A.

UPAH PEKERJA

Pekerja

Jam

9,000.00

8,930.63

Tukang

Jam

11,550.00

11,460.98

Mandor

Jam

16,500.00

16,372.83

Operator

Jam

14,950.00

14,834.77

Pembantu Operator

Jam

11,530.00

11,441.13

Sopir / Driver

Jam

12,100.00

12,006.74

Pembantu Sopir / Driver

Jam

10,450.00

10,369.46

Mekanik

Jam

19,800.00

19,647.39

Pembantu Mekanik

Jam

10,780.00

10,696.91

10

Kepala Tukang

Jam

15,400.00

15,281.30

HARGA BAHAN

Pasir Pasang (Sedang)

M3

139,500.00

138,424.80

Pasir Beton (Kasar)

M3

296,500.00

294,214.72

Pasir Halus (untuk HRS)

M3

369,936.32

367,085.03

Pasir Urug (ada unsur lempung)

M3

296,500.00

294,214.72

Batu Kali

M3

262,600.00

260,576.00

Agregat Kasar

M3

369,936.32

367,085.03

Agregat Halus

M3

369,936.32

367,085.03

Filler

Kg

630.00

625.14

Batu Belah / Kerakal

M3

242,800.00

240,928.61

10

Gravel

M3

272,600.00

270,498.93

11

Bahan Tanah Timbunan

M3

36,750.00

36,466.75

12

Bahan Pilihan

M3

42,000.00

41,676.28

13

Aspal

KG

10,700.00

10,617.53

14

Kerosen / Minyak Tanah

LITER

9,450.00

9,377.16

15

Semen / PC (40kg)

Zak

74,500.00

73,925.79

16

Semen / PC (kg)

Kg

1,862.50

1,848.14

17

Besi Beton

Kg

21,000.00

20,838.14

18

Kawat Beton

Kg

16,275.00

16,149.56

19

Kawat Bronjong

Kg

34,125.00

33,861.98

20

Sirtu

M3

202,500.00

200,939.23

21

Cat Marka (Non Thermoplas)

Kg

42,000.00

41,676.28

22

Cat Marka (Thermoplastic)

Kg

52,500.00

52,095.35

23

Paku

Kg

31,500.00

31,257.21

24

Kayu Perancah

M3

2,100,000.00

2,083,814.20

25

Bensin

LITER

7,875.00

7,814.30

26

Solar

LITER

8,925.00

8,856.21

27

Minyak Pelumas / Olie

LITER

31,500.00

31,257.21

28

Plastik Filter

M2

21,000.00

20,838.14

29

Pipa Galvanis Dia. 1.6"

Batang

420,000.00

416,762.84

30

Pipa Porus

M'

42,000.00

41,676.28

31

Bahan Agr.Base Kelas A

M3

410,110.35

406,949.41

32

Bahan Agr.Base Kelas B

M3

363,644.57

360,841.77

33

Bahan Agr.Base Kelas C

M3

334,698.69

332,118.99

34

Bahan Agr.Base Kelas C2

M3

35

Geotextile Woven

M2

89,250.00

88,562.10

36

Geotextile Non Woven

M2

40,000.00

39,691.70

36

Aspal Emulsi

Kg

10,500.00

10,419.07

37

Gebalan Rumput

M2

5,250.00

5,209.54

38

Rumput Vertiver

M'

55,000.00

54,576.09

39

Thinner

LITER

26,250.00

26,047.68

40

Glass Bead

Kg

36,750.00

36,466.75

41

Pelat Rambu (Eng. Grade)

BH

630,000.00

625,144.26

42

Pelat Rambu (High I. Grade)

BH

735,000.00

729,334.97

43

Rel Pengaman

M'

840,000.00

833,525.68

44

Beton K-250

M3

1,906,842.88

1,892,145.84

45

Baja Tulangan (Polos) U24

Kg

13,125.00

13,023.84

46

Baja Tulangan (Ulir) D32

Kg

15,750.00

15,628.61

47

Kapur

M3

42,000.00

41,676.28

48

Chipping

M3

369,936.32

367,085.03

49

Chipping (kg)

Kg

196.27

194.76

50

Cat

Kg

28,875.00

28,652.45

51

Pemantul Cahaya (Reflector)

Bh.

13,230.00

13,128.03

52

Pasir Urug

M3

135,800.00

134,753.32

53

Arbocell

Kg.

33,600.00

33,341.03

54

Baja Bergelombang

Kg

13,125.00

13,023.84

55

Beton K-125

M3

1,319,180.82

1,309,013.20

56

Baja Struktur

Kg

28,875.00

28,652.45

57

Tiang Pancang Baja

Kg

25,247.37

25,052.78

58

Tiang Pancang Beton Pratekan

M3

9,000,000.00

8,930,632.28

59

Kawat Las

Dos

42,000.00

41,676.28

60

Pipa Baja

Kg

15,750.00

15,628.61

61

Minyak Fluks

Liter

6,548.85

6,498.37

62

Bunker Oil

Liter

3,150.00

3,125.72

63

Asbuton

Kg

10,000.00

9,922.92

64

Baja Prategang

Kg

8,400.00

8,335.26

65

Baja Tulangan (Polos) U32

Kg

14,700.00

14,586.70

66

Baja Tulangan (Ulir) D39

Kg

16,275.00

16,149.56

67

Baja Tulangan (Ulir) D48

16,800.00

16,670.51

68

PCI Girder L=17m

Buah

90,300,000.00

89,604,010.53

69

PCI Girder L=21m

Buah

101,850,000.00

101,064,988.62

70

PCI Girder L=26m

Buah

130,200,000.00

129,196,480.29

71

PCI Girder L=32m

Buah

164,850,000.00

163,579,414.56

72

PCI Girder L=36m

Buah

176,400,000.00

175,040,392.65

73

PCI Girder L=41m

Buah

201,600,000.00

200,046,163.03

74

Beton K-300

M3

1,987,423.53

1,972,105.41

75

Beton K-175

M3

1,464,846.09

1,453,555.75

76

Cerucuk

M'

45,000.00

44,653.16

77

Elastomer

buah

277,200.00

275,063.47

78

Bahan pengawet: kreosot

liter

5,250.00

5,209.54

79

Mata Kucing

buah

78,750.00

78,143.03

80

Anchorage

buah

504,000.00

500,115.41

81

Anti strpping agent

liter

52,500.00

52,095.35

82

Bahan Modifikasi

Kg

1,000.00

992.29

83

Beton K-500

M3

2,729,180.80

2,708,145.57

84

Beton K-400

M3

2,557,306.86

2,537,596.35

85

Beton K-400 Non Shrink

M3

3,000,000.00

2,976,877.43

85

Ducting (Kabel prestress)

M'

157,500.00

156,286.06

86

Ducting (Strand prestress)

M'

52,500.00

52,095.35

87

Beton K-350

M3

2,467,377.88

2,448,360.51

88

Multipleks 12 mm

Lbr

190,575.00

189,106.14

89

Elastomer jenis 1

buah

404,775.00

401,655.19

90

Elastomer jenis 2

buah

682,500.00

677,239.61

91

Elastomer jenis 3

buah

879,900.00

873,118.15

92

Expansion Tipe Joint Asphaltic Plug

Kg

65,000.00

64,499.01

93

Joint Rubber

M'

400,000.00

396,916.99

94

Epoxy Mortar

Kg

125,000.00

124,036.56

95

Sealant

Kg

170,000.00

168,689.72

93

Expansion Join Baja Siku

288,750.00

286,524.45

94

Kerb Type A

Buah

47,250.00

46,885.82

95

Paving Block

Buah

42,000.00

41,676.28

96

Mini Timber Pile

Buah

28,350.00

28,131.49

97

Strip Bearing

Buah

240,975.00

239,117.68

98

Joint Socket Pile 35x35

Set

637,875.00

632,958.56

99

Joint Socket Pile 16x16x16

Set

70,875.00

70,328.73

Kg

100

Mikro Pile 16x16x16

M1

63,787.50

63,295.86

101

Matras Concrete

Buah

425,250.00

421,972.38

102

Assetilline

Botol

240,975.00

239,117.68

103

Oxygen

Botol

120,487.50

119,558.84

104

Batu Bara

Kg

630.00

625.14

105

Pipa Galvanis Dia 3"

220,500.00

218,800.49

106

Pipa Galvanis Dia 1,5"

105,000.00

104,190.71

107

Agregat Pecah Mesin 0-5 mm

M3

369,936.32

367,085.03

108

Agregat Pecah Mesin 5-10 & 10-20 mm

M3

369,936.32

367,085.03

109

Agregat Pecah Mesin 20-30 mm

M3

369,936.32

367,085.03

110

Joint Sealent

Kg

35,805.00

35,529.03

111

Cat Anti Karat

Kg

37,537.50

37,248.18

112

Expansion Cap

M2

6,352.50

6,303.54

113

Polytene 125 mikron

Kg

20,212.50

20,056.71

114

Curing Compound

Ltr

40,425.00

40,113.42

115

Kayu Acuan

M3

2,100,000.00

2,083,814.20

116

Additive

Ltr

40,425.00

40,113.42

117

Casing

M2

9,450.00

9,377.16

118

Plat Baja tebal 4 Mm

Kg

25,000.00

24,807.31

119

Cat Dasar untuk Plat Baja

Kg

75,000.00

74,421.94

120

Cat Akhir untuk Plat Baja

Kg

90,000.00

89,306.32

121

Baut Angkur

Bh

9,000.00

8,930.63

122

Alat Penyuntik Nipple

Bh

25,000.00

24,807.31

123

Anyaman Kawat

M2

55,000.00

54,576.09

124

Propil Baja Pengaku Tegangan Leleh 250 Mpa

Kg

25,000.00

24,807.31

125

Fibber Composit Carbon

M2

5,000,000.00

4,961,462.38

126

Angkur Dia 16 mm

Bh

85,000.00

84,344.86

127

Beton Grouting K-250, tebal 7,5 Cm

M2

3,000,000.00

2,976,877.43

C.

HARGA SEWA PERALATAN

ASPHALT MIXING PLANT

Jam

6,845,022.68

6,792,264.50

ASPHALT FINISHER

Jam

974,276.24

966,766.98

ASPHALT SPRAYER

Jam

143,723.81

142,616.06

BULLDOZER 100-150 HP

Jam

745,610.72

739,863.90

COMPRESSOR 4000-6500 L\M

Jam

181,096.32

179,700.52

CONCRETE MIXER 0.3-0.6 M3

Jam

116,659.89

115,760.73

CRANE 10-15 TON

Jam

615,487.48

610,743.60

DUMP TRUCK 3.5 TON

Jam

271,447.24

269,355.05

DUMP TRUCK 10 TON

Jam

465,807.64

462,217.42

10

EXCAVATOR 80-140 HP

Jam

618,511.07

613,743.88

11

FLAT BED TRUCK 3-4 M3

Jam

453,491.55

449,996.25

12

GENERATOR SET

Jam

484,170.92

480,439.16

13

MOTOR GRADER >100 HP

Jam

708,440.72

702,980.39

14

TRACK LOADER 75-100 HP

Jam

402,896.84

399,791.50

15

WHEEL LOADER 1.0-1.6 M3

Jam

475,850.02

472,182.40

16

THREE WHEEL ROLLER 6-8 T

Jam

448,915.89

445,455.86

17

TANDEM ROLLER 6-8 T.

Jam

412,882.75

409,700.44

18

TIRE ROLLER 8-10 T.

Jam

459,581.09

456,038.86

19

VIBRATORY ROLLER 5-8 T.

Jam

511,411.48

507,469.77

20

CONCRETE VIBRATOR

Jam

67,332.30

66,813.34

21

STONE CRUSHER

Jam

754,782.30

748,964.80

22

WATER PUMP 70-100 mm

Jam

39,959.20

39,651.21

23

WATER TANKER 3000-4500 L.

Jam

298,542.64

296,241.62

24

PEDESTRIAN ROLLER

Jam

128,202.07

127,213.95

25

TAMPER

Jam

51,359.46

50,963.61

26

JACK HAMMER

Jam

35,101.26

34,830.72

27

FULVI MIXER

Jam

1,083,144.71

1,074,796.34

28

CONCRETE PUMP

Jam

281,533.92

279,363.99

29

TRAILER 20 TON

Jam

547,795.28

543,573.13

30

PILE DRIVER + HAMMER

Jam

196,103.42

194,591.95

31

CRANE ON TRACK 35 TON

Jam

616,346.10

611,595.59

32

WELDING SET

Jam

132,841.84

131,817.96

33

BORE PILE MACHINE

Jam

824,284.42

817,931.22

34

ASPHALT LIQUID MIXER

Jam

43,877.50

43,539.32

35

TRONTON

Jam

527,913.52

523,844.61

36

COLD MILLING MACHINE

Jam

1,704,625.93

1,691,487.49

37

ROCK DRILL BREAKER

Jam

328,013.29

325,485.12

38

COLD RECYCLER

Jam

6,525,465.85

6,475,170.66

39

HOT RECYCLER

Jam

7,997,853.78

7,936,210.12

40

AGGREGAT (CHIP) SPREADER

Jam

535,675.52

531,546.79

41

ASPHALT DISTRIBUTOR

Jam

360,564.63

357,785.57

42

SLIP FORM PAVER

Jam

553,134.27

548,870.97

43

CONCRETE PAN MIXER

Jam

657,364.76

652,298.11

44

CONCRETE BREAKER

Jam

810,194.65

803,950.06

45

ASPAHLT TANKER

Jam

530,634.87

526,544.99

46

CEMENT TANKER

Jam

494,934.87

491,120.15

47

CONDRETE MIXER (350)

Jam

77,360.67

76,764.41

48

VIBRATING RAMMER

Jam

47,388.42

47,023.17

49

TRUK MIXER (AGITATOR)

Jam

620,091.38

615,312.01

50

BORE PILE MACHINE

Jam

665,057.40

659,931.45

51

CRANE ON TRACK 75-100 TON

Jam

878,507.59

871,736.47

52

BLENDING EQUIPMENT

Jam

283,068.63

280,886.87

53

ASPHALT LIQUID MIXER

Jam

140,550.41

139,467.12

54

HYDROLIK PUMP

Jam

364,676.92

361,866.16

55

HYDROLIK JACK

Jam

229,003.54

227,238.49

56

HAMMER K.80

Jam

550,000.00

545,760.86

57

HAMMER K.60

Jam

517,000.00

513,015.21

58

HAMMER K.45

Jam

466,606.78

463,010.40

59

HAMMER K.35

Jam

438,667.66

435,286.62

60

TUG BOAT

Jam

267,202.75

265,143.28

61

PONTON

Jam

557,524.00

553,226.87

62

Lauding Set

Jam

876,421.55

869,666.51

63

MESIN GROUTING

Jam

331,149.98

328,597.63

64

UNCOILER

Jam

82,296.57

81,662.27

65

BORE PILE

Jam

949,857.70

942,536.64

66

DRAILING MACHINE

Jam

465,732.41

462,142.76

65

STRASSING JACK

Jam

462,546.15

458,981.06

66

CONCRETE BATCHING PLANT

Jam

656,496.94

651,436.97

67

TOWER CRANE

Jam

370,360.60

367,506.04

68

ULTRASONIC TEST

Jam

802,716.31

796,529.35

69

PERALATAN SELAM

Jam

62,267.82

61,787.89

70

UNDERWATER TORCH

Jam

57,300.87

56,859.22

71

AG/AGC1 REF. ELECTRODE

Jam

55,748.69

55,319.01

72

DIGITAL MULTIMATER

Jam

52,727.69

52,321.29

73

AUTOMACT LEVEL

Jam

73,447.71

72,881.61

74

THEODOLITE

Jam

84,073.36

83,425.36

75

PICK UP TRUCK

Jam

196,353.29

194,839.90

76

MESIN MARKA/APPLICATOR

Jam

75,546.60

74,964.33

77

MESIN PEMOTONG RUMPUT

Jam

57,317.17

56,875.39

78

GROUD PUMP

Jam

318,625.30

316,169.49

79

LAUCHING SET

Jam

536,010.29

531,878.98

D.

TENAGA

1.

TENAGA AHLI
Ahli Muda (1 - 4 tahun)

Jam

14,018,000.00

14,158,000.00

Ahli (5 - 8 tahun)

Jam

19,140,000.00

19,676,000.00

Ahli Utama (9 - 12 tahun)

Jam

24,262,000.00

24,413,000.00

Ahli Kepala (13 - 20 Tahun)

Jam

29,923,000.00

###

Pengalaman (1 - 7 tahun)

Jam

8,762,000.00

###

Pengalaman (8 - 11 tahun)

Jam

12,940,000.00

###

Pengalaman (12 - 15 tahun)

Jam

16,175,000.00

16,336,000.00

Pengalaman (16 - 20 tahun)

Jam

20,218,000.00

###

2.

TENAGA PENDUKUNG

3.

ASISTENSI
Pengalaman (1 - 4 tahun)

Jam

9,166,000.00

###

Pengalaman (1 - 2 tahun)

Jam

8,088,000.00

###

4.

OFFICE MANAJER

Jam

5,392,000.00

5,471,000.00

5.

SEKRETARIS

Jam

2,022,000.00

2,052,000.00

6.

SEKRETARIS BILINGUAL

Jam

4,044,000.00

4,044,000.00

7.

JURU GAMBAR

Jam

4,044,000.00

4,044,000.00

8.

OPERATOR KOMPUTER

Jam

2,022,000.00

2,022,000.00

9.

SOPIR

Jam

1,348,000.00

1,348,000.00

10.

PESURUH

Jam

1,079,000.00

1,079,000.00

11.

PENJAGA

Jam

1,079,000.00

1,079,000.00

HARGA SATUAN BARANG DAN JASA (HSBJ)


DINAS PEKERJAAN UMUM
PROVINSI KALIMANTAN TIMUR
TAHUN ANGGARAN 2010

Harga Satuan Barang dan Jasa di Kabupaten / Kota Propinsi Kalimantan Timur
Penajam
Paser Utara

