PART A: Organization Structuring

PART B: Manpower Planning

PART C: Manpower Policy

Jammu & Kashmir State Power Development Corporation

PART A: Organization Structuring


Page 5

Jammu & Kashmir State Power Development Corporation

JKSPDC Business Plan


Upcoming Projects till 2020
S.No.

Project Name

1.

Sawalkote

2.

Kirthai II

930

3.

BHEP II

450

4.

Kirthai I

390

5.

Barinium

230

6.

Shous

215

7.

Ujh

200

8.

NGHEP

93

9.

Parnai

37.5

10.

Lower Kalnai

48

11.

Karnah

12

12.

Mohra

13.

Hanu

14.

Dah

Total Capacity Addition

Page 6

Capacity (MW)
1856 (1456 in Phase 1)

4488.50 MW

759 MW,
almost 5 times to

From existing installed O&M capacity of


JKSPDC plans to increase it by

4488.5 MW by 2020
Currently, JKSPDC has only 1 plant under O&M with
installed capacity above 200 MW (BHEP I)
By 2020, JKSPDC will have at least 8 plants under O&M
with installed capacity above 200 MW
To cater to this rapid growth in the next 7 years, JKSPDC
should have effective project execution and proper
operations & maintenance of its plants supported by
functions like HR, Legal, IT, Finance, Commercial,
Vigilance etc.
An Organization Structure aligned to its future needs, a
phase-wise Manpower Plan as per the organization
structure combined with an Manpower Policy to ensure
skilled manpower is available for smooth project
execution as well as operation & maintenance

Jammu & Kashmir State Power Development Corporation

Why Restructuring?
Business Imperatives

Structural Implications

Need to develop the capability of managing


Large/Mega Projects (from Concept to
Commissioning)

Corporate structure should support field structure


with overall policy guidance and support in day to
day operations

Setting up Governance Mechanisms for


maintaining checks & balances

Ensuring funding for multiple project execution

Structure needs to have a independent focus on


identifying & developing new business
opportunities

Ready for generating additional funds by external


investment and getting listed

Creation of structure to ensure timely completion


of upcoming projects

Ensure high capacity index of all operational plants

Need for strong focus on O&M for achieving and


maintaining high capacity index for running plants

Manage multiple PPAs as JKSPDC moves from one


customer model to multi-customer model

Need for single point responsibility for managing


commercial aspects

Need to build synergy between various support


functions in the organization and create single
point responsibility for HR, IT, Finance etc.

Proposed Organization Structure for JKSPDC should take into account existing and future business
imperatives and must be scalable in alignment with the organizational growth

Page 7

Jammu & Kashmir State Power Development Corporation

Page 8

Proposed Organization Structure

Jammu & Kashmir State Power Development Corporation

Proposed Designations
With movement into Proposed Structure, JKSPDC will adopt new designations. Mapping of the existing
designations to the new designations will be as shown below:

Existing Designations

NHPC Designations

Executive Director (ED)

Director (D)

Director (D)

Executive Director (ED)

Executive Director/General
Manager (ED/GM)

Chief Engineer (CE)

Chief General Manager (CGM)

Chief Manager (CM)

Superintending Engineer (SE)

General Manager (GM)

Senior Manager (SM)

Executive Engineer (XEN)

Sr. Deputy General Manager


(SDGM)

Manager (M)

Assistant Executive Engineer (AEE) Deputy General Manager (DGM)

Deputy Manager (DM)

Assistant Engineer (AE)

Assistant General Manager (AGM)

Assistant Manager
Engineer/Officer (AM/E/O)

Manager (M)

Assistant Engineer/Assistant
Officer (AE/AO)
Supervisor/Supervisor Grade
II/Supervisor Grade I (Supv.)

Junior Engineer (JE)

Page 9

Proposed Designations

Jammu & Kashmir State Power Development Corporation

Page 10

Jammu & Kashmir State Power Development Corporation

Corporate

Page 11

Jammu & Kashmir State Power Development Corporation

Key Features of the Proposed Organization Structure


1

Provision of governance mechanism by creation of audit committee reporting to MD, with Internal Audit
reporting to this committee. A strengthened vigilance function for additional checks and balances

2 Independent accountability for Pre-Execution phase including project identification, corporate planning,
approvals and clearances, design etc.

3 Independent accountability for Execution phase including project execution, contracting, design support
etc.

4
Independent accountability for Post Execution phase including operations & maintenance of plants

5
Creation of commercial function to support future aspirations of JKSPDC for multi consumer model

6
7
8

Strengthen Finance function to support organizations growth

Creation of Human Resource Development function to aid organizations capability building for growth

Strengthening of IT function

Page 12

Jammu & Kashmir State Power Development Corporation

Proposed Structure: Corporate Top Level


Board of
Directors

Audit Committee

Managing
Director
Pre
Execution

Execution

Corporate
Planning
Group
Director (C)

Corporate
Planning
IPP/Appraisal
/Design/Clear
ances

Commercial
CGM

Director
O&M (E)

Corporat
e Projects
Support
Team

Corporat
e O&M
Support
Team

to be
the Secretary to the Audit
Committee

Internal
Audit
CGM

Post
Execution

Director
Projects (C)

*Company Secretary

Company
Secretary*
GM

Legal
GM

Director
Finance

Trading

Project
Finance

Regulatory

Financial
Management

Billing

Accounting

Human
Resources
CGM/GM

Chief
Vigilance
Officer
GM
Admin &
Compliances

Human
Resource
Development
IR & Welfare

Survey &
Investigation

Corporate
Social
Responsibility

Geology
Information
Technology
Environmen
t
Field Roles
All
Individual
Region-wise
Project
Generation
Heads

Page 13

Director, Corporate Planning (Pre-execution), Director, Projects (Execution) and


Director, O&M (Post-execution) will be functional Directors heading the
specified wings of the corporation. They shall be appointed as Directors on the
Board by the Government in accordance with the provisions of the Articles of
Association

Jammu & Kashmir State Power Development Corporation

Proposed Structure: Corporate Planning Group


Corporate
Planning Group
1 Director (C)
Centralized focus on S&I
from Corporate Office

Corporate
Planning
1 GM (C)
1 SDGM (C)
1 AGM
2M

Survey &
Investigation
1 GM (C)
1 SDGM (C)
1 AGM (C)
2 M (C)

CPE
Ladakh
1 GM (C)
Single Design Cell for
JKSPDC, responsible for
Design, IPPs and Appraisals

Field Roles
S&I Jammu
1 SDGM (C)
2 AGM (C)
4 M (C)

Page 14

Design Support
Cell
1 GM (C)
1 SDGM (C)
1 SDGM (E)
1 SDGM (M)
4 AGM
4M

Centralized
Geology
1 GM (G)
1 DGM (G)
2 AGM (G)

Environment
(Forest/Environme
nt Officer)
1 AGM
1 Forest Official

Field Roles
S&I Kashmir
1 SDGM (C)
2 AGM (C)
4 M (C)

Mechanical
Support for S&I
Machinery
1 SDGM (M)
2DGM/AGM(M)
4 M (M)

Geology Jammu
1 SDGM (G)
2 AGM (G)
4 M (G)

Geology
Kashmir
1 SDGM (G)
2 AGM (G)
4 M (G)

Jammu & Kashmir State Power Development Corporation

Geology Ladakh
1 SDGM (G)
2 AGM (G)
4 M (G

Information
Technology
1 GM (IT)
2 SDGM (IT)
4 AGM (IT)

Additional
Manpower for
ERP might be
provided as and
when required

Proposed Structure: Corporate Planning Group


Manpower Numbers
Electrical

Designation

Prop
osed

Sanc
tione
d

Civil
Addit
ional
Requ
irem
ent

ED
CGM
GM
SDGM

DGM
AGM
Manager
Total

Page 15

Mechanical

Prop
osed

Sanc
tione
d

Addit
ional
Requ
irem
ent

-3

-1

32

-32

Prop
osed

Geology

Prop
osed

Sanc
tione
d

Addit
ional
Requ
irem
ent

-8

Sanc
tione
d

Addit
ional
Requ
irem
ent

IT

Prop
osed

Sanc
tione
d

Addit
ional
Requ
irem
ent

13

61

-48

17

-12

12

14

-2

-1

29

105

-76

10

29

-19

25

25

Jammu & Kashmir State Power Development Corporation

Proposed Structure: Projects (Corporate & Field Top Level)


Director
Projects (C)

Project Head
Sawalkote
1 ED (C)

Project Head
Barinium
1 CGM (C)

Project Head
Mohra
1 GM (C)

Project Head
Kirthai I & II
1 ED (C)

Project Head
Shous
1 CGM (C)

Project Head
Karnah
1 GM (C)

Project Head
BHEP II
1 ED (C)

Project Head
Ujh
1 CGM (C)

CPE
Ladakh
(Dah/Hanu)
1 GM (C)

Project Head
NGHEP
1 CGM (C)

Project Management
1 SDGM (C)
3 AGM/DGM (C)
1 AGM/ DGM (E)
1 AGM/ DGM (M)

