Description of work
E.W/I.G
5,636
11,882
2.00
17,518
35,036
E.W/M.G
4*2*1/2*150
35,036
600
35,636
E.W/E.G
4*2*1/2*150
35,636
600
36,236
I.W/I.G
4,877
1,829
1,524
3,448
4,267
5,636
21,581
I.W/M.G
21,581
8*1/2*150
600
2*2*1/2*150
300
22,481
1,200
21,281
35.64
0.30
0.46
4.92
21.28
0.30
0.46
2.94
S
7.85
Description of work
Description of work
35.64
0.30
21.28
0.30
6.38
17.08
4.88
2.44
1.83
1.52
2.79
2.44
5.64
13.74
4.88
1.83
2.44
2.44
1.52
5.64
11.89
2.79
13.74
9.29
4.42
3.05
1.01
28.33
4.46
(4.46)
23.87
23.87
23.87
11.40
11.40
4.27
1.98
3.45
1.67
14.71
3.31
63.68
(3.31)
63.68
0.08
11.40
4.78
6" Thick hollow block work in cement and sand mortar 1:5 w
cavities unfilled.
2.00
18.06
36.12
36.12
1.00
11.88
2.43
2.00
18.06
36.12
11.88
28.92
2.43
28.92
28.92
D
1.00
11.88
3.66
1.00
Description of work
11.88
43.46
3.66
43.46
43.46
21.88
2.43
4.88
3.60
1.98
138.16
4.27
1.52
(16.70) ddt
5.64
21.88
2.43
121.46
53.26
Deduction for Doors windows & opening areas
Type
2.00
18.06
NO,S
WIDTH
m
D1
3.00
1.15
D2
2.00
0.95
W1
3.00
1.20
C1
4.00
0.61
36.12 5/8" thick to wall in lime cement and sand 1:1:5 finished
36.12 semi-rough with wooden float.
External Wall Plaster
1.00
12.18
2.43
29.65
29.65 Deduction for Doors windows & opening areas
1.00
12.18
3.66
44.56
44.56
110.33
Type
No of Side
WIDTH
m
D1
3.00
1.15
D2
1.00
0.95
W1
3.00
1.20
(13.22) ddt
97.11
Description of work
T
1.00
Description of work
17.18
17.18 5/8" thick Plastering to wall in lime cement and sand 1:1:5
17.18 finished smooth with lime putty floating.
Internal Wall Plaster
1.00
16.81
16.81
16.81
1.00
11.73
2.43
1.00
Type
No of Side
WIDTH
m
D1
3.00
1.15
28.56
D2
3.00
0.95
28.56
W1
3.00
1.20
C1
8.00
0.61
11.43
3.66
41.82
41.82
1.00
19.66
2.43
47.85
47.85
152.22
(20.17) ddt
132.05
13 No's
11.51
0.15
0.14
140.00
1.75
1.75
Wall Tilling
10.02
5.20
10.02
Description of work
4.86
2.41
22.48
22.48
8.52
0.61
5.20
Description of work
(2.23)
Tile for Slab - Side (75mm)
15.83
24.72 m2
0.15
2.41
7.32
32.04
Type
No of Side
C1
WIDTH
m
6.00
Charging Room
0.61
3.048
3.658
6.706
1.524
ddt
12"*12" Tile
0.09
344.90
No's
11.40
2.79
345.00
Floor tile
14.19 Filling Room
11.40
2.79
14.19
24'*24' Tile
0.37
38.18
No's
39.00
D
1.00
Description of work
12.18
7.05
ROOF COVERING
85.85
75mm
85.85
splying
75mm
m
width
1.10
1.00
total area
no of asbastror roofing sheets
n of work
n of work
n of work
1:2 finished
n of work
ning areas
HEIGHT
m
Area (m)
2.12
(7.31)
2.09
(3.97)
1.09
(3.92)
0.61
(1.49)
(16.70)
ning areas
HEIGHT
Area (m)
m
2.12
(7.31)
2.09
(1.99)
1.09
(3.92)
n of work
(13.22)
n of work
HEIGHT
Area (m)
m
2.12
(7.31)
2.09
(5.96)
1.09
(3.92)
0.61
(2.98)
(20.17)
ton
kg
n of work
7.97
0.61
4.86
n of work
HEIGHT
Area (m)
m
0.61
(2.23)
(2.23)
Area
10.22
2.90
7.32
n of work
VERING
75mm
length
3.66
3.51
area
4.01
3.50
85.85
25.00
Basic Prices
MATERIALS
Item No.