Pasir

Kutai
Kartanegara

Bontang

Kutai Timur

Kutai Barat

Berau

10

11

12

8,934.50

9,377.41

9,368.84

9,887.50

9,971.65

9,971.65

9,675.87

11,465.94

12,034.34

12,023.35

12,688.96

12,796.95

12,796.95

12,417.37

16,379.91

17,191.91

17,176.21

18,127.09

18,281.36

18,281.36

17,739.10

14,841.19

15,576.92

15,562.69

16,424.24

16,564.02

16,564.02

16,072.70

11,446.08

12,013.50

12,002.53

12,666.99

12,774.79

12,774.79

12,395.87

12,011.93

12,607.40

12,595.89

13,293.20

13,406.33

13,406.33

13,008.67

10,373.94

10,888.21

10,878.27

11,480.49

11,578.20

11,578.20

11,234.76

19,655.89

20,630.30

20,611.45

21,752.51

21,937.63

21,937.63

21,286.92

10,701.54

11,232.05

11,221.79

11,843.03

11,943.82

11,943.82

11,589.55

15,287.91

16,045.79

16,031.13

16,918.62

17,062.60

17,062.60

16,556.49

138,484.68

145,349.82

145,217.04

153,256.31

154,560.61

154,560.61

149,976.04

294,341.99

308,933.48

308,651.28

325,738.32

328,510.53

328,510.53

318,766.27

367,243.82

385,449.29

385,097.19

406,416.31

409,875.14

409,875.14

397,717.45

294,341.99

308,933.48

308,651.28

325,738.32

328,510.53

328,510.53

318,766.27

260,688.72

273,611.91

273,361.97

288,495.39

290,950.65

290,950.65

282,320.48

367,243.82

385,449.29

385,097.19

406,416.31

409,875.14

409,875.14

397,717.45

367,243.82

385,449.29

385,097.19

406,416.31

409,875.14

409,875.14

397,717.45

625.41

656.42

655.82

692.13

698.02

698.02

677.31

241,032.83

252,981.61

252,750.52

266,742.88

269,013.01

269,013.01

261,033.56

270,615.94

284,031.25

283,771.80

299,481.50

302,030.26

302,030.26

293,071.45

36,482.52

38,291.08

38,256.10

40,373.97

40,717.58

40,717.58

39,509.82

41,694.31

43,761.23

43,721.26

46,141.68

46,534.38

46,534.38

45,154.08

10,622.12

11,148.70

11,138.51

11,755.14

11,855.19

11,855.19

11,503.54

9,381.22

9,846.28

9,837.28

10,381.88

10,470.23

10,470.23

10,159.67

73,957.77

77,624.09

77,553.19

81,846.56

82,543.12

82,543.12

80,094.73

1,848.94

1,940.60

1,938.83

2,046.16

2,063.58

2,063.58

2,002.37

20,847.16

21,880.62

21,860.63

23,070.84

23,267.19

23,267.19

22,577.04

16,156.55

16,957.48

16,941.99

17,879.90

18,032.07

18,032.07

17,497.20

33,876.63

35,556.00

35,523.52

37,490.12

37,809.18

37,809.18

36,687.69

201,026.15

210,991.67

210,798.93

222,468.83

224,362.17

224,362.17

217,707.15

41,694.31

43,761.23

43,721.26

46,141.68

46,534.38

46,534.38

45,154.08

52,117.89

54,701.54

54,651.58

57,677.11

58,167.97

58,167.97

56,442.59

31,270.73

32,820.93

32,790.95

34,606.26

34,900.78

34,900.78

33,865.56

2,084,715.59

2,188,061.73

2,186,063.00

2,307,084.20

2,326,718.80

2,326,718.80

2,257,703.79

7,817.68

8,205.23

8,197.74

8,651.57

8,725.20

8,725.20

8,466.39

8,860.04

9,299.26

9,290.77

9,805.11

9,888.55

9,888.55

9,595.24

31,270.73

32,820.93

32,790.95

34,606.26

34,900.78

34,900.78

33,865.56

20,847.16

21,880.62

21,860.63

23,070.84

23,267.19

23,267.19

22,577.04

416,943.12

437,612.35

437,212.60

461,416.84

465,343.76

465,343.76

451,540.76

41,694.31

43,761.23

43,721.26

46,141.68

46,534.38

46,534.38

45,154.08

407,125.45

427,307.98

426,917.65

450,551.96

454,386.41

454,386.41

440,908.42

360,997.86

378,893.70

378,547.59

399,504.12

402,904.12

402,904.12

390,953.20

332,262.65

348,733.99

348,415.43

367,703.83

370,833.20

370,833.20

359,833.57

88,600.41

92,992.62

92,907.68

98,051.08

98,885.55

98,885.55

95,952.41

39,708.87

41,677.37

41,639.30

43,944.46

44,318.45

44,318.45

43,003.88

10,423.58

10,940.31

10,930.32

11,535.42

11,633.59

11,633.59

11,288.52

5,211.79

5,470.15

5,465.16

5,767.71

5,816.80

5,816.80

5,644.26

54,599.69

57,306.38

57,254.03

60,423.63

60,937.87

60,937.87

59,130.34

26,058.94

27,350.77

27,325.79

28,838.55

29,083.98

29,083.98

28,221.30

36,482.52

38,291.08

38,256.10

40,373.97

40,717.58

40,717.58

39,509.82

625,414.68

656,418.52

655,818.90

692,125.26

698,015.64

698,015.64

677,311.14

729,650.46

765,821.61

765,122.05

807,479.47

814,351.58

814,351.58

790,196.33

833,886.23

875,224.69

874,425.20

922,833.68

930,687.52

930,687.52

903,081.52

1,892,964.32

1,986,804.73

1,984,989.84

2,094,879.56

2,112,708.17

2,112,708.17

2,050,041.14

13,029.47

13,675.39

13,662.89

14,419.28

14,541.99

14,541.99

14,110.65

15,635.37

16,410.46

16,395.47

17,303.13

17,450.39

17,450.39

16,932.78

41,694.31

43,761.23

43,721.26

46,141.68

46,534.38

46,534.38

45,154.08

367,243.82

385,449.29

385,097.19

406,416.31

409,875.14

409,875.14

397,717.45

194.84

204.50

204.32

215.63

217.46

217.46

211.01

28,664.84

30,085.85

30,058.37

31,722.41

31,992.38

31,992.38

31,043.43

13,133.71

13,784.79

13,772.20

14,534.63

14,658.33

14,658.33

14,223.53

134,811.61

141,494.66

141,365.41

149,191.45

150,461.15

150,461.15

145,998.18

33,355.45

35,008.99

34,977.01

36,913.35

37,227.50

37,227.50

36,123.26

13,029.47

13,675.39

13,662.89

14,419.28

14,541.99

14,541.99

14,110.65

1,309,579.44

1,374,499.56

1,373,244.00

1,449,267.26

1,461,601.34

1,461,601.34

1,418,247.40

28,664.84

30,085.85

30,058.37

31,722.41

31,992.38

31,992.38

31,043.43

25,063.61

26,306.10

26,282.07

27,737.05

27,973.11

27,973.11

27,143.37

8,934,495.37

9,377,407.44

9,368,841.45

9,887,503.73

9,971,651.99

9,971,651.99

9,675,873.40

41,694.31

43,761.23

43,721.26

46,141.68

46,534.38

46,534.38

45,154.08

15,635.37

16,410.46

16,395.47

17,303.13

17,450.39

17,450.39

16,932.78

6,501.19

6,823.47

6,817.24

7,194.64

7,255.87

7,255.87

7,040.65

3,127.07

3,282.09

3,279.09

3,460.63

3,490.08

3,490.08

3,386.56

9,927.22

10,419.34

10,409.82

10,986.12

11,079.61

11,079.61

10,750.97

8,338.86

8,752.25

8,744.25

9,228.34

9,306.88

9,306.88

9,030.82

14,593.01

15,316.43

15,302.44

16,149.59

16,287.03

16,287.03

15,803.93

16,156.55

16,957.48

16,941.99

17,879.90

18,032.07

18,032.07

17,497.20

16,677.72

17,504.49

17,488.50

18,456.67

18,613.75

18,613.75

18,061.63

89,642,770.23

94,086,654.60

94,000,709.17

99,204,620.78

100,048,908.26

100,048,908.26

97,081,263.06

101,108,705.96

106,120,994.14

106,024,055.69

111,893,583.91

112,845,861.64

112,845,861.64

109,498,633.92

129,252,366.38

135,659,827.56

135,535,906.24

143,039,220.66

144,256,565.39

144,256,565.39

139,977,635.11

163,650,173.56

171,762,846.19

171,605,945.80

181,106,110.03

182,647,425.54

182,647,425.54

177,229,747.69

175,116,109.29

183,797,185.73

183,629,292.33

193,795,073.16

195,444,378.92

195,444,378.92

189,647,118.54

200,132,696.33

210,053,926.55

209,862,048.37

221,480,083.61

223,365,004.48

223,365,004.48

216,739,564.05

1,972,958.48

2,070,764.46

2,068,872.88

2,183,406.39

2,201,988.42

2,201,988.42

2,136,673.16

1,454,184.51

1,526,273.18

1,524,878.97

1,609,296.80

1,622,992.83

1,622,992.83

1,574,851.70

44,672.48

46,887.04

46,844.21

49,437.52

49,858.26

49,858.26

48,379.37

275,182.46

288,824.15

288,560.32

304,535.11

307,126.88

307,126.88

298,016.90

5,211.79

5,470.15

5,465.16

5,767.71

5,816.80

5,816.80

5,644.26

78,176.83

82,052.32

81,977.36

86,515.66

87,251.95

87,251.95

84,663.89

500,331.74

525,134.82

524,655.12

553,700.21

558,412.51

558,412.51

541,848.91

52,117.89

54,701.54

54,651.58

57,677.11

58,167.97

58,167.97

56,442.59

992.72

1,041.93

1,040.98

1,098.61

1,107.96

1,107.96

1,075.10

2,709,317.02

2,843,626.70

2,841,029.13

2,998,309.48

3,023,826.79

3,023,826.79

2,934,134.21

2,538,694.03

2,664,545.37

2,662,111.39

2,809,486.79

2,833,397.11

2,833,397.11

2,749,353.04

2,978,165.12

3,125,802.48

3,122,947.15

3,295,834.58

3,323,884.00

3,323,884.00

3,225,291.13

156,353.67

164,104.63

163,954.73

173,031.32

174,503.91

174,503.91

169,327.78

52,117.89

54,701.54

54,651.58

57,677.11

58,167.97

58,167.97

56,442.59

2,449,419.58

2,570,845.30

2,568,496.91

2,710,689.78

2,733,759.28

2,733,759.28

2,652,670.67

189,187.94

198,566.60

198,385.22

209,367.89

211,149.73

211,149.73

204,886.62

401,828.93

421,748.90

421,363.64

444,690.48

448,475.05

448,475.05

435,172.41

677,532.57

711,120.06

710,470.48

749,802.37

756,183.61

756,183.61

733,753.73

873,495.83

916,797.87

915,960.40

966,668.28

974,895.18

974,895.18

945,977.89

64,526.91

67,725.72

67,663.85

71,409.75

72,017.49

72,017.49

69,881.31

397,088.68

416,773.66

416,392.95

439,444.61

443,184.53

443,184.53

430,038.82

124,090.21

130,241.77

130,122.80

137,326.44

138,495.17

138,495.17

134,387.13

168,762.69

177,128.81

176,967.01

186,763.96

188,353.43

188,353.43

182,766.50

286,648.39

300,858.49

300,583.66

317,224.08

319,923.83

319,923.83

310,434.27

46,906.10

49,231.39

49,186.42

51,909.39

52,351.17

52,351.17

50,798.34

41,694.31

43,761.23

43,721.26

46,141.68

46,534.38

46,534.38

45,154.08

28,143.66

29,538.83

29,511.85

31,145.64

31,410.70

31,410.70

30,479.00

239,221.11

251,080.08

250,850.73

264,737.91

266,990.98

266,990.98

259,071.51

633,232.36

664,623.75

664,016.64

700,776.83

706,740.83

706,740.83

685,777.53

70,359.15

73,847.08

73,779.63

77,864.09

78,526.76

78,526.76

76,197.50

63,323.24

66,462.38

66,401.66

70,077.68

70,674.08

70,674.08

68,577.75

422,154.91

443,082.50

442,677.76

467,184.55

471,160.56

471,160.56

457,185.02

239,221.11

251,080.08

250,850.73

264,737.91

266,990.98

266,990.98

259,071.51

119,610.56

125,540.04

125,425.36

132,368.96

133,495.49

133,495.49

129,535.76

625.41

656.42

655.82

692.13

698.02

698.02

677.31

218,895.14

229,746.48

229,536.62

242,243.84

244,305.47

244,305.47

237,058.90

104,235.78

109,403.09

109,303.15

115,354.21

116,335.94

116,335.94

112,885.19

367,243.82

385,449.29

385,097.19

406,416.31

409,875.14

409,875.14

397,717.45

367,243.82

385,449.29

385,097.19

406,416.31

409,875.14

409,875.14

397,717.45

367,243.82

385,449.29

385,097.19

406,416.31

409,875.14

409,875.14

397,717.45

35,544.40

37,306.45

37,272.37

39,335.79

39,670.56

39,670.56

38,493.85

37,264.29

39,111.60

39,075.88

41,239.13

41,590.10

41,590.10

40,356.46

6,306.26

6,618.89

6,612.84

6,978.93

7,038.32

7,038.32

6,829.55

20,065.39

21,060.09

21,040.86

22,205.69

22,394.67

22,394.67

21,730.40

40,130.78

42,120.19

42,081.71

44,411.37

44,789.34

44,789.34

43,460.80

2,084,715.59

2,188,061.73

2,186,063.00

2,307,084.20

2,326,718.80

2,326,718.80

2,257,703.79

40,130.78

42,120.19

42,081.71

44,411.37

44,789.34

44,789.34

43,460.80

9,381.22

9,846.28

9,837.28

10,381.88

10,470.23

10,470.23

10,159.67

24,818.04

26,048.35

26,024.56

27,465.29

27,699.03

27,699.03

26,877.43

74,454.13

78,145.06

78,073.68

82,395.86

83,097.10

83,097.10

80,632.28

89,344.95

93,774.07

93,688.41

98,875.04

99,716.52

99,716.52

96,758.73

8,934.50

9,377.41

9,368.84

9,887.50

9,971.65

9,971.65

9,675.87

24,818.04

26,048.35

26,024.56

27,465.29

27,699.03

27,699.03

26,877.43

54,599.69

57,306.38

57,254.03

60,423.63

60,937.87

60,937.87

59,130.34

24,818.04

26,048.35

26,024.56

27,465.29

27,699.03

27,699.03

26,877.43

4,963,608.54

5,209,670.80

5,204,911.91

5,493,057.63

5,539,806.66

5,539,806.66

5,375,485.22

84,381.35

88,564.40

88,483.50

93,381.98

94,176.71

94,176.71

91,383.25

2,978,165.12

3,101,710.28

3,100,217.43

3,407,574.66

3,434,921.03

3,775,460.96

3,692,873.44

6,795,202.61

7,132,062.95

7,125,548.02

7,520,020.81

7,584,020.44

7,584,020.44

7,359,063.65

967,185.17

1,015,131.69

1,014,204.40

1,070,351.10

1,079,460.40

1,079,460.40

1,047,441.50

142,677.75

149,750.75

149,613.96

157,896.64

159,240.43

159,240.43

154,517.05

740,183.94

776,877.28

776,167.62

819,136.53

826,107.84

826,107.84

801,603.88

179,778.25

188,690.44

188,518.08

198,954.51

200,647.72

200,647.72

194,696.12

115,810.81

121,551.93

121,440.89

128,163.90

129,254.65

129,254.65

125,420.71

611,007.78

641,297.43

640,711.63

676,181.64

681,936.33

681,936.33

661,708.77

269,471.57

282,830.15

282,571.80

298,215.07

300,753.05

300,753.05

291,832.13

462,417.36

485,340.90

484,897.55

511,741.65

516,096.86

516,096.86

500,788.42

614,009.37

644,447.82

643,859.13

679,503.39

685,286.35

685,286.35

664,959.43

450,190.91

472,508.34

472,076.72

498,211.05

502,451.10

502,451.10

487,547.43

480,646.98

504,474.22

504,013.40

531,915.75

536,442.66

536,442.66

520,530.72

703,284.48

738,148.58

737,474.31

778,301.14

784,924.92

784,924.92

761,642.52

399,964.44

419,791.98

419,408.51

442,627.11

446,394.12

446,394.12

433,153.20

472,386.65

495,804.39

495,351.49

522,774.32

527,223.42

527,223.42

511,584.95

445,648.55

467,740.80

467,313.53

493,184.17

497,381.45

497,381.45

482,628.15

409,877.67

430,196.64

429,803.67

453,597.74

457,458.12

457,458.12

443,889.02

456,236.12

478,853.24

478,415.82

504,901.08

509,198.07

509,198.07

494,094.27

507,689.28

532,857.09

532,370.34

561,842.55

566,624.15

566,624.15

549,816.97

66,842.24

70,155.83

70,091.74

73,972.05

74,601.59

74,601.59

72,388.76

749,288.77

786,433.46

785,715.08

829,212.53

836,269.60

836,269.60

811,464.22

39,668.36

41,634.85

41,596.82

43,899.64

44,273.25

44,273.25

42,960.02

296,369.76

311,061.78

310,777.63

327,982.39

330,773.70

330,773.70

320,962.31

127,268.97

133,578.11

133,456.09

140,844.27

142,042.93

142,042.93

137,829.66

50,985.66

53,513.18

53,464.30

56,424.10

56,904.30

56,904.30

55,216.41

34,845.79

36,573.21

36,539.80

38,562.65

38,890.84

38,890.84

37,737.27

1,075,261.26

1,128,565.47

1,127,534.56

1,189,955.26

1,200,082.45

1,200,082.45

1,164,485.67

279,484.84

293,339.81

293,071.85

309,296.41

311,928.70

311,928.70

302,676.29

543,808.27

570,766.61

570,245.23

601,814.21

606,935.99

606,935.99

588,933.09

194,676.12

204,326.85

204,140.20

215,441.48

217,275.01

217,275.01

210,830.21

611,860.15

642,192.05

641,605.43

677,124.93

682,887.64

682,887.64

662,631.87

131,874.98

138,412.45

138,286.01

145,941.58

147,183.62

147,183.62

142,817.87

818,285.03

858,850.09

858,065.55

905,568.36

913,275.26

913,275.26

886,185.74

43,558.15

45,717.47

45,675.71

48,204.33

48,614.58

48,614.58

47,172.57

524,071.21

550,051.13

549,548.67

579,971.88

584,907.76

584,907.76

567,558.26

1,692,219.17

1,776,107.99

1,774,485.57

1,872,721.70

1,888,659.62

1,888,659.62

1,832,638.30

325,625.91

341,768.25

341,456.05

360,359.18

363,426.04

363,426.04

352,646.11

6,477,971.61

6,799,105.78

6,792,894.99

7,168,952.00

7,229,963.84

7,229,963.84

7,015,509.05

7,939,643.06

8,333,237.05

8,325,624.88

8,786,534.34

8,861,312.72

8,861,312.72

8,598,468.95

531,776.72

558,138.62

557,628.78

588,499.30

593,507.76

593,507.76

575,903.17

357,940.33

375,684.60

375,341.42

396,120.45

399,491.66

399,491.66

387,641.96

549,108.39

576,329.49

575,803.03

607,679.68

612,851.38

612,851.38

594,673.02

652,580.27

684,930.80

684,305.14

722,188.50

728,334.74

728,334.74

706,730.91

804,297.82

844,169.49

843,398.36

890,089.19

897,664.35

897,664.35

871,037.88

526,772.75

552,886.60

552,381.55

582,961.58

587,922.92

587,922.92

570,483.98

491,332.59

515,689.55

515,218.48

543,741.15

548,368.70

548,368.70

532,103.02

76,797.61

80,604.72

80,531.09

84,989.32

85,712.63

85,712.63

83,170.23

47,043.52

49,375.62

49,330.51

52,061.47

52,504.54

52,504.54

50,947.15

615,578.17

646,094.39

645,504.20

681,239.54

687,037.27

687,037.27

666,658.41

660,216.91

692,946.02

692,313.03

730,639.72

736,857.88

736,857.88

715,001.24

872,113.55

915,347.06

914,510.92

965,138.56

973,352.43

973,352.43

944,480.91

281,008.37

294,938.88

294,669.46

310,982.46

313,629.10

313,629.10

304,326.25

139,527.44

146,444.27

146,310.50

154,410.30

155,724.42

155,724.42

151,105.33

362,022.69

379,969.34

379,622.25

400,638.27

404,047.93

404,047.93

392,063.08

227,336.78

238,606.61

238,388.65

251,585.93

253,727.07

253,727.07

246,201.03

545,996.94

573,063.79

572,540.31

604,236.34

609,378.73

609,378.73

591,303.37

513,237.12

538,679.96

538,187.89

567,982.16

572,816.01

572,816.01

555,825.17

463,210.68

486,173.54

485,729.44

512,619.59

516,982.27

516,982.27

501,647.57

435,474.91

457,062.82

456,645.31

481,925.35

486,026.80

486,026.80

471,610.30

265,257.97

278,407.67

278,153.35

293,552.02

296,050.31

296,050.31

287,268.89

553,466.17

580,903.30

580,372.66

612,502.29

617,715.03

617,715.03

599,392.40

870,042.70

913,173.55

912,339.40

962,846.82

971,041.19

971,041.19

942,238.22

328,739.77

345,036.47

344,721.29

363,805.18

366,901.37

366,901.37

356,018.36

81,697.60

85,747.61

85,669.28

90,411.96

91,181.42

91,181.42

88,476.80

942,944.35

989,689.18

988,785.13

1,043,524.61

1,052,405.60

1,052,405.60

1,021,189.20

462,342.67

485,262.50

484,819.23

511,658.99

516,013.50

516,013.50

500,707.53

459,179.60

481,942.63

481,502.39

508,158.53

512,483.25

512,483.25

497,282.00

651,718.76

684,026.59

683,401.75

721,235.10

727,373.22

727,373.22

705,797.92

367,665.01

385,891.36

385,538.86

406,882.42

410,345.22

410,345.22

398,173.59

796,873.90

836,377.54

835,613.54

881,873.39

889,378.63

889,378.63

862,997.93

61,814.62

64,878.97

64,819.70

68,408.15

68,990.34

68,990.34

66,943.95

56,883.81

59,703.73

59,649.19

62,951.39

63,487.14

63,487.14

61,603.99

55,342.94

58,086.47

58,033.41

61,246.16

61,767.40

61,767.40

59,935.26

52,343.93

54,938.79

54,888.60

57,927.25

58,420.25

58,420.25

56,687.39

72,913.13

76,527.68

76,457.77

80,690.50

81,377.22

81,377.22

78,963.41

83,461.45

87,598.90

87,518.88

92,363.96

93,150.03

93,150.03

90,387.02

194,924.18

204,587.20

204,400.32

215,715.99

217,551.86

217,551.86

211,098.85

74,996.75

78,714.59

78,642.68

82,996.37

83,702.71

83,702.71

81,219.93

56,899.99

59,720.71

59,666.16

62,969.30

63,505.20

63,505.20

61,621.51

316,306.25

331,986.58

331,683.32

350,045.43

353,024.51

353,024.51

342,553.12

532,109.05

558,487.43

557,977.27

588,867.08

593,878.68

593,878.68

576,263.08

14,000,000.00

14,648,000.00

14,579,000.00

15,140,000.00

14,579,000.00

14,859,000.00

14,859,000.00

18,000,000.00

19,999,000.00

19,687,000.00

20,507,000.00

19,960,000.00

20,507,000.00

20,507,000.00

22,000,000.00

25,351,000.00

25,020,000.00

26,081,000.00

