ESTUDIO DEL EMBALSE AZAFRANCUCHO


DEPARTAMENTO AYACUCHO, PROVINCIAS HUAMANGA - HUANTA, DISTRITOS
HUAMANGUILLA, IGUAIN (MACACHACRA)

TOMO II

DISEO,COSTOS Y PRESUPUESTO

E
N01
A9H8
II
Lima, Diciembre 2002

%UO-P^(^

z 1 t C ^

'-erlerici)
r;90:
hii;

I t

"aisliL

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1
]

I
1

liPII

MINISTERIO DE AGRICULTURA

INRENA
Biblioteca

INSTITUTO NACIONAL DE RECURSOS NATURALES


- INRENA-

PERSONAL DIRECTIVO

Ing. Matas Prieto Cell

Jefe del INRENA

Ing. Jos Perea Cceres

Sub Jefe del INRENA

Ing. Roque Fernndez Gutirrez

Director General de la Oficina de


Informacin
de
Recursos
Naturales

PERSONAL PARTICIPANTE

ing. Justo Salcedo Baquerizo

Especialista en Recursos Hdricos

Ing. Demetrio Noa Pacheco

Especialista
Geotecnia

Ing. Manuel Montoya Mendoza

Especialista en Geoelctrica

Ing. Mara Caro Ramos

Especialista ^.i L/iseo Hidrulicu

Tc. Manuel Chuln

Tcnico en Topografa

Tc. Alejandro Loayza Ramos

Tcnico PAD

en

Geologa

CAPITULO III
DISEO DEL DIQUE AZAFRANCUCHO

Pg.
3.1.0 Introduccin
3.2.0 Dique
3.2.1 Dentelln
3.2.2 Tapete impermeable
3.2.3 Ncleo
3.2.4 Espaldones
3.2.5 Rip Rap
3.2.6 Filtro
3.2.7 Drenes
3.3.0 Estructuras conexas
3.3.1 Toma y conducto de descarga
A." Toma
B.- Conducto de descarga
C - Poza amortiguadora
3.3.2 Aliviadero de excedencias
A.- Vertedero
B.- Canal aliviadero
C - Poza amortiguadora
3.4.0 Camino de acceso
3.5.0 Caseta de control y guardiana
3.6.0 Consideraciones y criterios de diseo
3.6.1 Diseos hidrulicos
3.6.2 Diseos estructurales
3.7.0 Operacin y mantenimiento
3.7.1 Operacin
3.7.2 Mantenimiento
3.8.0 Conclusiones y Recomendaciones
3.8.1 Conclusiones
3.8.2 Recomendaciones

APNDICES
1.0 Anlisis de filtraciones
2.0 Anlisis de Estabilidades
ANEXOS
1.0
2.0
3.0
4.0
5.0
6.0

Clculos Justificatorios
Filtracin por el cuerpo y la cimentacin, seccin principal
Filtracin por el cuerpo y la cimentacin, lado Izquierdo
Filtracin por el cuerpo y la cimentacin, lado derecho
Estabilidad de taludes
Relacin de pianos

CAPITULO III
DISEO DEL DIQUE AZAFRANCUCHO

3.1.0 INTRODUCCIN
El Dique Azafrancucho esta emplazada en el ro del mismo
nombre, sobre la cota de 3962.35 m.s.n.m. lecho del ro y cota de
corona de 3992.35 m.s.n.m, diseada para almacenar un volumen
total de 6.168 MMC, de los cuales el volumen muerto ser 0.140
MMC y el volumen de conservacin en 6.028 MMC
El cuerpo del dique es de seccin compuesta diseado para ser
construido con los materiales de la zona.
3.2.0 DIQUE AZAFRANCUCHO
La estructura est conformada segn los planos Nro.
:por un
dentelln, un tapete impermeable aguas arriba de la presa,
ncleo, espaldones, hp rap, drenes, filtros y una transicin.
El Dique tiene las siguientes dimensiones: altura de 30.00 m en su
seccin mxima, 7,00 m de ancho en la corona, longitud de
329.50 m. y est confinada en ambas mrgenes del ro.
El nivel de agua mxima del embalse (NAME) es de 3990.95
m.s.n.m.
El nivel de agua mxima ordinaria (AMO) es de 3990.35
m.s.n.m.
El nivel de aguas mnimas (NAMI) es de 3975.35 m.s.n.m.
El bordo libre mximo es de 2.00 m y el mnimo es de 1.40 m
La cota de corona es de 3992.35 m.s.n.m.
3.2.1 Dentelln
Por ser la cimentacin un material permeable se ha considerado
un dentelln de seccin trapezoidal con 6.00 m de ancho en la
base, talud 1:1, profundidad variable hasta 30.00 m la mxima. El
material para el dentelln ser de grava arcillosa (GC) y/o arcilla
inorgnica (CL) y se construir en toda la longitud tal como se
indica en el plano respectivo

3.2.2 Tapete impermeable


Para garantizar la estanqueidad del embalse y evitar las prdidas
excesivas del agua por filtracin se ha considerado un tapete
impermeable en 120 m de longitud, ancho de 151.80 m, ubicado
aguas arriba del dique, zona estimada como permeable.
El tapete ser de material predominantemente arcilloso con 0.20
m. De espesor, una capa de geomembrana con 1.50 mm de
espesor, otra capa de geotextil para amortiguamiento y proteccin
de Polipropileno No Tejido y una capa Geoweb de 100 mm
rellenado con material suelo-cemento en proporcin 4:1, para
optimizar de sta manera la impermeabilidad del tapete
3.2.3 Ncleo
Es la zona impermeable del dique, el material a emplearse ser de
grava arcillosa (GC) y/o arcilla inorgnica dimensiones son 4.00 m
de ancho en la corona, taludes 0.75:1 y 1:1 aguas arriba y aguas
abajo respectivamente, en una altura variable y unida al dentelln
y al tapete impermeable
3.2.4 Espaldones
Los espaldones constituyen la parte permeable en el cuerpo del
dique, y son de mucha ayuda para la estabilidad de la estructura.
El material del espaldn ser de enrocado (grava bien graduada)
con taludes de 3:1 y de 2.5:1 aguas arriba y aguas abajo
respectivamente.
3.2.5 Rip Rap
Viene a ser una estructura de proteccin contra el oleaje mediante
el enrocado, ubicado en el talud aguas arriba de la presa
3.2.6 Filtro
El filtro consta de capas de material permeable (arena, grava) de
2.00 m de espesor, que se ubica entre el ncleo y el espaldn
ubicado en el talud aguas abajo de la presa, ver planos de
secciones transversales de la presa, su funcin ser el de permitir
el drenaje, para evitar que al mismo tiempo ocurra el movimiento
de las partculas del suelo debido a la circulacin del agua a
presin.

3.2.7 Drenes
El dren es de material permeable (arena, grava) con 2.00 m de
espesor que ser colocado entre el material de cimentacin y la
zona permeable del talud aguas abajo de la presa, su funcin es
permitir el drenaje, para evitar que ocurra al mismo tiempo, el
movimiento de las partculas del suelo debido a la circulacin del
agua a presin.

3.0 ESTRUCTURAS CONEXAS


3.1 TOMA Y CONDUCTO DE DESCARGA
A.- Toma
La estructura de captacin est diseada para un caudal de 1.00
mS/seg., consta de una caja de concreto armado f c=210 Kg./cm2
con una 1.50 m de longitud, 1.50 m de ancho, 1.85 m de altura y
0.20 m de espesor en muros y losas, lleva una rejilla de 1.50 m x
1.50 m con platinas de VA X 1 "espaciadas a 0.10 m., esta caja de
concreto ser unida a la tubera de descarga mediante una
transicin vertical.
B.- Tubera de descarga
La tubera de descarga est diseada para el trabajo a presin,
sus dimensiones son 0.60 m de dimetro interior, l.lOm de
dimetro exterior con una, longitud de 174.50 m, y pendiente s =
0.023, apoyada sobre una losa de concreto, cada 5.00 m la
tubera tiene una viga collar con 0.30 m de ancho, esta estructura
ser de concreto armado f c=210 Kg./cm2, ver plano Nro: ....
En la tubera se ha colocado dos vlvulas, una es la vlvula de
compuerta de 16" ubicada en el ncleo de la presa a la cual se
acceder mediante una poza con 2.00 m de dimetro, y otra
vlvula para regulacin de 16" ubicada aguas abajo del dique
inmediatamente antes de la poza disipadora.
C - Poza disipadora
La poza disipadora es del tipo impacto, es de una caja con 4.80 m
de longitud por 3.60 m de ancho y una altura de 2.90 m, con
muros y losa con 0.30 m de espesor, tiene un bafle con 1.30 m de
altura, 3.60 m de longitud y 0.20 m de espesor, su construccin
ser de concreto armado fc=210 Kg./cm2

3.2.0 ALIVIADERO DE EXCEDENCIAS


3.2.1 Vertedero
Esta estructura esta ubicada en la margen derecha del dique,
diseada para una capacidad mxima de evacuacin hasta de 25
m3/seg., con una carga de 0.60 m, con la forma del tipo pico de
pato, tendr una longitud de 27 m, una seccin transversal de
ancho variable, con taludes 0.5:1, la losa ser anclada al piso por
medio de un dentelln de seccin trapezoidal de ancho en la base
0.30 m , hasta una profundidad 1.50m , el control se realiza
mediante la cresta tipo cimacio sin compuerta, los muros y losa
son 0.30 m de espesor y empalmar con el canal de excedencias,
el cual tendr la misma capacidad que la estructura del aliviadero.
3.2.2 Canal aliviadero
El canal de excedencias diseado tiene una capacidad mxima de
25 m3/seg. una longitud de 305.00 m, con tres tipos de seccin
transversal los que se describen a continuacin:
Seccin tipo I. - Tiene una longitud de 105.00 m pendiente s =
0.0025, talud 0.5:1, ancho de base 4.00 m, altura de 1.80 m, y
mediante una transicin horizontal de 5.00 m de longitud
empalmar con la seccin del tipo II
Seccin tipo II. - Su longitud es de 100.00 m, pendiente s = 0.24,
talud vertical, ancho de base 4.00 m, altura 1.20m, este tramo
ser con pendiente ms pronunciada por lo que necesita de una
poza amortiguadora.
3.2.3 Poza amortiguadora
La transicin a la poza amortiguadora es una curva vertical en
8.62 m de longitud y 3.85 m de desnivel, vara horizontalmente
de 4.00 m a 6.00 m de ancho.
Mediante un tramo pronunciado con talud 2:1 se conecta la
trayectoria con la poza disipadora, esta estructura tiene una
longitud de 17.90 m, por 6.00 m. de ancho y 4.50 m. de altura
Los muros de la poza son de seccin trapezoidal con 0.60 m de
ancho en la corona, 2.30 m de ancho en la base, 4.50 m de altura
y la losa de piso con 0.50 m de espesor. Las dimensiones y
especificaciones se indican en el plano Nro:....
Esta poza se conecta al canal tipo III por una transicin horizontal
con 5.87 m de longitud.

Seccin tipo III. - Tiene una longitud de 31.00 m pendiente s =


0.002, talud vertical, ancho de base 4.00 m altura de 2.40 m y
entregar el caudal de excedencias a la quebrada Azafrancucho.
El canal aliviadero llevar bermas de 0.50 m. y 1.00 m en la
margen derecha e izquierda respectivamente
Esta estructura del aliviadero y del canal de excedencias sern
de concreto ciclpeo f c = 175 Kg/cm2. + 30% PM

3.4.0 CAMINO DE ACCESO


El camino de acceso tiene una longitud de 4+210 Km. de
longitud, 4.00 m de ancho, lleva una cuneta de 0.50 m de ancho
y 0.30 m de profundidad, talud de corte variable, de acuerdo al
tipo de terreno, Este camino de acceso une los embalses
Yanacocha con Azafrancucho, y el desarrollo se ha realizado
teniendo en cuenta los criterios de pendiente mxima, radios
mnimos etc.
La quebrada Yanacocha cruzar al camino por medio de un
badn tal como se indica en el plano respectivo, ver planos
Nro:...

3.5.0 CASETA DE CONTROL Y GUARDIANIA


La caseta de control y guardiana ser diseada por el
Contratista en la etapa de obra, de tal manera que pueda
proporcionar confort y abrigo a las personas que realicen la
labor de inspeccin, vigilancia y control del embalse

36.0 CONSIDERACIONES Y CRITERIOS DE DISEO


3.6.1 Diseos hidrulicos
Para el diseo del dique se ha considerado un coeficiente de
permeabilidad conservador para los tramos que el estudio geoelctrico indica una menor resistividad
Por efectos constmctivos, se eligi el dentelln de seccin
trapezoidal
El cuerpo de la presa se ha diseado con material de la zona.
Se ha disminuido la permeabilidad del vaso incluyendo un tapete
impermeable de arcilla, geomembrana, geotextil y/o Geoweb

rellenado con material suelo - cemento para proteger la


geomembrana y geotextll del vandalismo
La tubera trabajar a presin, y con carga hidrosttica
El aliviadero trabajar libremente y tendr una capacidad para la
mxima avenida en un perodo de retorno de 50 aos
El canal aliviadero se adeca a la topografa de la zona en el
tramo de pendiente fuerte, en los tramos con pendiente suave se
ha diseado para una mxima eficiencici
Se ha evitado el diseo de transiciones largas en el aliviadero
El kilometraje de la presa s refonnul en gabinete por lo que en
plano se indica dos progresivas, una de campo y otra de
gabinete.
En el camino de acceso se vari el trazo en gabinete en la
progresiva Km. 3+820
3.6.2 Diseos estructurales
Los parmetros para el diseo se han tomado en base a los
resultados de los ensayos de laboratorio de mecnica de suelos.
Las normas tcnicas a usarse para las obras civiles sern:
a.- Reglamento Nacional de Construcciones
ITINTEC INDECOPI
ACI (American Concrete Institute)
USBR (US Bureau of Reclamation)
ASTM (American Society for Testing Materials)
AASHO (American Association of state Highway Oficiales)
ISO (International Standard Organization)
b.- Para el equipo electromecnico:
ASTM American Society for Testing Materials)
AWS (American Welding Society)
ISO (International Standard Organization)
NEC (National Electric Code)
Para el diseo de las estructuras se ha utilizado el mtodo
elstico y se han analizado las condiciones de estabilidad de
acuerdo a las cargas hidrulicas, peso propio, sobrecargas,
empuje del terreno, subpresin, sismo, etc. Ver apndice Nro....
Se han analizado las estructuras con agua y sin agua, siendo el
caso mas desfavorable cuando estn vacas, en el caso de la
presa se ha considerado las siguientes condiciones:
1.- Talud aguas arriba, construccin final sin sismo
2.- Talud aguas arriba, construccin final con sismo
3.- Talud aguas abajo, construccin final sin sismo
4.- Talud aguas abajo, construccin final con sismo

5.- Talud aguas arriba, desembalse rpido sin sismo


6.- Talud aguas arriba, desembalse rpido con sismo
7.- Talud aguas abajo, infiltracin constante sin sismo
8.- Talud aguas abajo, infiltracin constante con sismo
Ver anexos 02 al 04
3.7.0 OPERACIN Y MANTENIMIENTO
3.7.1 Operacin
Durante la fase de operacin se deber hacer descender el nivel
del embalse al recibir el aviso de tormentas para dejar espacio al
agua de las avenidas.
Las instrucciones para la operacin del equipo mecnico deben
seguirse fielmente para evitar daos a cualquiera de las
instalaciones por mala operacin.
3.7.2 Mantenimiento
Se realizar la conservacin de rutina de los taludes del
terrapln y de la corona, sin embargo cualquier condicin
anormal que pueda afectar la seguridad de la presa debe
reportarse rpidamente al igual que la necesidad anormal de
mantenimiento.
-

Se inspeccionar regularmente la presa para comprobar que


no se han presentado condiciones desfavorables.
Durante I llenado rpido del vaso, el talud de aguas abajo
del terrapln ^ ~ la cimentacin de! terrapln deben
inspeccionarse cuidadosamente a intervalos frecuentes,
buscando indicaciones de grietas, deslizamientos, tramos
licuados, asentamientos, defectos en la proteccin de los
taludes, filtraciones zonas lodosas producidas por las
filtraciones del vaso.
El talud mojado tambin tiene que inspeccionarse
cuidadosamente despus de los vientos sostenidos de alta
velocidad y cuando se hace descender el nivel del agua en el
vaso, para descubrir grietas, derrumbes, material licuado,
asentamiento o daos en la proteccin del talud, como el
dislocamiento del enrocado u otros signos serios de erosin.
Durante los periodos en que el agua del vaso se encuentra
en un nivel bajo, la ladera expuesta y el piso del vaso deben
examinarse para ver si se han formado hundimientos
agujeros producidos por las filtraciones.

En el perodo en que se mantiene el nivel del agua elevado


por un largo tiempo se debe poner especial atencin a la
corona de la presa y a los taludes aguas arriba y de aguas
abajo para comprobar que no se haya producido
anormalidades en ellas.
Se estimular y proteger la vegetacin en los taludes del
vaso para evitar la erosin y licuacin de las mrgenes,
sedimentacin y para el embellecimiento de la estructura.

3.8.0 CONCLUSIONES Y RECOMENDACIONES


3.8.1 Conclusiones
-

La capacidad de almacenamiento de esta represa


abastecer de agua a las zonas de cultivo del sector de
Macachacra.
El caudal de avenida de diseo (Aliviadero de excedencias)
no guarda relacin con el rea de cuenca.
Por los anlisis de filtraciones se concluye que el tapete
impermeable y el dentelln en la zona de alta
permeabilidad presentan un comportamiento adecuado en
la cimentacin.
El porcentaje de prdida de agua (7.5%) por la cimentacin
no es el ptimo, se puede mejorar con el anlisis de
permeabilidad.
No existe riesgo de tubificacin.

Las propiedades fsicas de los materiales para la construccin se


han tomado de los ensayos de mecnica de suelos realizado para
la Presa Yanacocha, por tener caractersticas similares los suelos
de ambos proyectos.
Por los anlisis de estabilidad de taludes la presa es estable para
las diferentes condiciones; embalse vaco, desembalse rpido e
infiltracin constante con sismo y sin sismo.
3.8.2
-

Recomendaciones
Se debe actualizar el estudio hidrolgico, para determinar si
es posible aumentar la capacidad del embalse elevando la
altura, y de esta manera se puede abastecer del recurso
hdrico al sector de Macachacra, cumpliendo con la demanda
de agua propuesta en el proyecto.

Verificar el caudal de la avenida mxima del proyecto para un


perodo de retorno de 50 aos
Se debe realizar los estudios de permeabilidad en la zona de
cierre en la fase de obra para obtener el valor exacto de la
prdida de agua por la cimentacin aplicando presiones de O,
1.0, 1.5, 3.0, 5.0, 3.0, 1.5, 1.0, y O Kg./cm2
Es conveniente realizar los ensayos de mecnica de suelos de
la cimentacin en al fase de obra, para verificar los datos
asumidos en el diseo
La ejecucin del proyecto debe ceirse a estas
recomendaciones, a lo estipulado en planos, especificaciones
tcnicas y /o lo indicado por el Supervisor.

APNDICE 01

ANLISIS DE FILTRACIONES
NDICE

Contenido

Pg.

1.0 Introduccin

01

2.0 Materiales de la presa y la cimentacin

01

3.0 Anlisis de filtracin

02

4.0 Anlisis de resultados

02

4.1

5.0

A travs del cuerpo y la cimentacin de la seccin principal

02

4.2 A travs del cuerpo y la cimentacin del lado izquierdo

02

4.3 A travs del cuerpo y la cimentacin del lado derecho

03

Conclusiones

03

ANLISIS DE FILTRACIONES
PRESA AZAFRANCUCHO

1.0

INTRODUCCIN
El diseo de la presa Azafrancucho con ncleo grava arcilloso (GC) o arcilla
inorgnica (CL) y espaldones de enrocado considera una altura total de 30 metros
y una altura de embalse de 28.0 metros. La presa Azafrancucho se implanta
sobre suelos conformados por gravas limosas (GM) y limoarcillosas (MC). Debido
a los valores altos de permeabilidad del subsuelo se realizaron anlisis de
filtraciones para evaluar las prdidas por la cimentacin.
En el presente estudio se realiza el anlisis de filtraciones de la presa
Azafrancucho aplicando el Mtodo de Elementos Finitos mediante el uso del
programa FL0W-3D de la Pontificia Universidad Catlica de Rio de Janeiro,
Brasil. El programa FL0W-3D realiza el anlisis de filtracin en medios saturados
y no saturado, en rgimen de flujo transiente y permanente para cualquier
condicin de borde o frontera.
Se han realizado 03 anlisis de flujo de la Presa Azafrancucho considerando la
condicin de flujo permanente:
A travs del Cuerpo de la Presa y la Cimentacin de la Seccin Principal con
una altura de 30 m. considerando un tapete impermeable de 120m. de longitud
y un dentelln de 30 m. de profundidad.
A travs del Cuerpo de la Presa y la Cimentacin de la Seccin Izquierda con
una altura de 20 m. considerando un tapete impermeable de 120 m. de
longitud y un dentelln de 20 m. de profundidad.
A travs del Cuerpo de la Presa y la Cimentacin de la Seccin Derecha con
una altura de 20 m.

2. O MATERIALES DE LA PRESA Y LA CIMENTACIN


Las caractersticas de los materiales del dique y suelos de cimentacin as como
los valores de conductividad hidrulica son:
Ncleo de la Presa
de 1.0x10'^ cm/seg.
Espaldones

: Grava Arcillosa (GC), compactado con una permeabilidad

Enrocado muy permeable, compactado con una permeabilidad


de 1 X 1 0 - 4 cm/seg.

Filtro Dren

Arena Pobremente Gradada (SP) con una permeabilidad de


1.0x10-3 cm/seg.

Tapete Impermeable :

Cimentacin

Tapete arcilloso con Geomembrana con una


permeabilidad de 1.0x10-20 cm/seg.

: Grava Limosa (GM) con una permeabilidad variable de 1.0x102 a 1.0x10-4 cm/seg.

3.0. ANLISIS DE FILTRACIN


El anlisis de filtracin realizado con el Programa FL0W-3D considera la condicin
real de Flujo Transiente desde el inicio de la saturacin hasta llegar a la condicin
de Flujo en Rgimen Permanente.
Para la elaboracin de la Malla de Elementos Finitos se utiliz el Pre-Procesador
MTOOL. Los resultados de los anlisis se presentan de manera grfica utilizando el
Programa de Interpolacin y Curvas de Nivel SURFER.
Para cada anlisis realizado se presenta la distribucin de los materiales y la
malla de elementos finitos utilizados. Tambin se presentan la grfica de la
Distribucin de las Presiones de Poro o Cargas Hidrulicas de Presin expresadas
en ton/m^ o metros de columna de agua, respectivamente.
Por ltimo se anexa el Archivo de Salida que contiene informacin de flujo
relacionado a los Nodos de los Elementos Finitos utilizados como son las Cargas
Hidrulicas de Presin (m) y las Cargas Hidrulicas Totales (m) asociado a cada
nodo. El archivo de salida tambin contiene la informacin de flujo relacionado a los
elementos como son las Veloeidades de Flujo (m/seg) y los Gradientes en cada
elemento.

4.0 ANLISIS DE RESULTADOS


4.1 A TRAVS DEL CUERPO Y LA CIMENTACIN DE LA SECCIN PRINCIPAL
Durante los anlisis no se aprecia flujo significativo a travs del cuerpo de la
presa, se presenta solamente por la cimentacin, debido a las buenas
caractersticas de la grava arcillosas (GC) que conforma el cuerpo de la presa.
La Velocidad de flujo por la cimentacin (correspondiente al Elemento Finito No.
4) es de 0.254x10'^ m/seg. con un Gradiente Hidrulico del orden de 0.507
unidades.
La prdida de caudal estimado por la cimentacin es del orden de 0,00381 m^/seg
considerando un tirante de 60 m y un ancho de cimentacin de 25 m. As el

caudal perdido por da es de 330 m^ y en una estacin de 100 das alcanza la


cantidad de 33,000 m i
En el Anexo 01 se presentan la geometra de la seccin analijiada, los valores de
permeabilidad utilizados y los resultados de los anlisis de fii^cin por el cuerpo
y la cimentacin de la presa de la seccin principal.

4.2 A TRAVS DEL CUERPO Y LA CIMENTACIN DEL LADO IZQUIERDO


No se aprecia el flujo significativo a travs del cuerpo de la presa, el flujo se
presenta solamente por la cimentacin, debido a las buenas caractersticas de la
grava arcillosas que conforma el cuerpo de la presa.
La Velocidad de flujo por la cimentacin (correspondiente al Elemento Finito No.
2) es de 0.251x10"^ m/seg., con un Gradiente Hidrulico del orden de 0.251
unidades.
La prdida estimada de caudal por la cimentacin es del orden de 0,0439m^/seg
considerando un tirante de 50 m y un ancho de cimentacin de 40m. As el caudal
perdido por da es de 4,300 m^ y en una estacin de 100 das alcanza la cantidad
de 430,000 m^
En el Anexo 02 se presenta la geometra de la seccin analizada, los valores de
permeabilidad utilizados y los resultados de los anlisis de filtracin por el cuerpo
y la cimentacin de la presa de la seccin izquierda.

4.3 A TRAVS DEL CUERPO Y LA CIMENTACIN DEL LADO DERECHO


No se aprecia flujo significativo a travs del cuerpo de la presa, el flujo se
presenta solamente por la cimentacin, debido a las buenas caractersticas de la
grava arcillosas (CG) que confonna el cuerpo de la presa.
La Velocidad de flujo por la cimentacin (correspondiente al Elemento Finito No.
2) es de 0.162x10'^ m/seg. con un Gradiente Hidrulico del orden de 0.584
unidades.
La prdida estimada de caudal por la
cimentacin es del orden de
0,0000972mVseg considerando un tirante de 50 m y un ancho de cimentacin de
120 m. As el caudal perdido por da es de 8.4 m^ y en una estacin de 100 d\as
alcanza la cantidad de 800 m^
En el Anexo 03 se presenta la geometra de la seccin analizada, los valores de
permeabilidad utilizados y los resultados de los anlisis de filtracin por el cuerpo
y la cimentacin de la presa de la seccin derecha.

5. CONCLUSIONES
Las simulaciones de flujo de la presa Azafrancucho fueron realizados exitosamente
los anlisis de filtraciones numricas utilizando soluciones numricas basados en el
mtodo de los elementos finitos.
Los resultados del anlisis de filtracin indican que la presa Azafrancucho no
presenta condiciones de poros significativas en el cuerpo de la presa debido a las
caractersticas de baja permeabilidad de la grava arcillosa (CL)
La cimentacin de la presa Azafrancucho conformado por suelos granulares de
regular permeabilidad presenta un comportamiento adecuado cuando se incorpora
un tapete impermeable y un dentelln central.
Los caudales o prdidas de agua por la cimentacin, son significativos, alcanzando
una cantidad de 464,000 m^ durante una estacin de 100 das. La prdida de caudal
por la cimentacin alcanza un porcentaje de 7.3% del volumen de agua
almacenada.
Los niveles de gradientes hidrulicos son menores, lo que resulta en fuerzas de
percolacin no significativas, evitndose algn riesgo de erosin interna o problema
de tubificacin tanto en el cuerpo de la presa como en la cimentacin.

ANEXOS

Clculos Justifcatorios
Filtraciones por el Cuerpo y la Cimentacin, Seccin Principal
Filtracin por el Cuerpo y la Cimentacin , Lado Izquierdo
Filtracin por el Cuerpo y la Cimentacin, Lado Derecho
Estabilidad de Taludes

ANEXO 1
CLCULOS JUSTIFICATIVOS
NDICE

1.0

PRESA A Z A F R A N C U C H O

2.0

CARACTERSTICAS D E LA PRESA

3.0

ANLISIS DE REDES DE FLUJO

3.1

A travs Del Cuerpo De La Presa Seccin Principal

3.2

A Travs Del Cuerpo De La Presa Y Cimentacin Del Lado Izquierdo

3.3

A Travs Del Cuerpo De La Presa Y Cimentacin Del Lado Derecho

4.0

ESTABILIDAD DE TALUDES

5.0

CALCULO DE ACENTAIVIIENTO

6.0

TOMA Y CONDUCTO DE DESCARGA


6.1

A. Calculo de Prdidas

7.0

CALCULO DEL COEFICIENTE DE PERDIDA TOTAL

8.0

CALCULO DE POZA AMORTIGUADORA

9.0

ALIVADERO
9.1

Poza Aliviadero

9.2

Trayectoria Rpida

9.3

Calculo de Rpida

10.06 ESTRUCTURALES
10.1 Presa
10.2 Tubera
10.3 Poza de Impacto
10.4 Calculo De Bafle
10.5 Calculo Poza de Maniobra de Vlvula
10.6 Poza Disipadora del Aliviadero

TcticA

LCIA,

a-ytiij

C^

nntti^r^

Ld

,e\

"

cu-

' '-' /

,XA? ^h

../

l'c-('a-)ucr,u, cil^'-lKo

t>^'

, ic lutria

^t'^^

- ^'"^

f'^

fs'

/jd

y/rO

4H*

;4zo
If 3^
Z^- 2 /
39-,? o

I
J

Vr. / o
Z)F^

. I

'

'

)- -

I
I

'

L
I

* ' .,s.

SJ^fWwi*

m.

TOMA

4V

O^VCJXJ

^-^xJt^

'
>

-l(

'U^UMr^ i fjliC-i^l^PL^ e^~-VlZcyi^UK^

1 , 1

fA'dA}^
^nrU^

/.'Z.^

2 . ZJ" - <D.^2.'
^

^^7'

.?

Wyu^yU'-^'^UL
-r

1 i I
fuy^e/tJ^a IJ^c^^iJ-f

^k./zj2^i^

/ ^ i =:

2SZ.o3/Ujt^

, ^

/^c.

LO J>7

/7 J l 3 , ^ I >

X,. ^ /^A^^^ji^ J(M-^ ^axrU^.2^C4'^^


/^Vn/^
/^c^^.A-'-yi-i.^.^i^

So

^^

f i#

'i'f^k

1^*,

k,* i '

^
*M

^^^
,

C/koOCo

^-^^ COBT^lOIBAJTE.

^BM^K^JP

i- )

JieSlLL

l^i^JMh

^>e R&^^^

^~12Z
D^ZSZ
^.ZIZ
-Z2Z

TC>TU,
p&S>IOf

o.o\Z

d^JK-L

A- /. o

LOO

euTiUb/^

^ 0. lo

>> 0 1 i

0 - / 0 0

Loo
0-/00

0A2C>

o.so
i(DtfS"0

az22

ir CO

fdicao

4 //j

OAZ,

aizc
0A~^^

5 , 0 >

-l-t^

ZL

l%Oq$

a>. "i -2
^.1/3
5. 2^2-

[jj

/<2e LdoJ.
L'

H^XAj _-

/''i-

::: 3,Q>>

/, S^O

f^,

Ou (oO

z= oo y <^ no
12 "Z-^

/J^

::z / - i ^

' -E- u; :^ /> ^>r


^^t)

^rfm/Q^amto

^
w

dU^p^c<>\.^tuJy^ r: -^

tJ jr

-.

<2p rr<D^ "ZJ

tjD

&a^

: jT

'

"i

aO/J

- Do 4^[X"

T),/4-

a)^3>

J.r'

/*2-J - o ^ ? 0

(D,<&0

y{^

12. X JT O^ / 2 i^

/i^ -

<D 2 r l ? i

><: -

^^c -

"H3"

, '

)< / i T

^0 />

/*?

H ^>^) ; ' h.'o


^^

|,2^

2.V^

1 I I

'

7^
^

O
o

:2,o ' 9 . p i
-r ^^^i,
I

y.^
^o
/^3 2 /^^^

6^o
J,o
^.^2 Z.S3

-^,o
?MY

^,<iZ
?./r-

""1I^
, *f'

'Sf

^ , - o. 2 3 2 ' /?

^ \ - 3^o^ 4- 0123Z ~hM,^

f/^

[S/iLCCo

'^37 Mf^/e^

i
!

39^6u4?

{/^t/trete:

su/'?.haB

STEADY-STATE WATER-SURFACE PROFDLE


Trapezoidal Channel
Mircoles, Diciembre 4, 2002
SI Units
Length = 100
Discharge = 25
Width = 4
Manning's n = .015
Distance
0.000
0.007
0.028
0.065
0.120
0.195
0.292
0.414
0.565
0.748
0.968
1.230
1.542
1.910
2.344
2.855
3.459
4.173
5.020
6.030
7.242
8.708
10.501
12.722
15.526
19.150
23.998
30.824
41.310
60.703
100.000

Depth
1.585
1.546
1.506
1.467
1.428
1.389
1.349
1.310
1.271
1.231
1.192
1.153
1.114
1.074
1.035
0.996
.956
0.917
0.878
0.839
0.799
0.760
0.721
0.682
0.642
0.603
0.564
0.524
0.485
0.446
0.434

Normal Depth = 0.404


XSec Area == 1.617
Critical Depth = 1.585
XSecArea == 6.341
Control Depth = 1.585
Flow Type = supercritical
Invert Slope = 23 Side S l ( ^ == 0
Energy
2.378
2.379
2.384
2.392
2.405
2.422
2.443
2.471
2.504
2.545
2.594
2.651
2.720
2.800
2.894
3.004
3.134
3.285
3.462
3.671
3.916
4.208
4.554
4.970
5.471
6.081
6.832
7.767
8.948
10.466
10.989

Area
6.340
6.183
6.026
5.869
5.711
5.554
5.397
5.240
5.083
4.926
4.769
4.612
4.454
4.297
4.140
3.983
3.826
3.669
3.512
3.355
3.197
3.040
2.883
2.726
2.569
2.412
2.255
2.098
1.940
1.783
1.738

Velocily
3.943
4.043
4.149
4.260
4.377
4.501
4.632
4.771
4.918
5.075
5.242
5.421
5.612
5.818
6.038
6.276
6.534
6.814
7.119
7.452
7.819
8.223
8.671
9.171
9.731
10.365
11.088
11.918
12.883
14.018
14.387

Top Width
4.000
4.000
4.000
4.000
4.000
4.0(K)
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000
4.000

Momentum
15.078
15.087
15.116
15.166
15.237
15.331
15.450
15.596
15.769
15.972
16.208
16.479
16.789
17.140
17.537
17.985
18.489
19.055
19.691
20.406
21.211
22.119
23.145
24.309
25.635
27.153
28.903
30.935
33.316
36.137
37.057

Lugar:

canal aliviadero

Proyecto:

Azafrane ucho

Tramo

jm 0+242.97

Revestimiento:

conc. ciclpeo

ttt'.

[ Caudal (Q):

j25

1 m3te

Ancho de sctera (bH


Tllud (Z).

|4
0

1 ffl
1

nudosidad {n):

015

f>endiente (S);

.002

1 i^n>

[esultads
Tirante normal {y);

12.0720 flt

perttnetrd (p):

8.1439

Area hidrulica (/^:

|e 2079 t m

Radio hidrulico (R):

10177 I *n

Espejo de agua (T):

|4.0000 1 m

Velocidad (v|:

3.0165 i I*

Nmero de FrOtide (F):

jo 6691 1

Energa especifica (E):

2.5357 ttt4<|WKfl

Tipo de nujo;

|Subcrtico

Meni Piihcit!
....^.tl.,^,IU,.i^.^li..
t ^<*<^^

Raiia la inqtejrt de l pmit'ftila

'^k^-^i^.
i s^

!|fI!' C ^

'

Lugai

tapida aliviadero

TrariiO

0+221 77

Cirtal (Q):

Tirante (y):

25
23

Proyectot

Azafiancucho
tabuladora,
Ancho de solera (b):

ttt3/$

tirante supercitico

RwiMlltsdci**

Tirante corrugado (y):

3e09G

AKura dt reitt:

3 579G

Prdida de energian el resalto:

Numero de Frottde oo^jtigAdo (F);


y-

01789

Longitud del restlto (ti;

17.90

13 0S66 >^

Men PrTcipal |

mprimif
VI

...f^p.,.....^j.ff

HiiKzd i fni|t!si6rt d ta pantalla

%.'& i r * i

14

5.'

'

'

"i

'-H

lOp/TOSe'/^i^ ^ ^ i k ^ . ^ ^

H^ST^^

-y^^/^J,

61= els'r^iLjr^

ch^=: V><j i^//?7

f^ oftU) Q^
I I I

2^2:^fs/h,

^4

I
i

fq/iTv e :: oio"

^/2OA = 0.4 ^ ^=-csr

-t^''' 'fS,'.

fi

_ A r z?.3.'?:/fi

^ I-i

cJ>a4^Aj [L

^/^

< I-

ji'nAJ

/9
D.'-r

,1.

'i.'l

A//'/'. - c 6?. dJ -

//^^ > # - ^

J^-t -

o.ahzo

y-^tbo X '^'i^-

viC^ c ^ ^ (> ^fi)-'^^ -^^-^

[('>, F ^ ^ ] ^ ^ /A^^/^TO

2.
,2.

-p.-r^-

fi

= <>.rr-7> hot H'^-'^^-^ hI

JV f^^

/*>>' ><" V- 2c
/a ^ l|

/ - Z'

^2^0
D^

^.^<k^

7tT^o^-r3

.,uJ}\^'<-<z.<^.rj^

r**rt^

cf> 'A"),/?u-

V^

'2-

6 So

/Co^ShTKXr

^ 11'^^

4'/x'@ '/^

t
.2>o

f^

\2lsro y^

h^r

^ s r / ^ "2^ >^ (> 2.^0 ^ ^


1

/, 3>r X- 2-rK 1X z v o o -

\
\

^o*
'l<^

/2.
- / ^
1

1 1

HA. -

r^\^
y , z ^ ^^

^ //2-^ ^ ^

^ r LuAre -f (H Are
r^

\H-j-4H^
(Ti :^ X-ooo

/<^ I A}^

^ ' }if]zr\(^

H
3

'^

..iinA-i'

'^'^m . ^

^w^^

E ' ;',r5xo.-r;<A9x^-r

AM

o M>

A-r

Mu
2

-/<O.?.-J

APNDICE 02

ANLISIS DE ESTABILIDAD
NDICE

Contenido

Pg

1. INTRODUCCIN
2. OBJETIVOS
3. PROPIEDADES DE LOS MATERIALES
4. MTODO DE ANLISIS
5. SOFTWARE EMPLEADO PARA EL ANLISIS
6. SECCIONES ANALIZADAS
7. CASOS ANALIZADOS Y FACTORES DE SEGURIDAD MNIMOS
8. RESULTADOS
9. RESUMEN Y CONCLUSIONES DEL ANLISIS

RELACIN DE FIGURAS

1.0

Datos Geomtricos del Talud

2.0

Contornos Mostrando la Variacin Espacial de los Factores de Seguridad


para un Talud

3.0

Dibujo Tridimencional Mostrando la Variacin Espacial de los Factores de


Seguridad para un Talud

1.1

INTRODUCCIN
Se ha realizado el anlisis de estabilidad de taludes de la presa con el fin de poder
establecer la configuracin definitiva de la seccin transversal. Inicialmente, el anlisis
parti de una seccin transversal en funcin a la experiencia anterior, la cual fue
sucesivamente modificada de acuerdo con los resultados que se obtenan. Este anlisis
fue realizado para la seccin mxima de la presa.
Para el clculo de los factores de seguridad al corte se ha empleado el mtodo JAMBU,
basado en la determinacin, mediante el anlisis de equilibrio lmite, de la relacin entre la
resistencia disponible del suelo al corte y el esfuerzo cortante requerido para mantener el
equilibrio lmite a lo largo de superficies que definan un mecanismo potencial de falla.
Utilizando los criterios, hiptesis y modelo matemtico antes indicados, los clculos
relativos al anlisis de estabilidad de taludes se realizaron empleando un programa de
cmputo geotcnico de reconocida confiabilidad (el grupo de programas STABL 4, 4M, 5,
5M, 6 y 6H) lo que posibilita definir, detalladamente una gran variedad de configuraciones
alternativas para obtener una seccin ptima, aceptable tanto desde el punto de vista de la
seguridad como de economa de la obra.
El programa aludido analiza la estabilidad de taludes tomando en cuenta las propiedades
del suelo (cohesin y friccin), las caractersticas geomtricas del talud y las variables
desencadenantes de deslizamiento (nivel de agua).