Contracts Policy &


Project Contracts
1 GM (C)
1 SDGM (E)
1 SDGM (M)
2 AGM/DGM (C)
1 AGM/DGM (E)
1 AGM/DGM (M)
4M

Project Head
Lower Kalnai
1 CGM (C)

QA&I and SHE


1 SDGM (C)

Project Head
Parnai
1 CGM (C)

Corporate Roles

Field Roles

Mega Projects (>350 MW)


Large (25-350 MW)
Small Projects (< 25 MW)

Page 16

Expected Date of
Commissioning

2015

2016

2017

2018

2019

2020

2021

Project Name

BHEP II

Hanu
Dah
Lower
Kalnai
Parnai

NGHEP

Kirthai I
Karnah
Mohra

Kirthai II

Sawalkote
Barinium
Shous
Ujh

Jammu & Kashmir State Power Development Corporation

Proposed Structure: O&M/Plants (Corporate & Field)


Director
O&M (E)

2013
O&M
Jammu
1 CGM (E)

Civil Mtc.
Jammu
1 GM (C)

O&M
Ladakh
1 CGM (E)

Generation
Jammu
1 GM (E)

O&M
Kashmir
1 CGM (E)

Civil Mtc.
Kashmir
1 GM (C)

O&M
BHEP I
1 ED (E)

Maintenance / Gen.
Planning/Monitoring
1 SDGM (E)
1 DGM (E)
1 DGM (M)
1 DGM (C)
3M

Generation
Kashmir
1 GM (E)

O&M
Jammu
1 CGM (E)

Page 17

RMU/O&M
Contracts
1 GM (E)
1 SDGM (C)
1 DGM (E)
1 DGM (C)
1 DGM(M)
3M

Tech.
Documentation
1 DGM (E)
1 AGM (C)
2M

Director
O&M (E)

2021

Field Roles

Tech.
Documentation
1 DGM (E)
1 AGM (C)
2M

Corporate Roles

Field Roles

Civil Mtc.
Jammu
1 GM (C)

RMU/O&M
Contracts
1 GM (E)
1 SDGM (C)
1 DGM (E)
1 DGM (C)
1 DGM(M)
3M

Generation
Jammu
1 GM (E)

O&M
Ladakh
1 CGM (E)

O&M
Kashmir
1 CGM (E)

Civil Mtc.
Kashmir
1 GM (C)

O&M
BHEP I & II
1 ED (E)

Generation
Kashmir
1 GM (E)

O&M
Kirthai I & II
1 ED (E)
O&M
Sawalkote
1 ED (E)

Maintenance / Gen.
Planning/Monitoring
1 SDGM (E)
1 DGM (E)
1 DGM (M)
1 DGM (C)
3M

Corporate Roles

Jammu & Kashmir State Power Development Corporation

Proposed Structure: Corporate Support


Manpower Numbers
Electrical
Designation

Director

Civil

Mechanical

Propo
sed

Sancti
oned

Additi
onal
Requir
ement

Propo
sed

Sancti
oned

Additi
onal
Requir
ement

-1

-1

12

ED

Propo
sed

Sancti
oned

Additi
onal
Requir
ement

18

16

CGM
GM
SDGM
DGM
AGM
Manager
Total

Page 18

Jammu & Kashmir State Power Development Corporation

for Projects and O&M

Proposed Structure: Commercial


Commercial
1 CGM
(C/E/M/Other)

Trading, PPA
signing
1 DGM (C/E/M)
1AGM
1M

Billing
1 DGM (C/E/M)
1 AGM
1 AGM
(Accounts)
1M

Regulatory
1 DGM (E)
1AGM
2M

Manpower Numbers
Electrical
Designation

Propos
ed

Sanctio
ned

Accounts
Additio
nal
Requir
ement

Propos
ed

Sanctio
ned

Any Cadre
Additio
nal
Requir
ement

CGM

Propos
ed

Sanctio
ned

Additio
nal
Requir
ement

GM
SDGM

AGM

Manager

Total

DGM

Page 19

Jammu & Kashmir State Power Development Corporation

Proposed Structure: Finance & HR

Director
Finance
Project
Finance
1 SDGM
1 AGM

Financial
Management
1 SDGM

Working
Capital
Management
1 AGM

Finance

Page 20

Budgeting
1 AGM

Accounting
1 SDGM

Statutory
Audit &
Balance
Sheet
1 AGM

Pre-check
1 AGM

Human
Resources
1 CGM

CSR
1 DGM

Admin &
Compliances
1 DGM

Human Resources

Jammu & Kashmir State Power Development Corporation

Human
Resource
Development
1 DGM

IR & Welfare
1 DGM

Proposed Structure: Finance & HR


Manpower Numbers
HR
Designation

Finance

Proposed

Sanctioned

Additional
Requirement

GM

-2

SDGM

13

14

11

Proposed

Sanctioned

Additional
Requirement

Director
CGM

DGM

AGM
Total

The requirement of Posts to be reassessed

Page 21

Jammu & Kashmir State Power Development Corporation

Proposed Structure: Internal Audit, CS, Legal, Vigilance


Internal Audit
1 CGM

Company Secy.
1 GM/DGM

Proprietary Audit

Financial Audit

Technical Audit

1 AGM

1 AGM

1 SDGM

Secretarial
1 AGM
CS will be inducted as DGM, will be promoted to GM subsequently

Internal Audit

Company Secy.

Chief Vigilance
Officer
1 GM

Legal
1 GM

Contracts

Litigation

1 DGM

1 DGM

1 AGM

1 AGM

Legal

Page 22

Arbitration
1 DGM

Technical
Vigilance Officer
1 SDGM (E)

Technical
Vigilance Officer
1 SDGM (C)

Vigilance

Jammu & Kashmir State Power Development Corporation

Admin./Finance
Support
1 DGM

Proposed Structure: Internal Audit, CS, Legal, Vigilance


Manpower Numbers
(Electrical/Civil/Mechanical)

Designation
Proposed

Sanctione
d

Additional
Requireme
nt

Finance

Proposed

Sanctione
d

Other
(Legal/
Company Secy.)
Additional
Requireme
nt

Proposed

Sanctione
d

Additional
Requireme
nt

Director
CGM
GM
SDGM

DGM
AGM
Total

Page 23

Jammu & Kashmir State Power Development Corporation

Page 24

Jammu & Kashmir State Power Development Corporation

Field

Projects & Plants Classification as per Capacity


Projects
Mega Projects

Large Projects

Small Projects

Capacity = > 350MW

Capacity (25 MW 350 MW)

Capacity (2 MW 25 MW)

SAWALKOTE, KIRTHAI II, BHEP II,


KIRTHAI I

BARINIUM, SHOUS, UJH,NGHEP,


PARNAI, LOWER KALNAI

KARNAH, MOHRA, HANU, DAH

Plants
Mega Plants

Large Plants

Medium Plants

Small Plants

Mini Plants

Capacity = >
350MW

Capacity (>100 MW
350 MW)

Capacities (>25
MW 100 MW)

Capacity (=>2 MW
25 MW)

Capacity<2 MW

BHEP I

Page 25

LJHP
USHP II

CHENANI I,II & III


KARNAH
SEWA III
USHP I
GANDERBAL
PAHALGAM
STAKNA
IQBAL
IGO-MARCELLONG

Jammu & Kashmir State Power Development Corporation

BHADERWAH
HAFTAL
MARPACHOO
BAZGO
HUNDAR
SUMOOR

Proposed Norms
Component Executive Technical

Manpower Norms
HR/Fin/Support

Non-Executive
Technical

Total

Projects
Mega-Peak

81

37

296

414

Mega-Initial

81

19

148

248

Large-Peak

81

19

296

396

Large-Initial

81

19

148

248

Small-Peak

40

186

226

Small-Initial

40

92

132

204
188
121
53
40
*shared between a
cluster of 3 plants

295
232
140
61
56
*shared between a
cluster of 3 plants

Plants

Mega
Large
Medium
Small
Mini

Page 26

54
25
15
8
16
*shared between a
cluster of 3 plants

37
19
4
-

Jammu & Kashmir State Power Development Corporation

Page 27

Proposed Norms: Executive (Projects)

Jammu & Kashmir State Power Development Corporation

Proposed Norms: Projects- Mega


Land Acquisition

Support Staff

Project Head

Contracts, Procurement, Planning, Billing & Workshop/Stores

1 ED (C)

1 SDGM (C) 2 DGM (C ), 4 Mgr. (C ), 1 AGM (M), 1 DGM (E)

1 Collector

Electromechanic
al Package 1 GM
(E)

Evacuation &
Construction
Power
1 SDGM (E)
3 DGM (E)

Electrical
Works

HRT & Water


Canal

DAM/
Intake

Power
House/TRT

1 SDGM (C)

1 SDGM (C)

1 SDGM (C)

3 DGM (C)

3 DGM (C)

3 DGM (C)

6 Mgr. (C)

6 Mgr. (C)

6 Mgr. (C)

Hydro
mechanical
Works
1 SDGM (M)
3 DGM (M)
6 Mgr. (M)

Geology

Infrastructure

1 Geologist/1
Asst.
Geologist

(Access Road
and Township)

2 Geology
Assistants

Medical

1 SDGM (C)

HR &

2 DGM (C)

Administration

4 Mgr. (C)

1 SGM (E)

Finance /

2 DGM (E)

Accounts and IT

4 Mgr. (E)

12 Mgr. (E)

Proposed Norms-Executive
CGM

GM

SDGM

DGM

AGM

Mgr.