25,172,000.00

25,778,000.00

25,778,000.00

30,000,000.00

31,266,000.00

30,920,000.00

21,918,000.00

31,253,000.00

21,918,000.00

21,918,000.00

6,750,000.00

9,089,000.00

8,981,000.00

9,418,000.00

9,369,000.00

9,418,000.00

9,418,000.00

10,350,000.00

13,234,000.00

13,234,000.00

13,822,000.00

13,528,000.00

13,822,000.00

13,822,000.00

13,950,000.00

16,498,000.00

16,498,000.00

17,145,000.00

16,882,000.00

17,145,000.00

17,145,000.00

20,586,000.00

20,586,000.00

20,586,000.00

21,689,000.00

21,321,000.00

21,321,000.00

21,321,000.00

9,428,000.00

9,428,000.00

9,428,000.00

9,690,000.00

9,690,000.00

9,690,000.00

9,690,000.00

8,319,000.00

8,319,000.00

8,319,000.00

8,550,000.00

8,550,000.00

8,550,000.00

8,550,000.00

5,652,000.00

5,634,000.00

5,550,000.00

5,788,000.00

5,630,000.00

5,709,000.00

5,788,000.00

2,120,000.00

2,113,000.00

2,082,000.00

2,171,000.00

2,111,000.00

2,141,000.00

2,171,000.00

4,239,000.00

4,226,000.00

4,179,000.00

4,314,000.00

4,246,000.00

4,314,000.00

4,314,000.00

5,250,000.00

4,226,000.00

4,213,000.00

4,381,000.00

4,213,000.00

4,297,000.00

4,297,000.00

2,400,000.00

1,750,000.00

2,107,000.00

2,191,000.00

2,107,000.00

2,149,000.00

2,149,000.00

3,000,000.00

1,750,000.00

1,498,000.00

1,498,000.00

1,498,000.00

1,498,000.00

1,498,000.00

2,400,000.00

1,300,000.00

1,133,000.00

1,187,000.00

1,133,000.00

1,133,000.00

1,187,000.00

2,550,000.00

1,300,000.00

1,133,000.00

1,187,000.00

1,133,000.00

1,133,000.00

1,187,000.00

si Kalimantan Timur
Bulungan

Tarakan

Nunukan

Malinau

Tana Tidung

13

14

15

16

10,019.70

10,029.43

10,800.00

11,700.00

11,118.64

12,858.62

12,871.10

13,860.00

15,015.00

14,268.92

18,369.45

18,387.29

19,800.00

21,450.00

20,384.17

16,643.84

16,660.00

17,940.00

19,435.00

18,469.29

12,836.35

12,848.81

13,836.00

14,989.00

14,244.21

13,470.93

13,484.01

14,520.00

15,730.00

14,948.39

11,633.99

11,645.28

12,540.00

13,585.00

12,909.97

22,043.34

22,064.75

23,760.00

25,740.00

24,461.00

12,001.37

12,013.03

12,936.00

14,014.00

13,317.66

17,144.82

17,161.47

18,480.00

20,020.00

19,025.22

155,305.35

155,456.17

167,400.00

181,350.00

172,338.88

330,093.45

330,414.01

355,800.00

385,450.00

366,297.33

411,850.11

412,250.07

443,923.59

480,917.22

457,020.86

330,093.45

330,414.01

355,800.00

385,450.00

366,297.33

292,352.58

292,636.49

315,120.00

341,380.00

324,417.13

411,850.11

412,250.07

443,923.59

480,917.22

457,020.86

411,850.11

412,250.07

443,923.59

480,917.22

457,020.86

701.38

702.06

756.00

819.00

778.30

270,309.24

270,571.75

291,360.00

315,640.00

299,956.12

303,485.58

303,780.30

327,120.00

354,380.00

336,771.17

40,913.78

40,953.51

44,100.00

47,775.00

45,401.10

46,758.60

46,804.01

50,400.00

54,600.00

51,886.97

11,912.31

11,923.88

12,840.00

13,910.00

13,218.82

10,520.69

10,530.90

11,340.00

12,285.00

11,674.57

82,940.85

83,021.40

89,400.00

96,850.00

92,037.61

2,073.52

2,075.53

2,235.00

2,421.25

2,300.94

23,379.30

23,402.00

25,200.00

27,300.00

25,943.49

Ket.
17

18,118.96

18,136.55

19,530.00

21,157.50

20,106.20

37,991.36

38,028.26

40,950.00

44,362.50

42,158.17

225,443.25

225,662.18

243,000.00

263,250.00

250,169.34

46,758.60

46,804.01

50,400.00

54,600.00

51,886.97

58,448.25

58,505.01

63,000.00

68,250.00

64,858.72

35,068.95

35,103.01

37,800.00

40,950.00

38,915.23

2,337,930.00

2,340,200.43

2,520,000.00

2,730,000.00

2,594,348.68

8,767.24

8,775.75

9,450.00

10,237.50

9,728.81

9,936.20

9,945.85

10,710.00

11,602.50

11,025.98

35,068.95

35,103.01

37,800.00

40,950.00

38,915.23

23,379.30

23,402.00

25,200.00

27,300.00

25,943.49

467,586.00

468,040.09

504,000.00

546,000.00

518,869.74

46,758.60

46,804.01

50,400.00

54,600.00

51,886.97

456,575.85

457,019.25

492,132.42

533,143.45

506,652.02

404,845.50

405,238.66

436,373.49

472,737.94

449,248.01

372,620.05

372,981.91

401,638.42

435,108.29

413,488.14

99,362.03

99,458.52

107,100.00

116,025.00

110,259.82

44,532.00

44,575.25

48,000.00

52,000.00

49,416.17

11,689.65

11,701.00

12,600.00

13,650.00

12,971.74

5,844.83

5,850.50

6,300.00

6,825.00

6,485.87

61,231.50

61,290.96

66,000.00

71,500.00

67,947.23

29,224.13

29,252.51

31,500.00

34,125.00

32,429.36

40,913.78

40,953.51

44,100.00

47,775.00

45,401.10

701,379.00

702,060.13

756,000.00

819,000.00

778,304.60

818,275.50

819,070.15

882,000.00

955,500.00

908,022.04

935,172.00

936,080.17

1,008,000.00

1,092,000.00

1,037,739.47

2,122,888.17

2,124,949.77

2,288,211.45

2,478,895.74

2,355,721.57

14,612.06

14,626.25

15,750.00

17,062.50

16,214.68

17,534.48

17,551.50

18,900.00

20,475.00

19,457.62

46,758.60

46,804.01

50,400.00

54,600.00

51,886.97

411,850.11

412,250.07

443,923.59

480,917.22

457,020.86

218.51

218.72

235.53

255.16

242.48

32,146.54

32,177.76

34,650.00

37,537.50

35,672.29

14,728.96

14,743.26

15,876.00

17,199.00

16,344.40

151,186.14

151,332.96

162,960.00

176,540.00

167,767.88

37,406.88

37,443.21

40,320.00

43,680.00

41,509.58

14,612.06

14,626.25

15,750.00

17,062.50

16,214.68

1,468,644.01

1,470,070.25

1,583,016.99

1,714,935.07

1,629,721.44

32,146.54

32,177.76

34,650.00

37,537.50

35,672.29

28,107.90

28,135.19

30,296.84

32,821.58

31,190.71

10,019,700.00

10,029,430.43

10,800,000.00

11,700,000.00

11,118,637.19

46,758.60

46,804.01

50,400.00

54,600.00

51,886.97

17,534.48

17,551.50

18,900.00

20,475.00

19,457.62

7,290.83

7,297.92

7,858.62

8,513.51

8,090.48

3,506.90

3,510.30

3,780.00

4,095.00

3,891.52

11,133.00

11,143.81

12,000.00

13,000.00

12,354.04

9,351.72

9,360.80

10,080.00

10,920.00

10,377.39

16,365.51

16,381.40

17,640.00

19,110.00

18,160.44

18,118.96

18,136.55

19,530.00

21,157.50

20,106.20

18,703.44

18,721.60

20,160.00

21,840.00

20,754.79

100,530,990.00

100,628,618.62

108,360,000.00

117,390,000.00

111,556,993.10

113,389,605.00

113,499,721.00

122,220,000.00

132,405,000.00

125,825,910.83

144,951,660.00

145,092,426.84

156,240,000.00

169,260,000.00

160,849,617.96

183,527,505.00

183,705,733.99

197,820,000.00

214,305,000.00

203,656,371.13

196,386,120.00

196,576,836.37

211,680,000.00

229,320,000.00

217,925,288.85

224,441,280.00

224,659,241.56

241,920,000.00

262,080,000.00

249,057,472.98

2,212,598.61

2,214,747.33

2,384,908.23

2,583,650.58

2,455,271.24

1,630,813.15

1,632,396.88

1,757,815.31

1,904,299.92

1,809,676.91

50,098.50

50,147.15

54,000.00

58,500.00

55,593.19

308,606.76

308,906.46

332,640.00

360,360.00

342,454.03

5,844.83

5,850.50

6,300.00

6,825.00

6,485.87

87,672.38

87,757.52

94,500.00

102,375.00

97,288.08

561,103.20

561,648.10

604,800.00

655,200.00

622,643.68

58,448.25

58,505.01

63,000.00

68,250.00

64,858.72

1,113.30

1,114.38

1,200.00

1,300.00

1,235.40

3,038,396.98

3,041,347.66

3,275,016.96

3,547,935.04

3,371,641.23

2,847,049.73

2,849,814.58

3,068,768.23

3,324,498.92

3,159,307.46

3,339,900.00

3,343,143.48

3,600,000.00

3,900,000.00

3,706,212.40

175,344.75

175,515.03

189,000.00

204,750.00

194,576.15

58,448.25

58,505.01

63,000.00

68,250.00

64,858.72

2,746,931.80

2,749,599.42

2,960,853.46

3,207,591.25

3,048,208.83

212,167.15

212,373.19

228,690.00

247,747.50

235,437.14

450,636.01

451,073.63

485,730.00

526,207.50

500,060.71

759,827.25

760,565.14

819,000.00

887,250.00

843,163.32

979,592.67

980,543.98

1,055,880.00

1,143,870.00

1,087,032.10

72,364.50

72,434.78

78,000.00

84,500.00

80,301.27

445,320.00

445,752.46

480,000.00

520,000.00

494,161.65

139,162.50

139,297.64

150,000.00

162,500.00

154,425.52

189,261.00

189,444.80

204,000.00

221,000.00

210,018.70

321,465.38

321,777.56

346,500.00

375,375.00

356,722.94

52,603.43

52,654.51

56,700.00

61,425.00

58,372.85

46,758.60

46,804.01

50,400.00

54,600.00

51,886.97

31,562.06

31,592.71

34,020.00

36,855.00

35,023.71

268,277.47

268,538.00

289,170.00

313,267.50

297,701.51

710,146.24

710,835.88

765,450.00

829,237.50

788,033.41

78,905.14

78,981.76

85,050.00

92,137.50

87,559.27

71,014.62

71,083.59

76,545.00

82,923.75

78,803.34

473,430.83

473,890.59

510,300.00

552,825.00

525,355.61

268,277.47

268,538.00

289,170.00

313,267.50

297,701.51

134,138.73

134,269.00

144,585.00

156,633.75

148,850.76

701.38

702.06

756.00

819.00

778.30

245,482.65

245,721.05

264,600.00

286,650.00

272,406.61

116,896.50

117,010.02

126,000.00

136,500.00

129,717.43

411,850.11

412,250.07

443,923.59

480,917.22

457,020.86

411,850.11

412,250.07

443,923.59

480,917.22

457,020.86

411,850.11

412,250.07

443,923.59

480,917.22

457,020.86

39,861.71

39,900.42

42,966.00

46,546.50

44,233.64

41,790.50

41,831.08

45,045.00

48,798.75

46,373.98

7,072.24

7,079.11

7,623.00

8,258.25

7,847.90

22,502.58

22,524.43

24,255.00

26,276.25

24,970.61

45,005.15

45,048.86

48,510.00

52,552.50

49,941.21

2,337,930.00

2,340,200.43

2,520,000.00

2,730,000.00

2,594,348.68

45,005.15

45,048.86

48,510.00

52,552.50

49,941.21

10,520.69

10,530.90

11,340.00

12,285.00

11,674.57

27,832.50

27,859.53

30,000.00

32,500.00

30,885.10

83,497.50

83,578.59

90,000.00

97,500.00

92,655.31

100,197.00

100,294.30

108,000.00

117,000.00

111,186.37

10,019.70

10,029.43

10,800.00

11,700.00

11,118.64

27,832.50

27,859.53

30,000.00

32,500.00

30,885.10

61,231.50

61,290.96

66,000.00

71,500.00

67,947.23

27,832.50

27,859.53

30,000.00

32,500.00

30,885.10

5,566,500.00

5,571,905.79

6,000,000.00

6,500,000.00

6,177,020.66

94,630.50

94,722.40

102,000.00

110,500.00

105,009.35

4,203,220.69

4,115,268.59

5,043,864.82

5,349,849.16

6,279,611.71

7,620,563.75

7,627,964.30

8,214,027.22

8,898,529.48

8,456,369.30

1,084,661.73

1,085,715.08

1,169,131.48

1,266,559.11

1,203,624.89

160,007.72

160,163.11

172,468.58

186,840.96

177,556.99

830,088.41

830,894.54

894,732.86

969,293.93

921,130.56

201,614.54

201,810.33

217,315.59

235,425.22

223,727.14

129,877.46

130,003.59

139,991.87

151,657.86

144,122.11

685,222.21

685,887.65

738,584.98

800,133.73

760,375.78

302,202.21

302,495.69

325,736.69

352,881.41

335,347.04

518,583.65

519,087.26

558,969.17

605,549.94

575,460.69

688,588.38

689,257.09

742,213.29

804,064.40

764,111.14

504,872.14

505,362.44

544,189.86

589,539.02

560,245.34

539,027.48

539,550.95

581,005.10

629,422.20

598,146.75

788,707.05

789,472.99

850,128.86

920,972.93

875,210.59

448,545.05

448,980.65

483,476.21

523,765.89

497,740.42

529,763.83

530,278.30

571,020.03

618,605.03

587,867.08

499,778.06

500,263.41

538,699.07

583,590.66

554,592.55

459,662.36

460,108.75

495,459.30

536,747.57

510,077.05

511,651.63

512,148.51

551,497.31

597,455.42

567,768.38

569,354.40

569,907.32

613,693.78

664,834.93

631,799.86

74,961.05

75,033.85

80,798.77

87,532.00

83,182.61

840,299.13

841,115.17

905,738.76

981,216.99

932,461.17

44,486.58

44,529.78

47,951.04

51,946.96

49,365.76

332,367.53

332,690.30

358,251.17

388,105.44

368,820.82

142,727.36

142,865.97

153,842.48

166,662.69

158,381.36

57,178.49

57,234.02

61,631.36

66,767.30

63,449.70

39,078.24

39,116.19

42,121.52

45,631.64

43,364.25

1,205,865.00

1,207,036.05

1,299,773.65

1,408,088.12

1,338,121.45

313,431.72

313,736.10

337,840.71

365,994.10

347,808.17

609,860.48

610,452.74

657,354.33

712,133.86

676,748.55

218,321.94

218,533.96

235,324.10

254,934.45

242,266.97

686,178.11

686,844.48

739,615.32

801,249.93

761,436.52

147,892.82

148,036.44

159,410.21

172,694.39

164,113.36

917,675.84

918,567.02

989,141.30

1,071,569.74

1,018,324.37

48,848.83

48,896.26

52,653.00

57,040.76

54,206.45

587,726.12

588,296.88

633,496.22

686,287.57

652,186.54

1,897,760.05

1,899,603.02

2,045,551.12

2,216,013.71

2,105,901.92

365,177.19

365,531.83

393,615.94

426,417.27

405,228.97

7,264,801.13

7,271,856.20

7,830,559.02

8,483,105.61

8,061,587.48

8,904,010.61

8,912,657.56

9,597,424.53

10,397,209.91

9,880,581.60

596,367.56

596,946.71

642,810.62

696,378.17

661,775.75

401,416.60

401,806.43

432,677.55

468,734.01

445,443.03

615,804.38

616,402.41

663,761.12

719,074.55

683,344.36

731,844.19

732,554.91

788,837.71

854,574.19

812,111.14

901,989.71

902,865.66

972,233.59

1,053,253.05

1,000,917.82

590,755.80

591,329.50

636,761.84

689,825.33

655,548.51

551,010.99

551,546.09

593,921.84

643,415.33

611,444.58

86,125.63

86,209.27

92,832.80

100,568.87

95,571.69

52,757.53

52,808.76

56,866.11

61,604.95

58,543.85

690,347.73

691,018.15

744,109.65

806,118.79

766,063.45

740,408.40

741,127.43

798,068.88

864,574.62

821,614.66

978,042.49

978,992.30

1,054,209.10

1,142,059.86

1,085,311.90

315,140.31

315,446.35

339,682.36

367,989.22

349,704.16

156,474.77

156,626.73

168,660.49

182,715.53

173,636.56

405,994.81

406,389.09

437,612.30

474,080.00

450,523.37

254,949.64

255,197.23

274,804.25

297,704.60

282,911.92

612,315.00

612,909.64

660,000.00

715,000.00

679,472.27

575,576.10

576,135.06

620,400.00

672,100.00

638,703.94

519,473.33

519,977.80

559,928.13

606,588.81

576,447.94

488,368.70

488,842.97

526,401.19

570,267.96

541,931.84

297,476.82

297,765.71

320,643.30

347,363.57

330,103.38

620,691.47

621,294.24

669,028.80

724,781.20

688,767.45

975,720.12

976,667.67

1,051,705.86

1,139,348.02

1,082,734.81

368,669.27

369,027.29

397,379.97

430,494.97

409,104.05

91,620.78

91,709.75

98,755.89

106,985.55

101,669.53

1,057,476.57

1,058,503.52

1,139,829.24

1,234,815.01

1,173,458.12

518,499.89

519,003.42

558,878.89

605,452.13

575,367.74

514,952.63

515,452.71

555,055.38

601,309.99

571,431.42

730,878.04

731,587.82

787,796.33

853,446.02

811,039.03

412,322.46

412,722.87

444,432.72

481,468.78

457,545.01

893,664.07

894,531.93

963,259.57

1,043,531.20

991,679.04

69,322.77

69,390.09

74,721.39

80,948.17

76,925.92

63,793.05

63,855.01

68,761.04

74,491.13

70,789.73

62,065.02

62,125.29

66,898.43

72,473.30

68,872.17

58,701.74

58,758.75

63,273.23

68,546.00

65,140.01

81,769.33

81,848.74

88,137.25

95,482.02

90,737.60

93,598.87

93,689.76

100,888.03

109,295.36

103,864.57

218,600.12

218,812.41

235,623.95

255,259.28

242,575.67

84,106.03

84,187.71

90,655.92

98,210.58

93,330.59

63,811.20

63,873.17

68,780.60

74,512.31

70,809.86

354,725.55

355,070.03

382,350.36

414,212.89

393,631.01

596,740.26

597,319.77

643,212.35

696,813.38

662,189.33

15,728,000.00

15,621,000.00

17,184,000.00

17,554,000.00

17,554,000.00

21,475,000.00

21,329,000.00

21,601,000.00

23,968,000.00

23,968,000.00

27,222,000.00

27,037,000.00

27,598,000.00

30,381,000.00

30,381,000.00

33,573,000.00

33,345,000.00

34,245,000.00

37,470,000.00

37,470,000.00

9,637,000.00

9,764,000.00

9,965,000.00

10,972,000.00

10,972,000.00

14,522,000.00

14,420,000.00

14,704,000.00

16,204,000.00

16,204,000.00

18,148,000.00

18,025,000.00

18,439,000.00

20,255,000.00

20,255,000.00

22,688,000.00

22,530,000.00

22,975,000.00

25,317,000.00

25,317,000.00

10,082,000.00

10,214,000.00

10,475,000.00

11,478,000.00

11,478,000.00

8,896,000.00

9,013,000.00

9,242,000.00

10,128,000.00

10,128,000.00

6,052,000.00

6,008,000.00

6,026,000.00

6,752,000.00

6,752,000.00

2,270,000.00

2,253,000.00

2,260,000.00

2,532,000.00

2,532,000.00

4,537,000.00

4,506,000.00

4,583,000.00

5,064,000.00

5,064,000.00

4,539,000.00

4,506,000.00

4,549,000.00

5,064,000.00

5,064,000.00

2,269,000.00

2,253,000.00

2,275,000.00

2,532,000.00

2,532,000.00

1,498,000.00

1,502,000.00

1,653,000.00

1,688,000.00

1,688,000.00

1,187,000.00

1,202,000.00

1,323,000.00

1,352,000.00

1,352,000.00

1,187,000.00

1,202,000.00

1,323,000.00

1,400,000.00

1,400,000.00

INFORMASI UMUM
No.

U RAIAN

IN F OR MAS I

1.

Nomor Paket Kontrak

2.

Nama Paket

Pembangunan Jalan Tol Dirgantara - Rajawali STA. 0+000 - 1+300 Samarinda Ilir

3.

Propinsi / Kabupaten / Kotamadya

: Kal-Tim/Samarinda

4.

Lokasi pekerjaan

Periksa lampiran

5.

Kondisi jalan lama

Lapis pondasi Aggt Klas B

6.

Panjang efektif ( lihat sketsa di bawah )

2.100 Kilometer ( Leff = a + b )

7.

Lebar jalan lama ( bahu + perkerasan + perkerasan + bahu )

8.

Lebar Rencana ( bahu + perkerasan + perkerasan + bahu )

( 0.75

9.

Penampang jalan, jenis dan volume pekerjaan pokok

10.

Jangka waktu pelaksanaan pekerjaan

120 hari kalender


Atau : 4.00 bulan (Periode Pelaksanaan)

11.

Jarak rata-rata Base Camp ke lokasi pekerjaan --->

L=

Perhitungan didasarkan pada sketsa di bawah ini :

L = { (c+a/2)*a + (c+b/2)*b } / (a+b)

1.00 Km = a

1.43 Kilometer

1.100 Km = b
B

0.9 Km = c
Base Camp --------->

Kalkulasi Jarak Rata-Rata =

12.
13.
14.
15.

Jam kerja efektif dalam 1 hari


Asuransi, Pajak, dsb. untuk Peralatan
Tingkat Suku Bunga Investasi Alat
Biaya Umum dan Keuntungan

16.

RINGKASAN METODE PELAKSANAAN

a.

Mobilisasi dilaksanakan sesuai ketentuan yang berlaku dalam Kontrak.

b.

Pekerjaan Tanah dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .


...........................................................................
Pekerjaan Lapis Pondasi Agregat dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
...........................................................................
Pekerjaan Campuran Aspal Panas dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
...........................................................................
Pekerjaan Pasangan Batu dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
...........................................................................
Pekerjaan Pengembalian Kondisi dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
...........................................................................
...........................................................................
...........................................................................

c.
d.
e.
f.
g.

Lihat lampiran.

7.0
0.002
15.00
10.00

jam
x Harga Pokok Alat
%
% x Biaya Langsung

17.

Lokasi Quarry

Periksa lampiran.

18

Jumlah Jembatan = ...................... Buah

Periksa lampiran.

19

Total Bentang Jembatan = .................. Buah

Periksa lampiran.

20

....................................

21

....................................

