MIS CO. LTD. INC.

, QATAR OPERATIONS

Job Description
Chairman
Participants

No.

RISK ASSESSMENT PROCEDURE

: Installation of the Lay Down Area Facilities


: Sa'aed Habib
Ammar Al Hamad
:
Ahmad Abdul Rahim
HAZARD

Emergency Situation / Evacuation

HAZARD EFFECT

Harm to People

PROB Vs. HAZARD


EFFECT = RISK
H
M
L

MITIGATION/CONTROLS

Conduct Safety Toolbox Talk daily and prior


start of work in order to highlight any
expected hazard related to location of
equipment set-up and how to control.
2

Slip / Trip / Falls

Moving material or parts of machinery


(Manual Handling).

Working around mobile construction


machinery (Graders, Rollers,
Excavators, etc.)

Harm to People

Harm to People

Harm to People

Doc. No.

: JSA-Q-017

ACTION BY

Ensure that the Housekeeping procedure is


implemented at all times.
All workers to be wearing site applicable
PPE (Plus good visibility safety glasses and
safety shoes with good tread).
Conduct Safety Toolbox Talk daily and prior
start of work.
Ensure size of material or parts of
machinery is below 35Kg for one person.
All workers to be wearing gloves and site
applicable PPE.
Ear plugs/muffs shall be worn if required.
Reflective Jackets shall be worn.
Machinery to be fitted with reverse horn
and pass MIS inspection prior allowed to
commence work.

Page 1 of 6

7/4/2005

RESIDUAL RISK
H

Follow the Emergency Evacuation


Procedure (Contact 474-8888)
HSE Officer/Supervisor to be available on
site full time.
Communication means to be available on
site all times.

R/A Date

HSE
HSE

All

Supervisor

All

All
Supervisor
All

All
All
All
x
Supervisor

MIS CO. LTD. INC., QATAR OPERATIONS

Job Description
Chairman
Participants

No.

RISK ASSESSMENT PROCEDURE

: Installation of the Lay Down Area Facilities


: Sa'aed Habib
Ammar Al Hamad
:
Ahmad Abdul Rahim
HAZARD

HAZARD EFFECT

PROB Vs. HAZARD


EFFECT = RISK
H
M
L

MITIGATION/CONTROLS

Use of Hand/Electric Tools

Noise

Dust

Electricity

Harm to People

Harm to People

Harm to People

Harm to People

Doc. No.

: JSA-Q-017

ACTION BY

Fit with RCD's, P44 plugs and sockets and


inspection system to be implemented.
Conduct Safety Toolbox Talk prior start of
work.
Ear plugs/muffs shall be worn if noise is
higher than 85db.
Conduct noise survey if suspect much
noise.
Conduct Safety Toolbox Talk prior start of
work.
All workers to be wearing site applicable
PPE (Plus goggles and dust masks where
required).
Use of dust suppression system.
Only certified personnel to handle electrical
works.
Follow the Emergency Evacuation
Procedure (Contact 474-8888)
Log Out / Tag Out System to be used
during operation.

All
HSE
x
Supervisor
Supervisor
All
HSE

Supervisor
all

Supervisor
Supervisor
All
Supervisor

Electrical cables to be inspected regularly.

Supervisor

Conduct Safety Toolbox Talk prior start of


work.

Supervisor

Page 2 of 6

7/4/2005

RESIDUAL RISK
H

All workers to be wearing site applicable


PPE.
Hand/electric tools and equipment to be
inspected daily.
5

R/A Date

MIS CO. LTD. INC., QATAR OPERATIONS

Job Description
Chairman
Participants

No.

RISK ASSESSMENT PROCEDURE

: Installation of the Lay Down Area Facilities


: Sa'aed Habib
Ammar Al Hamad
:
Ahmad Abdul Rahim
HAZARD

Working at Heights

HAZARD EFFECT

Harm to People

PROB Vs. HAZARD


EFFECT = RISK
H
M
L

MITIGATION/CONTROLS

Crane Operations

Harm to People Asset


Damage
Harm to
Environment

Doc. No.

: JSA-Q-017

ACTION BY

Crane to be MIS inspected.


Crane to be QP/RLC approved.
Operator to be certified and posses
competency certificate
Conduct Safety Toolbox Talk prior start of
work.
Signalling person to be available during
offloading/lifting operation and wearing
reflective jacket.
Use of robes to guide the load during
offloading/lifting.
No one allowed to stand/move under
suspended load.
All workers to be wearing gloves and site
applicable PPE.
All lifting gear must be inspected and
QP/RLC Approved.