CE

SE

EE

AEE

AE

JE

13

22

Electrical
Mechanical
Civil

Total

81

Page 28

Jammu & Kashmir State Power Development Corporation

16
1

6
26

48

Proposed Norms: Projects- Large


Land Acquisition

Support Staff

1 Collector

Electromechanic
al Package 1 GM
(E)

Evacuation &
Construction
Power
1 SDGM (E)
3 DGM (E)

Electrical
Works

Project Head

Contracts, Procurement, Planning, Billing & Workshop/Stores

1 CGM (C)

1 SDGM (C) 2 DGM (C ), 4 Mgr. (C ), 1 AGM (M), 1 DGM (E)

HRT & Water


Canal

DAM/
Intake

Power
House/TRT

1 SDGM (C)

1 SDGM (C)

1 SDGM (C)

3 DGM (C)

3 DGM (C)

3 DGM (C)

6 Mgr. (C)

6 Mgr. (C)

6 Mgr. (C)

Hydro
mechanical
Works
1 SDGM (M)
3 DGM (M)
6 Mgr. (M)

Geology

Infrastructure

1 Geologist/1
Asst.
Geologist

(Access Road
and Township)

2 Geology
Assistants

Medical

1 SDGM (C)

HR &

2 DGM (C)

Administration

4 Mgr. (C)

1 SGM (E)

Finance /

2 DGM (E)

Accounts and IT

4 Mgr. (E)

12 Mgr. (E)

Proposed Norms-Executive
CGM

GM

SDGM

DGM

AGM

Mgr.

CE

SE

EE

AEE

AE

JE

13

22

Electrical
Mechanical
Civil

Total

81

Page 29

Jammu & Kashmir State Power Development Corporation

16
1

6
26

48

Proposed Norms: Projects- Small


Support Staff

Diversion/Water
Conductor

Land Acquisition

Project Head

1 Collector

1 GM (C)

Power House/TRT
1 SDGM (C)

1 SDGM (C)

Contracts, Procurement, Planning, Billing &


Workshop/Stores
1 DGM (C ), 2 Mgr. (C ), 1 Mgr. (M), 1 Mgr. (E)

Hydro mechanical
Works

Electromechanical
Works

1 SDGM (M)

1 SDGM (E)

Medical

HR &
Diversion Structure
1 DGM (C)
3 Mgr. (C)
Water Conductor
1 DGM (C)
3 Mgr. (C)

Power-House and Tail


Race

Hydro mechanical
1 DGM (M)
2
Mgr. (M)

Electrical Erection
1 DGM (E)
3
Mgr. (E)

Workshop/Transport

Evacuation and
Construction Power

Administration
Finance /

1 DGM (C)
3 Mgr. (C)

1 DGM (M)

Forebay/Penstock/I
nfrastructure and
Townships

Accounts and IT

1 DGM (E), 3 Mgr. (E)

2 Mgr. (M)

1 DGM (C)
3 Mgr. (C)

Proposed Norms-Executive
GM

SDGM

DGM

SE

EE

AEE

JE

Electrical

Mechanical

Civil

14

Total

26

40

Page 30

Jammu & Kashmir State Power Development Corporation

Page 31

Proposed Norms: Technical Non-Executive (Projects)

Jammu & Kashmir State Power Development Corporation

Proposed Norms: Projects- Mega/Large


Technician

Initial Stage
Operator

Helper

28

14

Supervision

14

HRT & Water Canal

12

12

24

12

Dam/Intake

12

12

24

12

Powerhouse/TRT

12

12

24

12

HM
Construction

HM Works

12

12

24

12

Infrastructur
e
Construction

Infrastructure Works

16

Area

EM
Construction

Civil
Construction

Sub-Area
Evacuation & Construction
Power
Electrical Works

Technician

Peak Stage
Operator

Helper

Stores

Support
Services
Workshop
Total

12

66

64

166

33

32

83

296
Page 32

Jammu & Kashmir State Power Development Corporation

148

Proposed Norms: Projects- Small


Area

Technician

Peak Stage
Operator

Evacuation &
Construction
Power

Supervision

Diversion
Structure/Wate
r Conductor

12

12

24

12

Powerhouse/T
RT

12

12

24

12

HM Works

16

Sub-Area

EM
Construction

Civil
Construction

HM
Construction

Stores

Helper

Technician

Initial Stage
Operator

Helper

Support
Services

Workshop
Total

12

52

47

87

26

23

43

186

Page 33

Jammu & Kashmir State Power Development Corporation

92

No. of Projects Phasing


Type of Plant
Mega
Peak
Mega
Initial
Large
Peak

2013

2015

2017

2019

4
BHEP-II, Kirthai-I,
Kirthai-II, Sawalkote

3
Kirthai-I, Kirthai-II,
Sawalkote

BHEP-II, Kirthai-I
2

Kirthai-II, Sawalkote
3
Lower Kalnai, NGHEP,
Parnai

Remarks

Page 34

4
NGHEP, Shous ,
Barinium, Ujh

3
Shous , Barinium, Ujh

Shous , Barinium, Ujh


2
Dah, Hanu

2
Dah, Hanu

2
Mohra, Karnah

Small
Initial
Total Number

3
Lower Kalnai, NGHEP,
Parnai
3

Large
Initial
Small
Peak

Kirthai-II, Sawalkote

Mohra, Karnah
14

Peak Stage: 7 Projects Peak Stage: 9 Projects Peak Stage: 9 Projects


Initial Stage: 2 Projects Initial Stage: 5 Projects

Peak Stage: 5 Projects

Jammu & Kashmir State Power Development Corporation

2021

Non-Exec Phasing
Year->

2013

2015

2017

2019

2021

Type of Plant

Mega-Peak

132

128

332

264

256

664

198

192

498

132

128

332

Mega-Initial

66

64

166

Large-Peak

198

192

498

198

192

498

264

256

664

198

192

498

99

96

249

104

94

174

104

94

174

52

46

86

717

684

1671

566

542

1336

330

320

830

Large-Initial
Small-Peak

104

94

174

Small-Initial
Total

Page 35

500

478

1170

Jammu & Kashmir State Power Development Corporation

Technician

Operator

Helper

Page 36

Proposed Norms: Executive Plants

Jammu & Kashmir State Power Development Corporation

Proposed Norms: Plants- Mega


1 ED (E)

Planning, Procurement, Scheduling & Billing

1 GM (E) Head

1 SDGM (E), 1 DGM (E) , 3 Mgr.

Operation & Maintenance

Civil (Maintenance)

Mechanical (Maintenance)

Line 400 KV

1 SDGM (E)

1 SDGM (C)

1 SDGM (C)

1 SDGM (E)

Operations

1 DGM ( C) Dam and P/H

1 DGM (M) All Gates

(For 4 Shifts)

1 DGM ( C) Roads,
Colony

1 DGM (M) Workshop &


Transport

1 Mgr. ( C) Dam

1 Mgr. (M) Transport

1 Mgr. (C) Power House

1 Mgr. (M) Workshop

1 Mgr. ( C) Roads &


Colony

1 Mgr. (M) Dam

4 DGM (E), 12 Mgr.(E)


4 Mgr. (M)
Main Plant Maintenance
2 DGM (E) for E/M

Medical

HR &
Administration

1 DGM (E) Stores


1 DGM(E) Field
4 Mgr. (E) Stores/Field

Finance /
Accounts and IT

1 Mgr. (M) Elevators &


Cranes

1 DGM (E) Automation


1 DGM (M) Turbine, Spiral casing

Proposed Norms-Exec

2 Mgr. (E) Automation


1 Mgr. (E) Generator Excitation/UAT
1 Mgr. (E) Pothead/11 KV outdoor
1 Mgr. (E)
Transformation/GIS/AuxillarySupply, AC/DC
1 Mgr. (E) Instrumentation of Dam Control
1 Mgr. (M) Turbines,

Proposed Norms-Exec

Support
Function

DGM

AGM

Mgr.

Finance

HR

IT

Medical

Total

10

ED

GM

SDGM

DGM

Mgr.

ED

SE

EE

AEE

JE

Electrical

10

13

Mechanic
al

Civil

Total

15

25 + 8*

18

54
*Additional 8 JEs Training/Reserve

Page 37

Jammu & Kashmir State Power Development Corporation

Proposed Norms: Plants- Large


Planning, Procurement ,
Stores and Scheduling
1 DGM (E)
2 Mgr. (E)

Civil Maintenance
Head
1 SDGM (C)

Plant Head
1 SDGM (E)

1 DGM (E)

Electrical Maintenance
Head
1 DGM (E)

Mechanical
Maintenance Head
1 DGM (M)

Shift In-Charge
1 AGM (E) & 4 Mgr. (E)

Electrical Maintenance
2 Mgr. (E)

Mechanical
Maintenance
2 Mgr.. (M)

Operations Head

Civil

2 DGM (C)
1 AGM (C)
5 Mgr. (C)

Mech.

