of
COMPANY's written notice to do so, withdraw such person without any
objection and shall promptly provide suitable replacement at no extra cost to
the COMPANY.
or

11.4

CONTRACTOR shall make his own arrangement for medical services to its
personnel. However, if for any reason, COMPANY's medical facilities are
availed, the actual costs incurred shal be back-charged to the CONTRACTOR.

11.5

COMPANY shall allow CONTRACTOR personnel access to so much of the SITE


where the SERVICES are to be carried out as COMPANY may determine and
shall advise CONTRACTOR of COMPANY's rules and regulations regarding
security pass, safety, personnel and vehicle movements on its properties and
CONTRACTOR shall comply with such rules, regulations limitations.

11.6

COMPANY shall have the right at all reasonable times to supervise the
performance of the SERVICES by CONTRACTOR. The supervision of the
SERVICES by COMPANY shall not be deemed acceptance thereof by COMPANY,
and shall not re]eve CONTRACTOR of any of its obligations set forth in this

AGREEMENT.
11.7

Unless otherwise agreed between the PARTIES, CONTRACTOR, shall be solely


responsible for and where applicable, shall provide at its sole cost and
expense all passports, visas, no objection certificates, work permits, residence

visas, certificates of medical fitness, driver's licenses, security passes, and all
other permits and documentation as may be required for its employees to

perform the SERVICES.

11.8

CONTRACTOR shall have no claim for extra payment nor shall it be relieved or
excused from any obligation under this AGREEMENT as a result of any lack of
knowledge as to the nature of the SERVICES, means of access, local facilities,

Tender No. CD/34/14


Enterprise Content Management Implementation
Draft Form of Contract

11 of 30

<g-

L.-# '

=
J
IA?HAO

labor conditions and


SERVICES.

practices, or similar matters affecting performance of the

All cost of transportation, boarding and lodging of CONTRACTOR's personnel


at alllocations or SITE(s) and transportation of materials, equipment, tools for
the SERVICES shall be to CONTRACTOR's account and responsibility.

1
11.9

Permits and Visas

CONTRACTOR shall procure and maintain administrative authorization,


which must be procured in CONTRACTOR's name, including, without
limitation, entry visas, residence permits, work permits, access cards to Oil
Installations (Security Pass) for his employees, agents or servants, import
license required in order to comply with all applicable laws and regulations
relating to CONTRACTOR's right to operate in ABU DHABI. The cost of
procuring and maintaining such authorizations shall be borne by
CONTRACTOR and deemed included in the CONTRACT PRICE.
11.10 CONTRACTOR REPRESENTATIVE

11.10.1 CONTRACTOR shall

designate and maintain during the entire course of the


WORK,
English speaking representative whose appointment shall be
subject to the prior written approval of the COMPANY and who shall have
been supplied with copies of this CONTRACT and of all other information in
an

connection with the WORK.

11.10.2 CONTRACTOR shall inform COMPANY in writing of the name of the


representative, attaching his curriculum vitae for COMPANY approval. Any
subsequent replacement of the representative or changes in CONTRACTOR S
key personnel connected with the WORKS shall be subject to the prior
written approval of COMPANY, which approval shall not be unreasonably
withheld. The representative shall have full charges of all operation of
CONTRACTOR in respect of the WORK and shall have full authority to
represent CONTRACTOR in all matters concerning the performance of the
WORK under his supervision. This authority shall include the power to agree
on behalf of CONTRACTOR to any changes or modification to the WORK and

sign CHANGE ORDERS.

11.10.3

Any

communication or notice given to CONTRACTOR REPRESENTATIVE by


COMPANY or COMPANY REPRESENTATIVE or ENGINEER shall be
considered as given to CONTRACTOR.

11.10.4 CONTRACTOR shall also designate a deputy representative who shall be fully
authorized to act as CONTRACTOR REPRESENTATIVE, when the appointed
representative is absent.
11.11

Conformity of Equipment & Consumables

Tender No. CD/34/14

Enterprise Content Management Implementation


Dratt Form of Contract

12 of 30

Lt J'

O
IAIHAO

CONTRACTOR shall ensure, at its own cost that all its

equipment, tools,

consumables deployed for the WORK complies throughout the OPERATIONAL


PERIOD, with the specifications set out in this CONTRACT and with any
national or international laws and regulations, HSE Guidelines applicable to

such items.

11.12

Compliance with Instructions


CONTRACTOR

shall

comply with the instructions of COMPANY


REPRESENTATIVE concerning the Project, provided that such instructions do
not exceed their authority, scope and provisions of this CONTRACT.
CONTRACTOR REPRESENTATIVE shall be only entitled to reject instructions
which, in the performance thereof, would threaten the safety of
CONTRACTOR's or COMPANY's personnel. If such right is exercised,
CONTRACTOR REPRESENTATIVE shall inform COMPANY REPRESENTATIVE
in writing at the earliest opportunity.
11.13

Logs and Reports


CONTRACTOR shall prepare and submit to
operations in a form acceptable to COMPANY.

COMPANY, reports of the

11.14 Replacement ofpersonnel

Upon

the written request of COMPANY, CONTRACTOR shall replace within a


maximum of 7(seven) days at its cost, with another of similar qualifications,
any person who in the judgment of COMPANY is unable to perform his duties
due to sickness, absence, inefficiency, incompetence, negligence, indiscipline
or who harms the good relations between COMPANY and Government

Authorities.

11.15 Health, Safety and Environment

(HSE}

The HSE Directives are subject to revision & upgrades from time to time:
CONTRACTOR to take into account all such revisions that are in-force
from time to time & comply with them diligently, without any delay &
negligence, and not at any additional cost to COMPANY arising from

whatsoever reasons thereof.

COMPANY would conduct independent HSE audits and or inspections and


observations of the audit and or inspection team will be communicated to the
CONTRACTOR. The HSE audit and /or inspections observations and
comments shall be

satisfactorily closed out by the CONTRACTOR within the


time frame agreed with the COMPANY REPRESENTATIVE.

Tender No.

CD/34/14

Enterprise Content Management Implementation


Draft Form of Contract

13 of 30

IRIHADI

Audit/Inspection
CONTRACTOR shall cooperate and assist in all specialized technical audits and
or inspections of the services/work provided under this CONTRACT, when the
COMPANY chooses to arrange such an audit and/or inspection for the express
purpose for ensuring that the specified operating code and practices are being
complied by the CONTRACTOR. Any recommendations arising from the audit
shall be implemented by the CONTRACTOR at its own cost, within the time
table agreed by the COMPANY REPRESENTATIVE.

11.16 Compliance with Statutes and Regulations

In all respect, the provisions of any statute, ordinance, decree, proclamation


or any other order or any other enactment or any regulation or by law of any
local or other duly constituted authority having the force of law in the
OPERATIONAL AREA/SITE and the rules and regulations of all public bodies
and companies whose property or rights are affected or may be affected shall
apply to the CONTRACTOR. The CONTRACTOR shall keep COMPANY fully
indemnified against all penalties and iabilities of every kind thereunder for
which it, as a result of the CONTRACTOR not complying with such statutes,
rules and regulations may become liable.
11.17

Emergencies
CONTRACTOR shall exercise due care and attention at all times for the
prevention of fire, explosion and shall notify COMPANY in the quickest and
most effective way of any signs which may indicate a dangerous situation for
personnel and material and shall take all possible emergency measures
consistent with good practice and in accordance with all safety regulations.

11.18 Patent rights


CONTRACTOR hereby warrants that the use of any equipment, software,
material or process supplied or used by the CONTRACTOR for or in
connection with the WORKS envisaged under this CONTRACT does not
infringe upon the patent rights, copy rights or intellectual property rights of
any third party and CONTRACTOR shall hold COMPANY harmless and fully
indemnified from any claim or action based on such alleged infringement by

the CONTRACTOR.
11.19

Delivery of Documents
Upon completion

of the Project, on the COMPLETION DATE, CONTRACTOR


shall handover the full ownership and responsibility of the system to
COMPANY.

11.20 Disclosure and Confidentiality


CD/34/14
Enterprise Content Management Implementation

Tender ND.

Draft Form of Contract

14 of 30

e
LEJ '

n
IAIHAO

CONTRACTOR undertakes that neither it nor its personnel shall at any time,
except with the prior written consent of COMPANY, make any reference
publicly or disclose any information on the content of this CONTRACT or to
the operations or interest of COMPANY to any person who is not directly
concerned with the performance of the activity or operations envisaged under
this CONTRACT.
All information, data and documents generated under this CONTRACT or
provided by COMPANY shall be treated strictly confidential by the
CONTRACTOR, its subcontractors and agents.
11.21

Qualified Personnel
CONTRACTOR shall provide and deploy only qualified and skilled personnel
on the respective trade. All CONTRACTOR staffshall be holders of Abu Dhabi
Visas and minimum language ability for communicating in English.

11.22

ApprovaI of personnel
CONTRACTOR shall obtain prior approval of COMPANY, which shall not be
unreasonably withheld, for all CONTRACTOR personnel deployed for the
CONTRACT. CONTRACTOR shall make his best endeavors to permanently
assign the same personnel for the services.

11.23 Accident Reports


CONTRACTOR shall immediately report to COMPANY all accidents, near
misses and occurrences resulting in injury, death, property damage or loss
and shall furnish such reports as may be required by Police and other
Government authorities.
11.24

Discipline
CONTRACTOR shall maintain at all times strict
among CONTRACTOR personnel.

discipline

and

good

order

11.25 Additional Services


CONTRACTOR shall do its best endeavors to provide at COMPANY request
such additional services not included or otherwise covered in the CONTRACT
that may be required by COMPANY requested in writing shall be issued and
reimbursed by way of a Variation.
ARTICLE 12 COMPANY'S RIGHTS AND PRIVILEGES
12.1

Work Programme

Tender No. CD/34/14


Enterprise Content Management
Draft Form ofContract

15 of 30

[mplementation

L-ki '

IAIHAO

Outlined as
agreed Contract Duration.
12.2

be

to

within the

Replacement of Personnel
COMPANY shall be entitled to

CONTRACTOR's
12.3

unconditionally completed

personnel.

require

the

replacement

of any of the

Variation in Scope of WORK


COMPANY may require CONTRACTOR to effect a reduction or increase of
WORK to meet the unanticipated requirement not covered under the
CONTRACT. A VARIATION ORDER shall be mutually agreed between PARTIES
to effect such changes.

12.4

Technical Audit
CONTRACTOR shall cooperate and assist in all specialized technical audits of
the services/work provided under this CONTRACT, when the COMPANY
chooses to arrange such an audit for the express purpose for ensuring that the
specified operating code and practices are being complied by the
CONTRACTOR. Any recommendations arising from the audit shall be
implemented by the CONTRACTOR at its own cost, within the time table
agreed by the COMPANY REPRESENTATIVE.