22

....................................

meter

0.75 )

meter

PT. MAHA SUKSES


MAHA
SUKSES

GENERAL CONTRACTOR & CIVIL ENGINEERING


Jalan Jakarta Blok BG No. 13 Loa Bakung Samarinda Kalimantan timur

REKAPITULASI
DAFTAR KUANTITAS DAN HARGA
Program
Kegiatan
Lokasi
Sumber Dana
Tahun Anggaran

:
:
:
:
:

Pembangunan Jalan dan Jembatan Prop. Kaltim


Pembangunan Jalan Dalam Kota Samarinda
Jalan Tol Samarinda
APBD
2012

No. Divisi

Jumlah Harga
Pekerjaan
(Rupiah)

Uraian

UMUM

134,955,782.00

DRAINASE

1,198,769,251.52

PEKERJAAN TANAH

3,500,378,248.04

PELEBARAN PERKERASAN DAN BAHU JALAN

PERKERASAN BERBUTIR

1,823,623,981.90

PERKERASAN ASPAL

1,844,892,659.13

(A)

Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan )

8,669,623,748.17

(B)

Pajak Pertambahan Nilai ( PPN ) = 10% x (A)

(C)

JUMLAH TOTAL HARGA PEKERJAAN

9,536,586,122.99

(D)

PEMBULATAN

9,536,586,000.00

167,003,825.57

866,962,374.82

Terbilang : Sembilan Milyar Lima Ratus Tiga Puluh Enam Juta Lima Ratus Delapan Puluh Enam Ribu Rupiah

Samarinda, 20 Januari 2010


Penawar
PT. MAHA SUKSES

RISKA MAHARANI, SST


Direktur Utama

DAFTAR KUANTITAS DAN HARGA


Program
Kegiatan
Lokasi
Sumber Dana
Tahun Anggaran

:
:
:
:
:

Pembangunan Jalan dan Jembatan Prop. Kaltim


Pembangunan Jalan Dalam Kota Samarinda
Jalan Tol Samarinda
APBD
2012

No. Mata
Pembayaran

Uraian

a
DIVISI 1
1.2

b
UMUM
Mobilisasi

Satuan

Perkiraan
Kuantitas

Harga
Satuan

Jumlah
Harga-Harga

(Rupiah)
e

(Rupiah)
f = (d x e)

LS

1.00

###

Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

c
DIVISI 2

134,955,782.00
134,955,782.00

DRAINASE

2.1

Galian untuk Selokan Drainase dan Saluran Air

M3

1990.00

38,552.95

76,720,367.82

2.2

Pasangan Batu dengan Mortar

M3

1194.00

939,739.43

1,122,048,883.70

Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 3

###

PEKERJAAN TANAH

3.1 (1)

Galian Biasa

M3

31279.16

38,552.95

1,205,903,945.85

3.2 (1)

Timbunan Biasa

M3

22076.63

97,297.31

2,147,996,325.79

3.3 (3)

Penyiapan Badan Jalan

14300.00

10,243.22

146,477,976.40

Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 4
4.1

PEKERJAAN BAHU JALAN


Lapis Pondasi Agregat Kelas C

M3

298.50

559,476.80

Jumlah Harga Pekerjaan DIVISI 4 (Masuk Pada Rekapitulasi Perkiraan Harga Pekerjaan )
DIVISI 5

###

167,003,825.57
167,003,825.57

PERKERASAN BERBUTIR

5.1 (1)

Lapis Pondasi Agregat Kelas A

M3

1592.00

597,230.40

950,790,800.22

5.1 (2)

Lapis Pondasi Agregat Kelas B

M3

1492.50

584,812.85

872,833,181.67
###

Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 6
6.1 (1)
6.3 (5)

PERKERASAN ASPAL
Lapis Resap Pengikat
Asphalt Treated Base (ATB)

Liter
M2

5572.00
522.38

16,309.34
3,357,773.62

90,875,664.77
1,754,016,994.36

Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
A
B
C
D

Jumlah Keseluruhan
PPN (10 % x Jumlah Keseluruhan)
Jumlah Termasuk PPN
Pembulatan

###
8,669,623,748.17
866,962,374.82
9,536,586,122.99
9,536,586,000.00

Samarinda, 20 Januari 2010


Penawar
PT. MAHA SUKSES

RISKA MAHARANI, SST

Direktur Utama

No. Mata
Pembayaran

LS
0
M1
M3
M6
0
0
M3
0
M2
M2

Uraian
DIVISI 1. UMUM
Mobilisasi dan Demobilisasi
DIVISI 2. DRAINASE
Galian untuk Selokan Drainase dan Saluran Air
Pasangan Batu dengan Mortar
DIVISI 3. PEKERJAAN TANAH
Galian Biasa
Timbunan Biasa
Penyiapan Badan Jalan
DIVISI 4. PEKERJAAN BAHU JALAN
Lapis Pondasi Agregat Kelas C
DIVISI 5. PEKERJAAN BERBUTIR
Lapis Pondasi Agregat Kelas A
Lapis Pondasi Agregat Kelas B
DIVISI 6. PERKERASAN ASPAL
Lapis Resap Pengikat
Asphalt Treated Base (ATB)

Volume

Harga

1.00 Rp

134,955,782.00

1990.00 Rp
1194.00 Rp

76,720,367.82
1,122,048,883.70

31279.16 Rp
22076.63 Rp
14300.00 Rp

1,205,903,945.85
2,147,996,325.79
146,477,976.40

298.50 Rp

167,003,825.57

1592.00 Rp
1492.50 Rp

950,790,800.22
872,833,181.67

5572.00 Rp
522.38 Rp
Rp

90,875,664.77
1,754,016,994.36
8,669,623,748.17

Bobot
1

2.58846

2.58846

2.58846

2.58846

2.58846
4.252

2.58846
6.840

2.58846
9.429

2.58846
12.017

1.56 0.389163 0.389163


0.88
12.94

0.442467 0.442467

13.91
24.78
1.69
1.93
10.97
10.07
1.05
20.23
100
0.389163 0.389163 0.442467 0.442467
0.389
0.778
1.221
1.663

MINGGU K
9

10

11

12

13

14

15

16

17

2.58846
3.477383 3.477383 3.477383 3.477383
2.752902 2.752902 2.752902 2.752902

2.58846 3.477383 3.477383 3.477383 3.477383 2.752902 2.752902 2.752902 2.752902


14.606
18.083
21.560
25.038
28.515
31.268
34.021
36.774
39.527

MINGGU KE18

19

20

21

22

23

24

25

26

2.752902 2.752902 2.752902 2.752902 2.752902


1.689554
1.92631

2.516929 2.516929

2.752902 2.752902 2.752902 2.752902 2.752902 1.689554


42.280
45.033
47.785
50.538
53.291
54.981

1.92631 2.516929 2.516929


56.907
59.424
61.941

27

28

2.517

2.517

29

30

31

32

2.74173

2.742

2.742

2.74173

33

34

35

0.210
0.210
0.210
4.046351 4.046351 4.046351
2.516929 2.516929
64.458
66.975

2.74173
69.717

2.74173
72.458

2.74173
75.200

2.74173 4.255992 4.255992 4.255992


77.942
82.198
86.454
90.710

36

37

38

39

0.389

0.389

0.210
0.210
4.046351 4.046351
4.255992 4.255992 0.389163 0.389163
94.966
99.222
99.611 100.000

HARGA DASAR SATUAN UPAH


No.

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

U RAIAN

Pekerja
Tukang
Mandor
Operator
Pembantu Operator
Sopir / Driver
Pembantu Sopir / Driver
Mekanik / Tenaga ahli
Pembantu Mekanik
Kepala Tukang

KODE

SATUAN

(L01)
(L02)
(L03)
(L04)
(L05)
(L05)
(L05)
(L05)
$$
(L05)

Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam

HARGA
SATUAN
( Rp.)
9,000.00
11,550.00
16,500.00
14,950.00
11,530.00
12,100.00
10,450.00
19,800.00
10,780.00
15,400.00

DAFTAR
HARGA DASAR SATUAN BAHAN
No.

1
2

U RAIAN

Pasir Pasang (Sedang)


Pasir Beton (Kasar)

KODE

SATUAN

M01b
M01a

M3
M3

HARGA
SATUAN
( Rp.)
139,500.00
296,500.00

3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55

Pasir Halus (untuk HRS)


Pasir Urug (ada unsur lempung)
Batu Kali
Agregat Kasar
Agregat Halus
Filler
Batu Belah / Kerakal
Gravel
Bahan Tanah Timbunan
Bahan Pilihan
Aspal
Kerosen / Minyak Tanah
Semen / PC (40kg)
Semen / PC (kg)
Besi Beton
Kawat Beton
Kawat Bronjong
Sirtu
Cat Marka (Non Thermoplas)
Cat Marka (Thermoplastic)
Paku
Kayu Perancah
Bensin
Solar
Minyak Pelumas / Olie
Plastik Filter
Pipa Galvanis Dia. 1.6"
Pipa Porus
Bahan Agr.Base Kelas A
Bahan Agr.Base Kelas B
Bahan Agr.Base Kelas C
Bahan Agr.Base Kelas C2
Geotextile Woven
Aspal Emulsi
Gebalan Rumput
Thinner
Glass Bead
Pelat Rambu (Eng. Grade)
Pelat Rambu (High I. Grade)
Rel Pengaman
Beton K-250
Baja Tulangan (Polos) U24
Baja Tulangan (Ulir) D32
Kapur
Chipping
Chipping (kg)
Cat
Pemantul Cahaya (Reflector)
Pasir Urug
Arbocell
Baja Bergelombang
Beton K-125
Baja Struktur

M01c
M01d
M02
M03
M04
M05
M06
M07
M08
M09
M10
M11
M12
M12
M13
M14
M15
M16
M17a
M17b
M18
M19
M20
M21
M22
M23
M24
M25
M26
M27
M28
M29
M30
M31
M32
M33
M34
M35a
M35b
M36
M37
M39a
M39b
M40
M41
M41kg
M42
M43
M44
M45
M46
M47
M48

M3
M3
M3
M3
M3
Kg
M3
M3
M3
M3
KG
LITER
Zak
Kg
Kg
Kg
Kg
M3
Kg
Kg
Kg
M3
LITER
LITER
LITER
M2
Batang
M'
M3
M3
M3
M3
M2
Kg
M2
LITER
Kg
BH
BH
M'
M3
Kg
Kg
M3
M3
Kg
Kg
Bh.
M3
Kg.
Kg
M3
Kg

369,936.32
296,500.00
262,600.00
369,936.32
369,936.32
630.00
242,800.00
272,600.00
36,750.00
42,000.00
10,700.00
9,450.00
74,500.00
1,862.50
21,000.00
16,275.00
34,125.00
202,500.00
42,000.00
52,500.00
31,500.00
2,100,000.00
7,875.00
8,925.00
31,500.00
21,000.00
420,000.00
42,000.00
410,110.35
363,644.57
334,698.69
0.00
89,250.00
10,500.00
5,250.00
26,250.00
36,750.00
630,000.00
735,000.00
840,000.00
1,906,842.88
13,125.00
15,750.00
42,000.00
369,936.32
196.27
28,875.00
13,230.00
135,800.00
33,600.00
13,125.00
1,319,180.82
28,875.00

56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108

Tiang Pancang Baja


Tiang Pancang Beton Pratekan
Kawat Las
Pipa Baja
Minyak Fluks
Bunker Oil
Asbuton Halus
Baja Prategang
Baja Tulangan (Polos) U32
Baja Tulangan (Ulir) D39
Baja Tulangan (Ulir) D48
PCI Girder L=17m
PCI Girder L=21m
PCI Girder L=26m
PCI Girder L=32m
PCI Girder L=36m
PCI Girder L=41m
Beton K-300
Beton K-175
Cerucuk
Elastomer
Bahan pengawet: kreosot
Mata Kucing
Anchorage
Anti strpping agent
Bahan Modifikasi
Beton K-500
Beton K-400
Ducting (Kabel prestress)
Ducting (Strand prestress)
Beton K-350
Multipleks 12 mm
Elastomer jenis 1
Elastomer jenis 2
Elastomer jenis 3
Expansion Tipe Joint Asphaltic Plug

M49
M50
M51
M52
M53
M54
M55
M56
M57a
M39c
M39d
M58a
M58b
M58c
M58d
M58e
M58f
M59
M60
M61
M62
M63
M64
M65
M66
M67
M68
M69
M70
M71
M72
M73
M74a
M74b
M74c
M75d

M'
M3
Dos
Kg
Liter
Liter
Kg
Kg
Kg
Kg
Kg
Buah
Buah
Buah
Buah
Buah
Buah
M3
M3
M
buah
liter
buah
buah
liter
Kg
M3
M3
M'
M'
M3
Lbr
buah
buah
buah
Kg

25,247.37
9,000,000.00
42,000.00
15,750.00
6,548.85
3,150.00
10,500.00
8,400.00
14,700.00
16,275.00
16,800.00
90,300,000
101,850,000
130,200,000
164,850,000
176,400,000
201,600,000
1,987,423.53
1,464,846.09
45,000
277,200
5,250
78,750
504,000
52,500.00
1,000.00
2,729,180.80
2,557,306.86
157,500
52,500
2,467,377.88
190,575.00
404,775.00
682,500.00
879,900.00
65,000.00

Expansion Join Baja Siku

M75f

288,750.00

Kerb Type A
Paving Block
Mini Timber Pile

M77
M78
M79

Buah
Buah
Buah

47,250.00
42,000.00
28,350.00

Strip Bearing
Joint Socket Pile 35x35
Joint Socket Pile 16x16x16
Mikro Pile 16x16x16
Matras Concrete
Assetilline
Oxygen
Batu Bara
Pipa Galvanis Dia 3"
Pipa Galvanis Dia 1,5"

M81
M82
M83
M84
M85
M86
M87
M88
M24a
M24b

Buah
Set
Set
M1
Buah
Botol
Botol
Kg
M
M

240,975.00
637,875.00
70,875.00
63,787.50
425,250.00
240,975.00
120,487.50
630.00
220,500.00
105,000.00

109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161

Agregat Pecah Mesin 0-5 mm


Agregat Pecah Mesin 5-10 & 10-20 mm
Agregat Pecah Mesin 20-30 mm
Joint Sealent
Cat Anti Karat
Expansion Cap
Polytene 125 mikron
Curing Compound
Kayu Acuan
Additive
Casing
Geotextile Non Woven

M91
M92
M93
M94
M95
M96
M97
M98
M99
M67a
M100

M3
M3
M3
Kg
Kg
M2
Kg
Ltr
M3
Ltr
M2
M2

Rumput Vertiver
Beton K-400 Non Shrink
Joint Rubber

M'

Epoxy Mortar

Kg

Sealant

Kg

Plat Baja tebal 4 Mm

Kg

Cat Dasar untuk Plat Baja

Kg

Cat Akhir untuk Plat Baja

Kg

Baut Angkur

Bh

Alat Penyuntik Nipple

Bh

Anyaman Kawat

M2

Propil Baja Pengaku Tegangan Leleh 250 Mpa

Kg

Fibber Composit Carbon

M2

Angkur Dia 16 mm

Bh

Beton Grouting K-250, tebal 7,5 Cm

M2

369,936.32
369,936.32
369,936.32
35,805.00
37,537.50
6,352.50
20,212.50
40,425.00
2,100,000.00
40,425.00
9,450.00
40,000.00
55,000.00
3,000,000.00
400,000.00
125,000.00
170,000.00
25,000.00
75,000.00
90,000.00
9,000.00
25,000.00
55,000.00
25,000.00
5,000,000.00
85,000.00
3,000,000.00

162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214

215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267

268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320

321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373

374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426

427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452

PAH

HARGA PEROLEHAN ALAT

10%

KETERANGAN
( Rp. / hari)

No.

63,000.00
80,850.00
115,500.00
104,650.00
80,710.00
84,700.00
73,150.00
138,600.00
75,460.00
107,800.00

HAN

105%

KETERANGAN

Base Camp
Base Camp

Jenis Alat

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33

Asphalt Mixing Plant


Asphalt Finisher
Asphalt Sprayer
Bulldozer 100-150 Hp
Compressor 4000-6500 L\M
Concrete Mixer 0.3-0.6 M3
Crane 10-15 Ton
Dump Truck 3-4 M3
Dump Truck
Excavator 80-140 Hp
Flat Bed Truck 3-4 M3
Generator Set
Motor Grader >100 Hp
Track Loader 75-100 Hp
Wheel Loader 1.0-1.6 M3
Three Wheel Roller 6-8 T
Tandem Roller 6-8 T.
Tire Roller 8-10 T.
Vibratory Roller 5-8 T.
Concrete Vibrator
Stone Crusher
Water Pump 70-100 Mm
Water Tanker 3000-4500 L.
Pedestrian Roller
Tamper
Jack Hammer
Fulvi Mixer
Concrete Pump
Trailer 20 Ton
Pile Driver + Hammer
Crane On Track 35 Ton
Welding Set
Bore Pile Machine

34

Asphalt Liquid Mixer

35
36
37
38
39
40
41
42

Trailler 15 Ton
Rock Drill Breaker
Cold Milling
Cold Recycler
Hot Recycler
Aggregat (chip) Spreader
Asphalt Distribution
Split Form Paver

Harga
yang
digunakan
4,590,000,000
2,295,000,000
423,300,000
1,785,000,000
178,500,000
81,600,000
1,377,000,000
244,800,000
357,000,000
1,428,000,000
306,000,000
510,000,000
1,785,000,000
1,020,000,000
1,122,000,000
1,326,000,000
969,000,000
1,020,000,000
1,377,000,000
51,000,000
1,275,000,000
7,650,000
357,000,000
280,500,000
25,500,000
35,700,000
484,500,000
306,000,000
867,000,000
510,000,000
1,581,000,000
132,600,000
2,295,000,000
30,600,000
459,000,000
918,000,000
5,043,900,000
19,890,000,000
29,835,000,000
402,900,000
402,900,000
1,363,885,714

Base Camp
Base Camp
Lokasi Pekerjaan
Base Camp
Base Camp
Proses/Base Camp
Lokasi Pekerjaan
Base Camp
Borrow Pit/quarry
Quarry
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Pertamina
Pertamina
Pertamina
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Base Camp
Base Camp
Base Camp
Tidak tersedia
Lokasi Pekerjaan
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Hasil Proses
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Pelabuhan terdekat

43
44
45
46
47
48
49
50
51
52
53

105000

Concrete Pan Mixer


Concrete Breaker
Asphalt Tanker
Cement Tanker
Concrete Mixer (350)
Vibrating Rammer
Truk Mixer
Bore Pile Machine Dia 60
Crane On Track 75 - 100Ton
Blending Equipment
Asphalt Liquid Mixer (kap 20000)

1,020,000,000
918,000,000
510,000,000
510,000,000
35,700,000
20,400,000
765,000,000
1,193,400,000
1,989,000,000
510,000,000
153,000,000

Lokasi Pekerjaan
Pelabuhan terdekat
Lokasi Pekerjaan
Pelabuhan terdekat
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Pelabuhan terdekat
Pelabuhan terdekat
Pelabuhan terdekat
Pelabuhan terdekat
Pelabuhan terdekat
Pelabuhan terdekat
Lokasi Pekerjaan
Lokasi Pekerjaan

Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan
Lokasi Pekerjaan

Base Camp
Base Camp
Base Camp

OLEHAN ALAT
Harga
contoh

2%
Harga

4,590,000,000
2,295,000,000
423,300,000
1,785,000,000
178,500,000
81,600,000
1,377,000,000
244,800,000
357,000,000
1,428,000,000
306,000,000
510,000,000
1,785,000,000
1,020,000,000
1,122,000,000
1,326,000,000
969,000,000
1,020,000,000
1,377,000,000
51,000,000
1,275,000,000
7,650,000
357,000,000
280,500,000
25,500,000
35,700,000
484,500,000
306,000,000
867,000,000
510,000,000
1,581,000,000
132,600,000
2,295,000,000

4,500,000,000
2,250,000,000
415,000,000
1,750,000,000
175,000,000
80,000,000
1,350,000,000
240,000,000
350,000,000
1,400,000,000
300,000,000
500,000,000
1,750,000,000
1,000,000,000
1,100,000,000
1,300,000,000
950,000,000
1,000,000,000
1,350,000,000
50,000,000
1,250,000,000
7,500,000
350,000,000
275,000,000
25,000,000
35,000,000
475,000,000
300,000,000
850,000,000
500,000,000
1,550,000,000
130,000,000
2,250,000,000

30,600,000

30,000,000

459,000,000
918,000,000
5,043,900,000
19,890,000,000
29,835,000,000
402,900,000
402,900,000
1,363,885,714

450,000,000
900,000,000
4,945,000,000
19,500,000,000
29,250,000,000
395,000,000
395,000,000
1,337,142,857

Sumber
Data

Keterangan

1,020,000,000
918,000,000
510,000,000
510,000,000
35,700,000
20,400,000
765,000,000
1,193,400,000
1,989,000,000
510,000,000
153,000,000

1,000,000,000
900,000,000
500,000,000
500,000,000
35,000,000
20,000,000
750,000,000
1,170,000,000
1,950,000,000
500,000,000
150,000,000

40
114
103
102
48
18
19
60
120
24
97
14
96
80
105
104
99
62
27
89
107
23
2
3
1
53
4
98
69
70
71
72
73
74
41
42
52
61
110
109
29
31
28
117
43
20
26
15
16
101
39

58
59

ANALISA HARGA DASAR SATUAN BAHAN


Jenis : M1c- Pasir Beton
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan

No.

IV.

URAIAN

KODE

KOEF.

SATUAN

Kapasitas Produksi / Jam =


V x Fa x 60
Ts2 x Bil

Q2

2.22

Biaya Dump Truck / M3 = (1 : Q2) x RpE08

Rp2

209,625.80

Rupiah

M44

296,514.14

Rupiah

M44

296,500.00

Rupiah

M3 / Jam

HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN
Harga Satuan Dasar pasir urug =
( RpM44 + Rp1 + Rp2 )
Dibulatkan :

Lanjutan
HARGA
SATUAN
(Rp.)

DAFTAR
HARGA DASAR SATUAN UPAH
BAGIAN PROYEK
PEKERJAAN
KOTA

: PEMBANGUNAN JALAN TOL DIRGANTARA


: PEMBANGUNAN JALAN TOL DIRGANTARA
: SAMARINDA

No.

U R A I A N

1
2
3
4
5
6
7
8
9
10

Pekerja
Tukang Batu
Mandor
Operator
Pembantu Operator
Sopir
Pembantu Sopir
Mekanik
Pembantu Mekanik
Kepala tukang

KODE

SATUAN

L01
L02
L03
L04
L05
L06
L07
L08
L09
L10

Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam

HARGA
SATUAN
(Rp./jam)

KET.

20,000.00
25,700.00
36,700.00
32,300.00
25,700.00
26,900.00
23,300.00
0.00
24,000.00
34,300.00

Samarinda, 6 Juni 2012


Penawar
PT. MAHA SUKSES
MAHA
SUKSES

RISKA MAHARANI, SST


Direktur Utama

DAFTAR
HARGA DASAR SATUAN BAHAN
BAGIAN PROYEK
PEKERJAAN
KOTA

No.