Total

SDGM

DGM

AGM

Mgr.

15

25

Page 38

Electrical

Jammu & Kashmir State Power Development Corporation

Proposed Norms: Plants- Medium


Planning, Procurement,
Stores and Scheduling
1 DGM (E)
1 Mgr. (E)

Civil Maintenance
Head
1 SDGM (C)

Plant Head
1 SDGM (E)

Operations Head
1 DGM (E)

Electro-Mechanical
Maintenance Head
1 DGM (E)

Shift In-Charge
4 Mgr. (E)

Electro-Mechanical
Maintenance
1 Mgr. (E), 1 Mgr.(M)

Civil Maintenance
1 DGM (C)
2 Mgr. (C)

Civil

Mech.

Total

SDGM

DGM

AGM

Mgr.

15

Page 39

Electrical

Jammu & Kashmir State Power Development Corporation

Proposed Norms: Plants- Small


Plant Head

CMD Head
1 SDGM (C)

1 DGM (E)

Civil Maintenance
Operations Head
1 Mgr. (E)

Electro-Mechanical
Maintenance & Stores
1 Mgr. (E), 1 Mgr. (M)

1 DGM (C) and 2 Mgr. (C)

Civil
SDGM

DGM

Mech.

Electrical

Total
1

AGM
Mgr.

Total

Page 40

Jammu & Kashmir State Power Development Corporation

Proposed Norms: Plants- Mini


Planning, Procurement,
Scheduling & Stores
1 AGM (E)
1 Mgr. (E)

Plant Head
1 SDGM (E)

Ops. Head

Ops Head

Ops. Head

Mini Plant 1

Mini Plant 2

Mini Plant 3

1 AGM(E)

1 AGM (E)

1 AGM(E)

Shift Incharge

Shift Incharge

Shift Incharge

1 Mgr. (E)

4 Mgr. (E)

1 Mgr. (E)

Common Electro-Mechanical Maintenance


1 DGM (E), 2 Mgr. (E), 1 Mgr.(M)

CMD MP1,2,3
1 SDGM (C)

Civil Maintenance

Civil Maintenance

1 Mgr.(C)

1 Mgr. (C)

Manpower requirement for Mini Power Plants had been calculated basis the actual
analysis of JKSPDC plants and their current context. Most of the Mini Plants are in
Ladakh region and the norm has been provided keeping that in mind. In future,
majority of the plants are either Large or Mega.
However, as suggested, reporting of Mini Plants to SDGM (E) and SDGM (C) should
be done on case to case basis considering practical and geographical constraints

Page 41

Civil
SDGM

Mech.

Electrical

Total

DGM

AGM

Mgr.

Total

12

16

Jammu & Kashmir State Power Development Corporation

16

Support to CGM and GM

CGM/GM Support Norms


Unit

Page 42

Total

SDGM

CGM

2
(1
Electrical, 1
Civil)

GM

AGM

Personal
Assistant

Steno

Jammu & Kashmir State Power Development Corporation

Page 43

Proposed Norms: Technical Non-Executive Plants

Jammu & Kashmir State Power Development Corporation

Proposed Norms: Plants- Mega


Area

Technicians

Operators
32
(8 per shift X 4
shifts)

Powerhouse
Operations
Electrical
Maintenance

14

Civil Maintenance

20

12

20

Mechanical
Maintenance

12

12

24

Switchyard
Operations &
Maintenance

Peripheral Services

16

Stores

Total

48

68

204

Page 44

Helpers

Jammu & Kashmir State Power Development Corporation

88

Proposed Norms: Plants- Large


Area

Sub-Area
Head Works Stage

Hydro Works

Gate Operation
Forebay Tank/Balancing
Reservoir
Control Room
Machine Hall/UCB Floor
Minus Floor

8 ( 2 per shift x 4 shifts)


12 ( 3 per shift x 4 shifts)
4 (1 per shift x 4 shifts)

Disc Valve floor

4 (1 per shift x 4 shifts)

Powerhouse

Technician
4 (1 per shift x 4 shifts)

Operator
4 (1 per shift x 4 shifts)

Helper
4 (1 per shift x 4 shifts)

4 (1 per shift x 4 shifts)

4 (1 per shift x 4 shifts)

4 (1 per shift x 4 shifts)


4 (1 per shift x 4 shifts)

Turbine/Compressors
Inside/Outside Dewatering
Switchyard

Switchgears for Transformers

4 (1 per shift x 4 shifts)

4 (1 per shift x 4 shifts)

Receiving
Station

Receiving Station33 KV

4 (1 per shift x 4 shifts)

4 (1 per shift x 4 shifts)

Auxiliary
Services

Peripheral
Services

Maintenance

LT Supplies
Illuminations/11
KV/33KV/Telephone
Lines/Erector
Water Supply
DG Set
Sweepers

4 (1 per shift x 4 shifts)

Gardener

Mechanical Maintenance

Electrical Maintenance

10

Civil Maintenance

Stores

29

18

53

4
70

Stores

Total

65
188

Page 45

4 (1 per shift x 4 shifts)


2

Jammu & Kashmir State Power Development Corporation

Proposed Norms: Plants- Medium


Area

Hydro Works

Powerhouse

Sub-Area
Head Works Stage
Gate Operation
Forebay Tank/Balancing Reservoir

Technician

Control Room
Machine Hall
Minus Floor/UCB Floor

4 (1 per shift X 4 shifts)


8 (2 per shift X 4 shifts)
4 (1 per shift X 4 shifts)

Operator
12 (3 per shift X 4 shifts)
2
12 (3 per shift X 4 shifts)

Helper

4 (1 per shift X 4 shifts)

Disc Valve floor


turbine/Compressors
Inside/Outside Dewatering

Switchyard

Switchgears for Transformers

Receiving
Station

Receiving Station33 KV

Auxiliary
Services
Peripheral
Services

Maintenance

4 (1 per shift X 4 shifts)

LT Supplies
Illuminations
Water Supply
DG Set
Sweepers

Gardener

Mechanical Maintenance

Electrical Maintenance

Civil Maintenance

Stores

18

50

4
35

Stores
Total

36

121
Page 46

20

Jammu & Kashmir State Power Development Corporation

Proposed Norms: Plants- Small


Area
Hydro Works

Powerhouse

Sub-Area
Head Works Stage
Gate Operation
Forebay Tank/Balancing Reservoir
Control Room
Machine Hall
Minus Floor/UCB Floor

Technician

Operator

Helper

1
4 (1 per shift X 4 shifts)
4 (1 per shift X 4 shifts)
8 (2 per shift X 4 shifts)

Disc Valve floor


turbine/Compressors
Inside/Outside Dewatering

Switchyard

Switchgears for Transformers

Receiving
Station

Receiving Station 132/33/11 KV

Auxiliary
Services
Peripheral
Services

Maintenance

LT Supplies
Illuminations
Water Supply
DG Set
Sweepers

Gardener
Mechanical Maintenance

Electrical Maintenance

Civil Maintenance

Stores

16

22

4
13

Stores
Total

18

53
Page 47

Jammu & Kashmir State Power Development Corporation

Proposed Norms: Plants- Mini


Area

Sub-Area
Head Works Stage

Hydro Works

Gate Operation

Forebay Tank/Balancing Reservoir

4 (1 per shift X 4 shifts)

Control Room
Machine Hall

Technician

Operator

Helper

4 (1 per shift X 4 shifts)


8 (2 per shift X 4 shifts)

Minus Floor/UCB Floor


Powerhouse

Switchyard
Receiving
Station
Auxiliary
Services
Peripheral
Services

Maintenance

Disc Valve floor


turbine/Compressors
Inside/Outside Dewatering
Switchgears for Transformers
Receiving Station 132/33/11 KV

LT Supplies
Illuminations
Water Supply
DG Set
Sweepers

Gardener
Mechanical Maintenance

Electrical Maintenance

Civil Maintenance

Stores

Stores

6
4

Total

17

40
Page 48

Jammu & Kashmir State Power Development Corporation

10

13

Proposed Norms: Summary


Type of Plant
Mega
(>=350 MW)
NHPC Norms
(>500 MW)
Large
(100-350 MW)
NHPC Norms
(100-500 MW)
Medium
(25-100 MW)
NHPC Norms (11-100
MW)
Small
(2-25 MW)
NHPC Norms (<10
MW)
Mini
(<2 MW)
NHPC Norms

