VOLUME III
PRICE BID
Name Of Work :
HVAC System for Employees State Insurance (ESI) Hospital and PG College of Maniktala,Kolkata
NIT:
PRICE SCHEDULE
SI. No.
DESCRIPTION
HVAC System
ESTIMATED COST
(Rs.)
3
TO BE QUOTED BY TENDERER
Amount ( -) Below / (+) Above
5= (3 x 4 )
In words
In figures
In words
7,29,77,607
TENDER VALUE
Project :HVAC System for ESI Hospital and PG College at Maniktala -West Bengal
Bill of Quantities (BOQ) of the HVAC works :
Sr.No.
Description
Qty
Unit
Rate
Nos.
6500000
Amount
26000000
Project :HVAC System for ESI Hospital and PG College at Maniktala -West Bengal
Bill of Quantities (BOQ) of the HVAC works :
Pump performance characteristics shall be as
follows as per drawings and specifications.
a) Chilled water Primary Pumps
system :
Water flow Rate : 700 US GPM
Head
: 18 m
( Including one standby)
b) Chilled water secondary Pumps with VFDs
system :
Water flow Rate : 700 US GPM
Head
: 18 m
( Including one standby)
c) Hot Water Pumps for winter Heating :
Water Flow Rate : 300 US GPM
Head
: 24 m
( Including one standby)
Nos.
160000
640000
Nos.
280000
1120000
Nos.
153000
459000
No
445000
890000
Project :HVAC System for ESI Hospital and PG College at Maniktala -West Bengal
Bill of Quantities (BOQ) of the HVAC works :
4
a)
b)
c)
d)
e)
f)
g)
h)
I)
j)
k)
l)
m)
n)
2
1
2
2
1
1
1
1
3
1
1
1
1
1
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
650000
630000
630000
520000
500000
500000
500000
475000
475000
425000
425000
400000
400000
360000
1300000
630000
1260000
1040000
500000
500000
500000
475000
1425000
425000
425000
400000
400000
360000
1
1
No.
No.
75000
60000
75000
60000
Project :HVAC System for ESI Hospital and PG College at Maniktala -West Bengal
Bill of Quantities (BOQ) of the HVAC works :
(All AHUs shall be with thermal break profile)
Ceiling Suspended AHUs for OTs:
6
a)
b)
c)
d)
7
1
1
9
1
No.
No.
No.
No.
175000
163000
150000
110000
175000
163000
1350000
110000
11
Nos.
155000
1705000
R.O.
R.O.
No.
No.
22000
28000
0
0
Project :HVAC System for ESI Hospital and PG College at Maniktala -West Bengal
Bill of Quantities (BOQ) of the HVAC works :
Hydronic Type chilled water Cassette Units :
9
a)
b)
c)
d)
29
37
15
1
No.
No.
No.
No.
30000
40000
45000
50000
870000
1480000
675000
50000
2
2
8
Nos
Nos
Nos
130000
90000
70000
260000
180000
560000
5
13
3
1
1
No.
Nos.
Nos.
Nos.
Nos.
20000
14000
14500
13000
11000
100000
182000
43500
13000
11000
11
a)
b)
c)
d)
e)
12
Project :HVAC System for ESI Hospital and PG College at Maniktala -West Bengal
Bill of Quantities (BOQ) of the HVAC works :
of following sizes :
a) 225 mm dia (free discharge)
13 Supply,installation,testing and commissioning
of decorative High Wall type split units complete
with indoor and outdoor units,refrigerant pipes
with insulation, stablisers,ms frame for outdoor
units interconnecting all wiring,cabling and
complete in all respects as per drawings and
specifications. (2 TR cooling capacity)
14 Supply,installation,testing and commissioning
of decorative High Wall type split units complete
with indoor and outdoor units,refrigerant pipes
with insulation, stablisers,ms frame for outdoor
units interconnecting all wiring,cabling and
complete in all respects as per drawings and
specifications.(1.5 TR cooling capacity)
15
No.
3267
49005
R.O.
Nos.
41440
R.O.
Nos.