2.0

OBJETIVOS
El anlisis de estabilidad de taludes tiene por objeto definir las diversas configuraciones de
los taludes (modificando tanto las pendientes como la zonificacin del cuerpo mismo de la
presa) optimizando el diseo de manera tal que los taludes definitivos de los mismos
correspondan a un valor ptimo, desde el punto de vista econmico y de estabilidad para los
estados de carga y condiciones ms desfavorables.

3.0

PROPIEDADES DE LOS MATERIALES


Los parmetros correspondientes a las propiedades de los materiales que componen la
cimentacin y el cuerpo de la presa, requeridos para el anlisis de estabilidad de los
taludes, son los siguientes:
Peso unitario hmedo (yh)
Peso unitario saturado (ysac)
Cohesin efectiva (c')
ngulo de resistencia al corte efectivo {^')
Coeficiente de presin de poros al fin de la construccin (ru)
Los valores de estos parmetros se han seleccionado teniendo en consideracin los
resultados de los diversos ensayos de laboratorio, la evaluacin de las condiciones

geolgicas y geotcnicas de la cinnentacin, as como los valores usados para este fin en
otros proyectos de presas de tierra con alturas, materiales y condiciones de cimentacin
similares a las de este proyecto.
Los cuadros siguientes, presentan un resumen de los parmetros geotcnicos de los
materiales que conforman la cimentacin as como el cuerpo de la presa y con los cuales
se ha hecho el anlisis de estabilidad.

PARMETROS PARA EL ANLISIS DE LA PRESA

MATERIAL

1
2
3
4
5
6

4.0

NCLEO
(material
morrnico arcilloso)
ESPALDN (Grava)
Rip-Rap
FILTRO (grava)
MANTO IMPERMEABLE
CIMENTACIN

Yh

19

20

20
20
17
18
18

21
21
18
19
19

UU
Final de
construccin
C
t)
kg/cm^
0.25
26.7

0
0
0
0.25
0.25

37
38
33
26.7
35

CU
Desembalse
Rpido
c
kg/cm^
()
30.1
0.20
0
0
0
0.20
0.20

37
38
33
30.1
35

]
Infiltracin
Constante
C
kg/cm^
0.17

()
27.9

0
0
0
0.17
0.20

37
38
33
27.9
35

MTODO DE ANLISIS
Para el anlisis de estabilidad de taludes se ha empleado exclusivamente el mtodo
simplificado de JAMBU, debido a que, en general, los valores de los factores de seguridad
obtenidos mediante dicho mtodo para superficies de falla circulares difieren en un 5% a
10% por defecto (es decir, dando un margen conservador de seguridad) de los valores
obtenidos empleando mtodos rigurosos de anlisis (tales como el de SPENCER o el de
MORGENSTERN - PRICE).
Por tanto, para fines prcticos, el mtodo simplificado de
JUMBU es satisfactorio.
El clculo utiliza el mtodo de las dovelas. Este mtodo asume que no hay fuerzas de corte
entre dovelas adyacentes y que la geometra de cada una queda definida por su altura, h,
medida a lo largo de su lnea central, su ancho, Ax, y por las inclinaciones de su base y de
su parte superior, a y p respectivamente.
El mtodo satisface el equilibrio de fuerzas verticales para cada dovela. Por lo tanto, de
acuerdo con el diagrama de cuerpo libre se tiene:

Z F = (AA^' + A/ ) cosa + AS sena - Af (1 - A;,)


(1)
- A/p eos P - AQ cos5 = O
Asimismo, este mtodo satisface el equilibrio de momentos de toda la porcin del talud
susceptible de falla, tomados con respecto al centro de la superficie circular de falla
analizada; por lo tanto:

XM=

^[AW{\-k^)

+ AUp cosp +Agcos6](i?sena)

-^[A7p senP+Agsen6](i?cosa-/2)
-f^[AS](R)
; = 1

+ f^[k,AW](Rcosa-K^)

(2)
=0

/ = 1

En la anterior expresin (2), R es el radio de la superficie circular de falla, h es la altura


promedio de cada dovela y heq es la altura vertical entre el centro de la base y el centroide
de cada dovela.
Por otro lado, considerando que el factor de seguridad es el mismo para todas las dovelas,
la resistencia al corte MOHR - COULOMB movilizada (AS) a lo largo de la base de cada
dovela est dada por:

^ ^ A C + AW^tgi
F
En base a las relaciones anteriores, finalmente se deduce la frmula que permite hallar el
factor de seguridad al deslizamiento, que es la siguiente:

[ A C + AAA'tg(|)]
F = ^^
/=1

/=1

(4)

/=1

en donde:

4 = \AW (1 - /t) + At/p eos P + Ag cos6] (sena)


^2=[A[/p senp+Aesen6](cosa-/z/i?)

(4a)

h
4 = {kf, A r ] (cosa - -^)
y la fuerza normal (AN') es:
(4b)

AN' = -^[A^(l-.J-^^^
- [AW (\-kJ

AC/ eosa + AU^ eosa + AU^ eos p + AQeos5 ]

donde:

m = eosa [1 + -S^L^]
F

(4c)

Las ecuaciones (4), (4a), (4b) y (4c) son las expresiones programadas en el programa
STABL para calcular el factor de seguridad al deslizamiento de superficies de falla
circulares segn el mtodo simplificado de JAMBU.

5.0

SOFTWARE EMPLEADO PARA EL ANLISIS


El programa realiza los anlisis de estabilidad segn equilibrio lmite bidimensional,
calculando el factor de seguridad de un talud con varios estratos emplesHido el mtodo
simplificado de BISHOP o el mtodo modificado de JAMBU. El programa permite analizar
tanto una superficie nica de falla como una gran cantidad de superficie de falla circulares
y no circulares. Para los clculos realizados en el presente estudio, se han considerado
100 y 400 crculos de falla por cada anlisis. De est manera se obtiene el mnimo factor
de seguridad, graficando las superficies de falla con menores factores de seguridad. Este
programa ofrece, entre otras, las siguientes opciones:

Sistemas de suelos tieterogneos

Suelos con caractersticas de resistencia anisotrpicas


Envolvente no lineal de esfuerzos, segn l\/lohr Coulomb
Presiones de poros calculadas de diversas maneras: A partir del coeficiente de presin
de poros ru de una superficie fretica, de una superficie piezomtrica o de una malla de
presiones de poros definida previamente.

Clculo de los factores de seguridad (corregidos) segn el mtodo de JAMBU

Verificacin de errores de entrada de datos


Visualizacin preliminar de la geometra del talud analizado
Archivos independientes de datos de entrada, salida de resultados y grficos, los
cuales pueden ser inicialmente grabados y posteriormente recuperados e impresos.
Anlisis de taludes tanto con pendientes.

Sistema de unidades mtricas o inglesas

Men de ayuda para todas las opciones del programa

IDO

Live Loads
00

Retaining Wall

I I

Possible failure zone


for bearing capacity

Possible failure surfaces


for overall stability

40

20 .

100

X-AXIS (feet)
FIGURA N 01
Datos Geomtricos del Talud

2CX>

1
9

/
100
_2.e

" " " " - ^

^,^2.8

W^r-

^Slope
f.
-100

100

x-ooordtnates ( f e e t )
FIGURA W 02
Contornos mostrando la variacin espacial de los Factores de Seguridad para un Talud.

MMimimFOS

-100

FIGURA N" 03
Dibujo Tri Dimensional mostrando la variacin espacial del tos Factores de Seguridad para un Talud

6.0

SECCIONES ANALIZADAS
Se analiz la estabilidad de los taludes en la seccin mxima del estribo derecho y estribo
izquierdo de la presa.
En base a los sucesivos resultados del anlisis se fueron modificando progresivamente la
configuracin de los taludes hasta finalmente, determinar la seccin transversal definitiva.

7.0

CASOS ANALIZADOS Y FACTORES DE SEGURIDAD MNIMOS


Para cada una de las secciones transversales indicadas en el numeral anterior se ha
analizado la estabilidad de los taludes considerando los siguientes casos crticos que
pueden ocasionar fallas por deslizamiento:
Caso I

Talud aguas arriba


Construccin final

Caso

Talud aguas abajo


Construccin final

Caso I

Talud aguas arriba


Desembalse rpido

Caso IV

Talud aguas abajo


Filtracin constante

Asimismo, se ha verificado la estabilidad de los taludes bajo la accin ssmica (Caso V),
aplicando a los casos anteriores el correspondiente coeficiente ssmico Horizontal de 0,20
g y un coeficiente ssmico vertical de 0.10 g.

El Cuadro siguiente resume ios valores de los factores de seguridad mnimos a ser
satisfechos segn los diferentes casos analizados siguiendo las recomendaciones dadas
por el Comit Internacional de Grandes Presas (ICOLD).
Caso
1
II
III
IV
V

8.0

Talud
Aguas
Aguas
Aguas
Aguas
Aguas
abajo

Descripcin

arriba
abajo
arriba
abajo
arriba y aguas

Construccin final
Construccin final
Desembalse rpido
Filtracin constante
Casos 1, II, III y IV con
sismo 0,20g

Factor de Seguridad
mnimo requerido
1,4
1,4
1,3
1,5
1,0

RESULTADOS
A continuacin se discuten los resultados de los anlisis efectuados: esttico y ssmico
pseudo esttico.

A.

Anlisis esttico
Los factores de seguridad calculados del anlisis esttico, correspondientes a la seccin
mxima de los estribos derecho e izquierdo, respectivamente, de acuerdo a los casos
crticos considerados (Casos 1 al IV).
El cuadro siguiente resume los factores de seguridad determinados:

Presa
Azafrancucho

Construccin
final
Aguas Arriba
2.33

Construccin
final
Aguas Abajo
1.95

Desembalse
rpido
Aguas Arriba
2.07

Filtracin
Constante
Aguas Abajo
1.86

Asimismo, en los grficos adjuntos se muestran ios crculos de falla crticos y sus factores
de seguridad asociados.
Se observa que los valores de los factores de seguridad se encuentran cercanos al valor de
2,0. Estos valores son bastante superiores a los mnimos requeridos, lo que indica que el
diseo de los taludes est controlado por los resultados del anlisis pseudoesttico; es
decir, que la carga ssmica (a = 0.20 g en la horizontal y 0.10 g en la vertical) originar tas
condiciones ms desfavorables.
En resumen, se puede decir que los taludes adoptados satisfacen muy holgadamente los
requisitos mnimos de seguridad recomendados por el ICOLD.

Anlisis ssmico
Los factores de seguridad determinados corresponden a la seccin mxima, estribo derecho
y estribo izquierdo, respectivamente, segn los casos crticos con carga ssmica
considerados (Construccin final aguas arriba y abajo, desembalse rpido aguas arriba y
filtracin constante aguas abajo). Por otro lado, en los apndices adjuntos se muestran los
crculos de falla, as como sus correspondientes factores de seguridad.
Como se indic en el acpite anterior correspondiente al anlisis esttico, el diseo de los
taludes est gobernado por los valores obtenidos del anlisis pseudoesttico de la
estabilidad de la presa sometida a accin ssmica. Se analizado la estabilidad del talud
considerando una accin ssmica de 0.20 g en la horizontal y 0.10 g en la vertical, actuando
hacia fuera del talud analizado, en sentido horizontal.
El siguiente cuadro resume los valores del factor de seguridad determinados.

Presa
Azafrancucho

Construccin
final
Aguas Arriba
1.30

Construccin
final
Aguas Abajo
1.14

Desembalse
rpido
Aguas Arriba
1.02

Filtracin
Constante
Aguas Abajo
1.02

Los factores de seguridad hallados para el caso de anlisis ssmico son los mnimos
aceptables, por lo que la estabilidad ssmica de los taludes de la presa queda garantizada.
En los grficos adjuntos se muestran las correspondientes secciones transversales finales,
con el anlisis realizado.

RESUMEN Y CONCLUSIONES DEL ANLISIS


Se ha empleado el mtodo de equilibrio lmite para realizar el anlisis esttico y
pseudoesttico (ssmico) de la estabilidad de los taludes y establecer la forma definitiva de
la presa.
Los anlisis se han efectuado segn el mtodo simplificado de JAMBU, cuyos resultados
difieren muy poco (un 5% a 10%), generalmente por defecto, de los obtenidos aplicando
otros mtodos ms refinados, dando por lo tanto valores algo ms conservadores.
Los anlisis se han procesado mediante un adecuado software geotcnico de reconocida
confiabilidad (el STABL, versin 6.541), lo cual ha permitido analizar un gran cantidad de
casos.
Para el anlisis seudoesttico ssmico se ha considerado un coeficiente ssmico igual a 0.20
g en la horizontal y 0.10 g en la vertical.
El anlisis de estabilidad asume un carcter bidimensional de los esfuerzos y de la
geometra de los taludes. Sin embargo, los deslizamientos reales se producen no en dos,
sino en tres dimensiones, siendo los factores de seguridad tridimensionales mayores que
los hallados en base a anlisis bidimensionales, debido a la interaccin estabilizadora del

material adyacente a la seccin de posible deslizamiento, lo cual proporciona un margen


adicional de seguridad.
Basndose en los anlisis efectuados y los resultados obtenidos se ha establecido
finalmente las secciones transversales tpicas de cada una de las presas, talud aguas arriba
3:1, talud aguas abajo 2.5:1.
Como conclusin final se tiene que los resultados obtenidos en los anlisis de estabilidad de
taludes en todos los casos y secciones considerados son mayores que los valores mnimos
recomendados por el ICOLD, verificndose de esta manera la estabilidad de la presa.

ANEXO 2
FILTRACIN POR EL CUERPO Y LA CIMENTACIN
SECCIN PRINCIPAL

ANLISIS DE FILTRACIONES EMBALSE AZAFRANCUCHO^


SECCIN PRINCIPAL
*
:
MODELAMIENTO MEDIANTE ELEMENTOS FINITOS

fc

CUERPO k=1.010-7cm/seg

FILTRO k=1.010-3cm/seg

TAPETE IMPERMEABLE k=1.0 lO'^O cm/seg

CIMENTACIN 1 k=1.010'^ cm/seg

CIMENTACIN 2 k=5.0 ICT^ cm/seg

x.'s-"

istsr- T

' ' " v ^ s - -f ^irav' P -

^ l-,

i^3- j ? i *

f v3?-

.rfSv ' - e i ^

-^

i.'v^^

/l.

-t.*-

ANLISIS DE FILTRACIONES EMBALSE AZAFRANCUCHO


IMPERMEABILIZACION SECCIN PRINCIPAL
ANLISIS DE FLUJO BIDIMENSiONAL Y PERMANENTE
DISTRIBUCIN DE CARGAS DE PRESIN (m)

^^ r- jm^"^^

-^-^^ '' ^

*IVC/RJ-CIVIL ENGINEERING DEPARTMENT-PUCVRJ


2D-3D STEADY-UNSTEADY SATURATHMJNSATRATBD FLOW
PROBLEM - ANAL.fILTRACJM&AZAFRANCUCHO SECCPKINCIPAL 26.11.02 ABEL CHUM>Z
NUMBER a? NOTJES
45
NUMffiR OT ELEMaJTS
33
N U M ^ Cff MATERIALS
5
N l M f f i R OF NCaXS AT FREE SURFACE
7
NUMBER CffELEM. P C ONE NCM3E AT FREE SURFACE
NUMBER OF FOMENTS W/PRESCRIBED VELOCITY
DATUM
OOOE+00
MAX. NUMBER OF POINT TO DH^INEPSI-TU-K
9
FLOW TYPE
PLANE
DIMENSION
2D

CIVIL ENGINEERING r P T - PUC/RJ


ORDOEZ

MATERIAL
1

K2

SSWAi

PRESSURE VOLUMETRIC
REL.HYIMI.
HEAD SOIL MOISTURE
COND.
-.4560E+02
..1480E+02
-.6600E-H)1
-.350aE-K)l
-.213(^+01
..1380E-H)1
..930(ffi400
-.6800E-K)0
.OOOOE+00

.lOOOE+OO
.ISOOE-K
.200(ME-K)0
.250fflE-K)0
.3000E+00
.3500E400
.4000E-H)0
.4400E+00
.4500E-H)0

.5800E-05
.2000E-03
.2100E-02
.I400E-01
.6800E^1
.2600E+00
.7000E-K)0
.9000E-K)0
.1000E-H)1

CIVIL ENGINEERING D H T - PUC/RJ


ORDOffiZ

MATERIAL
2

Kl

.lOOOE-04

NODE

1
2
3
4
5
6
7
8
9

ANAL.FILTRAC.EMB.AZAFRANCUCHO SECC.PRINCIPAL 26.1L02 ABEL

.lOOOE-08 .lOOOE-OS .OOOOE+OO

NODE

1
2
3
4
5
6
7
8
9

Kl

3
0

K:2

ANAL.FILTRAC.EMB.AZAFRANCUCHO SECCHUNCIPAL 26.11.02 ABEL

SSW/n

.lOOOE-04 .OOOOE+OO

PRESSURE VOLUMETRIC
REL-HYISL
HEAD SOIL MOISTURE
COND.
..4560E-M)2
-.14affi-H)2
-.6600E-K)1
-.3500E-M)1
-.2I30E+01
-.1380E-H)1
..9500E+00
-.6800E+00
.OOOOE-HX)

.lOOOE+00
.ISOffi-HX)
.200(ffi-K)0
.2500E+OO
.300aE'tO0
.3500E-K)0
.400QE+00
.44O0E-M)0
.4500E+00

.5800E^5
.2000&O3
.2100E-02
.1400E-01
.6800&O1
.2600E-H)0
.7000E-fO0
.90(E-K)0
,1000E+01

CIVIL mOINEERlNG DEFT - PUGJ

ORDCmZ
MATERIAL

Kl

K2

SSW/n

ANALFILTRAC.EMB-AZAFRANCUCHO SECC.PRINCIPAL 26.11.02 ABH.

.lOOOE-19

NOCffi

1
2
3
4
5
6
7
8
9

.lOOQE-19

.OOOOE-K

PRESSURE VCa^UMETRIC
REL.HYDR.
HEAD 3CL MOISTURE
COND.
-.4560E-K)2
-.1480E-K)2
-.6600E-K>1
-.3500E-K)1
-.2130E-K)1
-.1380E-H)1
-.9500E-K)0
-.6800E-H)0
.OOOOE+00

.lOOOE+00
.150(ffi400
.2000E+00
.2500E+00
.3000E-M)0
.3500E-H)0
.4000E400
.4400E+00
.4500E-K)0

.S800E-0S
.20O0E-O3
.2100E-O2
.140QE41
.6800E-01
.2600E+00
.7000E-K)0
.9000E+00
.lOOOE+01

CIVIL ENOINEHRING E P T - PUC/RJ


ORDOWEZ

MATERL\L
4

Kl

.lOOOE-03

NCMJE

1
2
3
4
5
6
7
8
9

K2
.lOOOE-03

SSW/n
.OOOOE-KX)

PRESSURE VOLUMETRIC
REL-HYE.
HEAD SOIL MOISTURE
CC.

-.4560E+02
-.I480E+02
-.6600E-H)1
-.350(E-H)1
-.2130E-K)1
-.1380E-H)1
..9500E400
-.6800E-K)0
.OOOOE-KX)

lOOOE-MX)
.1500E+00
.2000E-K)0
.ZSOOE-MX)
.3000E+00
.3500E400
.4000E-K)0
.4400E-K)0
.4500E+00

.5800E-05
.2000&O3
.2100E-02
.1400E-01
.6800E-OI
.2600E-K)0
.7000E+00
.9000E-K)0
.100(ffi-Kl

CIVIL ENGINEERING DEPT - PUC/RJ


OROOEZ

MATERIAL
5

Kl

.5000E-05

NOEffi

1
2
3
4
5
6
7
8
9

ANAL.FILTRAC.EMB J \ Z A F R A N C U C H O S E C C . H U N C I P A L 26.11.02 ABEL

K2
.500E-05

ANAL.nLTRACJEMB.AZAFRANCUCHO SECCPRINCIPAL 26.11.02 ABEL

SSW/h
.OOOOE-KX)

PRESSURE VCO-UMETRIC
REL.HYMl.
HEAD SOILMCMSTURE
CC1D.
-.4560E-K)2
-.148(ffi-K)2
-.6600E-K)1
-.3500E-K)1
-.2130E-H)1
-.1380E-K)1
-.9500E-K)0
-.680(ffi+00
.00E-K)0

.lOOOE-KJO
.150(ffi-H)0
.MOfflE-KJO
.2500E-K)0
.3000E-M)0
.3500E-K)0
.4000E-K)0
.4400E+00
.450(ffi-KX)

.58008^5
.MOOE-03
.2100E-02

AWB^l
.680(-0l
.2600E-K)0
.7000E-M)0
.900(ffi-K)0
.1000E-K)1

CIVIL EbflNHQUNOEffiPT -PUOKJ


ORDOSffiZ

NCE BC

ANAL.FILTOAC.EMB.AZAFRANCUCHO SECCUNC1PAL 26.11.02 ABEL

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45

0
0
0
0
0
0
0
0
0
1
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
0
1
1
1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0

.1875E-K)3
.1825E-K)3
.1901E-H)3
.1913E-W3
.3000E+03
.187(E+03
.1850E403
.1782E-H)3
.1698E-M)3
.188E-H)3
.2071E-M)3
.2015E+03
.2124E+03
J715E-M)3
.2140E-M)3
.2715E+03
.30OH-H)3
.2000E-H)3
.1813E-H)3
.169fflE-M)3
.1585E+03
.1600E-H)3
.2080E-K)3
.2494E+03
.2210E-M)3
.3000E+03
.3000E-M)3
.1461E+03
.9588E-M)2
.4O0(ffl-tO2
.OOOOE-K
.1800E-M)3
.1740E+03
.1460E-M)3
.2061E-H)3
.2407E^3
.9588E+02
.4100E+02
-OOOOE+OO
.1447E403
.1728E+03
.7905E+02
OOOOE-H
.1009E-K)3
.OOOOE+OO

.1500E-H)3
.1500E4O3
.1439E+03
.1454E-H>3
.1180E403
.1440E-M)3
.I440E-f03
.1304E+O3
.1183E-M)3
.1477E+03
.1200E-H)3
.1200E-K)3
.1200E-K)3
.lia)E4<)3
.1180E-K)3
.9588E-M)2
.7854E+02
.118(-t03
.1071E403
.1091E-K)3
.1180E+03
.1200E-H)3
.1180E-K)3
.8214E+02
.8214E+02
.430(^402

.0000E4O0
.OOOOE+OO
.OOOOE+OO

.000(E+00
.OOOOE+OO
.O00(ffi+00
.OOWE+OO
.OOOOE+OO
.000(^+00
.3000E+OO
.OOOOE+OO
.OOOOE+OO
.OOOOE+OO
.OOOOE+OO
.OOOOE+OO
.OOOOE+OO
.OOOOE+OO
.OOOOE+OO
.OOOOE+OO
.OOOOE+OO
.OOOOE+OO
.2800E+02
.OOOOE+OO
.O00(ffi+00
.OOOOE+OO
.OOOOE+OO
.OOOOE+OO
.2800E+O2
.2800E+O2
.2800E+02

.ooocm+oo
.120(ffi-H)3
.120OE-K)3
.1200BH
.1200K-H)3
.9000E402
.9000E4O2

2mm+(n
.OOOOE+OO
.OOOOE+OO
.OOOOE+OO
.OOOOE+OO
.OOOOE-KK
.OOOOE+OO
.OOOOE+OO
.O00(ffi+00
.OOOOE+OO
.OOOOE+OO
.OOOOE-KX)
.OOOOE+OO
.O00(ffi+00
.OOOOE+OO

.lia)E-H)3
.430ffl&K)2
.O00(ffi-K)0
.118Ce-H)3
.11K-H)3
.8756E-K)2
.4300E+02
.OOOOE-K
.4300E-M)2
.4300E+02
.000(ME+0O
.000(ffi400

CIVIL ENGINEERING DEPT - PC/RJ


ORIXWEZ
I

mMM

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

42
40
35
36
24
39
32
16
37
25
33
20
15
21
17
14
32
38
9
9
29

J
43
42
40
27
25
43
33
24
38
23
34
33
23
34
5
IS
23
30
20
22
30

K
45
44
41
26
35
42
40
26
42
32
37
32
25
33
14
24
18
31
19
21
38

M
44
41
36
35
26
38
35
17
40
35
40
19
24

^
16
16
19
39
8
20
37

ANAL.FILTRAC.EMB AZAFKANCUCHO SECCPRINCIPAL 26.11.02 ABEL

MAT

5
5
5

ANGUE

.OOOE+00
.OOOE+00
.OOCffi+00
.00(ffi+O0
.OOOE+00
.OOOE+00

.oo(ffi;+oo
.OOOE+OO
.OOOB+OO
.OOOE+00
.OOOB+OO
.OOOE+00
.OOOE+00
.OOOE-KX)
.OOOE+00
.OOOB+OO
-OOOE+OO
.OOOE+00
.OOfflE+00
.OOOE+00
.00(C+00

22
23
24
25
26
27
28
29
30
31
32
33

28
23
34
18
8
3
12
10
6
8
4
7

29
15
21
23
19
11
6
22
12
7
1
6

37
13
22
11
18
13
7
9
11
2
6
1

34
3 .OOQE-KW
11
2 .00(MB-K)0
28
3 -OOOE+OO
2 .UOt-K
12
7
1 .OOOE+OO
4
1 .OOOE+OO
18
2 .OOOE+OO
8
1 .OOOE+OO
3
1 .00(E+00
10
1 .OOOE+OO
1 .OOOE+OO
3
1 .OOOE+OO
2

CIVIL HHNEERINO DEPT - PUC/RJ


C9UXWEZ

ANAL.FILTRAC.EMB.AZAFRANCUCHO SECXJ.PRJNCIPAL 26.11.02 ABEL

HALF-BAND WDDTH- 15

DflTIAL CONDmON

PRESSURE HEAD -

-1.00

D^CHIMATION ABOUT FREE SURFACE


NCM^NBC

4
5
13
14
15
17
26

.OOOOE+00
.OOOOE+00
.OOOOE+00
.OOOOE+00
.OOOOE+00
.OOOOE-H
.000(^+00

FX
.OOOOE+OO
.OOOOE+00
.OOOOE+OO
.OOOOE+OO
.OOOOE+00
.OOOOE+OO
.OOOOE+OO

REQUIRED MEMCaiY-

1613

AVAILABI MEMMtY = 25000

REQUIRED TIME FOR READING DATA ** .OOOOB+OO SEC

Ml********************************************

PUC/RJ-CIVIL ENCNEERII> DEPARTMENT-POKJ


EVENT* 1

************************************

NUMBER OF TIME INTERVAL


1800
TOLERANCE
lOOOE+OO
NAX. NUMBHl OT ITERATIONS
20
TIME INTERVAL
1728E+06
NUMBHl OF rrERATICWS FCMl PRINTINO

1800

CIVILETKJINEERINGDEPT-PUC/RJ -TIME: .OOOOE-KX)ITER.: 0 HiROR: .OOOOE+00


NtXffi
1
2
3
4
5
6
7
8
9

.187^+03
.1825E+03
.1901E+03
.1913E+03
.3000E+O3
.187(ffi+03
.1850E+O3
.1782E+03
.1698E-K)3

PRESS.HEAD TOTAL HEAD SCHL MOISTURE

.1500E+O3
.1500B+03
.1439E+03
.1454E+03
.n80E+O3
,1440E+03
.1440E+O3
.1304E+03
.1183E+03

-.lOOOE+01
-.lOOOE+Ol
-.100(ffi+Ol
.OOOOE+OO
.OOOOE+OO
-.lOOOE+01
-.100(+01
-.lOOOE+01
-.lOOOE+01

.1490E+03
.I490E+O3
.1429E+03
.1454E+03
.118(-K)3
,143(^+03
.1430E+03
.1294E+03
.1173E+03

.3942E+00
.3942E+00
.3942E+00
.4500E+00
.4500E+00
.3942E+00
.3942E+O0
.3942E+00
.3942E+O0

10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45

.1808E-K>3
.2071E-K)3
.2015E-K)3
.2124E-+03
.2715E+03
.2140E-H)3
.2715E403
.30O0E+O3
.2OO0E-K)3
.1813E-K)3
.16^E-H)3
.1585E-K)3
.1600E+03
.2080E-H)3
.2494E-K)3
.2210E+03
.3000E+03
.3000E+03
.1461E-403
.9588E402
.400(^402
.000(^+00
.1800E-M)3
.1740E-M)3
.1460E+03
.2061E-K)3
.2407E-H)3
.9588E402
,4100E-H)2
.000(ME-M)0
.1447E-K)3
.1728E+03
.7905E+02
.000OE4OO
.1009E4O3
.000(^+00

EIM

.1477E-H)3
.1200E-KI3
.1200E4O3
.1200E+03
.1180E-K>3
.1180E-K)J
.9588E+02
.7854E-M)2
.1180E+03
.1071E+03
.1091E+03
.1180E-H)3
.1200E-K)3
.118(ffi+03
.8214E+02
.8214E-H)2
.4300E-K)2
.000(+00
.1200E+03
,120E-K)3
.1200E+03
.1200E-K)3
.9000E+a2
.9000E-H)2
.1180E+03
.4300E-K)2
.000OE4O0
.1180E-H)3
.nSOE-HO
.8756E-H)2
.4300E-K)2
.OOOOE-K
.430aE-K)2
.430(ffi-H)2
.OOOfflE+OO
.OOOCffi-fOO

.SOOOE-H .148(S+03
-.lOOOE+Ol
.1190E-H)3
-.lOOOE-M)!
.1190E-H)3
.OOOOE-HX) .1200E-K)3
.OOOOE-MX) .1180E-H>3
.000(400
.1180E'f03
-.lOOfflE+Ol
.9488E'42
.OOOOE-MX) .7854E+02
-.1000E-H)1
.11708+03
-.1000E-K)1
.1061E-K)3
-.lOOOE+01
.1081E-H)3
..lOOOE-KIl
.1170E+03
.2800E-H)2 .1480E-M)3
.1170E+03
-.1000E-K)1
-.1000E-M)1
.8114E-K)2
-.1000E401
.8114E+02
.OOOfflE-K .4300E-M)2
-.1000E-K)1 -.1000E-K)1
.280(ffi+02
.1480E-M)3
.2800E-M)2 .1480E+03
.U9m-H)3
.280(^+02
.2800E-K)2 .1480E+03
-.lOOOE-tOl
.8900E+02
-.lOOOE-tOl
.890(ffi+02
-.lOOOE+01
.1170E+03
-.1000E-M)1
.4200E+02
-.lOOOE+01 -.lOOOE+01
..lOOOE-tOl
.1170E-K)3
-.lOOQE+01
.1170E+03
-.100(ffi+01
.8656E+02
.lOOOE+Ol
A20(m+02
-.lOOOE-tOl -.100(^+01
-.lOOOE+01 .4200E-M)2
-.lOOOE+01
.4200E-M)2
-.1000E-H)1 -.lOOOE+Ol
-.1000E-K)1 -.lOOOE+01

VELOC-1 VELOC-2

.4500E+00
.3942E+00
.3942E400
.4500E-K)0
.4500E-K)0
ASOOyMJO
.3942E-+O0
.4500B-K)0
.3942E-K)0
.3942E-H)0
.3942E-K)0
.3942E-K)0
.4500E+00
.3942E-M)0
.3942E-HX)
.3942E+00
.450(^+00
.3942E+00
.4500E-)0
.4500E-M)0
.4500E-K)0
.450(ffi-M)0
.3942E400
.3942E-M)0
.3942E-M)0
.3942E-H)0
.3942E+O0
.3942E-K)0
.3942E-K)0
.3942E-K)0
.3942E400
.3945E-K)0
.394ZE+00
.3942E-)0
.3942E-M)0
.3942E-K)0

ANG-IX VELOC

ANGLE-X GRAD-1

.OOOE-MX) .324E-05 -.900E+02


.00(ffi+OO .324&05 -.900E-H)2
.OOiffi-K .324E-05 -.900E-M)2
.OOOE-MK) .362E-05 -.904E4O2
.OOOE+OO .716E-04 -.905E+02
.OOOE+00 M9EA)4 -.900E-H)2
.0O0E-+0O .649&04 -.900E+O2
.OOOE-H .765E-04 -.912E-M)2
.OOOE+00 .649E-04 -.900E+02
.OOOE-KX) . 6 4 9 E ^ -.900E-M)2
.OOOE-H .649E-04 -.900E-M)2

GRAD-2 C3RADIENT ANO-X

1
2
3
4
5
6
7
8
9
10
n

.450E-rt)2
.124E+03
.191E-M)3
.262E+03
.244E-K)3
.300E-K)2
.176E-H)3
.28(^403
.902E-H)2
.204E-K)3
.140E-H)3

.215E-M)2 .00(ffi+00 -.324E-05


.215E-K2 .OOOE-M -.324E^5
.215E-M)2 .OOOE+00 -.324&05
.215E+02 ..250&07 ..362E^5
.626E+02 -.626E-06 -.716E-04
.72^+02 .OOOE+00 -.649E-04
.665E+02 .00(ffi-H)0 -.649E-04
.749B+02 -.163E-05 -.765E-04
.805E-K)2 OOOE-K -.649&04
.833E-t02 .00(E-H30 -.649E-04
.923E+02 .OOOE-MXI -.649E-04

.OOOE+00 .lOOE+01 .100E-K)1 .900E-tO2


.OOOE+00 .100E-K)1 .lOOE+Ol .900E+02
.OOOE+00 .lOOE+01 .lOOE+01 .900E-H)2
.653E-02 ,101E+01 .101E-K)1 .896E+02
.817E-02 .991E+00 .991E+00 .895E-K)2
.OOOE+OO .10(S-K)1 .lOOE+01 .90<ME+02
.OOOE+OO .100E-H)1 .100E-M)1 .900E+02
.192E-01 .991E+00 ,992E-M)0 .889E-K)2
.OOOE+00 .lOOE+Ol .100E-K)1 .900E-M)2
.OOOE-K .100E-H)1 .100E-H)1 .900E-M)2
.OOOE-fOO .lOOE-tOl .100E-H)1 .900E-tO2

12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

.176E+03
.223E-M)3
.162E403
.28QE+03
.252E+03
.192E+03
.203E+O2
.175E+03
.165E+03
.682E+02
.121E+03
.210E+O3
.153E+03
.204E+03
,186E+03
.200E+O3
.193E+03
.172E+03
.196E+03
.182E+03
.189E+03

.990E+02 .OOOE-M -.649E-09 .00(ffi-K .649E-09 -.900E-M)2 .OOOE-M .100E-M)1 .100E-K)1 .900E+02
.100E403 -.222E-05 -.714E-04 .OOOE-M .714E-04 -.918E-K)2 .291E-01 .103E-M)1 .103E+01 .884E+02
.109E-M)3 .OOOE-M -M9EM9 .OOOE-M .649E-09 -.900E-M)2 .OOOE+00 .10(E+Ol .lOOE+01 .900E+O2
.103E+03 -.199E-05 -.847E-04 .OOOE+00 .847B-04 -.913E+02 .225E^1 .102E+01 .102E+01 .887E+02
.104E+03 .413B-06 -.810E-04 .000E+< .810E-04 -.897E+02 -.539E-02 .103E-M)1 .103E+01 .903E+02
.108E+03 .OOOE+00 -.649E-09 .OOOE+00 .64ME-09 -.900E+02 .OOOE+00 .lOOE+01 .lOOE+01 .900E+02
.lllE+03 .516E4M -.235E-03 .00(+00 .241E-03 -.776E+02 -.626E+00 .267E+01 .274E+01 .1O3E+03
.116E+03 .OOOE+00 -.649E-09 .OOOE+00 .649E-09 -.900E+02 .OOOE+flO .lOOE+01 .10(^+01 .900E+O2
.llfE+03 .645E-10 -,301E-08 .OOOE+00 .302E-O8 -.888E+02 -.756E^1 .359E+01 .359E+01 .912E+02
.119E+03 .O0(ffi+00 ..137E-18 .00<ffi+00 .137E.18 -.90(ME+O2 .000E+< .155E+02 .155E+02 .900E+O2
.119E+03 .00(ffi+00 -.137E-18 .OOOE+00 .137E-18 -.90OE+O2 .00(E+00 .155E+02 .155E+02 .900E+02
M9B-*<)3 -.14^-05 -.862B-05 .OOOB+00 .875E-05 -.996E+02 .177E+G0 .112E+01 .USE+Ol .81(ffi+02
.119E+03 .OOOE+00 ..137E-18 .00(^+00 .137E-18 -.900E+02 .OOOE+00 .155E+02 .155E+02 .900E+02
.119E+03 .OOOE+00 -.649E-05 .OOOB+00 .64^-05 -.900E+02 .OOOE+00 .lOOE+01 .lOOE+01 .900E+O2
.125E+03 .OOOE+OO .649E4)9 .OOOE+OO .649E-09 .900E+O2 .OOOE+OO .lOOE+01 .lOOE+01 .90(+02
.132E+03 -.216E-09 ..936E-09 .OOOE+OO .961E-09 -.103E+03 .262E+00 .120E+01 .123E+01 .777E+02
.132E+03 .OOOE+OO -.649E45 .OOOE+OO .649&05 -.90OE+O2 .OOOE+OO .lOOE+01 .IOOE+01 .900E+O2
.12E+03 .18^-08 -.163E-08 .00(ffi+) .249E-08 -.410E+02 -.205E+O1 .181E+01 .273E+01 .139E+03
.132E+03 .OOOE+OO -.649E-09 .00(K+00 .649E-09 -.900E+02 .OOOE+OO .lOOE+01 .lOlffi+01 .900E+02
.143E+03 .212E.09 -.822E-09 .OOOE+OO .849E-09 -.755E+02 -.258B+00 .106E+01 .109E+01 .104E+O3
.146E+03 -.15^-09 -.767E-09 .OOOE+OO .783E-09 -.lOlE+03 .203E+O0 .109E+01 .lllE+01 .794E+02

33

.186E-K)3 .147E-M)3 .OOOE-K -.649E-09 .00^+00 .649E-09 -.900E-)2 .OOOE+00 .100E-K)I .lOOE+Ol .9(K-K)2

CIVILENGINEHUNGEffiPT-PUC/RJ -TIME: .3110E+O9nER.: 1 ERROR; .1515E-04


N(M3E

PRESS.HEAD TOTAL HEAD SOIL MOISTURE

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

.1875E-K)3
.1825E403
.1901E-H)3
.1913E+03
.300(+03
.1870E-Kt3
.1850E+03
.1782E+03
.1698E+03
.1808E+03
.2071E-K)3
.2015E+O3
.2124E403
.2715E+03
.2140E+03
.2715E+03
.3000E-O3
.2000E-H)3

.1500E-K)3
.1500E-M)3
.1439E-M)3
.1454E-H)3
.n80E-K)3
.1440E+03
.1440E+03
.1304E-K)3
.J183E-t03
.1477E^3
.1200E-H)3
.1200E+O3
.1200E-K)3
.11)E403
.1180E+03
.9588E-K)2
.7854E+02
.1180E-K)3

19
20
21
22

.1813E-*03
.1698E+03
.1585E403
.1600E-H)3

.1071E+03 -.9744E+00 .1061E+03


.1091E-)3 -.7243E-K)0 .1084E-K)3
.1180E-H)3 .7454E+01 .1255E-M)3
.1200E-K)3 .2800E-H)2 .1480E-tO3

23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45

.208aE+03
.2494E+03
.2210E+03
.300fflE-)3
.3000E-M)3
.1461E-H)3
.9588E-H)2
.400aE4O2
.OOOOE-tOO
.1800E-K)3
.1740E-K)3
.1460E+03
.2061E4O3
.2407E+03
.958^402
.4100E-M)2
.OOOOE-tOO
.1447E-H)3
.1728E-t03
.790SEW2
.OOOOE-H
.10O9E-tO3
.OOOOE-KK)

.118(ffi+03 -.2103E+02
.8214E+02 -.1294E-+01
.8214E-H)2 .9942E-K)1
.4300E-M)2 .OOOOE-KX)
.OOOOE+00 .5835E402
.12O0B+O3 .2800E-M)2
.1200E-K)3 .2800E-K)2
.1200E-M)3 .280(ffi+02
.1200E4O3 .280(MS-K)2
.9000E-H)2 .1559E-K)2
.90006402 .18a)E-H)2
.1180E+03 .9691E-K)0
.4300E-H)2 .5505E-H)2
.000(ffi-K)0 .7792E+02
.1180E+03 .1144E-K)2
.1180E^3 .2758E+02
.8756E+02 .5583E-H)2
.4300E-KI2 .7279E-)2
.OOOOE-KX) .1070E+03
.4300E-M)2 .8760E-K>2
.4300E-K)2 .9858E-M)2
.OOOOE+OO .1256E-H)3
.OOOOE-HX) .1389E-t03