Description
Code No.
Unit
Price
( Rs.)
Item No.
Acid
M-001
Gal
M-002
litre
M-003
No
Barrel Bolt
M-004
No
Binding Wire - 16 BW
M-005
Lbs
125.00
Bitumen
M-006
Gal
85.00
Blasting Powder
M-007
Lbs
Blue
M-008
Ozs
Boild Lime
M-009
Cwt
10
M-010
No
10
11
M-011
No
12
M-012
Lbs
13
M-013
Doz
14
M-014
No
15
M-015
No
16
M-016
No
17
M-017
No
18
M-018
No
19
Bricks
M-019
No
20
Brush - 3"
M-020
No
21
Brush - 6"
M-021
No
22
Brush 2"
M-022
No
23
Butt Hinges
M-023
No
24
Casement Fasteners
M-024
No
25
Casement Stays
M-025
No
26
Cement
M-026
Bag
27
M-027
Sq.ft
28
M-028
No
29
M-029
No
30
M-030
No
31
M-031
No
32
M-032
No
33
M-033
Lbs
34
M-034
No
35
Coloured Pigment
M-035
Lbs
2,050.00
3
4
920.00
36
Colouring Powder
M-036
Lbs
37
Cotton Waste
M-037
Lbs
38
D. D. T. Powder
M-038
Lbs
39
Diesel Fuel
M-039
Ltr
40
Door Closer
M-040
No
41
Draw Rings
M-041
No
42
M-042
Cube
43
Emulsion Paint
M-043
litre
44
Enamel Paint
M-044
litre
45
M-045
No
46
Fire Wood
M-046
Lbs
47
Flannel Cloth
M-047
Yards
48
M-048
Sq.ft
49
Floor Brush
M-049
No
50
Fuel Forge
M-050
Ltr
51
Fuse wire
M-051
L.ft
52
M-052
No
53
M-053
Cube
54
Gutter Brackets
M-054
No
55
Gutter joiner
M-055
No
56
M-056
No
57
M-057
No
58
M-058
No
59
M-059
No
60
M-060
Kg.
61
M-061
No
62
Jumper Steel
M-062
Lbs
63
Jute Hessian
M-063
Sq.ft
64
Metal - 1 "
M-064
Cube
65
M-065
Cube
66
M-066
Cube
67
M-067
No
68
M-068
Kg.
69
M-069
litre
70
M-070
No
71
Mould Oil
M-071
litre
72
Nails - 2"
M-072
Lbs
73
Nails - 3/4"
M-073
Lbs
35.00
7,500.00
7,000.00
102.00
74
M-074
No
75
Primer
M-075
litre
76
M-076
No
77
M-077
No
78
M-078
No
79
M-079
No
80
M-080
No
81
M-081
No
82
M-082
No
83
M-083
No
84
M-084
No
85
M-085
No
86
M-086
No
87
M-087
No
88
M-088
No
89
M-089
No
90
M-090
No
91
M-091
No
92
M-092
L.ft
93
M-093
L.ft
94
M-094
L.ft
95
M-095
L.ft
96
M-096
L.ft
97
M-097
L.ft
98
M-098
L.ft
99
PVC Shoe
M-099
No
100
M-100
No
101
M-101
No
102
M-102
No
103
M-103
No
104
PVC Straps
M-104
No
105
M-105
No
106
M-106
Pair
107
M-107
No
108
M-108
No
109
M-109
No
110
M-110
No
111
M-111
Cube
112
Salt
M-112
Lbs
6.50
3,700.00
113
Sand
M-113
Cube
114
Sand Papers
M-114
No
115
Slaked Lime
M-115
Lbs
116
Soldering Lead
M-116
Lbs
117
Solvent Cement
M-117
Grms
118
Spur Stone
M-118
No
119
Tarnap
M-119
Gal
120
M-120
No
121
M-121
No
122
M-122
No
123
M-123
No
124
M-124
No
125
M-125
No
126
M-126
No
127
M-127
No
128
Tee Hinges
M-128
Pair
129
M-129
No
130
M-130
No
131
M-131
No
132
M-132
No
133
M-133
L.ft
134
M-134
L.ft
135
M-135
Sq.ft
136
Timber Class I
M-136
Cu.ft
137
M-137
L.ft
138
M-138
Cu.ft
139
M-139
Sq.ft
139a
M-139a
Sq.ft
140
Timber Class II
M-140
Cu.ft
141
M-141
Sq.ft
142
M-142
L.ft
143
M-143
L.ft
144
M-144
L.ft
145
M-145
Sq.ft
146
M-146
L.ft
147
M-147
Sq.ft
148
Timber Purlins
M-148
L.ft
149
M-149
L.ft
9,500.00
300.00
150
M-150
L.ft
151
Timber Wedges
M-151
No
152
M-152
Kg.