12.5

Deficient Work
If during the course of the CONTRACT, any part of the WORK executed by
CONTRACTOR or his SUBCONTRACTOR is found defective or does not
conform to the CONTRACT in any way, including but not limited to

CONTRACTOR's failure to:

Prosecute the WORK with

diligence and dispatch, and/or

Correct

or cause to correct

any defect of the WORK,

Comply

with any other

provisions

and/or

of the CONTRACT

relating

to the

WORK,

require and direct the CONTRACTOR to remedy, or


be
such
deficient part of the WORK, at CONTRACTOR's
cause to
remedied,
own expense.
Then the COMPANY may

If the CONTRACTOR does not promptly undertake and proceed with due
diligence to remedy said deficiency, then COMPANY may give CONTRACTOR
notice of said deficiency and hire another contractor to remedy that
deficiency. In any case, CONTRACTOR shall not be remunerated for the
Tender No.

CD/34/14

Enterprise Content Management Implementation


Draft Form of Contract

16 of 30

4
Lk'I
IAIHAO

deficient WORK but shall be invoiced for any additional expenses that
COMPANY may incur as a result of the deficient WORK or deduct appropriate
COMPANY determined

rate/percentage

from CONTRACTOR's invoice for the

deficient work or services.


ARTICLE 13

CONTRACTOR's UNDERSTANDING OF THE NATURE AND DETAILS


OF WORK

CONTRACTOR

acknowledge and undertake that before signing the


he
has carefully read and understood the SCOPE OF WORK and
AGREEMENT,
the entire documents relating to the CONTRACT, and have obtained a full
understanding and knowledge of the nature and scope of the WORK and ofthe
prevailing SITE conditions and all those factors affecting the WORK directly
and

indirectly.

ARTICLE 14 TAXES AND DUTIES

14.1

CONTRACTOR shall be liable for all taxes, imposts, duties, withholding taxes,
charges or other assessment of whatsoever nature, whether levied by the
Government of Abu Dhabi or the U.A.E. or any other government elsewhere
pursuant to and as existing and payable on the coming into force of this
CONTRACT.

sponsorship which would enable CONTRACTOR to


as ali personal income tax or any corporate taxes or
registration charges levied by the Government of Abu Dhabi or U.A.E. at any

14.2 All payments relating to


work in the U.A.E. as well

future date, shall be

to

the sole account of CONTRACTOR.

ARTICLE 15 CHANGES AND MODIFICATION

COMPANY shall have the right at any time to require CONTRACTOR to make
any change or modification to the WORK incIuding any addition or deduction
to the amount of WORK or level of services to be provided by CONTRACTOR,
and such changes shall be dealt through a VARIATION ORDER issued n
writing provided it constitutes a change in the magnitude or quality of WORK
affecting the CONTRACT PRICE.
ARTICLE 16 REMUNERATION
16.1

COMPANY agrees to pay, and CONTRACTOR agrees to accept, as full


compensation released in accordance with the Payment Milestones laid out in
ARTICLE 18 for CONTRACTOR's entire and orderly performance of the WORK
the CONTRACT PRICE set forth in ANNEXURE II, subject to such additions or
deductions thereof, as may be made under the provisions herein contained.

16.2

In consideration of the payment to be made by COMPANY to CONTRACTOR as


hereinafter mentioned, CONTRACTOR hereby is committed to render all
17 of 30

Tender No. CD/34/14

Enterprise Content Management


Draft Form of Contract

Implementation

=LJI
IMHAD
COMPANY all service, manpower, equipment, softwares,
consumable, reports and materials necessary for the entire completion and
orderly prosecution of the WORK in full conformity in all respect with the
provisions ofthis CONTRACT.

WORK and

16.3

provide

COMPANY is

performance
and in the

hereby

of the WORK the remuneration

manner

consideration of due
herein mentioned at the time

covenant to pay CONTRACTOR in


as

prescribed herein,

ARTICLE 17 CONTRACT PRICE


The LUMPSUM CONTRACT PRICE for the provision of services and
performance of WORK as directed by COMPANY shall be as defined within
ANNEXURE II, and shall include without limitation, mobilization,
demobilization, tools & equipment, lodging & boarding, management, testing,
overhead, allowances, profit, insurance, premises, visa fees, air tickets,
transportation, taxes & duties, bank guarantees, consumable, corporate,
maintenance, personnel training (inside UAE & outside UAE region),
premiums, depreciation and other taxes and all other costs and expenses
directly or indirectly incurred by the CONTRACTOR in the provisions of
WORK to COMPANY.
CONTRACT PRICE shall be all inclusive & remain FIRM and FIXED for the
whole duration of the CONTRACT and any extensions thereof. No claim of the
CONTRACTOR on account of currency exchange rate fluctuation, inflation,
variation in the wage rate, additional manpower/ equipment/ facilities
required than estimated etc. shall be admissible.
ARTICLE 18 CONDITIONS OF PAYMENT
18.1

Invoicing Procedure

18.1.1 At the COMPLETION & ACCEPTANCE of SERVICES, the CONTRACTOR shall


submit to COMPANY an invoice and shall be fully inclusive of all direct &
indirect costs arising from fullest understanding of the Scope of Works and
respect of the SERVICES rendered, during the period.

"Original Invoice" [stamped "Original for payment"] plus three copies,


together with supporting documents, shall be addressed and submitted to:

18.1.2 The

Finance Division
IRSHAD
PO BOX 61
Abu Dhabi
18.1.3 Each invoice shall be presented as follows:
With reference number of the CONTRACT, serial number of invoice and
I)
date of invoice.
CD/34/14
Enterprise Content Management Implementation

Tender No.

Draft Form of Contract

18 of 30

Lt '

n
J
IASMAD

Stating clearly the work item for which payment is required, showing
the relevant line items in the PRICE SCHEDULE.
Supported by all necessary documentation to enable COMPANY to
review and approve, such as but not limited to, receipts, STATEMENT
OF FACT and other relevant documents signed by COMPANY
REPRESENTATIVE or his delegate.
Prepared in the currency of the CONTRACT.
Stating the CONTRACTOR's bank details where the payment is to be
made.
Final invoice shall be clearly marked as "FINAL INVOICE" and shall be
supported by the duly signed RELEASE LETTER & COMPLETION
CERTIFICATE.

11)
HI)

IV)
V)

VI)

18.2

Payment of Invoices

18.2.l Payment Procedure

COMPANY shall release the payment to CONTRACTOR

as

per the payment

terms listed below:

Payment
Percentage

ECM Milestone
Process Analysis, Meetings and Documentation,
Business Requirement Review/Signoff, Customization
Design Review/Signoff,Project Implementation Plan

A)

10

Review/Signoff
B) System Installation & Configuration
Forms & Workflow Completion
Reports & Customization Completion
System Integration Completion

20

User & Admin Training

15

User Acceptance Testing

15

Final Acceptance

20

10
10

Payment Terms for 1 (One) year Post implementation Support as below:


Post Implementation Support for

1(One)

year
1-3 Months

Payment
Percentage
20
20
25
35

(Payment end of the Quarter)


4-6 Months (Payment at end of the Quarter)
7-9 Months (Payment at end of the Quarter)
10-12 Months(Payment at end of the Quarter)
Tender No. CD/34/14

Enterprise Content Management Implementation


Draft Form of Contract

at

19 of 30

L=i l

=
IAIHAO

Upon receipt of invoice, COMPANY shall review it and should the payment
requirement be deemed in accordance with the CONTRACT, COMPANY shall
approve said invoice and subject to the provisions of sub-articles below
payment shall be made within forty five [45] days of receipt thereof, by bank
transfer to the bank account which shall be notified by CONTRACTOR to
COMPANY in writing.
The COMPANY shall deduct

applicable penalties for all delays, un-attended


defects & non-compliance notified in writing to the CONTRACTOR as specified
in Article 10.3.

18.2.2

Any payment made by COMPANY shall not be


COMPANY's right to object to any invoice so paid.

18.2.3 No claim for bank charges, interest


accepted for delayed payments.
18.3

charges

or

construed

loss of

use

as a

waiver of

of funds shall be

DISPUTED INVOICE

Should the invoice be

disputed wholly,

or

in

part, COMPANY shall

act as

follows:
18.3.1 When the disputed amount s more than ten percent [10%] of the invoice
value, the invoice shall be fully rejected and returned to CONTRACTOR and
considered as cancelled in COMPANY records. A new invoice shall then be
issued by CONTRACTOR in accordance with COMPANY s recommendation.
Payment o f the new invoice shall be done within forty five [45] days of receipt
of the new invoice by COMPANY.
,

18.3.2 When the disputed amount is less than 10% of the invoice value, COMPANY
will on its own, correct the invoice value and pay the amount less the disputed
amount. This payment is regarded as final payment ofthe said invoice.

18.3.4 In the event of deductions from "Original Invoice" as provided for above,
COMPANY's liability to CONTRACTOR shall be limited only to the prompt
payment of such amounts as are subsequently proved payable. No claim for
bank charges, interest charges or loss of use of funds shall be accepted.
18.4

due to CONTRACTOR under the CONTRACT, COMPANY shall be


entitled to deduct any and all amounts due by CONTRACTOR to COMPANY by
way of"Set Off'
From any

ARTICLE 19
19.1

Tender No.

sum

SUSPSENSION OF PAYMENTS

Thirty [30] days from the signing of the CONTRACT and before any
payment is made by COMPANY, CONTRACTOR shall submit to COMPANY a
copy of all the Insurance Policies required under Article 30.

Within

20 of 30

CD/34/14

Enterprise Content Management


Draft Form of Contract

[mplementation

L.?J 1

IAIHAO

19.2

Should the CONTRACTOR fail to effect or keep in force the insurances


required under the CONTRACT or any other insurance which may be required
under the terms of the CONTRACT, COMPANY shall have the right to withhold
payment of all moneys due to CONTRACTOR under this CONTRACT. Amount
so withheld shall only be paid after the submission by CONTRACTOR of the
insurance policy certificates required under the CONTRACT.

ART[CLE 20 CURRENCY

The currency of the CONTRACT shall be United Arab Emirates Dirhams

{AED)

and all compensation and invoices shall be expressed and all payments to the
CONTRACTOR shall be made in that currency.

ARTICLE 21 PERFORMANCE BANK GUARANTEE


CONTRACTOR to submit a Irrevocable & Unconditional PERFORMANCE BANK
GUARANTEE as in amounting to 10% of the CONTRACT PRICE within 15
(Fifteen] Days of signing of the Contract, as detailed in the EXHIB[T 2 valid
till 90 days beyond the completion date of the Contract.

ARTICLE 22 FINAL PAYMENT


22.1

recording the COMPLETION DATE has been


CONTRACTOR shall submit a final summation

When the STATEMENT OF FACT

countersigned by COMPANY,
for the COMPANY's approval of the amount and value [in terms of the
CONTRACT PRICE] of all WORK. Upon approval by COMPANY of any such

summation CONTRACTOR shall prepare and submit his final invoice in


accordance with such summation. Within forty five [45] days following
receipt of such invoice COMPANY shall pay to CONTRACTOR all amounts
remaining due after deducting amount due from CONTRACTOR.

22.2

COMPANY shall not be obliged to make final payment unless and until
CONTRACTOR has furnished COMPANY the RELEASE LETTER as in EXHIBIT
3.

