MAJESTIC TOWER

Progress Report
Date: 05/09/2014

A. Majestic Tower Residential Sale Building (BUA 22,


00,000 sft approx.)
2 basement + ground floor + 6 podium + 36 floors with 4
wings.
1. A wing : (2.5 BHK- 208 flats excluding Refuge area)
1st typical floor slab completed.
2. B wing : (2.5 BHK- 140 flats, 2 BHK 68 flats excluding Refuge area)
Typical 10th floor slab completed.
Typical 11th floor slab 25 % completed.
Column above Typical 10th floor is completed.
Block work on 1st Floor is started for Sample Flat.
3. C wing : (2.5 BHK- 64 flats, 2 BHK 140 flats, 3 BHK 72 flats excluding
Refuge area)
Typical 11th floor slab completed.
4. D wing : (2 BHK 132 flats, 3 BHK 144 flats excluding Refuge area)
Typical 13th floor slab completed.
Typical 13th To 14th floor column 35 % completed.
Note:

Drawing of 6th podium slab of podium area is not finalized yet.

B. Majestic Tower Rehab building (BUA 9, 50,000 sft


approx.)
1. Building 1 : Ground floor + 17 floors with 6 wings.
a. A wing : No. of flats 134 excluding refuge area , balwadi , society
office and meter room.
RCC and Brick work completed
External Plaster 80 % of periphery area completed.
Gypsum Plaster 78/134 flats completed.
b. B wing: No. of flats 134 excluding refuge area, balwadi, society
office and meter room.
RCC and Brick work completed
External Plaster 35 % of periphery area completed.
Gypsum Plaster 78/134 flats completed.
c. C wing : No. of flats 134 excluding refuge area , balwadi ,
society office and meter room.

d.

e.

f.

RCC and Brick work completed


Casting of OHWT is completed.
Gypsum Plaster 62/134 flats completed.
D wing: No. of flats 134 excluding refuge area, balwadi, society
office and meter room.
RCC and Brick work completed
Fixing of marble frame on 17th floor is completed.
Gypsum Plaster 54/134 flats completed.
E wing: No. of flats 134 excluding refuge area, balwadi, society
office and meter room.
RCC and Brick work completed
External Plaster 25 % of periphery area completed.
Gypsum Plaster 118/134 flats completed.
F wing: No. of flats 134 excluding refuge area, balwadi, society
office and meter room.
RCC and Brick work completed
External Plaster 90 % of periphery area completed.
Gypsum Plaster 118/134 flats completed.
Basecoat in Bath & WC from 5th floor to 10th floor is
completed.

2. Building 2: Ground floor + 16 floors with 4 wings.


a. A wing: No. of flats 126 excluding refuge area, balwadi , society
office and meter room.
RCC and Brick work completed
External Plaster 80 % of periphery area completed.
Gypsum Plaster 78/126 flats completed.
b. B wing: No. of flats 126 excluding refuge area, balwadi, society
office and meter room.
RCC and Brick work completed.
External Plaster 10 % of periphery area completed.
Gypsum Plaster 102/126 flats completed.
c. C wing: No. of flats 127 excluding refuge area, balwadi, society
office and meter room.
RCC and Brick work completed
External Plaster 60 % of periphery area completed.
Gypsum Plaster 80/127 flats completed.
d. D wing: No. of flats 126 excluding refuge area, balwadi, society
office and meter room.
RCC and Brick work completed
External Plaster 90 % of periphery area completed.
Gypsum Plaster 118/126 flats completed.
3. Building 3: Ground floor + 16 floors with 3 wings.
a. A wing: No. of flats 90 excluding refuge area, balwadi, society
office and meter room.
RCC work completed excluding OHWT.
Brick work up to 9th floor completed.

b.

c.

Gypsum Plaster 40/90 flats completed.


B wing: No. of flats 124 excluding refuge area, balwadi, society
office and meter room.
RCC and Brick work completed.
Gypsum Plaster 70/14 flats completed.
C wing: No. of flats 142 excluding refuge area, balwadi, society
office and meter room.
RCC work completed excluding OHWT.
Brick work up to 8th floor completed.
Gypsum Plaster 67/142 flats completed.

4. Building 4: Ground floor + 16 floors with 3 wings.


a. A wing: No. of flats 94 excluding refuge area, balwadi, society
office and meter room.
Typical 11th floor slab completed.
Brick work on 3rd, 4th, 5th & 6th floor completed.
b. B wing: No. of flats 108 excluding refuge area, balwadi, society
office and meter room.
Casting of Typical 12th floor slab completed.
Brick work on 3rd, 4th, 5th & 6th floor completed.
c. C wing: No. of flats 134 excluding refuge area, balwadi, society
office and meter room.
RCC work completed.
Brick work up to 16th floor completed.
Fixing of Marble in Door & window frames is going on.

Description

August
-14

July14

June14

May
-14

Labor strength per day

452 nos

351 nos

313 nos

300 nos

Average concreting per day


Average steel consumption
per day

45 cum

23 cum

32 cum

18 cum

6.5 T

6.5 T

7.2 T

3.36 T

MAJESTIC TOWER PROGRESS REPORT


DATE : 05 / 09 / 2014
TOTAL PROJECT COMPLETED TILL DATE IN %
=

25.05
%

N IN PROJECT

A
WIN
G

EXCAVATION

5%

100%

R.C.C.