153
M-153
No
154
Varnish
M-154
Ltr
155
M-155
No
156
M-156
No
157
Water
M-157
Gal
158
Wax Polish
M-158
Lbs
159
M-159
Lbs
160
Wire Brush
M-160
No
161
Wire Nails
M-161
Lbs
162
M-162
Lbs
163
M-163
Lbs
164
Wirecut Bricks
M-164
No
165
Wood Preservative
M-165
Gal
166
Yellow Ochre
M-166
Lbs
LABOUR
Description
PLANT
Price
( Rs.)
Item
No.
Code No.
Unit
Painter
L-001
Day
Hire of Mixer
P-001
Plumber
L-002
Day
Hire of Vibrator
P-002
SK Labour
L-003
Day
Vibrating Rammer
P-003
SK Labour (Vibrator)
L-004
Day
Tinker
L-005
Day
Tiler
L-006
Day
U / SK Labourer
L-007
Day
1,200.00
Carpenter
L-008
Day
1,500.00
Mason
L-009
Day
1,500.00
Glazier
L-010
Day
35
1,500.00
Description
Code No.
LANT
Unit
Day
Day
Day
Price
( Rs.)
3,500.00
TYPE &
SHAPE
LENGTH (M)
LENGTH OF MEMB
NO OF
NO OF
MARK
INCL LAP
ELEMENT
EACH
TOTAL LENGTH
TOTAL
SHAPE
INCL LAP
(M.TON)
INCL LAP
EXCL
LAP
SIZE
CODE
01,
Y12
0.635
0.635
0.635
30
30
19.05
19.05
0.017
0.017
02,
Y12
.-do-
1.639
1.639
1.639
6.56
6.56
0.006
0.006
03,
Y12
.-do-
2.569
2.569
2.569
10.28
10.28
0.009
0.009
04,
Y12
.-do-
1.280
1.280
1.280
21
21
26.88
26.88
0.024
0.024
05,
Y12
.-do-
2.035
2.035
2.035
10.18
10.18
0.009
0.009
06,
Y12
.-do-
0.635
0.635
0.635
3.81
3.81
0.003
0.003
07,
Y12
.-do-
5.661
5.661
5.661
16.98
16.98
0.015
0.015
08,
Y12
.-do-
9.444
9.444
9.444
18.89
18.89
0.017
0.017
09,
Y12
.-do-
5.052
5.052
5.052
35.36
35.36
0.031
0.031
10,
Y12
.-do-
0.635
0.635
0.635
3.81
3.81
0.003
0.003
151.79
151.79
0.135
0.135
EXC LAP
NO'S
WEIGHT
EXCL LAP
04.01
Item Description
Cube
Item Ref
Unit
Quantity
1.01
M-111
Cube
1.3
1.02
Cement
M-026
Bag
1.03
Sand
M-113
Cube
1.04
Water
M-157
1.05
Mason
1.06
U / SK Labourer
Rate
Amount
3,700.00
4,810.00
920.00
4,600.00
0.3
9,500.00
2,850.00
Gal
100
0.00
L-009
Day
1,500.00
6,000.00
L-007
Day
1,200.00
7,200.00
Total for
Cube
Rate for 1
Cube
25,460.00
25,460.00
Rate(Say)
1Cube
25,460.00
Rate(Say)
1ft3
254.60
Rate(Say)
1m3
8,996.47
7.85 m3
70,663.16
2.78
Item Description
Unit
Quantity
Rate
Amount
Cube
3.61
3,700.00
13,349.95
Cement
Bag
13.88
920.00
12,767.11
Sand
Cube
0.83
9,500.00
7,910.06
34,027.11
03.B.01
3/4" thick DPC in cement sand 1:2 finished with 2 coats hot tar and blinded with sand.