Page 49

Technician

Operator

Helper

Total

48

68

88

204

172

68

65

53

140

60

36

50

106

42

18

22

36

18

17

10

13

40

NA

NA

NA

NA

Jammu & Kashmir State Power Development Corporation

240
70

188
200

35

121
148

13

53
54

No. of Plants Phasing


Type of Plant

2013

2015

2017

2019

Mega

BHEP-I

BHEP-I

LJHP, Kangan

LJHP, Kangan

Chenani-I, Sumbal,
Ganderbal

Chenani-I, Sumbal,
Ganderbal

Chenani-II, Pahalgam

Chenani-II, Pahalgam

12

12

Large

Medium

Small

Mini

2021

5
BHEP-I, BHEP-II,
BHEP-I, BHEP-II,
BHEP-I, BHEP-II
Kirthai-I, Kirthai-II,
Kirthai-I
Sawalkote
2
2
5
LJHP, Kangan, Shous,
LJHP, Kangan
LJHP, Kangan
Barinium, Ujh
5
6
6
Chenani-I, Sumbal,
Chenani-I, Sumbal,
Chenani-I, Sumbal,
Ganderbal, Lower
Ganderbal, Lower
Ganderbal, Lower
Kalnai, Parnai
Kalnai, Parnai, NGHEP Kalnai, Parnai, NGHEP
4
6
6
Chenani-II, Pahalgam, Chenani-II, Pahalgam,
Chenani-II, Pahalgam,
Dah, Hanu, Karnah,
Dah, Hanu, Karnah,
Dah, Hanu
Mohra
Mohra
12
12
12

Bhaderwah, Karnah,
Bhaderwah, Karnah,
Bhaderwah, Karnah,
Bhaderwah, Karnah,
Bhaderwah, Karnah,
Chenani-III, Sewa-III,
Chenani-III, Sewa-III,
Chenani-III, Sewa-III,
Chenani-III, Sewa-III,
Chenani-III, Sewa-III,
Marpachoo, Stakna,
Marpachoo, Stakna,
Marpachoo, Stakna,
Marpachoo, Stakna,
Marpachoo, Stakna,
Iqbal, Igo, Bazgo,
Iqbal, Igo, Bazgo,
Iqbal, Igo, Bazgo,
Iqbal, Igo, Bazgo,
Iqbal, Igo, Bazgo,
Sumoor, Hundar, Haftal Sumoor, Hundar, Haftal Sumoor, Hundar, Haftal Sumoor, Hundar, Haftal Sumoor, Hundar, Haftal

Total Number

Remarks

Page 50

20

Existing 20 Plants

20

25

29

34

No Addition
BHEP-II will transition
from Project to Plant in
this year

Addition of 5 Plants
BHEP-II
Lower Kalnai
Parnai
Dah
Hanu

Addition of 4 Plants
Kirthai-I
NGHEP
Karnah
Mohra

Addition of 5 Plants
Kirthai-II
Sawalkote
Shous
Barinium
Ujh

Jammu & Kashmir State Power Development Corporation

Technical Non-Exec Phasing


Year->

2013

2015

2017

2019

2021

Type of Plant

Mega

48

68

88

48

68

88

96

136

176

144

204

264

240

340

440

Large

130

106

140

130

106

140

130

106

140

130

106

140

325

265

350

Medium

108

150

105

108

150

105

180

250

175

216

300

210

216

300

210

Small

36

44

26

36

44

26

72

88

52

108

132

78

108

132

78

Mini

204

120

156

204

120

156

204

120

156

204

120

156

204

120

156

Total

526

488

515

526

488

515

682

700

699

802

862

848

Page 51

Jammu & Kashmir State Power Development Corporation

1093 1157 1234

Technician

Operator

Helper

Page 52

Proposed
Non
Technical
Non-Executive Corporate & Field
JammuNorms:
& Kashmir State
Power
Development Corporation

Proposed Norms Corporate: Administration & Finance


Administrative Staff Norms
Unit

Total

Supdt.

Assistant

CSR

IR & Welfare

HRD

Administration &
Compliances

Finance & Accounts Staff Norms

Page 53

Unit

Total

Accountant

Project Finance

Financial Management

Accounting

Jammu & Kashmir State Power Development Corporation

Proposed Norms Field: Administration & Finance


Administrative Staff Norms
Unit

Total

Executive

Circle Supdt./Personal
Officer

Circle Assistant

LDC/UDC

Mega Plants/Projects

15

Circle/Large
Plants/Projects

Division/ Medium Plants

Finance & Accounts Staff Norms


Unit

Total

Accounts Officer

Assistant Accounts
Officer

Divisional Accountant

Accounts Assistant

Mega Plants/Projects

10

Circle/Large
Plants/Projects

10

Division/ Medium Plants

No of Circle/Mega/Large/Medium Plants/Divisions

Page 54

Unit

2013

2015

2017

2019

2021

Circle

Mega Plants

Large Plants

Medium Plants

Divisions

13

13

13

13

13

Jammu & Kashmir State Power Development Corporation

Non Technical Non-Exec Phasing


Year->

Page 55

2013

2015

2017

2019

2021

Type of Plant

Admin

Finance

Admin

Finance

Admin

Finance

Admin

Finance

Admin

Finance

Corporate

Circles

54

60

54

60

54

60

54

60

54

60

Mega Plants

10

10

18

20

27

30

45

50

Large Plants

18

20

18

20

18

20

18

20

45

50

Divisions

26

26

26

26

26

26

26

26

26

26

Medium Plants

10

10

12

12

12

12

Total

121

127

121

127

134

141

145

153

190

203

Jammu & Kashmir State Power Development Corporation

Page 56

Jammu & Kashmir State Power Development Corporation

Projects

Proposed Structure: BHEP II, SAWALKOTE

Land Acquisition

Support Staff

Project Head

Contracts, Procurement, Planning, Billing & Workshop/Stores

1 ED (C)

1 SDGM (C) 2 DGM (C ), 4 Mgr. (C ), 1 AGM (M), 1 DGM (E)

1 Collector

Electromechanic
al Package 1 GM
(E)

Evacuation &
Construction
Power
1 SDGM (E)
3 DGM (E)

Electrical
Works

HRT & Water


Canal

DAM/
Intake

Power
House/TRT

1 SDGM (C)

1 SDGM (C)

1 SDGM (C)

3 DGM (C)

3 DGM (C)

3 DGM(C)

6 Mgr. (C)

6 Mgr. (C)

6 Mgr. (C)

Hydro
mechanical
Works
1 SDGM (M)
3 DGM (M)
6 Mgr. (M)

Geology

Infrastructure

1 Geologist/1
Asst.
Geologist

(Access Road
and Township)

2 Geology
Assistants

1 SDGM (C)

HR &

2 DGM (C)

Administration

4 Mgr. (C)

1 SDGM (E)

Finance /

2 DGM (E)

Accounts and IT

4 Mgr. (E)

12 Mgr. (E)

Page 57

Medical

Jammu & Kashmir State Power Development Corporation

Proposed Structure: KIRTHAI I, KIRTHAI II

Land Acquisition

Support Staff

Project Head

Contracts, Procurement, Planning, Billing & Workshop/Stores

1 ED (C)

1 SDGM (C) 2 DGM (C ), 4 Mgr. (C ), 1 AGM (M), 1 DGM (E)

1 Collector

Electromechanic
al Package 1 GM
(E)

Evacuation &
Construction
Power
1 SDGM (E)
3 DGM (E)

Electrical
Works

HRT & Water


Canal

DAM/
Intake

Power
House/TRT

1 SDGM (C)

1 SDGM (C)

1 SDGM (C)

3 DGM (C)

3 DGM (C)

3 DGM (C)

6 Mgr. (C)

6 Mgr. (C)

6 Mgr. (C)

Hydro
mechanical
Works
1 SDGM (M)
3 DGM (M)

6 Mgr. (M)

Geology

Infrastructure

1 Geologist/1
Asst.
Geologist

(Access Road
and Township)

2 Geology
Assistants

Medical

1 SDGM (C)

HR &

2 DGM (C)

Administration

4 Mgr. (C)

1 SDGM (E)

Finance /

2 DGM (E)

Accounts and IT

4 Mgr. (E)

12 Mgr. (E)

Page 58

(Common ED but separate staff below ED)

Jammu & Kashmir State Power Development Corporation

Proposed Structure:
Land Acquisition

Support Staff

1 Collector

Electromechanic
al Package 1 GM
(E)

Evacuation &
Construction
Power
1 SDGM (E)
3 DGM (E)

Electrical
Works

BARINIUM, SHOUS, UJH, NGHEP, PARNAI, LOWER KALNAI

Project Head

Contracts, Procurement, Planning, Billing & Workshop/Stores

1 CGM (C)

1 SDGM (C) 2 DGM (C ), 4 Mgr. (C ), 1 AGM (M), 1 DGM (E)

HRT & Water


Canal

DAM/
Intake

Power
House/TRT

1 SDGM (C)

1 SDGM (C)

1 SDGM (C)

3 DGM (C)

3 DGM (C)

3 DGM (C)

6 Mgr. (C)

6 Mgr. (C)

6 Mgr. (C)

Hydro
mechanical
Works
1 SDGM (M)
3 DGM (M)
6 Mgr. (M)

Geology

Infrastructure

1 Geologist/1
Asst.
Geologist

(Access Road
and Township)

