A Beginner's Guide To PI

sheets
created by
Mahadevan M

on May 10, 2013 7:49 AM, last modified by


on Jun 19, 2013 12:44 PM
Rajesh Mahadevan M

Rajesh

Version 3
inShare

Introduction:
PI Sheets in general can be used to describe the total production process or a part of it. The PI sheet is
used to inform the process operator about the individual production steps that need to be performed.
Apart from control information, the PI sheet can contain input fields and pushbuttons. You can, for
example, define fields into which you want the process operator to enter the quantity of
material components consumed for a phase. The material withdrawals must then be posted as goods
issues in inventory management. You can use process messages to automatically carry out this function.
In General there are two types of PI sheets in Normal SAP
1.

ABAP based PI sheets

2.

Browser based PI sheets


We shall concentrate on the later version that is browser based PI sheets

1 Master Data:
1.

Material Master

2.
3.

BOM
Master Recipe.

2 Configuration Requirements
In the initial step transport all the predefined characteristics, message categories
and display variants predefined by SAP from the reference client to our logon client.

A.

SPRO-->Production planning for Processindustries-->Process management->Standard settings

Here transport all the standard settings to your local client.

3 Control Recipes and Control Recipe Destinations

1.
2.
3.
4.

Control recipes are used to transfer the control data defined in the process order by
the user to the process control. The control data like process instructions
assigned to the phase are transferred to their respective destinations assigned
in the phase.
Control Recipe Destinations: SAP standard has Four types of recipe
destinations defined
Transfer to ABAP list based PI sheet
Download to ext. system, initiated by
SAP process management
Download to ext. system, initiated by
ext. process control
Transfer to browser-based PI sheet
Path: SPRO-->Production planning for Processindustries-->Process management->Decentralized Process Management
-->Define and Set Up Control Recipe Destinations

/ser
vlet/JiveServlet/downloadImage/38-84701-214903/SAP.jpg
Here in the work area enter the plant and select enter. Now double click the HTML-PI
sheet (05) to open it.
Here it has the destination type 4 which will enable to create browser based PI sheets. In
the destinations
we can assign digital signatures for the process steps. Here we can have levels of
approvals defined for the process step.

4 Process Message Characteristics


There are standard process message characteristics available in SAP which can be
transported to the local client.
All standard characteristics for process messages starts with PPPI and cannot be
changed. If we require additional
characteristics then user can create them as per the business requirement.
Path: SPRO-->Production planning for Processindustries-->Process management-> Process Messages
-->Define Characteristics forProcess Messages
Process Messages and Destinations: Process Messages are used to transfer the
process data from process control to the
defined destinations. Process messages trigger various business functions such as GI,
GR, mail trigger, data
transfer to external system etc. The actual data entered in the system are transferred to
the respective work areas defined
in the destinations. The process message categories contains the process instruction
characteristics, message
destinations and the characteristics which the destination needs to update. Standard
SAP contains several Process messages
which can be transported to the local client; in addition we can create new messages
with destinations as per the business need.
Path: SPRO-->Production planning for Process industries-->Process management-> Process Messages-->
Define and Set Up Process Message Categories

The message categories will have process instruction characteristics assigned

Each Message will have destinations with their respective address assigned

We can create multiple destinations in a single message category.


Now each destination needs to be assigned characteristics to update the target
fields

/servlet/JiveServlet/downloadImage/38-84701-214932/SAP1.jpg

5 Assigning Process Instructions to Master Recipe


Open the master recipe in change mode and go to operations header screen. Here we
can assign the activities which needs to be carried out through PI
sheets to eachphase as per the business requirement.

/servlet/Jiv
eServlet/downloadImage/38-84701-214938/SAP.jpg
Select the phase for which you want to assign the instructions and click on Process Instructions.In the next
screen assign the process instruction categories to the selected phase and click on simulate PI sheet.This will
display the output format of the PI sheet if there is no error in the assignment

/servlet/JiveServlet/downloadImage/38-84701-214939/SAP.jpg

The simulation will not work if there is any error in the characteristics assigned. After
assigning successfully save the Master Recipe.

6 Releasing Control Recipes


Now create the process order as usual and once you release the order the Generate Control Recipe indicator
gets enabled, click on this indicator to release the recipes and save the order.

Upon successful release of control recipes go to T code CO53 to convert the recipes to PI sheets
In the initial screen enter the order number and press display

In the next screen select the recipe and press -send,this action will generate PI sheets

Now go to T code CO60 and open the PI sheet which has been generated for this order
Here enter the plant, order number and execute(F8)

In the next screen select the PI sheet and press maintain PI sheet This will open the PI sheet in Change mode

7 PI Sheets

We can have a wide array of instructions assigned for each phase.


Phase 0020 has the following assigned

1.

Standard operating Procedure here we can enter


the instructions which the user needs to do and check while performing
operation 20. If DMS is integrated with PI sheet we can assign drawings and
PDF files if required

2.

The table is used to enter the GOODS ISSUE


quantity for the order, this is just a sample configuration so we can have the
material number assigned. The + mark at the bottom of the table allows to add
multiple lines so that we can have partial GIs and also to enter for multiple
materials. This is enabled by using Repeated Data Request in the instructions

3.

GO TO MIGO tab allows the user to go directly


to MIGO, likewise we can go to any transaction which is required, it is also
possible to open a blank SAP screen.

Phase 0040 is used to record the temperature, data and time of the reading, this will be only for information and it
will not update any table records. This can be used in process industries where it is required to record a
measured value
like temperature, pressure etc.
Each step can also be incorporated with DigitalSignatures. This will help track the data entry user and also the
time
(Records of signature will be available in DSAL)

Phase 0080 can be used to carry out GR for materials,here again we can add a wide array of instructions like
batch, final delivery
etc.
Data required for phase wise confirmation, time ticket confirmation etc can all be incorporated in a PI sheet.
QM results recording can be carried in the same manner as above or can be done through a call transaction.
Once the user enters the values in PI sheets the data needs to be transferred so that it will update the order.

This can be done through T code CO54.


In CO54 enter the order number and press message list

Here select the process messages and press send, the data will get transferred to their respective locations.

Now open the process order and check the goods movement carried out through PI sheets

This is just an overview document, apart from the above awide array of activities like time ticket, final delivery,
simple signature, digital signatures with authorization levels etc can be done through a PI sheet.