1
2
3
4
6
7
8
9
10
11
12
13
14
15
16
17

: PEMBANGUNAN JALAN TOL DIRGANTARA


: PEMBANGUNAN JALAN TOL DIRGANTARA
: SAMARINDA

U R A I A N

Pasir Pasang
Pasir Cor
Batu Gunung
Agregat Kasar utk Pondasi Kelas A, B
Agregat Halus utk Pondasi Kelas A
Agregat Halus utk Pondasi Kelas B
Bahan Agregat Base Kelas C
Filler
Material Tanah Timbunan Biasa
Aspal Cement
Kerosen
Semen ( kg )
Semen ( 40 kg )
Bensin
Solar
Minyak Pelumas / Oli
Sirtu

KODE SATUAN

M01
M01
M02
M03
M04
M04
M28
M05
M08
M10
M11
M12
M13
M20
M21
M22
M16

m3
m3
m3
m3
m3
m3
m3
kg
m3
kg
ltr
kg
zak
ltr
ltr
ltr
m3

HARGA
SATUAN
(Rp.)
139,500.00
296,500.00
272,600.00
369,936.32
410,110.35
363,644.57
334,698.69
1,000.00
36,750.00
10,700.00
9,450.00
2,125.00
74,500.00
7,875.00
8,925.00
36,500.00
245,000.00

KET.

Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Base Camp
Proses/Base Camp
Borrow Pit/quarry
Base Camp
Base Camp
Base Camp
Base Camp
Pertamina
Pertamina
Pertamina
Lokasi Pekerjaan

Formulir Penentuan Harga Bahan


Bahan : Semen
No

Uraian Kegiatan

1 Harga di Pelabuhan

2 Handling

Biaya
Rp/satuan Jumlah (Rp)
Rp/ton

Jumlah Kombinasi
(Rp)

65,000.00

65,000.00

3 Transport ke proyek

Rp/ton

4 Pembongkaran, gudang

Rp/ton

1,500.00

1,500.00

5 Waste 5%

Rp/ton

2,500.00

2,500.00

subtotal

Rp/ton

69,000.00

Rp/ton

3,450.00

total jumlah

Rp/ton
Rp/zak

72,450.00
3,622.50

Harga Netto
Harga setelah ditambah

Rp/zak
Rp/zak

70,875.00
74,500.00

6 Keuntungan & Overhead


5 % (hanya utk pekerjaan
harian)

7
8

Bahan : Aspal
No

Uraian Kegiatan

Biaya
Rp/satuan Jumlah (Rp)

Jumlah Kombinasi
(Rp)

1 Harga di pelabuhan
dari Jakarta

Rp/ton

214,700.00

214,700.00

2 Handling

Rp/ton

1,500.00

1,500.00

3 Transport ke proyek

Rp/ton

3,360.00

3,360.00

4 Pembongkaran, gudang

Rp/ton

1,500.00

1,500.00

5 Waste 2%

Rp/ton

4,300.00

4,300.00

subtotal
6 Keuntungan & Overhead
5 % (hanya utk pekerjaan
harian)

Rp/ton

225,360.00

Rp/ton

11,268.00

7
8

total jumlah

Rp/ton
Rp/kg

236,628.00
236.63

Harga Netto
Harga setelah ditambah

Rp/kg
Rp/kg

10,500.00
10,700.00

5%

ANALISA BIAYA SEWA PERALATAN PER JAM KERJA


BIAYA PASTI PER JAM
DAYA

NOMOR

JENIS PERALATAN

KODE
ALAT

KAPASITAS

(HP)

JAM
UMUR
OPERASI 1
ALAT
TAHUN
(Thn)

(jam)

HARGA

NILAI
SISA
ALAT

(Rp.)

(Rp.)

FAKTOR
PNGMBLN
MODAL
-

BIAYA OPERASI PER JAM KERJA


BAHAN BAKAR & PELUMAS

BIAYA
ASUPENGEM- BALIAN RANSI
MODAL
DLL
(Rp.)

TOTAL BIAYA
PASTI/JAM

(Rp.)

(Rp.)

BAHAN
BAKAR

MINYAK
PELUMAS

Lt/Hp/Jam

Lt/Hp/Jam

WORKSHOP

SPAREPART

UPAH

BIAYA

KOEF

BIAYA

KOEF

BIAYA

(Rp.)

(Rp.)

(Rp.)

f1 x HP x
(10% x B)

i(1+i)^A

(B - C) x D

0.002 x B

---------------

----------------

---------------

(1+i)^A-1

(Rp.)
1 Orang

0.125

(g1 x B')

0.125

(g1 x B')

Per

Per

s/d

s/d

-------------

s/d

-------------

Jam Kerja

Jam Kerja

0.02

f2 x HP x

0.175

0.175

Rp14,950.0

Rp11,530.0

Harga Olie
1

(Rp.)
1 Orang

s/d

0.01

Harga BBM

ASS. OPERATOR
SOPIR

0.175

0.125
(e1 + e2)

OPERATOR
SOPIR

SEWA ALAT
PER

TOTAL
BIAYA
OPERASI

JAM
/ JAM
(Rp.)

(Rp.)

F+G+H+I

E+J

HP

Cp

e1

e2

f1

f2

g1

g1

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

ASPHALT MIXING PLANT

E01

294.0

60.0 T/Jam

10

1,500.0

4,590,000,000

459000000

0.199

548,740.18

6120

554,860.18

0.1250

0.0100

420603.75

0.1250

382,500.00

0.1250

382,500.00

14950.00

11530.00

1212083.75

1766943.93

ASPHALT FINISHER

E02

72.4

10.0 Ton

1,400.0

2,295,000,000

229500000

0.264

389,843.81 3278.57142857

393,122.38

0.1250

0.0100

103577.25

0.1250

204,910.71

0.1250

204,910.71

14950.00

11530.00

539878.68

933001.06

ASPHALT SPRAYER

E03

4.0

850.0 Liter

2,000.0

423,300,000

42330000

0.298

56,824.64

423.3

57,247.94

0.1250

0.0100

5722.50

0.1250

26,456.25

0.1250

26,456.25

14950.00

11530.00

85115.00

142362.94

BULLDOZER 100-150 HP

E04

155.0

- -

2,000.0

1,785,000,000

178500000

0.298

239,621.97

1785

241,406.97

0.1250

0.0100

221746.88

0.1250

111,562.50

0.1250

111,562.50

14950.00

11530.00

471351.88

712758.84

COMPRESSOR 4000-6500 L\M

E05

60.0

5,000.0 L/M

2,000.0

178,500,000

17850000

0.298

23,962.20

178.5

24,140.70

0.1250

0.0100

85837.50

0.1250

11,156.25

0.1250

11,156.25

14950.00

11530.00

134630.00

158770.70

CONCRETE MIXER 0.3-0.6 M3

E06

20.0

500.0 Liter

1,500.0

81,600,000

8160000

0.615

30,116.09

108.8

30,224.89

0.1250

0.0100

28612.50

0.1250

6,800.00

0.1250

6,800.00

14950.00

11530.00

68692.50

98917.39

CRANE 10-15 TON

E07

138.0

15.0 Ton

2,000.0

1,377,000,000

137700000

0.298

184,851.23

1377

186,228.23

0.1250

0.0100

197426.25

0.1250

86,062.50

0.1250

86,062.50

14950.00

11530.00

396031.25

582259.48

DUMP TRUCK 3-4 TON

E08

100.0

3.5 Ton

2,000.0

244,800,000

24480000

0.298

32,862.44

244.8

33,107.24

0.1250

0.0100

143062.50

0.1250

15,300.00

0.1250

15,300.00

14950.00

11530.00

200142.50

233249.74

DUMP TRUCK 10 TON

E09

190.0

10.0 Ton

2,000.0

357,000,000

35700000

0.298

47,924.39

357

48,281.39

0.1250

0.0100

271818.75

0.1250

22,312.50

0.1250

22,312.50

14950.00

11530.00

342923.75

391205.14

10

EXCAVATOR 80-140 HP

E10

133.0

0.9 M3

2,000.0

1,428,000,000

142800000

0.298

191,697.57

1428

193,125.57

0.1250

0.0100

190273.13

0.1250

89,250.00

0.1250

89,250.00

14950.00

11530.00

395253.13

588378.70

11

FLAT BED TRUCK 3-4 M3

E11

190.0

10.0 ton

2,000.0

306,000,000

30600000

0.298

41,078.05

306

41,384.05

0.1250

0.0100

271818.75

0.1250

19,125.00

0.1250

19,125.00

14950.00

11530.00

336548.75

377932.80

12

GENERATOR SET

E12

180.0

135.0 KVA

2,000.0

510,000,000

51000000

0.298

68,463.42

510

68,973.42

0.1250

0.0100

257512.50

0.1250

31,875.00

0.1250

31,875.00

14950.00

11530.00

347742.50

416715.92

13

MOTOR GRADER >100 HP

E13

135.0

10,800.0 10,800.0

2,000.0

1,785,000,000

178500000

0.298

239,621.97

1785

241,406.97

0.1250

0.0100

193134.38

0.1250

111,562.50

0.1250

111,562.50

14950.00

11530.00

442739.38

684146.34

14

TRACK LOADER 75-100 HP

E14

70.0

0.8 M3

2,000.0

1,020,000,000

102000000

0.298

136,926.84

1020

137,946.84

0.1250

0.0100

100143.75

0.1250

63,750.00

0.1250

63,750.00

14950.00

11530.00

254123.75

392070.59

15

WHEEL LOADER 1.0-1.6 M3

E15

96.0

1.5 M3

2,000.0

1,122,000,000

112200000

0.298

150,619.52

1122

151,741.52

0.1250

0.0100

137340.00

0.1250

70,125.00

0.1250

70,125.00

14950.00

11530.00

304070.00

455811.52

16

THREE WHEEL ROLLER 6-8 T

E16

55.0

8.0 Ton

2,000.0

1,326,000,000

132600000

0.298

178,004.89

1326

179,330.89

0.1250

0.0100

78684.38

0.1250

82,875.00

0.1250

82,875.00

14950.00

11530.00

270914.38

450245.27

17

TANDEM ROLLER 6-8 T.

E17

82.0

7.1 Ton

2,000.0

969,000,000

96900000

0.298

130,080.50

969

131,049.50

0.1250

0.0100

117311.25

0.1250

60,562.50

0.1250

60,562.50

14950.00

11530.00

264916.25

395965.75

18

TIRE ROLLER 8-10 T.

E18

100.5

9.0 Ton

2,000.0

1,020,000,000

102000000

0.298

136,926.84

1020

137,946.84

0.1250

0.0100

143777.81

0.1250

63,750.00

0.1250

63,750.00

14950.00

11530.00

297757.81

435704.65

19

VIBRATORY ROLLER 5-8 T.

E19

82.0

7.1 Ton

2,000.0

1,377,000,000

137700000

0.298

184,851.23

1377

186,228.23

0.1250

0.0100

117311.25

0.1250

86,062.50

0.1250

86,062.50

14950.00

11530.00

315916.25

502144.48

20

CONCRETE VIBRATOR

E20

5.5

1,000.0

51,000,000

5100000

0.350

16,077.18

102

16,179.18

0.1250

0.0100

7868.44

0.1250

6,375.00

0.1250

6,375.00

14950.00

11530.00

47098.44

63277.62

23

WATER TANKER 3000-4500 L.

E23

125.0

50.0 50.0

2,000.0

357,000,000

35700000

0.298

47,924.39

357

48,281.39

0.1250

0.0100

178828.13

0.1250

22,312.50

0.1250

22,312.50

14950.00

11530.00

249933.13

298214.52

24

PEDESTRIAN ROLLER

E24

8.8

1.0 Ton

2,000.0

280,500,000

28050000

0.438

55,283.64

280.5

55,564.14

0.1250

0.0100

12589.50

0.1250

17,531.25

0.1250

17,531.25

14950.00

11530.00

74132.00

129696.14

25

TAMPER

E25

4.7

121.0 Ton

1,000.0

25,500,000

2550000

0.350

8,038.59

51

8,089.59

0.1250

0.0100

6723.94

0.1250

3,187.50

0.1250

3,187.50

14950.00

11530.00

39578.94

26

JACK HAMMER

E26

0.0

2,000.0

35,700,000

3570000

0.298

4,792.44

35.7

4,828.14

0.1250

0.0100

0.00

0.1250

2,231.25

0.1250

2,231.25

14950.00

11530.00

30942.50

35770.64

27

FULVI MIXER

E27

345.0

2,005.0 2,005.0

1,000.0

900,000,000

90000000

0.350

283,714.93

1800

285,514.93

0.1250

0.0100

493565.63

0.1250

112,500.00

0.1250

112,500.00

14950.00

11530.00

745045.63

1030560.56

28

CONCRETE PUMP

E28

100.0

8.0 M3

2,000.0

306,000,000

30600000

0.264

36,385.42

306

36,691.42

0.1250

0.0100

143062.50

0.1250

19,125.00

0.1250

19,125.00

14950.00

11530.00

207792.50

244483.92

29

TRAILER 20 TON

E29

175.0

20.0 Ton

2,000.0

867,000,000

86700000

510,000,000

51000000

510

68,973.42

35765.63

0.1250
0.1250

54,187.50
31,875.00

489173.40

2,000.0

54,187.50
31,875.00

385214.38

0.1250
0.1250

11530.00

20.0 Ton

0.0100
0.0100

14950.00

25.0

0.1250
0.1250

250359.38

E30

103,092.03
68,463.42

103,959.03

PILE DRIVER + HAMMER

0.264
0.298

867

30

14950.00

11530.00

125995.63

194969.04

31

CRANE ON TRACK 35 TON

E31

125.0

35.0 Ton

2,000.0

1,581,000,000

158100000

0.264

187,991.35

1581

189,572.35

0.1250

0.0100

178828.13

0.1250

98,812.50

0.1250

98,812.50

14950.00

11530.00

402933.13

592505.47

32

WELDING SET

E32

40.0

250.0 Amp

2,000.0

132,600,000

13260000

0.298

17,800.49

132.6

17,933.09

0.1250

0.0100

57225.00

0.1250

8,287.50

0.1250

8,287.50

14950.00

11530.00

100280.00

118213.09

272,890.67

2295

275,185.67

0.1250

0.0100

214593.75

0.1250

143,437.50

0.1250

143,437.50

14950.00

11530.00

527948.75

803134.42

4,823.15

30.6

4,853.75

0.1250

0.0100

7153.13

0.1250

1,912.50

0.1250

1,912.50

14950.00

11530.00

37458.13

42311.88

33

BORE PILE MACHINE

E33

150.0

34

ASPHALT LIQUID MIXER

E34

5.0

25

1330

1330

2,000.0 Meter

2,000.0

2,295,000,000

229500000

0.264

1,000.0 Liter

2,000.0

30,600,000

3060000

0.350

KETERANGAN :
1 Tingkat Suku Bunga

2 Upah Operator / Sopir / Mekanik

14,950.00 Rupiah / hari

3 Upah Pembantu Operator/Sopir/Mekanik

11,530.00 Rupiah / hari

4 Harga Bahan Bakar Bensin

5 Harga Bahan Bakar Solar

8,925.00 Liter

6 Minyak Pelumas

31,500.00 Liter

15.00 %

7,875.00 Liter

7 Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
8 Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar , (kolom 16)

47668.53

ANALISA BIAYA SEWA PERALATAN PER JAM KERJA (II)

TENAGA

KAPASITAS

HARGA

ALAT

ALAT

ALAT

ALAT YANG DIPAKAI


JAM
UMUR

KERJA

HARGA

ALAT

1 TAHUN

ALAT

NILAI

FAKTOR

SISA
ALAT

PENGEMBALIAN
MODAL

BIAYA PASTI PER JAM


BIAYA

ASURANSI

BIAYA OPERASI PER JAM KERJA

TOTAL

PENGEM-

DAN

BIAYA

BALIAN

LAIN-LAIN

PASTI / JAM

BAHAN BAKAR & PELUMAS


BAHAN

WORKSHOP

MINYAK

BAKAR PELUMAS

BIAYA

KOEF.

BIAYA

TOTAL

PERBAIKAN & PERAWATAN


KOEF.

BIAYA

UPAH

(HP)

JENIS PERALATAN

(Tahun)

(Tahun)

(Jam)

(Rp.)

(Rp.)

KODE
ALAT

(Rp.)

(Rp.)

i(1+i)^A

(B - C) x D

0.002 x B

-----------

-----------

-----------

(1+i)^A-1

(Rp.)

Lt/HP/Jam Ltr/HP/Jam

(Rp.)

(Rp.)

(Rp.)

0.0625

(g1 x B')

0.125

(g1 x B')

s/d

-----

s/d

-----------

f2 x HP x

0.0875

0.175

f1 x HP x
(10% X B)

0.125
(e1 + e2)

0.01

s/d

s/d

0.175

0.02

Harga BBM

Harga Olie
1

35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.
66.
67.
68.

TRONTON
COLD MILLING MACHINE
ROCK DRILL BREAKER
COLD RECYCLER
HOT RECYCLER
AGGREGAT (CHIP) SPREAD
ASPHALT DISTRIBUTOR
SLIP FORM PAVER
CONCRETE PAN MIXER
CONCRETE BREAKER
ASPAHLT TANKER
CEMENT TANKER
CONDRETE MIXER (350)
VIBRATING RAMMER
TRUK MIXER (AGITATOR)
BORE PILE MACHINE
CRANE ON TRACK 75-100 T
BLENDING EQUIPMENT
ASPHALT LIQUID MIXER

KETERANGAN :

2a

E35
E37
E36
E38
E39
E40
E41
E42
E43
E44
E45
E46
E47
E48
E49
E50
E51
E52
E34a

1
2
3
4
5
6
7
8
9

BIAYA
SEWA ALAT

OPERATOR

PEMBANTU

BIAYA

/ SOPIR

OPERATOR

OPERASI

PER

/ SOPIR

/ JAM

JAM KERJA

(Rp.)

(Rp.)

F+G+H+I

E+J

MODAL

No.

TOTAL

(Rp.)

(Rp.)

1 Orang

1 Orang

Per

Per

Jam Kerja

Jam Kerja

Rp14,950.0

Rp11,530.0

KET.

HP

Cp

e1

e2

f1

f2

g1

g1

10

11

12

13

14

15

16

17

18

17

18

19

20

21

22

23

527,913.52
1,704,625.93
328,013.29
6,525,465.85
7,997,853.78
535,675.52
360,564.63
553,134.27
657,364.76
810,194.65
530,634.87
494,934.87
77,360.67
47,388.42
620,091.38
665,057.40
878,507.59
291,568.63
140,550.41

Pek. Ringan
Pek. Berat
Pek. Ringan
Pek. Berat
Pek. Berat
Pek. Ringan
Pek. Berat
Pek. Berat
Pek. Ringan
Pek. Berat
Pek. Berat
Pek. Berat
Pek. Berat
Pek. Ringan
Pek. Berat
Pek. Ringan
Pek. Berat
Pek. Ringan
Pek. Berat

150.0
15.0 Ton
248.0 1,000.0 m
3.0 900.0 2,200.0 M
400.0
3.0 M
115.0
3.5 M
115.0 4,000.0 Liter
105.0
2.5 M
134.0
600.0 Liter
290.0
20.0 m3/ja
190.0 4,000.0 liter
190.0 4,000.0 liter
20.0
350.0 liter
4.2
80.0 KG
220.0
5.0 M3
125.0
60.0 CM
200.0
75.0 Ton
50.0
30.0 Ton
40.0
### Liter

459,000,000
4,945,000,000
918,000,000
19,890,000,000
29,835,000,000
402,900,000
402,900,000
1,363,885,714
1,020,000,000
918,000,000
510,000,000
510,000,000
35,700,000
20,400,000
765,000,000
1,193,400,000
1,989,000,000
510,000,000
150,000,000

10.0
5.0
10.0
5.0
5.0
4.0
5.0
6.0
10.0
5.0
6.0
6.0
2.0
4.0
5.0
10.0
5.0
10.0
4.0

1,500.0
2,000.0
1,500.0
2,000.0
2,000.0
1,000.0
2,000.0
2,000.0
1,500.0
2,000.0
2,000.0
2,000.0
2,000.0
1,000.0
2,000.0
1,500.0
2,000.0
1,500.0
2,000.0

459,000,000
4,945,000,000
918,000,000
19,890,000,000
29,835,000,000
402,900,000
402,900,000
1,363,885,714
1,020,000,000
918,000,000
510,000,000
510,000,000
35,700,000
20,400,000
765,000,000
1,193,400,000
1,989,000,000
510,000,000
150,000,000

45,900,000
494,500,000
91,800,000
1,989,000,000
2,983,500,000
40,290,000
40,290,000
136,388,571
102,000,000
91,800,000
51,000,000
51,000,000
3,570,000
2,040,000
76,500,000
119,340,000
198,900,000
51,000,000
15,000,000

0.19925
0.29832
0.19925
0.29832
0.29832
0.35027
0.29832
0.26424
0.19925
0.29832
0.26424
0.26424
0.61512
0.35027
0.29832
0.19925
0.29832
0.19925
0.35027

54,874.02
663,826.68
109,748.04
2,670,073.35
4,005,110.03
127,009.72
54,086.10
162,175.02
121,942.26
123,234.15
60,642.37
60,642.37
9,881.84
6,430.87
102,695.13
142,672.45
267,007.34
60,971.13
23,642.91

612.00
4,945.00
1,224.00
19,890.00
29,835.00
805.80
402.90
1,363.89
1,360.00
918.00
510.00
510.00
35.70
40.80
765.00
1,591.20
1,989.00
680.00
150.00

55,486.02
668,771.68
110,972.04
2,689,963.35
4,034,945.03
127,815.52
54,489.00
163,538.91
123,302.26
124,152.15
61,152.37
61,152.37
9,917.54
6,471.67
103,460.13
144,263.65
268,996.34
61,651.13
23,792.91

0.1500
0.1200
0.1500
0.1200
0.1200
0.1500
0.1200
0.1200
0.1500
0.1200
0.1200
0.1200
0.1200
0.1500
0.1200
0.1500
0.1200
0.1500
0.1200

0.0300
0.0250
0.0300
0.0250
0.0250
0.0300
0.0250
0.0250
0.0300
0.0250
0.0250
0.0250
0.0250
0.0300
0.0250
0.0300
0.0250
0.0300
0.0250

342,562.50
460,908.00
6,851.25
1,672,650.00
743,400.00
262,631.25
213,727.50
195,142.50
306,022.50
538,965.00
388,815.00
353,115.00
37,170.00
9,591.75
408,870.00
285,468.75
371,700.00
114,187.50
74,340.00

