Professional Documents
Culture Documents
D
0.8
0.2666666667
d
0.3239
N
33
t
0.0103
L
11.7
BD
1
BD-P
1.3
p
0.8
F
0.3
Sin
0
K Value
1950
di
0.3033
C
199.6052415113
332.6754025188
M
1.59E-03
-1.31E-03
di x t
2.87E-04
J
0.7781926001
HP1
50.9351129643 Kw
38.4050751751
KW
31.1933179153
V
1.3816
Cement
< 1.5 m/s
Coal
< 0.75 m/s
Clearence
Shell thickness
k Value
M
W1 (Pipe)
W2 (Casing)
W3 (Flight)
Wt
0.011
8
0.927
1.46
932.00583
1944.9859
789.25072 3666.2425
5352.714
Screw conveyor
C = (pi/4)x(D2-d2)xPxfxBDxNx60x(1-sin)
Where
C
Capacity
D
Casing dia.
d
Shaft dia.
P=D
In general (0.8D & 0.6D)
f
Filling Factor (0.3 to 0.4 for U-Trough)(0.85 for Round)
BD
Bulk Density (Volume)
N
RPM (32/D)
Inclination
To select pipe
M=1.3X10-9x(D2-d2)*L3xBDx1000
D
Casing dia.
d
Shaft dia.
L
Length of Pipe or shaft
BD
Bulk Density (Power)
3
di xt=(do-2xt)3xt
Material
Coal
Cement
di3xt >M
do
Shaft dia.
t
Thickness of the pipe
V=(pixDxN)/60 or DN/19.1
V
Velocity
D
Casing dia.
N
RPM
Cement
Coal
=8.177x10-6{L4/(do2+di2)}
<0.6
do
di
Deflection
Shaft dia.
do-2xt
L
Length of Pipe or shaft
HP=0.1317D3xLxNx{1-(D/d)2}xBDxfmx0.754
fm
Material Factor
D
Casing dia.
L
Length of Pipe or shaft
N
RPM
d
Shaft dia.
BD
Bulk Density (Power)
HP
If HP is <5 Multiply by factor (Refer Data sheet)
KW=[(QxL)/367]x(f+Sin)x1/
KW
Kilo watt
Q=C
Capacity (with 65% filling)
L
Length of Pipe or shaft
f
Factor
Inclination
Drive Efficiency
W1 (Pipe) = 0.0246615x(d-t)xtxL
W
Weight
0.754 to convert to KW
Cement
Flyash
Fine coal
Cement
Coal
0.85 to 0.96
d
Shaft dia. (in Mtrs.)
t
Thickness of the Shaft to pipe (in mm)
L
Length of Pipe or shaft (in mm)
W2 (Casing)=pix{D+2x(c+t)}xTx7.85xL
W
Weight
D
Casing dia.
c
Clearence
t
Thickness of the Shaft to pipe
T
Thickness of casing (in mm)
L
Length of Pipe or shaft (in mm)
W3 (Flight)=K2x(L/D)xTx7.85
For K value refer data sheet by Calculating (d/D)
L
Length of Pipe or shaft
D
Casing dia.
T
Thickness of casing (in mm)
W= Mx(W1+W2+W3)
W
Total weight
For M value refer data sheet
Volume Power
0.6
0.85
1
1.3
To select pipe
.754 to convert to KW
.85 to 0.96
1.8
2
1.2
4
2.5
a
b
t
Cos
Sin
L
W
0.55
1.5
12
30
0.866
0.5
1.732102
2162.347
CONVEYOR REF
CONVEY RATE
48.0
TPH
BD
0.5
T/M3
LENGTH OF CONVEYOR
6.0
MAX FILLING
75.0
MA X SC SPEED
1.0
M/S
96
125.631
500
PITCH
450
AREA
0.1551
VOL
0.0698
Q!
0.0523
1.05
AT ACTUAL
1.0
SCREW SPEED
40
38.20
MAX FILLING
75
CONVEYING SPEED
ACTUAL FILLING
SHAFT POWER
MOTOR POWER (KW)
57.31
6.25
60.02
FILLING OK
6.25
7.5
7.5
DIA
mm
S
m
PITCH
mm
300
0.0435
300
400
0.0899
350
500
0.1551
450
630
0.282
580
800
0.436
650
500
0.1551
450
V
m3
Q1
SPEED
m3/Rev
RPM
VELOCITY Q
m/s
m3/hr
3M
4M
5M
0.0131
0.0098
65
1.02
38.17125
0.0315
0.0236
49
1.03
69.380325
0.0698
0.0523
40
1.05
125.631
7.5
7.5
7.5
0.1636
0.1227
30
0.99
220.806
0.2834
0.2126
25
1.05
318.825
12.5
12.5
12.5
0.0698
0.0523
40
1.05
125.631
7.5
7.5
7.5
6M
7M
8M
3.7
7.5
7.5
7.5
7.5
11
11
11
15
15
15
7.5
FEEDER REF
MATERIAL CONVEYED
TYPE OF DRIVE
RAW MEAL
DIRECT
CONVEY RATE
205.0
TPH
BD
1.0
T/M3
MAX FILLING
90.0
MA X SC SPEED
0.4
M/S
CONVEYING SPEED
ROTOR SPEED
MAX FILLING
ACTUAL FILLING
SHAFT POWER
MOTOR POWER (KW)
205
226.56
630
1020
90
0.3117
0.0375
0.2517
0.49
AT ACTUAL
0.4
15
12.13
90.0
81.43
4.20
100.73
FILLING OK
4.2
DIA
mm
200
200
200
280
280
360
630
HUB DIA
mm
170
115
55
180
70
85
90
WIDTH
mm
220
220
220
420
420
520
1020
Ss
m2
0.031
0.031
0.031
0.062
0.062
0.102
0.3117
Sz
m2
0.0238
0.0136
0.0079
0.0323
0.0158
0.0193
V
m3
0.0017
0.0039
0.0052
0.0123
0.0192
0.0429
Q1
m3/REV
0.0015
0.0035
0.0047
0.0111
0.0173
0.0386
0.0375
0.2797
0.2517
speed
RPM
30
30
30
25
25
20
Velocity
m/s
0.31
0.31
0.31
0.37
0.37
0.38
15
0.49
Q
m3/hr
2.71
6.35
8.38
16.60
25.95
46.33
226.56
Ps
Pm
BG (DIRECT)
BG (SPRO)
1.00
1.00
1.00
1.20
1.20
1.60
1.5
1.5
1.50
1.50
1.50
2.20
9.07
9.07
9.07
13.06
13.06
21.76
4.32
4.32
4.32
6.22
6.22
10.36
4.20
5.50
76.16
36.27