ELHkl
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

.45(ME-M)2
.12ffi-K)3
.191E+03
.262E-M)3
.244E-K)3
.300E4O2
.17ffi-K)3
.28(-M)3
.902E+02
.204E-K)3
.140E-K)3
.176E-K)3
.223E-K)3
.162E-K)3
.286E-K)3
.252E+03
.192E-K)3

-.1629E+01 .1484E+03 .3334E400


-.1037E-H)1 .1490E-H)3 .3899E-K)0
-.6349E-K)0 .1433E-K)3 .4407E+00
-.8791E-K)0 .1445E-K)3 .4105E+00
..4491E-K)2 .7309E+02 .lOUE-MX)
-.8825E-M)1 .1352E-H)3 .1864E-M)0
-.8285E-K)1 .1357E-K)3 .1897E+00
-.2440E-+00 .1302E+03 .4464E-K)0
.2012E-H)1 .I203E-tO3 ASOOE-WO
.3000E+00 .1480E-H)3 .4500E+00
-.1993E-M)2 .1001E-tO3 .1417E+00
-.763aE-M)l .1124E-M)3 .1937E+00
-.2324E-K)2 .9674E-H)2 .1363E+00
-.4152E-K)2 .7648EH02 .1066E-H)0
-.2126E-K)2 .9674E-H)2 .1395E-M)0
-.2094E-tO2 .7494E-H)2 .1400E-HX)
..1938E-H)2 .591B-K)2 .1426E-HX)
-.5537E-H)1 .1125E-H)3 .2172E-KK)

.3972E-K)0
.4334E+00
.4500E^O0
.4500E-K)0

.9697E+02 .1399E+00
.8085E+02 .3600E-K)0
.9208E+02 .450(ffi+00
.4300E+02 .4500E-K)0
.5835E+02 ASOOEMX)
.14WE+03 .4500E-M)0
.1480E-H)3 .4500E+00
.1480E-K)3 .450(ffi+00
.1480E-M)3 .4500E-K)0
.1056E-M)3 .4500E-M)0
.1088E+03 .4500E-K)0
.1190E-H)3 .4500E+00
.9805E-K)2 .450(E+00
.7792E-H)2 .4500E-H)0
.1294E-H)3 .4500E+00
.1456E+03 .4500E400
.1434E-K3 .4500E-KX)
.115ffi-M)3 .4500E-K)0
.lOTOE-M .450(-K)0
.1306E-K)3 ASOOB-H
.1416E-K)3 .450OE-K)O
.1256E-H)3 .4500E-K)0
.1389E-K>3 .4500E-H)0

VHLOC-1 VELOC-2 ANO-IX VELOC ANGl^-X ORAD-l

.215E-M)2 .675E-06 -.270&06


.215E-f02 .I2IE^5 -.931E-07
.215E-KS2 .18E-05 -.358E-06
.215E-K)2 .244E-05 .704E-06
.626E-MH .501E-O4 -.143E-04
.729E-H)2 .lOlE-04 -.108E-04
.665E+02 . 3 n B ^ -.163E^5
.749E-K2 .112&04 -.97^-05
.805E-K)2 . 2 5 7 E ^ -.421E-05
.833E-)2 .279B-04 .727E-06
.923E-K)2 .247E-04 -.465E-05
.99(ffi-K)2 .314E-09 .442B-10
.10(-K)3 .106E-04 -.177E-05
.109E-K)3 .271E-09 -.433E-09
,103E+O3 .277E-08 -.236E-08
.104E-K)3 .194E-05 -.706E-06
.lOSE-K .156E-09 -.169E-09

,O0OE-K)O
.OOOE-KW
.OWE-H
.OOOE400
.OOOE-KK)
.00(E-)0
.00(E-H)0
.OOOE-K
.OOOE-K
.OOOE-HX)
.OOOE-K
.OOOE-K
.00(ME-K
.000E4OO
.OOOE-K
.OOOE-K
.00(ffi-K

CSIAD-Z CHIADIENT ANO-X

.727E-06 -.218E-K)2 ..135E-K)0 .541E-01 .145E-K)0 .158E-H)3


.122E-05 -Aim+Ol ..243E+00 .186E-01 .244E-K)0 .176E-H)3
.185E-05 -.112E-H)2 -.362E-H)0 .717E-01 .369E-H)0 .169E-K)3
.254B-05 .161E-K)2 -.487E-MX) -.141E-M .507E-H)0 -.164E-M)3
.521E-04 -.159E-M)2 -.542E400 .16flE-KK) .565E-K)0 .164E-K)3
.148E-04 -.471E-H)2 -.lOlE-HX) .lOSE-K .148E-M)0 .133E403
.312E-04 -.300E-KH -.311E-K)0 .163E-01 .312E-K)0 .177EH03
.149&04 -AlOEMa -.401E+00 .38ffi-HX) .558E-M)0 .136E-K)3
.26Cffi-04 ..932E-K)1 -.257E-M .421E-01 .260E-K .171E-K)3
.27E-04 .149E-K)1 -.33QE-K -.59^-02 .331E-MX) -.179E-)3
.252E-04 -.106E-K)2 -.247E-M .463E-01 .252E-K .169E-K)3
.317E-09 .803E-K>1 -.316E-K -.232E-01 .316E-K -.176E-K)3
.107E-04 -.948E-K)1 -.333E-K .64ffi-01 .339E-K .169E-K)3
.511E-09 -.S80E-K)2 -.281E-K .439E-K .521E-K .123E-W3
.364E-08 -.405E-K)2 -.260E-K .251E-K .362E-K .136E-K)3
.206BO5 -.20fflE+02 -.344E-K .902E^1 .356E-K .165E-K)3
.230B-O9 -.474E402 -.626E-K .693E+00 .934E-K .132E+03

18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33

.203E+02
.175E+03
.165E+03
.682E402
.121E403
.21(ffi+03
.153E-K)3
.204E-H)3
.18^+03
.200E-K)3
.193E-K)3
.172E-K3
.196E-K)3
.1?F-K)3
.189E-K)3
.186E-M)3

.111E^03
.116E+03
.n6E403
.119E-H)3
.119E+03
.119E-K)3
.11^403
.119E-M)3
.125E-K)3
.132E-K)3
.132E+03
.I2i-K)3
.132E+03
.143E403
.146E-K)3
.147E-K)3

.490E^5
.154E^
.52^4)9
.146E-20
.104E-20
.496E-09
-.245E-20
.328F-07
.116E-09
.137E^
.144E^
.1926^8
.126E-10
.815E^
-.375E-09
-.282E-10

-.203E-O4
-.907E^
-.309E-08
-.521E-19
-MSBrlB
-.921E^
-.128E.18
-.203E-07
-.379E^
-JOOE^
-.152E-07
-.165E-08
-ISIE^
..68aS-09
-.409E-09
-.351E-09

.00<ffi400
.OOOE-KX)
.OOOE-MX)
.OOOE+00
.00OE4O0
.OOOE-K
,000E-HX)
.OOOE+OO
.OOOE+00
.OOOE+OO
.00(+00
-OOfflE+OO
.OOOE+OO
.OOOE+OO
.OOOE+OO
.OOOE+OO

.208E-04
.970R-09
.314E-08
.521E-19
.119E-18
.lOSE-08
.128E-18
.386E-07
.397E^
.33(ffi-09
.21(07
.253E-08
.182E-09
.107E-08
.555E^
.352E-09

-.764E+02
-.804E+02
-.803E+O2
-.884E+02
-.895E+02
-.617E+02
-.911E+02
-.317E+02
-.730E+O2
-.655E+02
-.465E+02
-.40ffi+02
-.860E-K)2
..401E+O2
-.133E+03
-.946E+02

REQUIRED TIME FOR EXECUTION .OOOOE+00 SEC** EVENT # 1


** END OF PROGRAM *

-.490E-01
-.171E+00
-.543E+O0
-.14E+00
-.104E+00
-.314E+00
.245E+00
-.205E+01
-.337E-KI0
-.630E-H)0
-.529E+00
-.192E+01
-.472E+00
-.174E+01
.166E+01
-.162R+00

.203E+00
.109E+01
.314E+01
.521E+01
.119E+02
.575E+00
.128E+02
.10*6+01
.836E-K)0
.136E+01
.609E+00
.166E+01
.107E+01
.134E+01
.155E+01
.218E+01

.208E+00
.llOE+01
.319E+01
.521E-K)1
.119E+02
.655E+O0
.128E+02
.230E4O1
.901E+00
.15(ffi+01
.807E+O0
.254E+01
.117E+01
.219E+01
.227E+01
.218E+01

.104E+03
.989E+02
.99^+02
.916E+02
.905E+O2
.119E+03
.889E+02
.153E+03
.112E+03
.115E+03
.131E+03
.139E+03
.114E+03
.142E+03
.430E+02
.942E+02

2 4 201.^

JZ2.

4BX
18^X\

26

2S3

v. i

\
\

JL3

X5

i l

^^*

ii.^~,

'\

./

X.

\ /

-i

\
2
\

3^ 32

/\.

31.

/ ''. \

/
/
/

1/
1/

/
/

\
\

29

26

\
\

"2-t"

~r~~^~-^

20

J.9

.-^

J.4

./

17
/

X.

V\ .

\
\

X2

/
\

--^

\
\

\ )2ifV" 23.

azafrancucho: nodos
it

"\
\

ANEXO 3
FILTRACIN POR EL CUERPO Y LA CIMENTACIN
LADO IZQUIERDO

ANLISIS DE FILTRACIONES EMBALSE AZAFRANCUCHO


SECCIN LADO IZQUIERDO
MODELAMIENTO MEDIANTE ELEMENTOS FINITOS

CUERPO k=1.010-''cm/seg

FILTRO k=1.010-3cm/seg

TAPETE IMPERMEABLE k=1.0 lO^^^ cm/seg

CIMENTACIN 1 k=1.010'^ cm/seg

ANLISIS DE FILTRACIONES EMBALSE AZAFRANCUCHO


IMPERMEABILIZACION SECCIN LADO IZQUIERDO
ANLISIS DE FLUJO BIDIMENSIONAL Y PERMANENTE
DISTRIBUCIN DE CARGAS DE PRESIN (m)

15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

0
0
1
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
1
1
0
0
0
0

.1742E-K)3
.1665E-H)3
.16805+03
.1844E-)3
.1925E403
.2064E+O3
.3000E-M)3
.1541E-H)3
.1800E-K)3
.1540E-K)3
.1860E-K)3
.3000E-H)3
.3000E4O3
.1075E-K)3
.2069E-tO3
.1075E-K)3
.1531E+03
.2293E-K)3
.4800E-H)2
.OOOfflE-KX)
.4900E-K)2
.1200E-K)3
.OOOOE-KX
.OOOOE+OO

.1124E+03
.n80E-M)3
.1200B+03
.llOlE+03
.1084E-K)3
.9437E-H)2
.9437E-K)2
.120^+03
.lOOOE-K
.IISOE-M
.1000E-K)3
.6753E-H)2
.000(ffi+00
.1200E-K)3
.6762E+02
.1180E-M)3
.3523E+02
.OOOOE+00
.1200E-)3
.1200E-M)3
.n80E-K)3
.OOOOE400
.5704E-K)2
.000OE4OO

.OOOOB+OO
.OOOOE-KK)
.1800E-M)2
.OOOOE+OO
.OOOOE-HX)
.OOOOE-MK)
.OOOOE+OO
.OOOOE+00
.OOOOE+OO
.OOOOE+OO
.O00(ffi+00
.000(ffi+00
.OOOOE+OO
.1800E+02
.OOOOE+00
.OOOOE+OO
.OOOOE+OO
.OOOOE+00
.1800E+02
.1800E+02
.OOOOE+OO
.OOOOE+OO
.OOOOE+00
.OOOOE+00

CIVIL ENGINEERING DEPT - RJC/RJ


ORDOfEZ

RI.RM

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

29
29
37
20
25
30
19
18
31
21
19
20
18
15
35
10
10
11
28
14
22
24
5
1
4
14
4
9

J
31
32
38
29
23
35
25
23
23
13
11
12
14
16
33
9
11
12
33
17
28
16
4
6
5
9
1
4

36
32
27
26
35
36
26
21
31
29
36
31
29
20
19
25
24
30
20
12
18
10
19
11
15
23
24
23
34
37
18
14
6
5
6
7
35
30
16
15
30
24
17
22
9
10
7
2
6
1
17
8
3
2
8
3

MAT

'\

ANGLE

4 .OOOE+00
4 .OOOE+OO
4 .OOOE+OO
4 .00OP,+OO
4 .OOOE+OO
4 .OOOE+OO
4 .OOOE+OO
1 .OOOE+OO
4 .OOOE+OO
4 .OOOE+OO
1 .OOOE+OO
4 ,00OE+O0
1 .OOOE+OO
1 .OOOE+OO
4 .OOOE+OO
1 .OOOE+OO
2 .OOOE+OO
2 .OOOE+OO
3 .OOOE+OO
1 .OOOE+OO
3 .OOOE+OO
3 .OOOE+OO
2 .OOOE+OO
1 .OOfflE+OO
1 .OOOE+OO
1 .OOOE+OO
1 .OOOE+OO
1 .OOOE+OO

CIVIL ENGINEERING DEPT-PUCJ


ORDC^EZ

HALF-BAND WIDTH = 11

ANAL.FILTRAC.EMB.AZAFRAl:UCHO SECC.IZQUIERDA 27.11.02 ABEL

ANALJILIllACMB.AZAFRANCUCHO^CC.IZQUIERDA 27.11.02 ABEL

CIVIL ENGINEERING DEFT - PUC/RJ


ORDCWEZ

MATHUAL
3

Kl

.\0OOB-\9

NOra

1
2
3
4
5
6
7
8
9

K2
.1000E-I9

ANAL.FILTRAC.EMB.AZAFRANCUCHO S E C C . I Z Q U M D A 27.11.02 A B E L

SSWAi
.OOOOE+00

PRESSURE VCa^UMETRIC
REL.HYDR.
H E A D SOIL MOISTURE
COND.
-.4560E+02
-.1480E+02
-.6600E-M)1
-.3500E-H!
-.2130E-H)1
-.1380E+01
-.9500E400
-.6800E+00
.OOOOE-KX)

-lOOOE+OO
.1500E^O0
.2000E+00
.2500E4O0
.3000E-H)0
.3500E+00
.4000E-M)0
.4400E+00
,45O0e4OO

.5800E4)5
.2000E-03
.2100E-02
.140(ffi-01
.6800E-O1
.2600E-K)0
.7000E-K)0
.9000E-H)0
. 100(^401

CIVIL ENGINEERING DEPT - PUC/RJ


ORDOHEZ

MATERIAL
4

Kl

.1000E^3

NODE

1
2
3
4
5
6
7
8
9

K2

SSWAi

.lOOOE-03 .OOOOE-KX)

PRESSURE VOLUMETRIC REL.HYDR.


HEAD SOIL MOISTURE
COND.

-.456aE-K>2
-.1480E-H)2
-.6600E+0I
-.3500E-K)1
-.2130E-H)1
-.138fflE-H)l
-.9500E-K)0
-.6800E+00
.0000E4O0

.lOOOE-HX)
.1500E+00
.2000E-M)0
.2500E+00
.3000E-M)0
.3500E-H)0
.4000E-K)0
.4400E400
.4500E-M)0

.5800E-OS
.2000E^3
.2100E-O2
.1400E-01
.6800E^1
.260(ffi+00
.7000E-K)0
.9000E-H)0
.lOOOE-tOl

CIVIL ENGINEHUNG D H T - PUC/RJ


ORIXWEZ

NOIffi BC

1
2
3
4
5
6
7
8
9
10
11
12
13
14

0
0
0
0
0
0
0
1
0
0
0
0
0
0

ANAL.F1LTRAC.0^.AZAFRANCUCHO aECC.IZQUlERDA 27.11.02 ABEL

.1904E-K)3
.1915E+03
.1875E-K3
.1870E4O3
.1935E-03
.1984E-K)3
.2044E-H)3
.1825E-K)3
.185(^403
.1920E+03
.200aE+03
.2060E-K)3
.300(E-rt)3
.1806E-K)3

y
.1333E-M
.1352E+03
.1400E-K)3
.1340E-K)3
.1200E+03
.1200E-K)3
.1200E-M)3
.1400E-K)3
.134aB-t03
.118aE-K)3
.1180E+03
.1180E-K)3
.1180E-K)3
.1192E-K)3

ANAL.FlLTRACm4B.AZAFRAiJCUCHO SECC.IZQUIERDA 27.11.02 ABEL

F
.000(ME+O0
.OOOOE-KX)
.OOOOE-KX)
.OOOOE+OO
OOOOE-KX)
.OOOOE-KX)
.000(ffi-KK)
.OOOOE-KX)
.0000E4<X)
.OOOOE-KX)
.OOOOE-KX)
.OOOOE-KX)
.OOOOE-KX)
.OOOOE-KX)

*PUCVRJ-CmLENGINEHUNODEPARTM0MT-PUC/RJ
*2I>-3DSIBADY-UNSrEADYSATURATED-UNSATURATEDFLOW *

PRCBLEM - ANALJJ1LTRACMB.AZAFRANCUCHO SECX;.IZQUIERDA 27. U .02 ABEL ORDCMfEZ

haJMBERi NOLKS
38
NUMBER OF EIMBNTS
28
NUMBER Cff MATERIALS
4
NUMBER OF NODES AT FREE SURFACE
6
NUMBER OF ELEM. FOR C*IENOEffi AT FREE SURFACE
NUMBER OT SEGMENTS W/DESCRIBED VELOCITY
DATUM
OOOE+00
MAX. NUMBER OF POINT TO DEFINE PSI-TU-K.
9
FLOW TYPE
H.ANE
DIMENSICi
2D

CIVIL ENGINEERING EffiPT - PUORJ


ORD0*EZ

MATERIAL
1

K2

SSW^

PRESSURE VCa.UMETRIC REL.HYDR.


HEAD SOIL MOISTURE
COND.

-.4560E-H)2
-.1480E-K)2
-.6600E-K)1
-.3500E-K)1
-.2I30E-K)I
-.1380E-K)1
-.9500E-K)0
-.6800E+00
.OOOOE-KX)

.lOOOE-KX)
.1500E+00
.2000E-KX>
.2500E4O0
.300(ffi+00
.3500E-H)0
.4000E+00
.440(ffi+00
.4500E+00

.5800E-05
.2000E-O3
.2100E-02
.1400E-01
.6800E-01
.2600E+00
.7000E+00
.9000E-K
.lOOOE+01

CIVIL ENGINEERING EffiPT - PUC/RJ


cmocsfEZ

MATERIAL
2

ANAL.FILTRACEMB.AZAFRANCUCHO SECC.EQUIERDA 27.11.02 ABEL

.lOOOE-08 .lOOOE-08 .OOOOE+00

NOEHS

1
2
3
4
5
6
7
8
9

Kl

Kl

K2

ANALflLTRACEMB.AZAFRANCUCHO SECCEZQUIERDA 27.11.02 ABEL

SSW/n

.lOOOE-04 .lOOOE-04 .OOOOE+00

NCOE

1
2
3
4
5
6
7
8
9

3
0

PRESSURE VOLUMETRIC REL.HYESt


HEAD SOIL MOISTURE
CC.

-.4560E-H)2
-.1480E-K)2
-.6600E-H)1
-.3500E-K)1
-.2130E-K)1
-.1380E+01
-.9500E-W)0
-.6800E-H)0
.OOOOE+00

.lOOOE-KX)
.ISOOE-MX)
.2000E+00
.2S00E+00
.3000E400
.3500E-K)0
.4000E-HK)
.440(ffi-K)0
.4500B-H)0

.5800E-05
.200(-03
.2I00E^2
.1400E-01
.680aE-01
.2600E400
.7000E-H)0
.9000E+00
.1000E-*Ol

*INrnALCONDmC

HOESSUREHEAD

-1.00

INFORMATION ABOUT FREE SURFACE


>K)I>ENBC
2 1
7 1
12 1
13 1
21 1
26 1

FX

.OOOOE+00 .OOOOE-K
.OOOOE+00 .OOOOE+00
.OOOOE+00 .OOOOE+00
.OOOOE+00 .OOOOE+00
.OOOOE+00 .OOOOE+00
.OOOOE+00 .OOOOE+00

REQUIRED MEMORY =

1205

AVAILABLE MEMORY = 25000

REQUIRED TIME FOR READING DATA * OOOOE+OOSEC

PC/RJ-CIVIL ENGINEERING DEPARTMENT-PUC/RJ


*
*
*EVBNIU 1
*
*
*

NUMBER OF TIME INTERVAL


TOLERANCE

1800
lOOOE+OO

NAX. NUMBEROTITERATIONS
TIME INTERVAL

20
1728E-M)6

NUMBER OP riERATICaiS FOR HUNTING

1800

CIVIL ENGINEERING EffiPT-PUC/RJ -TIME: .OOOOE+OOriER.: 0 ERRCai: .OOOOE+00


NOCffi

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

.1904E+03
.19I5E+03
.1875E+03
.1870E+O3
.1935E+03
.1984E+03
.2044E+O3
.1825E+03
.1850E+O3
.1920E+O3
.2000E+O3
.2060E+O3
.3000E+03
.1806E+03
.1742E+03
.1665E+03
.1680E+03

PRESS.HEAD TOTALHEAD SOILMOIS

.1333E+03
.1352E+03
.140(^+03
.1340E+03
.1200E+O3
.1200E+03
.120OE+O3
.1400E+O3
.1340E+03
.1180E+O3
.1180E+03
.H80E+O3
.118(ffi+03
.1192E+03
.1124E+03
.1180E+03
.120aE+O3

-.lOOOE+01
.OOOOE+00
-.lOOOE+01
-.lOOOE+01
-.lOOOE+01
-.lOOOE+01
.OOOOE+00
.OOOOE+00
-.lOOOE+01
-.lOOOE+01
-.lOOOE+01
.OOOOE+00
.OOOOE+00
-.lOOOE+01
-.lOOOE+01
-.lOOOE+01
.1800E+02

.1323E+03
.1352E+03
.1390E+03
.1330E+O3
.1190E+03
.1190E+03
.1200E+03
.140(ffi+03
.1330E+O3
.1170E+03
.1170E+03
.1180E+O3
.1180E+O3
.1182E+03
.1114E+03
.1170E+O3
.1380E+03

.3942E+O0
.4500E+00
.3942E+00
.3942E+00
.3942E+O0
.3942E+O0
.4500E+O0
.450(ffi+00
.3942E+O0
.3942E+O0
.3942E+O0
.4500E+00
.4500E+00
.3942E+00
.3942E+00
.3942E+00
.450(ffi+00

18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

.1844E-H)3
.1925E+03
.2064E-M)3
.300(ffi+O3
.1541E+03
.1800E-K)3
.1540E+03
.1860E-K)3
.3000E-KI3
.3000E-K)3
.1075E403
.2069E-K)3
.1075E+03
.1531E+03
.2293E+03
.4800E-M)2
.OOOOE-K
.4900E-W2
.1200E-H)3
.OOOOE+00
.OOOOE-tOO

RI,KM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

.1101E-M)3
.1084E-rt)3
.9437E-H)2
.9437E-H)2
.120(^+03
.1000E-M)3
.1180E-M)3
.lOOOE+03
.6753E+02
.000(^400
.1200E-K)3
.6762E-K)2
.1180E-M)3
.5523E-H)2
.OOOOE-H
.1200E-H)3
.1200E-*O3
.118(MB-H)3
.OOOOE+OO
J704E+02
.OOOOE+OO

.177E-H)3
.259E+03
.422E-)2
.253E+03
.181E+03
.107E+03
.198E+03
.186E-M)3
.149E+03
.253E-K)3
.192E+03
.201E+03
.18QE-H)3
.169E-K)3
.243E-H)2
.186E-H)3
.196E-K)3
.202E-K>3
.780E-K)2
.172E-K)3
.131E+03
.161E+03
.189E403
.196E-M)3
.192E-K)3
.179E-K)3
.189E-t03
.18SE-t03

-.lOOOE+Ol
-.1000E-H)1
-.100(ffi+01
.OOOOE-KX)
-.1000E-K)1
-.100(+01
-.lOOOE+01
-.lOOOE+01
.OOOOE-tOO
-.lOOOE+Ol
.1800E4O2
-.lOOOE+01
-.lOOOE+01
-.lOOOE+Ol
-.lOOOE-tOl
.1800E-K)2
.1800E+02
-.1000E-K)1
-.lOOOE+Ol
-.lOOOE+01
-.lOOOE-tOl

.1091E+O3
.1074E+03
.933TE+02
.9437E+02
.1190E+03
.9900E+O2
.1170E+O3
.9900E+02
.6753E+02
-.lOOOE+01
.1380E+03
,6662E+02
.1170E+03
.5423E+02
-.lOOOE+01
.1380E+03
.1380E+O3
.1170E+O3
-.lOOOE+01
.5604E+O2
-.lOOOE+01

VELOC-1 VELOC-2

.3942E+O0
.3942E+00
.3942E+00
.450(ffi+00
.3942E+00
.3942E+O0
.3942E+00
.3942E+00
ASOm-iOO
.3942E+00
.4500E+O0
.3942E+00
.3942E+00
.3942E+00
.3942E+00
.450(ffi+00
.4500E+00
.3942E+00
.3942E+O0
.3942E+00
.3942E+00

A N G - I X VELOC

ANGIE-X GRAD-l

307E4O2 . 555E-21 -.649E-04 .OOOE+OO .649&04 - .900E+O2 - .158E-17 . lOOE+01 lOQE+01 900E+O2
338E-K)2 -. 468E-06 -.718E-04 .OOOE+OC .718E-04 - .904E+02 .611E-02 . lOlE+01 . lOlE+01 897E+02
438E-K)2 -. 343E-21 -.649E-04 .OOOE+OC .649E-04 - .900E+02 .97,7,R-17 lOOB+01 lOOE+01 900E+O2
810E-H)2 -. 883E-06 -.766E-04 .OOOE+OC .766E-04 - .907E+02 .I07E-01 . lOOE+01 . lOOE+01 894E+02
807E-K)2 . DOOE+OO ..649E-04 .OOOE+OO .649E4)4 -.900E+02 .OOOE+OO .lOOE+01 .lOOE+01 .900E+O2
7?,R+02 . OOOE+OO -.649E-04 .OOOE+OO .649E-04 -.900E+Q2 .OOOE+OO .lOOE+01 .lOOE+Ol .90QE+O2
.926E+02 . MOE+OO -.649E-04 .OOOE+OO .649E-04 -.900E+O2 .OOOE+OO .lOOE+01 .lOOE+01 .900E+02
105E-K>3 . 00E+OO -.649E-09 .OOOE+OO .649E-09 ..900E+O2 .OOOE+OO .lOOE+01 .lOOE+01 ,900E+02
978E402 . BOfflE+OO -.649E-04 .OOOE+OO .649E-04 -.900E+02 .OOOE+OO .lOOE+01 .lOOE+01 .900E+02
.106E-H)3 - 471E^)6 -.843B-04 .OOOE+OO .843E-04 -.903E+02 .533E-02 .102E+01 .102E+01 .897E+02
.114E+03 00(HE+O0 -.649E-09 .OOOE+OO .649E-09 -.900E+O2 .OOOE+OO -lOOE+Ol .lOOE+01 .900E+O2
.110E-K)3 -.477E-05 -.713E-04 .OOOE+OO .715E-04 -.938E+02 .623E-01 .102E+O1 .102E+01 .865E+02
.110E-M)3 OOOE+OO -.649E-09 .OOOE+OO .649E-09 -.900E+O2 .OOOE+OO .lOOE+01 .lOOE+01 .900E+O2
.112E-K)3 OOOE+OO - . 6 4 9 E ^ .OOOE+OO .649E-09 -.900E+02 -OOOE+OO .lOOE+01 .lOOE+01 .900E+02
.104E-K)3 300E-O4 -.139&03 .OOOE+OO .142E.03 -.778E+02 ..364E+00 .158E+01 .162E+01 .103E+03
,120E403 0 0 ( ^ + 0 0 -.649E-09 .OOOE+OO .649E-09 -.900E+02 .OOOE+OO .lOOE+01 .10(ffi+01 .900E+02
.119B+03 OOOE+OO -.649E-05 .OOOE+OO .649E-05 -.90Cffi+O2 .OOOE+OO .lOOE+01 .lOOE+01 .900E+O2
.119E+03 -.138E-05 -.880E^5 .OOOE+OO .891E-05 -.989E+02 .167E+00 .114E+01 .115E+01 .816E+02
.119E+03 OOOE+OO -.928E-19 .OOOE+OO .928E-19 -.900E+02 .OOOE+OO .105E+02 ,10SE+02 .900E+O2
.117E+03 166E-09 -.280E-08 .OOOE+OO .280E-08 -.866E+02 -.194E+00 .333E+01 .334E+01 .933E+02
.119E-H)3 174E-20 -.489E-19 .OOOE+OO .489E-19 -.880E+02 -.204E+00 .576E+01 .576E+01 .920E+O2
.119E-K)3 - 615E-20 -.463E-19 .OOOE+OO .467E-19 -.976E+02 .721E+00 .546E+01 .550E+O1 .825E+02
.127E+03 OOOE+OO - . 6 4 9 E 4 5 .OOOE+OO .649E-05 -.900E+02 .OOOE+OO .lOOE+01 .lOOE+01 .900E+02
.127E-K)3 - .196&09 -.916E-09 .OOOE+OO .936E-09 -.102E+O3 .236E+O0 .117E+01 .120E+01 .786E+02
.127E-K)3 OOOE+OO -.649E-09 .OOOE+OO . 6 4 ^ ^ -.900E+02 .00(+O0 .lOOE+01 .lOOE+01 .900E+02
.128E+03 112E-08 -.103E- .OOOE+OO .153E-08 -.425E+02 -.125E+01 .116E+01 .171E+01 .137E+03
.136E-K)3 -. 1 5 2 E ^ - . 7 6 6 E ^ .OOOE+OO .781E-09 -.101E+03 .199E+00 .109E+01 .llOE+Ol .796E+02
.137E+03 115&09 -.835E-09 .OOOE+OO .843E-09 -.822E+02 ..143E+O0 .106E+01 .107E+01 .977E+02

CIVIL ENGINEliRING OEFI -PUCVRJ -TIME:.3110E+O911BK.: 1 ERROR: .1145E-04


NODE
1
2
3
4
5
6
7
8
9

.1904E+03
.1915E-K3
.1875E+03
.187(ffi-K)3
.1935E-M)3
.1984E-K)3
.204^403
.1825E-+03
.1850E+03

GRAD-2 GRADIENT ANG-X

PRESSJHEAD

.1333E+03
.1352E+03
.1400E4O3
.1340E-H)3
.1200E-K)3
.1200E-H)3
.1200E-+O3
.1400E-H)3
.1340E-K)3

-.7775E+00
-.8159E+00
-.1979E+01
-.1161E+02
-.9034E+01
-.1833E+02
-.2303E+O2
.O00(ffi+00
-.1125E+02

I'Ol'ALHEAD SOIL MOISTURE


.1325E+03
.1344E+03
.1380E+O3
.1224E+03
.1109E+03
.1016E+O3
.9693E+02
.1400E+03
.122RE+03

.4256E+O0
.4199E+00
.3101E+00
.1695E+O0
.1852E+00
.1443E+O0
.1366E+00
4500E+O0
.1716E+00

10 .1920E-+O3 .1180E-M)3 -.6859E+01

n
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

.2000E+03
.2060E+03
,300(ffi+03
.1806E-K)3
.1742E-H)3
.1665E+03
.1680E+03
.1844E-M)3
.1925E-M)3
.2064E+03
.3000E+03
.1541E-M)3
.1800E+03
.1540E-H)3
.1860E-M)3
.3000E-K)3
.3000E-K)3
.1075E-K)3
.2069E+03
.1075E-H)3
.1531E+03
.2293E-K)3
.480(^+02
.OOOOE+00
.4900E-K)2
.120fflE+03
.OOOOE+00
.OOOOE-tOO

ELEM
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

.177E+03
.259E-K)3
.422E-K)2
.253E-K)3
.181E-H)3
.!07E-H)3
.198E-K)3
.186E+03
.149E+03
.253E-M)3
.192E+03
.201E-K)3
.180E+03
.169E+03
.243E+02
.186E+03
.19^403
.202E+03
.780E+02
.172E+03
.131E+03
.161E+03
.189E+03
.19^+03
.192E+03
.179E+03
.189E+03
.185E+03

.1180E+03
.lI8E+03
.1180E-K)3
.n92E+03
.1124E403
.1180E-K)3
.1200E+03
.llOlE+03
.1084E-K)3
.9437E-H)2
.9437E-M)2
.1200E-H)3
.1000E-K)3
.118(ffi+03
.lOOOE+03
.6753E-K12
.OOOOE-H
.1200E-K)3
.6762E-K)2
.1180E+03
.5523E+02
.000OE4O0
.1200E-K)3
.1200E-K)3
.llSOE'tOS
.OOOOE-KX)
.5704E+02
.OOOOE-K

-.2040E+02
-.2153E+02
-.440^-H)2
-.5267E-K)0
-.2009E-tO0
.3158E-W1
.1800E-K)2 .
-.IIOIE+Ol
..8824E-H)1
.2145E-H)1
-.2276E-M)2
-.lOOOE+01
.3480E+01
-.7377E+01
.1556E+01
.OOOOE+00
.8168E-K>2
.1800E4O2
J885E+02
.2561E-M)1
.5285E-M)2
.9054E-K)2
.1)0E-K)2
.1800E-K)2
.1747E-K)2
.n24E+03
.7249E-K)2
.1286E+03

.lllIE+03 .1984E-K)0
.9760E-4O2 .1409E-K)0
.9647E402 .1391E-K)0
.7391E+02 .1024E+00
.1187E-K)3 .4423E+00
.1122E-M)3 .4470E-K)0
.1212E-K)3 .4500E4O0
.1380E4O3 .4500E-MX)
.109(ffi+03 .3824E-K)0
.9960E-K>2 .1864E400
.%51E+02 .4500E-K)0
.7160E-H)2 .1371E+00
.1190E+03 .3942E-KX)
.1035E-K)3 .4500E400
.1106E-K)3 .1953E^O0
.1016E-K)3 .4500E+00
.6753E-K)2 .4500E-M)0
.816RF,-K)2 .4300E+00
.1380E-H)3 .4500E400
.9647E-H)2 .450(ffi+00
.1206E+03 .4500E+00
.108IE-K)3 .4500E-MX)
.9054E-K)2 .4500E400
.1380E+03 .4500E+00
.138(ffi-K)3 .4500E^O0
.1355E+03 .4500E+00
.1I24E-K)3 .4500E+00
.1295E+03 .4500E+00
.1286E-K)3 .4500E-M)0

VELOC-1 VmX)C-2 ANG-IX VELOC ANOLE-X QRAD-l

.307E+02
.338E-KI2
.438E-K)2
.810E+02
.807E+02
.72E+02
.926E-M)2
.105E+03
.978E-M)2
.10^+03
.114E-K)3
.110E-K)3
.llOE+03
.112E+03
.104E403
.120E-H)3
.119E-K)3
.119E403
.119E+03
.117E+03
.119E+03
.llE+03
.127E+03
.127E+03
.127E+03
.128E+<)3
.136E+03
.137E+03

.208E-04 -.309E-03
.231E-04 .992E-05
.958&05 -.981&05
.242E-04 -.55ffi-05
.232E.04 -.243E-05
.237E-04 -.437E-05
. 2 1 7 E ^ .774E-06
.43<ffi-09 .,401E-09
.199E-04 ..377E-0S
.429E-05 -.473E-06
.683E-10 -.152E^9
.491E-05 . 4 5 3 B ^
.118E-09 - . 6 7 4 E 0 9
-.277E-09 -.905E-09
.448E-05 -.169E-04
.114E-09 -.217E-09
.145E-07 -.868E-08
.790E-09-.122E-<
.126E-20 -.496E-19
.407E-09 -.298E-08
.243E-20 -.523E-19
-.876E-20 -.471E-19
.698E-08 -.760E-08
.196E-09 -.342E-09
.794E-11 - . 1 7 7 E 0 9
.155E-08 -.103E-08
-.389E-09 -.367E-09
-.829E-11 -.565E-(

GRAD-2 CaiADIENT ANG-X

.OOOE+00 .210E-04 -.845E+01 -.208E-K)0 .309E-01 .210E-K)0 .172E-K)3


.OOOE+00 . 2 5 1 E 0 4 .233E-K)2 -^31E-K)0 -.992E-01 .251E-+O0 -.157E-H)3
.OOOE-KX) .137E-04 -.457E-f02 -.958E-01 .981E-01 .137E+00 .134E+03
.OOOE-KK) .248E-04 -.129E-K)2 -.288E-K)0 .743&01 .298E+00 .166E+03
.OOOE+00 .233E-04 -.600E+01 -.232E-M)0 .243E-01 .233E-H)0 .174E403
.00OE-+O0 .241E-04 -.105E-H)2 -.237E-K)0 .437E-01 .241E-K)0 .170E+03
.00(ffi-t00 .217E-04 .204E-K)1 -.250E-K)0 -.112E^1 .250E-H)0 -.177E-K)3
.OOOE-HX) .588E-09 -.430E-K)2 -.727E-H)0 .622E-K)0 .957E+00 .139E-K)3
.OOCE-KX) .203E-04 -.107E+02 .225E-H)0 .437E-01 .229E-K)0 .169E+03
.OOOE-HX) .431E-05 -.630E+01 -.253EHO0 .457E^1 .257E+00 .170E+03
.OOOE+00 .167E-09 -.658E-H)2 -,130E-)1 . I B E + O l .172E-01 .I39E-K)3
.OOOE-KK) .493E-05 .528E+01 -.222E-K)0 -.143E-01 .222E-H)0 -.176E-K)3
.OOOE+OO .684E-09 ..SOIE-K -.133E+00 .796E-K)0 .807E+00 .995E-M)2
.000E-M)0 .946E-09 -.107E+03 .444E-M)0 .132E-K)1 .139E-K)1 .713E-K)2
.00OE-H)O .174E-04 -.751E-K)2 -.448E-01 .169E+00 .174E+00 .105E+03
.000E-K)0 .246E-09 -.623E+02 -.602E-KI0 .590E-H)0 .843E-H)0 .13aS+03
.OOOE+OO . 1 6 9 E 0 7 -.309E+02 -.nSE+Ol .925E-M)0 .199E-K)1 .152E+03
.OOOE+OO . 1 4 5 E - 0 8 - . 5 7 1 E + 0 2 - . 4 8 7 E + 0 0 .741E+O0 .887E+00 .123E+03
.OOOE+OO .496E-19 -.885E+02 -.126E+O0 .496E+01 .496E+01 .915E+02
.OOOE+00 .301E-08 -.822E+02 -.430E+O0 .304E+O1 .307E+01 .980E+02
.OOOE+OO .523E-19 -.873E+02 -.310E+00 .646E+01 .647E+01 .927E402
.00(^+00 .479E-19 -.lOlE+03 .112E+01 .584E+01 .595E+01 .791E+02
.OOOE+OO .103E-O7 -.475E+02 -.473E+O0 .557E+00 .731E+00 .130E+03
.OOOE+OO .395E-09 -.601E+02 -.874E+00 .175E+01 .196E+01 .117E+03
.00(ffi+00 .177E4)9-.874E+02 .242E+00 .167E+01 .169E+01 .818E+02
.OOOE+OO .186E-08 -.337E+02 ..188E+01 .119E+01 .223E+01 .148E+03
.OOOE+OO .535E-09 -.137E+03 .219E+01 .176E+01 .281E+01 .389E+02
.OOOE+OO ,566E-09 -.908E+02 -.332E+00 .270E+<)1 .272E+01 .970E+O2

* REQUIRED TIME FOR EXECUTION * .OOOOE+00 SEC* EVENT* 1


E^JD OP PROGRAM **

azafrancucho:nodos secc.izquierda
^
/ s

K.
\~'~~\ '^"''-
/

/
/

.*6

'sML

"\

^Mn-j4ln~~:,.w../<.r.SMniJmk.

\
\

-i4t9

\.
\

')a_^s

JK-

3^L

3-t._

8
/

\.

/
/
37

^H

\
\

\
\

\
\

^1

_86

/
38

J!m_

.,i37

azafrancuchorelementos secc.izquierda

21

19

15/

222016118

le

"-

/
\/.