Tingkat Suku Bunga


=
15.00 % per-tahun
Upah Operator / Sopir / Mekanik
=
14,950 Rupiah per-orang/jam
Upah Pembantu Operator/Sopir/Mekanik
=
11,530 Rupiah per-orang/jam
Harga Bahan Bakar Bensin
=
7,875 Rupiah per-liter
Harga Bahan Bakar Solar
=
8,925 Rupiah per-liter
Minyak Pelumas
=
31,500 Rupiah per-liter
Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar , (kolom 16)
AMP , Aspal Sprayer, Aspal Distribusi ditambah bahan bakar untuk pemanasan Aspal = 1/1000 x Kapasitas tangki aspal x harga bahan bakar solar ( lihat E 01 , E 03, E 41)

0.0875
0.0875
0.0875
0.0875
0.0875
0.0625
0.0875
0.0875
0.0875
0.0875
0.0875
0.0875
0.0875
0.0625
0.0875
0.0875
0.0875
0.0875
0.0875

26,775.00
216,343.75
53,550.00
870,187.50
1,305,281.25
25,181.25
17,626.88
59,670.00
59,500.00
40,162.50
22,312.50
22,312.50
1,561.88
1,275.00
33,468.75
69,615.00
87,018.75
29,750.00
6,562.50

0.1750
0.1250
0.1750
0.1250
0.1250
0.1750
0.1250
0.1250
0.1750
0.1250
0.1250
0.1250
0.1250
0.1750
0.1250
0.1750
0.1250
0.1750
0.1250

53,550.00
309,062.50
107,100.00
1,243,125.00
1,864,687.50
70,507.50
25,181.25
85,242.86
119,000.00
57,375.00
31,875.00
31,875.00
2,231.25
3,570.00
47,812.50
139,230.00
124,312.50
59,500.00
9,375.00

14,950.00
14,950.00
14,950.00
14,950.00
14,950.00
14,950.00
14,950.00
14,950.00
14,950.00
14,950.00
14,950.00
14,950.00
14,950.00
14,950.00
14,950.00
14,950.00
14,950.00
14,950.00
14,950.00

34,590.00
34,590.00
34,590.00
34,590.00
34,590.00
34,590.00
34,590.00
34,590.00
34,590.00
34,590.00
11,530.00
11,530.00
11,530.00
11,530.00
11,530.00
11,530.00
11,530.00
11,530.00
11,530.00

472,427.50
1,035,854.25
217,041.25
3,835,502.50
3,962,908.75
407,860.00
306,075.63
389,595.36
534,062.50
686,042.50
469,482.50
433,782.50
67,443.13
40,916.75
516,631.25
520,793.75
609,511.25
229,917.50
116,757.50

DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA


No.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45

URAIAN

ASPHALT MIXING PLANT


ASPHALT FINISHER
ASPHALT SPRAYER
BULLDOZER 100-150 HP
COMPRESSOR 4000-6500 L\M
CONCRETE MIXER 0.3-0.6 M3
CRANE 10-15 TON
DUMP TRUCK 3.5 TON
DUMP TRUCK 10 TON
EXCAVATOR 80-140 HP
FLAT BED TRUCK 3-4 M3
GENERATOR SET
MOTOR GRADER >100 HP
TRACK LOADER 75-100 HP
WHEEL LOADER 1.0-1.6 M3
THREE WHEEL ROLLER 6-8 T
TANDEM ROLLER 6-8 T.
TIRE ROLLER 8-10 T.
VIBRATORY ROLLER 5-8 T.
CONCRETE VIBRATOR
STONE CRUSHER
WATER PUMP 70-100 mm
WATER TANKER 3000-4500 L.
PEDESTRIAN ROLLER
TAMPER
JACK HAMMER
FULVI MIXER
CONCRETE PUMP
TRAILER 20 TON
PILE DRIVER + HAMMER
CRANE ON TRACK 35 TON
WELDING SET
BORE PILE MACHINE
ASPHALT LIQUID MIXER
TRONTON
COLD MILLING
ROCK DRILL BREAKER
COLD RECYCLER
HOT RECYCLER
AGGREGAT (CHIP) SPREADER
ASPHALT DISTRIBUTOR
SLIP FORM PAVER
CONCRETE PAN MIXER
CONCRETE BREAKER
ASPAHLT TANKER

KO
DE

E01
E02
E03
E04
E05
E06
E07
E08
E09
E10
E11
E12
E13
E14
E15
E16
E17
E18
E19
E20
E21
E22
E23
E24
E25
E26
E27
E28
E29
E30
E31
E32
E33
E34
E35
E36
E37
E38
E39
E40
E41
E42
E43
E44
E45

HP

KAP.

294.0
60.0 T/Jam
72.4
10.0 Ton
4.0
850.0 Liter
155.0 60.0
5,000.0 M2/jam
20.0
500.0 Liter
138.0
15.0 Ton
100.0
3.5 Ton
190.0
10.0 Ton
133.0
0.9 M3
190.0
10.0 ton
180.0
135.0 KVA
135.0
10,800.0
0.00
70.0
0.8 M3
96.0
1.5 M3
55.0
8.0 Ton
82.0
8.1 Ton
100.5
9.0 Ton
82.0
7.1 Ton
5.5
25.0
0.00
220.0
50.0 T/Jam
6.0 100.0
4,000.0 Liter
8.8
835.00 Ton
4.7
121.00 Ton
0.0
1,330.00
0.00
345.0
2,005.00
0.00
100.0
8.00 M3
175.0
20.00 Ton
25.0
2.50 Ton
125.0
35.0 Ton
40.0
250.0 Amp
150.0
2,000.0 Meter
5.0
1,000.0 Liter
150.0
15.0 Ton
248.0
1,000.0 m
3.0 900.0
2.2 M
400.0
3.0 M
115.0
3.5 M
115.0
4,000.0 Liter
105.0
2.5 M
134.0
600.0 Liter
290.0
20.0 m3/jam
190.0
4,000.0 liter

46
47
48
49
50
51
52
53
54
55
56
57
58
59
60

CEMENT TANKER
CONDRETE MIXER (350)
VIBRATING RAMMER
TRUK MIXER (AGITATOR)
BORE PILE MACHINE
CRANE ON TRACK 75-100 TON
BLENDING EQUIPMENT
ASPHALT LIQUID MIXER
HYDROLIK PUMP
HYDROLIK JACK
HAMMER K.45
HAMMER K.35
TUG BOAT
PONTON
Lauding Set

61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79

MESIN GROUTING
UNCOILER
BORE PILE
DRAILING MACHINE
STRASSING JACK
CONCRETE BATCHING PLANT
TOWER CRANE
ULTRASONIC TEST
PERALATAN SELAM
UNDERWATER TORCH
AG/AGC1 REF. ELECTRODE
DIGITAL MULTIMATER
AUTOMACT LEVEL
THEODOLITE
PICK UP TRUCK
MESIN MARKA/APPLICATO
MESIN PEMOTONG RUMPUT
GROUD PUMP
LAUCHING SET

E46
E47
E48
E49
E50
E51
E52
E34a

190.0
20.0
4.2
220.0
125.0
200.0
50.0
40.0
120.0
30.0
130.0
130.0
15.0
0.0
100.0
0.0
120.0
15.0
150.0
100.0
125.0
150.0
100.0
175.0
0.0
0.0
0.0
0.0
0.0
0.0
60.0
5.0
3.0
110.0
100.0

4,000.0
350.0
80.0
5.0
60.0
75.0
30.0
20,000.0
8.0

liter
liter
KG
M3
CM
Ton
Ton
Liter

4.0

30.0

M3

PER JAM KERJA


BIAYA

HARGA
ALAT

SEWA

KET.

ALAT/JAM
(di luar PPN)

4,590,000,000
2,295,000,000
423,300,000
1,785,000,000
178,500,000
81,600,000
1,377,000,000
244,800,000
357,000,000
1,428,000,000
306,000,000
510,000,000
1,785,000,000
1,020,000,000
1,122,000,000
1,326,000,000
969,000,000
1,020,000,000
1,377,000,000
51,000,000
1,275,000,000
7,650,000
357,000,000
280,500,000
25,500,000
35,700,000
484,500,000
306,000,000
867,000,000
510,000,000
1,581,000,000
132,600,000
2,295,000,000
30,600,000
459,000,000
4,945,000,000
918,000,000
19,890,000,000
29,835,000,000
402,900,000
402,900,000
1,363,885,714
1,020,000,000
918,000,000
510,000,000

6,845,022.68
974,276.24
143,723.81
745,610.72
181,096.32
116,659.89
615,487.48
271,447.24
465,807.64
618,511.07
453,491.55
484,170.92
708,440.72
402,896.84
475,850.02
448,915.89
412,882.75
459,581.09
511,411.48
67,332.30
754,782.30
39,959.20
298,542.64
128,202.07
51,359.46
35,101.26
1,083,144.71
281,533.92
547,795.28
196,103.42
616,346.10
132,841.84
824,284.42
43,877.50
527,913.52
1,704,625.93
328,013.29
6,525,465.85
7,997,853.78
535,675.52
360,564.63
553,134.27
657,364.76
810,194.65
530,634.87

Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru

510,000,000
35,700,000
20,400,000
765,000,000
1,193,400,000
1,989,000,000
510,000,000
150,000,000
385,000,000
495,000,000
715,000,000
605,000,000
750,000,000
2,000,000,000
588,500,000
253,000,000
22,000,000
2,475,000,000
533,500,000
423,500,000
1,320,000,000
550,000,000
825,000,000
45,100,000
27,500,000
22,000,000
6,600,000
49,500,000
71,500,000
137,500,000
55,000,000
3,850,000
275,000,000
577,500,000

494,934.87
77,360.67
47,388.42
620,091.38
665,057.40
878,507.59
283,068.63
140,550.41
364,676.92
229,003.54
466,606.78
438,667.66
267,202.75
557,524.00
876,421.55
331,149.98
82,296.57
949,857.70
465,732.41
462,546.15
656,496.94
370,360.60
802,716.31
62,267.82
57,300.87
55,748.69
52,727.69
73,447.71
84,073.36
196,353.29
75,546.60
57,317.17
318,625.30
536,010.29

Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru
Alat baru

HARGA SATUAN LUMP SUM UNTUK MOBILISASI


PROGRAM

: PEMBANGUNAN JALAN DAN JEMBATAN PROP. KALTIM

KEGIATAN

: PEMBANGUNAN JALAN DALAM KOTA SAMARINDA ( JALAN TOL DIRGANTARA )

PAKET

ITEM PEKERJAAN

: 1,2

ITEM PEMBAYARAN NO.

: 1,00

JENIS PEKERJAAN

: MOBILISASI

SATUAN PEMBAYARAN

: Ls

No.

U R A I A N

A.

SATUAN

HARGA
SATUAN
(Rp.)

KUANTITAS

JUMLAH
HARGA
(Rp.)

SEWA TANAH
M2

1.00

5,000,000.00

5,000,000.00

Mobilisasi Peralatan ( Lihat Lampiran )

Ls

1.00

76,637,188.00

76,637,188.00

FASILITAS KONTRAKTOR
Base Camp
Kantor
Barak, Bengkel, Gudang
Ruang Laboratorium
Peralatan Laboratorium
Sarana Komunikasi
Perabotan dan Pelayanan

M2
M2
M2
M2
Set
Bh
Set

100.00
104.00
100.00
96.00
1.00
1.00
1.00

5,000,000.00
-

5,000,000.00
-

D.

FASILITAS DIREKSI TEKNIS

Ls

E.

MOBILISASI LAINNYA
Papan Nama Proyek
As Built Drawing

Bh
Set

2.00
6.00

500,000.00
1,500,000.00

1,000,000.00
9,000,000.00

DEMOBILISASI

LS

1.00

38,318,594.00

38,318,594.00

Sewa Tanah

B.

MOBILISASI PERALATAN

C.
1
2
3
4
5
6
7

1
2

F.

TOTAL BIAYA MOBILISASI


Catatan

134,955,782.00

Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over head dan laba serta seluruh pajak dan
bea (kecuali PPn), dan pengeluaran lainnya.
Samarinda, 6 Juni 2012
Penawar
PT. MAHA SUKSES

MAHA
SUKSES

RISKA MAHARANI, SST

Direktur Utama

HARGA SATUAN LUMP SUM UNTUK MOBILISASI


PROGRAM

: PEMBANGUNAN JALAN DAN JEMBATAN PROP. KALTIM

KEGIATAN

: PEMBANGUNAN JALAN DALAM KOTA SAMARINDA ( JALAN TOL DIRGANTARA )

PAKET

ITEM PEKERJAAN

: 1,2

VOLUME PEKERJAAN

: 1,00

JENIS PEKERJAAN

: MOBILISASI

SATUAN PEMBAYARAN

: Ls

No.

B.

JENIS

ALAT

KODE
ALAT

SATUAN

E01
E02
E03
E04
E05
E06
E08
E09
E10
E11
E12
E13
E15
E17
E18
E19
E20
E22
E23
E26
-

Set
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Set

HARGA SATUAN
(Rp.)

JUMLAH HARGA
(Rp.)

1.00
1.00
1.00

40,000,000.00
1,000,000.00
500,000.00

40,000,000.00
1,000,000.00
500,000.00

1.00
1.00
8.00

500,000.00
250,000.00
500,000.00

500,000.00
250,000.00
4,000,000.00

1.00

4,000,000.00

4,000,000.00

1.00
1.00
1.00
1.00
1.00
1.00

500,000.00
4,000,000.00
4,000,000.00
4,000,000.00
4,000,000.00
4,000,000.00

500,000.00
4,000,000.00
4,000,000.00
4,000,000.00
4,000,000.00
4,000,000.00

1.00
1.00
1.00
1.00

500,000.00
137,188.00
250,000.00
5,000,000.00

500,000.00
137,188.00
250,000.00
5,000,000.00

KUANTITAS

PERALATAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

ASPHALT MIXING PLANT


ASPHALT FINISHER
ASPHALT SPRAYER
BULLDOZER 100 - 150 HP
COMPRESSOR 4000 - 5000 L/M
CONCRETE MIXER 0.3 - 0.6 M3
DUMP TRUCK 3 - 4 M3
DUMP TRUCK
EXCAVATOR 80 - 180 HP
PLAT BED TRUCK 3 - 4 M3
GENERATOR SET
MOTOR GRADER > 100 HP
WHEEL LOADER 1.0 - 1.6 M3
TANDEM ROLLER 6 - 8 T
PNEUMATIC TIRE ROLLER 8 - 10 T
VIBRATORY ROLLER 5 - 8 T
CONCRETE VIBRATOR
WATER PUMP 70 - 100 mm
WATER TANKER 3000 - 4500 L
JACK HAMMER
PICK UP TRUCK 1 T
SURVEY EQUIPMENT

TOTAL UNTUK ITEM B PADA LEMBAR 1

76,637,188.00

Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over head dan laba serta seluruh pajak dan bea (kecuali
PPn), dan pengeluaran lainnya.
Samarinda, 6 Juni 2012
Penawar
PT. MAHA SUKSES

MAHA
SUKSES

RISKA MAHARANI, SST


Direktur Utama

ANALISA HARGA SATUAN


PROYEK

: PEMBANGUNAN JALAN DAN JEMBATAN PROP. KALTIM

PAKET
NAMA KONTRAK

: PEMBANGUNAN JALAN DALAM KOTA SAMARINDA


: PEMBANGUNAN JALAN TOL DIRGANTARA

PROVINSI
: KALIMANTAN TIMUR
ITEM PEMBAYARAN NO. : 6.3 (5)
JENIS PEKERJAAN
: LAPIS PONDASI AGREGAT KELAS C
SATUAN PEMBAYARAN

NO.

TOTAL HARGA (Rp) :


% THD. BIAYA PROYEK :

KOMPONEN

A.
1.
2.

TENAGA
Pekerja
Mandor

298.50
167,003,825.57
1.751

PERKIRAAN KUANTITAS :

: M3

SATUAN

(L01)
(L03)

PERKIRAAN
KUANTITAS

jam
jam

0.0898
0.0128

HARGA SATUAN
(Rp.)

JUMLAH
HARGA

20,000.00
36,700.00

JUMLAH HARGA TENAGA


B.
1.

BAHAN
Agregat Kelas C1

(M28)

m3

1.2586

334,698.69

JUMLAH HARGA BAHAN


C.

PERALATAN

1.
2.
3.
4.
5.

Wheel loder
Motor Grader
Tandem Roller
Damp truck
Water Tank

(E15)
(E13)
(E17)
(E08)
(E23)

jam
jam
jam
jam
jam

0.0128
0.0039
0.0357
0.2497
0.0141

455,811.52
684,146.34
395,965.75
233,249.74
298,214.52

JUMLAH HARGA PERALATAN


D.
E.
F.
Note :

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


OVERHEAD & PROFIT 10% x D
HARGA SATUAN PEKERJAAN (D + E)
1
2

(Rp.)

1,795.89
470.78
2,266.67

421,254.87

421,254.87

5,847.05
2,671.25
14,135.32
58,248.34
4,191.77

85,093.74
508,615.28
50,861.53
559,476.80

Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, Volume dan / atau ukuran berat untuk bahan-bahan.
Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran.

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari Kontrak) dan biayabiaya lainnya.

Penawar
PT. MAHA SUKSES

RISKA MAHARANI, SST


Direktur Utama

ANALISA HARGA SATUAN


PROYEK

: PEMBANGUNAN JALAN DAN JEMBATAN PROP. KALTIM

PAKET
NAMA KONTRAK

: PEMBANGUNAN JALAN DALAM KOTA SAMARINDA


: PEMBANGUNAN JALAN TOL DIRGANTARA

PROVINSI
: KALIMANTAN TIMUR
ITEM PEMBAYARAN NO. : 6.1 (1)
JENIS PEKERJAAN
: LAPIS RESAP PENGIKAT
SATUAN PEMBAYARAN : LITER

NO.

KOMPONEN

A.

TENAGA

1.
2.

Pekerja
Mandor

% THD. BIAYA PROYEK :

SATUAN

L01
L03

5,572.00
90,875,664.77
0.953

PERKIRAAN KUANTITAS :
TOTAL HARGA (Rp) :

PERKIRAAN
KUANTITAS

jam
jam

0.0425
0.0035

HARGA SATUAN
(Rp.)

JUMLAH
HARGA

20,000.00
36,700.00

JUMLAH HARGA TENAGA


B.

BAHAN

1.
2.

Aspal Cement
Kerosen

M10
M11

Kg
Ltr

0.6407
0.4888

10,700.00
9,450.00

JUMLAH HARGA BAHAN


C.

PERALATAN

1.
2.
3.
4.

asphalt sprayer
Air compresor
Damp Truck
Alat Bantu

(E03)
(E05)
(E08)

jam
jam
jam
Ls

0.0035
0.0003
0.0035
1.0000

142,362.94
158,770.70
233,249.74
1,000.00

JUMLAH HARGA PERALATAN


D.
E.
F.
Note :

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


OVERHEAD & PROFIT 10% x D
HARGA SATUAN PEKERJAAN (D + E)
1
2

(Rp.)

850.46
130.05

980.51

6,855.92
4,619.54

11,475.46

504.48
39.69
826.54
1,000.00
2,370.71
14,826.68
1,482.67
16,309.34

Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, Volume dan / atau ukuran berat untuk bahan-bahan.
Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran.

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari Kontrak) dan biayabiaya lainnya.

Penawar
PT. MAHA SUKSES

RISKA MAHARANI, SST

Direktur Utama

ANALISA HARGA SATUAN


PROYEK

: PEMBANGUNAN JALAN DAN JEMBATAN PROP. KALTIM

PAKET
NAMA KONTRAK
PROVINSI

: PEMBANGUNAN JALAN DALAM KOTA SAMARINDA


: PEMBANGUNAN JALAN TOL DIRGANTARA
: KALIMANTAN TIMUR

ITEM PEMBAYARAN NO. : 6.3 (5)


JENIS PEKERJAAN
: ASPHALT TREATED BASE
SATUAN PEMBAYARAN : M3

NO.

KOMPONEN

A.
1.
2.

TENAGA
Pekerja
Mandor

% THD. BIAYA PROYEK :

SATUAN

L01
L03

522.38
87,700,849.72
0.920

PERKIRAAN KUANTITAS :
TOTAL HARGA (Rp) :

PERKIRAAN
KUANTITAS

jam
jam

0.0339
0.0023

HARGA SATUAN
(Rp.)

JUMLAH
HARGA

20,000.00
36,700.00

JUMLAH HARGA TENAGA


B.
1.
2.
3.
4.

BAHAN
Agregat Kasar utk Pondasi Kelas A, B
Agregat Halus utk Pondasi Kelas A
Filler
Aspal Cement

M03
M04
M05
M10

m3
m3
Kg
Kg

0.0344
0.0241
7.8750
8.2688

369,936.32
410,110.35
1,000.00
10,700.00

JUMLAH HARGA BAHAN


C.

PERALATAN

1.
2.
3.
4.
5.
6.
7.
8.

Wheel loder
AMP
Generator set
Damp truck
Asphalt finisher
Tandem Roller
Tire
Roller Tire Roller
Pneumatic
Alat bantu

(E15)
(E01)
(E12)
(E09)
(E02)
(E17)
(E18)

jam
jam
jam
jam
jam
jam
jam
Ls

0.0019
0.0023
0.0023
0.0303
0.0136
0.0016
0.0023
1.0000

455,811.52
1,766,943.93
416,715.92
391,205.14
933,001.06
395,965.75
435,704.65
1,000.00

JUMLAH HARGA PERALATAN


D.
E.
F.
G
Note :

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


OVERHEAD & PROFIT 10% x D
HARGA SATUAN PEKERJAAN (D + E)
HARGA SATUAN PEKERJAAN PER M3 (D + E) x 20
1
2

(Rp.)

677.71
82.91
760.62

12,716.56
9,868.28
7,875.00
88,475.63
118,935.47

847.49
3,991.59
941.38
11,867.45
12,646.10
636.09
999.90
1,000.00
32,929.99
152,626.07
15,262.61
167,888.68
3,357,773.62

Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, Volume dan / atau ukuran berat untuk bahan-bahan.
Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran.

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari Kontrak) dan biayabiaya lainnya.