2 Geology
Assistants

1 SDGM (C)

HR &

2 DGM (C)

Administration

4 Mgr. (C)

1 SDGM (E)

Finance /

2 DGM (E)

Accounts and IT

4 Mgr. (E)

12 Mgr. (E)

Page 59

Medical

Jammu & Kashmir State Power Development Corporation

Proposed Structure: KARNAH, MOHRA

Support Staff

Diversion/Water
Conductor

Land Acquisition

Project Head

1 Collector

1 GM (C)

Power House/TRT
1 SDGM (C)

1 SDGM (C)

Contracts, Procurement, Planning, Billing &


Workshop/Stores
1 DGM (C ), 2 Mgr. (C ), 1 Mgr. (M), 1 Mgr. (E)

Hydro mechanical
Works

Electromechanical
Works

1 SDGM (M)

1 SDGM (E)

Medical

HR &
Diversion Structure
1 DGM (C)
3 Mgr. (C)
Water Conductor
1 DGM (C)
3 Mgr. (C)

Power-House and Tail


Race

Hydro mechanical
1 DGM (M)
2
Mgr. (M)

Electrical Erection
1 DGM (E)
3
Mgr. (E)

Workshop/Transport

Evacuation and
Construction Power

Finance /

1 DGM (C)
3 Mgr. (C)
Forebay/Penstock/I
nfrastructure and
Townships

1 DGM (M)
2 Mgr. (M)

1 DGM (E), 3 Mgr. (E)

1 DGM (C)
3 Mgr. (C)

Page 60

Administration

Jammu & Kashmir State Power Development Corporation

Accounts and IT

Proposed Structure: Ladakh Projects Hanu, Dah

Contracts, Procurement, Planning, Billing &


Workshop/Stores
1 AGM (C ), 1 Mgr. (C )

1 GM (C)

Hydro mechanical
Works

1 SDGM (C)

1 SDGM (M)

1 DGM (C)
3 Mgr. (C)

1 CGM (E)

Ladakh

Civil Works (Common


for all 3 projects)

Diversion
Structure/Water
Conductor upto
Power House

Ladakh Generation

Electromechanical
Works
1 SDGM (E)

Hydro mechanical
1 DGM (M)
2
Mgr. (M)

Electrical Erection
1 DGM (E)
3
Mgr. (E)

Workshop/Transport

Evacuation and
Construction Power

1 DGM (M)

1 DGM (E), 3 Mgr. (E)

2 Mgr. (M)

Power House and Tail


Race
1 DGM (C)
3 Mgr. (C)

Page 61

Jammu & Kashmir State Power Development Corporation

Electromechanical Division
for Projects
(Dah/Hanu/Dumkhar,
Rangdo,Bairas) will report
to CGM (Electrical) and will
Functionally support the
SGM (C) Ladakh for these
projects

Page 62

Jammu & Kashmir State Power Development Corporation

Plants

Proposed Structure: BHEP-I


(BHEP I and II#)
1 ED (E)
Planning, Procurement, Scheduling & Billing

1 GM (E) Head

Operation & Maintenance

Civil (Maintenance)

Mechanical (Maintenance)

Line 400 KV

1 SDGM (E)

1 SDGM (C)

1 SDGM (C)

1 SDGM (E)

Operations

1 DGM ( C) Dam and P/H

1 DGM (M) All Gates

(For 4 Shifts)

1 DGM ( C) Roads,
Colony

1 DGM (M) Workshop &


Transport

1 Mgr. ( C) Dam

1 Mgr. (M) Transport

1 Mgr. (C) Power House

1 Mgr. (M) Workshop

1 Mgr. ( C) Roads &


Colony

1 Mgr. (M) Dam

4 DGM (E), 12 Mgr.(E)


4 Mgr. (M)
Main Plant Maintenance
2 DGM (E) for E/M

1 Mgr. (M) Elevators &


Cranes

1 DGM (E) Automation


1 DGM (M) Turbine, Spiral casing

2 Mgr. (E) Automation


1 Mgr. (E) Generator Excitation/UAT
1 Mgr. (E) Pothead/11 KV outdoor
1 Mgr. (E)
Transformation/GIS/AuxillarySupply, AC/DC
1 Mgr. (E) Instrumentation of Dam Control
1 Mgr. (M) Turbines,

*Common ED (E) for BHEP-I and II once BHEP II is commissioned

Page 63

1 SDGM (E), 1 DGM (E) , 3 Mgr.

Jammu & Kashmir State Power Development Corporation

Medical

HR &
1 DGM (E) Stores

Administration

1 DGM (E) Field


4 Mgr. (E) Stores/Field

Finance /
Accounts and IT

Proposed Structure: Jammu Generation (2013)


O&M Zone
Jammu
1 CGM (E)

Civil Mtc Circle.


Jammu
1 GM (C)

Generation Circle
Jammu
1 GM (E)

Civil Maintenance
Division Jammu 1
1 SDGM (C)

Civil Maintenance
Chenani
1 DGM (C)
Civil
Maintenance
Chenani I
1 M (C)

Civil Maintenance
Division Jammu 2
1 SDGM (C)

Civil Maintenance
Bhaderwah
1 AGM (C)

Civil Maintenance
Sewa-III
1 AGM (C)

Generation Division
Chenani
1 SDGM (E)

Plant Head
Chenani I & II
1 DGM (E)

Civil
Maintenance
Bhaderwah
1 M (C)

Civil
Maintenance
Chenani II
1 M (C)
Civil
Maintenance
Chenani III
1 M (C)

Page 64

Jammu & Kashmir State Power Development Corporation

Generation Division
Bhaderwah + SewaIII
1 SDGM (E)

Plant Head
Chenani III
1 AGM (E)

Plant Head
Bhaderwah
1 AGM (E)

Plant Head
Sewa III
1 DGM (E)

Proposed Structure: Kashmir Generation (2013)


O&M Zone
Kashmir
1 CGM (E)

Civil Mtc Circle.


Kashmir
1 GM (C)

Civil Maintenance
Division Kashmir 1
1 SDGM (C)

Civil Maintenance
LJHP
1 DGM (C)

Civil Maintenance
Karnah
1 AGM (C)

Generation Circle
Kashmir
1 GM (E)

Civil Maintenance
Division Kashmir 2
1 SDGM (C)

Civil Maintenance
USHP I/II
1 DGM (C)

Civil Maintenance
Ganderbal
1 DGM (C)

Civil Maintenance
Pahalgam
1 AGM (C)

Page 65

Generation Division
Ganderbal
1 SDGM (E)

Generation Division
LJHP
1 SDGM (E)

Generation Division
Kangan
1 SDGM (E)

Plant Head
Ganderbal
1 DGM (E)

Plant Head
Karnah
1 AGM (E)

Plant Head
Pahlgam
1 DGM (E)

Plant Head
LJHP
1 DGM (E)

Plant Head
Pampore Gas
Turbine
1 DGM (E)

Jammu & Kashmir State Power Development Corporation

Plant Head
Sumbal
1 DGM (E)

Plant Head
Kangan
1 AGM (E)

Proposed Structure: Ladakh Generation & Projects


O&M Zone
Ladakh
1 CGM (E)

Generation Circle
Ladakh
1 GM (E)

CPE Ladakh
1 GM (C)

Projects (Dah
& Hanu) Civil

Page 66

Survey &
Investigation
Ladakh
1 SDGM (C)

CMD Leh
1 SDGM (C)

CMD Kargil
1 SDGM (C)

Generation Division
Leh
1 SDGM (E)

Jammu & Kashmir State Power Development Corporation

Generation Division
Kargil
1 SDGM (E)

Projects (Dah &


Hanu) Electrical

Plant- Generation- Ladakh (Iqbal 3.75 MW, Hundar 0.4 MW,


Sumoor - .1 MW, Igo-Marcellong 3 MW, Haftal 1 MW, Marpachoo 0.75 MW,
Bazgo 0.3 MW, Satkna 4 MW)
Ladakh Generation
1 AGM (E) and 1 Mgr. (E)

1 GM (E)

Planning, Procurement,
Scheduling & Stores
1 AGM.(E)
1 Mgr. (E)

Plant Head Leh


Plants

Plant Head Kargil


Plants

1 SDGM (E)

1 SDGM (E)

1 AGM (E)

Operations
Head Igo
Marcellong
1 AGM (E)

Shift
Incharge

Shift
Incharge

Shift
Incharge

Shift
Incharge

Shift
Incharge

4 Mgr. (E)

4 Mgr. (E)

1 Mgr. (E)

4 Mgr. (E)

1 Mgr. (E)

Operations
Head Stakna

O&M Head
Bazgo
1 Mgr. (E)

O&M
Head
Hundar
1 Mgr. (E)

O&M
Head
Sumur
1 Mgr. (E)

Common ElectroMechanical Maintenance


1 AGM (E) 2 Mgr. (E)
1 Mgr. (M)

CMD LEH
1 DGM (C)

Civil
Maintenance
Stakna
1 Mgr. (C)

Page 67

Civil
Maintenance
Igo Marcellong
1 Mgr. (C)

