Professional Documents
Culture Documents
Date _____________________
_________
_________
_________
14.
Invert the medication vial and keeping the tip of the needle below
the fluid level, withdraw the accurate amount of medication into the
syringe while holding the syringe vertically at eye level.
_________
15.
If any air bubbles have formed in the syringe, sharply tap the syringe to
force the bubbles to top of the syringe. Inject the bubbles back into the
Date _____________________
17.
Holding the IV fluid bag, use an antimicrobial swab to clean the
medication port. Allow to dry.
_________
18.
With the IV bag held vertically, pierce the medication port and inject
the medication into the IV bag. Discard syringe properly, or recap using one
handed scoop method . Repeatedly invert the IV bag to mix the
medication in the IV fluid.
_________
19.
20.
Close the clamp on the IV tubing and using aseptic technique, and
remove both the cover of the IV tubing spike and the plastic cover
on the port of the IV bag.
_________
21.
Pierce the IV bag port with the spike and firmly attach the tubing to
the bag, maintaining aseptic technique.
_________
22.
Hang the piggyback IV bag on an IV pole and squeeze & release the
drip chamber to the fill line or about way up the chamber.
_________
23.
24.
25.
Connect the IVPB setup to the access port of the Main IV line.
_________
26.
Trial # 2 _________
Trial # 3
Date _____________________
Date: ___________________
Date: ___________________