You are on page 1of 9

Project:

ETAP PowerStation

Short Circuit

Location:

4.0.0C

Lab DSTL

Contract:
Engineer:

Hilda Mega Marcella

Filename:

03111004003-SC

Short Circuit Analysis


IEC 909 Standard
3-Phase, LG, LL, & LLG Fault Currents

Number of Machines:

Date:

10-09-2014

SN:

KLGCONSULT

Config.:

ETAP PowerStation

Number of Branches:

Revision: Base

Study Case: SC

Electrical Transient Analyzer Program

Number of Buses:

Page:

Swing

Generator

Load

Total

XFMR2

XFMR3

Reactor

Tie PD

Total

Synchronous
Generator

Power
Grid

Synchronous
Motor

Induction
Machines

Lumped
Load

Total

Line/Cable Impedance

System Frequency:

50 Hz

Unit System:

English

Project Filename:

03111004003-SC

Output Filename:

C:\ETAP 400\PowerStation\03111004003-SC\sc.SI2

Normal

Project:
Location:

ETAP PowerStation

Short Circuit

4.0.0C

Lab DSTL

Contract:
Engineer:

Hilda Mega Marcella

Filename:

03111004003-SC

Page:

Date:

10-09-2014

SN:

KLGCONSULT

Revision: Base

Study Case: SC

Config.:

Normal

BUS Input Data


Bus
ID

Initial Voltage

Type

Nom. kV

Base kV

%Mag.

Ang.

Bus1

SWNG

13.800

13.800

100.0

0.0

Bus2

Gen.

13.800

13.800

100.0

0.0

Bus3

Load

20.000

20.000

100.0

0.0

Bus4

Load

20.000

20.000

100.0

0.0

Bus5

Gen.

13.800

13.800

100.0

0.0

5 Buses Total

Generation
MW

Mvar

15.000

0.000

15.000

0.000

Motor Load
MW

Mvar

30.000

All voltages reported by PowerStation are in % of bus Nominal kV. Base kV values of buses are calculated and used internally by PowerStation.

Project:

ETAP PowerStation

Short Circuit

Location:

4.0.0C

Lab DSTL

Contract:
Engineer:

Hilda Mega Marcella

Filename:

03111004003-SC

Page:

Date:

10-09-2014

SN:

KLGCONSULT

Revision: Base

Study Case: SC

Config.:

Normal

LINE / CABLE Input Data


Line/Cable
ID

Ohms or Mohs / 1000 ft per Conductor (Cable) or per Phase (Line)


Library

Size

Line1

Line / Cable resistances are listed at the specified temperatures.

Length(ft)

#/Phase

49200.0

T (C)
75

R1

X1

0.091463

0.060976

Y1

R0

X0

0.060976

0.091463

Y0

Project:

ETAP PowerStation

Short Circuit

Location:

4.0.0C

Lab DSTL

Contract:
Engineer:

Hilda Mega Marcella

Filename:

03111004003-SC

Page:

Date:

10-09-2014

SN:

KLGCONSULT

Revision: Base

Study Case: SC

Config.:

Normal

2-WINDING TRANSFORMER Input Data

Transformer
ID

Rating

Z Variation
X/R

% Tap Setting
% Tol.

Adjusted

Phase Shift

MVA

Prim. kV

Sec. kV

%Z

+ 5%

- 5%

Prim.

Sec.

%Z

Type

T1

60.000

13.800

20.000

6.500

34.1

6.5000

Std Pos. Seq.

0.0

T2

50.000

13.800

20.000

6.500

29.5

6.5000

Std Pos. Seq.

0.0

T3

40.000

20.000

13.800

6.500

27.3

6.5000

Std Pos. Seq.

0.0

2-WINDING TRANSFORMER Grounding Input Data


Grounding
Transformer
ID

Rating

Conn.

Prinary
Type

Amp

Secondary

MVA

Prim. kV

Sec. kV

Type

Type

T1

60.000

13.800

20.000

D/Y

Solid

T2

50.000

13.800

20.000

D/Y

Solid

T3

40.000

20.000

13.800

D/Y

Solid

Amp

Angle

Project:
Location:

ETAP PowerStation

Short Circuit

4.0.0C

Lab DSTL

Contract:
Engineer:

Hilda Mega Marcella

Filename:

03111004003-SC

Page:

Date:

10-09-2014

SN:

KLGCONSULT

Revision: Base

Study Case: SC

Config.:

Normal

BRANCH CONNECTIONS
CKT/Branch

Connected Bus ID

ID

Type

From Bus

% Impedance, Pos. Seq., 100 MVAb


To Bus

T1

2W XFMR

Bus1

Bus3

0.32

10.83

10.83

T2

2W XFMR

Bus2

Bus3

0.44

12.99

13.00

T3

2W XFMR

Bus4

Bus5

0.59

16.24

16.25

Line1

Line

Bus3

Bus4

112.50

75.00

135.21

Project:
Location:

ETAP PowerStation

Short Circuit

4.0.0C

Lab DSTL

Contract:
Engineer:

Hilda Mega Marcella

Filename:

03111004003-SC

Page:

Date:

10-09-2014

SN:

KLGCONSULT

Revision: Base

Study Case: SC

Config.:

Normal

GENERATOR Input Data


Synchronous Generator
ID

Type

Rating

% Impedance (Machine Base)

MVA

kV

RPM

% PF

X"

R/X

Grounding

Xd, sat

Conn.