Ops. Head
Marpachoo

Ops Head
Iqbal

Ops. Head
Sanjak

1 AGM (E)

1 AGM (E)

1 AGM (E)

Planning, Procurement,
Scheduling & Stores
1 AGM (E)
1 Mgr. (E)

O&M Head
Haftal
1 AGM (E)

Shift
Incharge
1 Mgr. (E),
1 Mgr.(M)

Common Electro-Mechanical
Maintenance
1 AGM (E), 2 Mgr. (E), 1 Mgr. (M)

CMD Leh
1 DGM (C)

CMD LEH
1 DGM (C)

Civil
Maintenance
Bazgo
1 Mgr. (C)

Civil
Maintenance
Hundar/Sumur
1 Mgr. (C)

CMD Kargil
1 DGM (C)

Civil Maintenance
Iqbal/Marpachoo
1 Mgr. (C)

Jammu & Kashmir State Power Development Corporation

Civil Maintenance
Sanjak
1 Mgr. (C)

CMD Kargil
1 DGM (C)

Civil
Maintenance
Haftal
1 Mgr. (C)

PART B: Manpower Planning


Page 68

Jammu & Kashmir State Power Development Corporation

Manpower Phasing 2013-2021


Phasing of Corporate, Projects and Plants is as follows:
Year ->

2013

Corporate

Peak
Stage

Plants

Page 69

2017

2019

Commercial- 3
HR- 4
Finance -7
IT-1
Legal-4

Commercial- 3
HR- 4
Finance -7
IT-1
Legal-4

Commercial- 3
HR- 4
Finance -7
IT-1
Legal-4

Commercial- 3
HR- 4
Finance -7
IT-1
Legal-4

BHEP-II
Hanu
Dah
Lower Kalnai
NGHEP
Kirthai-I
Parnai

BHEP-II
Hanu
Dah
Lower Kalnai
NGHEP
Kirthai-I
Parnai
Sawalkote
Kirthai-II

NGHEP
Kirthai-I
Sawalkote
Kirthai-II
Mohra
Karnah
Shous
Barinium
Ujh

Sawalkote
Kirthai-II
Shous
Barinium
Ujh

Sawalkote
Kirthai-II

Mohra
Karnah
Shous
Barinium
Ujh
BHEP-II
Hanu
Dah
Lower Kalnai
Parnai

Kirthai-I
NGHEP
Mohra
Karnah

Projects

Initial
Stage

2015

BHEP-II will
transition from
Project to Plant in
this year

Jammu & Kashmir State Power Development Corporation

2021

Commercial- 3
HR- 4
Finance -7
IT-1
Legal-4

Sawalkote
Kirthai-II
Shous
Barinium
Ujh

Manpower Plan: Executives 2013-2021


Total Manpower Requirements for Projects till year 2021 are as follows:
(As per existing plans, no Projects planned in 2021)
Assuming one ED for both Kirthai-I and Kirthai-II
Total

Page 70

2013

2015

2017

2019

ED

CGM

GM

10

SDGM

13

41

20

62

10

18

43

11

13

31

DGM

36

106

21

48

160

27

50

111

29

36

80

21

AGM

10

Manager

101

224

45

133

344

57

140

238

62

101

172

45

Total

157

380

81

211

581

104

215

402

109

155

290

79

Jammu & Kashmir State Power Development Corporation

Manpower Plan: Executives 2013-2021


Total Manpower Requirements for O&M till year 2021 are as follows:

Total

Page 71

2013

2015

2017

2019

2021

ED

CGM

GM

SDGM

12

12

10

13

12

14

20

16

DGM

26

22

26

22

40

25

13

53

28

18

85

38

30

AGM

20

11

20

11

20

11

20

11

24

11

17

Manager

111

73

24

111

73

24

134

86

32

154

98

38

212

124

58

Total

170

121

33

170

121

33

211

138

51

248

155

66

354

192

114

Jammu & Kashmir State Power Development Corporation

Manpower Plan: Executives 2013-2021


Total Manpower Requirements for Corporate till year 2021 are as follows:

2013
E

ED

CGM

GM

SDGM

DGM

AGM
Manag
er

Total

Other
M Cadre
s

13

14

27

14

34

56

23

Total

Page 72

2015

2017

Other
M Cadre
s

13

14

27

14

25

34

56

23

2019

Other
M Cadre
s

13

11

14

27

14

26

34

56

23

2021

Other
M Cadre
s

Other
M Cadre
s

11

11

13

14

13

14

14

27

14

14

27

14

32

34

56

23

38

34

56

23

38

Jammu & Kashmir State Power Development Corporation

1
2
4

Manpower Plan: Executives 2013-2021


Total Manpower Requirements for ENTIRE JKSPDC till year 2021 are as follows:

2013
Total

2017

2019

2021

Other
Cadres

Other
Cadres

Other
Cadres

Other
Cadres

Other
Cadres

ED

CGM

GM

10

13

10

11

10

SDGM

26

60

11

33

81

13

33

63

15

30

52

13

25

23

11

DGM

68

133

33

80

187

39

96

141

47

95

113

44

11

91

43

35

11

AGM

26

24

10

26

24

13

26

24

13

11

26

24

14

14

30

24

19

14

Manag
226
er

324

83

258

444

95

288

351

108

269

297

97

226

151

72

361

557

137

25

415

758

160

26

460

596

183

32

437

500

168

38

388

248

137

38

Total
Grand
Total

Page 73

2015

1080

1359

1271

1143

Jammu & Kashmir State Power Development Corporation

811

Manpower Plan: Non Executives 2013-2021


Total Manpower Requirements for Non Executive for O&M and Projects till year 2021 are as follows:
Year->

Page 74

2013

2015

2017

2019

2021

Area

Projects

500

478

1170

717

684

1671

566

542

1336

330

320

830

Plants
(O&M)

526

488

515

526

488

515

682

700

699

802

862

848

1093

1157

1234

S&I & MID

66

212

194

66

212

194

66

212

194

66

212

194

66

212

194

Sub-Total

1092

1178

1879

1309

1384

2380

1314

1454

2229

1198

1394

1872

1159

1369

1428

Total

4149

5073

4997

4464

3956

Non Tech

248

248

275

298

393

Non-Exec
Total

4397

5321

5272

4762

4349

Jammu & Kashmir State Power Development Corporation

Technician

Operator

Helper

Consolidated Manpower Plan: 2013-2021


Consolidated Manpower Phasing is as follows

Year->

2013

2015

2017

2019

2021

Exec Total

1080

1359

1271

1143

811

Non-Exec
Total

4397

5321

5272

4762

4349

Organization
Total

5477

6680

6543

5905

5160

Page 75

Jammu & Kashmir State Power Development Corporation

PART C: Manpower Policy


Page 76

Jammu & Kashmir State Power Development Corporation

Manpower Policy: Overview


Basis the Manpower Projections for the next few years, JKSPDC needs to fill manpower gaps through the
following modes:

Absorption

Absorb existing personnel working on deputation in JKSPDC based on a


selection criteria

Deputation

Deputation from other State Govt./Central Govt. Departments to JKSPDC

Recruitment

Direct recruitment at entry level as well as lateral recruitment*

Short Term
Contracts

Short term contracts (1-2 years) based on JKSPDCs requirement

JSKPDC needs to have a manpower policy to make it an attractive employer

Page 77

Jammu & Kashmir State Power Development Corporation

Page 78

Jammu & Kashmir State Power Development Corporation

Absorption Criteria

Absorption Selection Criteria


We can divide Designations applying for Absorption into 3 groups with corresponding Selection Criteria
Component:

Group

Existing Designation

Selection Criteria
Component

Senior Management

SE, CE (or equivalent)

APR, Seniority, Education, Behavioral


Assessment, Interview

Middle Management

XEN, AEE (or equivalent)

APR, Seniority, Education, Behavioral


Assessment, Interview

AE, JE (or equivalent)

APR, Education, Technical


Assessment, Behavioral Assessment,
Interview

Junior Management

Page 79

Jammu & Kashmir State Power Development Corporation

Absorption Selection Criteria: Senior & Middle Management


For selection of employees for Absorption, a balanced and objective selection criteria should be utilized as
shown below:

Selection Criteria Component

Marks (Maximum Marks 50)

20%

10 marks- Outstanding
8 marks- Very Good
6 marks- Good
4 marks- Satisfactory

10%

5 marks- > 20 years of experience


3 marks- 15-20 years of experience
2 marks- 10-15 years of experience
1 mark- < 10 years of experience

10%

5 marks- Post Grad


3 marks- Grad
2 marks- Diploma

Behavioral Assessment

30%

15 marks- Rating 5
12 marks- Rating 4
10 marks- Rating 3
8 marks- Rating 2
5 marks- Rating 1

Interview

30%

15 marks

Annual Performance Report

Seniority

Education

Page 80

Weightage

Jammu & Kashmir State Power Development Corporation

Absorption Selection Criteria: Junior Management


For selection of employees for Absorption, a balanced and objective selection criteria should be utilized as
shown below:

Selection Criteria Component

Marks (Maximum Marks 50)

20%

10 marks- Outstanding
8 marks- Very Good
6 marks- Good
4 marks- Satisfactory

Education

10%

5 marks- Post Grad


3 marks- Grad
2 marks- Diploma

Technical Assessment

30%

15 marks

Behavioral Assessment

20%

10 marks- Rating 5
8 marks- Rating 4
6 marks- Rating 3
4 marks- Rating 2
2 marks- Rating 1

Interview

20%

10 marks

Annual Performance Report

Page 81

Weightage

Jammu & Kashmir State Power Development Corporation

Absorption Selection Method


Absorption Selection Methods are detailed out below:

Selection Criteria Component

Method

Annual Performance Report


Seniority

Basis the certificates/records supplied by the candidate with


the Absorption Option Form

Education

Page 82

Technical Assessment

A technical test related to the technical area of the applicant


75 question of 4 mark each and negative marking of 1 mark.
Candidates score will be divided by 20 to scale it down to
maximum 10 marks

Behavioral Assessment

Behavioral Assessment exercise could be conducted by


independent consultants, comprising of 3-4 exercises like
Psychometric Tests, Case Studies, Role Plays, Simulations to
asses the candidate on behavioral competencies. A rating on a
scale of 1 to 5 is given to each candidate

Interview

Interview committee can decide on the interview weightage.