45%

BRICKWORK

10%

0.00%

0.00%

0.00%

0.00%

0.0%

10%

0.00%

0.00%

0.00%

0.00%

0.0%

8%

0.00%

0.00%

0.00%

0.00%

0.0%

3%

0.00%

0.00%

0.00%

0.00%

0.0%

SR
.N
O

DESCRIPTION

4
5
6

% WISE

INTERNAL
PLASTER
EXTERNAL
PLASTER
WATERPROOFI
NG

CONTRIBUTIO

29.57
%

B
WIN
G

C
WIN
G

D
WIN
G

100.00

100.00

100.00

100.0

42.86%

49.67%

56.14%

%
44.6

COMPLETED%
WISE
CONTRIBUTION

PLUMBING

5%

0.00%

0.00%

0.00%

0.00%

0.0%

FIRE FIGHTING

1%

0.00%

0.00%

0.00%

0.00%

0.0%

3%

0.00%

0.00%

0.00%

0.00%

0.0%

ELECTRICAL
WORK

10

TILING

6%

0.00%

0.00%

0.00%

0.00%

0.0%

11

PAINTING

2%

0.00%

0.00%

0.00%

0.00%

0.0%

2%

0.00%

0.00%

0.00%

0.00%

0.0%

12
13

`MISCLLEANEO
US
TOTAL

100%

0.0%

5.00%
20.05%

25.05%

NAHUR REHAB PROGRESS REPORT

BLDG.NO.3

BLDG.NO.4

ACTIVITY

BLDG.NO.2

5%

100%

100%

100%

100%

100%

5%

45%

100%

100%

100%

81%

95%

43%

BRICKWORK

10%

94%

94%

64%

46%

75%

7%

INTERNAL GYPSUM

10%

71%

71%

47%

0%

45%

5%

EXTERNAL
PLASTER

8%

40%

61%

0%

0%

25%

2%

WATERPROOFING

3%

0%

0%

0%

0%

0%

0%

PLUMBING

5%

0%

0%

0%

0%

0%

0%

FIRE FIGHTING

1%

0%

0%

0%

0%

0%

0%

ELECTRICAL WORK

2%

94%

94%

58%

20%

67%

1%

10

ELECTRICAL WORK
SWITCH FITTING

1%

0%

0%

0%

0%

0%

0%

11

TILING

6%

0%

0%

0%

0%

0%

0%

12

PAINTING

2%

0%

0%

0%

0%

0%

0%

12

MISCELLANEOUS

2%

0%

0%

0%

0%

0%

0%

TOTAL

100%

38%

40%

28%

19%

31%

63%

SR
.N
O

ACTIVITY

EXCAVATION

R.C.C.

13

SALE & REHAB STEEL OPENING


SCHEDULE
DIA.
RECEIVED
USE
BALANCE
MT.
8mm
2203.99
2148.99
55
10mm
362.352
341.352
21
12mm
982.22
940.22
42
16mm
955.755
929.755
26
20mm
1537.72
1496.72
41
25mm
1857.085
1790.085
67
32mm
813.13
751.13
62
TOTAL

8712.252

8398.252

314

COMPLETE

BLDG.NO.1

CONTRIBU% WISE
TION IN

CONTRIBUTIONWISECOMPLETED%

63 %

TOTAL PROJECT COMPLETED TILL DATE IN % =

RMC CONSUMPTION
REHAB
SR. NO.

CONCRETE
GRADE

PREVIOUS
QUANTITY

TODAY' S
QUANTITY

1
2
3
4
5
6
7
8

M15
M20
M25
M30
M35
M40
M45
M50

1195

CUMML.
QUANTITY
CU.M.
1195

15548.75
15108.75

0
0

15548.75
15108.75

31852.5

31852.5

TOTAL

RMC CONSUMPTION
SALE
SR. NO.

CONCRETE
GRADE

PREVIOUS
QUANTITY

TODAY' S
QUANTITY

M15

54

CUMML.
QUANTITY
CU.M.
54

2
3
4
5
6
7
8
9
10
11
TOTAL

M20
M25
M30
M35
M40
M45
M50
M55
M60
M65

45
4.5
38.45
8673.4
0
506.5
435.05
7326.55
91.5
55.5
17230.45

0
0
0
0.75
0
0
8.05
6.7
0
0
15.5

45
4.5
38.45
8674.15
0
506.5
443.13
7333.25
91.5
55.5
17245.95

CEMENT CONSUMPTION
SALE AND REHAB
MATERIAL

OPC 53
GRADE

BULKER

PPC

TOTAL RECEIVED
TOTAL CONSUMED
TODAY' S RECEIVED
OPENING BALANCE
TODAY' S CONSUMPTION
BALANCE ON SITE

111465
111260
0
205
25
180

15167.295
15106.274
0
61.021
6.816
54.205

44718
43908
0
810
150
660