You are on page 1of 76

MECON LIMITED

REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 1 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

Tender Document No. :

ISSUED BY

MECON LIMITED
REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 2 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

ISSUED BY

Tender Document No. :

SPECIFICATION
FOR

AIR CONDITIONING AND


VENTILATION SYSTEM

MECON LIMITED
REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 3 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

ISSUED BY

Tender Document No. :

SPECIFICATION NO. - MEC/TS/05/E9/E/035, R-0

MECON LIMITED
REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 4 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

Tender Document No. :

ISSUED BY

MECON LIMITED
REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 5 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

ISSUED BY

Tender Document No. :

(ELECTRICAL SECTION)
MECON LIMITED
DELHI 110 092

MECON LIMITED
REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 6 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

Tender Document No. :

ISSUED BY

MECON LIMITED
REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 7 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

ISSUE DATE

MECON LIMITED

TenderCONTENTS
Document No. :

Sl. No.

Description

1.0

SCOPE

2.0

CODES AND STANDARDS

3.0

ENVIORMENTAL REQUIREMENTS

4.0

TECHNICAL DATA

ISSUED BY

MECON LIMITED
REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 8 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED
5.0

ISSUE DATE

EQUIPMENT
AND SYSTEM
DESCRIPTION
Tender
Document
No. :

6.0

TESTS

7.0

DOCUMENTATION

8.0

SHIPPING

9.0

SPARE PARTS AND SPECIAL TOOLS

10.0

DATA SHEET

ISSUED BY

MECON LIMITED
REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 9 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

Tender Document No. :

ISSUED BY

MECON LIMITED
REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 10 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

Tender Document No. :

ISSUED BY

MECON LIMITED
REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 11 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED
PREPARED BY:
(Vinay Nagvanshi)

ISSUE DATE

Tender Document
CHECKED
BY:
(B.R.Satpathy)

ISSUED BY

No.
:
APPROVED
BY:
(D.G. Majumder)

AMENDMENT STATUS

REVISION

ISSUE DATE :

Jun, 2013

MECON LIMITED
REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 12 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

ISSUE DATE

MECON LIMITED
TenderPage
Document
No. :
Sl. Clause / Paragraph / Annexure
Revision
No.
/ Exhibit / Drawing Amended
No.

ISSUED BY

Date

By
(Name)

Verified
(Name)

MECON LIMITED
REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 13 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

ISSUE DATE

MECON LIMITED
TenderPage
Document
No. :
Sl. Clause / Paragraph / Annexure
Revision
No.
/ Exhibit / Drawing Amended
No.

ISSUED BY

Date

By
(Name)

Verified
(Name)

MECON LIMITED
REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 14 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

ISSUE DATE

MECON LIMITED
TenderPage
Document
No. :
Sl. Clause / Paragraph / Annexure
Revision
No.
/ Exhibit / Drawing Amended
No.

ISSUED BY

Date

By
(Name)

Verified
(Name)

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 15 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED
1.0
SCOPE

ISSUE DATE

ISSUED BY

Tender Document No. :

This specification covers the Air conditioning and Ventilation design, Engineering,
Manufacturing, painting, inspection & testing at manufacturers works and delivery
to site inclusive of packing and transportation and commissioning at site as per this
specification & data sheet and performance guarantee of Air Conditioning and Ventilation
Systems. The equipment offered shall be complete in all respects. Any material or
accessories, which may not have been specifically mentioned in the specifications
but which are usually necessary for satisfactory, safe, trouble free, operation shall be
provided without any extra charges.

2.0

CODES AND STANDARDS

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 16 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

ISSUE DATE

ISSUED BY

MECON LIMITED

Tender Document No. :


All equipment, systems and practices shall conform to those contained in the following
publications, norms/guidelines, standards, acts and rules.
- Publications of Bureau of Indian standards (BIS)
- American Conference of Governmental Industrial Hygienists (ACGIH) publication
USA.
- Interplant standard specifications (IPSS) for steel plants.
- Publications of International standards organization (ISO).
- VDI stipulation of vibration level.
- ARI Standard 550-92.

