Summary for Basement of Phase 1A

Weather Report
PROGRAMME FOR THE DAY :
S.NO

Description

1)

Concreting
a. GR.lvl slab P2&P3 at 2.355 lvl

2)

Shuttering
a. Grd Lvl slab Pour-3 Stagging & slab dacking
b GR. Slab beam satgging P4+slab dacking

PHASE 1A
S.No.

1
2
2
3
4
5
8

SUNNY

Activities
P.C.C M10
Plum Concrete / PCC - M15
RCC - M40
Shuttering
Reinforcement
PT work of Slab
150mm thk Solid Conc. Blk Masonry

Unit

M3
M3
M3
M2
MT
M2
M2

Total Cumalative Quantities Achieved Till Date:


S.No

Description

Unit

S.No
1
2
3
4
5
E

Description

Unit

Reinforcement
PCC/Plum Concrete
RCC - M40
Shuttering
150mm thk Solid Block Masonry

MT
Cum
Cum
Sqm
Sqm

Labour Report:
S.No

Description

1
2
3
2
3
5
4
5

At Phase 1 A
Tower 1 B
Tower 1 C
Site
Camp
& Steel
yard.
Security
at Gate
no:1
& Gate no:4( 3 day
& 2 Night)
Guniting
Backfilling
JVI labour
TOTAL

Security Guard

NOTE:8 labours in camp shed.


F

PLANT, MACHINERY & MATERIALS-USE & WORKING.


S.No
1
2
3
4
5
6
7
8

Description
Fixed Tower Crane
Electric Concrete Pump
10 H.P DW Pump
5 H.P DW Pump
3 H.P DW Pump
Curing Pump
Electric Vibrator
60mm Vibrator Needle

Qty.
Available
1
1
2
2
2
2
6
6

STAFF DETAILS.
S.No

Description

Nos

1
2

Project Manager
Planning & Billing Head

1
1

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Project Manager
Dy.Manager(Project)
Planning & Billing Head
Planning Asst.
Billing Engg
Sr. Billing Engineer
Sr.Engineer
Surveyor
Supervisors / Foreman
Dy. Manager (Store)
Stores Officer
Asst. Manager(Account)
Admin/HR
P&M Foreman
Conc. Pump Operator

By GDCL
Prepared By :Rishikesh kumar
Date: 31/12/2014
Sign:

1
1
2
1
5

1
1
1
1

NEW CUFFE PARADE PROJECT

DAILY PROGRESS REPORT

QTY

S.NO

Description

Reinforcement Work.
a GR. Slab P2 & P3 Bottom & Top 3.355 lvl

4)
300 cum

100

PT Work.

5)

40

Completed Till Date

121
2,961
11,553.3
36,265
2,254.24
3
2,044

This Month

Yesterday Plan

27

10

500.5
1,365
165.00

15
100
10.00
15

190

Yesterday Achievment

Todays Plan

40
5.00

300.0
100
10.00

15

D
Phase 1A

Phase 1B

Phase 1C

SR NO

Phase 1A

Phase 1B

Phase 1C

2,254
3,082
11,553
36,265
2,044

M/C

1
2

Mason

Rigger

CarpenterHelper

Carpenter

18

15

21

18

15

21

Status

S.No
9
10
11
12
13
14
15

Status

S.No

Description
40mm Vibrator Needle
Diesel Concrete Pump
Breakers
Cutting Bending Machine
Hydra Crane
STP & RO

Description

Checked By:
Date:
Sign:

Nilesh Chokshi
( Dy.Project Manager)
31/12/2014

15
16
17
18
19
20
21
22
23
24

General Operator/Mech
Sr. Electrician
Jr.Electrician
HSE Supervisior
Stores/Account Asst
Jr.Engineer
Engineer-QA/QC
MT operator/Signal man
HSE manager
Lab Assistant

1
2

JVI Staff
Enginner
Technican

Gannon Dunkerley & Co. Ltd.

Mumbai.

Date:

31/Dec/14

QTY

ottom & Top 3.355 lvl

Remark

Slab Stagging P3&P2+R/W PT P1 B1 lvl


Grd Floor slab P2,3 Top & Bottom Reinforcement
Completed
B4 level +drain+ B3 lvl convenal area of wall

Electric Meter Reading


Meter Sr. No

Location

Reading

130205857 Phase 1A
32048515 Logistic Area

104248
1850.4

z
Fitter

Fitter Helper

13

18

13

18

Welder

Mate/ Forman

5
TOTAL =

Description

Qty. Available

Status

4
1
3
2
1
1

Description

Nos

Status

1
1
1
2
1
1
1
2
1

TOTAL=

26

By Lodha
Received By: Document Controller
Date:
Sign:

31/12/2014

rley & Co. Ltd.

Mumbai.

31/Dec/14

Breaker operator

-###
107
115

Status

Status

31/12/2014

You might also like