36720
ii)
iii)
iv)
v)
Project :HVAC System for ESI Hospital and PG College at Maniktala -West Bengal
Bill of Quantities (BOQ) of the HVAC works :
vi)
b)
ii)
iii)
iv)
vii)
f)
g)
1 set
2800000
2800000
Project :HVAC System for ESI Hospital and PG College at Maniktala -West Bengal
Bill of Quantities (BOQ) of the HVAC works :
16
I)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
a)
b)
c)
d)
e)
sets
20000
20000
12
sets
25000
300000
14
sets
45000
630000
sets
45000
90000
sets
45000
90000
Project :HVAC System for ESI Hospital and PG College at Maniktala -West Bengal
Bill of Quantities (BOQ) of the HVAC works :
I)
ii)
iii)
iv)
v)
vi)
vii)
viii)
a)
b)
10
2
sets
sets
25000
45000
250000
90000
200
75
125
30
400
550
150
70
55
100
500
100
RM
RM
RM
RM
RM
RM
RM
RM
RM
RM
RM
RM
4200
3500
2150
1902
1648
958
807
684
571
513
462
300
840000
262500
268750
57060
659200
526900
121050
47880
31405
51300
231000
30000
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
Project :HVAC System for ESI Hospital and PG College at Maniktala -West Bengal
Bill of Quantities (BOQ) of the HVAC works :
19
a)
b)
c)
c)
d)
e)
f)
10
7
30
4
10
28
10
R.O.
R.O.
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
25000
4619
2572
2109
1576
1452
1274
1159
175000
138570
10288
21090
44128
14520
0
0
28
2
Nos
Nos
1400
956
39200
1912
6
R.O.
2
14
5
R.O.
R.O.
14
1
Nos
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
32000
11957
8744
5407
3182
2279
1622
1200
950
192000
0
17488
75698
15910
0
0
16800
950
8
3
Nos
Nos
7500
3000
60000
9000
15
5
15
R.O.
11
Nos
Nos
Nos
Nos
Nos
4171
3553
3090
2626
1500
62565
17765
46350
0
16500
No
140000
24
R.O.
Nos
Nos
12000
10041
140000
0
288000
0
Project :HVAC System for ESI Hospital and PG College at Maniktala -West Bengal
Bill of Quantities (BOQ) of the HVAC works :
100 mm dia.
80 mm dia.
65 mm dia.
32 mm dia
25 mm dia
g) Water Flow Switch
10
28
10
28
2
4
Nos
Nos
Nos
Nos
Nos
Nos
7724
6488
4943
3399
2400
5057
77240
181664
49430
95172
4800
20228
R.O
14
5
14
1
Nos
Nos
Nos
Nos
Nos
77445
52263
46675
15000
8500
0
731682
233375
210000
8500
115
Nos.
4300
494500
90
105
Nos
Nos
707
637
63630
66885
a)
b)
c)
d)
e)
21
22
23
11
Project :HVAC System for ESI Hospital and PG College at Maniktala -West Bengal
Bill of Quantities (BOQ) of the HVAC works :
rubber foam insulation covered with 28 Ga Aluminium
sheet with man hole cover, drain ,overflow,quick
fill,water supply connections,valves and complete
in all respects as per drawings and specification
1000mm X 1000mm X 1000 mm
No
35000
70000
R.O.
75
300
75
50
350
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
900
700
600
500
400
300
0
52500
180000
37500
20000
105000
75
Nos
1400
105000
150
Nos
956
143400
3450
2300
800
400
M2
M2
M2
M2
690
790
930
1065
2380500
1817000
744000
426000
Drain Piping :
24
a)
b)
c)
d)
e)
f)
25
26
Rectangular Ductwork :
27
a)
b)
c)
d)
12
Project :HVAC System for ESI Hospital and PG College at Maniktala -West Bengal
Bill of Quantities (BOQ) of the HVAC works :
28
6300
M2
461
2904300
1200
M2
381
457200
M2
8249
32996
110
M2
6477
712470
78
M2
12342
962676
20
M2
8000
160000
M2
7500
45000
15
M2
4400
66000
30
31
32
33
34
35
36
13
Project :HVAC System for ESI Hospital and PG College at Maniktala -West Bengal
Bill of Quantities (BOQ) of the HVAC works :
37
38
39
25
M2
25000
625000
1500
M2
786
1179000
M2
6100
18300
30
M2
3400
102000
200
200
75
85
150
450
400
RM
RM
RM
RM
RM
RM
RM
4000
2000
700
600
500
400
300
800000
400000
52500
51000
75000
180000
120000
Power Cabling :
40
a)
b)
c)
d)
e)
f)
g)
41
14
Project :HVAC System for ESI Hospital and PG College at Maniktala -West Bengal
Bill of Quantities (BOQ) of the HVAC works :
as per specifications and drawings.
a) 2C X 1.5 mm2
200
RM
150
125
350
250
RM
RM
RM
95
25
17
Grand Total
30000
Earthing :
42
15
11875
8750
4250
72977607