ARTICLE 23 DEDUCTION FROM PAYMENTS

23.1

From any sum due to the CONTRACTOR under the CONTRACT, COMPANY,
without waiver or limitation of any of its rights under the CONTRACT or at
law, shall be entitled to deduct any and all amount due from the
CONTRACTOR to COMPANY.

23.2

Charges including, but not limited to, COMPANY provided services shall be the
subject of a Monthly Debit Note raised by COMPANY which sum shall be paid
by CONTRACTOR within thirty [30] days of issue of said debit note.

CD/34/14
Enterprise Content Management [mplementation

Tender No

Draft Form of Contract

21 of 30

L---JI

=
IAIHAO

23.3

not paid by the CONTRACTOR shall be recovered by COMPANY


deduction from payments due to CONTRACTOR, in accordance with
sub-article 23.1 above, immediately following the time that such payments
become due.

Charges
through

ARTICLE 24 SUSPENSION CAUSED BY FORCE

MAIEURE

24.1

If the WORK is suspended on account of FORCE MAIEURE, no payment shall


be made by COMPANY for the period of FORCE MAJEURE. However, this
CONTRACT may be terminated under the ARTICLE 26 herein.

24.2

temporarily rendered unable wholly or in part by FORCE


MAIEURE to comply with its obligations under this CONTRACT and i f notice of
such FORCE MAJEURE is given to the other PARTY in writing within five (5)
days after the occurrence of the cause relied on, then such obligations of the
PARTY affected shall, without prejudice to the provisions of ARTICLE 26
hereinafter and to any right of the other PARTY under this CONTRACT, be
suspended so long as this inability continue by reason of such FORCE
MAJEURE. The PARTY claiming FORCE MAJEURE shall also give written well
founded notice to the other PARTY within five (5) days of occurrence and end
1f either PARTY is

of the FORCE
24.3

The PARTY

MA]EURE.

claiming to

of proving that it is

so

be affected

affected.

by FORCE MAJEURE shall

bear the burden

ARTICLE 25 SUSPENSION FOR FAULT OF CONTRACTOR

25.1

COMPANY shall decide what remuneration is due to CONTRACTOR in the


event that any part of the WORK remains unavailable to COMPANY, generally

applying following principles:


25.1.1 If the CONTRACTOR is unable to provide the WORK/services due to
CONTRACTOR's failure to provide within the time periods specified, then the
COMPANY may hire equivalent services from others and counter charge the
CONTRACTOR with any additional cost over the CONTRACT PRICE.
25.1.2 If part of the WORK is unavailable but does not prevent COMPANY
proceeding with its work program, then the remuneration, calculated or
prorated based on rates and/or prices included in ANNEXURE 11 concerning
the part of WORK unavailable shall not be due.

WORK/services is unavailable and COMPANY are prevented


from proceeding with its work program, the total remuneration concerning all

25.1.3 If part of the

WORK shall not be due, until the services

are

resumed.

25.1.4 If all WORKS are unavailable, then the total remuneration will not be due,
until the WORK is resumed.
Tender No.

CD/34/14

Enterprise Content Management Implementation


Draft Form of Contract

22 of 30

e
<rr..
n

Lk, I

IRSHAO

25.1.5 Should the WORK, services or part thereof be unavailable from any cause
including normal repair and maintenance for over forty eight [48] hours in
succession, CONTRACTOR shall provide COMPANY substitute WORK of

equivalent specifications.

25.2

COMPANY may at

anytime after serving a ten days notice to the


CONTRACTOR, suspend the WORK in whole or part, if the CONTRACTOR is
not prosecuting the WORK as per CONTRACT, is in substantial breach of

CONTRACT

is willfully neglecting the COMPANY's notice thereof. The


suspension shall continue until the CONTRACTOR has fully remedied the fault
to the satisfaction of the COMPANY or termination of the CONTRACT. No
compensation shall be payable by COMPANY on account of any such
suspension, provided however, that the works completed and accepted as per
the CONTRACT is paid after deducting all additional expenses incurred by the
COMPANY on account of such suspension.
or

ARTICLE 26 TERMINATION ON ACCOUNT OF FORCE MAJEURE

Either PARTY may terminate the CONTRACT before the WORK is completed if
the provision of the WORK or services is made impossible on account of
FORCE MAJEURE or ifa situation of FORCE MAjEURE has lasted formore than
sixty {601 consecutive days. If the CONTRACT is so terminated, CONTRACTOR
shall be paid for that part of the WORK satisfactorily completed at the
commencement of FORCE MAJEURE. Upon such payment by the COMPANY,
full ownership of the WORK shall vest with COMPANY.
ARTICLE 27 TERM[NAT10N FOR FAULT OF CONTRACTOR
27.1

COMPANY may terminate this CONTRACT by giving a 30 ( Thirty ) days


written notice to CONTRACTOR i f CONTRACTOR persists in failing to comply
with any of his obligations under the CONTRACT after receipt of COMPANY's
written notice drawing CONTRACTOR's attention to the faults and failures
including but not limited to the following:

27.1.1 If CONTRACTOR fails to provide the WORK within the time schedule
stipulated in the CONTRACT or CONTRACTOR suspends or abandons the
WORK in whole or part, and /or
27.1.2 If CONTRACTOR fails to carry out the WORK or any part thereof in
efficient, workmanlike, skillful and careful manner, and/or

27.1.3 Failure

by the CONTRACTOR
stipulated herein, and/or

to

provide and

maintain the insurances

27.1.4 If CONTRACTOR becomes bankrupt or goes into receivership or liquidation


make an arrangement with or assignment in favor of his creditors.
Tender No. CD/34/14

Enterprise Content Management Implementation


Draft Form of Contract

an

23 of 30

or

LS '

n
J
IAIHAO

If no action has been taken by CONTRACTOR within (10} days of receipt of


written notice of default from COMPANY or if CONTRACTOR fails to provide
satisfactory evidence that such default will be corrected, in such event,
COMPANY shall have the option either to take over itself, completely or in
part, the obligation of CONTRACTOR and deduct the cost of so doing from any
money due or become due to CONTRACTOR, or to terminate the CONTRACT
without prejudice to any claim that COMPANY may have hereunder.

27.1.5 In the event of such termination, CONTRACTOR shall not be entitled to receive
any payment excepting the value of work or services provided until the
effective date of termination calculated in accordance with Attachment II,
after applying such deductions of rectification cost of deficient work and the
additional cost incurred by the COMPANY in completing the WORK or
continuing the services as envisioned under the CONTRACT. Should the
deduction amount exceed the amount due to CONTRACTOR, then the excess
amount shall be paid to COMPANY upon demand by the CONTRACTOR.
ARTICLE 28 TERMINATION AT CONVENIENCE OF COMPANY

28.1

Without prejudice to the provisions of the preceding ARTICLE 27, COMPANY


reserves the right to terminate the CONTRACT for its own convenience, but
COMPANY shall in such case pay CONTRACTOR the value of work or services
provided by CONTRACTOR prior to the date of termination. Should
COMPANY exercise its right under this ARTICLE, it shall do so by giving
CONTRACTOR 30 (Thirty} day notice of termination. COMPANY's sole liability
for reimbursement of CONTRACTOR shall be limited to that for the work
satisfactorily performed at the date of termination or such later date as may
be stated in the notification.

28.2

AH materials, equipment, supplies and rights so paid for by COMPANY shall be


delivered to COMPANY and the ownership right thereof shall be fully vested in
COMPANY.

ARTICLE 29 LIABILITIES, INDEMNITIES & WARRANT1ES


29.1

CONTRACTOR shall exercise all reasonable skill, care and diligence in the
performance of its obligations under this AGREEMENT. But in respect of any
loss or damage which in any way arises out of or is connected with the
performance or non-performance by CONTRACTOR of such obligations the
liability of CONTRACTOR shall be limited to any case of negligence or default
on his part and shall consist solely in satisfactory performance or nonperformance, as the case may be, by CONTRACTOR and at no cost to ADNOC of

the obligation in
29.2

question, to the exclusion ofall other liability.

Neither COMPANY

indirect

or

CONSULTANT shall be liable to the other for any


consequential loss or damage, including without limitation loss of
nor

CD/34/14
Enterprise Content Management Implementation

Tender No.

Draft Form of Contract

24 of 30

1= J I

IASHAO

product or equipment or facility down-time or loss of profit or loss of


opportunity, or revenue or increased costs of finance or like items of damage.
29.3

INDEMNITY

keep COMPANY, its servants or agents


indemnified against any claims, actions or proceedings brought or
instituted against COMPANY, its servants or agents by any CONTRACTOR's
employees, servants or agents or any other third party in connection with,
relation to or arising out of the performance of the SERVICES under this

29.3.1CONTRACTOR

shall

AGREEMENT.

29.3.2 CONTRACTOR shall indemnify COMPANY against any liability for any
accident, death or injury to COMPANY' s servants or agents and against and
loss of or damage to any property belonging to COMPANY, its servants or
agents which may arise out of the performance of the SERVICES under this
AGREEMENT and against all costs, claims, demands and damages involved
therewith.

29.3.3 CONTRACTOR agrees to hold harmless and indemnify COMPANY, its


respective agents and the employees of each and every of the forgoing,
form and against any and ali claims, suits, costs, liabilities, judgments, fines,
penalties or demands in respect of damage to or loss of third party
property and injury to or death of any person, caused by any of
CONTRACTOR or any of his respective agents or employees and arising out
of or in relation to the performance of SERVICES under this AGREEMENT.

29.4

Warranty
Defects Liability period: 12 months defects liability period against failure of
the work due to technical reasons or software supplied by the Contractor.

ARTICLE 30 INSURANCE

obligations and responsibilities under this


Agreement, CONTRACT during the whole period of the Agreement from
commencement until the issue of the Final Acceptance Certificate for the
works/services shall at his own expense insure or cause to be insured.
Without limitation to his

30.1

Workmen s Compensation

(Employer s Liability}

Workmen's compensation and Employer's Liability Insurance covering the


agents, servants and employees of CONTRACTOR for all compensation and
other benefits required of CONTRACTOR by the Workmen's Compensation or
similar statutory insurance laws of any nation or political subdivision thereo f
to which CONTRACTOR operations under this Agreement are subject in
respect of liability for bodily injury by accident or disease including death
Tender No. CD/34/14
Enterprise Content Management Implementation
Draft Form of Contract

25 of 30

<41--JJ '
IAIHAO
employee of
W

resulting

there from sustained by any agent servant or


CONTRACTOR or SUB-CONTRACTORS arising out of and in the course of his
employment. The limit of liability under the Employers Liability Section shall
not be less than US $1 Million per occurrence.