Analysis for
No
Item Description
Sqr
Item Ref
Unit
Quantity
Rate
Amount
1.01
Cement
M-026
Bag
2.25
920.00
2,070.00
1.02
Sand
M-113
Cube
0.11
9,500.00
1,045.00
1.03
Bitumen
M-006
Gal
1.5
85.00
127.50
1.04
Fire Wood
M-046
Lbs
10
1.05
Water
M-157
Gal
10
1.06
Mason
L-009
Day
1.25
1,500.00
1,875.00
1.07
U / SK Labourer
L-007
Day
2.5
1,200.00
3,000.00
Total for
Sqr
Rate for 1
Sqr
8,117.50
8,117.50
Rate(Say)
1Sqr
8,118.00
Rate(Say)
1ft2
81.18
Rate(Say)
1m2
873.50
17.08 m2
14,915.05
9.29
1.84
Item Description
Unit
Quantity
Rate
Amount
Cement
Bag
4.13
920.00
3,803.17
Sand
Cube
0.20
9,500.00
1,919.96
Gal
2.76
85.00
234.25
Bitumen
5,957.38
05.C.01
Item Description
Cube
Item Ref
Unit
Quantity
Rate
Amount
1.0099999905 Cement
M-026
Bag
14
920.00
12,880.00
1.0199999809 Sand
M-113
Cube
0.6
9,500.00
5,700.00
M-064
Cube
0.9
7,500.00
6,750.00
P-001
Day
0.333
3,500.00
1,165.50
1.0499999523 Water
M-157
Gal
100
1.0599999523 SK Labour
L-003
Day
0.333
1,500.00
499.50
1.0699999523 U / SK Labourer
L-007
Day
1,200.00
2,400.00
Total for
Cube
Rate for 1
Cube
0.00
29,395.00
29,395.00
Rate(Say)
1Cube
29,400.00
Rate(Say)
1m3
10,388.69
4.78 m3
49,620.14
1.69
Item Description
Unit
Quantity
Rate
Amount
Cement
Bag
23.63
920.00
21,738.35
Sand
Cube
1.01
9,500.00
9,620.23
1 " Metal
Cube
1.52
7,500.00
11,392.38
Hire of Mixer
Day
0.56
3,500.00
1,967.08
44,718.04
08.02
6" Thick hollow block work in cement and sand mortar 1:5 with cavities unfilled.
Analysis for
No
Item Description
Sqr
Item Ref
Unit
Quantity
M-059
No
112
1.0299999714 Cement
M-026
Bag
0.65
920.00
598.00
1.0399999619 Sand
M-113
Cube
0.07
9,500.00
51.00
1.0499999523 Mason
L-009
Day
1.5
1,500.00
2,250.00
1.0599999523 U / SK Labourer
L-007
Day
1,200.00
2,400.00
Total for
Sqr
Rate for 1
Sqr
Rate
Amount
35.00
196.00
139.50
9,554.50
9,554.50
Rate(Say)
1 Sq
9,554.50
Rate(Say)
1ft2
95.55
Rate(Say)
1m2
1,028.06
Ground floor
1m2
1,028.06
121.46 m2
124,869.64
9.29
13.07
Item Description
Unit
No
Cement
3,920.00
Bag
Quantity
Rate
1,463.75
8.49
35.00
Amount
51,231.25
2,561.56
920.00
7,815.38
Sand
Cube
0.91
9,500.00
8,691.02
70,299.21
13.A.03
5/8" thick to wall in lime cement and sand 1:1:5 finished semi-rough with wooden float.
Analysis for
No
Item Description
Sq
Item Ref
Unit
Quantity
1.0099999905 Cement
M-026
Bag
0.8
920.00
736.00
M-115
Lbs
44
300.00
13,200.00
1.0299999714 Sand
M-113
Cu
0.07
9,500.00
665.00
1.0399999619 Water
M-157
Gal
10
0.00
1.0499999523 Mason
L-009
Day
1,500.00
1,500.00
1.0599999523 U / SK Labourer
L-007
Day
1.25
1,200.00
1,500.00
Total for
Sq
Rate for 1
Sq
Rate
Amount
90.00
17,691.00
17,691.00
Rate(Say)
1Sq
17,691.00
Rate(Say)
1ft2
176.91
Rate(Say)
1m2
1,903.55
Ground floor
1m2
1,903.55
97.11 m2
184,856.66
9.29
10.45
Item Description
Unit
Quantity
Rate
Amount
Cement
Bag
8.36
920.00
7,690.61
Slaked Lime
Lbs
459.76
300.00
137,929.33
Sand
Cu
0.73
9,500.00
6,948.71
152,568.65
13.A.04
5/8" thick Plastering to wall in lime cement and sand 1:1:5 finished smooth with lime putty floating.
