MCC-JCL Aynak Minerals Company Ltd.

Construction
C
t ti Plan
Pl off
400MW Thermal Power Plant
July 29, 2010

MJAM

MCC-JCL Aynak
Minerals Company
y
p y Ltd.

Project Background

The 400MW thermal power plant of MJAM is an important component


of Aynak Copper Project. According to the power supply agreement
signed between MCC and Government of Afghanistan in Feb 2009, the
main purpose of this project is to provide power to Aynak Project, and
supply/sale the surplus power to Government of Afghanistan, to
promote local economic development.
2

MJAM

MCC-JCL Aynak
Minerals Company
y
p y Ltd.

Project Background
The Project construction includes coal resources development, 400MW
thermal power plant and transmission power lines etc.
The project is located at Ashpushta, Kohmard District, Bamyan Province.

Job place

MJAM

MCC-JCL Aynak
Minerals Company
y
p y Ltd.

Construction Plan of Coal Mine and Power Plant

Coal Resources Development


According to the power supply agreement, Government of
Afghanistan is responsible to provide sufficient coal reserves to
MCC with no less than 100 million tons of coal so as to meet the
demand of constructing a 400MW thermal power plant.
On August 6th, 2009, Government of Afghanistan appointed the
region between Qaleech and Ashpushta as coal prospecting
area which is about 67.5km2.
The development of coal resources includes 4 stages: resources
prospecting, shaft design, shaft construction and surface
industrial facilities construction. Provided the security and other
conditions are fulfilled, the construction period for coal project
would be 3.5--4
3 5--4 years.
years

MJAM

MCC-JCL Aynak
Minerals Company
y
p y Ltd.

Construction Plan of Coal Mine and Power Plant

Construction of Thermal Power Plant

The power plant will be built near the coal prospecting area
area.
The estimated installed gross capacity is 400MW, and the total
investment is preliminary planned to be 500 million US Dollars. The total
area of the p
plant would be 667000m2 and the p
power p
plant includes steam
turbine workshop, electric workshop, chemical treatment workshop and
boiler workshop. Two 20MW steam turbo-generators will be installed in the
steam turbine workshop which is environment-friendly thermal power
generating units of high capacity
capacity, high dimension and high efficiency
efficiency. It
requires 1.5million tons of fire coal annually and annual power generating
capacity is 2.88 billion kwh.

MJAM

MCC-JCL Aynak
Minerals Company
y
p y Ltd.

Construction Plan of Coal Mine and Power Plant

Construction of Thermal Power Plant


The location of power plant can be settled after confirmation of a coal
mine site which can annually produce 1.5 million tons of coal, with a total
reserve of about 100 millions ton and service period of 30 years. Upon
completion
l ti off lland
d acquisition
i iti ffor power plant,
l t th
the power supply
l
development plan and ESIA report will be compiled.
After approval of Ministry of Mines the construction of power plant will
be started,, and with sufficient securityy protection
p
and government
g
support,
pp ,
the construction period will be 3.54 years.

MJAM

MCC-JCL Aynak
Minerals Company
y
p y Ltd.

Construction Plan of Coal Mine and Power Plant

Electric Transmission Line


MJAM will construct a 220KV
two circuit high-tension
two-circuit
high tension
transmission line, via Bamyan
Province, Parwan Province, Kabul
and Logar Province with total
distance of 280km including plant
to Aynak Copper Project and plant
to Kabul.

MJAM

MCC-JCL Aynak
Minerals Company
y
p y Ltd.

Progress of the Project


In September 2009, MJAM dispatched a team of engineers and
surveyors to the working area to conduct geological survey, geological
mapping and topographic measurements.
The confirmed coal survey area starts from Qaleech in the west and
ends at Ashpushta in the east, about 18 KM in length and 4KM in width.
The total area is 67.5 KM2
On March 26, 2010, 45 MJAM employees and 4 drilling machines
started drilling operation in the easten Ashpushta area. On April 24, MJAM
submitted Coal Prospecting Program for Bamyan Project to MOM.
Currently MJAM is carrying out drilling and geolgocial survey in the
eastern Ashpushata area.
area
8

MJAM

MCC-JCL Aynak
Minerals Company
y
p y Ltd.