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 17 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

ISSUED BY

Tender Document No. :


- ASHRAE handbook
- Handbook of Air Conditioning System Design by Carrier Air Conditioning
Company
- Indian electricity rules

The list furnished above for standards and norms may not cover certain aspects or products.
In such cases where norms/standards/guidelines other than those listed above are followed,
the Contractor shall furnish a copy of such documents in support for the Purchasers perusal
and acceptance of this project. Whenever a contradiction is found between the different
documents, the decision of the Purchasers shall be final and binding.

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 18 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED
3.0

ISSUE DATE

ISSUED BY

Tender Document No. :

ENVIRONMENTAL CONDITIONS

The following ambient design data shall be considered for selecting and sizing various
equipment for air conditioning and ventilation systems:
SEASON
SUMMER
RAINY
WINTER

TEMERATURE
50
32
10

HUMIDITY
30
80
--

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 19 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED
4.0
TECHNICAL DATA

ISSUE DATE

ISSUED BY

Tender Document No. :

The air conditioning shall include central air conditioning / water cooled package type air
conditioning systems for Control room, Server room and other rooms require air conditioning
facility.
Substation, Switch gear room, MCC room, VFD room, UPS room cable cellar / basement and
other room require ventilation facility shall be provided with washed air supply system with
pressurization of 2-3 mmWC positive pressure & maximum temperature of 27 0C. The system
shall include air washer unit, centrifugal fan, dry panel filter, 100% stand by pump sets,
ducting net work, supply air grills, gravity dampers etc. The equipment shall be installed in
ventilation room of adequate size.

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 20 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

ISSUE DATE

ISSUED BY

MECON LIMITED

Tender
Document
No. : rooms, pump house, transformer rooms,
Exhaust ventilation shall
be provided
for battery
store, toilets and other areas emitting heat / fumes. The system shall include wall mounted
axial flow fan with louver shutter / cowl with bird screen at the outlet side.
Mono rail beam with handling and hoisting facilities shall be provided for air conditioning
and ventilation equipments in AC Plant room, AHU room & ventilation room.
The layout of premises for ACVS to be prepared by contractor shall be such that the
ventilation room, AC plant room/AHU room shall be located suitably adjacent to the served
premises.

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 21 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

ISSUE DATE

ISSUED BY

MECON LIMITED

Document
:
The Contractor shall Tender
clearly specify
basis No.
of design
being offered along with heat load
calculations, Ventilation (Ach) calculation and back up guarantee on his design.
Contractor shall furnish schedule & brief specification of air conditioning and ventilation
systems with the offer.

A. Air conditioning system


The different air conditioned rooms shall be maintained at 23+20C and 55+5% RH. The
contractor shall provide split air conditioner/window air conditioner for personal comfort
only to maintain maximum temperature of 25 0C(maximum) in shift in charge rooms, senior

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 22 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

ISSUE DATE

ISSUED BY

MECON LIMITED

Tender
No.
: be as per requirement and same shall be
officers and other room
if any..Document
The quantity
shall
decided during detail engineering.
The contractor shall provide rain canopy at outdoor condensing unit of split air conditioner.
The capacity of air conditioning systems shall be decided based on equipment heat load in the
premises, building heat load, illumination, occupancy heat load and other heat load.
Minimum 10% safety margin shall be considered over and above calculated value.

Type of air conditioning system to be provided as per the following guide lines

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 23 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

ISSUE DATE

ISSUED BY

MECON LIMITED

Tender Document
No. :
Sl. Type of Air Conditioning
System
Capacities
of AC system
No.
(i)
Split air conditioner / Window air Premises with cooling load less
conditioner
than 5 TR.
(ii) Water cooled package air
Premises with cooling load
conditioners
between 5 TR to 25 TR.

The package AC unit shall consist of reciprocating compressor, water cooled condenser, fan
and other standard accessories. Cooling tower and 100% stand by condenser water pump sets
shall be provided. The package AC unit capacity shall be 5TR / 7.5TR only. If system

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 24 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

ISSUE DATE

ISSUED BY

MECON LIMITED

Tender
:
capacity is more than 10TR
andDocument
upto 25TR, No.
multiple
number of AC units of similar capacity
with minimum 50% stand by shall be provided. No other capacity will be accepted.
If air conditioning systems is provided with microprocessor control, manual over ride shall be
provided for operation of the unit in case of failure / mal functioning of micro processor for
central air conditioning unit/package air conditioning unit.