.A~"
/

\ 28

/
/

26

\ \

\ 23 25

24
\

\ \
\

1SW

20
V.

14

X.

N/

13

V.

\ \

16

11

12

/
"":?<.

V.

"V.
V,

/
/

\
X

/
X
\

ANEXO 4
FILTRACIN POR EL CUERPO Y LA CIMENTACIN
LADO DERECHO

ANLISIS DE FILTRACIONES EMBALSE AZAFRANCUCHO


SECCIN LADO DERECHO
MODELAMIENTO MEDIANTE ELEMENTOS FINITOS

CUERPO k=1.010-'^cm/seg

FILTRO k=1.010-3cm/seg

E]

CIMENTACIN 1 k=1.0 10"^ cm/seg

ANLISIS DE FILTRACIONES EMBALSE AZAFRANCUCHO


IMPERMEABILIZACION SECCIN LADO DERECHO
ANLISIS DE FLUJO BIDIMENSiONAL Y PERMANENTE
DISTRIBUCIN DE CARGAS DE PRESIN (m)

PUC/RJ-CIVtt,ENGINEERlNOEffiPAR'rMENT-PC/RJ
*
2I>3DSTEADY-imSTEADYSATRA'mD-UNSATlJRAlEDFLOW

PROBLEM - ANAL.nLTRAC.EM&AZAFRANCUCHO SECCDERECHA 27MM

NUMBER OF N C a ^ S
38
NUMBER OF ELEMENTS
28
NUMBER OF MATERIALS
4
NUMBER OF NCHDES AT FREE SURFACE
6
NUMBER OF ELEM FOR ONE NODE AT F R m SURFACE
NUMBER OF SEGMENTS W/PRESCRIBHD VELOCITY
DATUM
OOOE-K
MAX. NUMBER Cff POINT TO DEFINE PSI-TU4C
9
FLOW TYPE
PLANE
DIMENSIC9
2D

CIVIL ENGINEERINO DEPT - PUC/RJ

MATERLW.
1

.lOOfflE-08

UODE

1
2
3
4
5
6
7
8
9

Kl

K2

ANAL.F1LTRAC.EMB.AZAFRANCUCH0 SECCDERECHA 27.11.02 ABEL ORDOBEZ

.lOOOE-08 .OOOOE+00

PRESSURE VOLUMETRIC
RELHYtat
HEAD SOIL MOISTURE
COND.
-,4560E+02
-.1480E-M)2
-.6600E+01
-.350fflE-M)l
-.2130E401
-.1380E+01
-.9500E-K)0
-.6800E-K)0
.0OOOE4OO

MAT0AL

Kl

.lOOOE-04

NCOE

1
2
3
4
5
6
7
8
9

3
0

SSWAi

.lOOOE+00
.1500E-M)0
.2000E-K)0
.2500E-K)0
.3000E+00
.3300E-+OO
.400fflE+00
.4400E+00
.4500E-K)0

.5800E^5
.2000E-O3
.2100E-02
.140ffi-01
.6800E-01
.2600E-K)0
.700(ffi+00
.9000E-K)0
.1000E-H)1

CIVIL ENGINEERING EEPT - PUC/Rj

ABEL ORDOKEZ

K2
.lOOOE^

ANAL.FILTOAC.EMB.AZAFRANCUCHO SECCDERECHA 27.11.02 ABEL ORDCSfEZ

SSWAj
.OOOOE+00

HESSURE VOLUMETRIC
REL.HYEai.
HEAD SOIL MOISTURE
COND.
-.4560E+02
-.1480E+02
-.6600E-M)1
-.3500E-K)1
-.213(ffi+01
-.1380E+01
-.9500E-H)0
-.6800E-K)0
.000(^400

.lOOOE-tOO
.ISOOE-K
.2000E-M)0
.2500E+00
.3O0(ffi-H)O

.isomMso
.4000E+00
.4400E-H)0
.4500E+00

.580OE-O5
.2000E-03
.2100E-02
.1400E-01
.6800E-01
.2600E-K)0
.7000E+00
.9000E-K)0
.lOOOE+01

CIVIL ENGINEERING DEFT - PC/RJ

MATERL^L
3

Kl

K2

SSWM

.lOOOE-06 .lOOOE-06 .OOOOE+00

NODE

1
2
3
4
5
6
7
8
9

HESSURE VOLUMETIUC REL. HYDR.


HEAD SOIL MOISTURE
CCM).

-.456QE+02
-.1480E-K)2
-.6600E401
-.35O0E-M)l
-.2130E+01
-.138(+01
-.9500E-K)0
-.6800E-HX)
.OOOOE+00

.lOOOE+00
.1500E+00
.2000E+00
.2500E-K)0
.3000E4O0
.3500E-fO0
.400(-H)0
.4AO0E+00
.4500E+00

.5800E^5
.2000E4)3
.2100E^2
.1400E-01
.6800E-01
.2600E-K)0
.7000E+00
.9000E-K)0
.lOOOE-tOI

CIVIL HGINEERING DEPT - PUORJ

MATERIAL
4

Kl

K2

.lOOOE-06 .1000E-06

NCaDE

1
2
3
4
5
6
7
8
9

,0000E-O0

PRESSURE VOLUMETRIC REL. HYDR.


HEAD SOIL MOISTURE
COND.

-.4560E-H)2
-.1480E+02
..6600E+01
-.3500E+01
-.2130E+01
-.1380E-K)1
-.9500B-M)0
-.6800E-K)0
.OOOOE+00

NODE BC
0
0
0
0
0
0
0
1
0
0
0
0
0
0
0

ANAL.FILTRAC.EMBjkZAFRAircUCHO SECCXffiRECHA 27.11.02 ABEL ORDCMEZ

SSW/h

.lOOOE+00
.ISOOE-HX)
JOOOE+00
.2500E-fO0
.3000E-K)0
.35O0E+OO
.4000E-M
.4400E+00
.4500E-K)0

.5800E-0S
.2000E-03
.2100E-02
.1400E-01
.6800B^1
.2600E-K)0
.7000E+00
.9000E+00
.lOOOE-tOl

CIVIL EhKHNEERING DEPT - PUCARJ

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

ANAL.FILTRAC.EMB.AZAFRANCUCHO SECC.DERECHA 27.11.02 ABEL ORIXWEZ

.1904E-H)3
.1915E+03
.1875E-H)3
.1870E+03
.1935E-H)3
.i984B-K)3
.2044E-K)3
.1825E-M)3
.1850E+03
.192(HE+03
.2000E4O3
.2060E+03
.300(^403
.180^403
.1742E+03

Y
.1333E+03
.1352E-K)3
.1400E-K)3
.1340E-M)3
.1200E-K)3
.1200E-K)3
.1200E+03
.1400E+03
.13406403
.1180E4O3
.1180E403
.1180E4O3
.1180E403
.1192E403
.1124E403

ANAL.FILTRAC.EMB.AZAFRANCCHO SECC.ERECHA 27. H .02 ABEL ORDCWEZ

F
.000OE4OO
-OOOOE+OO
.OOOOE400
.O00OE4OO
.OOOOE400
.QOOCE-tOO
.OOOOE+00
.OOOOE+00
.0000E4O0
.OOOOE+00
.OOOOE+00
.0000E4O0
.OOOOB+00
.OOOOE+00
.OOOOE+00

16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

0
1
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
1
1
0
0
0
0

.1665E+03
.1680E4O3
.1844E-K)3
.1925E+03
.2064E-K)3
.3000E-H)3
.1541E+03
.18006+03
.1540E+03
.1860E-K)3
.3000E+03
.3000E+03
.1075E+03
.206^+03
.1075E+03
.1531E+03
.2293E+03
.4800E-H)2
.OOOOE-KX)
.4900E-M)2
.1200E+03
.OOOOE-KX)
OOOOE-KK)

.1180E+03
.1200E-H)3
.1101E403
.1084EHO3
.9437E-102
.9437E+02
.1200E+03
.lOOOE+03
.1180E-K)3
.lOOOE+03
.6753E-K)2
.OOOOE-KK)
.1200E-K)3
.6762E+02
.1180E-K)3
.5523E-K)2
.OOOOE-K)0
.1200E-M)3
.1200E403
.1180E-K)3
.OOOOE+00
.5704E-K)2
.O0OOE-K)O

.O00OE-M)O
.1800E+02
.OOOOE-K)0
.OOOOE-WO
.OOOOE-K)0
.OOOOE-K)0
.000OE-+O0
.OOOOE+00
.000(ffi-KX)
.00O0E-K)O
.OOOOE-K)0
.0000E-H)0
.1800E-K)2
.OOOOE-K)0
.0000E-K)O
.OOOOE-K)0
.OOOOE+OO
.1800E-K)2
.1800E-K)2
.000OE-K)0
.OOOOE-K)0
.OOOOE+00
.O00(ffi+00

CIVIL ENGINEERING DEPT - PUC/RJ

FI.FM

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

29
29
37
20
25
30
19
18
31
21
19
20
18
15
35
10
10
11
28
14
22
24
5
1
4
14
4
9

J
31
32
38
29
23
35
25
23
23
13
11
12
14
16
33
9
11
12
33
17
28
16
4
6
5
9
1
4

K
36
27
36
26
31
36
29
25
24
12
10
11
15
24
34
14
6
7
35
16
30
17
9
7
6
8
2
3

M
32
26
35
21
29
31
20
19
30
20
18
19
23
23
37
18
5
6
30
15
24
22
10
2
1
17
3
8

ANAL.FILTRAC.EMB.AZAFRANCUCHO SECC.DERECHA 27.11.02 ABEL ORIXWEZ

MAT

ANGLE

4 .OOOE+00
4 .OOOE+00
4 .OOOE+00
4 -OOOE+OO
4 .OOOE+00
4 .OOOE+OO
4 .OOOE+OO
1 .OOOE+00
4 -OOOE+OO
4 .OOOE+OO
1 .OOOE+00
4 .OOOE+OO
1 .OOOE+00
1 .OOOE+00
4 .OOOE+OO
1 .OOOE+00
2 .OOOE+OO
2 .OOOE+00
3 .OOOE+OO
1 .OOOE+OO
3 .OOOE+OO
3 .OOOE+OO
2 .OOOE+00
1 .OOOE+OO
1 .OOOE+00
1 .OOOE+OO
1 .OOOE+00
1 .OOOE+00

CIVIL H>K}INEERINO DEPT TVORJ

ANAL.FIL'raAC.EMB.AZAFRANCUCHO S E C C D E R E C H A 27.11.02 ABEL ORDONEZ

HALF-BAND WIDTH = 11

INITIAL C O N O m C !

PRESSURE H E A D =

-1,00

INFCRMATION ABOUT FREE SURFACE


N O T NBC
2 1
7 1
12 1
13 1
21 1
26 1

FX

.OOOOE+00
.OOOOE+00
.OOOQE+OO
.OOOOE+00
.OOOOE+00
.OOOOE+00

.OOOOE-KK)
.OOOOE-K
.OOOOE+00
.OOOOE+00
.OOOOE+00
.OOOOB+00

REQUIRED M E M O R Y

1205

AVAILABLE MEMCSRY = 25000

*** REQUIRED H M E FOR READING D A T A * * * .OOOOE+00 SEC

P U C / R J - C I V I L ENGINEERING DEPARTMENT-PUC/RJ
*
*
EVENT# 1

NUMBER OF TIME INTERVAL


TOLERANCE

1800
lOOOE+00

NAX. NUMBER OF ITERATIONS


TIME INTERVAL

20
1728E+06

NUMBER OF ITERATIONS F C HUNTING

1800

CIVILEhKJINEERINGDEFT-PC/RJ -TIME: .OOOOE+00ITER.: 0 ERRCl: .OOOOE+00


NODE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

.1904E+O3
.1915E+03
.1875E+03
,1870E+03
.1935E+03
.1984E+03
.2044E+O3
.1825E+03
.I850E+03
.1920E+03
.2000E+O3
.2060E+O3
.3000E+03
.l%)6E+03
.1742E+03
.1665E+03
.1680E+O3
.1844E+03
.1925E+03
.2064E+O3

PRESSJIEAD
.1333E+03
.1352E+03
.1400E+03
.1340E+O3
.120(+O3
.1200E+03
.1200E+03
.1400B+O3
.1340E+O3
.118(ffi+<)3
.1180E+03
.1180E+03
.1180E+O3
.1192E+03
.1124E+03
.n80E+O3
.1200E+03
.llOlE+03
.1084E+O3
.9437E+02

-.lOOOE+01
.OOOOE+00
-.lOOOB+01
-.lOOOE+01
-.lOOOE+Ol
-.lOOOE+Ol
.OOOOE+00
.OOOOE+00
-.lOOfflE+01
-.lOOOE+01
-.lOOOE+01
.OOOOE+00
.OOOOE+00
-.lOOfflS+01
-.lOOOE+01
-.lOOOE+OI
.180(ffi+02
-.lOOOE+Ol
-.100(ffi+Ol
-.lOOOE+01

TOTAL HEAD SOIL MOISTURE


.1323E+03
.1352E+03
.1390E+O3
.1330E+03
.1190E+03
.1190E+O3
.1200E+O3
.14O0E+O3
.1330E+O3
.1170B+O3
.1170E+03
.1180E+O3
.1180E+O3
.1182E+03
.1114E+03
.1170E+O3
.13805+03
.1091E+O3
.1074E+03
.9337E+02

.3942E+00
.4500E+00
.3942E+O0
.3942E+00
.3942E+00
.3942E+00
.450OE+O0
.4500E+00
.3942E+O0
.3942E+O0
.3942E+00
.4500E+O0
.450(ffi+00
.3942E+O0
.3942E+00
.3942E+00
.4500E+00
.3942E+00
.3942E+00
.3942E+00

21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

.3000E-M)3
.1541E+03
.1800E-K)3
.1540E+03
.1860E-H)3
.3000E-K)3
.30OOE-K)3
.1075E+03
.2069E+O3
.1075E-H)3
.1531E403
.2293E+03
.4800E+02
.OOOOE+00
.4900E-K2
.1200E+03
.OOOOE+00
.OOOOE+00

ELEM

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

.9437E-M)2
.120OE-K)3
.1000E-H)3
.IISOE+OS
.lOOSE+OS
.6753E-K)2
.OOOOE-HJO
.1200E-H)3
.6762E-K)2
.1180E-K)3
.5523E-H)2
.OOOCE+OO
.1200E+03
.1200E-H)3
.1180E-K)3
.OOOOE+00
.5704E+02
.000(E+00

.177E+03
.259E+03
.422E+02
.253E+03
.181E+03
.107E+03
.198E+03
.186E+03
.149E+03
.253E+03
.I92E+03
.201E-K)3
.180E+O3
.169E+03
.243E+02
.186E+03
.196E+03
.202E+O3
.780E+02
.172E+03
.131E+03
.161E+03
.189E+03
.196E+03
.192E+03
.179E+03
.189E+03
.185E+03

.OOOOE-K .9437E+02
-.lOOOE+01 .1190E-K)3
-.100(ffi+01 .990(ffi+02
-.lOOOE+01 .1170E-K)3
-.lOOffi+Ol .9900E+02
.OOOOE+00 .6753E-t02
-.lOOOE+01 -.lOOOE+01
.1800E+O2 .138QE+03
-.lOOOE+01 .6662E-M)2
-.lOOOE+01 .1170E-+O3
-.lOOOE+01 .5423E-+02
-.lOOOE-KH -.lOOOE+OI
.1800E+02 .1380E+03
.1800E-M)2 .1380E+03
-.lOOOE+01 .1170E+O3
-.lOOOE+Ol -.lOOOE+Ol
-.lOOOE+Ol .5604E+O2
-.lOOOE+Ol -.lOOOE+01

VELOC-1 VELOC-2

.4500E-M)0
.3942E-K)0
.3942E-H)0
.3942E+00
.3942E+00
.4500E+00
.3942E+00
.4500E+00
.3942E+00
.3942E+00
.3942E-H)0
.3942E-K)0
.4500E-M)0
.4500E-H)0
.3942E-MX)
.3942E-H)0
.3942E-K)0
.3942E+O0

ANG-IX VELOC ANOLE-X GRAD-1

.307E-K)2 .244E-25 -.649E-07 .OOOE+00 .649E-07 -.900E+02 .213E-16 .lOOE+01 .lOOE+Ol .900E+02
.338E+02 -.468E-09 -.718E-07 .OOOE+00 .718E-07 -.904E+O2 .611E-02 .lOlE+01 .lOlE+01 .897E+02
.438E+02 -.165E-24 -.649E-07 .OOOE+00 .649E-07 -.900E+O2 .106E-16 .lOOE+01 .lOOE+01 .900E+02
.8iaE+02 -.883E-09 -.766E-07 .OOOE+00 .766E-07 -.907E+02 .107E-01 .lOOE+01 .lOOE+01 .894E+02
.807E+02 .OOOE+00 -.649E-07 .OOOE+00 .649E-07 -.900E+02 .OOOE+00 .lOOE+Ol .10(E+01 .900E+O2
.72SE+02 .OOOE+00 -.649B-07 .OOOE+00 .649E-07 ..900E+02 .OOOE+00 .lOOE+01 .IOOE+01 .900E+O2
.926E+02 .OOOE+00 -.649E-07 .OOOE+00 .649E^7 -.900E+O2 .OOOE+00 .lOOE+01 .lOOE+01 .900E+02
.1O5E+03 .OOOE+00 -.649E-09 .OOOE+00 .649E^ ..900E+O2 .OOOE+00 .lOOE+01 .lOOE+01 .900E+O2
.978E+02 .OOOE+00 -.649E-07 .OOOE+00 .649E-07 -.900E+O2 .OOOE+00 .lOOE+01 .lOOE+01 .900E+02
.106E+O3 -.471E-09 -.843E07 .OOOE+00 .843E-07 -.903E+02 .533E-02 .102E-H)1 .102E+01 .897E+02
.n4E+03 .OOOE+00 -.649E-09 .OOOE-fOO .649E-09 -.900E+O2 .OOOE+00 .lOOE+01 .lOOE+01 .900E+02
.llOE+03 -.477E-08 -.713E-07 .OOOE+00 .715E-07 -.938E+02 .623E-01 .102E+01 .102E+01 .865E+02
.llOE+03 .OOOE+00 -.649E^ .OOOE+00 .649E-09 -.900E+02 .OOOE+00 .lOOE+01 .lOOE+01 .900E+02
.112E+03 .OOOE+00 -.649E-09 .OOOE+00 .649E-09 -.900E+O2 .OOOE+00 .lOOE+01 .lOOE+01 .900E+O2
.104E+O3 .300E-07 -.139E-06 .OOOE+00 .142E4)6 -.778E+02 -.364E+O0 .158E+01 .162E+01 .103E+O3
.120E+03 .OOOE+00 -.64^-09 .OOOE+00 .649E-09 -.900E+02 .OOOE+00 .lOOE+01 .lOOE+01 .900E+02
.n9E+03 .OOOE+00 -.649E-05 .OOOE+00 .649E-05 -.900E+02 .OOOE+00 .lOOE+01 lOOE+Ol .900E+O2
.119E+03 -.13gE-05 -.MOE-05 .OOOE+00 .891E-05 -.989E+02 .167E+O0 .114E+01 .115E+01 .816E+02
.119E+03 .OOOE+00 -.928E-06 .OOOE+00 .928E^ -.900E+02 .OOOE+00 .105E+O2 .105E+02 .900E+02
.117E+03 .166E-09 -.280E-O8 .OOOE+00 .280E-08 ..866E+02 -.194E+00 .333E+01 .334E+01 .933E+02
.119E+03 .174E-07 -.48^-06 .OOOB+00 .489B-06 -.880E+02 -.204E+00 .576E+01 .576E+01 .920E+O2
.1I9E+03 -.615B-07 -.463E-06 .OOOE+00 .467E^ -.976E+02 .721E+O0 .546E+01 .550E+01 .825E+02
.127E+03 .OOOE+00 -.649E-05 .OOOE+00 .649E^5 -.900E+O2 .OOQE+00 .lOOE+01 .lOOE+01 .900E+O2
.127E+03 -.196E^ -.9iaE^ .OOOE+00 .936E-09 -,102E+03 .236E+00 .117E+01 .120E+01 .786E+02
.127E+03 .00(ffi+O0 -.649E^ .OOOE+00 .649E^9 -.90OE+O2 .OOOE+00 .lOOE+01 .lOOE+01 .900E+02
.128E+03 .112E-08 -.103E-08 .OOOE+00 .153E-08 -.425E+02 -.125E+01 .116E+01 .171E+01 .137E+03
.136E+03 -.152E-09 -.766E-09 .OOOE+00 .781E-09 -.lOlE+03 .199E+00 .109E-H)1 .llOE+01 .796E+02
.137E+03 .115E-09 -.835E-09 .OOOE+00 .843E-09 -.822E+02 -.143E+00 .106E+01 .107E+01 .977E+02

CIVILENOINESUNGDEPT-PUC/RJ -TIME: .31 lOE+09ITER,: 1 ERROR: .3674E-03


NODE
1
2
3
4
5
6
7
8
9
10

.1904E+O3
.1915E+03
.1875E+03
.1870E+O3
.1935E+03
.1984E-K)3
.2044E+03
.1825E+03
.1850E+O3
.1920E+03

GRAD-2 GRADIENT ANG-X

PRESS.HEAD TOTAL H E A D SOD-MOISTURE

.1333E+03
.1352E+03
.1400E+O3
.1340E+03
.1200E+03
.1200E+03
.1200E+03
.14006+03
.1340E+03
.1180E+O3

-.1495E-K)1 .131^+03 .3424E+00


-.1246E+01 .1340E+03 .3656E+00
-.I953E+01 .1380E+O3 .3117E+00
-.163^+02 .1177E+03 .1475E+00
-.4504E+01 .1155E+03 .2338E+O0
-.5015E+01 .1149E+03 .2256E+00
-.580^+01 .1142E+03 .2128E+00
.OOOCE+OO .1400E+O3 .4500E+00
-.1632E+02 .1177E+03 .1475E+O0
-.2585E+01 .1154E+03 .2834E+O0

11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

.2000E+O3
.2060E-H)3
.3O0OE-H)3
.1806E-K)3
.1742E403
.1665E-t03
.1680E+03
.1844E-K)3
.1925E-)3
.2064E-K)3
.300OE-K)3
.1541E+03
.1800E-K)3
.1540E4O3
.1860E-K)3
.3000E-W3
.3000E+O3
.1075E-M)3
.2069E-K)3
.1075E-H)3
.1531E+03
.2293E-H)3
.4800E-K)2
.O00(ffi-K)0
.49O0E'+O2
.120<t03
.OOOOE+00
.OOOOE-KX)

ELEM

.177E+03
.259E+03
.422E-K)2
.2S3E+03
.181E+03
.107E+O3
.198E+03
.186E+03

.149E-W3

10
II
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

.253E+03
.192E+03
.201E+03
.180E+03
.169E+03
.243E+02
.186E+03
.196E+03
.202E+03
.780E+02
.172E+03
.131E+03
.161E+03
.189E+03
.19^+03
.192E+03
.179E+03
.189E+03
.185E+03

.1180E+O3
.1180E-tO3
.1180E-tO3
.1192E-H)3
.1124E-H)3
,1180E-K)3
.1200E+03
.1101E-K)3
.1084E-M)3
.9437E-H)2
.9437E+02
.120(E+03
.100OE-+O3
.1180E+03
.lOOOE+03
.6753E-f02
.OOOOE+OO
.1200E+03
.6762E+02
.1180E-K)3
.5523E-K)2
.OOOOE+OO
.1200E+O3
.1200E-K)3
.1180E-K>3
.OOOOE-HX)
.5704E-K)2
.000(ffi+00

-.3190E+01
,.4315E+01
-.6895E+01
-.2820E-K)0
.1185E-K)0
.1578E-K)2
.1800E+02
-.9726E-MX)
-.3646E+01
-.2391E+01
-.3287E-K)1
-.12686+02
-.6500E+O1
-.1019E+02
-.2883E+01
-.3907E+O1
.1811E+02
.1800E+O2
-.4411E+01
.1812E-K)2
.2858E+02
.2884E+02
.1800E+02
,I800E+O2
.1945E+02
.9781E+02
.6866E+02
.1247E+03

.1148E+03
.1137E+03
.llllE+03
.1189E+03
.1125E+03
.1338E+03
.1380E+03
.1091E+O3
.1048E+O3
.9198E+02
.9108E+02
.1073E+03
.9350E+02
.1078E+03
.9712E+02
.6362E+02
.1811E+02
.1380E+O3
.6321E+02
.1361E+03
.8381E+02
.2884E+02
.1380E+03
.138aB+03
.1375E'M)3
.9781E+02
.1257E+03
.1247E+03

.2613E+00
.2369E+00
.1982E+00
.459E+00
.4500E+00
.4500E+O0
.4500E+00
.3974E+00
.2476E+00
.2905E+00
.2578E+00
.1629E+00
.2016E+O0
.miEMJO
.2725E+00
.2434E+{)0
.4500E+00
.4500E+00
.2353E+O0
.4500E+00
.4500E+O0
.4500E+00
.4500E+00
.4500E+O0
.4500E+00
.4500E+O0
.4500E+00
.4500E+O0

V a o C - 1 VELOC-2 ANG-IX V a O C
.307E4O2
.338E+02
.438E+02
.810E-K)2
.807E+02
.728E+02
.926E+02
.105E+03
.978E-K)2
.106E+03
.114E+03
.llOE+03
.llOE+03
.112E+03
.104E+03
.120E+O3
.I19E+03
.119E+03
.119E+03
.117E+03
.119E+03
.119E+03
.127E+03
.127E+03
.127E+03
.128E+03
.13^+03
.137E+03

.492E-07 .I70E-07
.360E-08 . I 5 8 E ^
. I S I E ^ .171E-07
.554E-11 .338E-08
.155E-07 .136E-07
.341E-07 -.289B-07
.I14E-09 -.405E-08
.403E-10 -.380E-09
.377E-07 .301EW
.301E-10 -.173E-08
.416E-10 -.317E-09
.450E-10 -.261E^8
.328E-10 -.856E-09
-.444E-09 - . 1 6 8 E ^
J09E-09 -.198E-07
.616E-10 -.188E-09
.176E-07 -.982E-08
.192E-07 -.181E4)8
.n3E-08 -.603E-07
.123E-08
-.232E-08
.422E-07
-.340E-07
-.143E-06
-.915E-08
.966E-08
-.I22E-07
.272E-10
-.160E-09
-.147E-09
.17^-08 - . 1 3 8 E ^
-.241E-09 -.105E-08
-.356E-10 -.221E-09
-.739E-09

ANGLE-X GRAD-1 QRAD-2 GRADIENT ANG-X

OOOE+00 .52E-07 .191E+02 ..566E+O0 .215E+00


OOOE+00 .162B-07 -772E+02 .627E^1 .581E+O0
OOOE+OO .228E-07 .485E+02 .151E+00 .171E+00
OOOE+OO .338E-08 .899E+02 -.208E^2 .105E+O1
.OOOE+OO .20^-07 .413E+02 -.4O8E+O0 .597E+O0
.OOOE+00 .447E-07 .402E+O2 .341E+O0 .289E+00
.OOOE+OO .405E-08 -.9I6E+02 .324E-01 .103E+01
.OOOE+OO .382E-09 .%lE+02 .906E-O1 .I20E+01
OOOE+OO .483E-07 .385E+02 .491E+00 .389E+00
.OOOE+00 .173E-08 -.890E+O2 -.185E^1 .883B+00
.OOOE+00 .3I9E-09 -.825E+02 -.193E+00 -llOE+Ol
.OOOE+OO .261E-08 -.890E+O2 -.215E-01 -960E+OO
-OOOE+OO .856E-09 -.878E+02 -.333E-01 .133E+0!
-OOOE+OO .174E-08 -.105E+O3 .109E+01 .305E+O1
.OOOE+00 .198E-07 -.891E+02 -.309E-02 .198E+00
,000E+O0 .198E-09 -.719E+02 -.270E+O0 .366E+O0
.OOOE+OO .202E4)7 -.291E+02 -.861E^1 .443E-01
.213E-01
.OOOE+OO .I93E-07 -.538E+01 -.161E+00
.603E+00
.OOOE+OO .603E-07 -.889E+02 -.1I3E-01
.234E+01
.OOOE+OO .263E-08 -.620E+02 -.124E+01
.368E+00
-O0(ffi+00 .542E-07 -.389E+02 -.633E+00
.310E-01
.OOOE+OO .144E-06 -.176E+03 .215E+01
.121E+00
.OOOE+OO .155E-07 -.515E+02 -.655E-01
.119E+01
.OOOE+00 . I 6 3 E ^ -.804E+02 -.128E+O0
.164E+01
.00(^+00 .202E-09 -.137E+03 .178E+01
.121E+01
.OOOE+OO .208E-08 -.304E+02 -.21E+0I
.223E+01
-O0(ffi+00 .326E-09 -.137E+03 .302E+01
.353E+01
.00(^+00 .740E-09 -.928E+02 -.284E+O0

RECPKED TIME FOR EXECUTION*** .OOOOE+OO SEC*** EVE^JT # 1


*** END OF PROGRAM ***

.605E+O0 .159E+03
584E+00 .%2E+02
-228E+O0 .I32E+03
105E+01 .901E+02
.723E+O0 .I24E+03
.447E+O0 .140E+O3
103E+01 .882E+02
121E+0I .857E+02
.627E+00 .142E+03
.883E+O0 .912E+02
.112E+01 .lOOE+03
.961E+00 .913E+02
.133E+01 .914E+02
.324E+OI .704E+02
.198E+00 .90^+02
-455E+00 .126E+03
968E^I . 153E+03
.162E+00 .172E+03
.603E+00 .911E+02
.265E+01 .I18E+03
.732E+00 .150E+O3
.213E+01 .825E+O0
.138E+O0 .I18E+03
.120E+01 .962E+02
.242E+01 .426E+02
.25IE+01 .151E+03
.376E+01 .365E+02
.354E+01 .946E+02

azafrancucho:elementos secc.derecha

19

15 /

10

9
4

/
\

V\

/
\

/
\

/
./

./

\
\

16
ISS^

20

/ \

\
,
"XT"i^

./
/

X4

'V

1.3

\
\

12
/

-V

/
/
\ .

\.

azafrancuchornodos secc.derecha

/ \

-A

/ \

JCZ
X.

Efi.

_i(!fjl.-

^3L5L

IML
\

S3^
34L

"^5=

235

\
\

Nv

37
\

\
\

38

}di

ANEXO 5
ESTABILIDAD DE TALUDES

%^

CASO I: FIGURA 1

PRESA AZAFRANCUCHO AGUAS ARRIBA FINAL DE CONSTRUCCIN SIN SISMO


Ten Most Critica!. C:AZAFC1SS.PLT By: HSA 11/19/2002 1:02am
#
a
b
o
d
t-e
f
g
h

FS
2.33
2.37
2.38
2.40
2.42
2.42
2.44
2.44
2.46
2.46

Sol
Type
No. Label
1 NCLEO
2 GRAVA
3 RIP-RAP
4 FILTRO
5 MANTO
6 CIMENTAC

Total
UnitWt.
(KN/m3)
19
20
20
17
18
18

Cohesion
Intercept
(KPa)
25
0
0
0
25
25

Saturated
Unit Wt.
(KN/m3)
20
21
21
18
19
19

Friction
Angle
(deg)
26.7
37
38
33
26.7
35

Pressure
Constant
(KPa)
0
0
0
0
0
0

Pore
Pressure
Param.
0
0
0
0
0
0

FSmin=2.33

-40

40

120
X-Axis (m)

(T

280

320

** PCSTABL5M **
by
Purdue University

Slope Stability Analysis


Simplified Janbu, Simplified Bishop
or Spencer's Method of Slices

Run Date:
Time of Run:
Run By:

11/19/2002
1:02am
HSA

Input Data Filename:


Output Filename:
Plotted Output Filename:

C:AZAFC1SS.SI
C:AZAFC1SS.00T
C:AZAFC1SS.PLT

PROBLEM DESCRIPTION

PRESA AZAFRANCCHO AGUAS ARRIBA


FINAL DE CONSTRUCCIN SIN SISMO

BOUNDARY COORDINATES
7 Top
Boundaries
27 Total Boundaries

ndary
No.

X-Left
( m)

y-Left
( m)

X-Right
( m)

Y-Right
( m)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

15.63
38.92
183.56
265.76
268.92
272.76
352.28
183.56
186.42
186.42
233.15
246.06
266.14
272.93
302.49
325.06
270.29
272.76
291.97
270.29
290.98
38.92
40.95
233.14
233.14
262.96
268.96

47.24
47.23
44..95
72.35
72.35
72.35
40.54
44.95
44.85
44.85
43.94
43.52
70.83
70.68
41.12
40.63
66.85
66.85
41.24
66.85
39.25
47.23
45.20
42.17
42.17
12.35
12.35

38.92
183.56
265.76
268.92
272.76
352.28
361.33
186.42
268.92
233.15
246.06
266.14
272.93
302.49
325.06
352.28
272.76
291.97
302.49
290.98
295.81
40.95
233.14
233.15
262.96
268.96
295.81

47.23
44.95
72.35
72.35
72.35
40.54
40.84
44.85
72.35
43.94
43.52
70.83
70.68
41.12
40.63
40.54
66.85
41.24
41.12
39.25
39.20
45.20
42.17
43.94
12-35
12.35
39.20

ISOTROPIC SOIL PARAMETERS

6 Type(s) of Soil

Soil Type
Below End
6
5
3
3
2
2
6
5
2
5
1
1
1
1
4
6
4
4
4
1
1
6
6
1
6
6
6

Soil Total Saturated Cohesion Friction


Pore
Pressure
Piez.
Type unit Wt. unit Wt. Intercept
Angle Pressure Constant Surface
No. (kN/m3) {kN/m3)
(KPa)
(deg)
Param.
(KPa)
No.
1
2
3
4
5
6

19.0
20.0
20.0
17.0
18.0
18.0

20.0
21.0
21.0
18.0
19.0
19.0

25.0
.0
.0
.0
25.0
25.0

26.7
37.0
38.0
33.0
26.7
35.0

.00
.00
.00
.00
.00
.00

.0
.0
.0
.0
.0
.0

0
0
0
0
0
0

BOUNDARY LOAD(S)
1 Load{s) Specified

Load
No.

X-Left
( m)

X-Right
( m)

268.00

271.00

Intensity
(kPa)

25.0

Deflection
(deg)

.0

NOTE - Intensity Is Specified As A uniformly Distributed


Force Acting On A Horizontally Projected Surface.

A Critical Failure Surface Searching Method, Using A Random


Technique For Generating Irregular Surfaces, Has Been Specified.

400 Trial Surfaces Have Been Generated.

20 Surfaces Initiate From Each Of 20 Points Equally Spaced


Along The Ground Surface Between X = 120.00 m.
and X = 220.00 m.

Each Surface Terminates Between


and

X = 240.00 m.
X = 290.00 m.

Unless Further Limitations Were Imposed, The Minimum Elevation


At Which A Surface Extends Is Y =
.00 m.

10.00 m. Line Segments Define Each Trial Failure Surface.

Factor Of Safety Calculation Has Gone Through Ten Iterations

The Trxal Failure Surface In Question Is Defined


By The Following 20 Coordinate Points

Point
No.

X-Surf
( m)

y-Surf
( m)

146.32

45.54

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

153.64
161.06
169.24
177.19
185.43
194.61
204.54
214.51
224.46
234.37
244.34
253.16
260.89
262.93
263.00
263.40
263.76
263.88
264.09

38.72
32.02
26.27
20.21
14.54
10.57
9.43
8.67
7.64
6.29
7.06
11.77
18.12
27.91
37.91
47.90
57.89
67.89
71.79

Factor Of Safety For The Preceding Specified Surface =

8.726

Factor Of Safety Calculation Has Gone Through Ten Iterations

The Trial Failure Surface In Question Is Defined


By The Following 17 Coordinate Points

I
I
I
I
I
I
I

Point
No.

X-Surf
( m)

Y-Surf
( m)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

162.11
170.11
177.42
184.53
192.41
201.29
208.77
216.82
226.82
235.26
237.48
238.39
238.43
239.87
242.93
247.33
247.33

45.29
39.29
32.46
25.44
19.28
14.68
8.04
2.11
1.94
7.30
17.05
27.01
37.01
46.91
56.43
65.40
66.21

Factor Of Safety For The Preceding Specified Surface = 12.416

Factor Of Safety Calculation Has Gone Through Ten Iterations

The Trial Failure Surface In Question Is Defined


By The Following 18 Coordinate Points

Point
No.

X-Surf
( m)

Y-Surf
( m)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

177.90
185.01
192.13
200.01
208.89
217.06
225.34
233.57
243.07
253.02
260.64
261.49
261.93
261.95
262.78
264.53
267.09
267.10

45.04
38.02
30.99
24.83
20.24
14.47
8.86
3.18
.06
1.05
7.53
17.49
27.48
37.48
47.45
57.29
66.96
72.35

Factor Of Safety For The Preceding Specified Surface = 14.525

Factor Of Safety Calculation Has Gone Through Ten Iterations

The Trial Failure Surface In Question Is Defined


By The Following 13 Coordinate Points

Point
No.

X-Surf
( m)

Y-Surf
( m)

1
2
3
4
5
6
7
8
9
10
11
12
13

198.95
206.41
215.18
223.68
232.58
241.75
251.72
261.05
266.55
266.59
266.73
266.74
266.99

50.08
43.42
38.63
33.34
28.80
24.80
23.99
27.58
35.93
45.93
55.93
65.93
72.35

Factor Of Safety For The Preceding Specified Surface = 24.625

Following Are Displayed The Ten Most Critical Of The Trial


Failure Surfaces Examined. They Are Ordered - Most Critical
First.

* * Safety Factors Are Calculated By The Modified Janbu Method *

Failure Surface Specified By

8 Coordinate Points

Point
No.

X-Surf
( m)

Y-Surf
( m)

1
2
3
4
5
6
7
8

198.95
208.89
218.83
228.57
237.79
246.78
255.39
255.83

50.08
51.17
52.21
54.51
58.38
62.75
67.83
69.04

2.325

Individual data on the

ice
o.
1
2
3
4
5
6
7
8
9

slices

Water Water
Tie
Tie
Earthquake
Force Force
Force
Force
Force
Surcharge
Bot
Norm
Tan
Hor
Weight
Top
Ver
Load
Lbs(kg) Lbs(kg) Lbs (kg) Lbs (kg) Lbs(kg) Lbs(kg) Lbs(kg) Lbs(kg)
49.7
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
171.1
.0
.0
.0
.0
.0
.0
668.0
.0
.0
966.8
.0
.0
.0
.0
.0
.0
.0
929.7
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
712.8
.0
.0
.0
.0
.0
373.5
.0
.0
.0
.0
..0
.0
.0
.0
.0
.0
.0
.1
.0
.0
.0
.0
.0
4.6
.0
.0

Width
Ft(m)
4.7
5.2
9.9
9.7
9.2
9.0
8.6
.0
.4

Failure Surface Specified By 10 Coordinate Points

Point
No.

X-Surf
( m)

Y-Surf
( m)

1
2
3
4
5
6
7
8
9
10

188.42
197.84
207.80
217.64
227.23
236.89
245.89
254.34
262.29
267.32

46.57
43.20
44.08
45.87
48.69
51.27
55.64
60.97
67.05
72.35

2.366

Failure Surface Specified By

5 Coordinate Points

Point
No.

X-Surf
( m)

y-Surf
( m)

1
2

214.74
224.68

55.34
56.45

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

3
4
5

234.45
242.63
242.69

58.56
64.32
64.66

2.380

Failure Surface Specified By

7 Coordinate Points

Point
No.

X-Surf
( m)

Y-Surf
( m)

1
2
3
4
5
6
7

188.42
198.41
208.40
217.83
227.23
235.08
240.01

46.57
46.14
46.56
49.92
53.30
59.50
63.77

2.400

Failure Surface Specified By

6 Coordinate Points

Point
No.

X-Surf
{ m)

Y-Surf
( m)

1
2
3
4
5
6

209.47
219.47
229.06
237.16
247.14
254.50

53.59
53.98
56.81
62.67
63.23
68.60

2.415

Failure Surface Specified By

5 Coordinate Points

Point
No.

x-Surf
( m)

Y-Surf
( m)

1
2
3
4
5

209.47
219.42
229.00
237.43
244.29

53.59
52.54
55.42
60.79
65.19

2.422

Failure Surface Specified By

8 Coordinate Points

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

Point
No.