30.2

Motor Vehicle Third

Party and Passenger Liability

Motor Vehicle Third Party and Passenger Liability Insurance in respect of


or injury to persons and/or loss or damage to property in respect of
motor vehicles used by CONTRACTOR in connection with the execution of the
works/services under this agreement and shall ensure that SUBCONTRACTORS maintain such insurance in respect of motor vehicles used by
them.
death

Such insurance shall provide an unlimited indemnity for death of or injury to


persons and the equivalent of not less than USD One Million

(US$: 1,000,000)

for loss of or

damage to property which shalI be extended as


required by statutory

may be necessary to cover any additional cover


requirements in the country or location of Works.
30.3

Professional

Indemnity:

CONTRACTOR shall procure and maintain Professional Indemnity Insurance


for protection from claims arising out of performance of professional services
cause by negligent error, omission and/or act for which the insured is liable;
such ProfessionaI [ndemnity Insurance shall provide for coverage in the
amount of USD 1,000,000/- and for such period oftime as set forth below, and
certificates indicating that such Insurance is in effect shall be delivered to the
COMPANY. Such policy shall also contain a provision to the effect that in case
of cancellation, a notice shall be sent to the COMPANY of the impeding
cancellation and that such cancellation shall not be effective for a period of 30
days after receipt of such notice. In the event of such cancellation, the
CONTRACTOR shall immediately replace said policy with another acceptable
to the COMPANY.

This insurance shall be maintained in force during the period of AGREEMENT


and after the completion of professional services under this AGREEMENT
until the expiration of any applicable statutes of limitation. In the event there
is no such statute especially applicable to design and construction or
improvements to real property, this insurance shall be maintained by
CONTRACTOR for a period of three (3) years after the date of FINAL
ACCEPTANCE CERTIFICATE.
30.4 Waiver of Subrogation:

All the insurance policies should have IRSHAD


waiver of subrogation.
Tender No. CD/34/14
Enterprise Content Management
Draft Form of Contract

as

additionally assured with a


26 of 30

Implementation

Ll jl

IAIHAO

30.5

Supply of Policies:
of policies in respect of CONTRACTOR's and/or SUBCONTRACTORS'
insurance shall be supplied to COMPANY by CONTRACTOR within 30 days of
the effective date of AGREEMENT or prior to commencement of any activity
at SITE whichever is earlier.

Copies

ARTICLE 31 CONFLICT OF INTEREST


31.1

CONTRACTOR shall conduct the WORK in a lawful manner which is consistent


with professional business practices and ethical standards.

31.2

Neither CONTRACTOR nor any of his affiliates shall in connection with the
WORK enter into any contract and/or give any undertaking, pay any
commission, and/or bid, and/or enter into any joint venture partnership,
and/or have any relation with a third party or any other arrangements to
perform any services, to supply goods or equipment which COMPANY feels
may be to the COMPANY's detriment.

ARTICLE 32
32.1

CONFIDENTIALITY

CONTRACTOR shall not, without the prior written approval of the COMPANY,
disclose or make available to any person other than for COMPANY use,
directly or indirectly, except for the performance and implementation of the
CONTRACT, any information acquired from COMPANY in connection with the
performance of the CONTRACT unless:

32.1.1 Such information is known to CONTRACTOR

(as evidenced by

his written

records) prior to obtaining the same from COMPANY, or


32.1.2 Such information s in the

CONTRACTOR,

public domain prior

to the

time of disclosure to

or

32.1.3 Such information is disclosed to CONTRACTOR by a third party who did not
receive the same, directly or indirectly, from COMPANY and who has, in the
best of CONTRACTOR's knowledge, no obligation of secrecy with respect
thereto.
32.2

CONTRACTOR shall not without prior written consent of COMPANY disclose


to any third party any information obtained or generated by the
CONTRACTOR in the performance of the CONTRACT except to the extent that
such information falls within one of the categories of non-confidential
information described in sub-article 32,1 above.

CONTRACTOR shall take steps which may be necessary or appropriate in


order that their employee and/or agents and/or representatives adhere to the
confidentiality provisions herein. Appropriate clauses to carry out the
27 ot 30
Tender No. CD/34/14
Content
Management Implementation
Enterprise
32.3

Draft Form of Contract

1= 1

W
J
IRSHAO

purpose and intent hereof shall be included into all subcontracts entered into
by CONTRACTOR in relation to the WORK.
ARTICLE 33 APPL[CABLE LAW AND ARBITRATION

33.1

The construction validity and performance of this AGREEMENT and legal


relations of the PARTIES hereto shall be governed by the laws of Abu Dhabi
and the UAE. Such laws include without limitation any ordinance, rule, decree,
regulation or order of any governmental authority or agency of Abu Dhabi or
the UAE (state, national municipal, local or other).

33.2

ARBITRATION

Any dispute, claim or difference arising out of or related to this CONTRACT, or


any breach thereof, shall be first referred to the PARTIES for an amicable
settlement and in the event such referral fails, shall be finally settled by
arbitration in Abu Dhabi under Abu Dhabi Law and the laws of the UAE,
applying the Rules of Conciliation and Arbitration of Abu Dhabi Chamber of
Commerce and Industry. The proceedings and all papers sent or presented in
connection therewith shall be in the English language. The arbitrator's
decision shall be final and binding on the both PARTIES. Judgment upon the
award may be entered and executed in any court having jurisdiction. All costs,
legal or professional fees, incurred in the arbitration shall be paid by the
PARTY against whom the verdict is obtained.
ARTICLE 34 HEALTH, SAFETY AND SECURITY
34.1

CONTRACTOR shall at all times conduct and execute the WORK in such a
to avoid any risk of bodily harm to person or damage to WORK and

manner as

property. CONTRACTOR shall promptly take all precautions which are


reasonable or necessary to safeguard against such risks and shall make daily

inspection of the equipment and tools. CONTRACTOR shall be solely


responsible for the discovery, determination and correction of any unsafe
conditions prevailing or arising in connection with the performance of the

WORK.

addition,

34.2

CONTRACTOR shall comply with all applicable safety rules, codes


and standards including any safety program established by COMPANY.
CONTRACTOR shall co-operate and co-ordinate with other contractors on
safety matters and shall promptly comply with any specific instructions or
directions given to the CONTRACTOR.

34.3

CONTRACTOR shall maintain accurate HSE records, accident and injury


reports and shall inform his personnel of safety practices and the requirements
of any safety program. CONTRACTOR shall furnish suitable safety gear or
equipment and enforce the use of such equipment by his personnel including
any special regulation detailed in COMPANY procedures or safety regulations.

In

Tender No. CD/34/14


Enterprise Content Management
Draft Form of Contract

28 of 30

Implementation

ieh
<4=s
n UJ I
IPIIHAO
34.4

Upon the failure of CONTRACTOR to comply with any of the requirements set
forth herein, COMPANY shall have the authority to stop any operations and
work of CONTRACTOR affected by such failure until the condition is remedied.
No part of the time lost due to any such stop order shall be made the
a claim for increased costs or damages by CONTRACTOR.

34.5

subject of

CONTRACTOR shall be responsible for the provision of adequate first aid


facilities, including personnel trained in first aid and firefighting at SITE
,

during the entire

period ofthe CONTRACT.

ARTICLE 35 ASSIGNMENT
35.1

CONTRACTOR shall not assign the CONTRACT


prior written consent of the COMPANY.

35.2

assign the CONTRACT (to any ADNOC Group Companies/ SPCPPA} including all rights and obligations hereunder at any time and shall
inform the CONTRACTOR by serving 60 (sixty} days written notice. ln such
case, COMPANY shall remain responsible to CONTRACTOR for the performance
by the assignee of all obligations of COMPANY.
All such assignments shall not infringe & change, wholly or partially, any rates,

or

any part thereof without

COMPANY may

terms & conditions of this Contract.

35.3

SUB CONTRACTOR: The Contractor shall not assign but may sub contract a
part of its special requirements to a specialized Sub Contractor with prior
approval of the Company; However, this shall not relieve the Contractor of its
responsibility towards the delivery of the Contractual deliverables.

ARTICLE 36 WAIVER OF DEFAULT


36.1

Any failure by COMPANY or COMPANY REPRESENTATIVE at any time, or from


time to time, to enforce or require the strict performance of any of the terms

and conditions of the CONTRACT shall not constitute a waiver of COMPANY's


right to enforce or require strict observance of such terms or conditions and
shall not affect or impair such terms or conditions in any way or the rights of
COMPANY at any time to avail itself of such remedies as it may have for any
breach or breaches of any such terms and conditions including, without
limitation, the right to require additional work or services.

36.2

None of the provisions of this CONTRACT shall be considered waived by either


PARTY unless such waiver is given in writing and signed by COMPANY or
CONTRACTOR as the case may be. No such waiver shall be construed as a
modification of any of the provisions of this CONTRACT or as a waiver of any
past or future default, breach, right or entitlement hereof, except as expressly
stated in such waiver.

Tender No.

CD/34/14
Enterprise Content Management Implementation

Draft Form of Contract

29 of 30

LJJ I

IAIHAO

ARTICLE 37

LANGUAGE

The text of this CONTRACT is in the English language and all other documents
relating to this CONTRACT shall also be written, and communications
conducted, in the English language.

ARTICLE 38 ENTIRE AGREEMENT


1

38.1

This CONTRACT embodies the entire agreement between the PARTIES relating
to the WORK, and the PARTIES shall not be bound by or be liable for any
statement, representations, promise, inducement or understanding of any kind
or nature relating to the WORK, which is not set forth or provided for herein.

38.2

No changes, amendments or modifications to any of the terms


this CONTRACT shall be valid unless given in writing and
PARTIES.

38.3

All Pre Contract


meeting form an

or

conditions of

signed by both

Correspondence & meetings recorded in minutes of


integral part & binding upon both parties under the

provisions of this agreement.

In WITNESS whereof, the PARTIES, in fullest understanding & compliance to the provisions
set forth in this document hereto, have entered into this AGREEMENT effective from the XX
day o f XXXX XXXX.

For: Abu Dhabi Petroleum Ports

Operating Company (IRSHAD}

Signature

For:

[successful Bidder)

Signature :

Name

Name

Position

Position

Witnessed by:

Witnessed by:

Signature

Signature :

Name

Position
Tender No.

CD/34/14

Name

Position

30 of 30

Enterprise Content Management Implementation


Draft Form of Contract

9
3

L= j 1

IA-HAR

Annexure

Tender No.

CD/34/14

Enterprise Content Management


Implementation

Scope of Work

Tender No. CD/34/14


Enterprise Content Management
Annexure I Scope of Work
-

Implemetation

9
nL-ki 1

Scope of Work for ECM Implementation

'..HA.

1...
IRSHAO

Scope of Work

Prepared by
Abu Dhabi Petroleum Ports Operating Company (IRSHAD)

Page 1 of 17

9
nL-kJ '
ImIHAI

Scope of Work for ECM Implementation

Project

Enterprise Content Management (ECM)


Implementation

Page 2 of 17

9
3

Scope of Work for ECM Implementation

LL.J I

-.HA.

1.o

Executive Summary

1.i Introduction

1
1.2

2.o

Project Overview

Requirementc

2.1

Scope of Work

2.1.i

Functional Requirements

2.I.l.1

..............

Capture'

..5

2.1.1.2 Document
2.1.1.3

Management Requirements......................................................................................6
Workflow and Electronic Forms Requirements

2. I.1.4 Store

Requirementv

..8

2.1.1.5 Deliver Requirements


2.1.1.6 User Interfhcp

.9

2. l.1.7 Data Migration

l0

2.1.1.8

10

Integratinn
2.1.1.9 Training Requirement
2.1.1. IO System & Security Requirements
2.1.2

Technical

Requirements

10
10
.ll

-....