B.

Ventilation system
Temperature inside substation, switch gear room, cable cellar / basement and other room with
pressurized ventilation facility shall be maintained to 380C ( Maximum ) by the provision of
suitable air washer unit of minimum 90 % saturation efficiency.

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 25 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

ISSUE DATE

ISSUED BY

MECON LIMITED

No. :being exhaust ventilated shall not exceed 3


The temperature insideTender
the cableDocument
tunnel and areas
C above ambient temperature at any part of the year.
Ventilation equipment (Centrifugal fan, Air washer, filter, pump sets etc. ) shall be installed
in the Ventilation room. Monorail beam with chain pulley block shall be provided in the
ventilation room having fan motor 18.5 Kw and above.
2-3 mm WC pressurization shall be maintained in the supply air ventilated premises. The
capacity of the systems shall be decided on the basis of total heat dissipated in the premises.
However minimum air changes/ hour shall be 15 in case of washed air supply system and 20

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 26 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

ISSUE DATE

ISSUED BY

MECON LIMITED

air changes/ hour for fresh filtered air supply system & exhaust ventilation systems. 10%
safety margin shall be considered over and above of calculated value.

C. Detail heat load calculations for ventilation and AC system shall be submitted first by the
contractor before submitting any detail engineering drawing.
Fire damper interlocking provision with fire detection system shall be considered for all
electrical premises, cable cellar / basement, cable tunnel susceptible to fire hazard premises
shall be provided in air conditioning & ventilation room.

MECON LIMITED
REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 27 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

ISSUED BY

Tender
No.a: constant frictional drop along its length.
The air distribution system
shall Document
be sized to have
The maximum air velocity shall be restricted to 8 m/sec for air conditioning and 10 m/sec for
ventilation ducts. All Grills/Diffuser shall be selected to give maximum room or space,
coverage and low noise characteristics. The noise level within the air conditioned premises
shall be restricted to 65 dB (A). Acoustic insulation shall be provided inside duct surface for a
length of 5 m from package AC / AHU mouth. Fan installed in battery rooms shall be spark
proof construction and motor flame proof construction and painted with acid resistant paint.
Noise level of equipment shall not exceed 85 dB(A) at 1m distance from all equipment of
ACVS unless stated otherwise elsewhere.
IS: 655 shall be followed for construction of ducting however the sheet thickness for ducting
shall not be less than 1mm GI.

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 28 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

ISSUE DATE

ISSUED BY

MECON LIMITED

Document
No.
Any other premises not Tender
specifically
mentioned
in :the TS but required to be provided with air
conditioning / ventilation shall be provided with suitable air conditioning / ventilation systems
to maintain the required temperature and humidity.
The schedule of equipment list as envisaged for the facilities of AC & ventilation systems in
different rooms is been listed in Annexure I.

5.0

EQUIPMENT AND SYSTEM DESCRIPTION


Brief description of main equipment is indicated below.
1.

Air-conditioning system by water cooled package air conditioner:

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 29 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

ISSUE DATE

ISSUED BY

MECON LIMITED

Tender Document
No.
:
The Package Air Conditioner
System will
comprise
of:

Package type air conditioning unit comprising of water cooled condenser,


hermetic/semi hermetic sealed HCFC (R-22) refrigerant based reciprocating
compressor, cooling refrigerant pipe line, blower, insulated cabinet,
instruments and controls.

Thermal insulation over condensate drain line to avoid condensation over


cold surface.

Condenser cooling water network comprising of natural draft cooling tower,

MECON LIMITED
REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 30 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

ISSUED BY

circulating water pumps with 100% standby arrangement, pipe & pipefitting,
pot strainer, valves, instruments and controls.

Ducting network with damper, acoustic and thermal insulation, supply air
diffuser, return air grills etc.

Thermal insulation shall be provided in supply air ducting, return air


ducting, chilled water piping, expansion tank etc. for all air conditioning
systems as per GS. The thickness of insulating material shall be 50mm for
ducting outside the served premises. Ducting outside the served premises for
washed air supply shall also be thermally insulated with minimum 40mm

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 31 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

ISSUED BY

Tender Document No. :


thick insulation.