Page 3 of 6

7/4/2005

RESIDUAL RISK
H

Ensure CPW approved and on site and


that all requirements are implemented.
Working at heights procedure to be
followed.
Safety Harness to be used when at 1.8m
and tied-up to a suitable point.
Ladders to be secured and a standby
person to be available.
Life line to be installed when applicable.
Conduct Safety Toolbox Talk prior start of
work.
Crane to be third party inspected.

10

R/A Date

All
All
All

All
All
Supervisor
Supervisor
HSE
HSE
HSE
Supervisor
Supervisor
Supervisor
All
All
HSE

MIS CO. LTD. INC., QATAR OPERATIONS

Job Description
Chairman
Participants

No.

11

: Installation of the Lay Down Area Facilities


: Sa'aed Habib
Ammar Al Hamad
:
Ahmad Abdul Rahim
HAZARD

Excavation

RISK ASSESSMENT PROCEDURE

HAZARD EFFECT

Harm to People Asset


Damage
Harm to
Environment

PROB Vs. HAZARD


EFFECT = RISK
H
M
L

MITIGATION/CONTROLS

Ensure CPW approved and on site and


that all requirements are implemented.
Excavator to be QP/RLC approved.
Excavator to be MIS Inspected and
approved.
Conduct Safety Toolbox Talk prior start of
work.
Supervisor to be available during excavator
work full time.
Trench to be barricaded to avoid personnel
falling into trench.
Blinking lights to be installed, if trench to be
left open overnight and near personnel
movement area.
No equipment/machinery to be placed near
trench edges.
All trenches to be viewed as confined
space unless determined otherwise during
CPW review.
Soil must be placed 1-2m away from trench
edge.
Regular check and maintenance to be
applied on excavators.
All workers to be wearing site applicable
PPE.

R/A Date

Doc. No.

: JSA-Q-017

ACTION BY

RESIDUAL RISK
H

Page 4 of 6

7/4/2005

All
HSE
HSE
Supervisor
Construction
Manager
Supervisor
Supervisor
All
Supervisor
Supervisor
Supervisor
All

MIS CO. LTD. INC., QATAR OPERATIONS

Job Description
Chairman
Participants

No.

RISK ASSESSMENT PROCEDURE

: Installation of the Lay Down Area Facilities


: Sa'aed Habib
Ammar Al Hamad
:
Ahmad Abdul Rahim
HAZARD

HAZARD EFFECT

PROB Vs. HAZARD


EFFECT = RISK
H
M
L

MITIGATION/CONTROLS

13

Concrete Works

Welding / Grinding

Harm to People

Harm to People Asset


Damage
Harm to
Environment

Doc. No.

: JSA-Q-017

ACTION BY

Page 5 of 6

All

Use the eye wash located in the medical


first aid kit if concrete in-contact with eyes.
Hand tools must be in good shape and
inspected regularly.
Conduct Safety Toolbox Talk prior start of
work.
Welding Machines to be inspected prior
use.
Welding Machines to be earthed.
Only qualified mechanics/welder to
start/stop the machine.
Implement the Grinder, Disc Inspection
Procedure.
Fire Extinguisher to be available on site.
Ensure that flash back arrestors are
installed.
Ensure that storage procedure is correctley
implemented.
Ensure that energy procedure is correctley
implemented.
Face mask to be used when grinding.
Fire Watch to be available at site.
Grinders to be fitted with safety guard.
All workers to be wearing site applicable
PPE and welders to wear welding helmets
and Aprons).

7/4/2005

RESIDUAL RISK
H

All workers to be wearing site applicable


PPE (i.e. Hard Hats, Safey Glasses,
Coveralls, Safety Shoes and Plastic/Fabric
Gloves to avoid skin irritation).
12

R/A Date

HSE
Supervisor
Supervisor
Supervisor
Supervisor

Supervisor

All
HSE
All
All

MIS CO. LTD. INC., QATAR OPERATIONS

13

Harm to People Asset


Damage
Harm to
Environment
: Installation of the Lay Down Area Facilities
: Sa'aed Habib
Ammar Al Hamad
:
Ahmad Abdul Rahim

Welding / Grinding

Job Description
Chairman
Participants

No.

RISK ASSESSMENT PROCEDURE

HAZARD

HAZARD EFFECT

PROB Vs. HAZARD


EFFECT = RISK
H
M
L

MITIGATION/CONTROLS

R/A Date

Doc. No.

: JSA-Q-017

ACTION BY

RESIDUAL RISK
H

Conduct Safety Toolbox Talk prior start of


work.

Page 6 of 6

Supervisor

7/4/2005