2.1.2.1 ECM
2.1.2.2

System Requirements.........................................................................................-.-.--.ll
ECM User Interface Requirements..........................................................................................11

2.1.3 Formsto be enabled:

...

...........

...................................

.12

Project Deliverables
2.3 Support& Service

.15

2.4 Timeline

.16

2.2

2.5 Bill of Ouantities

15

.16

Page 3 of 17

Scope of Work for ECM Implementation

:,L-jl
IWSHAD

1.0 EXECUTIVE SUMMARY


1.1 INTRODUCTION
Abu Dhabi Petroleum Ports Operating Co.- IRSHAD was established in 1979 as a joint
venture between Abu Dhabi National Oil Company (ADNOC) 60% and Land and Marine
National Contracting Company (LAMNALCO) 40%. The company was formed to operate the
petroleum ports of Jebel
AI Dhanna and AI Ruwais and any other petroleum port in the emirate of Abu Dhabi. The
Company acronym was changed to IRSHAD in 2002 to highlight its key function in the field of
maritime

piloting.

IRSHAD commenced handling the port of Jebel AI Dhanna in 1979 and succeeded within the
first decade of its establishment to become the exclusive operator of all the petroleum ports
in Abu Dhabi. The company now provides its services to the port5 of AI Ruwais, Jebel AI
Dhanna, Das Island, Zirku Island and Mubarraz Island.
The prime activities of the company are:
.
Berthing/Unberthing of oil and gas tankers & ships.
I
Supervising & Coordinating the Loading /Unloading of oil products on SPMs.
o
Providing dive and maintenance support to our customers.
.
Overseeing navigational aids in the channels of the Abu Dhabi Emirate which concerns
our
.
.

For

customers

Provide offshore fire fighting


Provide offshore oil pollution

more

combating

information, please visit our website: htto://wvm. irshad.ae

1.2 PROJECT OVERVIEW


uses Zylab system for Document management System, for all the Company
related electronic documents. Currently it's used for few departments for limited users. Now
we are planning to bring full Enterprise Content Management system in order to avoid any
data loss & enable process automation thought electronically, minimize the operation time.

Currently IRSHAD

Proiect Obiectives
Increased efficiency and productivity through a well-managed records environment
2. Optimize business processes, decreasing number of steps, saving time
3. Lowering the cost, more effective Electronic Records Administration Management
4. Business process improvements are achievable through implementing document
scanning, electronic document management and electronic records management.
5. Provide records management for long-term archiving and the automation of retention
and compliance policies, and to ensure legal or regulator, record compliance
1.

Page 4 of 17

Scope of Work for ECM Implementation

nL-J '

'..HA.

System will provide document management for check-in/check-out, version control,


security and library services for business documents
7. Develop a document repository
8, Required Documents will be Integrated with existing ERP system
9. Existing Zylab document5 will be transferred to the current ECM System
6.

2.0 REQUIREMENTS
2.1 SCOPE OF WORK
The project must include the following key deliverables

2.1.1 Functional Requirements:


2.1.1.1 Capture:
1. Image processing features include rotation, straightening, color adjustment,
transposition, zoom, aligning, page separation, annotations and despeckling
2. System should show the scanned Image as Preview in the System
3. Error coding system is required on Capturing in order to understand level of error for
the

users.

System should capture the multiple forms and complex unstructured documents & map
them with the defined forms, fields automatically, should the workflow if required.
5. System should have option to import e-mails and attachments to be automatically and
fully indexed into the system
6, Ability to import content into your repository from direclly within an application such as

4.

Microsoft Word
7.

or

Excel.

Abilityto capture and index documents from

remote users

through eithera web-based

connection or disconnected method (offline)


8. Ability to view both the image and OCR results 5imultaneously.
9. Admin User should able to create \ customize Forms, configure & map the capture
Fields, create indexing for the same.
10. System should support local scanners & MFP Scanners. Local drive documents should be
able to import to the System.
11. Arabic and English OCR, ICR, OMR,signature detection, bar code5, spell check, document
orientation options are required in Capturing & Processing
12. User should be able to Drag\Drop files to the system
13. Windows Folders can be synced with ECM System, when a file is placed, it will be
uploaded to ECM System.

Page 5 of 17

9
1

Scope of Work for ECM Implementation

:3L.i,jl
IPHMAO

2.1.1.2 Document Management Requirements


1. Users have the ability to check documents out of the system for access via a
localized copy that can be worked on, checked back n, and processed automatically.
2. Ability to perform redaction without altering source document
3. Indices can have primary subject categories, sub-categories, and so on, in a
4.

5.
6.
7.

hierarchical relational structure.


Ability to save electronic file formats in system like PDF, Word, Excel, PowerPoint,
Text, Images, Media files (Audio, Video), Engineering Drawing
Ability to hide a part of the document or image based on access level.
Retention period should be handled based on different type of document attributes
System indexing should be easily configurable based on our Requirement.
Ability to identify and search for documents based upon document type
Automatic Barcode/Zone recognition to index scanned documents

8.
9.
10. Features

11.

Required in Document
a) Separating by them Pages
b) Merging document
c) Export the documents
d) Print document
e) Edit & enhancements
f) Hide a portion of the document
g) Annotations
h) Notes & Mark5

i) Linking Documents
Ability to grant/deny document viewing, editing and deletion based upon group
user accounts from Active Directory

12. Support for concurrent system usage


13. Support direct scan integration from multi-function devices

or

(MFP Printer, Local

Scanners)
14. Ability to index and search for document5 based upon text, date, numeric,
formatted or list fields.
15. Ability to view document access and modification audit trail
16. Ability to export single or multiple documents
17. Ability to report on stored documents (analyze data)
18. Ability to control and track the modification of documentsthrough multiple
revisions, allowing users to view prior revisions and track document history.
19. The solution should clearly display the number of revisions associated with a specific
document. The solution should allow for the addition of comments per revision.
20. Scan paper documents at 100 to 600 dpi on desktop scanners
21. Ability to automatically track and dispose of documents based upon type and age
22. Ability to stamp a specific revision of a document as a version, limiting which
revisions of a document a certain usercan 5ee.

Page 6 of 17

Scope of Work for ECM Implementation

L.,J '

j
ISHAO

2.1.1.3 Workflow and Electronic Forms Requirements

1,
2.
3.

Workflow uses Rules-based document automation


Workflow should able to create an audit trail, reports required on the same.
Ability to retrieve or perform activity on related documents that may exist in the
solution's ECM repository (file server), outside of the documents that currently exist
within various stages of the workflow process.

4.

Electronic forms features

5.
6.

a) Document import capture


b) Web (online form submission)
c) Web portal or SharePoint (form creation / submission through
portal)
d) Index value design and structure
e) Cross-referencing
f) Notes / annotations
g) Workflow (form auto-triggers a workflow process)
h) E-mail (form viewed as attachment)
View and annotate documents throughout the workflow process
Workflow Initiation from

a)
b)
c)
d)
e)
f)
g)

7.

8.
9.
10.
11.

12.
13.

14.
15.

16.
17.
18.

Scanning
Enterprise text report processing
Electronic forms processing
Document import processing

\ Web Service
E-mail interface
Adding documents already stored within the solution's repository to
a workflow process at a specific point-in-time
System admin able to create Custom Workflow on document or form level.
Electronic forms security based upon Active Directory \ User Groups
Workflow should have automatic event notification
Digital Signature Feature is required on Workflow
Workflow should be linked to ERP Leave system for backfill/reassignment.
Ability to dynamically query document attributes & route them based on values in
Workflow.
Allows user involvement during the process instances, e.g., enhancement of a process
on-line, to re-assign work tasks, re-prioritize tasks, and monitor audit trail.
GUI based work flow development tool (creation and modification)
Ability to provide for a document in a workflow to check an attribute (document
property or index value) on a related document and make the document s to be routed,
based on pre-configured logic and rules.
Web base electronic forms for Workflow
Workflow can be enabled across multiple forms
Workflow should support condition based routing\approval, based on document or
external values like ERP.
API

Page 7 of 17

Scope of Work for ECM Implementation

nL'J'
FIHAO

19. Solution maintains revision control on electronic forms to offer flexibility to display
forms in their submitted state or with a new layout, allowing business processes to
advance.
20. Immediately upon import, based on the document type, the solution automatically
identifies with which workflow processes to associate a given document.
21. Workflow processes can be used by multiple departments
22. Workflow features integrate through Company's email / collaboration platform. MS

Outlook/Exchange.
23. Automatic Escalaton
work flow)

procedure can be invoked (should be configurable

at any level of

24. While completing an electronic form, users have the ability to attach documents to it,
allowing those documents to automatically be associated with the form.
25. Ability to perform parallel processing by automatically routing a single document
through multiple business processes simultaneously and allowing multiple users to
access and work on the same document.

2.1.1.4 Store

Requirements:

Ability for multiple documents to be grouped together and treated by the system as
a single record, with a single retention plan.
2. Ability to search on e-mail index values and / or perform a full-text search on e-mail
1.

and attachment content.


3. Backup process should be well defined and should have audit logs.
4. Solution allows an administrator to create custom audit log entries tied to workflow
progress for the purpose of generating business process reports.
5. Easy to use and restore from back up.
6. Store documents in their original, native file format, not in a proprieta ry format
7. Ability to encrypt data at the database level and at the file storage level, as well as
content that has been backed up / at rest.
8. Solution allows a system administrator to perform an ad hoc audit on systemrelated activities from within the client
9. Able to archive all type of Documents Physical Docs, Media files, electronic
10.

documents, emails, Images etc


Ability to automate purging of documents, and Authorized

user

should be able to

purge document
11. Automated purging or retention period should be able to configure by document
type and the subcategory or location, user, type etc.
12. Ability for a document(s) to be dragged and dropped into a record (folder of
documents) and have this new document automatically inherit the records

management policy.
13. Solution provides the ability to
document.

access a

document-level audit trail directly from the

Page 8 of 17

9
=

Scope of Work for ECM Implementation

LLJ '

IBHAO

2.1.1.5 Deliver

Requirements

Solution should contain an export tool for massive exporting of content in a nonproprietary format. This should supply both the document and the index values.
2. For numeric fields, the retrieval software should permit index searches based on
ranges of field values specified by the following relational expressions: greater than,
less than, greater than or equal to, and less than or equal to.
3. System includes functionality to create PDF\TIFF\JPEG documents from retrieved
1.

images
4. Files may be searched and retrieved by defined indices, key word(s), symbols, or
system-assigned alphanumeric Ids.
5. Bulds a retrieval "hit list" of matches or near-matches.
6. Ability to print all or a selected portion of an image.
7. Ability to display text or image samples on screen when reviewing a search "hit list
to assist in determining which files to retrieve.
8. Documents should be able to print on network devices & local devices.
9. Search for multiple document types in one search.
10. Electronic signature support is Required
11. Ability to retrieve documents by document title, classification, type, address,
customer name, number, or any other user-defined index value.
12. Full Text Indexing to search for and retrieve files based on English & Arabic
13 Searches can be limited to the current directory, selected directory or the current
plus any child directories.
14. Ability to manipulate image displays by scaling, magnifying, or panning.
15. For textual and numeric fields, the retrieval software should permit index searches
based on exact or partial matches of specified field values.
16. For textual fields, the retrieval software should permit index searches based on root
word matches
17. User5 can return to a search resu[t5 lists after viewing a result.
18. Viewers should open to open multiple documents & multiple pages.
19. Full text search capabilities that include Parse Concept, wild card, fuzzy, proximity,
and SOUNDEX.
.