Penawar
PT. MAHA SUKSES

RISKA MAHARANI, SST


Direktur Utama

METODE PELAKSANAAN
ITEM PEKERJAAN
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

2.2
Analisa EI - 22
PASANGAN BATU DENGAN MORTAR (mekanik)
M3
URAIAN ANALISA HARGA SATUAN

NO.

URAIAN

I.
1
2
3
4
5
6

II.
1
2
3

KODE

ASUMSI
Menggunakan alat berat (cara manual)
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (batu,pasir dan semen) diterima seluruhnya
dilokasi pekerjaan
Jarak rata - rata Base Camp ke lokasi pekerjaan
Jam Kerja efektif per-hari
Perbandingan Pasir dan Semen
@ Volume semen
@ Volume pasir
Perbandingan batu dan mortar
@ Batu
@ Mortar ( campuran semen & pasir )
Berat Jenis material
- Pasangan batu dengan mortar
- Batu
- Adukan (mortar)
- Pasir
- Semen
Faktor Kehilangan Bahan :
@ Batu
@ Pasir/Semen
URUTAN KERJA
Semen, Pasair dan Air dicampur dan diaduk menjadi mortar
dengan menggunakan concrete mixer
Batu di bersihkan dan dibasahi seluruh permukaan sebelum
dipasang
Penyelesaian dan perapihan setelah pemasangan

III

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1.

BAHAN
Bt x D1 x 1 (m3)
D2 x Fh1
= Sm x ((Mr x D1 x 1m3) : D3)
Fh2 x (D5 x(1000))
Ps x (Mr x D1 x 1m3)
=
D4 x Fh2

Batu Gunung

Semen
Pasir
2.
2.a.

ALAT
CONCRETE MIXER
Kapasitas Bucket
Faktor Efisiensi alat
Waktu
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll
V x Fa x 60
1000 x Ts1

Kap. Prod. / jam

Koefisien Alat / M3

= 1 : Q1

KOEF.

SATUAN

L
Tk

5.00
7.00

km
jam

Sm
Ps

25.00
75.00

%
%

Bt
Mr

60.00
40.00

%
%

D1
D2
D3
D4
D5

2.40
1.60
1.80
1.67
1.44

t/m3
t/m3
t/m3
t/m3
t/m3

Fh1
Fh2

1.20
1.05

1.00

km

M02

1.08

m3

M12

202

Kg

M01

0.411

m3

500.00
0.83

Liter
-

2.00
2.00
1.00
1.00
6.00
4.15

menit
menit
menit
menit
menit
m3

0.24

Jam

E06
V
Fa
Ts1
T1
T2
T3
T4
Ts1
Q1

E06

KETERANGAN

Spec 7.3(2)b
Spec 7.3(2)b

Lepas

Bersambung

METODE PELAKSANAAN
ITEM PEKERJAAN

2.2

Analisa EI - 22

JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.

2.b.

3.

:
:

PASANGAN BATU DENGAN MORTAR (mekanik)


M3
URAIAN ANALISA HARGA SATUAN
Lanjutan
URAIAN

KODE

Alat Bantu
Sekop
Cangkul
Sendok Semen
Ember Cor
Drum Penampungan Air
Gerobak Dorong
Kaos, papan, benang, paku dll
WATER TANK TRUCK
Volume Tanki air
Kebutuhan air / m3 pasangan batu
Faktor efisiensi alat
Pasangan tangki / jam
Kapasitas produksi / jam

Koefisiensi alat / m3

V x Fa x n
Wc
1 ; Q2

= (Tk x M) : Qt
= (Tk x Tb): Qt
= (Tk x P) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKEMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp.

939,739.43

SATUAN

4.00
4.00
4.00
8.00
3.00
3.00
1.00

PERHITUNGAN TENAGA
Produksi pasangan batu yang menentukan Concrete Mixer
Produksi pasangan batu dengan mortar/hari = Tk x Q1
Kebutuhan Tenaga
:
- Mandor
- Tukang
- Pekerja
Koefisien tenaga / M3 :
- Mandor
- Tukang
- Pekerja

KOEF.

/ M3

6.

WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan :
1,194.00
M3

V
Wc
Fa
n
Q2
0

4.00
0.36
0.83
4.00
36.89

bh
bh
bh
bh
bh
bh
Ls
m3
m3
kali
m3

0.0271 Jam

Q1
Qt

4.15
29.05

m3

M
Tb
P

1.00
2.00
6.00

0rang
0rang
0rang

L03
L02
L01

0.24
0.48
1.45

Jam
Jam
Jam

KETERANGAN

Lump Sump

METODE PELAKSANAAN
ITEM PEKERJAAN
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

3.1 (1)
GALIAN BIASA
m3

Analisa EI - 311
URAIAN ANALISA HARGA SATUAN

URAIAN

I.
1
2
3
4
5
II.
1
2
3
4

KODE

Tk
Fk

7.00
1.20

jam
-

URUTAN KERJA
Tanah yang dipotong umumnya disisi jalan.
Penggalian dilakukan dengan menggunakan Excavator
Selanjutnya Excavator menuangkan material hasil
galian kedalam Dump Truck.
Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh

1.00

km

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1.

BAHAN
Tidak ada bahan yang diperlukan

2.b.

SATUAN

ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi Jalan : sedang / baik
Jam kerja efektif per-hari
Faktor pengembangan bahan

III

2.
2.a.

KOEF.

ALAT
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Waktu siklus
- Menggali / memuat
- Lain-lain
V x Fb x Fa x 60
Ts1 x Fk

Kap. Prod. / jam

Koefisien Alat / M3

= 1 : Q1

DUMP TRUCK
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Waktu tempuh isi
- Waktu tempuh kosong
- Memuat
- Lain-lain

= (L : v1) x 60
= (L : v2) x 60
= (V : Q1) x 60

Kap. Prod. / jam

Koefisien Alat / M3

= 1 : Q1

V x Fa x 60
Fk x Ts2

(E10)
V
Fb
Fa
Ts1
T1
T2
Ts1
Q1

0.93
0.95
0.83

m3
-

0.50
0.50
1.00
36.67

menit
menit
menit
m3 / jam

0.0273

Jam

3.50
0.83
40.00
60.00

m3
km / jam
km / jam

1.50
1.00
5.73
1.00
9.23

menit
menit
menit
menit
menit

Q2

15.74

m3

0.06

Jam

(E08)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2

KETERANGAN

Bersambung

METODE PELAKSANAAN
ITEM PEKERJAAN
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

2.c.

3.

3.1 (1)
GALIAN BIASA
m3
URAIAN

Analisa EI - 311
URAIAN ANALISA HARGA SATUAN
Lanjutan
KODE

ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop
- Cangkul
- Keranjang
TENAGA
Produksi menentukan :
Produksi Galian / hari
Kebutuhan Tenaga :
- Pekerja
- Mandor

= (Tk x P) : Qt
= (Tk x M) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKEMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp.

38,552.95

SATUAN

4.00 bh
4.00 bh
4.00 bh

EXCAVATOR
= Tk x Q1

Koefisien tenaga / M3 :
- Pekerja
- Mandor

KOEF.

/ M3

6.

WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan :
31,279.16
M3

Lump Sum

Q1
Qt

36.67
256.66

P
M

4.00
1.00

orang
orang

0.1091
0.0273

Jam
Jam

(L01)
(L03)

KETERANGAN

m3 / jam
m3

METODE PELAKSANAAN
ITEM PEKERJAAN
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.

:
:
:

3.2 (1)
TIMBUNAN BIASA
M3

Analisa EI - 321
URAIAN ANALISA HARGA SATUAN

URAIAN

I.
1
2
3
4
5
6
II.
1
2
3
4

KODE

ASUMSI
Pekerjaan dilakukan secara mekanis
Lokasi pekerjaan : sepanjang jalan
Kondisi Jalan : sedang / baik
Jam kerja efektif per-hari
Faktor pengembangan bahan
Tebal hamparan padat
URUTAN KERJA
Whell Loader memuat kedalam Dump Truck.
Dump Truck mengangkut ke lapangan dengan jarak
quarri ke lapangan.
Material dihampar dengan menggunakan Motor Grader.
Hamparan material disiram air dengan Water Tank Truck
(sebelum pelaksanaan pemadatan) dan dipadatkan
dengan menggunakan Vibro Roller.
Selama pemadatan sekelompok pekerja akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan alat bantu.

III

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1.
1.a.

BAHAN
Material timbunan

2.
2.a.

ALAT
WHELL LOADER
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Waktu siklus
- Muat
- Lain-lain

Kap. Prod. / jam


Koefisien Alat / M3

= 1 x Fk

V x Fb x Fa x 60
Fk x Ts1

= 1 : Q1

SATUAN

Tk
Fk
t

7.00
1.20
0.15

jam
m

2.00

km

(M08)

1.20

m3

1.50
0.90
0.83

m3
-

1.00
0.50
1.50

menit
menit
menit

Q1

37.35

m3

(E15)

0.027

Jam

(E15)
V
Fb
Fa
Ts1
T1
T2
Ts1
=

KOEF.

KETERANGAN

Borrow Pit

Bersambung

METODE PELAKSANAAN
ITEM PEKERJAAN
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.
2.b.

2.c.

2.d.

3.2 (1)
TIMBUNAN BIASA
M3

Analisa EI - 321
URAIAN ANALISA HARGA SATUAN
Lanjutan

URAIAN
DUMP TRUCK
Kapasitas bak
Faktor Efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus
- Waktu tempuh isi
- Waktu tempuh kosong
- Lain-lain

KODE

= (L : v1) x 60
= (L : v2) x 60

V x Fa x 60
Fk x Ts2

Kap. Prod. / jam

Koefisien Alat / M3

= 1 : Q2

MOTOR GRADER
Panjang hamparan
Lebar efektif kerja blade
Faktor efisiensi alat
Kecepatan rata-rata alat
Jumlah lintasan
Waktu siklus
- Perataan 1 kali lintasan
- Lain-lain

= Lh : (v x 1000) x 60

Lh x b x t x Fa x 60
n x Ts3

Kap. Prod. / jam

Koefisien Alat / M3

= 1 : Q3

VIBRATOR ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor efisiensi alat
Kap. Prod. / jam
Koefisien Alat / M3

(v x 1000) x b x t x Fa
n
= 1 : Q4
=

(E08)
V
Fa
v1
v2
Ts2
T1
T2
T3
Ts2

KOEF.

SATUAN

3.50
0.83
40.00
60.00

m3
km / jam
km / jam

3.00
2.00
2.00
7.00

menit
menit
menit
menit

Q2

20.75

m3

(E08)

0.05

Jam

50.00
2.40
0.83
4.00
6.00

m
m
km / jam
lintasan

0.75
0.50
1.25

menit
menit
menit

(E13)
Lh
b
Fa
v
n
Ts3
T1
T2
Ts3
Q3

119.52

m3

(E13)

0.0084

Jam

(E19)
v
b
n
Fa

3.00
1.20
8.00
0.83

km / jam
m
lintasan
-

Q4

56.03

m3

(E19)

0.0178

Jam

KETERANGAN

Bersambung

METODE PELAKSANAAN
ITEM PEKERJAAN
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.
2.e.

2.f.

3.

3.2 (1)
TIMBUNAN BIASA
M3

Analisa EI - 321
URAIAN ANALISA HARGA SATUAN
Lanjutan

URAIAN

KODE

WATER TANK TRUCK


Volume tangki air
Kebutuhan air / m3 material padat
Pengisian tangki / jam
Faktor Efisiensi alat

(E23)
V
Wc
n
Fa

Kap. Prod. / jam

Koefisien Alat / M3

= 1 : Q5

ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop
TENAGA
Produksi menentukan :
Produksi Galian / hari
Kebutuhan Tenaga :

V x n x Fa
Wc

= (Tk x P) : Qt
= (Tk x M) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKEMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

97,297.31

4.00
0.07
3.00
0.83

m3
m3
kali
-

Q5

142.29

m3

(E23)

0.0070

Jam

= 3 buah

- Pekerja
- Mandor

Rp.

SATUAN

KETERANGAN

Lump Sum

WHELL LOADER
= Tk x Q1

Koefisien tenaga / M3 :
- Pekerja
- Mandor

KOEF.

/ M3

6.

WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan :
22,076.63
M3

Q1
Qt

37.35
1.80

m3 / jam
m3

P
M

4.00
1.00

orang
orang

0.1071
0.0268

Jam
Jam

(L01)
(L03)

METODE PELAKSANAAN
ITEM PEKERJAAN
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

3.3 (3)
PENYIAPAN BADAN JALAN
M3
URAIAN

I.
1
2
3
4
5
II.
1
2
3

ASUMSI
Pekerjaan dilaksanakan hanya pada tanah galian.
Pekerjaan dilakukan secara mekanis
Lokasi pekerjaan : sepanjang jalan
Kondisi Jalan : jelek / belum padat.
Jam kerja efektif per-hari

Tk

KOEF.

SATUAN

7.00

jam

30.00
2.40
0.83
2.00
8.00

m
m
km / jam
lintasan

0.90
1.00
1.90

menit
menit
menit

KETERANGAN

URUTAN KERJA
Motor Grader meratakan permukaan hasil galian.
Vibro Roller memadatkan permukaan yang telah
diratakan oleh Motor Grader.
Sekelompok pekerja akan membantu meratakan
badan jalan dengan alat bantu.
PEMAKAIAN BAHAN, ALAT DAN TENAGA

1.

BAHAN
Tidak diperlukan bahan / material.

2.b.

URAIAN ANALISA HARGA SATUAN


KODE

III

2.
2.a.

Analisa EI - 333

ALAT
MOTOR GRADER
Panjang hamparan
Lebar efektif kerja blade
Faktor efisiensi alat
Kecepatan rata-rata alat
Jumlah lintasan
Waktu siklus
- Perataan 1 kali lintasan
- Lain-lain

= Lh : (v x 1000) x 60

Lh x b x Fa x 60
n x Ts1

Kap. Prod. / jam

Koefisien Alat / M2

= 1 : Q1

VIBRATOR ROLLER
Kecepatan rata-rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor efisiensi alat
(v x 1000) x b x Fa
n

Kap. Prod. / jam

Koefisien Alat / M2

= 1 : Q2

(E13)
Lh
b
Fa
v
n
Ts1
T1
T2
Ts1
Q1

235.89

m2

(E13)

0.0042

Jam

(E19)
v
b
n
Fa

2.00
1.40
8.00
0.83

km / jam
m
lintasan
-

Q2

290.50

m2

(E19)

0.0034

Jam

Bersambung

METODE PELAKSANAAN
ITEM PEKERJAAN
JENIS PEKERJAAN
SATUAN PEMBAYARAN
NO.
2.c.

2.d.

3.

:
:
:

3.3 (3)
PENYIAPAN BADAN JALAN
M2
URAIAN

Analisa EI - 333
URAIAN ANALISA HARGA SATUAN
Lanjutan
KODE

WATER TANK TRUCK


Volume tangki air
Kebutuhan air / m3 material padat
Pengisian tangki / jam
Faktor Efisiensi alat
Kap. Prod. / jam

Koefisien Alat / M2

= 1 : Q3

V x n x Fa
Wc

Koefisien Tenaga / M2 :
- Pekerja
- Mandor

4.00
0.07
2.00
0.83

m3
m3
kali
-

Q3

94.86

m3

(E23)

0.0105

Jam

3.00 bh

VIBRATORY ROLLER
= Tk x Q2

= (Tk x P) : Qt
= (Tk x M) : Qt

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKEMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

10,243.22

KETERANGAN

Lump Sum

4.

Rp.

SATUAN

(E23)
V
Wc
n
Fa

ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop
TENAGA
Produksi menentukan :
Produksi Pekerjaan / hari
Kebutuhan Tenaga :
- Pekerja
- Mandor

KOEF.

/ M3

6.

WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : . . . bulan

7.

VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan :
14,300.00
M3

Q2
Qt

290.50
2033.50

P
M

6.00
1.00

orang
orang

0.02
0.0034

Jam
Jam

(L01)
(L03)

m3 / jam
m2

METODE PELAKSANAAN
ITEM PEKERJAAN
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

NO.

4.1 (2)
LAPIS PONDASI AGREGAT KELAS B
M3
URAIAN

I.
1
2
3
4
5
6
7
8
9

II.
1
2
3
4

ASUMSI
Menggunakan alat berat ( Cara Mekanik )
Lokasi pekerjaan : sepanjang jalan
Kondisi existing jalan : sedang
Jarak rata-rata Base Camp ke lokasi pekerjaan
Tebal lapisan Agregat padat
Faktor kembang material ( Padat - Lepas )
Jam kerja efektif per-hari
Lebar bahu jalan
Proporsi Campuran :
- Agregat Kasar
- Agregat halus
- Sirtu

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1.

BAHAN
- Agregat Kasar
- Agregat Halus
- Sirtu

2.b.

URAIAN ANALISA HARGA SATUAN


KODE

KOEF.

SATUAN

L
t
Fk
Tk
Lb
Ak
Ah
St

2.00
0.15
1.20
7.00
2.00
35.00
20.00
45.00

Km
M
Jam
M
%
%
%

KETERANGAN

Gradasi harus
memenuhi spek.

URUTAN KERJA
Whell Loader mencampur dan memuat agregat
kedalam Dump Truck di Base Camp
Dump Truck mengangkut agregat ke lokasi
pekerjaan dihampar dengan Motor Grader
Hamparan agregat dibasahi dengan Water Tank Truck
sebelum dipadatkan dengan Tandem Roller dan PTR
Selama pemadatan sekelompok pekerja akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan alat bantu

III

2.
2.a.

Analisa EI - 412

=
=
=

Ak x 1 M3 x Fk
Ah x 1 M3 x Fk
St x 1 M3 x Fk

( M03 )
( M04 )
( M16 )

ALAT
WHEEL LOADER
Kapasitas Bucket
Faktor Bucket
Faktor efisiensi alat
Waktu siklus
- Mencampur
- Memuat dan lain-lain

(E15)
V
Fb
Fa
Ts1
T1
T2
Ts1
V x Fb x Fa x 60
Ts1 x Fk

Kap. Prod. / jam

Koefisien Alat / M2

= 1 : Q1

Q1
(E15)

DRUM TRUCK
Kapasitas Bucket
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu Siklus :
- Waktu tempuh isi
- Waktu tempuh kosong
- Lain - lain

(E09)
V
Fa
v1
v2
Ts2
T1
T2
T4
Ts2

Kap. Prod. / jam

Koefisien Alat / M2

= 1 : Q1

Vx Fa x 60
Ts2 x Fk

Q2
(E09)

0.4200
0.2400
0.5400

M3
M3
M3

1.50
0.90
0.83

m3
-

5.00
3.00
8.00

Menit
Menit
Menit

7.00

m3

0.1428

Jam

3.50
0.83
40.00
60.00

M3
KM/Jam
KM/Jam

26.67
20.00
3.00
49.67

menit
menit
menit
menit

2.92

m2

0.3420 Jam
Bersambung

METODE PELAKSANAAN
ITEM PEKERJAAN
JENIS PEKERJAAN
SATUAN PEMBAYARAN

:
:
:

4.1 (2)
LAPIS PONDASI AGREGAT KELAS B
M3

NO.
2.c.

2.d.

URAIAN

2.e.

2.f.

(E13)
Lh
b
Fa
v
n
Ts3
T1
T2
Ts3

Lh x b x t x Fa x 60
n x Ts3

Kap. Prod. / jam

Koefisien Alat / M2

= 1 : Q3

VIBRATOR ROLLER
Kecepatan rata - rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor efisiensi alat

Koefisien Alat / M2

URAIAN ANALISA HARGA SATUAN


Lanjutan
KODE

MOTOR GRADER
Panjang hamparan
Lebar efektif kerja blade
Faktor efisiensi alat
Kecepatan rata - rata alat
Jumlah lintasan
Waktu siklus
- Peralatan 1 kali lintasan = Lh ; ( V x 1000 ) x 60
- Lain-lain

Kap. Prod. / jam

Analisa EI - 412

( V x 1000 ) x b x t x Fa
n
= 1 : Q3
=

PNEUMATIC TIRE ROLLER


Kecepatan rata-rata
Lebar efektif pemadatan
Jumlah lintasan
Faktor Efisiensi alat
( V x 1000 ) x b x t x Fa
n

Kap. Prod. / jam

Koefisien Alat / M2

= 1 : Q3

WATER TANK TRUCK


Volume tangki air
Kebutuhan air/M3 material padat
Pengisian tangki/Jam
Faktor efisiensi alat
Kap. Prod. / jam

Koefisien Alat / M2

= 1 : Q3

V x n x Fa
Wc

Q3

KOEF.

SATUAN

50.00
2.40
0.83
4.00
6.00

M
M
Km/Jam
Lintasan

0.75
1.50
2.25

Menit
Menit
Menit

66.40

M3

(E13)

0.0151

Jam

(E19)
v
b
n
Fa

3.00
1.20
8.00
0.83

Km/Jam
M
Lintasan
-

Q4

56.03

M3

(E19)

0.0178

Jam

(E18)
v
b
n
Fa

4.00
1.50
6.00
0.83

Km/Jam
M
Lintasan
-

Q3

124.50

M3

(E13)

0.0080

Jam

(E23)
V
Wc
n
Fa

4.00
0.07
1.00
0.83

M3
M3
Kali
-

Q3

47.43

M3

(E13)

0.0211

Jam

KETERANGAN

ANALISA HARGA MATERIAL ON SITE ( MOS )


Program
Kegiatan
Lokasi Kegiatan
Provinsi
Tahun Anggaran
Material
Satuan

No.

: Pembangunan Jalan
: Pembangunan Jalan Baru Loa Bahu
: Pembangunan Jalan Baru Loa Bahu
Samarinda
: Kalimantan Timur
: 2010
: Pasir Pasang
: M3

U R A I A N

Harga Setempat

Penanganan / perawatan

Angkutan ke lapangan

Bongkar muat, penyimpanan dll

Material :

Rp.

/ SATUAN

Lokal
JUMLAH
HARGA
(Rp.)

65,000.00 / M3

65,000.00

1,000.00 / M3

1,000.00

47,000.00 / M3

47,000.00

1,000.00 / M3

1,000.00

J U M LAH

114,000.00

ANALISA HARGA MATERIAL ON SITE ( MOS )


Program
Kegiatan
Lokasi Kegiatan
Provinsi
Tahun Anggaran
Material
Satuan

No.