X-Surf
( m)

Y-Surf
( m)

1
2
3
4
5
6
7
8

198.95
208.85
218.85
227.41
236.14
245.15
254.37
260.63

50.08
48.66
48.80
53.97
58.83
63.17
67.05
70.64

2.436

Failure Surface Specified By 11 Coordinate Points

Point
No.

X-Surf
( m)

Y-Surf
( m)

1
2
3
4
5
6
7
8
9
10
11

183.16
193.06
202.23
211.50
221.31
231.30
240.61
250.19
258.53
266.39
266.98

44.96
43.54
47.51
51.27
53.24
53.59
57.24
60.12
65.63
71.82
72.35

2.440

Failure Surface Specified By

6 Coordinate Points

Point
No.

X-Surf
( m)

Y-Surf
( m)

1
2
3
4
5
6

204.21
214.08
223.94
232.83
240.62
243.28

51.83
50.20
51.87
56.43
62.71
64.86

2.459

Failure Surface Specified By

6 Coordinate Points

Point
No.

X-Surf
( m)

Y-Surf
( m)

214.74

55.34

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

***

54.92
57.08
59.79
67.19
67.45

2.4 63

***

A
.00

.00 +

135.50

135.50 +

*
+

225.83

^*
271.00 + .*

_
316.16 +

361.33 +

90.33

90.33 +

180.67 +

45.17

45.17 +

I
I
I

224.73
234.49
244.12
250.84
251.07

2
3
4
5
6

21
8
215
241.
215
**283
13
*.2810
2.1.
2*
**1/1

*
*

180.67

225.83

CASO I : FIGURA 2

PRESA AZAFRANCUCHO AGUAS ARRIBA FINAL DE CONSTRUCCIN CON SISMO


Ten Most Critical. C:AZAFC1CS.PLT By: HSA 11/19/2002 1:03am
4200
#
a
b
c
d
4160 H-e
f
g
h
i

4120

FS
1.30
1.33
1.33
1.34
1.35
1.36
1.37
1.38
1.38
1.38

Soil
Type
No. Label
1 NCLEO
2 GRAVA
3 RIP-RAP
4 FILTRO
5 MANTO
6 CIMENTAC

Total
Unit Wt.
(KN/m3)
19
20
20
17
18
18

Cohesion
Intercept
(KPa)
25
0
0
0
25
25

Saturated
Unit Wt.
(KN/m3)
20
21
21
18
19
19

Friction
Angle
(deg)
26.7
37
38
33
26.7
35

Pore
Pressure
Param.
0
0
0
0
0
0

Pressure
Constant
(KPa)
0
0
0
0
0
0

4080
Elev.
(m)

FSmin=1.30

4040

4000

0000

3960

3920
-80

-40

40

80

_L
120
X-Axis (m)

160

200

240

280

320

** PCSTAB,5M **
Purdue

by
University

Slcpe S t a b i l i t y Analysis
S i i ^ l i f i e d J a n b u , SioMplified B i s h o p
o r S p e n c e r ^ s Method o f S l i c e s

Run D a t e :
Time o f Run:
Run By:

11/19/2002
1:03arR
iiSA

I n p u t Data F i l e n a m e :
Output Filename:
P l o t t e d Output Filename:

C:AZArClCS.SI
C:ZAFClCS.OUT
C:A2AFC1CS.PLT

PRCffiLEM DESCRIPTICW

PRESA ASAFRAHCUCIiO AGUAS ARRIBA


FINAL DE CXJSTRUCCICJ CC4 3I3MO

BCW4DARY COORDINATES
7 Top
27 T o t a l

Boundaries
Boundaries

ndary

No.
1
2
3
4
5
6
7
0
9
10
11

li
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

X-l,eft

Y-I^ft

( m)

X-Right
! m)

Y-Right

( )
15.63
38 92
183 56
265 76
268 92
272 76
352 20
103 56
186. 42
186 42
233 15
246 06
266 14
272 93
302 49
325 06
270 23
272 76
291 97
270 29
230 98
38 92
40 95
233 14
233 14
2^2 3 6
266 96

47.24
47.23
44.95
72.35
72.35
72.35
40.54
44.95
44,85
44.85
43.94
43.52
70.83
70.60
41.12
40.63
66,05
66.85
41.24
66.85
39.25
47.23
45.20
42.17
42.17
12.35
12.35

38.92
183.56
265.76
268.92
272.76
352.28
361.33
106.42
268.92
233.16
246.06
266.14
272.93
302.49
325.06
352.28
272.76
291.97
302.49
290. m
295.81
40.95
233.14
233.15
262.96
268.96
295.81

47.23
44.95
72.35
72.35
72.35
40.54
40.94
44.85
72.35
43.94
43.52
70.83
70.68
41.12
40.63
40,54
66,85
41.24
41.12
33.25
39.20
45.20
42.17
43.94
12.35
12.35
39.20

ISOfROPIC s o i l , PARAMETERS
6 TsT*0) of

iJoil

itt)

Soil Type
Below Bnd
6
5
3
3
2
2
6
S
2
5

6
6
1
6
6
6

I
I
I
I
I
I
I
I
I
I
I
I

Soli Total Saturated Cohesion Friction


Pore
Pressure
Piez.
Type iJnlt Wt. Unit Wt. Intercapt
Angle Pressure Constant Surface
No. (kN/m3} {fcN/iB3)
IKPa)
(deg!
Pacam.
(KPa)
No.
1
2
3
4
5
6

19.0
20.0
20.0
17.0
10.0
10.0

20.0
21.0
21,0
18.0
19.0
19.0

25.0
.0
.0
.0

25.0
25.0

.00
.00
.00
,00
.00
.00

26.7
37.0
38.0
33.0
26.7
35.0

.0
.0
.0
.0
.0
.0

CaJNDftRY I,OAD{S>
1 i<oad(s)

Load
No.

Specified

X-Left
( m>

X-Right

260.00

271.00

IB)

Intensity
(kPa)

Deflection
(deg)

25.0

NOTE - Intensity Is Specified As A Uniforialy Distributed


Foto Acting On A Horizontally Pcojectd Surface.

A ItoriEontal Earthquake Loading Cofiicient


Of .200 Hae Been Assigned
A Vertical Earthquake Loading CoeEftcient
Of .100 Has Been Asoigned
Cavitation Pressure

.0 KPa

A Critical failure Surface Searching Method, Using A Ransfew


Technique For Qenerating Irregular Surfaces, Has Ben Specified.
4O0 Trial Surface Have Been Generated.
20 Surfaces Initiate From Each Of 20 Point Equally Spaced
Along The Ground Surface Betwn X =* 120.OO .
and X - 220.00 m.
Each 8urfac Terminate Between
and

X 240,00 m.
X = 290.00 m.

Unless Further Limitations Here Iw^toeed, Th Minimum Elevation


At itolch A Surface Extends I Y
.00 a.
10.00 a>. Line iJe^aents Define Each Trial Failure !urface.

I
I
I

Factox Of Safety Calculation Has Sone Through Ten Iteration

The Trial raiXure Surface In Queistion Ifl Defined


By The Following 13 Coordinate Points
?oint
No.

X-Surf
( m)

Y-8urf
( m}

1
2
3
4
5
6
7
C
9
10
11
12
13

198.95
206.41
215.18
223.68
232.58
241.75
251.72
261.05
266.55
266.59
266.73
266.74
266.99

50.00
43.42
38.63
33.34
26.00
24.80
23.99
27.56
35,93
45.93
55.93
65.93
72.35

Factor Of Safety Foe The PJieceding Specified Surface =

5.053

Following hee Displayed The Ten Most Critical Of The Trial


Failure Surfaces Exaisineci. They Are Ordered - Most Critical
First.

* * Safety Factors Are Calculated! By The Modified Janbu Method *

Failure Surface Specified Oy

8 Coordinate Points

"oint
Mo.

X-Surf
! mj

Y-Sutf
( m)

1
2
3
4
5
6
7
8

198.95
209.89
218.83
228.57
237.79
246.78
255.39
2S5.83

50.06
51.17
SZ-Zl
54,61
58.30
62.75
67.63
69.04

1.296

I n d i v t d u i ii d a t a o n t h e

lice
No.
1
2
3
4

Width
Ft{i
4.7
5.2
9.9
9.7

Itelght
^Ihntkgl
49.7
171.1
668.0
366.8

s l ices

Slater Wter
Earthquake
Tie
Tie
Force
Force
Force
FoEce
Force
Surcharge
Top
tot
NolriB
Taa
Hor
Ver
-oad
Utjskg L b ( k g j U>a{*g> U^ikg)
U5<kg UiBitg
Uinihg}
.0
.0
.0
.0
9.9
5.0
.0
.0
.0
34.2
17.1
.0
.0
.0
.0
.0
.0
.0
133.6
66.S
.0
-0
.0
193.4
96.7
.0
.0
.0

I
I
I
I

5
i
7
8
9

,0
.0
.0
.0
,0

929.7
712.0
373.5

9.2
9,0
8.6
.0
.4

.1
4.6

0
0
0
.0
0

.0
.0
.0
.0
.0

Failure Surface ^ecified By


X-Surf
< mi

Y-Surf

1
2
3
4
5

214.74
224.68
234.45
242.63
242.69

55.34
56.45
58.56
64.32
64.66

1,328

105.9
142.6
74.7
.0
9

93.0
71.3
37.4
.0
.5

.0
.0
.0
.0
.0

5 Coordinate Points

Point
No.

<

.0
.0
.0
.0
.0

HI)

***

Failure Surface Specified By 10 Coordinate Points


Point
No.

X-Surf
( mj

Y-Surf
m)

1
2
3
4
5
6
7
8
3
10

IBB.42
197.64
207.80
217.64
227.23
236.89
245.89
254.34
262.29
267.32

46.57
43.20
44,08
45.37
40.69
51.27
55.64
60.97
67.05
72.35

***

I
I
I
I
I
I
I
I

1.333

i**

F a i l u r e 3urfac S p e c i f i e d By
Point
No.
1
2
3
4
S
6
7

X-Srf
(

IB)

188.42
198.41
208.40
217.83
227.23
235.09
240.01

7 Coordinate Points

Y-Surf
( mi
46.57
46.14
46.56
49.92
53.30
59. 5Q
63.77

1.343

F a i l u r e 3urface S p e c i f i e d By

6 Coordinate P o i n t s

B I 8 LtO r c A

I'rocedencit:
'. !n!?re90:

.OOlSiLl--

olnt

No.

X-Surf
m)

Y-Surf
{ m)

1
2
3
4
5
6

209.47
219.47
229.06
237.16
247.14
254.50

53.53
53.98
56.81
62.67
63.23
60.60

1.351

***

Failure Surface Specified By

5 Coordinate Points

Point
No.

X-3urf
m)

y-Surf
( m)

1
2
3
4
5

203.47
219.42
229.00
237.43
244.29

53 59
52 54
55 .42
60 79
65 19

1.361

***

Failure Surface Specified Dy

Point

No,

1
2
3
4
5
6

7
0

X~3urf
(

H)

y-Surf
m)

198.95
200.85
218.85
227.41
236.14
245.15
254.37
260.63

1,370

50. OS
40.66
48.80
53.97
58.83
63.1?
67.05
70.64

***

Failure Surface Specified By

Point

8 Coordinate Points

6 Coordinate Points

Ho.

X-Surf
( i

y-^Srf
)

1
2
3
4
5
6

214,74
224.73
234.49
244.12
250.04
251.0?

S. 34
S4.92
57,08
59.73
67.13
67,4S

***

1.375

***

F a i l u r e Surface Specified

By

8 Coordinate P o i n t e

int
o.

X-Surf
( m}

Y-3urf
( m)

1
2
3
4
5
6
7
8

198.95
208.91
218.83
228.29
230.14
247.70
254.41
259-34

50. oe
49.17
43.70
53.11
S4.02
S7.50
64.99
70.21

***

1.382

***

F a i l u r e Surface S p e c i f i e d By 11 Coordinate Pointa


Point

X-Surf
( mi

Y-Surf

No.
1
2
3
4
6
6
7
6
9
10
11

103.16
193.06
202.23
211.50
221.31
231.30
240.61
250.19
2SC.53
266.39
26e.9a

44.96
43.54
47.51
51.27
53.24
53.39
57.24
60.12
65.63
71.02
72.35

***

1.382

(m

***

,00
X

.00 +

45.17 +

90.33 +

45.17
'

90.33
'^-+

135.50

180.67

-+

225.93
"

I
I
I

135.so 1

180.67 +.....
.

*
...31
.0
V.315

341.
..315
**302
912
*.3918
3919
. .*
3*
271.00 + ,*...........**1/1
225.03

316.16 +

361.33 +

CASO II: FIGURA 1

PRESA AZAFRANCUCHO AGUAS ABAJO FINAL DE CONSTRUCCIN SIN SISMO


Ten Most Critical. C:AZAFC3SS.PLT By: HSA 11/19/2002 1:18am
4200
#
a
b
c
d
4160
e
f
g
h
i
4120 J

FS
1.95
1.98
1.98
2.01
2.03
2.03
2.04
2.07
2.11
2.11

Soil
Type
No. Label
1
NCLEO
2 GRAVA
3
RIP-RAP
4
FILTRO
5
MANTO
6
CIMENTAC

Total
UnitWt.
(KN/m3)
19
20
20
17
18
18

Saturated
UnitWt
(KN/m3)
20
21
21
18
19
19

Cohesion
Intercept
(KPa)
25
0
0
0
25
25

Friction
Angle
(deg)
26.7
37
38
33
26.7
35

Pore
Pressure
Param.
0
0
0
0
0
0

Pressure
Constant
(KPa)
0
0
0
0
0
0

4080 Eiev.
(m)

FSmin=1.95
4040

4000

3960 -

3920
-100

140
X-Axis (m)

180

220

260

300

340

** PCSTABliSM **

by
Purdue U n i v e r s i t y
'Slope S t a b i l i t y ftnalyais-
S l a ^ l l f i e d Jatibu, S i m p l i f i e d Bishop
o r S p e n c e r ' s Method of S l i c e s
Run Dater
Time of Run:
Run By:

11/19/2002
1:18am

Input Data Filena:


Output Filename:
P l o t t e d Output Filenames

C:AZAFC33S.SI
C:AZAFC3SS.0UT
CZAE-CSSS.PLT

wan

PROBLEM DgSCRIPTIMI

P8E3A AZAFtyySCCHO AGUit ABAJO


riMAi. m ccNSTRiccica S I N S I S M O

BOJNBARY COORDINATES
7 Top Boundariee
31 Total Boundaries
Boundary
No.
1
2
3
4
5

7
3
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

X~I*ft
< m>
.00
73.20
152,71
156,55
153.71
241.92
386.56
156.55
239.05
73.20
89.71
100.41
105.46
122.99
152.55
159.33
179.28
192.32
122,99
133.51
1S2.71
100.41
102.41
129.67
134.49
192.32
192.33
304.56
123.67
156.51
162.51

y-teft

<
42.74
40.54
72.35
72.35
72.35
44.95
47.23
72.35
44.85
40.54
40.00
40.63
40.93
41.12
70.60
70.83
43.70
43.94
41.12
41.24
66.85
40.63
38.89
39.20
39.25
43.84
42.17
45,20
39.20
12.35
12.35

X-Riaht
{ m)

y-Right

( )

S o i l Type
Below Bnd

73.20
152.71
156.55
159.71
241.92
386.56
409.86
239.05
241.92
S9.71
100.41
105.46
122.99
152.55
159.33
179.28
192.32
239.05
133.51
152.71
155,19
102.41
129,67
134.49
155.1
192.33
394.56
386.56
156.51
162,51
192.33

40.54
72.35
72.35
72.35
44.95
47.23
47.24
44.85
44.95
40.00
40.63
40.93
41.12
70.60
70.83
43.70
43.94
44.86
41.24
66.05
66.85
38.^9
39,20
39,25
66.85
42.17
45.20
47.23
12.35
12.35
42.17

6
2
Z
3
3
5
6
2
5
6
6
4
4
1
1
1
1
5
4
4
4
6
6
1
1
1
6
6
6
6
6

ISOTROPIC a o i i , PJMW^TERS
6 Tjipefs} o f

Soil

Soil
Total S a t u r a t e
Cohesion F r i c t i o n
Pore
Presswre
Type U n i t Wt. U n i t W t . I n t e r c e p t
Angle P r e s s u r e Constant
Mo. {kM/iB3>
(kM/Bi3)
KPa)
{degi
ParaiB.
{KPa>
1
2
3
4
5
6

19.0
20.0
20.0
17.0
18.0
18.0

20.0
21.0
21.0
18.0
19.0
19.0

25.0
.0
.0
.0
25.0
25.0

26.7
37.0
38.0
33.0
26.7
35.0

00
00
00
00
00
00

Piez.
Surface
Mo.

.0
.0
.0
.0
.0
.0

0
0
0
0
0
0

BOWmRT LtD{S)
1 Load{s)

Load
Ho.

Specified

X-IrfSft
{ m)

X-Right
( m)

153.00

156.00

Intensity

Deflection
(deg)

25.0

NOTE - Intensity Is Specified o A uniformly Distributed


Force Acting Cm A Horizontally Projected Surface.

A Critical Failure Surface Searching Method, Using A Random


technique For Generating Irregular Surfaces, Has Been Specified.
400 Trial Surfaces Have Been Generated.
20 Surfaces Initiate Pro Each Of 20 Points Equally Spaced
Along ftte Ground Surface Between X ~ 40.00 m.
and X = 120.00 m.
Each Surface Terminateei Betwen
and

X = 140.00 m,
X = 170.00 m.

Unless Further Llwitations Were XmpOB^, ihe Miniaium Elevation


At ihich A Surface Exterels I Y .00 M.
10.00 m. hXtM Segments Define Each Trial Fallar Surface.

Factor O Safety Calculation Has Gone Through Ten Itrations

The Trial Failure Surface In Question Is Defined


By tkm Following 17 Coordinate Points

Point
No.

K-Surf
{ )

Y-Srf
< a)

1
2

4
5
6
7
8

69.47
76.59
83.71
91.59
100.47
108.64
116.92
126.65
136,48
143.54
143.58
143.87
143.89
144.72
146.47
149.03
149.03

40.6S
33.63
26.60
20.45
15.85
10.09
4.47
2.15
3.97
11.05
21.05
31.05
41.05
51.01
60.86
70.53
70.88

10
11
12
13
14
15
16
17

Factor Of Seifty For The Preceding Specified Surface - 22.799


Factor Of Safety Calculation Has Gone Through Ten Iterations

The Trial Failur Suitmce In Question I B Defined


By The Following 17 Coordinate Points
Point
No.

x-surf
( mS

Y-Surf

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

82.11
99.25
96.37
104.25
113.13
121.30
129.58
137.81
147.81
156.12
158.11
158.76
158.79
159.61
161.36
163.92
163.93

44.10
37.11
30.08
23.93
19.33
13.57
7.95
2.27
2.12
7.67
17.47
27.4S
37.45
47.42
57.26
66.93
70.94

{ BlJ

Factor Of Safety For The Preceding Specified SiirCaoo 12.444

Following A r e Displayed T h Ten Itoat Critical Of T h Trial


Failure Surfsc Exasiined. They A r e Ordered - Most Critical
First.

* * S a f e t y F a c t o r s Are C a l c u l a t e d By The Modified Jaidw Method * *

Failure Surface Specified By

8 Coordinate Points

Point

X-0urf

Y-Surf

No.

{ m)

( )

1
2
3
4
5
6
7
8

94.74
104.61
114.49
124.09
133.10
141.86
150.19
150.73

4.i6
50.76
52.31
55.11
59.45
64.27
69.80
71.56

1.945

***

Individual data on the

lice

Width

No,
1
2
3
4
5
6
7

Ft(BS)

slices

Water Water
Tie
Tie
Earthquake
force Force
Force
Force
Force
Surcharge
Top
Bot
Norm
Tan
Hor
Ver
Load
Weight
l>s{kq) Lbstkg} Lbsticg) Lbsfkg) Lbs{)cg) Ubstkg) Ifcslkg) Lb{icg)
U>s(teg
231.5
.0
.0
.0
.0
.0
.0
700.4
.0
.0
.0
.0
.0
.0
1011.0
.0
.0
.0
.0
.0
.0
97S.4
.0
.0
,0
.0
.0
.0
769.6
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
439.7
.0
.0
8.3
.0
.0
.0
.0
.0

9,9
9.3
9.6
9.0
8.8

e.3

.5

Failure Surface Specified By

4 Coordinate Points

Point
No.

X-Sutf

Y-Surf

1
Z
3
4

115.79
125.60
135.11
140.18

57.58
S9.53
62.62
67.34

1.975

***

Failure Surface Specified By 10 Coordinate Points


Point

X-Surf

No,

{ M>

1
2
3
4
S

82.11
91.92
101.73
111.72
121.70
131.18
138.56
146.02

7
8

Y-Surf
< >
44.10
42.17
40.25
40,81
41.40
44.58
51.33
57.99

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

9
10

152.S8
5S.24
i.984

65.54
72.35
**

Failure Surface Specified By 7 Coordinate Points


Point
No.

X-Surf
( m)

Y-Surf
! m)

1
2
3
4
5
fi
7

103.16
113.11
122.94
131.78
140.21
148.27
149.55

52.53
51.52
53.34
58.02
63.39
69.31
71.08

2.012

Failure Surface specified By


Point

5 Coordinate Points

Y-Surf

m.

X-Sucf
)

1
2
3
4
5

120.00
129.94
139.30
147.89
1S4.73

5f.26
59.16
61.67
66.80
72.35

{ mi

2.027

failure surface Specified By

4 Coordinate Point

Point
No.

X-Surf
{ )

t-Surf
( m}

1
2
3
4

120.00
123. S7
138.79
140.75

59.26
60.03
$4.79
67.5(5

2.031

Pallare Surface %iecified By 5 iSoordinate Point


Point

X-Surf

Y-Surf

No.

m}

{ }

X
2
3
4
S

115.79
125.40
135.32
144.10
145.88

57.59
0.35
61.58
66.38
69.62

2.041

Failure Surface Specified By


oint

X-SUrf

No.

( >

1
2
3
4
5
6
7
8

94.74
104.14
113.99
123.51
132.03
140.28
146.32
155.0&
2.066

Failure Surface

8 Coordinate Points

y-Surf
( mi
49.16
4S.7S
47.48
50.55
55.78
61.43
67.38
72.35
***

Specified -By 7 Coordinate Poiwte

oint
So.

X-Surf
m}

Y-gurf
i m)

1
2
3
4
5
6
7

SS.95
108.85
118.76
128.56
137,64
142.77
142.77

50.84
52.24
53.56
55. S6
59.76
68.34
68.37

2.107

Failure Surface Specified By


itoint

5 Coordinate Points

X-Surf
( m)

Y-Surf

No.
1
2
3
4
5

m.M
121.48
130.80
139.51
142.68

55.89
34.52
58.15
63.0S
68.34

2,114

( m)

***

I,

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

ft
.00

.00 +

51.23

X
102.46

*-+

51.23 +

-..
-

3
*.l
102.46
*81
....3810
*.425
*3.12
,..*.3.12
3.14
153.69+.*
**l/l

204.93 +

256.16 +

307.39 +

358.62 +

409.85 +

S
153.69

+-'

M
204.93
+

256.16
'

CASO I I : FIGURA 2

I
I

PRESA AZAFRANCUCHO AGUAS ABAJO FINAL DE CONSTRUCCIN CON SISMO


Ten Most Critical. C:AZAFC3CS.PLT By: HSA 11/19/2002 1:18am
4200

410

4120

#
a
b
c
d
e
f
g
h
i
"i

FS '
1.14
1.16
1.19
1.20
1.20
1.21
1.22
1.24
1.24
1.26

Soil
Type
No. Label
1 NCLEO
2 GRAVA
3 RIP-RAP
4 FILTRO
5 MANTO
6 CIMENTAC

Total
Unit Wt.
(KN/m3) .
19
20
20
17
18
18

Saturated
Unit Wt.
(KN/m3)
20
21
21
18
19
19

Cohesion
Intercept
(KPa)
25
0
0
0
25
25

Friction
Angle
(deg)
26.7
37
38
33
26.7
35

Pore
Pressure
Param.
0
0
0
0
0
0

Pressure
Constant
(KPa)
0
0
0
0
0
0

4080
Elev.
(m)

FSmin=1.14
4040

4000

^k

=^71-

3960

3920
-100

100

140
X-Axis (m)

180

220

260

300

340

** PCSABL* **
byPurdue Univeraity

Slope Stability AnalysiB


Siit^tlified Janbu, SiiBplifiecS Bishop
or Spender's Method of Slices

Run Date:
Time of Run:
Run By:

11/19/2002
l:ieaifi
HSA

I n p u t Data F i l e n a m e !
CXitput F i l e n a t n e :
P l o t t e d Output Filename:

C:SAPC3CS.CXJT

P R < i tSSCRIPION

PRESA AZAFRRHCUCHG ASOAS ABftJO


FIHAL m (xmstftxicxan CON S I S

BOJNDARY COCaiDINATES
1 Tqp
31 T o t a l

Boundary
No.
1
2
3
4
5
6
7
8
9

lo
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
2S
27
28
29
30
31

Boundaries
Boundaries

X-Left
( m}

-Lft
{ HI)

X-Right
{ JB)

Y-Right
m

.00

42,74
40.54
72.35
72.36
72.35
44.95
47.23
72.35
44.85
40.54
40.00
40.63
40.93
41.12
70.60
70,83
43.70
43.94
41.12
41.24
66.85
40.63
39.89
39.20
39.25
43.94
42.17
45.20
39.20
12.35
12.35

73.20

152 71
156 55
159 71
241 92
386 56
409 85
239 05
241 92
89 .71
100 41
IOS 46
122 99
152 55
159 33
179 28
192 32
239 05
133 51
152 71
ISS 19
102 41
129 67
134 .49
168 19
192 33
384 56
386 56
156 SI
162 51
192 .33

40.54
72.35
72.35
72.35
44.95
47,23
47.24
4 4 . S5
44.95
40.00
40.63
40.93
41.12
70,60
70.83
43.70
43.94
44.85
41.24
66.85
66.85
38.89
39.20
39.25

73.20
162.71
1S6.55
159.71
241.92
386.56
166.55
239.05
73.20
89,71
100.41
105.46
122.99
152.55
159.33
179.28
192.32
122.99
133.51
152.71
100.41
102.41
129.67
134.49
192.32
192.33
384.56
129.67
156.51
162,51

66.8S
42.17
45.20
47.23
12.35
12.35
42.17

Soil Type
Below Bnd
6
2
2
3
3
8
6
2
5
6
6
4
4
1
1
1
1
5
4
4
4
6
6
i
i

6
6
6
6

I
I
I
I
I
I
I
I

iSOTROPIC s o i l , PWRWffiTERS
6 Type(s) of S o i l
Soil Total Saturated Cohweion Friction
tore
Bt&eeurtt
Pies.
Type unit Wt, Unit Wt. Intercept
Angle Pressure Constant Surface
Ho. {kN/3> tm/m3}
(KPa)
(degj
Paran.
(KPaJ
No.
1
2
3
4
5
6

20.0
21.0
21.0
18.0
13.0
19.0

19.0
20.0
20.0
17.0
18.0
18.0

25.0
.0
.0
.0
25.0
25.0

26.7
37.0
38.0
33.0
26.7
35.0

.00
.00
.00
.00
.00
.00

.0
.0
.0
.0
.0
.0

0
0
0
0
0
0

BamDARY liWiDtS)
1 Loadis) S p e c i f i e d

Load
No.

X -Left

X-Right
(

153.00

Hi)

Intensity
(kPaJ

156.00

2S.0

Deflection
(deg)
.0

NOTE - Intensity Is Specified As A Uniformly Distributed


Force Acting Cto A Horizontally Projected Surface.

I
I
I
I
I
I
I

A Horizontal Earthquake Loading Coefficient


Of .200 Has Been Assigned
A Vertical earthquake Loading Coefficient
Of .100 Has Been Assigned
Cavitation Pressure

.0 KPa

A Critical Failure Surface Searching Method, Uping A Random


teeimique for Generating Irregular Surfaces, Has Been Specified.
400 Trial Surfaces Have Been Generated.
20 Surface Initiate Proia Each Of 20 Points Equally Spaced
Along The Ground Surface Between X = 40.00 ,
and X 120.00 to.
Each Surface Tetwinate Between
and

X 140.00 .
X 170.00 mv

netsm F u r t h e r L i m i t a t i o n tfere laijoeed The Minirau e l e v a t i o n


At tBich A Surface Extend I s y
,00 .
10.00 m. Line Se^pmenta Define Bach T r i a l f a i l u r e S u r f a c e .

I
I

Factor Of Safety Caloulatton Has one Through fen Itsrationsr

The Trial Pailur Surface In Ouestion Is Defined


By The Following 17 Coocdinate Points
Point
No.

X-Surf
( m)

Y-Surf
{ ml

1
2
3
4
5
6
7

69.47
76.53
83.71
91.59
100.47
I O S . 64
116.92
126.65
136.48
143.54
143.58
143.87
143.89
144.72
146.47
149.03
149.03

40.65
33,63
26.60
20.45
15.85
10.09
4.47
2.15
3.97
11.05
21.05
31.05
41.05
51.01
60.86
70.53
70.88

9
10

12
13
14
15
IS
17

Factor Of Safety For The Preceding Specified Surface *

6.661

FollowingftreDisplayed The Ten Most Critical Of The Trial


Failure Surfaces Examined. Thsy Are Ordered - Most Critical
First.
* * Safety Factore Are Calculated By Ths Modified Jaidw Method * *

Failure Surface pacified By


Point
NO.

1
2
3
4
5

7
8

**

8 Coordinate Points

X-Srf
( m)

Y-Surf

94.74
104.61
114,49
124.09
133.10
141.86
150.19
150.73

49.16
50.76
52.31
55.11
59.45
64.27
69.80
71.56

1.144

( B)

***

Individual data on the

slices

Watef
lice
Mo.
1
2
3
4
5
6
7

Wlijth

Weight
Top
lisaiJcg) Welkq\
231.6
.0
700.4
.0
.0
1011.0
.0
976.4
769.6
.0
439.7
.0
8.3
.0

rtlm)
9.9
9.9
9.6
9.0
8.8
8.3
.5

Watr

Tie

Earthquake

Bot
Nor
Tan
Hor
Ver
Load
Uas<)cg> Uoslicg) Usa < kg) Lbs(lcgi U>a(fcg) U o a i k g )
.0
.0
.0
46.3
23.1
.0
0
.0
.0
70.0
.0
140.1
.0
.0
.0
202.2
101.1
.0
.0
.0
195.3
97.6
.0
.0
0
.0
.0
153.9
77.0
-0
.0
87.9
.0
.0
44.0
.0
0
1.7
.0
0
.8
.0

Failure Surface Specified &y

Point
No.

Tie

4 Coordinate Points

Y-Surf

X-Surf

{ t)

57.58
5 9 . &3
62.62
67.34

115.79
125.60
135.11
140.18

1.162

Failure Surface Specified By

'olnt
NO.

K-Surt
( }

1
2
3
4
5
6
7

103.16
113,11
122.94
131.79
140-21
148.27
149.55

1.193

7 Coordinate Points

y-Surf
( ra)
52.53
S I . 52
53.34
58.02
63.39
69.31
71.08

***

F a i l u r e S u r f a c e S p e c i f i e d By

4 Coordinate

Point
No.

X-Sur
( mi

Y~Surf
mj

1
2
3
4

120.00
129.97
138-79
140.75

59.26
60.09
64.79
67.56

1.199

Points

***

F a i l u r e S w r f a c e % c i f i e i l By

5 Coordinate

Points

Point
No.

X-Sur
( mi

Y-Surf

115.79
125.40
135.32
144,10
145.88

57.58
60.35
61.58
66.38
69.62

i Itt)

1.202

Failure Surface Specified By 10 Coordinate Points


Point

X-Surf

Y-Surf

No.

( m)

( m)

1
2
3
4
5
6
7
S
9
10

82.11
91.92
101.73
111.72
121.70
131.18
138.56
146.02
152.58
156.24

44.10
42.17
40.25
40.81
41.40
44.58
51.33
57,39
65.54
72.35

1.210

Failure Surface Specifieti


lnt

X-Surf

Ho,

i J

1
Z
3
4
5

120.00
129.94
139.30
147.89
154.73
1.216

By

5 Coordinate Points

y-Surf
( m}
59.26
58.16
61.67
66.80
72.35
***

Failure Surface Specified By ^ Coordinate Points


Point
Ho.
I
2
3
4
5

e7

X-Surf
>

Y-Surf
)

m.m

50.84
52.24
53.56
5S.56
59.76
68.34
66.37

109.86
118.76
128.56
137.64
142.77
142.77

I
1.238

I
F a i l u r e Surface ^ j e c i f i e d By
Point

& Coordinate P o i n t s

No.

X-Surf
m)

y-Surf
( m)

1
2
3
4
6
6
7
8

94.74
104.14
113.99
123.51
132.03
140.28
148.32
155.00

49.16
45.75
47.48
50. S5
55.78
61.43
67,38
72.35

1.242

Failure Surface Specified By


Point

5 Coordinate Points

No.

X-Srf
{ mi

Y-Surf
I m)

1
2
3
4
5

111.58
121.4S
130,60
133,51
142.68

55.89
54.52
58.15
63.06
8.34

1.25

I
I
I

A
.00

.00 +

51.23
*-+

102.46
+

51.23 +

- 4 . . . . . . * . 1

I
I
I

102.46

..,....,*9l
,.,
6910
..*.324
. . . . . f . ^@.12
,.
*,6.12
.
6,13

153.69
-+

204.93
+

256.16
+

I
I
I
I
I
I

153,69 +.*

204.3 *

256.16 +

307,39 +

358.62 +
_
409-85 +

I
I
I
I
I
I
I
I
I
I
I

......**!/!

*
*

CASO III. FIGURA 1

PRESA AZAFRANCUCHO AGUAS ARRIBA DESEMBALSE RPIDO SIN SISMO


Ten Most Critica!. C:AZADR2SS.PLT By: HSA 11/19/2002 1:00am
4200
#
a
b
c
d
4160 f e
f
g
h

4120 -

FS

2.07
2.07
2.08
2.10
2.13
2.14
2.16
2.17
2.19
2.19

Soil
Type
No. Label
NCLEO
GRAVA
RIP-RAP
FILTRO
MANTO
CIMENTAC

Total
UnitWt.
(KN/m3)
19
20
20
17
18
18

Saturated
Unit Wt.
(KN/m3)
20
21
21
18
19
19

Pore
Pressure
Param.
O
O
O
O
O
O

Friction
Angle
(deg)

Cohesion
Intercept
(KPa)
20
O
O
O
20
20

30.1
37
38
33
30.1
35

Piez.
Surface

No.
W1
W1
W1
W1
W1
W1

4080
Elev.
(m)

FSmin=2.07

4040

4000

3960

3920
-80

m^

"*

^vvi

-40

40

80

120
X-Axis (m)

160

200

240

280

320

by
Purdue University
Slope Stability Analysis-Si^lifi^ Janiau, SiK>lifi6d Bishop
or Spencer's Method of Slices
Run D a t e :
T i n o f Run:
Run By:

11/19/2002
1 : OOata
HSA

I n p u t Data Filenarae;
Output Filename:
P l o t t e d Output Filename;

CiAZADR2SS.SI

mcmiSM

msCRIPTICSi

C:AZADR2SS.PI.T

PRiESA MAETAHCCHO AGUAS ARRIBA


J&SmBKhSE RPIDO SIN SISMO

BCWiDARY COC^0INATE8
7 Top
Boundaries
27 Total Boundaries

mdary
No.
1
2
3
4
5
6
7
S

9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

X-ieft
i Hi)

Y-Left
( m)

X-Right
{ m)

Y-Ri^ht
! }

47.24
47.23
44.95
72,35
72.35
72.35
40.54
44. 9S
44,85
44,85
43.94
43.52
70.83
70.68
41.12
40.63
66. @S
66.85
41,24
66.86
39.25
47.23
46.20
42.17
42.17
12.3S
12.35

38.92
183.56
265.76
268.92
272.76
352.28
361.33
186.42
268.92
233.15
246.06
266.14
272.93
302.49
325.06
362.28
272.76
291.97
302,49
290.98
295.81
40.95
233.14
233.15
262.96
268.96
295.81

47.23
44.95
72.35
72.3S
72.35
40.54
40,84
44,85
72.35
43.94
43.52
70.83
70.68
41.12
40.63
40.54
66.85
41.24
41.12
39.25
39.20
5.20
42.17
43.94
12.35

15.63
38.92
183.56
265.76
268.92
272.76
352.28
163.66
186,42
186.42
233.15
246.06
266.14
272.93
302.49
325.06
270.29
272.76
291.97
270.29
290.96
38.92
40.95
233.14
233.14
262.96
268.96

ISOTROPIC SOIL PARM4ETKRS


6 TypeiS) of

Soli

12. as

39.20

Soil Type
Below Bnd
6
5
3
3
2
2
6
5
2
5

6
6
1
6
6

Soil Total Saturated Cohston Friction


Pore
Preeeur Pt^z.
Type Unit Wt. Unit Ht. Intercept
Angle Presmire Constant Surface
No. (kN/m3i (icN/ltt3)
(KPa)
(deg) Para.
{KPa}
Ho,
1
2
3
4
5
6

19.0
20.0
20.0
17.0
18.0
18.0

20.0
21.0
21.0
18.0
19.0
15.0

20,0
-0
.0
.0
20.0
20.0

.00
.00
.00
.00
.00
.00

30.1
37.0
38.0
33.0
30.1
35.0

.0
.0
.0
.0
.0
.0

1
1
1
1
1
1

1 PlBZOMETRIC SURFACE!S) HAVE BEEN SPECIFIED


Unit Weight ot Water

9.80

PiezoBietric Surface No. 1 Specified by


Point
No,

X-Water
< m)

Y-Water
{ mj

1
2
3
4
5
6
7
S

15.63
252.60
265,58
268.14
270.29
291.97
352.28
361.33

52.42
52.42
69.92
68.74
66. es
41.24
40.54
40.94

8 Coordinate Points

1 Loadas) Specified
Iioad

No.

X^Left
{ mi

X-Rlght
m)

268.00

271.00

Intensity

25.0

Deflection
(deg)
.0

NOFE - Intensity Is Specified As A Oniforroly Distritwted


Force Acting On A Horizontally Projected Surface.

A Critical Failure Surface Searching Method, Uslrtg A Rando


Technique For Qenerating Irregular Surfaces, Has Been Specified.
400 Trial Surfaces Have Been Generated.
20 Swrfaces Initiate From Bach Of 20 toinfca Egially %>aced
Along The Ground Surfaca Between X 120.00 m.
and X 22S.00 m.
Each Surface Terminates Between
and

X = 230.00 .
X " 290.00 m.

Unless further I/iraltation Were Iv/pome, The Minlmun Elevation


At Which A Surface Extends la Y
.00 m.
11.00ra,U n e Segments Define Each Trial Failut Surface.

Factor Of Safety Calculation Has Gone Through Ten Iterations

The Trial Failure Surface In Question Is Defined


By The Following 19 Coordinate Points
Point
No.

X-Surf
( m)

Y-Surf
( m)

1
2
3
4
5
6
7
8

125.53
133.58
141.74
150.74
159.49
1S8.55
178.68
189.58
200.54
211.49
222.39
233.35
243.05
251.56
253.80
253.88
254.32
254.71
254.83

45.86
38.37
31.00
24.67
18.00
11.77
7.40
6.14
5.31
4.18
2.70
3.54
8.73
15.70
26.47
37.47
48.46
59.45
68.71

10
11
12
13
14
15
16
17
18
19

Factor Of Safety Por The Preceding Specified Surface =

7.461

Factor Of Safety Calculation Has Qone Throuq* Ten Iterations

The Trial Fnliure Surface In Question Is Define^i


By The Following IS Coordinate Points
Point
Ho.

X-Surf

Y-Surf

( >a)

1
2
3
4
5

7
8
9

163.1
161.6
170.00
1*77.83
186.50
196.26
204.49
ai5.i3
226.06

45.43
38.83
31.32
23,59
16.82
11.77
4.46

1.S8
2.95

10
11
12
13
14
15

234.48
235.47
236.20
23.24
237.82
241.13

10.03
20.3
31.96
42.96
53.84
64.14

Factor Of Safety for The Preceding Specified Surfaoe =

9.439

Factor Of Safety Calculation Has Gone Through Ten Iterations

The Trial Failure Surface In Question Is Defined


By The Following 16 Coordinate Points
>oint
No.