2.1.1.6 User Interface


1. System should have Web portal where user can access all his ECM related details.
2. The ability to store and view multiple pages files
3. Recently accessed files, quick access to mostly used files, saving the personalized
saved searches
on Applications for Users to perform their work faster
End user interface requirements (search, view, email and print documents from ECM)
User Personalization on Pages
7. Interfaces to standard mobile devices Blackerry, iPad, iPhone, Windows Phone, and
Android.
8. Administrative user (system administration and maintenance)

4.

Easy navigation

5.
6.

Page 9 of 17

Scope of Work for ECM Implementation

4Lkil
Iml/AI

(all rights of
administration)

9.

2.1.1.7 Data

Power user

end

user

plus scanning, indexing, deleting, records

Migration
1.

All the indexed document5 from

existing System (Zylab) has to be transferred to the

new 5ystem

2.

Existing indexing Form, Fields mapping should transferred to the Current system
,

with existing User

access

2.1.1.8 Integration
1.

2.
3.
4.

Should have API\Web service to add and retrieve document from ECM from any
other Application
System API's should allow external user to access the document based on his
windows authentication
System should have API\Web service to pull data from ERP system to show any
additional attributes\field5 in the existing document\form.
ECM should have API\Web service to push data to any external ERP\custom

applications.
2.1.1.9 Training Requirement
1. System Admin Training For IT Department
2. Development, Customization \ Technical Training for IT Department
3. User Training for all Users relative modules

2.1.1.10 System & Security Requirements


1. System's ability to assign security at each of the following levels:
User

Users

Document Type

Document Types
Index Value5
Folders
Workflow
Capture Process

.
.
.

2.

Groups

Groups

Forms

System's storage architecture should allow document5 and images to be stored at


one too many different physical locations for the purpose of redundancy. If one of
the locations were to have a failure, there would be no interruption of access to the
documents

3. System should have security options for

logging into the system by Active Directory


Page 10 of 17

Scope of Work for ECM Implementation

Luj '

IMOHAO

Ability to send documents as an encrypted PDF


Ability for designated users to perform the following administrative tasks via the

4.

5.

web-based client:

Ability to self-manage the system without continued vendor involvement


7. System and software must be hosted in house
8. Detailed System, Hardware, Database architecture along with specifications has to
be submitted.
6.

2.1.2 Technical

Requirements:

2.1.2.1 ECM System

Requirements

Server operating system support for Windows 2012 Server


Windows client operating system support for Windows 8, Windows 7, Windows
XP
3. Microsoft SQL Server database technology is preferred, still any RDBMS system is
1.
2.

accepted
Active Directory and LDAP authentication to control document access
5. SAN / NAS Storage Support
6. Any web based technology used must be based on standard web platforms
7. Email system integration via SMTP with email system through Exchange 2013.
8. ECM System should our VMware virtual environment
9. ECM System should our VEEM Backup solution
10. ECM System should support Clustering Architecture, wilh Database, Application
4.

Clustering
2.1.2.2 ECM User Interface Requirements
1. Zero foot print web access client for user activities administrative activities
(requires no additional software installed on the pc, including ActiveX controls)
2. Desktop client and/or web access client for user activities (may require additional
software installed on the pc, including ActveX or similar technology)
3. Document search and view via SharePoint WSS and MOSS 2013 (or above)
,

4.

Document search and view via Office 2013 interfaces

Page 11 of 17

Scope of Work for ECM Implementation

=,LLjl
IADHAO

2.1.3 Forms to be enabled:


SUPI)lier's rcsponsibilitv to understand Business process(WorkFIow) from corresponding
Department for each form listed here.

?Depa/ment

Form Name

Opening Registration

Workflow

ERP

Yes

No

Commercial

Bid

Commercial

Vendor Feedback Document

Commercial

User Division's Feed Back

Yes

No

Commercial

Vendor Audit Report


Vendor Evaluation Form

Yes

No

Ye5

Yes

Inventory Control Form


Item Codification Modification Form

Yes

Yes

Yes

Yes

Minor Tender Board Recommendation Form


Major Tender Board Submission form for Floating Tender

Yes

NO

Commercial
Commercjal

Commercial
Commercial

No

Commercial

contracts

Yes

NO

Commercial

Contractor's Performance Feedback Form

Yes

NO

Commercial

Tender Contract Request Form

Yes

NO

Commercial

Tender Board Submission Form

Yes

NO

Commercial

Life jacket Service Form

Yes

No

Commercial

Major Tender Board form floating Tender Procurement

Yes

No

Human & Resources

Duty Travel Request

Yes

Yes

Human & Resources

Employee Status Change

Ye5

Yes

Human & Resources

Employee Status Change (Contract Hire Employees

Yes

Yes

Human & Resources

Employment Request

Yes

Yes

Human & Resources

Justification for Manpower Changes

Yes

Yes

Human & Resources

Interview Evaluation Report

Yes

Yes

Human & Resources

Visa-Security Pass-Travel Card Request

Yes

No

Human & Resources

Commencement of Work

Yes

Yes

Human & Resources

Training Effectiveness
Proposed Manpower Changes Budget Year

Yes

Yes

Human & Resources

Yes

Yes

Human & Resources

Induction-Briefing Debriefing At Head

Yes

NO

Budget

Year

Office

Human & Resources

Request for Room Reservation

Yes

No

Human & Resources

Monthly Overtime Report

Yes

Yes

Human & Resources

Insurance

Yes

Yes

Payment Beneficiary

Integration

Page 12 of 17

Scope of Work for ECM Implementation

Al-kil
IllHAl

Human & Resources

Bank Information for Salary Transfer

Yes

Yes

Human & Resources

Yes

Yes

Human & Resources

Application for Educational Assistance


Application For- Employment
Medical Insurance Staff Expense Claim
Duty Resumption
Duty Resumption-(For Head Office Staff Only)
Individual Development Program

Human & Resources

Probation Period

Human & Resources

Drugs Alcohol Policy Vessel crew passenger Declaration


Car Park (Mawaqf) Assistance Request

Human & Resources


Admin &

Cooperation

Human & Resources

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

No

Yes

Yes

Car Purchase Loan Request

Yes

Yes

Fuel Card

Yes

Yes

Yes

N0

Yes

No

Etisalat Sim Card Request

Yes

No

Office Maintenance Request

Yes

No

Request for Vsitor Vehicle Parking at SKEC

Yes

No

Tenancy Renewal Request

Yes

Yes

Postage Stamp Expense Register

Yes

Yes

Purchase Requisition

Yes

Yes

Request For Flower Bouquet

Yes

No

Request For Catering Service

Yes

No

Request For Limousine Service

Yes

No

Head Office Stationery Request

Yes

NO

Stationery List

Yes

NO

Provison Of kitchen Items List

Yes

No

Cooperation

Records Inventory List

Yes

Yes

finance

Accrual JV

Yes

Yes

Finance

Bank Reconciliation

Yes

Yes

Finance

Bank Voucher

Yes

Yes

Finance

Budget Revision Form (BRF)

Yes

Yes

Human & Resources

Human & Resources


Human & Resources

Human & Resources

RahaIRequest

Admin &

Cooperation

Business Cards Request

Admn &

Cooperation

Office

Telephone Services Request

Admin &

Cooperation
Admin &

Cooperation
Admin &

Cooperation
Admin &

Cooperation
Admin &

Cooperation
Admin &

Cooperation
Admin &

Cooperation
Admin &

Cooperation
Admin &

Cooperation
Admin &

Cooperation
Admin &

Cooperation
Admin &

Cooperation
Admin &

Page 13 of 17

9
=L.ijl
MIHAI

Scope of Work for ECM Implementation

Finance

Capital Expendture Request


Chart Of Account Entry Form
Fixed Asset Transfer Form (FAT)
Off Hre Monthly Fuel Consumption Report
I Owe You (IOU)

Finance

Inventory Write Off Request

Yes

Finance

Rejected Invoice

Yes

Yes

Finance
Finance
Finance
Finance

(IPC)

Yes

Yes

Yes

Yes

Yes

Yes

Yes

NO

Yes

Yes
Yes

Finance

Invoice Payment Certificate

Yes

Yes

Finance

Journal Voucher

Yes

Yes

finance

Material Issue Voucher

Yes

Yes

Finance

Material Receipt Voucher

Yes

Yes

Finance

Material

Yes

Finance

Request
Monthly Activity Report

Yes
Yes

Yes

Finance

Official Receipt

Yes

Yes

Finance

Finance Division Petty Cash Control

Yes

Yes

Finance

Yes

Yes

Yes

Yes

Finance

Petty Cash Handover Statement


Petty Cash Voucher
Monthly Manpower Report (Contracted Staff)

Yes

Yes

Finance

Asset Retirement Form

Yes

Yes

Finance

Staff Expense Claim

Yes

Yes

Finance

Supplier Bank Information Form


Capital Expenditure (CAPEX) Budget

Yes

Yes

Finance

Yes

Yes

Finance

Work Service Order

Yes

Yes

Finance

Provisional Acceptance Certificate


Final Acceptance Certificate

Yes

NO

Finance

Yes

NO

Finance

Dry Dockng Projects To Be Capitalized

Yes

NO

Finance

Dry Docking Projects To Be Capitalized

Yes

No

Finance

Time Sheet For (Contracted

Yes

Yes

Finance

Service Receved Note

Yes

Yes

Finance

Petty Cash Count 5tatement


IRSHAD Capital Budget New Project Item Proposals

Yes

No

finance

Yes

Yes

Finance

Bad Debt Write-Off Authorization Form

Yes

Yes

Finance

Dry Docking Budget


Non Capital Budget
IRSHAD Non-Capital Budget Item Proposals
Bank Account Opening Form
ADNOC Group Hull& Machinery Policy Adding New Vessel
IT Service Report
Change Notification Form For Information

Yes

Yes

Yes

Yes

Yes

Yes

Fnance

Finance
Finance

Finance
Finance
IT

IT

Staff)
(SRN)

Yes

Yes

Yes

No

Yes

No

Yes

No

Page 14 of 17

Scope of Work for ECM Implementation

RLLJI
IISHAO

1T

Change Notification Form Impact

IT

Change

Notification Form

Action

Required

User Access Form

2.2

No

Yes

No

Yes

Yes

Project Deliverables
o
I
o

o
o
e

,
.
,
o
.
o

e
.
.
.

o
o

2.3

Yes

Process Analysis, Meetings and Documentation


Business Requirement Review/Signoff
Detailed Project Plan Review/Signoff
Customization Design Review/Signoff
Detailed Project Implementation Plan Review/Signoff
Implementation of the Project
Data Migration Plan
Periodical Project Status Report
Acceptance Criteria Document
User Acceptance Testing with Signoff

log Report
System Integration Testing with Signoff
Risk Assessment & Mitigation
User \ Admin Training
Issue

User\ Admin Manuals


Functional & Technical Documents
Module Level Closure & Signoff
Project Closure & Signoff
Pre & Post Live Support

Support & Service


1. The Software Suite should be bug free and the vendor should provide on-site or off-site
Support in case of any issue s reported
2. Post implementation support is required for minimum of 1 Year
3. SLA as follows

Category
Severity 1
Severity 2
Severity 3

Impact Type

Incident Resolution Time

Critical Impact

<

Major Impact

<

4 Service Hours
8 Service Hours

Standard Incident

<

16 Service Hours

Page

15 of 17

Scope of Work for ECM Implementation

=LJA
IASHAO

2.4 Timeline
The expected project duration is XX months:
Aftivities

No.