Analysis for
No
Item Description
Sqr
Item Ref
Unit
Quantity
1.0099999905 Cement
M-026
Bag
0.8
920.00
736.00
M-115
kg
30
300.00
9,000.00
1.0299999714 Sand
M-113
Cu
0.07
9,500.00
665.00
1.0399999619 Water
M-157
Gal
10
0.00
1.0499999523 Mason
L-009
Day
1.5
1,500.00
2,250.00
1.0599999523 U / SK Labourer
L-007
Day
1.5
1,200.00
1,800.00
Total for
Sqr
Rate for 1
Sqr
Rate
Amount
121.50
14,572.50
14,572.50
Rate(Say)
1Sq
14,573.00
Rate(Say)
1ft2
145.73
Rate(Say)
1m2
1,568.05
Ground floor
1m2
1,568.05
132.05 m2
207,054.07
9.29
14.21
Item Description
Unit
Quantity
Rate
Amount
Cement
Bag
11.37
920.00
10,457.13
Slaked Lime
Lbs
426.24
300.00
127,872.55
Sand
Cu
0.99
9,500.00
9,448.36
147,778.04
10.A.04
Roof covering with corrugated asbestos sheets (Timber frame work and ridge covering measured separately)
Analysis for
No
Item Description
85.85
Item Ref
Unit
Quantity
Sqr Meter
Rate
Amount
1.01
Asbestos Corrugated
M-003
Sheets
25
2,050.00
51,250.00
1.02
M109
No
72
6.50
468.00
1.03
Carpenter
L-008
Day
2.5
1,500.00
3,750.00
1.04
U / SK Labourer
L-007
Day
1,200.00
6,000.00
Total for
Rate for 1
85.85
Sqr Meter
61,468.00
Sqr Meter
716.02
Rate(Say)
716.00
85.85 m2
Item Description
Asbestos Corrugated
Roofing Screws and Washers
Unit
Quantity
Rate
61,466.13
Amount
Sheets
25.00
2,050.00
51,250.00
No
72.00
6.50
468.00
51,718.00
05.A.04
Item Description
Cube
Item Ref
Unit
Quantity
Rate
Amount
1.0099999905 Cement
M-026
Bag
18
920.00
16,560.00
1.0199999809 Sand
M-113
Cube
0.5
9,500.00
4,750.00
M-066
Cube
0.88
7,000.00
6,160.00
P-001
Day
0.333
3,500.00
1,165.50
1.0499999523 Water
M-157
Gal
120
0.00
1.0599999428 SK Labour
L-003
Day
0.333
1,500.00
499.50
1.0700000525 U / SK Labourer
L-007
Day
1,200.00
2,400.00
Total for
Cube
Rate for 1
Cube
31,535.00
31,535.00
Rate(Say)
1Cube
31,540.00
Rate(Say)
1m3
11,144.88
1.75 m3
Item Description
Unit
Quantity
Rate
19,551.65
Amount
Cement
Bag
11.16
920.00
10,265.54
Sand
Cube
0.31
9,500.00
2,944.53
Cube
0.55
7,000.00
3,818.58
17,028.65
7.02
Mild Steel reinforcement to lintels, slabs, beams or columns bent to shape, laid in position and tied with G.I. Wire as directed.
Analysis for
No
Item Description
Item Ref
Unit
Quantity
M-068
kg
50
M-005
Lbs
1.5
1.0399999619 SK Labour
L-003
Day
1.0499999523 U / SK Labourer
L-007
Cwt.
Rate
Amount
102.00
765.00
125.00
187.50
1,500.00
1,500.00
Day
1,200.00
1,200.00
Total for
Cwt.
Rate for 1
Cwt.
8,752.50
8,752.50
Rate(Say)
1Cwt
8,753.00
Rate(Say)
1Kg
175.06
140.00 Kg
Item Description
M.S./Tor Steel Rods including transport to site
Allow 15% of Items ( 1.01 ) for Wastage
16 BWG Binding Wire
5,100.00
Unit
Quantity
kg
Lbs
140.00
4.20
Rate
24,508.40
Amount
102.00
14,280.00
2,142.00
125.00
525.00
16,947.00
16"x8"x6" Block
400
200
150