Humidity control arrangement with strip heater.


Make-up air filter with damper.
All electrical and Instrumentation accessories including MCC for air
conditioning and ventilation system, temperature sensor, cables etc.
2.

Air conditioning system by split air conditioner:


The Split Air Conditioner System will comprise of

MECON LIMITED
REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 32 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

ISSUED BY

Document
:
PackageTender
type out
door unit No.
comprising
of air cooled condenser, hermetic
sealed HCFC (R-22) based refrigerant reciprocating compressor, refrigerant
pipe line, condenser cooling fan instruments and controls. The outdoor
condensing unit shall be provided with rain protection canopy.

Package type indoor unit comprising of fan, cooling coil, instruments and
controls.

Interconnecting refrigerant pipeline and condensate drain line shall be done to


suit site.

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 33 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

ISSUE DATE

MECON LIMITED

3.

ISSUED BY

Air-Conditioning System By Window Air Conditioner:


Window type air conditioner will comprise of air cooled condenser, hermetically
sealed HCFC (R-22) refrigerant reciprocating compressor, fan, refrigerant piping,
filter, supply air grills, instruments and controls etc.

4.

Ventilation by air washer system


The Air washer type ventilation system shall comprise of :

Centrifugal SISW fan with drive and accessories such as flexible connections,
VIV damper at fan inlet, flexible connection at fan inlet & outlet, ducting, duct
line dampers as required, supply air grills, channel base etc.

MECON LIMITED
REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 34 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

ISSUED BY

Tender
Document
:
Motorized
VIV damper
shall No.
be provided
if the system capacity is more than
50,000 m3/hr.

Air washer with spray sets, brass nozzle, air distributor, water eliminator, tank,
casing, marine light, hermetic door for achieving the saturation efficiency of
not less than 90% for air washer

Intermediate chambers before & after spray chamber with inspection door,
marine light etc.

Circulating water pump sets with 100% standby provision.

MECON LIMITED
REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 35 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

ISSUED BY

Tender
No. : water pipe line, Drain pipe line of air
Circulating
waterDocument
pipeline, Make-up
washer with pipe & pipe fittings, valves, instruments etc.

Ducting network with damper, supply air grill/ diffuser.


Dry panel filters with fixing frame
Gravity damper.
All electrical and Instrumentation accessories including MCC for air
conditioning and ventilation system, temperature sensor, cables etc.

MECON LIMITED
REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 36 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

ISSUED BY

The sheet thickness for air washer tank shall be 5 mm and for the body of the air
washer shall be 3.15 mm MS sheet. The internal of air washer shall be
galvanised / zinc spray coated.
Intermediate chambers shall be made of minimum 3.15 mm MS sheet. The
internal shall be galvanised / zinc spray coated.
The face velocity of air through air washer shall not be more than 2.5 m/sec.
Resistance to air flow in washing chamber shall not exceed 15 mmWC.
The face velocity of air through dry panel filter shall be limited to 2m/Sec.

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 37 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

5.

ISSUE DATE

ISSUED BY

Document
: tunnel
Fresh air supplyTender
ventilation
system toNo.
cable
The ventilation system shall comprise of :

Tube axial fan with drive and accessories and fixing frame
Dry panel filters with fixing frame
Ducting network and supply air grills if required.
Fire damper
6.

Exhaust ventilation system

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 38 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

ISSUED BY

The exhaust ventilation system shall comprise of :

tube axial fan / propeller fan with drive and accessories


louver shutter / cowl with bird screen
fixing frame
7.

Cooling Tower
Type : Natural draft
Frame Work : MS hot dip galvanized / FRP
Casing/ Basin : RCC

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 39 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

ISSUED BY

Document
Louvers Tender
: FRP
/ Wooden No. :
Nozzles
: Brass
Ladder
: Galvanised steel ladder with safety cage & hand railing
the top of tower. Inclined to 300 to the vertical
Cooling Tower Accessories :
(i)
(ii)
(iii)
(iv)

up to

Level switch at cooling tower basin (to be interlocked with pump)


Make up connection with float valve (float made of copper), back up ball
valve
Quick fill connection with ball valve
Overflow connection

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 40 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

(v)
(vi)
(vii)