X-Surf
{ m)

Y-Sucf
( m)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

16.74
177.57
185.39
1$4.06
203.83
212.82
221.93
232.63
243.44
251.21
2S1.26
251.57
251.60
252.50
254.43
254.77

45.17
37
29
22
17
11
5
2
4
12
23
34
45
56
67
68

44
71
.94
88
55
37
82
82
61
61
60
40
57
40
69

Factor Of Safety For The Preceding Specified Surface = 15.421


Factor Of Safety Calculation Ha Sone Through tan Iterartions-

The Trial Failure Surface In Question Is tefined


By the Following 15 Coordinate Points
Point
Mo.
1
2
3
4
5

e7
8
9

X-Srf
ai

-Surf

197.37
20S.16
213.82
223.59
232.39
241.35
250.15
260.47
271.46

49.SS
41,79
35.01
29t.&5
23.35
16.96
10.37
6.56
7.14

{ >

2S0.20
281.71
282.36
282.39
283.47
28S.52

10
11
12
13
14
15

13.81
24.71
35.6
46.6d
57.64
67.24

Factor Of Safety For The Preceding Specified Surface = 23.401


Following Are Displayed Th Ten Most Critical Of The Trial
Failure Surfaces Examined. They Are Ordered - Most Critical
First.
Safety Factors Are Calctiiated By The Modified Janbu Method * *

Failure Surface Specified By


Point

6 Coordinate Points

No.

X-Surf
( m\

Y-Surf
f n>

1
2
3
4
5
6

191.84
202.83
213.83
223.67
231.47
232.62

47.71
47,12
47,08
51.98
59.74
61.30

***

2.070

***

Individui si d a t a on t h e
ifater
Force

Slice
No.
1
2
3
4
5

7
B
9

s l ic e s

Tie
Tie
Earthquake
Force
Force
Forc^
Surchargs
Top
Bot
Tan
Hor
Vm
Weight
Norm
Load
U>s(feg) Lbs{kg) t b s i k g ) U>s(k:g) Lbskg) UDsikg! U>B(}tg ?(fcg>
0
.0
,0
30.1
119.6
127,6
.0
.0
0
,0
0
460.6
207.1
412.0
.0
.0
.0
0
.0
0
703.8
328.3
.0
.0
.0
0
0
69.6
.0
245.5
,0
.0
0
.0
.0
0
1436.9
311.7
.0
.0
1.3
.0
.0
.0
0
54.fr
.0
.0
0
0
.0
.0
,0
531.0
.0
.0
2.7
.0
.0
0
.0
0
.0
.0
.0
0
.0
,0
iO.9
.0
.0
&

Width
Fttmi
2.7
t 3
6 3
4 7
9 a
4
7 4
1
1 0

Water
Force

Failure Surface Specified By


Point

7 Coordinate Points

No.

X-Surf
C mS

Y-Sarf
{ m}

1
2
3
4
5
6
7

186.32
197.31
206,30
218.66
22. 01
237.65
243.06

45,7
45.40
45.86
49.55
53.28
60.09
64,78

***

2.073

***

Failure Surface Spacified By 9 Coorclinate Points


Point
No.

X-Surf
m)

y-Surf

1
2
3
4
5
6
7
8
9

191.84
202.22
213.21
224.20
233.49
2 4 2 . 4
252.27
269.37
259.39

47.71
44-06
43.55
43.83
49.74
55.36
61.19
69.59
70.23

( m)

2.079

Failure Surface Specified By 11 Coordinate Points

Point
No.

x-surf

y-Surf

( m)

m)

1
2
3
4
5

186.32
194.66
205.58
216.55
227.17

45.87
38.70
37.37
38.15
41.00

6
7
8
9
10
11

237.77
247,52
257.15
265.31
273.41
274.81

43.96
49.04
54.36
61.74
69.16
71.53

2,102

Failure Surfa-c Specifieci By

Point
Ifo.

X-Surf

1
2
3
4
S

191,84
202.35
213.29
224.23
234.09
243.64
252.87
2S5.30

7
8

( J

9 Coordinate Points

y-suEf
)
47.71
44.47
45.69
4.78
51.67
57.12
63.10
63.86

***

2.129

***

Failure Surface %>ecified By 13 Coordinate Points


oiltt

no.
I
2
3
4
5

7
8
9
10
11
12
13

X-Surf
m}

y-Surf
i M>

169.74
179.72
189.29
199.62
210.06
220.78
231.02
241.47
251.62
260.62
268.06
276.15
276.25

45.17
40.55
35.13
31.33
34.80
37.25
41.28
44.71
48.95
55.27
63.37
70.83
70.96

2.133

***

Failure Surface Specified By 7 CponSlnate Points


Point
No.

X-Surf
{ m)

Y-Surf
( m>

1
2
3
4
5
6
7

191.84
202.84
213.77
224.73
233.29
242.34
243.21

47.71
47.65
48.94
49.86
56.76
$3.03
64.83

2.1S7

Failutft Surface Specified


Point
KO.

X-Sutf
( m)

1
2
3
4
5
6
7
8
9
10

197.37
205-28
216.15
226.68
237.68
247.82
256.73
265.08
269.26
273.69

By 10 Coordinate PolBtS

Y-Surf
( M)
49.55
41.91
40,22
37.04
36.69
4 0 . 5
47.40
54.56
64.73
71.98

***

2.166

***

Failure Surface Specified By 10 Coordinate fo-int*

Saint
No.

X-Surf
{ m)

i
2
3
4
5
6
7
8
9
10

107.37
208.09
218,81
229.81
240.80
251.34
259.70
268.13
275.61
275.89

***

r-suct
i >
49.55
47,09
44.62
44.88
45.18
48.34
55.49
62.56
70.62
71.10

2 i 9^0

***

Failure Surface Specific Sy

int

9 Coordinate Points

X-rSurf

Y-Surf

to.

m)

i mi

1
2
3
4
5
6
7
8
9

202-90
212.49
223.29
233.92
244.58
253.97
261.52
268.03
269.27

***

2.192

51.40
46.02
43.95
41,09
43.80
4 9.53
57,53
66.40
72.35

***

1
y

A
.00

4 5 . 1 7 *

90.33 +

45.17

X
90,33

S
13S.50

180.67

I
135-50 +

* * *

- ..
- ...
6
6*
..6.*1
...428
..64817.
..6,17.
-.4892..
225.83
...84371.
...**3.11
..8.4.322
-.. . ....8*4....
..,.80W.333
604W*
.. * *
271.00 + .*
..6**1/1
- ,
4
180.67 .....

316.16 +

361.33 +

CASO III. FIGURA 2

PRESA AZAFRANCUCHO AGUAS ARRIBA DESEMBALSE RPIDO CON SISMO


Ten Most Critical. C:AZADR2CS.PLT By: HSA 11/19/2002 12:56am
4200

1^
a
b
c
d

j-e

4160

f
g
h

1j
-

4120

FS
1.02
1.02
1.06
1.08
1.09
1.10
1.10
1.12
1.12
1.13

ISoil
Type
1 No. Label
1 NCLEO
2 GRAVA
3 RIP-RAP
4 FILTRO
5 MANTO
6

CIMENTAC

Total
UnitWt.
(KN/m3)
19
20
20
17
18

Saturated
Unit Wl.
{KN/m3)
20
21
21
18
19

18

1
Friction
Angle
(deg)
30.1
37
38
33
30.1

Cohesion
Intercept
(KPa)
20
0
0
0
20

19

20

Pore
Pressure
Param.
0
0
0
0
0

35

Piez.
Surface
No.
Wl
Wl
W1
Wl
W1
W1

i
-j

4080

FSmin=1.02

4040 U
-

hi

r1 f

4000 -

ed
^

3960

U
-

^'^-T-

!l#^^y'

c\
^^-^^-^ wiwi
yii\ "

1"*^

5x

^'^<;;^^'Jss^

7\C">^

^^j^

=p^onnnr^nnnf^f^p

kC^iz^^^

6\

A
6

3920
-80

-40

40

80

120

X-Axis (m)

160

200

240

280

320

** PCSTftSIiSM *
by
Purdue U n i v e r e i t y
Slope S t a b i l i t y AnalyBie
S i i ^ l i f i e d Janbu, Simplified Bishop
o r ^ > e n c e r ' s Method o f S l i c e s

Run D a t e i
Time o f Run:
Run By:

11/19/2002
12:&6am
fiSA

I n p u t Data Filename:
O u t p u t FiXenaiae;
P l o t t e d Output Filenani:

CftZftESZCS.C
C:AZA2CS.PLT

raOBLm

mSCRIPTIC*}

PRESA AZAPRMCUCHO AGUAS A R R I l ^


TmSSmKLSK RPIDO C<m SISMO

Bo^maRy COORDINATES
7 "Pop Boundaries
27 Total Boundariss
indary
No.
1
2
3
4
6

7
8
9
10
11
12
13
14
IS
16
17
18
19
20
21
22
23
24
25
26
27

X-I<eft
mi

Tf-Left
a)

15.63
38.92
183.56
265.76
26.92
272.7S
352.28
183.56
18S,42
186.42
233.15
246.06
2fi6.14
2 7 2 . S3
302.49
325.0
270.29
272-76
291-97
270.29
290.98
38.32
4&.95
233-14
233.14
2S2.96
268.96

XSOraOPIC soil, PWRfiMETERS


6 TypetaJ of Soil

47.24
47.23
44.95
72.35
72.35
72.35
40.54
44.95
44.85
44.85
43.94
43.62
70.83
70.68
41.12
4 0 , S3
66.85
66.85
41.24
66.85
39.25
47,23
45.20
42,17
42.17
12.35
12.35

X-Right
i >

Y-Right

< )

S o i l Type
Below Snd

36.92
183-56
265.76
268.92
272.76
352.28
361.33
186.42
268.92
233.15
246.06
26S.14
272.93
302.49
325.06
352.28
272.76
291.97
302.49
290.98
295.81
40.95
233.14
233-is
262.9
26S.96
295.81

47.23
44.95
72.35
72.35
72.35
40.54
40,84
44.85
72.35
43.94
43.52
70,83
70,68
41,12
40.63
40.54
66.85
41.24
41,12
39.25
39.20
45.20
42.17
43-94
12.35
12.35
39.20

6
S
3
3
2
2
6
5
2
5
1
1
1
1
4
6
4
4
4
1
I
6
6
1
6
6
6

Soil Total Saturated Cohesion Prlotion


Pore
Pressure
Piz,
Type Unit Wt, Unit Wt. Intercept
Angle Pressure Constant Surface
No. <ld4/ia3) kN/m3)
jKPa)
ideg)
Para.
KPa)
No.
19.0
20.0
20.0

1
2
3
4
5
6

20,0
21.0
21.0
18.0
19.0
19.0

n.o

18.0
18.0

20.0
.0
.0
.0
20.0
20.0

.00
.00
.00
.00
.00

30.1
37.0
38.0
33.0
30.1
35.0

0
0
0
0
0

.oo

1 PIEZCWERIC SURFACE<S} HAVE BEEN SPECIFIED


Unit Weight of Water

9.80

PiezoHietjric Surface Mo. 1 Specified by


X-ater

Point

Ho.
1
2
3
4
5
6
7
9

8 Coordinate Points

Y-Water

S m)

m)

15.63
2S2,eo
265.58
268.14
270.29
291.97
352,28
361.33

52,42
52.42
69.92
6S-74
66-85
41.24
40. S4
40.84

BCSJNmRY LC0{a)
1 Load is)

lioad
NO.

Specified

X-l,eft
{ mi
268.00

X-Right
{ mi

Intensity
(kPa)

271,00

25.0

Deflection
(dgl

NOTE - I n t e n s i t y I s S p e c i f i e d a A tJniforwly D i s t r i b u t e d
Force Acting <^ A H o r i z o n t a l l y P r o j e c t e d S u r f a c e .

A H o r i z o n t a l Earthquake I^jading C o e f f i c i e n t
Of .200 Has Been Assigned
A V e r t i c a l Earthquake Iioading C o e f f i c i e n t
Of ,100 Has Been Pisgrtmi
Cavitation Preesure

.0 KPa

A Critical Failure Surface Searching Method, Wsin^ A Randcw


Technique For Generating Irregular Surface, Has Been %>eaiied.
40O Trial Swrface Have Been Generated.

20 Surfaces Initiate From Each Of 20 Point*fejuallySpaced


Along The Ground Surface Between X = 120.00 m.
and X - 225.00 m.
Each Surface Terminates Between
and

X 230.00 m.
X 290.00 m.

Unless Further Mmitations Were Isfjosed, The MlnimtHR Elevation


At Which A Surface Extenda Is Y .00 m.
11.00 m. Line Segaients Define Each Trial Failure Surface.

Following Are Displayed The ien Jfest Critical Of The Trial


Failure Surfaces Examined. They Are Ordered - Moat Critical
First.
* Safety Factors Are Calculated By The tfodified iJanbu Method *

Failure Surface Specified By


Point

6 Coordinate Points

X-Surf
{ m

y-Surf

No.
I
2
3
4
5
6

191.84
202.83
213.83
223.67
231.47
232.62

47,71
47.12
47.08
51.38
5.74
61.30

***

1.017

i ml

***

ItKlivid! data on the

Slice Width
No.
Ftfrn}
1

2
3
4
S

7
8
9

2.7
8.3
.3
4.7
9.9
.4
7,4
.1
1.0

Water Water
Force Force
Top
Bot
Itelght
Ii3(kg lOsafcg Ibslku
119 . 6
30.1
127,6
207 . 1
412.0
40-fi
.0
703.8
328,3
.0
98.6
24S.S
.0
1436.9
311.7
1.3
5f.
.0
.0
.0
531.0
2.7

.0
.0

10.

&

Tie
Ftorce
Tan
litoias
Lbs{feg} Weikq}
Tie
Borce

.0

o
.0
.0
.0
.0
.0
.0
.0

.0
.0

F a i l u r e Surface S p e c i f i e d By

ellees

7 Coordinate

Point

X-Sitrf

*Sarf

No.

! m)

{ )

.0
.0
.0
.0
.0
.0
.0
.0
.0

Earthquake
Surcharge
Force
Ver
hoa
Hor
Ii>s(!cai Uoalkg} U>3lkg)
6,0

3.0

92,1
140.8
139,7
2S7.4
11.0
106.2

46.1
71.4
69.9
143.7

.5
2.2

.3
1.1

^ints

5.S

S3.1

.0
.0
.0
.0
.0
.0
,0
.0
.0

1
2
3
4
6
6
7

186.32
197.31
208.30
218.66
229.01
237.65
243.06
1.017

45.87
45.40
45,86
49.5S
53,28
60.09
64,78
***

Failure Surface Specified By


Point
No.

X-Stir
S m>

1
2
3
4
S
6

191.84
202.62
213.56
222.96
231.20
231.52

1.063

Y-Stirf
i m}
47.71
45.52
44.38
60.11
57.39
0.94
***

Pailuce Surface Specified By


Point

6 Coordinate Points

9 Coordinate Points

No.

X-Swrf
{ i

Y-Surf
i m)

1
2
3
4
5
6
7
8
S)

1M.84
202.22
213.21
224.20
233.49
242.94
252.27
259.37
259.39

47.71
44.06
43.55
43.83
49,74
55.36
61.19
69.59
70.23

1,079

***

FailttF Surface %6cified By


Point
No,

X-Surf
)

1
2
3
4
5
6
7
8

191.84
202,35
213.29
224.23
234. m
243.64
252.87
255.30

8 Coordinate P o i n t s

Y-Surt
< mi
47-71
44.47
45,9
46.78
5 1 . 7
57.12
63.10
68.86

***

1.086

***

Failure Surface Specified By 13 Cooridiriate Pointe

oint
No.

X-Surf
( m)

Y-Suif
m}

1
2
3
t
5

7
8
9
10
11
12
13

169.74
179.72
189.29
199.62
210.06
220.78
231.02
241.47
251.62
260.2
268.06
276.15
276.2&

45.17
40.55
35.13
31.33
34.80
37.25
41.28
44.71
48.95
55.27
63.37
70.83
70.36

***

1.09

***

Failure Surface Specifi^ By 7 Coor<iinate Points


oint
No.

X-Surf
( ml

Y-Surf
{ ml

1
2
3
4
5
6
7

191.84
202.84
213.77
224.73
233.29
242.34
243.21

47.71
47.65
46.m
4 . 86
56.76
63.03
64.83

***

1,104

***

Failjre Surface Specified By 15 Coordinate Point

Point
Ho.

X-Sucf

1
2
3
4
5
6
7
8
9
10
11

147.63
157.28
167.32
177.88
188.37
199.27
210.01
220.99
229.03
238.06
247.17

( )

y-Surf
m
4&.52
40.23
35.74
3 2 . #6
29.34
27.91
25.53
26.24
33.75
40.02
46.20

12
13
14
15

256.81
264.14
271.5
275.22
1.117

51.49

m.m

7.^1
71.37
***

Failure Surface Specified By 11 Coordinate Points


'oint
Ntj.

X-Surf
( ro)

Y-Surf
( m)

1
2
3
4
5
6
7
8
9
10
11

186.32
194.S6
205.58
216.55
227.17
237.77
247.52
257.15
265.31
273.41
274.81

45.87
38.70
37.3?
38.15
41.00
43.96
49.04
54.36
61.74
69.18
71.53

.120

***

Failure Surface Specified By 13 Ooordinete Points


'oint
No.
1
2
3
4
5
6
7
S
3
10

12
13

X-Surf
(

175.26
184.58
193.63
202.83
213.82
224.81
234.92
245.30
255.69
264.02
271.59
276.55
278-09

1.131

.00
X

Y-Surf
( m)

JR)

45.08
39.24
32. &8
26.94
26.51
26.79
31.12
34.77
38.38
45.66
53.55
63.36
70.22

***

45.17

.00 + - . +

*w

90.33
+

135.50
.^-wt-

180.67

225.83

.+~^-.-+

46.17 +

90.33 +

135.60 +

180.67

_
_

225.83

271.00 +

316.16 +

361.33 +

8
8.
8..
6
..8.6*
.9.60*1
.80.92.
.069.17.
.8.6.17.
.8.6..2..
.09.9431.
..0.**4.11
ftfi-?
.
n *....
^ ^, ..O..W1.444
0.68SW*
^*
0.6**1/1
.*
0.6

CASO IV : FIGURA 1

PRESA AZAFRANCUCHO AGUAS ABAJO INFILTRACIN CONSTANTE SIN SISMO


Ten Most Critical. C:AZAIF4SS.PLT By: HSA 11/19/2002 1:23am
#
a
b
c
d
e
f
l
h
1
"j

4080

FS
1.86
1.88
1.89
1.89
1.89
1.90
1.90
1.91
1.91
1.91

Soil
Type
No. Label
1 NCLEO
2 GRAVA
3
RIP-RAP
4 FILTRO
5 MANTO
6
CIMENTAC

Total
UnltWt.
(KN/m3)
19
20
20
17
18
18

Cohesion
Intercept
(KPa)
17
0
0
0
17
20

Saturated
Unit Wt.
(KN/m3)
20
21
21
18
19
19

Friction
Angle
(deg)
27.D
37
38
33
27.3
35

Pore
Pressure
Param.
0
0
0
0
0
0

Piez.
Surface
No.
W1
W1
W1
W1
W1
W1

FSmin=1.86

W1

=TT

wi

-100

100

140
X-Axis (m)

180

220

260

300

340

by
Purdue U n l v e r a i t y
--.Slope S t a b i l i t y
ftnalysie
SiKfilifled Janbu, SB$)Hfiecl Bishop
or fipencer's Method of S l i c e s
Run Date:
TliB of Run:
Run By:

11/19/2002
l3 23m
HSA

Input Data Filename:


Output Filename:
Plotted Output Filename:

C:AZftIFSS3.SI
C:2AIF4SS.OUf

PROBLEM ESSCRIPTICW

C:A2AIF4SS.P1.T

PRESA ZPSiPMCacaO ACSAS ABAJO


INFILTRACIN CCSfSTANTE SIN S I * )

BCNDftRY COORDIMATES
7 Top
31 T o t a l

Boundaries
Boundaries

Boundary

X-teft

Y-teft

Mo.

( m)

( mi

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
26
26
27
28
29
30
31

73.20
152.71
1&6.55
150.71
241.92
38.5e
156.55
239.05
73.20
89.71
100.41
105.46
122.99
152.55
159*33
179.28
192.32
122.99
133.51
152.71
100.41
102,41
12$.67
134.49
192,32
i9!2.33
384.S6
129.67
156.51
1S2.51

.00

42.74
40.54
72.35
?2.35
72.35
44.96
47.23
72.35
44.B5
40.54
40.00
40.63
40.93
41.12
70-60
70.83
43.70
43.94
41.12
41,24
66.85
40.63
3&.89
39.20
39.25
43.34
42.17
45.20
39,20
12.35
12.35

X-Right
{ )

-Right
i m)

S o i l Type
Blow Bwl

73.20
152,71
156.55'
159.71
41,92
386.56
409.85
239.05
241.92
89.71
100.41
105.46
122.99
152.55
159.33
179.28
192.32
233.05
133.51
152.71
156.19
102.41
129.67
134-49
155.19
192.33
384.56
386.56
156.51
162.51
192.33

40.54
72.35
72.35
72.35
44.95
47.23
47.24
44.85
44.95
40,00
40-63
40.93
41.12
70,60
70.83
43.70
43.94
44.85
41.24
66.85
66.85
38.99
39.20
39.25
66,85
42.11
45.20
47.23
12.35
12.35
42.17

6
2
2
3
3
S
6
2
5
6
6
4
4
1
1
1
1
5
4
4
4
6
6
1
1
1
6
6
6
6
6

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

ISOTROPIC SOIL RAR;TBRS


6 Typ{e} of Soil
Soil Total Saturated Cohesion Friction
Pore
Preurie E>lez.
Type Unit Sit. Unit Wt. IntercBpt ftngle Pressure Conetant Surface
No. {k*/a3 {kN/m3!
(KPa>
(degj
Para.
(KPa)
tto.
1
2
3
4
5
6

19.0
20.0
20.0
17.0
18.0
18.0

20.0
21.0
21.0
18.0
13.0
19.0

17.0
.0
.0
.0

17.0
20.0

PIEZC;TRIC S U R P R C E S ) H A V E B E E

9.80

Piezomtric Sarface Ho.

1 Specified by

NO.

XHSatet
tnj

Y-Water
mi

1
2
3
4
5
6
7
8
9

6.32
100.41
133.51
155.19157.33
1S9.8S
162.02
163.91
409.00

42.74
40.63
41.24
66.85
68.74
69.92
70.53
70.95
70.95

,0
.0
.0
.0
.0
.0

SPECIFIED

Unit Weight of Water

Point

.00
00
00
00
00
00

27.9
37.0
38.0
33.0
27.5
35.0

9 Coordinate Pointa

1 Loadtsf Specified
Load
Mo.

X-Left

X-Right
{ i

153.00

Intensity
(ttPa)

156.00

Deflection
deg)

25.0

NOTE - Intensity Is Specified Ks A Uniformly Distributed


ForceftctifigOn h Horizontally Projected Surface.

A Critical Failure Svixtce Searching Mwthod, Using ft Random


Tsciinlque for SeneratinO Jrro^ular Surface, Has Been Specified,

I
I
I
I

400 "Trial Surfaces Hav Been Generated.


20 Surface* Initiate From Eacto Of 20 Points Equally ^oed
niong The Sround Surface Between X 46.00 .
and X - 120.00 m.

Each Surface Termina-tea Betvras


and

X 140.00 m.
X = 170.00 w.

UnleoB Further Limitations Were Xvcpoeed, Th Minlmun Elevation


At Iftilch A Surface Extends I Y .00 jft.
10.&0ra.Line Segments Define Each Trial Failure Surface.

Factor Of Safety Calcylation Has Gone Through Ten Iterations

The Trial Failure Surface In Question Is Defined


By The Following 17 Coordinate Points
Point

X-Surf

No.

t m)

1
2
3
4
S
6
7
0
9
10
11
12
13
14
IS
16
17

69.47
76.59
83.71
M,59
100.47
108.64
116.92
126.65
136.48
143.54
143.58
143.87
143.89
144.72
146.47
149.03
149.03

y-Surf
{ m}
40.65
33.63
26.60
20.4S
15. SS
10.09
4.47
2.15
3.97
11.05
21.05
31.06
41,OS
S I . 01
0.86
70-S3
70.88

Factor 0< Safety For The Preceding Specified Surface 10.7&8


Following Are Displayed The Ten Most Critical Of The Trial
Failure Surfaces Examined, fhey Are Ordered - Host Critical
First.
* * Safety Factors Are Csrlcalatesl By the Modified Jardc Method *

Failure Sutface %eciled By 13 Coordinate Points


PoiBt
No.

X-Surf
{Hi

y-Surf
{ l

1
2
3
4

65,26
73,47
83,36
93.20

40.78
36.06
33.&6
31.81

I
I
I
I
I
I
I
I
I
I
I
I
I
I

1&3.20
113.07
121.56
129.94
138.23
145.83
153.51
159.12
159v36

5
6
7
S
9
10
11
12
13

1.863

Individual

d a t a on t h e

Slice
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
13
20
21
22
23
24
25
26
27
2
29
30
31
32
33
34

34

slices

Earthquake
Tie
Tie
rorc
Force
Force
Surcharge
Hor
Top
Tan
Ver
Weight
Bot
NoriB
Load
U>s(fcg) L b s { k g ! Lbs(fcg} Us{(cg) Lbs {kg) l i ^ C k g ! LtoiSifcg) U J E i k g )
,0
.0
0
.0
.0
398.7
52.1
314.0
.0
.0
.0
27.9
1.8
0
.0
19.6
0
.0
.0
.0
.0
1591,1
.0
667.1
.0
.0
159S.3
.0
0
.0
S02.3
rO
,0
.0
1072.6
.0
302.7
0
.0
,0
.0
.0
.0
.0
636,5
.0
0
2574.9
.0
0
790.1
.0
178.0
.0
.0
.0
.0
,0
0
.0
.0
.0
319.4
70.5
.0
.0
.
.0
938.4
.0
0
202.2
.0
.0
.0
.0
.0
3344.2
0
628.2
.0
.0
3741.6
.0
.0
610.2
0
.0
.0
.0
477.0
0
.0
.0
.0
30.0
.0
.0
6,7
0
.0
.0
132.0
.0
.0
,0
1130.9
.0
.0
27.5
0
.0
.0
0
.0
.0
.0
34.9
.0
.0
.0
.0
.0
1630.4
.0
.0
,0
e
2985.4
.0
.0
.0
.0
.0
.0
o
.0
1242.9
.0
0
.0
.0
.0
.0
.0
1037.3
.0
.0
.0
0
.0
.o
.0
.0
85.1
0
.0
.0
.o
.o
.0
676.0
0
,0
.0
.0
.0
11.9
.0
.0
789.5
0
.0
.0
52.2
.0
.0
.0
.0
32.1
.0
0
.0
3.2
.0
.0
0
.0
57.5
6.1
.0
.o
.0
99.2
.0
.0
.0
12.8
11.4
.o
.0
47,9
0
.0
.0
282.0
.0
41.9
.0
.0
.0
.0
109.5
.0
20-1
20.2
63.8
.0
.0
.0
.0
16.6
0
.0
.0
0
-0
.0
10.9
75.6
.0
.0
.0
.0
.0
.0
58.1
4.9
0
.0
.0
49.8
.0
.0
0
,0
.0
.0
Hater
Force

Width
rt(m}
7.9
.3
9.9

e.4
3.5
7.2
2.0
.8
2.3
7.6
8.5
1.1
.3
2.7
.1
4.1
8.3
3.
3.7
.3
2.8
3.6
.2
.3
.5
1.7
.8
.6
.3
.6
1-0
.0
.1
.1

1.0
2.1
1.1

.0
.0

iater
Efarce

.0
.0
.0

0
0
0

,0
.0
,0

Failure SwrfBC* Specified By 12 Coordinate Points


>oint

I
I
I
I

31.52
33.ee
38.39
43.82
49.41
55. M
62.32
70.60
72.35

Mo.

X-Surf
{ ml

1
2
3
4
5
6
7

69.47
77.08
86.34
96.64
106.17
115.84
124.91

Y-Surf

( ^)
40.65
34.16
31.97
29.97
33,00
36.50
3 9 . 9S

.0
.0
.0

.0
.0
.0

.0
.0

.o

8
9
10
11
12

133.03
140.S7
146.63
152.46
153.2S

45.81
52.3&
60.34
68.46
72.35

1.875

Failure Surface Specified By 12 Coordinate Points

Point
No.
1
Z
3
4
5
6
7
8
9
10
11
12

Y-Surf
( m)

x-surf
{ )

40.78
34.29
32.10
30,10
33.13
36.62
40.10
45.94
52.51
60.47
68. S9
70,74

65.26
72.87
82.63
92.43
101.96
111,33
120.70
12.82
136.36
142.42
148.25
148.69
1.8&9

Failure Surface Specified By 14 Coordinate Points

Point

X-Surf

Ho.

I mi

1
2
3
4
5
6
7
8
9
10
11
12
13
14

61.05
69.80
77.52
87.37
97.19
107.19
116.5
126.58
135.22
144.83
ISO.05
157.83
162.96
166.13
l.BK

-Surf
( )
40.91
36.06
29,70
28.01
29.93
29.74
33-15
32.84
37.87
40.66
49.18
55.47
64.05
70.21
***

Failure Surface Specified By 15 Ctoordinate Points

Point
No.

X-Surf
mi

Y^Surf
{ Bl)

1
2
3
4
5
6
7
B
10
11
12
13
14
15

41.16
35-32
33.41
30.20
25.68
27.01
29.38
31.66
33.27
35.20
39.97
48.54
56.80
64-31
70.17

52.63
60.75
70.57
80.04
98.87
108.58
118-31
128.19
13&.00
146.79
151.93
157.57
164.18
166.25
1-694

***

Failure Surface Specified By 14 Coordinate Points


X-Sijrf
( B!>

Y-Surf

Mo1
2
3
4
5
6
7
8
9
10
11
12
13
14

65.26

72 .45
82 .12
91 73
101 42
111 26
120 23
127 84
136 IS
144 26
152 79
159 80
167 04
167 20

40.78
33.82
31.28
28.50
26.03
24.2
28.72
35,21
40.77
46.61
51.84
58.97
65.87
69-85

Point

f >

1.902

F a i l u r e Surface Sped tied


Point
NO.
1
2
3
4
5
S
7
9
9
10
11
12
13
14

X-Surf

By 14 Coordinate l ^ i n t a

ml

Y-Surf
( )

65.26
72.34
81.59
90.30
9*. 17
109.14
117.99
127.41
136.05
143.72
152-17
158.&
162.05
164-16

40.78
33.71
29.90
24.99
20.38
21.12
25.78
" 29.15
34.19
40,60
45.94
53.53
62.95
70-87

***

1.K53

***

F a i l u r e Surface S p e c i f i e d By 12 Coordinate Point


Point
Ho.

X-Surf
>

Y-Surf
}

1
2
3
4
5
6
7
8
9
10
11
12

73.68
82.46
92.45
102.43
112.40
122.06
129,&
137.65
145.29
152.13
159.08
lfe9.42

40.73
35.94
35.53
34.85
35.65
38-27
44,47
50.78
57.24
64.53
71.72
72.35

1.906

F a i l u r e Surface S p e c i f i e d By I t Coordinate ttoint


Point
No.
1
2
3
4

6
7
8

?
10
11
12
13
14

X-Srf
{ mi

Y-Surf
{ mi

61.05
68.28
75.70
5.37
95.24
104.4&
113.76
122.41
130.75
139.16
147.25
152-54
157.89
157,99

40. M
$3.99
27.29
24.76
23.14
26. 3
30.68
35.70
41.22
46.64
5S.51
61.00
69.45
72.35

1.911

***

F a i l u r e Surface S p e c i f i e d By 13 CoonJinate P o i n t s
Point
Mo.

X-Sucf
t i

y-Surf
{ mi

1
2
3
4
S

73.68
80.88
90.04
*9.ei
109.55

40,73
33.79
29. T7
27. 4
29.92

6
7

H9.4e
129.46
137.52
144.73
151.79
1S9.12
16S.01
168,02

9
10
11
12
13

31.23
31.46
37.38
44.30
51.40
58. l a
65.44
69.58

1.911

.00
X

.00 *-

51.23

102.46

153.69

*-4-

-+

'+

51.23 +
-

...5
.,.54
41
- . .,941*
-,, ..421..
- . , ..718*,.
102.46
.7518*..
.7613
. .741*.,..
...46*1...
....4*21...
,4691233
153.69 + . *
,.5441**1/1
. *
7064*
,
66

204.93 -t-

256.16 +

307.3? +

356.62 +

409.85 +

204.93

256,16
..+

CASO IV : FIGURA 2

PRESA AZAFRANCUCHO AGUAS ABAJO INFILTRACIN CONSTANTE CON SISMO


Ten Most Critical. C:AZAIF4CS.PLT By: HSA 11/19/2002 1:24am
#

a
b
c
.d
e
f
g
h

FS
1.02
1.03
1.04
1.04
1.05
1.06
1.06
1.08
1.08
1.08

Soil
Type
No. Label
1 NCLEO
2 GRAVA
3 RIP-RAP
4 FILTRO
5 MANTO
6 CIMENTAC

Total
Unit Wt.
(KN/m3)
19
20
20
17
18
18

Saturated
UnitWt.
(KN/m3)
20
21
21
18
19
19

Cohesion
Intercept
(KPa)
17
0

0
0
17
20

Friction
Angle
(deg)
27.9
37
38
33
27.9
35

Pore
Pressure
Param.
0
0
0
0
0
0

Piez.
Surface
No.
W1
W1
W1
W1
W1
W1

FSmin=1.02

wi

Wl

-100

6 6

100

140
X-Axis (m)

180

220

260

300

340

** PCSTftBLSM **

by
Purdue U n i v e r s i t y
Biop S t a b i l i t y A n s l y s i e
S i n p l l f i e d Janbu, Siiaplifled Biahop
or Si)enfcer'B Methoii of SliceiB
11/19/2002
1:24am

Run Date:
Time of Runt
Run By.

HSA

I n p u t Data Filename:
Output Wleame:
P l o t t e d Cftitput F i l e n a m e s

C:AZ1AIF4CS.SI
C:A2AIF4CS.CXJ'r
C;A2AIF4CS.PLT

PR(iE4 ESCRIPTICt

PRESA AgAFRANCCHO ASUAS ABA,70


IHFII.TRACIC*! COSANTE CCJ SI40

BOUNDARY COORDINATES
7 Top
BswJKsries
31 T o t a l B o u w i a r i s s

Boundary
NO1
2
3
4
5
6
7
8
9
10
11
12
13
14
IS
16
17
18
19
20
21
22
23
24
25
26
27
2S
2S
30
31

X-Let
< o>

Y-teft
{ m>

X-Right

( )

( )

.00
73.20
152.71
156.55
1S9.71
241.92

42.74
40.S4
72.35
72.33
72.35
44.95
47.23
72.35
44.86
40.54
40.00
40.63
40.93
41.12
70,60
70.83
43.70
43.94
41.12
41.24
66.85
40.63
38.89
39.20
39.25
43.94
42.17
45.a&
39,20
12.35
12.3S

73.20
152.71
156.55
159.71
241.92
386.56
409.5
239.05
241.92
89.71
100.41
105.46
122.99
152.55
159.33
179.28
192.32
239.05
133.51
152.71
155.19
102.41
129.67
134.49
155.19
192.33
384.56
386.56
15,51
162.51
192.33

40.54
72.35
72.35
72.35
44.95
47.23
47.24
44,85
44.95
40.00
40.63
40.93
41.12
70.60
70.83
43.70
43.94
44.B5
41.24
66. e s
66.85
36,89
39.20
39.25
66.96
42.17
46.20
47.23
12.35
12.35
42.17

JS^.S^

1S6.S5
239.05
73.20
89.71
100-41
105.46
122.93
1&2.55
155.33
179.28
152.32
122.99
133.51
152.71
100.41
102.41
129.67
134,4
192-32
192.33
3S4.66
129.67
156.51
162.51

y-Rlght

S o i l Type
Below Bnd
6
2
2
3
3
5
6
2
5
6
6
4
4
1
1
1

5
4
4
4
6
6
1
1
1
6
6
6
6
6

I
I
I
I
I
I
I
I
I
I
I

ISOTROPIC SOIL EWWMEBRS

6 Type(} of

Soli Total Safeursted Cohesin Friction


Por
Presaure
Ptz.
Type Unit Sit. Unit Wt. Intercept
Angle Pressure Constant Surface
No. (kN/ffl3} ?kN/Hi3>
KPa)
(deg)
Param.
{KPaJ
No,
19.0
20.
20.0
17.0
18.0
18.0

1
2
3
4
5
6

20,0
21.0
21.0
18.0
19.0
19.0

1-? . 0
.0
.0
.0
.0
20 . 0

27.9
37.0
38.0
33.0
27.9
35.0

.00
.00
.00
.00
.00
.00

.0
.0
.0
.0
.0
.0

1 PIBZOMETRIC SURFACE IS) HAVE BEEN SPECIFIED

Unit Weight of Water

9,80

P i e z o B t e t r l c S u r f a c e Ho.

1 Specified by

Point
No.

X-Water
{ )

Y-Water
{ m)

1
2
3
4
5
6
7
8
9

S.32
100.41
133.51
155.19
157,33
159.9
162,02
1 6 3 . 91
409,00

42.74
40.63
41,24
66.85
68.74
69.92
70.53
70,95
70,95

BCAmmRY

9 Coordinate

Points

ix]ftO{s)

1 Loadt)

ijoad
No.

I
I
I
I
I
I

Soil

Specified

X-I^ft
( m)

X-Right

153,00

186.00

Intensity
ikPa}

Deflection
(degi

25,0

NCWE - I n t e n s i t y l e ^ j e i f i d As A y n i f o m d y B i s t r i b w t e d
F o r c e A c t i n g Oa A H o r i z o n t a l l y P r o j e c t e d S u r f a c e .

A Horizontal Earthquake Loading


Of , 2 0 0 Has Been A s s i g n e d
V e r t i c a l garti|ua)ce I > o ^ i n g
Oif . 1 0 0 Has Been A s s i g n e d
Cavitation

Pressure

Coefficient
Coefficient

. 0 KPa

A C r i t i c a l R i l u r e Surface Searahing ffethod. Using A {tandom


f e e h n l ^ i e Wot 6neratiRg I r r e g u l a r S u r f a c e s , Has Seen S p e c i f i e d .
40O T r i a l Surfee4s Have Ben Generated.
20 Surfa<je8 I t i i t i a t o fx<mi Baeh Of 20 Points Equally Spa^imdi
Along The Qrouml Surface Btetween X = 4G.00 m.
and X 120>00 m.
Each Surface T e r t n a t e s Between
and

X " 140.00 m.
X = 170.00 m.

Unless Further Wmltations Were Inx>aedr The Minlmuffl Elevation


M Which A Surface Extends Is Y =
.00 m.
15,00 m. Line Segments Define Each Trial Failure Surface.

Following Are Displayed The Ten Most Critical Of The Trial


Failure Surface Examined. They Are Ordered - Most Critical
First.
Safety Factors Are Calculated By The Modified Jartt! Methc * *

Failure Surface Specified By 11 Coordnate Points


Point

X-Surf

Y-Surf

No.

