Professional Documents
Culture Documents
ETAP PowerStation
Short Circuit
Location:
4.0.0C
Lab DSTL
Contract:
Engineer:
Filename:
03111004003-SC
Number of Machines:
Date:
10-09-2014
SN:
KLGCONSULT
Config.:
ETAP PowerStation
Number of Branches:
Revision: Base
Study Case: SC
Number of Buses:
Page:
Swing
Generator
Load
Total
XFMR2
XFMR3
Reactor
Tie PD
Total
Synchronous
Generator
Power
Grid
Synchronous
Motor
Induction
Machines
Lumped
Load
Total
Line/Cable Impedance
System Frequency:
50 Hz
Unit System:
English
Project Filename:
03111004003-SC
Output Filename:
C:\ETAP 400\PowerStation\03111004003-SC\sc.SI2
Normal
Project:
Location:
ETAP PowerStation
Short Circuit
4.0.0C
Lab DSTL
Contract:
Engineer:
Filename:
03111004003-SC
Page:
Date:
10-09-2014
SN:
KLGCONSULT
Revision: Base
Study Case: SC
Config.:
Normal
Initial Voltage
Type
Nom. kV
Base kV
%Mag.
Ang.
Bus1
SWNG
13.800
13.800
100.0
0.0
Bus2
Gen.
13.800
13.800
100.0
0.0
Bus3
Load
20.000
20.000
100.0
0.0
Bus4
Load
20.000
20.000
100.0
0.0
Bus5
Gen.
13.800
13.800
100.0
0.0
5 Buses Total
Generation
MW
Mvar
15.000
0.000
15.000
0.000
Motor Load
MW
Mvar
30.000
All voltages reported by PowerStation are in % of bus Nominal kV. Base kV values of buses are calculated and used internally by PowerStation.
Project:
ETAP PowerStation
Short Circuit
Location:
4.0.0C
Lab DSTL
Contract:
Engineer:
Filename:
03111004003-SC
Page:
Date:
10-09-2014
SN:
KLGCONSULT
Revision: Base
Study Case: SC
Config.:
Normal
Size
Line1
Length(ft)
#/Phase
49200.0
T (C)
75
R1
X1
0.091463
0.060976
Y1
R0
X0
0.060976
0.091463
Y0
Project:
ETAP PowerStation
Short Circuit
Location:
4.0.0C
Lab DSTL
Contract:
Engineer:
Filename:
03111004003-SC
Page:
Date:
10-09-2014
SN:
KLGCONSULT
Revision: Base
Study Case: SC
Config.:
Normal
Transformer
ID
Rating
Z Variation
X/R
% Tap Setting
% Tol.
Adjusted
Phase Shift
MVA
Prim. kV
Sec. kV
%Z
+ 5%
- 5%
Prim.
Sec.
%Z
Type
T1
60.000
13.800
20.000
6.500
34.1
6.5000
0.0
T2
50.000
13.800
20.000
6.500
29.5
6.5000
0.0
T3
40.000
20.000
13.800
6.500
27.3
6.5000
0.0
Rating
Conn.
Prinary
Type
Amp
Secondary
MVA
Prim. kV
Sec. kV
Type
Type
T1
60.000
13.800
20.000
D/Y
Solid
T2
50.000
13.800
20.000
D/Y
Solid
T3
40.000
20.000
13.800
D/Y
Solid
Amp
Angle
Project:
Location:
ETAP PowerStation
Short Circuit
4.0.0C
Lab DSTL
Contract:
Engineer:
Filename:
03111004003-SC
Page:
Date:
10-09-2014
SN:
KLGCONSULT
Revision: Base
Study Case: SC
Config.:
Normal
BRANCH CONNECTIONS
CKT/Branch
Connected Bus ID
ID
Type
From Bus
T1
2W XFMR
Bus1
Bus3
0.32
10.83
10.83
T2
2W XFMR
Bus2
Bus3
0.44
12.99
13.00
T3
2W XFMR
Bus4
Bus5
0.59
16.24
16.25
Line1
Line
Bus3
Bus4
112.50
75.00
135.21
Project:
Location:
ETAP PowerStation
Short Circuit
4.0.0C
Lab DSTL
Contract:
Engineer:
Filename:
03111004003-SC
Page:
Date:
10-09-2014
SN:
KLGCONSULT
Revision: Base
Study Case: SC
Config.:
Normal
Type
Rating
MVA
kV
RPM
% PF
X"
R/X
Grounding
Xd, sat
Conn.
Type
Excitation
Amp
Type
Gen1
Turbo
50.000
13.800
1500
85.00
0.200
0.20 99999.90
0.00
Wye
Solid
Gen2
Turbo
40.000
13.800
1500
85.00
0.250
0.25 99999.90
0.00
Wye
Solid
Gen3
Turbo
30.000
13.800
1500
85.00
0.300
0.30 99999.90
0.00
Wye
Solid
Project:
Location:
ETAP PowerStation
Short Circuit
4.0.0C
Lab DSTL
Contract:
Engineer:
Filename:
03111004003-SC
Page:
Date:
10-09-2014
SN:
KLGCONSULT
Revision: Base
Study Case: SC
Config.:
Normal
Bus3
Nominal kV = 20.000
3-Phase Fault
Contribution
From Bus
ID
= 1.10
To Bus
ID
%V
From Bus
Bus3
Total
0.00
Bus4
Bus3
Bus1
Bus3
Bus2
Bus3
:
:
:
:
kA
Symm. rms
kA Symm. rms
Ia
3I0
52.754
0.00
101.77
97.60
92.07
2.162
61.79
117.07
118.79
95.92
28.117
97.31
100.42
98.24
94.71
23.135
96.50
100.51
97.75
23.572
3-Phase
52.754
133.340
72.438
Line-To-Ground Fault
L-G
53.109
134.236
53.109
53.109
L-L
45.687
115.476
45.687
45.687
53.109
R1
53.109
6.24E-001 5.99E+000
1.451
0.000
1.14E+002 9.23E+001
28.523
28.969 *
7.57E-001 1.13E+001
3.18E-001 1.08E+001
4.40E-001 1.30E+001
L-L-G
54.021
136.541
54.021
54.021
1.85E-001 5.91E+000
Project:
ETAP PowerStation
Short Circuit
Location:
4.0.0C
Lab DSTL
Contract:
Engineer:
Filename:
03111004003-SC
Page:
Date:
10-09-2014
SN:
KLGCONSULT
Revision: Base
Study Case: SC
Config.:
Normal
3-Phase Fault
kV
20.000
I"k
ip
52.754 133.340
Line-to-Ground Fault
Ik
72.438
All fault currents are in rms kA. Current ip is calculated using Method C.
* LLG fault current is the larger of the two faulted line currents.
I"k
ip
53.109 134.236
Line-to-Line Fault
Ib
Ik
53.109
53.109
I"k
ip
45.687 115.476
*Line-to-Line-to-Ground
Ib
Ik
45.687
45.687
I"k
ip
54.021 136.541
Ib
Ik
54.021
54.021
Project:
Location:
ETAP PowerStation
Short Circuit
4.0.0C
Lab DSTL
Contract:
Engineer:
Filename:
03111004003-SC
Page:
Date:
10-09-2014
SN:
KLGCONSULT
Revision: Base
Study Case: SC
Config.:
Resistance
Reactance
Impedance
Resistance
Reactance
Impedance
0.02495
0.23947
0.24077
0.00742
0.23625
0.23636
Normal