As a guidelines, 50% weightage can be given to assess the
Technical Skills and its application, candidate will be asked 1012 technical questions on his experience and application of
technical skills. 30% weightage can be given to assess the
Managerial Skills and its application will be asked 8-10
managerial questions on his experience and application of
managerial skills. 20% weightage can be given to assess
exceptional performance in the past, any accomplishment

Jammu & Kashmir State Power Development Corporation

Making JKSPDC an Attractive Employer


JKSPDC needs to be an attractive employer to attract employees for Absorption or Deputation through
incentivizing in 3 main areas:

Career
Progression

Promotion on Absorption for Engineers, Workmen as well as


Administration Staff
Career Progression Assurance

Benefits &
Allowances

Project Allowance
House Rent Allowance or Free Bachelor Accommodation
Deputation Allowance
Performance Related Pay
Health & Accident Insurance

Terminal
Benefits

Page 83

Option for VRS

Jammu & Kashmir State Power Development Corporation

Page 84

Jammu & Kashmir State Power Development Corporation

Career Progression

Promotion on Absorption for Engineers


Total Years of Experience
Eligibility for One Step Up
Promotion

Years Spent in Current


Designation

Offered Position if
Eligibility is met

NA

Less than 8 Years


8 Years +

Manager
Assistant General
Manager

JE
(Degree)

NA

Less than 4 Years


4 Years +

Manager
Assistant General
Manager

AE

10

NA

Deputy General Manager

AEE

15

NA

Sr. Deputy General


Manager

EE

17

NA

General Manager

SE

20

NA

Chief General Manager

Existing Position
JE
(Diploma)

Page 85

For lateral movement, years already spent in a current designation will be carried forward
Jammu & Kashmir State Power Development Corporation

Assured Career Progression for Engineers


At Junior and Middle Management levels, the current designations would be classified into clusters as shown below:
Sample Cluster for Engineers

Sample Cluster for Other Cadres like Accounts, Legal etc.

Cluster

Designation

Cluster

Designation

Cluster 1

Manager and AGM

Cluster 1

Manager

Cluster 2

SDGM and DGM

Cluster 2

SDGM, DGM and AGM

The vacancies will based on defined clusters ensuring intra-cluster promotability

The intra-cluster promotability will provide for an assured career path to an employee subject to meeting a minimum benchmark
performance criteria

Eligibility for promotion as per government rules and regulations

Sanction of posts will not be a limiting factor for promotions within a cluster. For example, if you are an DGM, you can reach up-to an
SDGM level without any vacancy limitation

For Engineering Cadre, movement from Manager to AGM, there would be a defined quota for promotion. This is in alignment with
the practices followed in other organizations

Inter-cluster promotions will be based on availability of vacancies and performance for all cadres

An officer could be given a maximum of two higher pay scales (assuming a service of 36 years)

Page 86

First higher pay scale on completion of 12 years of service

Second higher pay scale on completion of 24 years of service

Jammu & Kashmir State Power Development Corporation

Skill Up-Gradation exercise for Workmen

Training

Workers working at a higher


grade job

Page 87

3-6 months training


in batches
ITI equivalent
training to be
provided

Assessment
Skill assessment
exercise in batches
will be conducted

Fitment

Fitment of workers
into appropriate
designations based
on assessment
outcomes

Skill up-gradation exercise

The motive of the exercise will be to build and assess capabilities at the worker level and provide
appropriate designations and pay scales to deserving workers

The exercise may be conducted by an external agency to ensure fairness & transparency

The employees will be provided with a certificate of training

The exercise will be repeated for rest of the workers to provide them a chance to upgrade their skills
and move into higher designation & pay scale

Jammu & Kashmir State Power Development Corporation

Career Path for Workmen


Unskilled Workmen

Technical

Helper
Asstt. Storekeeper
Store Helper
Store Khalasi

Ministerial

Peon
Sweeper
Dak Runner
Diman
Chowkidar

Career growth for un-skilled workmen

Page 88

Skilled Workmen

Skill up-gradation to move into the skilled


workmen cadre

Technical

Ministerial

Technician 1

Office Superintendent

Technician 2

Head Assistant

Technician 3

Senior Assistant

Technician 4

Junior Assistant

Career growth for skilled workmen

Eligibility period for movement within grade


could be 8 years

Three level of growth without vacancy


consideration

Promotion will be based on a clearly defined


criteria

Jammu & Kashmir State Power Development Corporation

Page 89

Jammu & Kashmir State Power Development Corporation

Promotion on Absorption for Ministerial Staff


Existing Position

Junior Assistant

Senior Assistant

Head Assistant

Page 90

Years spent in current


designation

Less than 12 years

Offered Position

Junior Assistant/SDC

12 yr +

Senior Assistant

Less than 8 years

Senior Assistant

8 yr+

Head Assistant

Less than 8 years

Head Assistant

8 yr+

Office Superintendent

For lateral movement, years already spent in a current designation will be carried forward

Jammu & Kashmir State Power Development Corporation

Page 91

Jammu & Kashmir State Power Development Corporation

Benefits & Allowances

How employees can join JKSPDC after taking VRS

Employees may take Voluntary Retirement from parent department in accordance with the provisions of

the JKCSR.
Parent department may pay all terminal benefits due to service rendered.
Employees join JKSPDC afresh and can be covered by EPF/NPS

Page 92

as the case may be.

Jammu & Kashmir State Power Development Corporation

Proposed Benefits & Allowances: JKSPDC


Benefit/ Allowance

Details

Project Allowance

Project Allowance will be given to employees based on Hard and Soft Locations for Projects & Plants
Projects
Hard Location- 20% of Basic Pay
Soft Location- 15% of Basic Pay
Plants
Hard Location- 10% of Basic Pay
Soft Location- 7% of Basic Pay
Hard and Soft Locations will be notified by JKSPDC from time to time

House Rent
Allowance

Employee to be given an option to keep the family at hometown and the HRA to be provided of that location
Bachelor Accommodation to be provided rent free at project site

A certain defined percentage will be decided by JKPSDC for calculating Performance Related Bonus.
Maximum of 5% of the PBT is the government guidelines. This defined percentage will be used to calculate
Performance Related Bonus corpus.
Out of this PRB Corpus:
Performance Related
a) 50% of the PRB will be given to the employees of the operational Plants where the capacity index
Bonus
is equal to or more than 85%
b) 30% of the PRB will be given to the employees working in the Projects which have achieved the
milestones in the year
c) 20% of the PRB will be given to other employees of the Corporate/Regional offices
For lateral movement, years already spent in a current designation will be carried forward
Health & Accident
All employees to be covered under Group Accident Insurance Scheme
Insurance
All employees to be covered under Hospitalization Insurance Cover Empanelled Hospitals upto Rs 1 Lakh
Facilities

Entertainment and recreational facilities to be provided at each location

Extension of Service

For good performing employees, an employee may be retained in service for two years beyond the age of
superannuation to be evaluated through an objective and transparent evaluation system.

Government rules as applicable for deputation will be followed. Employees on deputation to JKSPDC shall, however, be governed by
other corporation related allowances.
Page 93

Jammu & Kashmir State Power Development Corporation

INTENTIONALLY LEFT BLANK

Page 94

For lateral movement, years already spent in a current designation will be carried forward

Jammu & Kashmir State Power Development Corporation

Thank You

Enst & Young

Private Limited, India

The information in this presentation pack is confidential and contains proprietary information of EY. It
should not be provided to anyone other that the intended recipients without our written consent. Anyone
who receives a copy of this presentation pack other than in the context of our oral presentation/
communication should note that we do not have any responsibility to anyone other than our client in
respect of the information contained in this document.

Page 95

Jammu & Kashmir State Power Development Corporation

You might also like