ISSUED BY

Drain connection with ball valve


GI wire mesh 18 gauge strainer
Equalising line of cooling towers with isolation valves

Cooling tower located at ground shall be provided with 1.5m wide cemented floor all
around the cooling tower.
6.0

TESTS

6.1

Workshop Tests

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 41 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

ISSUE DATE

ISSUED BY

MECON LIMITED
All HVAC panel, motor and other accessories shall be tested completely and detailed in
manufacturers workshop. All tests required by the codes and standards as well as all
manufactures tests have to be performed. The test program for the work shop test has to be
submitted prior to start of the tests in accordance with the Project Procedure Manual.
a)

Routine Test
Visual Test
HV test
IR test
Operational and Functional test
BOM verification

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 42 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

ISSUE DATE

ISSUED BY

MECON LIMITED
Detailed test protocols of all tests performed have to be submitted prior to installation.
6.2

Site Tests
The site tests shall include the following steps:

Pre-installation check and testing,


Pre-commissioning
Commissioning and test on completion,
Test runs,

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 43 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

ISSUE DATE

ISSUED BY

MECON LIMITED
Performance guarantee test.
The aim of the tests is to ensure and prove the proper function of the complete scope.
7.0

DOCUMENTATION
Complete documentation shall be provided for the design, Engineering, calculation
manufacturing, testing, commissioning, operation, maintenance and repair of the Air
conditioning and ventilation system and its components. All documents shall be in English
language.

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 44 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

ISSUE DATE

ISSUED BY

MECON LIMITED
The documentation HVAC shall include the following documents and drawings (minimum
requirements):
a) General Layout and Arrangement
b) Heat load calculation, ventilation calculation and Duct designing
c) Technical data sheets
d) Calculations, protocols, certificates
e) Spare parts list
f) Operation and maintenance manual
g) Reports of tests and commissioning with protocols.
The documents listed above shall be handed over for approval. Special attention has to be
given to the fact, that documentation must be submitted with sufficient time allocated for

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 45 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

ISSUE DATE

ISSUED BY

MECON LIMITED
approval prior to manufacturing / assembly. Documentation has to be prepared in
accordance with the relevant ISO standards or in the absence of relevant details in those
standards the DIN standards shall apply.
The final documentation shall be delivered on paper in sufficient number and with exception
of the signed protocols in electronic form, too. The type of the electronic files shall be agreed
with the Client.
8.0

SHIPPING

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 46 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

ISSUE DATE

ISSUED BY

MECON LIMITED
All equipment, material and spare parts shall be sufficient packaged and shall be shipped as
a common delivery. The material, especially loose parts and spare parts shall be clearly
labelled according to the designation.
9.0

SPARE PARTS AND SPECIAL TOOLS


The Contractor shall deliver all spare parts, which are necessary for commissioning and two
years operation time (see General Description of Project and Works).
Spare parts shall be available until ten years after commissioning.

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 47 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

ISSUE DATE

ISSUED BY

MECON LIMITED

10.0

DATA SHEET
Data to be furnished by the Contractor during detail engineering.
a) Centrifugal Fan
Sl.
No.
a
b

Characteristics

Unit

Make & Model No.


Quantity

no.

Value

MECON LIMITED
REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 48 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

Sl.
No.
c
d
e
f
g
h
i
j

ISSUED BY

Characteristics

Unit

Type of blade
Capacity
Static pressure and total pressure
Operating speed
Critical speed
Shaft power
Total Efficiency
Motor rating, kW/ pole

m3/h
mm WC
rpm
rpm
kW
%
kW/ pole

Value

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 49 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

Sl.
No.
k
l
m
n
o
p
q

Characteristics

ISSUED BY

Unit

Acoustic lagging / silencer, as included


Material of construction
Overall size
Velocity at inlet & outlet of fan
m/sec
Static weight & dynamic weight of fan and kg
motor
Coupling details/V-belt details
Vibration level

Value

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 50 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

Sl.
No.
r

Characteristics

ISSUED BY

Unit

s
t
u

Material of construction & thickness of scroll,


blade, shroud,
back plate, shaft diameter
mm
Noise level at 1m distance
dB(A)
Bearing details

b)

Fan Drive Motor Details

Value

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 51 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

Sl.
No.

