Professional Documents
Culture Documents
I. INTRODUCTION
5%
500 kV
4%
3%
330 kV
2%
750 kV
1%
0%
0
100
200
300
400
Line length (km)
Fig. 1. Fault location error as a function of 330 kV, 500 kV and 750 kV
transmission line length
Z1I
U'1I
A1I B1I
RF
A2I B2I
E2
I''2II
I2 U''0I
C2ID2I
A2II B2II
A0II B0II
A0I B0I
I0
U''0I
Z0II
C 0II D0II
(1)
( R + j L )( G + j C )
(2)
R + j L
G + j C
U1 I1* = (U 2 I 2* + U 0 I 0* ),
(7)
2
2
Im Si = Im U i"I I i* = 0 .
i =0
i =0
(8)
) = 0 ,
*
(9)
iI iI
(10)
iI iI
Zc =
(6)
RF
1
sh ( LF )
Zc
Ci =
Z2II
I''0II
RF
(5)
CiIU i'I + AiI Ii'I
2
Im DiIU i'I BiI I i'I
ki*I
i = 0
C 2II D2II
I''0I
C0ID0I
Z1II
C 1IID1II
I''2I
I'0I
Z0I
U'0I
U''1I
C1ID1I
I'2I
Z2I
U'2I
A1II B1II
I1
Bi = Z c sh ( LF )
(3)
(4)
standard deviation
N=N+1
Random value
generator
Z1I,Z2I,Z0I,Z1II,Z2II,Z0II
Model of the line
(model Fig. 2.)
measured
values U, I
Calculation of the
current distribution
coefficients
...
Calculation of the
fault power S
Im [Si] = 0
NO
Search procedure of
LF
NO
PSS/E Iplan program
Calculation of line model
parameters
(model Fig. 2.)
YES
N>Number of
trials
YES
Calculation of the
expected value and
deviation
Estimation of the line
segment limits to
recommend for
inspection
V. SIMULATION RESULTS
6%
500
750
3 ACO 500
4 ACO 600
0.022
0.014
0.940 0.0122
0.895 0.0130
0.170
0.162
2.37
2.23
0.0065
0.0075
TABLE II
POSITIVE AND ZERO SEQUENCE IMPEDANCES OF THE MONITORED AND
REMOTE SYSTEM
Strong state
Weak State
Sequence
System
R,
X,
R,
X,
Ohm
Ohm
Ohm
Ohm
Monitored
0.157
57.33
0.02
64.41
Positive,Negative
Remote
0.189
39.35
0.436
62.24
Monitored
0.013
66.60
0.012
71.97
Zero
Remote
0.0049
28.14
0.011
33.49
4%
3%
2%
Proposed
algorithm:
error of
Mathematical
expectation,
Maximal and
Minimal
determined
distance
1%
0%
-1%
-2%
-3%
50
400
4%
Error (percent of the line length)
TABLE I
POSITIVE AND ZERO SEQUENCE RESISTANCE, REACTANCE AND
CONDUCTANCE OF THE TESTED LINES
Voltage Conductor
Rpos.
Lpos.
Cpos.
Rzero
Lzero
Czero
mark
kV
Ohm/km mH/km F/km Ohm/km mH/km F/km
5%
3%
2%
Proposed
algorithm:
error of
Mathematical
expectation,
Maximal and
Minimal
determined
distance
1%
0%
-1%
-2%
-3%
50
100
350
400
7%
Method [8]: error of
Mathematical
expectation,
Maximal and
Minimal
determined
distance
6%
5%
4%
3%
2%
Proposed
algorithm:
error of
Mathematical
expectation,
Maximal and
Minimal
determined
distance
1%
0%
-1%
-2%
-3%
0
100
200
300
400
q
+ (1- p) L q
(11)
100
is the probability of fault location in the
E [ q ] = p l L
where
l = s X [1]
(12)
l
l
p = u
u
2X
2X
(13)
E [ q ] = Lq 0.02s X u
( 2s ) + 1 2u ( 2s )) .
(14)
3.0%
1.5%
0.0%
400
100
200
50
30
10
Fault resistance (Ohm)
40
0
Distance to the fault (km)
x = 10 %
x = 5 %
0.8
x = 2 %
0.6
x = 1 %
0.4
0.2
0.0
0
2
4
6
8
Proportionality coefficient, s
10
X. BIOGRAPHIES
Fig. 10. Records of the contingency processes during forced fault on 750 kV
transmission line.