Type

Excitation
Amp

Type

Gen1

Turbo

50.000

13.800

1500

85.00

0.200

0.20 99999.90

0.00

Wye

Solid

0.00 Turbine 130%

Gen2

Turbo

40.000

13.800

1500

85.00

0.250

0.25 99999.90

0.00

Wye

Solid

0.00 Turbine 130%

Gen3

Turbo

30.000

13.800

1500

85.00

0.300

0.30 99999.90

0.00

Wye

Solid

0.00 Turbine 130%

Total Connected Synchronous Generators ( = 3,00 ) : 120,000 MVA

Project:
Location:

ETAP PowerStation

Short Circuit

4.0.0C

Lab DSTL

Contract:
Engineer:

Hilda Mega Marcella

Filename:

03111004003-SC

Page:

Date:

10-09-2014

SN:

KLGCONSULT

Revision: Base

Study Case: SC

Config.:

Normal

SHORT- CIRCUIT REPORT


Fault at bus:

Bus3

Nominal kV = 20.000

Voltage factor (C)

3-Phase Fault

Contribution
From Bus
ID

= 1.10

To Bus
ID

%V
From Bus

Bus3

Total

0.00

Bus4

Bus3

Bus1

Bus3

Bus2

Bus3

Initial SymmetricalCurrent (kA, rms)


Peak Current (kA), Method C
Breaking Current (kA, rms, symm)
Steady State Current (kA, rms, Max.)

:
:
:
:

kA
Symm. rms

% Voltage at From Bus


Va
Vb
Vc

kA Symm. rms
Ia
3I0

52.754

0.00

101.77

97.60

92.07

2.162

61.79

117.07

118.79

95.92

28.117

97.31

100.42

98.24

94.71

23.135

96.50

100.51

97.75

23.572

3-Phase
52.754
133.340
72.438

Positive & Zero Sequence Impedances


Looking into "From Bus"

Line-To-Ground Fault

L-G
53.109
134.236
53.109
53.109

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta-Y transformer

L-L
45.687
115.476
45.687
45.687

53.109

R1

% Impedance on 100 MVA base


X1
R0
X0

53.109

6.24E-001 5.99E+000

1.451

0.000

1.14E+002 9.23E+001

28.523

28.969 *

7.57E-001 1.13E+001

3.18E-001 1.08E+001

24.140 * 1.13E+000 1.37E+001

4.40E-001 1.30E+001

L-L-G
54.021
136.541
54.021
54.021

1.85E-001 5.91E+000

Project:

ETAP PowerStation

Short Circuit

Location:

4.0.0C

Lab DSTL

Contract:
Engineer:

Hilda Mega Marcella

Filename:

03111004003-SC

Page:

Date:

10-09-2014

SN:

KLGCONSULT

Revision: Base

Study Case: SC

Config.:

Normal

Short-Circuit Summary Report


3-Phase, LG, LL, LLG Fault Currents
Bus
ID
Bus3

3-Phase Fault
kV
20.000

I"k

ip

52.754 133.340

Line-to-Ground Fault
Ik

72.438

All fault currents are in rms kA. Current ip is calculated using Method C.
* LLG fault current is the larger of the two faulted line currents.

I"k

ip

53.109 134.236

Line-to-Line Fault

Ib

Ik

53.109

53.109

I"k

ip

45.687 115.476

*Line-to-Line-to-Ground

Ib

Ik

45.687

45.687

I"k

ip

54.021 136.541

Ib

Ik

54.021

54.021

Project:
Location:

ETAP PowerStation

Short Circuit

4.0.0C

Lab DSTL

Contract:
Engineer:

Hilda Mega Marcella

Filename:

03111004003-SC

Page:

Date:

10-09-2014

SN:

KLGCONSULT

Revision: Base

Study Case: SC

Config.:

Short-Circuit Summary Report


Bus
ID
Bus3

Positive Sequence Imp. (ohm)


kV
20.000

Zero Sequence Imp. (ohm)

Resistance

Reactance

Impedance

Resistance

Reactance

Impedance

0.02495

0.23947

0.24077

0.00742

0.23625

0.23636

Normal