Characteristics

a
b
c
d
e
f
g
h

Type & make


Voltage, phase & frequency
Rated power
Speed
Starting/ pull out torque
Starter details
Line current
Starting current

ISSUED BY

Unit

kW
rpm

Value

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 52 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

c)

ISSUE DATE

Sl.
No.

Characteristics

i
j
k
l

Overall efficiency
Class of insulation
Type of enclosure
Any other information

VIV & Duct line Damper

ISSUED BY

Unit

Value

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 53 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

d)

ISSUE DATE

Sl.
No.

Characteristics

a
b
c
d
e

Make, model and type


Type of actuator, if applicable
Diameter of VIV
Motor
Material of construction and thickness

Dry Panel Air Filter

ISSUED BY

Unit

mm
kW/pole

Value

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 54 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

Sl.
No.

Characteristics

a
b
c

Make & Model.


Capacity.
Pressure drop.
i ) When clean
ii) When dirty
Effective cross sectional free and face area
Velocity through filter free and face area.
Filtering panel material & construction details

d
e
f

ISSUED BY

Unit

m3/h
Mm WC
m2
m/sec

Value

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 55 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

e)

ISSUE DATE

ISSUED BY

Sl.
No.

Characteristics

Unit

g
h
i
j

Cleaning efficiency Vs particle size


Overall dimensions & no. of filters.
Fixing frame details.
Total weight. free and face area

t & m2

Ducting

Value

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 56 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

f)

ISSUE DATE

ISSUED BY

Sl.
No.

Characteristics

Unit

a
b
c

M2 of duct work
Weight of supports and flanges
Material and thickness of duct work

m2
t
mm

Tube Axial fan / Propeller fan


Sl.
Characteristics
No.
a
Make & Model

Unit

Value

Value

MECON LIMITED
REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 57 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

Sl.
No.
b
c
d
e
f
g
h
i

ISSUED BY

Characteristics

Unit

Capacity
Quantity
Material of construction
Total pressure
Speed
Size of fan
Drive details (kW & power supply)
Efficiency

M3/hr
kgf/m2
rpm

Value

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 58 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

g)

ISSUE DATE

Sl.
No.
j
k
l

Characteristics

Unit

Weight of fan & motor


Details of non-return damper/louver shutter
Fixing frame

Air washing chamber with water tank


Sl.
Characteristics
No.
a

ISSUED BY

Make & Model No.

Unit

Value

Value

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 59 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

Sl.
No.

Characteristics

b
c
d
e
f
g
h

Type of unit (Horizontal/vertical)


Overall dimensions
Weight with and without water
Air flow capacity.
Air flow velocity
Total Pressure drop
Material of construction, diameter and
numbers of spray header pipes & nozzles.

ISSUED BY

Unit

mm
kg
m3/h
kgf/ m2

Value

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 60 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

ISSUED BY

Sl.
No.

Characteristics

i
j

Make up water requirement


Details of make up, over flow, drainage,
supply and return water pipe lines
Amount of water and its pressure at the
nozzle
Material of construction and thickness of
casing, tank, air distributor plate
Water tank capacity
M3

k
l
m

Unit

Value

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 61 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

h)

ISSUE DATE

Sl.
No.

Characteristics

n
o

Mounting supports
Details of mist /droplet eliminator: material
of construction, material thickness and
depth.

Recirculating water system

ISSUED BY

Unit

Value

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 62 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

Sl.
No.

Characteristics

a
b
c
d

Pump capacity & head, motor KW


Re-circulating piping & fitting;
Strainer & valve
Instruments pressure gauge, temperature
gauge, water flow switch, manometer

ISSUED BY

Unit

Value

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 63 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

i)

ISSUE DATE

ISSUED BY

Package air conditioning system


Sl.
No.
a
b
c
d
e
f

Characteristics
Make and model
Quantity
Capacity
Overall dimension of Package AC Unit
Air flow capacity of blower
Total Pressure

Unit

TR
m3/h
mm WC

Value

MECON LIMITED
REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 64 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

Sl.
No.
i
j
k
l
m
n
o
p

ISSUED BY

Characteristics

Unit

Fan Motor Kw
Fan RPM
Compressor type, model
Compressor motor
Refrigerant type
Condenser type
Condenser material of construction
Overall size of condenser

kW
rpm
kW

Value

MECON LIMITED
REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 65 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