( m}

( ml

1
2
3
4
5
6
7

44.21
57.91
71.62
86.40
101.20
116.12
12.18
142.31
154.44
164.04
166.08

41.41
35.31
29.21
26.68
24.20
23.69
33.07
40.32
49.15
60.61
70.23

9
10
11

1.020

Individual date on the


Water Water
Poroe Force

Slije Width
So.
Fti)
1
13.7
2
13.7
3
4
13.2
5
3.3
6
10.7

36 slices
Tie
Force

Earthquake
Tie
Force
Force
Surcharge
Weight
Mo era
La&d
Ver
Tan
Hoc
top
Bot
IA>s{icg} Ii>s{cg} U>{kg) Uwfkfl} U(*:gJ l*>a(kgi U>s(kg3 U>sikg)
.0
741.0
49.4
148.2
74.1
.0
.0
71.3
.0
85.
2222.6
1347.3
444.S
222.3
.0
.0
10,
.0
345.5
191.7
.0
69.1
34,6
.0
3904.2
1743.5
.0
.0
760.8
390.4
.0
128,6
476.8
.0
.0
.0
257.3
12. 7
4931.7
164S.9
iO
.0
SS8.3
493,2
.o

7
6
5
10
11
12
13
14
15
le
17
18
19
20
21
22
23
24
25
26
27
26
29
30
31
32
33
34
35
36

41S.4
S61.4
1673.9
62S5.9
4213,9
3667.7
284.9
2168.0
38.4
554.0
4304.3
5175.4
75.4
136.2
660.6
335.5
347.5
227,3
310.4
735.3
129,2
60.0
29.8
608. e

.8
1.2
3.0

10.7
6.9
6.2
.5
3.8
.1
1.0
7.8

10.2
.2
.3
1.4
.8
.8
.6

.a

2.0
.4
.2
.1
2.0
.0
1.9
.1
.6
1.2
.2

1.4

4S.0
28.6
111.6
103.5

.0
.0
.0
.0
.0
.0
.0
.0
.0
,0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0

127.9
195.9
487.2
1644.8
1032-4
681.6
43.7
288.0

.o

320.8
21.2
257.1
257.7
12.0

.0

.&

5.6
1.5

2.3

4.4

47.3
549.1
1199.3
22.0
40,1
203.3
137.4
161.3
108.1
151.3
429.4
76.3
36.9
ie.8
395.9
1.0

.0
.0
.0
.0
.0
.0
.0
,0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0

Failure Surface Specifltd By 11 Coordinate

Point
No.

X-Sur
j m)

y-0urf
>

1
Z
3
4
5
6
7
8
S
10
11

52.63
64.90
77.47
92.2S
107.20
121,07
134.94
147.46
158.84
164.55
167-01

41.16
32.52
24.34
21.80
20.55
26.26
31.97
40.23
50.00
63.88
69.92

.0
.0
.Q

.0
.0
.0
.0
.0
.0
.0
.0
.0
,0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0

83.3
130,3
334.8
1259.2
842.8
733.5
57.0
433.6
7.7

3.8

110.8
860.9
1035.1
15.1
27.2
13.l
67.1
69.5
45.5
62.1
147.1
25.8
12.0

55.4
430.4
517,5

6.0
3.0

121.8

60.9

1
2
3
4
5
6
7
8
9

x-surf

Y-Srf
f >

56.94
68.96
82.82
97.66
112.63
125,84
137.90
ISO.15
162.46

41.03
32.19
26.45
24.27
25.13
32.26
41.17
49.83
58.39

.3

.1

91.6

45.8

5.7

2.9

22.3
20.7

11.2
10.4

.5

.2

Paints

Failure Surface Specified By 10 Coomlinate Points

Ho.

7.5

13.6
66.1
33.5
34.7
22.7
31,0
73.5
12.9

6.0

1.033

Point

41.6
5.1
167.4
629. S
421.4
366.8
28.5
216.8

10

168.00
***

1.039

69.59
***

F a i l u r e S u r f a c e S p e c i f i e d By 1 0 C o o r d i n a t e

'oint
No.

X-Surf
I Bl)

Y-Surf
\ m)

1
2
3
4
5
6
7
8
9
10

65.26
78.58
93.32
108.27
123.00
137.20
151.71
160.24
165.41
166.22

40.76
33.97
31.06
25.91
32.75
37.57
41.38
53.72
67.80
70.18

***

1.044

***

F a i l u r e S u r f s e e g p e c i f i e d By 11 C o o i ^ i t t a t e
Point
Ho*

X-Surf
m}

Y-Suri
< mS

1
2
3
4
5
6
7
8

48.42
62.26
76.74
91.21
105.75
120.52
135.02
146.99
156.73
164.25
166.S3

41.2S
35.SO
31.56
27.63
23.94
26,57
30.42
39.45

10
11

***

Points

Points

Bo.m

63.84
70.04

1.051

F a l l a r e Surface S p e c i f i e d By 10 Coordinate foiiittiS


Point
No.

X-Surf
f m)

Y-Surf
n)

1
2
3
4
S
6
7
8
9

61.05
73.62
88.09
102,54
117.34
131.87
145.33
154.22
161.17

40.91
32.71
28.73
24.76
27.25
30.97
37.58
49.67
62.96

163.79

10
***

1.061

70.99
***

Failure Surface Specified By 11 Coordinate Points


>oint
No.

X-Surf
( m)

Y-Surf
( mi

1
2
3
4
5
6
7
8
9
10
11

48.42
61.23
76.06
91.06
106.01
120.99
134.90
147.85
161.90
169.85
169.86

41.28
33.47
31.24
31.22
30.06
29.26
34.89
42.46
47.71
60.43
68,97

***

1,062

***

Failure Surface Specified By 11 Coordinate Points


oint
Ho.

X-Srf
mi

Y-Swrf
m)

1
2
3
4
5
6
7
8
9
10
11

56.8^4
69.19
81.10
95.34
110.34
125.32
139.16
152.3S
159.58
166.79
167,86

41.03
32.52
23.40
18.68
1&.87
19,69
25.46
32.60
45.75
58,90
69.64

***

1.077

***

F a i l u r e Surface Sp<;ifil By 11 Coordinate Stointe


Point

X-Surf
< mi

Y-Surf

NO.
1
2
3
4
5
6
7

44.21
56.60
9.1
84.47
*9.35
113.81
128.00

41.41
32.95
25.49
23.43
21.54
25.52
30.40

( )

8
9
10
11

138.SO
14927
1&.09
162.78
***

1.11
61.54
63.68
71.33
***

1.080

Failure Surface Specified By 10 Coordinate Points


Point

X-8urf

y-urf

No.

C m)

i m)

1
2
3
4
5
6
7
8
9
10

56.94
6S.53
82.24
97.03
110.49
123,96
137.53
150.24
162.80
166.14

41.03
31.63
25.54
28.05
34.66
41.26
47.66
55.63
63-82
70.21

1.083

,00

***

51,23

102.46

. 0 0 +-

51.23 +

-.2
. 913
. 91.4
- ...254*
16,..
..,.234.*.,
102.46
917.*,.
.,..2340
.....14.*
-...9.1.*....
.
824*0
-,
61.9....
153.6f + * . . . 8 . 4 . 1 0 . * * l / l
- *......72314*
. 8772

204.93 +

153.69

204.93

256.16

I
I

256.16 +

307.39 +

358.62 +

409.85 +

ANEXO 6
RELACIN DE PLANOS

v_

CAPITULO IV

COSTOS Y PRESUPUESTOS

4.1.0

GENERALIDADES

4.2.0

COSTOS UNITARIOS

4.3.0

METRADOS

4.4.0

PRESUPUESTOS

4.5.0

CRONOGRAMA DE OBRA

4.6.0

CONCLUSIONES

RELACIN DE CUADROS
4.0.1

Listado de Partidas

4.0.2

Cuadro de Remuneraciones

4.0.3

Resumen del Presupuesto de Obra

4.0.4

Cronograma de Ejecucin de Obra

4.0.5

Cronograma de Inversiones

4.0.6

Presupuesto Desarrollado por Estructura Hidrulica

ANEXOS
1.

ANLISIS COSTOS UNITARIOS

2.

ESPECIFICACIONES TCNICAS

CAPITULO IV
COSTOS Y PRESUPUESTOS

4.1.0

GENERALIDADES
& Presupuesto calculado es el resultado del anlisis de costos unitarios y
metrados de las partidas proyectadas segn el diseo hidrulico indicada en el
cuadro N" 4.01, dicho presupuesto es referencial por cuanto los precios de los
materiales, mano de obra, equipos y herramientas estn sujetas a la oferta y la
demanda del mercado.
Las obras necesarias no contempladas en el Presupuesto se sugiere sean
considerados en la partida de obras adicionales previa aprobacin de la
Supervisin.

4.2.0 Costos Unitarios


Los costos unitarios de las diferentes partidas se ha elaborado teniendo en cuenta
los precios de mano de obra, materiales, alquiler de equipos y 5% de mano de
obra por desgaste de herramienta, as como tambin el rendimiento de la cuadrilla
indicada en cada uno de los costos unitarios. Los costos de la mano de obra no
calificada y calificada corresponde al del lugar, para los costos de los equipos y
materiales se ha tomado como referencia los indicados por CAPECO el 2003. Ver
anexo 01.
El costo de los materiales corresponde al precio de la ciudad de Huamanga y/o
Lima por lo cual se incluye los costos de fletes aproximados para el traslado a la
obra mediante transporte terrestre.

4.3.0 Metrados
Se ha elabor los metrados de las estructuras diseadas teniendo presente las
diferentes partidas agrupadas del siguiente modo: obras provisionales; trabajos
preliminares; dique, toma, y conducto de descarga, pozo de maniobras, alivadero
de excedencias y badn (can'etera de acceso). Ver cuadro N 4.06.

4.4.0 Presupuesto
Con los costos unitarios y los metrados respectivos se ha elaborado el
Presupuesto de obras cuyo valor total de la ejecucin del Proyecto de
Construccin Dique de Azaflrancucho, asciende a Treinta y siete millones
ochocientos seis mil doscientos treinta y nueve con 90/100 Nuevos Soles (37
806,239.90), que equivale a Diez millones setecientos cuarenta mil cuatrocientos
nueve con 06/100 Dlares Americanos (US$ 10740,409.06 a razn del tipo de
cambio a US$ 1 = S/. 3.52 a enero del 2003, este presupuesto corresponde a un
proceso de licitacin. Ver cuadros Ns. 4.03 y 4.06.

4.5.0 Cronogramas de Obra


Se ha programado la obra para ejecutarse en 15 meses calendarios, como se
Indica en el cronograma de inversiones, cuadros Ns. 4.04 y 4.05, la cuadrilla
promedio es el doble del indicado en los costos unitarios.
La programacin de obras y su cronograma de inversiones detallado lo realizar la
entidad financiera.
4.6.0 Conclusiones

Los costos unitarios de las partidas corresponden a las estructuras de diseos


realizados.
Los costos de mano de obra no calificada y calificada corresponden al lugar
prximo del proyecto, mientras los materiales estn referidos a los indicados
por CAPECO el mes de enero 2003.
El presupuesto calculado asciende a un total de SI. 37 806 239,90, equivalente
a US $10740,409,06; con tipo de cambio a razn de US $ 1 = S/.3,52 al mes
de enero del 2003.
El presupuesto de obra esta referido para un proceso de licitacin.
El calendario de ejecucin de las obras es de 15 meses calendarios.

CUADRO N 4,01
LISTADO DE PARTIDAS

Partida

Descripcin

1.01
1.02
1.03
1.03.1
[1.03.2
1.03.3
1.03.4
1.03.5
1.03.6
1.03.7
1.03.8
1.03.9
1.03.10
1.03.11
1.06
2.01
2.02
2.03
2.04
2.05
2.06
2.07
2.08
2.09

INSTALACIN DE CAMPAMENTO
CARTEL DE OBRA
CAMINO DE ACCESO
LIMPIEZA DEL TERRENO
TRAZO Y REPLANTEO
EXCAVACIN M.S. PLATAFORMA - DESPALME
EXCAVACIN R.S. PLATAFORMA - DESPALME
EXCAVACIN R.F. PLATAFORMA - DESPALME
EXCAVACIN MANUAL MS CUNETA Y CAJA
EXCAVACIN MANUAL MS CUNETA Y CAJA
EXCAVACIN RF CUNETA
RELLENO COMPACTADO MATERIAL PROPIO
MURO SECO ASENTADO CONCRETO F'C = 175 Kg/cm2
ELEMINACION MANUAL CE DESMONTE
EXCAVACIN CONGLOMERADO BAJO AGUA
EXTRACCIN Y CARGIO MAT IMPERMEABLE GC
EXTRACCIN Y CARGIO PIEDRA DE CANTERA
EXTRACCIN Y CARGIO MATERIAL GRADUADO D FILTRO
EXTRACCIN Y CARGIO DE GRAVA. DREN
TRANSPORTE VOLQUETE D = 10 KM
TRANSPORTE VOLQUETE D = 6 KM
CONFORMACIN TERRAPLN
ENROCADO ACOMODADO Y COMPACTADO C MAQUINARIA M3
ENROCADO AL VOLTEO CON MASQUINARIA RIP RAP

2.12

ENROCADO DIMETRO 0.30 M ASENTANTADO EN CONCRETO


FC = 175 Kg/CM2.

3.01
3.02
3.03
3.04
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
5.01
5.02
5.03
5.04
6.01
6.02

M2
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

2,82
1,14
5,68
12,18
26,35
24,15
59.27
78,25
14.66
45.69
12.05
16.26
9,28
27.04
14,25
18,97
15,67
10.49
3.70
6,51
8,24

M2

GEOMEMBRANA LISA HOPE 1,50 MM


GEOTEXTIL DE POLIETILENO NO TEJIDO DE AMORTIGUAMIENTO
Y PR0TECCK3N PARA GEOMEMBRANA

40,79
17,43 i

M2
M2
M2
M3
M3
M3
M3
M3
M2
M2
M2

GEOWEB GWV4, E = 100 MM


RELLENO COMPACTADO SUELO 0 CEMENTO 4:1
CONCRETO CICLPEO F*C=175 Kg/CM2 + 25% PM
CONCRETO CICLPEO F*C=175 Kg/CM2 + 30% PM
CONCRETO F*C= 210 Kg.- CM2
CONCRETO F*C= 210 Kg.- CM2 VIGA COLLAR
ENCOFRADO Y DESENCOFRADO MURO
ENCOFRADO Y DESENCOFRAEX) LOSA
ENCOFRADO Y DESENCOFRADO CIRCULAR
ACERO FY=4 2C Kg./CM2.
REJILLA PUTINA 2" X 3/4"
ESCALERA DE ACCESO D = 3/4"
SUMINISTRO E INSTALACIN VLVULA COMPUERTA D=16"
SUMINISTRO E INSTALACIN TUBERA PVC D=2"
JUNTA ELASTROMERICA
JUNTA WATER STOP DE 6"
1

M2
UNID

Precio
Unitario
N.S.
55,90
379,67

Unidad

Kg.
ML
ML
UNID
ML
ML
ML
1

1,

5,80
30.89
56,45
174,46
158,12
244.82
244,35
27.16
23.79
62,92
2.39
33.95
69.44
7138,07
16,23
10.16
20,10

CUADRO N 4.02
CUADRO DE REMUNERACIONES

ETALLE

[PARTIDA

I 1,00

REMUNERACIN BSICA VIGENTE (RB)

OPERARIO
SI.

OFICIAL
SI.

PEON

s/.

26,89

24,21

21,43!

8,61

7,26

6,43

1 3,00 LEYES Y BENEFICIOS SOaALES SOBRE LA RB 115,89%

31,16

28,06

24,84|

1 4,00 LEYES Y BENEFICIOS SOCIALES SOBRE LA BUC 14,00%

1,21

1,02

0,9o|

1 5,00 BONIFICACIN MOVILIDAD ACUMULADA

6,00

6,00

6,00

1 6,00 OVEROL (02 UNIDADES ANUALES)

0,40

0,40

0,4o|

COSTO DA HOMBRE (DH)

74,26

66,96

60,00

9,281

8,37|

7,50

2,00

BONIFICACIN UNIFICADA DE CONSTRUCCIN

COSTO HORA HOMBRE (HH)


EL JORNAL BSICO DEL CAPATAZ ES 1.20% DEL OPERARIO

CUADRO N" 4.03

RESUMEN DEL PRESUPUESTO DE OBRAS


Presa Azanfracucho

PARTfDA

1
1
1
1
1

DETALLE

^
^
^
^

Obras Provisonales
Trabajos Preliminares
Presa

COSTOS/.
SUB TOTAL

1
1
948 000,561
93 177,88

23 471 346,05

Toma y Conducto de Descarga

170 212,06

Pozo de Maniobras

119 570,2o|

Aliviadero de Excedencias

826 101,35

Badn

2 940,98

Total de Costo Directo

25 631 349,081

Gastos Generales (15%)

3 844 702,361

Utilidad (10%)

2 563 134,91

Sub Total
IGV
Costo General

32 039 186,35
5 767 053,541
37 806 239,891

CUADRO N 4.04
CRONOGRAMA DE EJECUCIN DE OBRA
Presa Azafrancucho

PARTIDA

DURACIN (Meses)

DESCRIPCIN
1

Obras Provistonales

Trabajos Preliminares

Presa

Toma y Conducto de Descarga

Pozo de Maniobras

Aliviadero de Excedencias

Badn

En este cronograma se han considerado 2 cuadrillas

10

11

12

13

14

15 1

CUADRO N" 4.05


CRONOGRAMA DE INVERSIONES
Presa Azafrancucho

JPARTI

DURACIN MESES

DESCRIPCIN

1 ^
' Obras Provisionales

1 F

474 000,28

11647,2

5 823,62

5 823.62

6 823,62

5 823,62

5 823,62

2 133 758 73

2 133758,73

2 133 758,73

2 133 758,73

2 133 758,73

Toma y Conducto de Descarga

15 473,82

15 473,82

Pozo ^ Maniobras

10170,0^

10 870.02

10 870,02

AHviaclero de excedencias

7* 100,12

75 100.12

76 100.12

1 *^Presa
1 E

474 000,28

1 B

10

11

12

13

14

948 0(,Se{
5 823,62 1

5 823,62

5 823,6^

5 823,62

5 823,62

6 823,62

2133 758,73

2 133 758,73

2133 758,7a|

2 133 768,73|

2 133758,7'

2 133 758,74

15 473,82

15 473,82

15473,82

15 473.83

15 473,82

15 473,82

10 870,02

10870,02

10 870,0^

10 870,02

75 100,12

75 1(M,12

75 100,12

75100,12

6 823,62

6 823,62

5 823,62

93 177,8B|

23 471 346 O|
15 473,83

15 473,83

15 473,83

10 870.02

10 870,02

10 870,01

10 870,01

119 570,20|

75 100,12

75 100,13

7S 100,13

826 101.351

2 940,98

2 940,^

110 208,57

25 631349 0 ^

76 100,13

1 ^

Badn

170 212,061

[COSTO DIRECTO
I G A S T O S G E N E R A L E S (16%

TOTAL
15

485 647,48
CD.)

[UTIUDAD (10% C D )

2 613 582,63

2 139 5B2,3S

2 139 S82,3S

2 241 026,31

2 241 026.31

2 241 026 31 2 241 026 31

2 241 026,31

2 241 026 31 2 241 026,32

2 241 026,33

107 267,60

107 267,58

72 847,12

3S2 037,3^

32 937,3^

320 937,36

336 163,96

336 153,95

336 153,96

336153 95

336 153,95

336 153,95

336 153,95

336 153.95

16 090. 4

16 090,14

16 531,2^

3 844 702 oq

48 664,76

261 358 2d

213 958,2^

213958 24

224 102,63

224 10263

224 102 63

224 10263

224 102,63

224 102 63

224 102,63

224 102,63

10 726,7^

10 726,76

11 020,86

2 6631349ll

2 801 282 89 2 801 282,9(^

2 674 477 94 2 801 282,89

2 801 282 8S

2 801 282 89 2 301 2 K 89

607 059,35

3286 978 2^

2 674 477 9^

2 801 282,91

134 084.5q

134 084,4q

137 760,71,

|lGV(18%)

109270,68

6B8Q5e,od

481406,0^

481406,03

504 230,92

504 230,92

504 230,92

504 230,92

504 230,92

604 230,92

504 230,9^

504 230,9^

24 135,21

24 135,2l|

24 796.9^

5 767 053,5.^

jcosto Qsneral

716 330,0^

3 SSS 034.3l|

3155883,97]

315S883,97J

3 305S13,8l]

3 305 513.81

3 305 513 81

3 305 513,8l]

3 305 513,81

3 306 513,8-^

3 305 S13,a^

3 306 513,&4|

1S8 219,7l|

158 219,7o|

162 557,6^

37 806 239 8 ^

|SUB TOTAL

2 801 282,89

32 039 186

CUADRO N 4.06
PRESUPUESTO DETALLADO POR ESTRUCTURAS HIDRULICAS
Presa Azafrancucho

IPART 1

UND 1

DESCRIPCIN

A [Obras Provisionales
1.01 Instalacin de campamento
1 02 Cartel de Obra
1.03 Camino de Acceso
1.03.1 Limpieza del terreno
1 03.2 Trazo y replanteo
1.03.3 Excavacin plataforma MS
1.03.4 Excavacin plataforma RS
1.03.5 Excavacin plataforma RF
1.03.6 Excavacin cuneta MS
1.03.7 Excavacin cuneta RS
1.03.8 Excavacin cuneta RF
11.03.9 Relleno compactado material propio
jl.03.10 Muro seco asentado concreto f e =175kg/cm2
4,01 Muro concreto ciclpeo f e = 175 kg/cm2 + 25% PM
4,05 Encofrado y Desencofrado Muro
|l.03.11 Eliminacin de desmonte
B
1.03.1
1.03.2
1,04
1,05

1
PRECIO SI.
1 UNITARIO1 PARCIAL 1

TOTAL

948.000,56]
m^
und

500,00
3,00

55,90
379,67

27.950,00
1.139,01

m^
m^
m^
m^
m^
m^
m^
m^
m^
m^
m^
m2
m^

16840,00
16840,00
6726,07
9406,30
22709,31
98,27
183,70
126,68
1565,70
245,40
157,80
414,90
408,65

2,82
1,14
5,68
12,18
26,35
24,15
59,27
78,25
14,66
45,69
174,46
27,16
12,05

47.488,80
19.197,60
38.204,08
114.568,73
598.390,32
2.373,22
10.887,90
9.912,71
22.953,16
11.212,33
27.529,79
11.268,68
4.924,23

m^
m^
Glob
Glob

54542,00
54542,00
1,00
1,00

2,82
1,14
21000,00
10000,00

153.808,44
62.177,88
21.000,00
10.000,00

93.177,88

Trabajos Preliminares
Limpieza del terreno
Trazo y Replanteo
Flete
Movilizacin y desmovilizacin de equipo

Presa
Excavaciones
Despalme MS
Despalme RS
Excavacin bajo agua
Excavacin MS
1 1.03.4 Excava^Hon
1
RS

MET

C
1.00
1.03.3
1.03.4
1,06
1.03.3

1.949.809,79
m^
m^
m^
m'
|

m^ J

61856,16
15.464,04
28.507,50
17.400,42
69.601,68|

5,68
12,18
16,26
5,68
12,18

351.342,99
188.352,0
463.531,95
98.834,39
847.748,46
Van

Viene

IARTID 1

DESCRIPCIOI^

PRECIO SI.
UNO IMETRADO 1
1 UNITARIO 1 PARCIAL |

2.00 1 Relleno
m^
2 0 1 Extraccin y carguio material impermeable grava arcillosa.
2,05 TransWolquete 8 m' (Carg. F. 125 HP) V = 30-40 Km/H D = 10 m^
2,07 Conformac. Terraplen-Motoniveladora 125 HP Sierra>3800 m m^
m^
2,02 Extraccin y carguio de piedra de cantera
m^
TransA/olquete
8
m^
(Carg.
F.
125
HP)
V
=
30-40
Km/H
D
=
6
1 2,06
m^
1 2,08 Enrocado acomodado y compactado con maquinaria
m^
2,03 Extraccin y carguio material graduado para filtro
m'
1 2,06 TransA/olquete 8 m^ (Carg. F. 125 HP) V = 30-40 Km/H D = 6
2,07 Conformac. Terraplen-Motoniveladora 125 HP Sierra>3800 rr m^
m^
2,02 Extraccin y carguio de piedra de cantera
m^
2,06 Trans/Volquete 8 m^ (Carg. F. 125 HP) V = 30-40 Km/H D = 6
m^
2,09 Enrocado al volteo con maquinaria Rip Rap
m^
2,04 Extraccin y carguio de grava, dren
m^
2,06 Trans/Volquete 8 m^ (Carg. F. 125 HP) V = 30-40 Km/H D = 6
m'
2,08 Reteno con material gravoso, dren
m^
2,01 Extraccin y carguio material impermeable .
2,05 TransA/olquete 8 m^ (Carg. F. 125 HP) V = 30-40 Km/H D = 10 m^
m^
2,07 Relleno manto de arcilla compactado
m^
2,07 Relleno compactado material propio
3.00
3.01
3.02
3.03
3.04

Impermeabilizantes
Geomembrana lisa Hope 1.50 mm
Geotextil de polietileno no tejido de amortiguamiento y protecci
para geomembrana
Geoweb GW 30 V4 , e = 100 mm textwado y perforado
Relleno compactado Suelo Cemento

TOTAL

1
1

20.368.724,11
259.964,82
259.964,82
259.964,82
230.473,99
230.473,99
230.473,99
34.001,50
34.001,50
34.001,50
18.306,83
18.306,83
18.306,83
21.371,50
21.371,50
21.371,50
3.645,20
3.645,20
3.645,20
25.022,54

9,28
15,67
3,70
27,04
10,49
6,51 '
14,25
10,49
3,70
27,04
10,49
8,24
18,97
10,49
6,51
9,28
15,67
3,70
3,70

2.412.473,53
4.073.648,73
961.869,83
6.232.016,69
2.417.672,16
1.500.385,67
484.521,38
356.675,74
125.805,55
495.016,68
192,038,65
150,848,28
405.417,36
224,187,04
139,128,47
33.827,46
57,120,28
13.487,24
92.583,40
1.152.812,14

m=^
m^

19.625,00
19.625,00

17,43
5,80

342.063,75
113.825,00

m^
m^

19.075,50
1.907,55

30,89
56,45

589.242,20
107.681,20

Van

Viene,
ARTID

DESCRIPCIN

D
1.00
4,03
4,05
4,06
4,08
5,01
4,04
4,07
4,08
6,01

Toma y conducto de desacrga


Toma
Concreto f e = 210 kg/cm2
Encofrado y Desencofrado Muro
Encofrado y Desencofrado Losa
Acero de refuerzo fy = 4200 kg/cnn2
RejHla Platina 2"x 3/4"
Concreto f'c = 210 kg/cnn2, viga collar
Encofrado y Desencofrado circular, viga collar
Acero de refuerzo fy = 4200 kg/cm2, viga collar
Junta elastomrica, viga collar

2.00
4,03
4,07
4,08
4,04
4,07
4,08
6,01
6,02
2,02
2,06
2,08
4,03
4,05
4,06
4,08

Conducto de Descarga
Concreto f'c = 210 kg/cm2
Encofrado y Desencofrado circular
Acero de refuerzo fy = 4200 kg/cm2
Concreto f'c = 210 kg/cm2, viga collar
Encofrado y Desencofrado circular, viga collar
Acero de refuerzo fy = 4200 kg/cm2, viga collar
Junta elastomrica
Junta \Afeter Stop 6', viga collar
Extraccin y carguo de piedra de cantera
Trans/Volquete 8 m^ (Carg. F. 125 HP} V = 30-40 Km/H D = 6
Enrocado dimetro 20cm, poza amortiguadora
Concreto f'c = 210 kg/cm2, poza amortiguadora
Encofrado y Desencofrado Muro, poza amortiguadora
Encofrado y Desencofrado Losa, poza amortiguadora
Acero de refuerzo fy = 4200 kg/cm2, poza amortiguadora

1 UND LETRADO 1

1 UNITARIO

PRECIO SI.
PARCIAL 1

1
TOTAL

5.608,47
m^
m^
m^
kg
ml
m^
m^
kg
ml

6,89
41,14
9,75
515,62
22,50
0,40
6,03
14,17
6,41

244,82
27,16
23,79
2,39
33,95
244,35
62,92
2,39
10,16

1.686,81
1.117,36
231,95
1.232,33
763,88
97,74
379,41
33,87
65,13
164.603,59

m^
m^
kg
m^
m^
kg
ml
ml

m^* 1
m^
m^
m^
m^
m'^
kg

165,50
926,57
18.093,40
9,05
96,50
444,88
44,92
69,11
3,76
3,76
3,76
20,78
82,98
14,04
1.468,73

244,82
62,92
2,39
244,35
62,92
2,39
10,16
20,10
27,04
10,49
6,51
244,82
27,16
23,79
2,39

40.517,71
58.299,78
43.243,23
2.211,37
6.071,78
1.063,26
456,39
1.389,11
101,67
39,44
24,48
5.087,36
2.253,74
334,01
3.510,26

Van

Viene...,

DESCRIPCIdN

ARTID

UND METRADO

UNITARIO

PRECIOS/.
PARCIAL

Pozo de maniobras

1,06
1.03.9
4,03
4,05
4,07
4,08
6,01
5,02
5,03
5,03

Excavacin bajo agua


Relleno compactado nnateriat propio
Concreto f c = 210 kg/cm2
Encofrado y Desencofrado Muro
Encofrado y Desencofrado circular
Acero de refuerzo fy = 4200 kg/cm2
Junta elastomrica
Escalera de acceso 03/4"
Vlvula corrvpuerta F.F.Brida C - 75 150
Vlvula compuerta F.F. Brida C - 7 5 - 150 ( regulacin)

F
1.(H)
1.03.3
1.03.9
4,01
4,05
4,06
4,07
6,01
5,04

Aliviadero de excedencias
Aliviadero
Excavacin conglorrierado
Relleno compactado material propio
Concreto ciclpeo f e = 175 kg/cm2 + 25%PM
Encofrado y Desencofrado Muro
Encofrado y Desencofrado Losa
Encofrado y Desencofrado circular
Junta elastomrica
Suministro e instalacin tubera PVC 0 2"

TOTAL
119.570,20

m
m^
m^
m^
m^
kg
ml
ml
u
u

8,75
2,50
116,55
4,90

904,96
6.990,33
70,68
30,00
1,00
1,00

16,26
14,66
244,82
27,16
62,92
2,39

10,16
69,44
7138,07
7138,07

142,28

36,65
28.533,77
133,08
56.940,08
16.706,89
718,11
2.083,20
7.138,07
7.138,07

39.339,65
m
m
m
m
r2

m
m
mi
mi

841,91
202,13
130,89
171,60
8,80
57,00
23,10
4,20

5,68
14,66
174,46
27,16
23,79
62,92
10,16
16,23

4.782,05
2.963,23
22.835,07
4.660,66
209,35
3.586,44
234,70
68,17

Van.

Viene

IARTID 1
2.00
1.03.3
1.03.4
1.03.6
1.03.7
1.03.9
4,01
4,05
2,04
2,06
2,08

DESCRIPCIN

Canal
Excavacin plataforma MS
Excavacin plataforma RS
Excavacin caja MS
Excavacin caja RS
Rellenocompactado material propio
Concreto ciclpeo f e = 175 kg/cm2 + 25%PM
Encofrado y Desencofrado Muro
Extraccin y carguo de grava, dren
TransA/olquete 8 m^ (Carg. F. 125 HP) V = 30-40 Km/H D = 6
Relleno con material gravoso, dren

1
PRECIO SI.
UND IMETRADO
1 UNITARIO1 PARCIAL 1

Concreto ciclpeo f e = 175 kg/cm2 +30%PG


Encofrado y Desencofrado Muro
Extraccin y carguo de piedra de cantera
TransA/olquee 8 m' (Carg. F. 125 HP) V = 30-40 Km/H D = 6
Enrocado acomodado y compactado Qon maquinaria
Suministro e instalacin tubera PVC 0 2"
i
G
Badn
1.03.6 Excavacin M S , manual
2,12 Enrocado dimetro, 0.30 m asentado en concreto
f e = 175 kg/cm2
1
Total de Costo Directo
Gastos Generales (15%)
Utilidad (10%)
Sub Total
IGV(18%)
Total General

1
1

696.321,03
m^
m^
m^
m^
m^
m^
m^
m^
m^
m^

4.275,24
17.103,36
1.196,44
4.785,76
1.040,00
522,51
1.347,52
227,15
227,15
227,15

5,68
12,18
24,15
59,27
14,66
174,46
27,16
18,97
10,49
6,51

24.283,36
208.318,92
28.894,03
283.652,00
15.246,40
91.157,09
36.598,64
4.309,04
2.382,80
1.478,75

m^
m^
m^
m^
m^
mi

464,18
613,04
6,08
6,08
6,08
7,80

158,12
27,16
27,04
10,49
6,5
16,23

73.396,14
16.650,17
164,40
63,78
39,58
126,59

24,15
40,79

1.883,70
1.057,28

90.440,67

1 3.00 Poza amortiguadora


4,02
4,05
2,02
2,06
2,08
5,04

TOTAL

2.940,98
m^
m^

78,00
25,92

25631349,091
3844702,36
2563134,91
32039186,361
5767053,541
3780^39,90

ANEXOS

1.

ANLISIS COSTOS UNTARIOS

2.

ESPECIFICACIONES TCNICAS

ANEXO 1

ANLISIS COSTOS UNITARIOS

I
I
I
I
I
I
I
I
I
I
I
I
1
I
I
I
I
I
I
I

ANLISIS DE COSTOS UNITARIOS


PARTIDA 1.01

INSTALACIN DE CAMPAMENTO

COSTO POR
ESPECIFICACIONES:
RENDIMIENTO

ACTIVIDAD
1. MANO DE OBRA
Capataz
Operario
Oficial
Pen

24 mVda

FECHA:

ene-03

0,1 CAP + 1 0 P + 10f+1pen


UND.
CANT.
P. UNIT.

P. PARCIAL

TOTAL

hh
hh
hh
hh

0,033
0,333
0,333
0,333

11,14
9,28
8,37
7,50

0,37
3,09
2,79
2,50

8,74

P=
m^
kg.
m^

3,80
0,90
0,25
2,20

2,48
9,86
2,12
12,68

9,42
8,87
0,53
27,90

46,72

2. MATERIALES
Madera Tornillo
Calamina Galvanizada
Clavos 3"
Triplay
3. EQUIPOS Y/O HERRAMIENTAS
Desgaste
1

%mo

0,05
8,74
Costo Unitario Directo SI.

0,44

0,44
55,90

ANLISIS DE COSTOS UNITARIOS


PARTIDA 1,02

CARTEL DE OBRA

COSTO POR

und.

ESPECIFICACIONES:

2,40 X 4.80 mTriplay

RENDIMIENTO

1 Unid./da

ACTIVIDAD
1. MANO DE OBRA
Cpate
Oficial

0,1 CAP + 1 OF.


CANT.
UND.

hh
hh

ene-03

FECHA:

0,80
8,00

P. UNIT.

P. PARCIAL

11,14
8,37

TOTAL

8,91
66,96
75,87

2. MATERIALES
Global

Unid.

1,00

300,00

300,00

3nn,oo

3,79

3,79
379,67

3. EQUIPOS Y/O HERRAMIENTAS


Desgaste
1

%mo

0,05
75,87
Costo Unitario Directo S/.

ANLISIS DE COSTOS UNITARIOS


PARTIDA 1.03.2

TRAZO Y REPLANTEO

COSTO POR

m^

ESPECIFICACIONES:
RENDIMIENTO

500 m^/da

FECHA:

ene-03

0,1 CAP * 3 PEON-t-1 TOPGRAFO


UND.
CANT.
P. UNIT. P. PARCIAL

ACTIVIDAD
1. MANO DE OBRA
Capataz
Topgrafo
Pen

TOTAL

hh
hh
hh

0,0016
0,016
0,048

11,14
9,28
7,50

0,02
0,15
0,36

0,53

kg.
ml
gi
pza
P^
gi

0,005
0,001
0,025
0,001
0,026
0,002

2,12
0,50
9,22
41,71
2,48
27,53

0,01
0,00
0,23
0,04
0,07
0,06

0,40

hm
hm
hm
%mo

0,032
0,016
0,016
0,05

1,18
0,91
8,1
0,53

0,04
0,01
0,13
0,03

0,21

2. MATERIALES
Clavo con cabeza 3"
Cordel
Yeso en bolsa de 20 Kg.
Wincha de 30 mi
Madera Tomillo
Pintura Esmalte
3. EQUIPOS Y/O HERRAMIENTAS
Jaln (2)
Mra(1)
Teodolito (1)
Desgaste
1

1,14

Costo Unitario Directo S/.

ANLISIS DE COSTOS UNITARIOS


PARTIDA 1.03.1

LIMPIEZA DEL TERRENO

COSTO POR

m^

ESPECIFICACIONES:
RENDIMIENTO

ACTIVIDAD
1. MANO DE OBRA
Operario
Oficial
Pen

50m^/da

FECHA:

ene-03

0,1 OP + 10F * 1 PEON


UND.
CANT.
P. UNIT.

P. PARCIAL

TOTAL

hh
hh
hh

0,016
0,16
0,16

9,28
8,37
7,K)

0,15
1,34
1,20

2.69

%mo

0,05

2,69

0,13

0,13

2. MATERIALES

3. EQUIPOS Y/O HERRAMIENTAS


Desgaste
1

Costo Unitario Directo S/.

2,82

ANLISIS DE COSTOS UNITARIOS


PARTIDA 1.03.3
COSTO POR
ESPECIFICACIONES
RENDIMIENTO

ACTIVIDAD
1.MANODEOBRA.
Capataz
Operario
Pen

Excavacin plataforma MS -Despalme Serra>3800 m

250 m^da
0.1 cpz + 1 op > 2 peones
Unid.

hh
hh
hh

Cant.

ene-03

FECHA:

Unitario

Costos s/
Parcial

Total

1
1

0,0032
0,0320
0,0640

11,14
9,23
7,50

0,04
0,30
0,48

0,81

0,0320
0,0500

150,88
0,81

4,83
0,04

4,87

2.MATERIALES
1
3.EQUIPOS Y/O HERRAMIENTAS.
Tractor S/Oruga de 140-160 HP
hm
Desgaste
%MO

5,68

Costo Unitario directo S/.

ANLISIS DE COSTOS UNITARIOS


PARTIDA 1.03.4
COSTO POR
ESPECIFICACIONES
RENDIMIENTO

ACTIVIDAD

Excavacin plataforma RS- Despalme Sien'a>3800 m


~3

400 m /da
0.1 cpz + 0.5 of + 6 aeones
Unid.

Cant

Untarlo

ene-03

FECHA:
Co^os s/
Parcial

XttaA

1.MANODEOBRA.
Capataz
Oficial
Pen

hh
hh
hh

0,0200
0,0100
0,1200

11,14
8,37
7,50

0,22
0,08
0,90

1,21

2.MATERIALES
Fulminante N 8
Guia de Sesudad
Dinamita al 65%
Barreno de 5 Pies

und
mi
Kg.
und

0,5000
0,5000
0,1000
0,0040

0,36
0,32
7,70
576,00

0,18
0,16
0,77
2,30

3,41

0,0200
0,0800
0,0200
0,0500

124,39
10,05
210,28
1,21

2,49
0,80
4,21
0,06 I

7,56

1
3.EQUtPOS Y/O HERRAMIENTAS.
Compres. Neum. 600-690 PCM, 1 hm
hm
1
MartiMo Neumtico de 29 1 ^ .
Tractor S/Oruga de 190-240 HP hm
Desgaste
%MO

Costo Unitario directo S/.

12,18

ANLISIS DE COSTOS UNITARIOS


PARTIDA 1.03.5
COSTO POR
ESPECIFICACIONES
RENDIMIENTO

Excavacin plataforma RF Sierra>3S00 m

300 m /da

ene-03

FECHA-

fttepz + 0.5 of + 6 f>}n


Unid.

ACTIVIDAD

Cant.

Unitario

Costos 8/
Parcial

1
Total

1.MANODEOBRA.
Capataz
Oficial
Pen
Periodista (Oficial)

hh
hh
hh
hh

0,0267
0,0133
0,1600
0,1333

11,14
8,37
7,50
8,37

0,30
0,11
1,20
1,12

2,72

2.MATERIALES
Fulminante N 8
Guia de Seguridad
Dinamita al 65%
Barreno de 5 Pies

und
mi
Kg.
und

1,0000
1,0000
0,2500
0,0170

0,36
0,32
7,70
576,00

0,36
0,32
1,93
9,79

12,40

0,0333
0,1333
0,0267
0,0500

124,39
10,05
210,28
2,72

4,14
1,34
5,61
0,14

11,23

1
3.EQUIPOS Y/O HERRAMIENTAS.
Compres. Neum. K)0-690 PCM, 1 hm
Martillo Neumtico de 29 Kg.
hm
Tractor S/Oruga de 190-240 HP
hm
Desgaste
i%MO

Costo Unitar io directo S/.

26,35

ANLISIS DE COSTOS UNITARIOS


PARTIDA 1.03.6

Excatmin manual MS en cuneta y caja

COSTO POR
ESPECIFICACIONES:

Hasta 1,70 m

RENDIMIENTO

3,0 m'/da

ACTIVIDAD
1. MANO DE OBRA
Capataz
Pen

0,1 CAP + 1 PEON


UND.
CANT.

hh
hh

ene-03

FECHA:

0,267
2,670

P. UNIT.

P. PARCIAL

11,14
7,50

TOTAL

2,97
20,03
23,00

2. MATERIALES

3. EQUIPOS Y/O HERRAMIENTAS


Desgaste
1

%mo

0,05
23,00
Costo Unitario Directo S/.