Team Mobilization / Project Kick -off


Process Analysis, Meetings and Documentation
Business Requirement Review/Signoff
Customization Design Review/Signoff
Project Implementation Plan Review/Signoff
Server Configuration

System Implementation

Forms Customization
Reports Customization

1
2

3
4
5

10
11
12
13
14

15

Expected Period

Proposed Period

-ui-',/l?,--(Months)

.r

(Months)

Training
User Acceptance Testing
Client Installation & Configuration
Go Live
Provisional Acceptance and Project Hand Over
Final Acceptance

2.5 Bill of Quantities


All rates and

prices shall be in U.A.E. Drham (AED) and the PROPOSED PRICE should be a fixed
lump sum amount in U.A.E. Dirham (AED) for the complete performance of the Project Scope
and Deliverables specified in this RFI. The rates and prices are deemed to be inclusive of all
overheads, profits, taxes, duties, charges, costs and expenses to carry out the Project Scope
and Deliverables in accordance with the RFI. Items not priced by VENDOR shall be deemed to
be included elsewhere.
VENDOR shall itemize the

lump sum cost of your Proposal in the following table.

Page 16 of 17

i?

Scope of Work for ECM Implementation

=,l---jl
IM?MAO

BILL OF QUANTITY

(BOQ) for Implementing the System


Description

Item

Total Cost

(AED)
Licenses:
50 Concurrent User Licenses & 5 Admin\System Users

Software:
2
3

Capturing System
Document Management
Store & Deliver System
Forms Customization
ERP Integration
Reports Customization

5
6
7
8
9
10

System

Project Implementation & Professional Services


Office User \ Admin Training
Post Implementation Support One Year
TOTAL SUM PRICE IN AED

,,

Page 17 of 17

9
=

L? J'

IA? HAO

Annexure

Tender No.

II

CD/34/14

Enterprise Content Management


Implementation

Commercial Bid

Tender No. CD/34/14


Enterprise Content Management Implementation
Annexure II Commercial Bid
-

L--,j 1

IASHAO

ANNEXURE [I
COMMERCIAL BID
(To be submitted ORIGINAL in BIDDER's LETTER-HEAD + 1 copies in a sealed
envelope)

TO,
The Tender Board Secretary
IRSHAD
PO Box 61, Abu Dhabi, UAE

Subject: Tender No. CD/34/14


Enterprise Content Management ImpIementation
Dear Sirs,
With reference to IRSHAD Tender No. CD/34/14 for Enterprise Content Management
Implementation, Scope of SERVICES, Terms and Conditions contained therein and all other
related correspondences if any on the subject Tender to date, we, M/s
UAE
PO Box No.
PRICE
to
out
ALL
FIRM
LUMPSUM
our
INCLUSIVE
FIXED
&
carry
complete
hereby submit
Enterprise Content Management Implementation including post implementation partners
support which is required for 12 months in full conformity with the Tender terms, conditions
and specifications as described in Scope ofWork ( Annexure -I)is
In

Figures:

In Words:
I

Our prices are valid for 150

days from the closing date of the Tender.

Our Quoted Prices shall be fully inclusive of all costs without limitation, mobilization,
demobilization, tools & equipments, lodging & boarding and any other allowances,
training (inside UAE & outside UAE region}, visa charges, air tickets, transportation,
loading/unloading, taxes & duties, overheads, premiums, profit, depreciation, etc.

Bidder's Declaration: Our offered LUMPSUM Price are fully in compliant with all the provisions
of the Scope of SERVICES, Draft form of CONTRACT & Form of Tender attached & shall remain
Firm & Fixed for the whole duration of the CONTRACT & thereafter as required to complete the
SERVICES.
Authorized Signatory
Date'
.................

.....................

Name'

Place:

Position:

(Bidder's company Seal)


Page 1 of 1
Tender No. CD/34/14
Enterprise Content Management
Annexure Il Commercial Bid
-

implementation

IABMAO

Annexure

Tender No.

III

CD/34/14

Enterprise Content Management


Implementation

HEALTH, SAFETY AND ENVIRONMENTAL

(HSE)
PRE QUALIFICATION

Tender No. CD/34/14


Enterprise Content Management Implementation
Annexure H[ HSE Pre-Qualification
-

TENDER NO.

CD/34/14

ANNEXURE III
-

CONTRACTOR
HEALTH, SAFETY AND ENVIRONMENTAL (HSE)
PRE

Name of

QUALIFICATION
Tel. No.

Company:

Fax No.

Address
I

certify that the details given

in this assessment

are

correct and accurate.

(Signature).

Title:

Surname and nitials (BLOCK CAPITALS)


Nature of Business

Tel. No.

Date:

Responses

Questionnaire items
Section 1:

Leadership and Commitment

(i)Commitment to
HSE through

a) Are senior managers personally


involved n HSE management?

leadership
b) Is there evidence of commitment
at all levels of the organisation?
c) Is there a positive culture towards

HSE matters.
Section 2:

Policy and

Strategic ObJectlves

(i)HSE policy

a) Does your company have an HSE

documents

policy document?
If the

answer

s YES

please attach

copy.
b) Who has overall and final

responsibility for HSE in your

organisation?
c) Who is the most senior person in
the organisation responsible for this
poliCy being carried out at the
premises and on site where his
employees are working?
Provide name, title and experience.
(ii) Availability of

policy
to

statements

ennployees

a) Itemise the methods by which you


have drawn your polcy statement to
the attention of all your employees?
b) What are your arrangements for
advising employees of changes in the
policy?

IRSHAD Tender No. CD/34/14

Enterprise Content Management Implementation

Contractor's Prequalification Questionnaire

Page 1 of 6

Organisation, Resources and Competence


(i) Organisation
a) How is management involved in
commitment and
HSE activities, objective-setting and
communication
monitoring?
Section 3:

b) How is your company structured to


manage and communicate HSE

effectively?
c) What provision does your company
make for HSE communication

meetings?
(ii) Competence
and Training of

managers/
supervisors/senior
site staff/ HSE
advisers

Have the managers and

supervisors at

all levels who will plan, monitor,


oversee and carry out the work
received formal HSE training in their
responsibilities with respect to
conducting work to HSE

requirements?
If YES pleasegive details. Where the
training is given in-house please
describe the content and duration of
courses.

(i) Competence

a) What arrangements does your

and General HSE

company have to

training

knowledge of basic
industrial HSE, and to keep this
knowledge up to date?

employees

ensure new

have

b) What arrangements does your


company have to ensure new
employees also have knowledge of
your HSE

policies and practices?

c) What arrangements does your


company have to ensure new
employees have been instructed and
have received information on any
specific hazards arising out of the
nature of the activities? What

do you

training

provide to ensure that all

employees are aware of Clent


requirements?
d) What arrangements does your
company have to ensure existing staff

knowledge is up to date?
(If training s provided in-house please
give details of content.)
HSE

(iv) Specalised
training

a) Have you identified areas of your


company's operations where
specialised training is required to deal
with

potential dangers? (If YES please


provide details of training

itemise and
IRSHAD Tender No. CD/34/14
Enterprise Content Management

Implementanon

Contractor's Prequalificaton Questionnaire

Page 2 of 6

given.)
b) If the speciatsed work involve
chemical or other occupational health

(v) HSE qualified


staff- additional

training

(vi) Assessment of

suitability of
subcontractors/
other companies

hazards, how are the hazards


identified, assessed and controlled?
Does your company employ any staff
who possess HSE qualifications that
aim to provide training in more than
the basic requirements?
a) How do you assess:
HSE competence
-

HSE record of the subcontractors


and companies with whom you place
-

contracts?

b) Where do you spell out the


standards you require to be met?
How do you ensure these are met and

verified?
Section 4: Risk evaluation and Management
What techniques are used within your
(i) Hazards and
effects
company for the identification,
assessment
assessment, control and recovery of
hazards and effects?

(ii) Exposure of

Do you have n

the workforce

monitor the exposure of your


workforce to chemical or physical

place any systems to

agents?
(iii) Handling of

How is your workforce advised on the

chemicals

properties of chemicals encountered


in the

(iv)

Personal

protective

equpment

course

of their work?

What arrangements does your


company have for provision and
upkeep of protective clothing, both
standard issue, and that
specialised activities?

(v) Waste
management

requred for

Does yourcompany have in

place

systems for identification,


classification and management of
waste?

Section 5: Planning, Standards and Procedures

(i) HSE or
operatons

a) Do you have a company HSE


manual (or Operations Manual with

manuals

relevant sections on HSE) which


describes in detail your company

approved HSE workng practices


relating to your work activities?
If the

answer

is YES

please attach

copy of supporting documentation.


IRSHAD Tender No. CD/34/14
Enterprise Content Management Implementation
Contractor's Prequalification Questionnaire

Page 3 of 6

b) How do you ensure that the


working practices and procedures
used by your employees on-site are

consistently in accordance with your


HSE policy objectives and
arrangements?
(ii) Equipment

How do you ensure that plant and


equipment used within your

control
and

premises, on-site, or at other


locat)ons by your employees are
correctly registered, controlled and
maintained in a safe working

maintenance

condition?

{iii) Standards

a) Where do you spell out the


standards you require to
be met?

b)

How do you

ensure

these

are

met

and verified?

c) Is there an overall structure for


producing, updating and

disseminating standards?

(v) Road Safety

What arrangements does your


company have for combating road
and vehicle incidents?

Management
Section 6:

Implementation and Monitoring

(i) Management

a) What arrangements does your


company have for supervision and
monitoring of performance?
b) What type of performance criteria

and

performance
monitoring of
work
activities

are

used in your company; give

examples
c) What arrangements does your
company have for passing on any
results and findings of this supervision
and monitoring to your:
base management
site employees?
Has your company received any
award for HSE performance
-

(ii) HSE
performance
achievement

achievement?

awards

(iii) Statutory
notifiable

Has your company suffered any


statutory notifiable incidents in the

incidents

last five years

/dangerous

health and environmental)?


(Answers with details including dates,
most frequent types, causes and

occurrences

(safety, occupational

IRSHAD Tender No. CD/34/14

Enterprise Content Management implementation


Prequalification Questionnaire

Contractor's

Page 4 of 6

follow-up preventative measures


taken.)