: Pembangunan Jalan
: Pembangunan Jalan Baru Loa Bahu
: Pembangunan Jalan Baru Loa Bahu
Samarinda
: Kalimantan Timur
: 2010
: Pasir Cor
: M3

U R A I A N

Harga Setempat

Penanganan / perawatan

Angkutan ke lapangan

Bongkar muat, penyimpanan dll

Material :

Rp.

/ SATUAN

Lokal
JUMLAH
HARGA
(Rp.)

85,000.00 / M3

85,000.00

1,000.00 / M3

1,000.00

47,000.00 / M3

47,000.00

1,000.00 / M3

1,000.00

J U M LAH

134,000.00

ANALISA HARGA MATERIAL ON SITE ( MOS )


Program
Kegiatan
Lokasi Kegiatan
Provinsi
Tahun Anggaran
Material
Satuan

No.

: Pembangunan Jalan
: Pembangunan Jalan Baru Loa Bahu
: Pembangunan Jalan Baru Loa Bahu
Samarinda
: Kalimantan Timur
: 2010
: Batu Gunung
: M3

U R A I A N

Biaya CIF di Pelabuhan

Penanganan / perawatan

Angkutan ke lapangan

Bongkar muat, penyimpanan dll

Material :

Rp.

/ SATUAN

Lokal
JUMLAH
HARGA
(Rp.)

200,000.00 / M3

200,000.00

1,000.00 / M3

1,000.00

114,000.00 / M3

114,000.00

1,000.00 / M3

1,000.00

J U M LAH

316,000.00

ANALISA HARGA MATERIAL ON SITE ( MOS )


Program
Kegiatan
Lokasi Kegiatan
Provinsi
Tahun Anggaran
Material
Satuan

No.

: Pembangunan Jalan
: Pembangunan Jalan Baru Loa Bahu
: Pembangunan Jalan Baru Loa Bahu
Samarinda
: Kalimantan Timur
: 2010
: Agregat Kasar utk Pondasi Kelas A, B
: M3

U R A I A N

Harga Setempat

Penanganan / perawatan

Angkutan ke lapangan

Bongkar muat, penyimpanan dll

Material :

Rp.

/ SATUAN

Lokal
JUMLAH
HARGA
(Rp.)

237,000.00 / M3

237,000.00

1,000.00 / M3

1,000.00

74,000.00 / M3

74,000.00

1,000.00 / M3

1,000.00

J U M LAH

313,000.00

ANALISA HARGA MATERIAL ON SITE ( MOS )


Program
Kegiatan
Lokasi Kegiatan
Provinsi
Tahun Anggaran
Material
Satuan

No.

: Pembangunan Jalan
: Pembangunan Jalan Baru Loa Bahu
: Pembangunan Jalan Baru Loa Bahu
Samarinda
: Kalimantan Timur
: 2010
: Agregat Kasar utk Pondasi Kelas A
: M3

U R A I A N

Harga Setempat

Penanganan / perawatan

Angkutan ke lapangan

Bongkar muat, penyimpanan dll

Material :

Rp.

/ SATUAN

Lokal
JUMLAH
HARGA
(Rp.)

245,000.00 / M3

245,000.00

1,000.00 / M3

1,000.00

62,000.00 / M3

62,000.00

1,000.00 / M3

1,000.00

J U M LAH

309,000.00

ANALISA HARGA MATERIAL ON SITE ( MOS )


Program
Kegiatan
Lokasi Kegiatan
Provinsi
Tahun Anggaran
Material
Satuan

No.

: Pembangunan Jalan
: Pembangunan Jalan Baru Loa Bahu
: Pembangunan Jalan Baru Loa Bahu
Samarinda
: Kalimantan Timur
: 2010
: Agregat Kasar utk Pondasi Kelas B
: M3

U R A I A N

Harga Setempat

Penanganan / perawatan

Angkutan ke lapangan

Bongkar muat, penyimpanan dll

Material :

Rp.

/ SATUAN

Lokal
JUMLAH
HARGA
(Rp.)

235,000.00 / M3

235,000.00

1,000.00 / M3

1,000.00

62,000.00 / M3

62,000.00

1,000.00 / M3

1,000.00

J U M LAH

299,000.00

ANALISA HARGA MATERIAL ON SITE ( MOS )


Program
Kegiatan
Lokasi Kegiatan
Provinsi
Tahun Anggaran
Material
Satuan

No.

: Pembangunan Jalan
: Pembangunan Jalan Baru Loa Bahu
: Pembangunan Jalan Baru Loa Bahu
Samarinda
: Kalimantan Timur
: 2010
: Filler
: Kg

U R A I A N

Harga Setempat

Penanganan / perawatan

Angkutan ke lapangan

Bongkar muat, penyimpanan dll

Material :

Rp.

/ SATUAN

Lokal
JUMLAH
HARGA
(Rp.)

3,000.00 / kg

3,000.00

500.00 / kg

500.00

50.00 / kg

50.00

500.00 / kg

500.00

J U M LAH

4,050.00

ANALISA HARGA MATERIAL ON SITE ( MOS )


Program
Kegiatan
Lokasi Kegiatan
Provinsi
Tahun Anggaran
Material
Satuan

No.

: Pembangunan Jalan
: Pembangunan Jalan Baru Loa Bahu
: Pembangunan Jalan Baru Loa Bahu
Samarinda
: Kalimantan Timur
: 2010
: Material Tanah Timbunan
: M3

U R A I A N

Harga Setempat

Penanganan / perawatan

Angkutan ke lapangan

Bongkar muat, penyimpanan dll

Material :

Rp.

/ SATUAN

Lokal
JUMLAH
HARGA
(Rp.)

52,000.00 / M3

52,000.00

1,000.00 / M3

1,000.00

37,000.00 / M3

37,000.00

1,000.00 / M3

1,000.00

J U M LAH

91,000.00

ANALISA HARGA MATERIAL ON SITE ( MOS )


Program
Kegiatan
Lokasi Kegiatan
Provinsi
Tahun Anggaran
Material
Satuan

No.

: Pembangunan Jalan
: Pembangunan Jalan Baru Loa Bahu
: Pembangunan Jalan Baru Loa Bahu
Samarinda
: Kalimantan Timur
: 2010
: Aspal Cement
: Kg

U R A I A N

Harga Setempat

Material :

Rp.

/ SATUAN

Lokal
JUMLAH
HARGA
(Rp.)

8,300.00 / kg

8,300.00

Penanganan / perawatan

500.00 / kg

500.00

Angkutan ke lapangan

700.00 / kg

700.00

Bongkar muat, penyimpanan dll

500.00 / kg

500.00

J U M LAH

10,000.00

ANALISA HARGA MATERIAL ON SITE ( MOS )


Program
Kegiatan
Lokasi Kegiatan
Provinsi
Tahun Anggaran
Material
Satuan

No.

: Pembangunan Jalan
: Pembangunan Jalan Baru Loa Bahu
: Pembangunan Jalan Baru Loa Bahu
Samarinda
: Kalimantan Timur
: 2010

: Kerosen
: Liter
U R A I A N

Harga Setempat

Material :

Rp.

/ SATUAN

Depot BBM
JUMLAH
HARGA
(Rp.)

11,000.00 / liter

11,000.00

Penanganan / perawatan

500.00 / liter

500.00

Angkutan ke lapangan

500.00 / liter

500.00

Bongkar muat, penyimpanan dll

500.00 / liter

500.00

J U M LAH

12,500.00

ANALISA HARGA MATERIAL ON SITE ( MOS )


Program
Kegiatan
Lokasi Kegiatan

: Pembangunan Jalan
: Pembangunan Jalan Baru Loa Bahu
: Pembangunan Jalan Baru Loa Bahu
Samarinda
: Kalimantan Timur
: 2010
: Semen
: Kg

Provinsi
Tahun Anggaran
Material
Satuan

No.

U R A I A N

Harga Patokan Setempat ( HPS )

Material :

Rp.

/ SATUAN

Lokal
JUMLAH
HARGA
(Rp.)

55,000.00 / Zak

55,000.00

Penanganan / perawatan

1,000.00 / Zak

1,000.00

Angkutan ke lapangan

5,000.00 / Zak

5,000.00

Bongkar muat, penyimpanan dll

1,000.00 / Zak

1,000.00

J U M LAH

Keterangan :

Harga semen / kg

= Rp.
= Rp.

62,000.00

62,000.00 / 50 Kg
1,240.00

ANALISA HARGA MATERIAL ON SITE ( MOS )


Program
Kegiatan
Lokasi Kegiatan
Provinsi
Tahun Anggaran
Material
Satuan

No.

: Pembangunan Jalan
: Pembangunan Jalan Baru Loa Bahu
: Pembangunan Jalan Baru Loa Bahu
Samarinda
: Kalimantan Timur
: 2010
: Bensin
: Liter

U R A I A N

Harga Setempat

2
3

Material :

Rp.

/ SATUAN

Depot BBM
JUMLAH
HARGA
(Rp.)

8,310.00 / liter

8,310.00

Penanganan / perawatan

500.00 / liter

500.00

Angkutan ke lapangan

500.00 / liter

500.00

Bongkar muat, penyimpanan dll

500.00 / liter

500.00

J U M LAH

9,810.00

ANALISA HARGA MATERIAL ON SITE ( MOS )


Program
Kegiatan
Lokasi Kegiatan
Provinsi
Tahun Anggaran
Material
Satuan

No.

: Pembangunan Jalan
: Pembangunan Jalan Baru Loa Bahu
: Pembangunan Jalan Baru Loa Bahu
Samarinda
: Kalimantan Timur
: 2010
: Solar
: Liter

U R A I A N

Harga Setempat

Material :

Rp.

/ SATUAN

Depot BBM
JUMLAH
HARGA
(Rp.)

8,500.00 / liter

8,500.00

Penanganan / perawatan

500.00 / liter

500.00

Angkutan ke lapangan

500.00 / liter

500.00

Bongkar muat, penyimpanan dll

500.00 / liter

500.00

J U M LAH

10,000.00

ANALISA HARGA MATERIAL ON SITE ( MOS )


Program
Kegiatan
Lokasi Kegiatan
Provinsi
Tahun Anggaran
Material
Satuan

No.

: Pembangunan Jalan
: Pembangunan Jalan Baru Loa Bahu
: Pembangunan Jalan Baru Loa Bahu
Samarinda
: Kalimantan Timur
: 2010
: Pelumas / Oli
: Liter

U R A I A N

Harga Setempat

2
3

Material :

Rp.

/ SATUAN

Lokal
JUMLAH
HARGA
(Rp.)

30,000.00 / liter

30,000.00

Penanganan / perawatan

500.00 / liter

500.00

Angkutan ke lapangan

500.00 / liter

500.00

Bongkar muat, penyimpanan dll

500.00 / liter

500.00

J U M LAH

31,500.00

ANALISA HARGA MATERIAL ON SITE ( MOS )


Program
Kegiatan
Lokasi Kegiatan
Provinsi
Tahun Anggaran
Material
Satuan

No.

: Pembangunan Jalan
: Pembangunan Jalan Baru Loa Bahu
: Pembangunan Jalan Baru Loa Bahu
Samarinda
: Kalimantan Timur
: 2010
: Sirtu
: M3

U R A I A N

Harga Setempat

Penanganan / perawatan

Angkutan ke lapangan

Bongkar muat, penyimpanan dll

Material :

Rp.

/ SATUAN

Lokal
JUMLAH
HARGA
(Rp.)

270,000.00 / liter

270,000.00

1,000.00 / liter

1,000.00

106,000.00 / liter

106,000.00

1,000.00 / liter

1,000.00

J U M LAH

378,000.00

JADWAL PELAKSANAAN PEKERJAAN


Program
Kegiatan
Lokasi Kegiatan
Provinsi
Tahun Anggaran

No. Mata
Pembayaran

: Pembangunan Jalan dan Jembatan Prop. Kaltim


: Pembangunan Jalan Dalam Kota Samarinda
: Jalan Baru Kel. Loa Bahu
Samarinda
: Kalimantan Timur
: 2010

Uraian

Waktu Pelaksanaan

Bobot
1

1.2
2.1
2.2
3.1 (1)
3.2 (1)
3.3 (3)
4.1
5.1 (1)
5.1 (2)
6.1 (1)
6.3 (5)

DIVISI 1. UMUM
Mobilisasi dan Demobilisasi
DIVISI 2. DRAINASE
Galian untuk Selokan Drainase dan Saluran Air
Pasangan Batu dengan Mortar
DIVISI 3. PEKERJAAN TANAH
Galian Biasa
Timbunan Biasa
Penyiapan Badan Jalan
DIVISI 4. PEKERJAAN BAHU JALAN
Lapis Pondasi Agregat Kelas C
DIVISI 5. PEKERJAAN BERBUTIR
Lapis Pondasi Agregat Kelas A
Lapis Pondasi Agregat Kelas B
DIVISI 6. PERKERASAN ASPAL
Lapis Resap Pengikat
Asphalt Treated Base (ATB)
TOTAL
RENCANA
MINGGUAN ( % )
FISIK
KOMULATIF ( % )

1.5567

0.389

10

11

12

14

15

0.221
1.294

0.221
1.294

1.546
2.252
0.422

1.546
2.252
0.422

1.9263

0.321

10.9669
10.0677

1.567

1.546

1.546
2.252
0.422

0.221

1.294

1.294

1.294

1.294

1.294

1.294

1.294

1.546
2.252
0.422

1.546
2.252

1.546
2.252

1.546
2.252

1.546
2.252

2.252

2.252

2.252

0.321

0.321

0.321

0.321

0.321

1.567
1.119

1.567
1.119

1.567
1.119

1.567
1.119

1.567
1.119

1.567
1.119

1.119

1.119

1.119

1.0482
20.2318
100.00
1.935
2.324

16
0.778

0.221

0.389
0.389

13

0.389

0.8849
12.9423
13.9095
24.7761
1.6896

4.441
6.765

6.329
13.095

8.742
21.837

8.742
30.579

8.098
38.677

8.098
46.776

8.098
54.874

7.777
62.652

4.665
67.317

4.665
71.982

1.294

0.524
6.744

0.524
6.744

6.744

11.933
83.916

8.562
92.478

6.744
99.222

Samarinda, 20 Januari 2010


Penawar
PT. HEQ JAYA

HEKI WIJAYANTI, SST


Direktur Utama

0.778
100.000

Ket.

100

50

Perkiraan kuantitas ( m3 )

#REF!
2.1
2.2
3.1 (1)
3.2 (1)
3.3 (3)
4.1
5.1 (1)
5.1 (2)
6.1 (1)
6.3 (5)

0
0
0
0
0
0
0
0
0
0
0

1
680.00
255.00
1,787.80
972.82
6,375.00
191.25
765.00
1,275.00
10.20
255.00

Pruduksi alat yg menentukan (m3/jam) hari


18.68
1.33
18.68
58.97
311.25
28.01
18.68
18.68
124.50
295.11

JAM
36.4123159304
192.0180722892
95.7324964117
16.4958566776
20.4819277108
6.8273092369
40.9638554217
68.2730923695
0.0819277108
0.8640813253

hari

minggu

2.6678571
0.1897143
2.6678571
8.424812
44.464286
4.0017857
2.6678571
2.6678571
17.785714
42.15873
127.69647

3.760592
0.26742
3.760592
11.87555
62.67653
5.640888
3.760592
3.760592
25.07061
59.42663
180

0.537227
0.038203
0.537227
1.696508
8.95379
0.805841
0.537227
0.537227
3.581516
8.489519

HARI
5.2017594
27.431153
13.676071
2.356551
2.9259897
0.9753299
5.8519793
9.7532989
0.011704
0.1234402

MINGGU
0.743108
3.918736
1.953724
0.33665
0.417999
0.139333
0.835997
1.393328
0.001672
0.017634

BULAN
0.173392
0.914372
0.455869
0.078552
0.097533
0.032511
0.195066
0.32511
0.00039
0.004115

PERHITUNGAN VOLUME
Program
Kegiatan
Lokasi Kegiatan
Provinsi
Tahun Anggaran

:
:
:
:
:

Pembangunan Jalan
Pembangunan Jalan Tol Dirgantara - Rajawali STA. 0+000 - 1+300 Samarinda Ilir
Kelurahan Pelita
Kalimantan Timur
2012

No.
1

Uraian

Satuan Panjang Lebar Tinggi

Drainase
- Galian pada saluran drainase

Volume

m3

995

Kanan

995.00

m3

995

Kiri

995.00

100

100

m3

TOTAL :

1,990.00

Kanan :

597.00

- Pasangan batu dengan mortar


60

m3

995

0.6
0.4

0.8

m3

995

0.6
0.4

0.8

80

Kiri

597.00

40

m3
2

TOTAL :

1,194.00

Pekerjaan Tanah
- Galian biasa

m3

31,279.16

- Timbunan biasa

m3

22,076.63

- Penyiapan badan jalan

m2

7,5 m

850 m

1300

11

14,300.00

7,5 m

850 m

Pekerjaan Bahu Jalan


- Lapis Pondasi Agregat Kelas C t = 15cm

m3
m3

995
995

1
1

0.15 Kanan :
0.15 Kiri
:

149.25
149.25

TOTAL :

298.50

m3
4

Perkerasan Berbutir
- Lapis Pondasi Agregat A t = 15 cm
- Lapis Pondasi Agregat B t = 20 cm

m3
m3

995
995

8
10

0.2
0.15

1,592.00
1,492.50

m2

995

0.8

5,572.00

m3

995

0.075

ATB

Perkerasan Aspal
- Lapis Resap Pengikat

6m

850 m

- ATB t = 5 cm

ATB

522.38

Tabel perhitungan Volume Lapis Permukaan


STA

LEBAR

0+000

0+100

0+200

0+230

7.85

0+300

0+400

0+500

8.12

0+550

0+600

0+700

0+750

7.71

0+800

0+900

0+970

7.32

1+000

1+100

1+120

1+200

1+300

RATA-RATA

JARAK

TEBAL

VOLUME

100

0.75

525.00

100

0.75

525.00

7.42

30

0.75

167.02

7.42

70

0.75

389.71

100

0.75

525.00

7.56

100

0.75

566.81

7.56

50

0.75

283.41

50

0.75

262.50

100

0.75

525.00

7.35

50

0.75

275.72

7.35

50

0.75

275.72

100

0.75

525.00

7.16

70

0.75

375.85

7.16

30

0.75

161.08

100

0.75

525.00

20

0.75

105.00

80

0.75

420.00

100

0.75

525.00

JUMLAH ()

###

TABEL PERHITUNGAN VOLUME LAPIS PERKERASAN ATAS (LPA)

STA
0+000
0+100
0+200
0+230
0+300
0+400
0+500
0+550
0+600
0+700
0+750
0+800
0+900
0+970
1+000
1+100
1+120
1+200
1+300

LEBAR RATA-RATA JARAK

TEBAL

VOLUME

7
7

100

0.2

140.00

100

0.2

140.00

7.42

30

0.2

44.54

7.42

70

0.2

103.92

100

0.2

140.00

7.56

100

0.2

151.15

7.56

50

0.2

75.58

50

0.2

70.00

100

0.2

140.00

7.353

50

0.2

73.53

7.353

50

0.2

73.53

100

0.2

140.00

7.159

70

0.2

100.23

7.159

30

0.2

42.95

100

0.2

140.00

20

0.2

28.00

80

0.2

112.00

100

0.2

140.00

7
7
7.85
7
7
8.12
7
7
7
7.71
7
7
7.32
7
7
7
7
7

JUMLAH ()

###

TABEL PERHITUNGAN VOLUME LAPIS PERKERASAN BAWAH (LPB)


STA
0+000
0+100
0+200
0+230
0+300
0+400
0+500
0+550
0+600
0+700
0+750
0+800
0+900
0+970
1+000
1+100
1+120
1+200
1+300

LEBAR RATA-RATA JARAK

TEBAL

VOLUME

7
7

100

0.15

105.00

100

0.15

105.00

7.42

30

0.15

33.40

7.42

70

0.15

77.94

100

0.15

105.00

7.56

100

0.15

113.36

7.56

50

0.15

56.68

50

0.15

52.50

100

0.15

105.00

7.35

50

0.15

55.14

7.35

50

0.15

55.14

100

0.15

105.00

7.16

70

0.15

75.17

7.16

30

0.15

32.22

100

0.15

105.00

20

0.15

21.00

80

0.15

84.00

100

0.15

105.00

7
7
7.85
7
7
8.12
7
7
7
7.71
7
7
7.32
7
7
7
7
7

JUMLAH ()

###

TABEL PERHITUNGAN VOLUME PARIT


STA

KETERANGAN
PANJANG
GALIANTIMBUNAN KIRI KANAN A

0+000

0+100

0+200

0+230

0+300

0+400

0+50
0

0+55
0

0+60
0

0+70
0

0+75
0

0+80
0

0+90
0

0+97
0

1+00
0

1+10
0

1+12
0

1+20
0

1+300

DIMENSI
VOLUME
B
C LUAS KIRI KANAN

100

100

0.6

0.4

0.8

0.4

40

40

100

100

0.6

0.4

0.8

0.4

40

40

30

30

0.6

0.4

0.8

0.4

12

12

70

70

0.6

0.4

0.8

0.4

28

28

100

100

0.6

0.4

0.8

0.4

40

40

100

100

0.6

0.4

0.8

0.4

40

40

50

50

0.6

0.4

0.8

0.4

20

20

50

50

0.6

0.4

0.8

0.4

20

20

100

100

0.6

0.4

0.8

0.4

40

40

50

50

0.6

1.4

0.8

0.8

40

40

50

50

0.6

0.4

0.8

0.4

20

20

100

100

0.6

0.4

0.8

0.4

40

40

70

70

0.6

1.4

0.8

0.8

56

56

30

30

0.6

0.4

0.8

0.4

12

12

100

100

0.6

0.4

0.8

0.4

40

40

20

20

0.6

0.4

0.8

0.4

80

80

0.6

0.4

0.8

0.4

32

32

100

100

0.6

0.4

0.8

0.4

40

40

568

568

JUMLAH ()
Jadi , Volume parit dari hasil perhitungan tabel diatas adalah :

568 m3

568 m3