Sl.
No.
q
r
s
t
u
v

Characteristics

ISSUED BY

Unit

Material of construction and its thickness of


casing
Insulating material of casing
Total Power consumption.
Noise level at 1m distance
dB(A)
Vibration isolation pad
Refrigerant drier and strainer

Value

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 66 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

j)

ISSUE DATE

Insulation data sheet


Sl.
Characteristics
No.
a
b
c
d
e
f
g

Make & Type


Quantity
Density
Thermal conductivity
Sound absorption co-efficient
Material of construction and its thickness
Cladding material

ISSUED BY

Unit

kg/m3

Value

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 67 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

ISSUE DATE

ISSUED BY

MECON LIMITED

k)

Cooling Tower
Sl.
Characteristics
No.
a
Make & Model
b
Type
c
Quantity
d
Overall size of cooling tower
e
Capacity of cooling.
f
Water flow

Unit

TR
m3/h

Value

MECON LIMITED
REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 68 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

Sl.
No.
g
h
i
j
k
l
m

Characteristics

ISSUED BY

Unit

Air flow
Design water inlet temperature, outlet
temperature
Material of construction and its thickness
Speed.
rpm
Drive details.
Shaft Power consumption.
Wheel diameter.
mm

Value

MECON LIMITED
REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 69 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

Sl.
No.
n
o
p
q
r
s

Characteristics

ISSUED BY

Unit

Efficiency.
Size of fan
Static & Dynamic weight of fan & motor t
assembly
Bare weight and operating weight of cooling t
tower
Noise level at 1m distance
dB(A)
Fixing details.

Value

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 70 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

ISSUE DATE

ISSUED BY

MECON LIMITED

l)

Pumps
Sl.
No.
a
b
c
d
e
f

Characteristics

Unit

Make and model no.


Type of pump
Capacity
Total head
Quantity
Material of Construction of

m3/hr.
m WC

Value

MECON LIMITED
REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 71 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

Sl.
No.

g
h
i

Characteristics
Shaft
Impeller
Casing
Pump speed
Shaft power
Drive details
Motor make
Motor kW

ISSUED BY

Unit

rpm

kW

Value

MECON LIMITED
REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 72 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

Sl.
No.
j
k
l
m
n
o

Characteristics
Class of insulation
Frame size
Bearing type & make
Type of coupling
Vibration level
Noise level at 1 m distance
Duty
Weight of pump & motor separately

ISSUED BY

Unit

dB(A)
t

Value

MECON LIMITED
REGD. OFF:
RANCHI 834002

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

TITLE

DOCUMENT NO.

Page 73 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

m)

ISSUE DATE

Sl.
No.
p

Characteristics

ISSUED BY

Unit

Value

Unit

Value

Characteristic curves for pumps

Split Air Conditioner / Window air conditioner


Sl.
Characteristics
No.
a
Make and model no.
b
Quantity

MECON LIMITED
REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 74 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

Sl.
No.
c
d
e
f
g
h
i
j

ISSUED BY

Characteristics

Unit

Capacity
Air flow
Flow direction and volume control grill
Material of Construction of
Compressor type
Drive details and total power consumption
Overall dimension
Refrigerant type

TR
m3/hr.

Value

MECON LIMITED
REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 75 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

Sl.
No.
k
l
m
n

Characteristics
Filter efficiency
Weight of unit
Noise level at 1 m distance
Accessories included

ISSUED BY

Unit

dB(A)

Value

MECON LIMITED
REGD. OFF:
RANCHI 834002

TITLE

STANDARD TECHNICAL SPECIFICATION


OIL & GAS SBU, DELHI

AIR CONDITIONING AND


VENTILATION SYSTEM

DOCUMENT NO.

Page 76 of 16

MEC/TS/05/E9/035

REVISION : 0
EDITION : 1

DISTRIBUTION LIST OF CONTROLLED COPIES


SL.
NO.
1.

COPY NO.

DISTRIBUTION

01

ED I/C

2.

02

MRR, Delhi

3.

03

ED (OIL & GAS)

APPROVED BY:

MECON LIMITED

ISSUE DATE

-x-x-x-

ISSUED BY

You might also like