(iv) Improvement
requirement and

prohibition
notices

Has your company suffered any

improvement requirement or

prohibition notices by the relevant


national body, regulatory body for
HSE or other enforcing authority or
been prosecuted under any HSE
legislation in the last five years?
(If your answer is YES please give

(v) HSE

details.)
a) Have you maintained records of

performance

your incidents and HSE

records

for the last five years?

performance

(If YES, please give following details


for each year, number of Non Lost
Time Injuries, number of Lost Time

Injuries, number and type of injuries,


total hours worked by workforce for
each corresponding year, Frequency
Rates, your company definition of a
Lost Time incident)
b) How is health performance
recorded?

c) How s environmental performance


recorded?
d) How often is HSE performance
reviewed?

(vi) Incident
investigation and
reporting

By whom?
a) Who conducts incident

investigations?
b) How are the findings following an
investigation, or a relevant incident
occurring elsewhere, communicated
to your

employees?

c) Are near misses reported?


Section 7: Audit and Review

(i)

Auditing

a) Do you have a written policy on


HSE

auditing and how does this policy


specify the standards for auditing
(including unsafe act auditing)?
b) Do your company HSE Plans
include schedules for auditing and
what range of auditing is covered?

IRSHADTender No. CD/34/14


Enterprse Content Management Impementatjon
Contractor's Prequalification Questionnaire

Page 5 of 6

c) How is the effectiveness of auditing


verified and how does management

report and follow up audits?


Section 8: HSE Management Additional Features
-

(i) Memberships
of Associations

(ii) Additional
features of your
HSE management

Doesyour company hold membership


of any industry, trade or HSE
organisation?
Does your company have any other
HSE features or arrangements not

described elsewhere in your response


to the

General
1 The

questionnaire?

guidelines for preparation of questionnare

questionnaire covers information required to assess the extent to which HSE and its management are organised by the

contractor.

2 The contractor is advised to cover all (including support) activities and not just those conducted on ADNOC or Group Company
sites.
3 The questionnaire should be completed by contractor line management.
4 Emphasis is placed on the need to complete answers substantiated by supporting documentation as far as is practicable.
Responses and any supporting documentation must relate specifically to the policy and organisational arrangements of the
company that would be the signatory of any contract.
5 The contractor is encouraged to identify where he exceeds Group Company requirements and this excellence should be
underlined where appropriate.

[RSHAD Tender No. CD/34/14


Enterprise Content Management Implementation
Contractor's Prequalification Questionnaire

Page 6 of 6

9
HL?J '

IFICIHAO

Annexure

IV

CD/34/14
Enterprise Content Management
Implementation
Tender No.

EXHIBITS
Exhibit 1: Bid Bond
Exhibit 2: Performance Bank Guarantee
Exhibit 3: Release Letter
Exhibit 4: Completion Certificate

Tender No. CD/34/14


Enterprise Content Management Implementation
Annexure IV EXHIBITS
-

EXHIBIT 1

BID BOND
Submittal of the TECHNICAL BID.

(to be issued by a reputed


Letter of Guarantee No.

Bank in Abu Dhabi,

preferably a nationalized bank )


Date:

:....

Abu Dhabi Petroleum Ports Operating Co. (IRSHAD)


P.O. Box 61
Abu Dhabi, UAE.
Dear Sir,

registered office
that we irrevocably

is at
and
have the honor to inform you
XXXXXXXXXXXXXXXXXX
the
of
AED
Messrs:
to
amount
unconditionally guarantee
50,000 (UAE Dirhams Fifty Thousand Only) against your Invitation to Tender No.
CD/34/14 vide your letter ref. CD/14/L/1578/AS dated 06th January 2015.

We, the undersigned,

(THE BANK)

whose

[or to your order) the said amount or any part thereof at


warning or any restriction or condition and without
notwithstanding any objection from the said Messrs:

We, undertake to pay

to you

your first demand without


recourse

and

or

any other third party.

Our liability hereunder shall not be discharged or impaired by the grant of any time
or other indulgence to Messrs:
or by any other act, circumstance or
event that might have operated to impair or discharge our liability herein.
Thjs guarantee shall remain valid until
the tender).
FOR AND ON BEHALF OF (BANK)

Name

(150 days from the closing date of

****

BANKSEAL *****

Position:

Tender No.

CD/34/14

Enterprise Content Management Implementaton


EXHIB[T 1: Draft Bid Bond

Page

1 of 1

EXHIB[T 2

PERFORMANCE BANK GUARANTEE

Abu Dhabi Petroleum Ports Operating Company (IRSHAD)


P.O.Box 61

Abu Dhabi
United Arab Emirates

SUBJECT:

Dear

PERFORMANCE BANK GUARANTEE REF.:


DATE :
CONTRACT NO. : CD/34/14
CONTRACT TITLE: ENTERPRISE CONTENT MANAGEMENT
IMPLEMENTATION

Sirs,

Whereas Abu Dhabi Petroleum Ports Operating Company (IRSHAD) (herenafter


referred to as "COMPANY } has entered into the above CONTRACT with
(hereinafter referred to as "CONTRACTOR ) for 'Enterprise Content
Management Implementation' services. Whereas, the CONTRACTOR is required under
the CONTRACT to procure a Performance Bank Guarantee issued by a bank in favour of
COMPANY in support of the due and proper performance of the obligations undertaken
by CONTRACTOR in respect of the above mentioned CONTRACT.
------

Thereof, in consideration of the above, We [bank)

established in Abu
address
at
P.O.
Box
Abu
Dhabi
U.A.E.
--,
having
hereby irrevocably
and unconditionally guarantee and undertake to COMPANY, without any right of
defense, set off or counterclaim whether on our behalf or on behalf o f CONTRACTOR to
pay to COMPANY a sum not exceeding AED XXXXX (UAE Dirhams XXXXX only) or any
lesser sum specified by COMPANY upon receipt of COMPANY's written request
addressed to us in the event that CONTRACTOR fails to perform or fulfill any of its
obligations set forth in the CONTRACT, by transfer to an account in COMPANY's name
at such bank in Abu Dhabi as COMPANY shall stipulate or in such other manner as
shall be acceptable to COMPANY. Such written request shall be conclusively binding
on us for all purposes under this Performance Bank Guarantee.

Dhabi and

our

We agree that any changes, modifications, additions or amendments which may be


made to the CONTRACT, or in the Services to be performed there under, or in the
payments to be made on account thereof, or any extensions of the time for
performance or other forbearance on the part of either COMPANY or CONTRACTOR to
the other or to any other guarantor of the obligations of either of them, shall not in any
way release us from our continuing liability hereunder, and we hereby expressly waive
notice to us of any such changes, modifications, additions, amendments, extensions or

forbearance.

Contract No. CD/34/ 14

Enterprise Content Management Implementation


Exhibit 2: Draft Performance Bank Guarantee

Page lof 2

We further agree, that any payment made hereunder shall be made free and clear of
and without deductions for or on account of any present or future taxes, levies,
mposts, duties, charges, fees, deductions or withholdings of any nature whatsoever
and by whomsoever imposed.

This Performance Bank Guarantee shall


continue to be valid up to
1

come

the date hereof and shall


two months after the expiry date of

into force
.

on

CONTRACT)
This Performance Bank Guarantee shall be governed by and interpreted under the
Laws of Abu Dhabi and the UAE.
Yours

faithfully,

Authorised Signature & Stamp of Bank

Contract No

CD/34/

14

Enterprise Content Management Implementation


Exhibit 2: Draft Performance Bank Guarantee

Page 2 of 2

-*Z
n

LEJ I

IRSHAO

EXHIBIT 4
COMPLETION CERTIFICATE
Date:

CONTRACT NO. CD/34/14


CONTRACT TITLE: ENTERPRISE CONTENT MANAGEMENT IMPLEMENTAT!0N
PART-I

DESCRIPTION OF SERVICES
AGREEMENT FOR ENTERPRISE CONTENT MANAGEMENT IMPLEMENTATION

FINAL
PAYMENT
DIRHAMS

DUE

FROM

COMPANY

TO

CONTRACTOR

IS

UAE

PART II
-

The above SERVICES have been


the CONTRACT No.
For and

on

finally completed

in accordance with the

provisions

of

CD/34/14 and final payment is now due.

behalf of CONTRACTOR: XXXXXXXXXXXXXXXXX

Signature

Name
Tile
Date

PART llI
-

The above SERVICES have been finally accepted


Operating Company (IRSHAD} in apparent good
For and

on

behalf ofAbu Dhabi Petroleum Ports


order, with effect from
on

behalf of COMPANY: ABUDHABI PETROLEUM PORTS OPERATING COMPANY

(IRSHAD)
Signature

Name
Tile

Date
Cc.: Commercial
IRSHAD

Deptt.
Page 1 of 1

Tender No. CD/34/14


Enterprise Content Management Implementation
Exhibit 4 Draft Completion Certificate
-

EXHIBIT 3

(To be typed on

RELEASE LETTER
CONTRACTOR's Letter-head, to be submitted while claiming the final

invoice)
CONTRACT NO.:

CD/34/14

CONTRACT TITLE: ENTERPRISE CONTENT MANAGEMENT IMPLEMENTATION


KNOWN BY ALL MEN BY THESE PRESENTS, that we M/s
Abu Dhabi, UAE (hereinafter referred to as
consideration of the receipt of the Sum of UAE Dhs.
,

PO Box
"CONTRACTOR") for and in
( UAE Dirhams

) from M/s Abu Dhabi Petroleum Ports Operating


Company (IRSHAD), hereinafter referred to as COMPANY", representing the final
day of
payment under the AGREEMENT/CONTRACT No. CD/34/14 dated the
Year
and subsequent amendments thereof between the COMPANY and the
CONTRACTOR, hereby releases & forever discharges the COMPANY, its successors in
interest and assgnees and their property from all claims and demands whatsoever in
any manner arising out of or related to the said AGREEMENT or labour and services
performed or materials and equipments furnishes by CONTRACTOR in connection with,
or incidental to, the execution & completion of the SERVICES.
In consideration of, and for the purpose of inducing the COMPANY to issue the
COMPLETION CERTIFICATE and to make the aforesaid final payment, CONTRACTOR
hereby represents, warrants & agrees that:

1. All Sum due

become due and all debts, accounts, damages, obligations,


claims and demands of every nature and kind whatsoever in any manner arising
out of, or reIated to, labour and services performed or materials or materials and
equipments furnished in connection with, or incidental to, the AGREEMENT have
been paid and satisfied.
2. There is no unsettled claim for injuries to, or death o f any person or damage to,
or destruction of property in any manner arising out of, or related to this
AGREEMENT.
3. CONTRACTOR shall indemnify and hold harmless the COMPANY and its
successors and
assignees from any Claims, Demands, Liens, Judgements,
attachments and costs related hereto in any manner, arising out of, or related
this AGREEMENT
4.

or

to

(WARANTEE SERVICES & PERIOD}

IN WlTNESS WHEREOF CONTRACTOR has caused this instrument to be executed


Year
day of
duly Authorized Representative(s) on this

by its

Signature:
BY:

Title:
Name of CONTRACTOR:

(CONTRACTOR's SEAL)
Tender No. CD/34/14
Enterprise Content Management
Exhibt 3 Draft Release Letter
-

Page 1 of 1

[mplementation