Work principle

MJAM combines
generall planning
bi
l i andd key
k points
i breakthrough
b kh
h in
i
the work and divides the working area into West Section, East Section
and Middle Section. The priortity sequence of coal prospect is No. 1
Layer of Lower jurassicWest
jurassic West Section and then No
No. 7 Layer of the
Middle jurassic, East Section, and finally the Middle Section

MJAM

MCC-JCL Aynak
Minerals Company
y
p y Ltd.

Prospecting Sequence
The survey will follow the
standard of: from the known to the
unknown,
k
ffrom the
th shallow
h ll
tto th
the
deep, from the center to the sides.
The drilling
g p
plan includes 13
survey lines, 21 holes and 10630
total footage, and will be adjusted
according the discovered coal
reserve situation.

10

MJAM

MCC-JCL Aynak
Minerals Company
y
p y Ltd.

Progress Achieved
East
Currently
been
completed
E t Section:
S ti
C
tl 3 drilling
d illi holes
h l have
h
b
l t d and
d
one is in operation. One drlling hole discoveres 4 layers of coal, the
thickest 2.5M and the thinnest 0.5M. Another discovers 7 uneven
layers of coal, the thickest 2.8M.
Drilling for the West and Middle Section is in preparation and can
be started the moment security arragements are confirmed.
Up to July 25, 2010, the total footage done is 1052M, 22% of the
2010 annual plan
plan.
Drilling for the whole working area is designed to be completed in
2010 and a survey report will be submitted in April 2011.

11

MJAM

MCC-JCL Aynak
Minerals Company
y
p y Ltd.

The Success of the Project will Benefit all Afghanistan


Aynak Copper Project and its auxiliary Coal Mine and Power Plant is
the largest ever foreign investment Project in Afghanistan. The
successful construction and opearion of the project is meaningful for the
economic development and social stability of Afghan society, attraction
of foreign investment, increase of government revenue and improvement
g
p
peoples
p
life standards.
of Afghan
The total investment of Aynak Project and its auxiliary facilities is 4.39
billion US dollars. Aynak Project will directly provide 3708 job
opportunities,
ii
iindirectly
di
l provides
id tens off thousands
h
d jjob
b opportunities
ii b
by
promoting the development of industies like mining, construction,
machinery maintenance, transporation and sevice.

12

MJAM

MCC-JCL Aynak
Minerals Company
y
p y Ltd.

The Success of the Project will Benefit all Afghanistan

he ttaxes submitted
h
b itt d by
b Aynak
A
k Project
P j t after
ft the
th sucessful
f l operation
ti will
ill
improve financial status of the Government.
As the largest foreign investment in Afghansitan, Aynak Project is
progressing smoothly and efficiently with the active support of Ministry of
Mines. The successful construction and production of Aynak Copper Project
will surely attract more foreign investment to Afghanistan.
Aynak Project will adopt advanced mining, concentrating and smelter
t h l
technology
and
d provide
id ttraning
i ffor llocall employees.
l
All thi
this will
ill d
definitely
fi it l
accelerate the sceince and technology advance of Afghanistan and benefit
Afghan people.

13

MJAM

MCC-JCL Aynak
Minerals Company
y
p y Ltd.

Provision of Security for the Project through cooperation

We are pleased to see strong promotion in the aspects of security, land


acquistion, ancient relics excavation and enviromental and social impact
assessment with the powerful support of Ministry of Mines, Ministry of Interior,
Ministry of Finance, Ministry of Culture, NEPA and other concerned ministries.
Security is the precondition of the Project, and land is the basis of the project.
We hold the belief that with the powerful support of Ministry of Mines,
Mines
Ministry of Interior, Ministry of Finance, Ministry of Culture, NEPA and other
concerned ministries, Aynak Project will become a success.
14

MJAM

MCC-JCL Aynak
Minerals Company
y
p y Ltd.

Provision of Security for the Project through cooperation


Here,
we want to use this
H
hi
occasion to thank Afghan
Government for their support to
MJAM. Because of your
y
consistent efforts, peace and
happiness are descending on this
resilient nation, this land full of
engery and hope.
hope China is a
neighbour with generations of
freindship with Afghanistan. We
believe our mutual assistance
and cooperation will secure a
sucessful future for Aynak
Project.

15

MJAM

MCC-JCL Aynak
Minerals Company
y
p y Ltd.

Thank you!