Professional Documents
Culture Documents
Weather Report
PROGRAMME FOR THE DAY :
S.NO
Description
1)
Concreting
a. GR.lvl slab P2&P3 at 2.355 lvl
2)
Shuttering
a. Grd Lvl slab Pour-3 Stagging & slab dacking
b GR. Slab beam satgging P4+slab dacking
PHASE 1A
S.No.
1
2
2
3
4
5
8
SUNNY
Activities
P.C.C M10
Plum Concrete / PCC - M15
RCC - M40
Shuttering
Reinforcement
PT work of Slab
150mm thk Solid Conc. Blk Masonry
Unit
M3
M3
M3
M2
MT
M2
M2
Description
Unit
S.No
1
2
3
4
5
E
Description
Unit
Reinforcement
PCC/Plum Concrete
RCC - M40
Shuttering
150mm thk Solid Block Masonry
MT
Cum
Cum
Sqm
Sqm
Labour Report:
S.No
Description
1
2
3
2
3
5
4
5
At Phase 1 A
Tower 1 B
Tower 1 C
Site
Camp
& Steel
yard.
Security
at Gate
no:1
& Gate no:4( 3 day
& 2 Night)
Guniting
Backfilling
JVI labour
TOTAL
Security Guard
Description
Fixed Tower Crane
Electric Concrete Pump
10 H.P DW Pump
5 H.P DW Pump
3 H.P DW Pump
Curing Pump
Electric Vibrator
60mm Vibrator Needle
Qty.
Available
1
1
2
2
2
2
6
6
STAFF DETAILS.
S.No
Description
Nos
1
2
Project Manager
Planning & Billing Head
1
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Project Manager
Dy.Manager(Project)
Planning & Billing Head
Planning Asst.
Billing Engg
Sr. Billing Engineer
Sr.Engineer
Surveyor
Supervisors / Foreman
Dy. Manager (Store)
Stores Officer
Asst. Manager(Account)
Admin/HR
P&M Foreman
Conc. Pump Operator
By GDCL
Prepared By :Rishikesh kumar
Date: 31/12/2014
Sign:
1
1
2
1
5
1
1
1
1
QTY
S.NO
Description
Reinforcement Work.
a GR. Slab P2 & P3 Bottom & Top 3.355 lvl
4)
300 cum
100
PT Work.
5)
40
121
2,961
11,553.3
36,265
2,254.24
3
2,044
This Month
Yesterday Plan
27
10
500.5
1,365
165.00
15
100
10.00
15
190
Yesterday Achievment
Todays Plan
40
5.00
300.0
100
10.00
15
D
Phase 1A
Phase 1B
Phase 1C
SR NO
Phase 1A
Phase 1B
Phase 1C
2,254
3,082
11,553
36,265
2,044
M/C
1
2
Mason
Rigger
CarpenterHelper
Carpenter
18
15
21
18
15
21
Status
S.No
9
10
11
12
13
14
15
Status
S.No
Description
40mm Vibrator Needle
Diesel Concrete Pump
Breakers
Cutting Bending Machine
Hydra Crane
STP & RO
Description
Checked By:
Date:
Sign:
Nilesh Chokshi
( Dy.Project Manager)
31/12/2014
15
16
17
18
19
20
21
22
23
24
General Operator/Mech
Sr. Electrician
Jr.Electrician
HSE Supervisior
Stores/Account Asst
Jr.Engineer
Engineer-QA/QC
MT operator/Signal man
HSE manager
Lab Assistant
1
2
JVI Staff
Enginner
Technican
Mumbai.
Date:
31/Dec/14
QTY
Remark
Location
Reading
130205857 Phase 1A
32048515 Logistic Area
104248
1850.4
z
Fitter
Fitter Helper
13
18
13
18
Welder
Mate/ Forman
5
TOTAL =
Description
Qty. Available
Status
4
1
3
2
1
1
Description
Nos
Status
1
1
1
2
1
1
1
2
1
TOTAL=
26
By Lodha
Received By: Document Controller
Date:
Sign:
31/12/2014
Mumbai.
31/Dec/14
Breaker operator
-###
107
115
Status
Status
31/12/2014