1,15

1,15
24,15

ANLISIS DE COSTOS UNITARIOS


PARTIDA 1.03.7

Excavacin RS en cun^a y caja

COSTO POR

m'

ESPECIFICACIONES:

Sin Explosivos

RENDIMIENTO

24 m'/da

FECHA:

ene-03

0,1 CAP * 1 OP+ 12 PEON + 2 OPERADORES


UND.
CANT.
P. UNIT. P. PARCIAL

ACTIVIDAD
LIVIANO DE OBRA

hh

Capataz
Operario
Pen
Operador de Equipo (2)

hh
hh
hh

TOTAL

0,0333
0,333
4,000
0,667

11,14
9,28
7,50
9,28

0,37
3,09
30,00
6,19

39,65

0,333
0,667
0,05

37,32
7,82
39,65

12,43
5,22
1,98

19,63

2. MATERIALES

3. EQUIPOS Y/O HERRAMIENTAS


Comprensora Neumtica 125-175 PCM
Martillo Neumtico 24 kg.
Desgaste

hm
hm
% mo

Costo Unitario Directo Si.

59,27

ANLISIS DE COSTOS UNITARIOS


PARTIDA 1.03.8

Excavacin en cuneta RF

COSTO POR

m'

ESPECIFICACIONES:

Con maquinaria + explosivos

RENDIMIENTO

20 m'/da

ACTIVIDAD
1. MANO DE OBRA
CapErtaz
Operario
Pen
Operadores Equipo (2)

FECHA:

ene-03

0,1 CAP ^ 1 OP + 12PEON + 2 OPERADORES


UND.
P. UNIT. P. PARCIAL
CANT.

TOTAL

hh
hh
hh
hh

0,04
0,40
4,80
0,80

11,14
9,28
7,50
9,28

0,45
3,71
36,00
7,42

47,58

kg.
ml

0,45
2,00
3,00
0,34
0.006

7,70
0,:^
0,36
1,80
354,J

3,47
0,64
1,08
0,61
2,13

7,92

2. MATERIALES
Dinamita
Mecha Blanca
Fulminante N 8
Nitrato 0 examn P
Barreno 3'

und
kg.
Un

3. EQUIPOS Y/O HERRAMIENTAS


iComprensora Neumtica 125-175
MartiBo Neumtico 24 Kg ( 2 )
Desgaste
1

hm
hm
%mo

0,40
34,57
8,17
0,80
0,05
47,58
Costo Unitario Directo S/

13,83
6,54
2,38

22,74
78,25

ANLISIS DE COSTOS UNITARIOS


PARTIDA 1.06

Excavacin Conglomerado bajo agua

COSTO POR

m3

ESPECIFICACIONES:

Con maquinaria

RENDIMIENTO

150m^/da

FECHA:

0,1 CAP+10 PEON


CANT.
UND.
P. UNIT.

P. PARCIAL

ACTIVIDAD
1. MANO DE OBRA
Capataz
Pen

0,0533
0,5333

hh
hh

11,14
7,50

ene-03
TOTAL

0,59
4,00

4,59

2. MATERIALES

3. EQUIPOS Y/O HERRAMIENTAS


Motobomba 4"
Reroexcavadora 115 -165 HP
Desgaste

hm
hm
%mo

0,8000
1,76
0,0533
188,13
0,0500
4,59
Costo Unitario Directo S/.

1,41
10,03
0,23

11,67
16,26

ANLISIS DE COSTOS UNITARIOS


PARTIDA 2.01

Extraccin y carguo material impermeable grava arcillosa.

COSTO POR

m3

ESPECIFICACIONES:

Para nudeo de Presa

RENDIMIENTO

250 m3/da

ACTIVIDAD
1. MANO DE OBRA
Capataz
Pen

FECHA:

0,1 CAP + 8 PEON


CANT.
UND.

hh
hh

P. UNIT.

ene-03

P. PARCIAL

TOTAL

0,032
0,2560

11,14
7,50

0,36
1,92

2,28

0,032
0,032
0,05

150,88
64,35
2,28

4,83
2,06
0,11

7,00

2. MATERIALES
3. EQUIPOS Y/O HERFWMIENTAS
Tractor S/Oruga de 140-160 HP hm
Caragdor frontal 125 -155 HP
hm
Desgaste
% mo

Costo Unlitarlo Directo &/.

9,28

ANLISIS DE COSTOS UNITARIOS


PARTIDA 2.05.
COSTO POR
ESPECIFICACIONES
RENDIMIENTO

ACTIVIDAD
1.MANODEOBRA.
Oficial

TransA/olquete 8 m^ (Carg. F. 125 HP) V = 30-40 Km/H D = 10 K


jn^
:80m'/da
0.2 of
Unid.

hh

FECHA:

Cant.

Unitario

ene-03

Costos s/
Parcial

1
Total

0,0200

8,37

0,17

0,17

0,1000
0,0500

154,93
0,17

15,49
0,01

15,50

2. MATERIALES
3.EQU1POS Y/O HERRAMIENTAS
Volquete de 8 m^
hm
%MO
Desgaste

Costo Unitario directo SI.

15,67

ANAUSIS DE COSTOS UNITARIOS


PARTIDA 2.07
COSTO POR
ESPECIFICACIONES
RENDIMIENTO

ACTIVIDAD
1.MANODEOBRA.
Capataz
Pen

: Conformac. Terrapln-Manto de arcilla Sierra>3800 m


:m'
:840m'/da
1 cpz ^^ 6 peones
Unid.

hh
hh

Cant.

FECHA:

lAiftariO

ene-03

Costos s/
Parcial

Total

0,0095
0,0571

11,14
7,50

0,11
0,43

0,53

0,0048
0,0(ra5
0,0095
0,0095
0,00^
0,0500

150,88
61,90
104,12
86,08
1,76
0,53

0,72
0,59
0,99
0,82
0,02
0,03

3,16

2.MATER1ALES
1
|3.EQUIPC Y/O HERRAMIENTAS.
Tractor S/Oruga de 140-160 HP
hm
Rodillo Vib. Autop 70-100 HP, 7-9 hm
Motontveladora de 125 HP
hm
Camin cisterna 4x2, 2CK)0 Gal 14 hm
Motobomba 4" , 7-10 HP
hm
%MO
Desgaste

Costo Unitar lo directo S/.

3,70

ANLISIS DE COSTOS UNITARIOS


PARTIDA 2,02
COSTO POR
ESPECIFICACIONES
RENDIMIENTO

ACTIVIDAD
1.MANODEOBRA.
Capataz
Operario
Oficial
Pen

Extraccin y carguo de piedra de cantera

150 m7da
FECHA:
0.15 cpz + 1 op -t- 1of + 3 peones
Costos s/
Unid.
Cant.
Unitario
Parcial

ene-03
1
Total

0,0080
0,0530
0,0530
0,1600

11,14
9,28
8,37
7,50

0,09
0,49
0,44
1,20

2,22

kg.
ml
und
kg.
Un

0,4500
2,0000
3,0000
0,3400
0,CX)60

7,70
0,32
0,36
1,80
354,60

3,47
0,64
1,08
0,61
2,13

7,92

3.EQUIPOS Y/O HERRAMIENTAS.


Tractor S/Oruga de 140-160 HP hm
Comprensora Neumtica 125-175
hm
Martillo Neumtico 24 Kg ( 2 )
hm
Caragdor frontal 125 -155 HP
hm
%MO
Desgaste

0,0530
0,0800
0,1060
0,0800
0,0500

150,88
34,57
8,17
64,35
2,22

8,00
2,77
0,87
5,15
0,11

16,89

hh
hh
hh
hh

2.MATERIALES
Dinamita
Mecha Blanca
Fulminante N 8
Nitrato 0 examn P
Barreno 3'
1

27,04

Costo Unltario directo S/.

ANLISIS DE COSTOS UNITARIOS


PARTIDA 2.09
COSTO POR
ESPECIFICACIONES
RENDIMIENTO

ACTIVIDAD
1.MANODEOBRA.
Capataz
Operario
Oficial
Pen

Enrocado al volteo CQn maquinara Rip Rap


m^
dimetro minmo 0.60m
3CK3 m'/da
FECHA:
0.1 cpz * 1 op + lof + 10 peones
Costos s/
Unid.
Cant.
Unitario
Parcial

hh
hh
hh
hh

ene-Q3
1
Total

0,0027
0,0267
0.0267
0,2667

11,14
9,28
8,37
7,50

0,03
0,25
0,22
2,00

2,50

0,0267
0,0500

210,28
2.50

5,61
0,13

5,74

2.MATERIALES

3.EQUIPOS Y/O HERRAMIENTAS


hm
Tractor S/Oruga de 190-240 HP
%MO
Desgaste

Costo Unitark) directo S/.

8,24

ANAUSIS DE COSTOS UhHTARIOS


PARTIDA 2.03
COSTO POR
ESPECIFICACIONES
RENDIMIENTO

Extraccin y carguo material graduado para filtro

180 m/da
0.1 cpz * 10 peoftes
Unid.

ACTIVIDAD
1.MANODEOBRA.
Capataz
Pen

Cant.

ene-03

FECHA:

Unitario

Costos s/
Parcial

1
Total

hh
hh

0,0444
0,4444

11,14
7,50

0,49
3,33

3,83

hm
hm
hm
%MO

0,0444
0,0444
0,0444
0,0500

150,88
64,35
15,00
3,83

6,71
2,86
0,67
0,19

10,42

2.MATERIALES

3.EQUIPOS Y/O HERRAMIENTAS


Tractor S/Oruga de 140-160 HP
Caragdor frontal 125 -155 HP
Zaranda
Desgaste

Costo Unitario directo SI.

14,25

ANLISIS DE COSTOS UNITARIOS


PARTIDA 1.03.9

RELLENO COMPACTADO MATERIAL PROPIO

COSTO POR

m^

ESPECIFICACIONES:

CON COMPACTADORA TIPO PLANCHA

RENDIMIENTO

30 m^/da

ACTIVIDAD
1. MANO DE OBRA
Capataz
Pen
Operador de Equipo

FECHA:

ene-03

0,3 CAP H- 3 PEON + 1 OPERADOR DE EQUIPO


UND.
CANT.
P. UNIT. P. PARCIAL

TOTAL

hh
hh
hh

0,08
0,800
0,267

11,14
7,50
9,28

0,TO
6.t
2,48

9,37

m'

0,12

1,20

0.14

0,144

2. MATERIALES
Agua
3. EQUIPOS Y/O HERRAMIENTAS
Compactadora Tipo Plancha 5.8
Desgaste
1

hm
%mo

0,267
17,54
0,05
9,37
Costo Unitario Directo S/.

4,68
0,47

5,15
14,66

ANLISIS DE COSTOS UNITARIOS


PARTIDA 2.08
COSTO POR
ESPECIFICACIONES
RENDIMIENTO

ACTIVIDAD
1.MANODEOBRA.
Capataz
Operario
Oficial
Pen

Enrocado acomodado y compactado con maquinaria


...3

.m
: piedras dimetro mximo 0.40 m
: 3&) m^/da
FECHA:
0.1 cpz + 1 op + lof -t- 8 peones
Costos s/
Unid.
Cant.
Unitario
Parcial

hh
tih
hh
hh

ene-03
I
Total

0,0022
0,0222
0,0222
0,1778

11,14
9,28
8,37
7,50

0,02
0,21
0,19
1,33

1,75

0.0222

210,28
1,75

4,67
0,09

4,76

2.MATERIALES

3.EQUIPOS Y/O HERRAMIENTAS


hm
Tractor S/Oruga de 190-240 HP
%MO
1 Desgaste

o,ceoo

6,51

Costo Unitario directo SI.

ANLISIS DE COSTOS UNITARIOS


PARTIDA 2.04
COSTO POR
ESPECIFICACIONES
RENDIMIENTO

ACTIVIDAD

I
I
I
I
I
I
I

1.MANODEOBRA.
[Capataz
Pen

Extraccin y carguo de grava, dren


m^
120 mYdia
0.1 cpz + 6 peones
Unid.

Cant.

ene-00

FECHA:

Unitario

Costos s/
Parcial

1
Total

hh
hh

0,0400
0,4000

11,14
7,50

0,45
3,00

3,45

hm
hm
hm
%MO

0,0667
0,0667
0,0667
0,0500

150,88
64,35
15,C
3,45

10,06
4,29
1,00
0,17

15,53

2.MATERIALES

3.EQU)POS YAD HERRAMIENTAS


Tractor S/Oruga de 140-160 HP
iCa-agdOr frontal 125 - 155 HP
Zaranda
Desgaste

Costo Unitario directo S/.

18,97

ANLISIS DE COSTOS UNITARIOS


PARTIDA 3.04

RELLENO COMPACTADO Suelo Cemento

COSTO POR

ESPECIFICACIONES:

CON COMPACTADORATIPO PLANCHA

RENDIMIENTO

30 m^/da

ACTIVIDAD

FECHA:

ene-03

0,3 CAP + 3 PEON + 1 OPERADOR DE EQUIPO


CANT.
UND.
P. UNIT.
P. PARCIAL

TOTAL

1. MANO DE OBRA
Capataz
Pen
Operador de Equipo

hh
hh
hh

0,0800
0,8000
0,2670

11,14
7,50
9,28

0,89
6,00
2,48

m^
m^

1,0500

39,8

41,79

0,1200

1,20

0,14

hm
%mo

0,2670
0,0500

17,54
9,37

4,68
0,47

9,37

2. MATERIALES
Suelo cemento proporcin 4 : 1
Agua

41,93

3. EQUIPOS Y/O HERRAMIENTAS


Compactadora Tipo Plancha 5.8
[Desgaste
1

5,15
56,45

Costo Unitario Directo S/.

ANLISIS DE COSTOS UNITARIOS


PARTIDA 3.01
CCffiTO POR
ESPECIFICACIONES
RENDIMIENTO

ACTIVIDAD
1.MANODEOBRA.
Capataz
Pen

Geomembrana lisa Hope 1.50 mm

:m2
: de Polietileno alta densidad (HDPE)
: 1500m2/da
FECHA:
1 cpz * 10 peones
Costos s/
Unid.
Cant.
Unitario
Parcial

hh
hh

2.MATERIALES
Geomembrana lisa e = 1.5mm HD

m2

3.EQUIPOS Y / O HERRAMIENTAS
m2
Equipo de instalacin
hm
C a r a d o r frontal 125 - 1 5 5 HP
i%MO
Desgaste

ene-03
1

Total

0,0050
0,C630

11,14
7,50

0,06
0,40

0,45

1,(S(X)

14,40

15,12

15,12

1,0500
0,0050
O.CBOO 1

1,44
64,:K

0,45

1.51
0,32
0.02 t

Costo Unitario directo SI.

1,86

17,43

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

ANLISIS DE COSTOS UNITARIOS


PARTIDA 3.02
COSTO POR
ESPECIFICACIONES
RENDIMIENTO

ACTIVIDAD

Geotextil de polietileno no tejido de amortiguamiento proteccin


:m2
325 gr/m2 valor MARV
: 1500m2/da
FECHA:
ene-03
0.1 cpz + 4 peorres
Costos s/
1
Unitario
Total
Unid.
Cant.
Parcial

1.MANODEOBRA.
Capataz
Pen

0,0005
0,0210

11,14
7,50

0,01
0,16

0,16

m2

1,0500

5,36

5,63

5,63

3.EQUIPOS Y/O HERRAMIENTAS.


Desgaste
%MO

0,0500

0,16

0,01

0,01

hii
hh

2.IVIATERIALES
Geotextil no tejido de amortiguami
proteccin de 325 gr/m2
1

5,80

Costo Unitario directo S/.

ANLISIS DE COSTOS UNITARIOS


PARTIDA 3.03
COSTO POR
ESPECIFICACIONES
RENDIMIENTO
->^.
ACTIVIDAD
l.MANODEOBRA.
Cap^az
Pen

GeowebGW30V4 , e = 100 mm texturado y perforado


m2
: 400m2/da
0.1 cpz 4 peones
Unid.

Cant.

ene-03

FECHA:

Unitario

Costos 8/
Parcial

1
Total

0,(20
0,0800

11,14
7,50

0,02
0,60

0,62

m2

1,0500

27,36

28,73

28,73

3.EQUIPOS Y/O HERRAMIENTAS


Equipo de instalacin
m2
%MO
D^gaste

1,0500

o.ofinn

1.44
0,62

1,51
0,03

1,54

2.MATERIALES
Geoweb GW M V4 , e = 1CK) mm t
p1br^o

hh
hh

Costo Unitario directo SI.

30,89

ANLISIS DE COSTOS UNITARIOS


PARTIDA

4.03

CONCRETO fe = 210 kg/cm^

COSTO POR
ESPECIFICACIONES:
RENDIMIENTO

ACTIVIDAD
1. MANO DE OBRA
Capataz
Operario
Oficial
Pen

20 m7 da

ene-03

FECHA:

0,2 CAP + 2 0P + 20F + 12PEON


CANT.
UND.
P. UNIT. P. PARCIAL

TOTAL

hh
hh
hh
hh

0,08
0,80
0,80
4,80

11,14
9,28
8,37
7,aD

0,89
7,42
6,70
36,00

51,01

m'
bl.
m'
tri'

0,80
9,00
0,50
0,18

41,50
15,25
18,00
1,20

33,20
137,K
9,00
0,22

179,67

2. MATERIALES
Piedra Chancada
Icemerrto
,Arena gruesa
Agua
3. EQUIPOS Y/O HERRAMIENTAS
Mezcladora 11 p^
Vibrador 4HP
Desgaste
1

hm
hm
% fn.o.

0,40
22,77
0,40
6,21
0,05
51,01
Costo Unitario Directo S/.

9,11
2,48
2,55

14,14
244,82

ANLISIS DE COSTOS UNITARIOS


PARTIDA 4.05
COSTO POR
ESPECIFICACIONES
RENDIMIENTO

ACTIVIDAD
IMANO DE OBRA.
Capataz
Operario
CMinial

Encofrado y Desencofrado Muro


2

10 m^/dia
0.1 cpz + 1 o p t lof
Unid.
hh
hh
hh

2.MATERIALES
Alambre Negro Recocido BWG N 1 ^ .
Clavo c/cabeza p/madera promedi Kg.
Madera Tornlo Larga
P^
1
3.EQUIPOS Y/O HERRAMIENTAS.
Desgaste
%MO

Cant.

ene-03

Fecha:

Unitario

Costos s/
Parcial

I
Total

0,0800
0,8000
0,8000

11.14
9,28
8,37

0,89
7,42
6,70

15,01

0,3000
0,3500
4,0400

2,12
2,12
2,48

0,64
0,74
10,(

11,40

0,0500

15,01

0,75

0,75

Costo Untar 0 directo S/.

27,16

ANLISIS DE COSTOS UMTARIOS


PARTIDA 4.06
COSTO POR
ESPECIFICACIONES :
RENDIMIENTO

Encofrado y Desencofrado Losa


m^
12 m^/da
0.1 cpz 1 op * lof
Unid.

ACTIVIDAD
1.MANODEOBRA.
Capataz
Operario
Oficial

Cant.

Fecha:

Unitario

ene-03

Costos s/
Parcial

Total

hh
hh
hh

0,0^7
0,6667
0,6667

11,14
9,28
8,37

0,74
6,19
5,58

12,51

2.MATERIALES
Alambre Negro Recocido BWG N Kg.
Clavo c/cabeza p/madera promed Kg.
Madera Tornillo Larga
P^

0,1000
0,1400
4,0aj0

2,12
2,12
2,48

0,21
0,30
10,14

10,65

0,0500

12,51

0,63

0,63

3.EQUIPOS Y/O HERRAMIENTAS.


Desgaste
|%MO

Costo Unitario directo S/.

23,79

ANLISIS DE COSTOS UNITARIOS


PARTIDA

4.08

COSTO POR

ACEROfy = 4200kg./cm^
kg.

ESPECIFICACIONES:
RENDIMIENTO

ACTIVIDAD
1. MANO DE OBRA
Capataz
Operario
Oncial

200kg/da

FECHA:

ene-03

0,1 CAP + 1 OP + 2 OF
CANT.
UND.
P. UNIT.

P. PARCIAL

TOTAL

hh
hh
hh

0,004
0.04
0.04

11,14
9,28
8,37

0,04
0,37
0,33

0,75

kg.
kg.

0,02
1,05

2.12
1,45

0,04
1,52

1.56

2. MATERIALES
Alambre Negro N 16
Fierro fy = 4200 kg/cm^
3. EQUIPOS Y/O HERRAMIENTAS
DoWadora
1 Desgaste
1

hm
% mo

0.013
2,98
0,05
0.75
Costo Unitario Directo S.

0,04
0,04

O.C|
2,39

ANLISIS DE COSTOS UNITARIOS


PARTIDA 5.01

R^Ua Platina 2"x 3/4"

COSTO POR

mi

ESPECIFICACIONES:
RENDIMIENTO

ACTIVIDAD
1. MANO DE OBRA
Operario
Pen

10 mi/da

FECHA:

1 OP + 1 OF
UND.
CANT.

P. UNIT.

ene-03

P. PARCIAL

TOTAL

hh
hh

0,8000
0,3000

9,28
7,50

7,42
6,00

13,42

mi
Kg

1,0500
0,4500

15,33
6,70

16,10
3,02

19,11

:2. MATERIALES
Rejilla Platina 2"x 3/4"
[Soldadura Cellocord 1/8" E-6011
3. EQUIPOS Y/O HERRAMIENTAS
Soldadora elctrica
Desgaste

tim
%mo

0,20
0,05

3,74
13,42

0,75
0,67

1,42
33,95

C o ^ o Unitario Directo S/.

ANLISIS DE COSTOS UNITARIOS


PARTIDA 4 04

Concreto F C = 210 Kg./cm^ Viga collar

COSTO POR

m'

ESPECIFICACIONES :
RENDIMIENTO

i
ACTIVIDAD
II.MANODEOBRA.
Capataz
Operario
Oficial
[Pen
2.MATERIALES
Cemento Portland tipo 1 (bte.:42)
Arerva Gruesa
Agua
Piedra Chancada de 1/2"

20m^/da
Fecha:
0.2 cpz + 2 op * 1of + 12 peones
Unid.

Cant.

Unitario

ene-03

Costos s/
Parcial

Total

1
1

hh
hh
hh
hh

O.CBOO
0,8000
0,4000
4,8010

11,14
9,28
8,37
7,50

0,89
7,42
3,35
36,tX)

47,66

bis
m^
m^
m^

9,2000

o,8ore)

15,25
18,00
1.20
41,50

140,30
9,00
0,22
33,20

182,72

0,4000
0,4000
0,(00

6,21
22,77
47,66

2,48
9,11
2,38

13,^

1
3.EQUIPOS Y/O HERRAMIENTAS.
hm
Vibrador de C o n c r ^ o 4HP
hm
Mezdadora de Concreto 11 P3
%M0
Desgaste

0,5000
0,1800

Costo Unitario directo S/.

244,35

I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I

ANAUSIS DE COSTOS UNAT/U^OS


PARTIDA 4.07
COSTO POR
ESPECIFICACIONES :
RENDIMIENTO

Encofrado y Desencofrado circular


2

Fecha:

5.76 m^/da
1 op + 1of+ 2pe

ene-03

Costos s/
Parcial

ACTIVIDAD
1.MANODEOBRA.
Operario
Oficial
Peon

hh
hh
hh

1,3889
1,3889
2,7778

9.28
8,37
7,50

12,89
11,63
20,83

45,35

2. MATERIALES
Alambre Negro Recocido BWG N
aavo c/cabeza p/madera promedi
Madera Tomillo Larga
Trlplay 4'x8'x 6mm

Kg.
Kg.
P^
Plan

0,1950
0,2400
3,5000
0,3000

2,12
2,12
2,48
19,00

0,41
0,51
8,68
5,70

15,30

0,0500

45,35

2,27

2,27

Unid.

1
3.EQUIPOS Y/O HERRAMIENTAS.
Desgaste
%MO

Cant.

Unitario

Costo Unitario directo S/.

Total

62,92

ANLISIS DE COSTOS UNITARIOS


PARTIDA 6.01

Junta Elastomrica

COSTO POR

mi

ESPECIFICACIONES:
RENDIMIENTO

ACTIVIDAD
1. MANO DE OBRA
Operario
Oficial
Pen

60 ml/da

FECHA:

1 OP + 1 OF + 2 PEON
P. UNIT.
CANT.
UND.

P. PARCIAL

hh
hh
hh

ene-03
TOTAL

0,133
0,133
0,267

9,28
8,37
7,50

1,24
1,12
2,00

4,36

0.263

21,30

5,59

5,59

0,22

0,22
10.16

2. MATERIALES
Junta Poliurtano Sika Flex 11FC artuch
(Elastomrica)
3. EQUIPOS Y/O HERRAMIENTAS
Desgaste
1

%mo

4,36
0,05
Costo Unitario Directo S/.

ANLISIS DE COSTOS UNITARIOS


PARTIDA 6.02

JUNTA WATER STOP DE 6"

COSTO POR

mi

ESPECIFICACIONES:
RENDIMIENTO

20nil/da

FECHA:

1 OP + 0,25 PEON
UND.
CANT.

ACTIVIDAD
1. MANO DE OBRA
Operario
Pen

P. UNIT.

ene-03

P. PARCIAL

TOTAL

hh
hh

0,400
0,100

9,28
7,50

3,71
0,75

4,46

mi
91

1,03
0,15

14,50
3,23

14,94
0,48

15,42

2. MATERIALES
Junta water stop PVC ancho 6", e=
Asfalto RC - 250
3. EQUIPOS Y/O HERRAMIENTAS
Desgaste
1

% mo

0,05
4,46
Costo Unitario Directo S/.

0,22

0,22
20,10

ANLISIS DE COSTOS UNITARIOS


PARTIDA 5.02

ESCALERA DE ACCESO 03/4"

COSTO POR

mi

ESPECIFICACIONES:

Tipo g^o 0.30x0.30m

RENDIMIENTO

10 mi/da

ACTIVIDAD
1. MANO DE OBRA
Operario
Pen

FECHA:

1 OP + 1 PE
UND.
CANT.

P. UNIT.

ene-03

P. PARCIAL

TOTAL

hh
hh

O.SOO
0,800

9,28
7,50

7,42
6,00

13,42

m(
9i

3,47
0,03

15,77
22,58

54,64
0,70

55,34

0,05

13,42

0,67

2. MATERIALES
P G 0 3/4"
Pintura anticorrosiva
3. EQUIPOS Y/O HERRAMENTAS
Desgaste
1

%mo

Costo Unitario Directo S/.

0,67
69,44

ANLISIS DE COSTOS UNITARIOS


PARTIDA

5.03

COSTO POR

SUMINISTRO E INSTALACIN VLVULA COMPUERTA


MAZ2A016"
unidad

ESPECIFICACIONES:

F.F. Con Brida C-75 -150

RENDIMIENTO

2u/da

FECHA:

1 OP+ 1 OF + 1PEON
UND.
CANT.
P. UNIT.

ACTIVIDAD
1. MANO DE OBRA
Operario
Oficial
Pen

ene-03

P. PARCIAL

TOTAL

hh
hh
hh

4,0000
4,0000
4,0(XM)

9,28
8,37
7,50

37,12
33,48
30,00

100,60

pza

1,0000

7029,36

7029,36

7029,36

hm
%mo

1,00
0,05

3,08
100,60

3,08
5,03

8,11

2. MATERIALES
Vlvula compuerta F.F,Brida C - 7

3. EQUIPOS Y/O HERRAMIENTAS


Tarraja para tuberia A.C.
Desgaste
1

7138,07

Costo Unitario Directo S/.

ANLISIS DE COSTOS UNITARIOS


PARTIDA

5.04

Suministro e instalacin tuberia PVC 0 2"

CC^TO POR

mi

ESPECIFICACIONES:

CLASE 10 - SAP

RENDIMIENTO

25 mi/da

FECHA:

0,1 CAP * 2 OP * OF
UND.
CANT.
P. UNIT.

P. PARCIAL

ACTMDAD
1, MANO DE OBRA
capataz
Operario
OffcM

ie-03

TOTAL

hh
hh
hh

0,032
0,32
0,32

11,14
9,28
8,37

0,36
2,97

2M

6,00

pza

0,0035
0,21

172,48
44,41

0,60
9,M

9,93

2. MATERIALES
P&Qdtmrito Ptisloo PS/C
Tuberia PVC 0 2" de 5 m
3. EQUIPOS Y/O HERRAMIENTAS
Desgaste
1

"Arrw

0,05
6,00
Costo Unitario Directo S/.

0,30

0,30
16,23

ANLISIS DE COSTOS UNITARIOS


PARTIDA 4.02

CONCRETO f c = 175 kg/cm2 + 30% PG

COSTO POR
ESPECIFICACIONES:
RENDIMIENTO

ACTIVIDAD
1. MANO DE OBRA
Capataz
Operario
Oficial
Pen

25 m7 da

FECHA:

ene-03

0,2 CAP + 2 OP + 10F + 8 PEON


CANT,
P. UNIT. P. PARCIAL
UND.

TOTAL

hh
hh
hh
hh

0,064
0,640
0,32
2,56

11,14
9,28
8,37
7,50

0,71
5,94
2,68
19,20

28,53

m^
m^
bl
m^
m^

0,35
0,56
5,46
0,30
0,162

18,00
41,50
15,25
26,27
1,20

6,30
23,24
83,27
7,88
0,19

120,88

2. MATERIALES
Arena gruesa
Piedra chancada
Cemento
1 Piedra grande
Agua
3. EQUIPOS Y/O HERRAMIENTAS
Mesctadorallp^
IDesgaste
1

hm
%mo

0,32
22,77
0.05
28,53
Costo Unitario Directo S/.

7,29
1,43

8,71
158,12

ANLISIS DE COSTOS UNITARIOS

I
I
I
I
I
I
I
I

PARTIDA
COSTO POR
ESPECIFICACIONES :
RENDIMIENTO

ACTIVIDAD
il.MANODEOBRA.
C^^artaz
Operafo
Oficia
jPen
2.*ATERIALES
\cmmto Porttarid ttpo 1 (bte.:42)
Arara druesa
Agua
Piedra Charreada de 1/2"

Concreto F'C = 175 Kg./cm^tosa


m^
20 m^/dra
Fecha:
0.2 cpz + 2 op + 2of + 12 peones
Ur.
hh
hh
hh

m
Ms
m^
m'
ITt

3.EQU1POS Y/O HERRAMIENTAS


Virador de Concreo 4HP
Ihm
Mezcladora de Coricreto 11 P3
hm
Desgaste
l%MO

Cant.

UnJtevo

ene-03

Costos 8/
Pareirt

0,(^00
0,8000
0,80C
4,850

11,14
9,28
8,37
7,50

0,e9
7,42
6,70
36,00

7,m30
0.5000
0,1W)
0,8000

15,2S

118,95

18,00

9,00

0,4000
0,4000

6,21 1
22,77
51,01

O.CSOO

i
1

Totat

51,01

1,20

0,22

41,50

33,20

161,37

2,48
9.11
2,55

14,14

Costo Unitarto directo S/.

226,52

ANLISIS DE COSTOS UNITARIOS


PARTIDA 2.12

Enrocado dimetro, 0.30 m asentado en concreto

COSTO POR

m^

ESPECIFICACIONES:

ASENTADA CONCRETO fe =175 kg./cm^ (O.lOm)

RENDIMIENTO

12 m^/da

FECHA:

0.1 CAP + 1 OP + 1 PEON


CANT.
UND.
P. UNIT.

P. PARCIAL

ACTIVIDAD
1. MANO DE OBRA
Capataz
Operarlo
Pen

ene-03

TOTAL

hh
hh
hh

0,067
0,667
0,667

11,14
9,28
7,50

0,74
6,19
5,00

11,93

m^
m*

0,090
0,300

226,52
26,27

20,39
7,88

28,27

%nf>o

0,050

11,93

0,60

0,60

2. MATERIALES
Concreto f e = 175 kg/cm2
Piedra 0 12"
3. EQUIPOS Y/O HERRAMIENTAS
Desgaste
1

40,79

Co^o Unitario Directo SI.

ANLISIS DE COSTOS UNITARIOS


PARTIDA 1 03.10

Muro seco

COSTO POR

m^

ESPECIF1CACK3NES:

ASENTADA CONCRETO fe =175 kg./cm^ (O.lOm)

REtlOIMIENTO

12m^/dia

FECHA:

0.1 CAP + 1 OP + 1 PEON


UN0.
CANT.
P. UNIT.

P. PARQAL

ACTIVIDAD
I . M A f ^ DECORA
Cap^az
Opmrana
Pen

hh
hh
hh

ene-03

TOTAL

0,C^7
0,667
0,^7

11,14
9,28
7,50

0,74
6,19
5,C

11,93

0,103
0,400

228,52
26,27

22,^
10,51

33,16

0,050

11,93

0,60

0,60

2. MATERIALES
Concr^) f e = 175 kg/cm2
Piedra 0 1 2 "
3. EQUIPOS Y/O HERRAMIENTAS
Desgaste
1

%mo

Costo Unitario Directo SI.

45,69

ANLISIS DE COSTOS UNITARIOS


PARTIDA 4.02

CONCRETO fe = 175 kg/cm2 + 30% PG

COSTO POR
ESPECIFICACIONES:
RENDIMIENTO

ACTIVIDAD
1. MANO DE OBRA
Capataz
Operario
Oficial
Pen

ene-03

FECHA:

25 m7 da

0,2 CAP + 2 0P + 10F + 8PEON


CANT.
UND.
P. UNIT. P. PARCIAL

TOTAL

hh
hh
hh
hh

0,064
0,640
0,32
2,56

11,14
9,28
8,37
7,50

0,71
5,94
2,68
19,20

28,53

m^
m^
bl
m^
m^

0,35
0,56
5,46
0,30
0,162

18,00
41,50
15,25
26,27
1,20

6,30
23,24
83,27
7,88
0,19

120,88

2. MATERIALES
Arena gruesa
Piedra chancada
Cemeito
Piedra grande
Agua
3. ECHJIPOS Y/O HERRAMIENTAS
Mesdadorallp^
Desgaste
1

hm
%mo

0,32
22,77
0,05
28,53
Co^o Unitario Directo S/.

7,29
1,43

8,71
158,12

ANLISIS DE COSTOS UNITARIOS


PARTIDA
,CC^TOf>OR
sPEClFWACIONES:
REMDMIENTO

ACTIVIDAD
1.MANO DE OBRA.
C^>aftaz
Operario
OScisri
Pen
2.MATERIALES
Cen(o Por^nd tipo I <t}ls.:42)

Concreto FC = 175 l^./cm losa


3

20 m /da
Fecha:
0.2 cpz * 2 op * 2of +12 peones
Costosa/
Unid.
Psu'ckrt
Cant.
Unitario
hh
hh
hh
hh

t>(s
m

Agua
nedm Chancada de 1/2"
3.EQUIRDS Y/O HERRAMIENTAS.
Vtt>rador de Concreto 4HP
hm
Mezcladora de Concreto 11 P3
hm
%MO

eoe-03

Total

0,(MC
0,^KX)
0,&300
4,8000

11,14
9,28
8,37
7,50

7,^m

118,^

o.aooo

13,25
18,00
1,20
41.50

0,22
33,20

161,37

0,4000
0,40)0
0,0500

6,21
22,77
51,01

2,48
9.11
2,55

14,14

0.5009
O.IK

0,89
7,42
6,70

:,oo

Costo UrHtaro directo S/.

51,01

226,52

ANLISIS DE COSTOS UNITARIOS


PARTIDA 2.12

Enrocado dimetro, 0.30 m asentado en concreto

COSTO POR

m^

ESPECIFICACIONES:

ASENTADA CONCRETO fe =175 kg./cm^ ( 0 . 1 0 m )

RENDIMIENTO

12 m^/da

FECHA;

0.1 CAP + 1 OP + 1 PEON


UND.
CANT.
P. UNIT.

P. PARCIAL

ACTIVIDAD
1. MANO DE OBRA
Capataz
jOp erario
Pen

ene-03

TOTAL

hh
hh
hh

0,067
0,667
0,667

11,14
9,28
7,50

0,74
6,19
5,00

11,93

m^
m^

0,090
0,300

226,52
26,27

20,39
7,88

28,27

%mo

0,050

11,93

0,60

0,60

2. MATERIALES
Concr^o f e = 175 kg/cm2
Piedra 0 12"
3. EQUIPOS Y/O HERRAMIENTAS
Desgaste
1

40,79

Costo Unterio Directo S/.

ANLISIS DE COSTOS UNITARIOS


PARTIDA 1.03.10

Muro seco

COSTO POR

m^

ESPEClFtCCIONES:

ASENTADA CONCRETO fe =175 kg7cm^ (O.lOm)

RENDIMIENTO

12m^/da

FECHA:

0.1 CAP + 1 OP + 1 PEON


CANT.
UND.
P. UNIT.

P. PARCIAL

1
ACTIVIDAD
|1. MANO DE OBRA
Cap^az
Opawio
Pedn

ie-03

TOTAL

hh
hh
hh

0,067
0,667
0,667

11,14
9,23
7,50

0.74
6,19
5,00

11,33

m'
m^

0,100
0,400

226,52
26,27

22,65
10,51

33,16

%mo

0,050

11,93

0,60

0,60

2. MATERIALES
Coricreto f e = 175 k9/cm2
Piedra 0 12"
3. EQUIPOS Y/O HERRAMIENTAS
Desgaste
1

Costo Unrtario Directo S/.

45,69

ANLISIS DE COSTOS UNITARIOS


PARTIDA 1.03.11

ELIMINACIN DE DESMONTE

COSTO POR

m^

ESPECIFICACIONES:

DISTANCIA PROMEDIO 30m

RENDIMIENTO

6m'/da

FECHA:

0,1 CAP * 1 PEON


UND.
CANT.

ACTIVIDAD
1. MANO DE OBRA

P. UNIT.

ene-03

P. PARCIAL

TOTAL

Capataz
Pen

hh
lih

0,133
1,333

1,48
10,00

11,14
7,50

11,48

2. MATERIALES

3. EQUIPOS Y/O HERRAMIENTAS


Desgaste
1

% mo

0,05
11,48
Costo Unitario Directo S/.

0,57

0,57
12.CB

ANLISIS DE COSTOS UNITARIOS


PARTIDA 4.01

CONCRETO ciclpeo fe = 175kg/cm^+25% PM

COSTO POR

m^

ESPECIFICACIONES:
RENDIMIENTO

ACTIVIDAD
1. MANO DE OBRA
Capataz
Operario
Oficial
Pen

25m'/cHa

FECHA:

0,2CAP-t-2OP*1OF*8PEOW
CANT.
P. UNIT. P. PARQAL
UND.

hh
hh
hh
hh

ene-03

TOTAL

0,064
0.640
0,32
2.56

11,14
9,28
8,37
7,)

0,71
5,94
2,68
19,20

28,53

0,375

18,00
41,50
15,25
^,27
1,20

6,75
24,90
91,50
6,57
0,22

129.93

2. MATERIALES
Arena gruesa
Wedra chancada
Comento
Piltra mediana
Agua

Q,m
bl
m^

6,00
0,25
0,18

3. EQUIPOS Y/O HERRAMIENTAS


Mezcladora 11 P'
Desgaste
1

hm
%mo

0,64
22,77
0,05
28,53
Costo Unitario Directo SI.

14,57
1,43

16,00
174,46

ANLISIS DE COSTOS UNITARIOS


PARTIDA 2.06
COSTO POR
ESPECIFICACIONES :.
RENDIMIENTO

ACTIVIDAD
1.MANODEOBRA.
Oficial

TrarWVolquete 8 m^ (Carg. F. 125 HP) V = 30-40 Km/H D = 6 Km


m'
120m^/da
0.2 of
Unid.

hh

FECHA:

Cant.

Unitario

ene-03

Costos 8/
Parcial

[
Total

0,0133

11,14

0,15

0,15

0,0667
0,0500

154,93
0,15

10,33
0,01

10,34

2.MATERIALES
1
3.EQUIPOS Y/O HERRAMIENTAS.
Volquete de 8 m^
hm
C^^i^e
%MO

Costo Unitario directo SI.

10,49

ANEXO 2
ESPECIFICACIONES TCNICAS DE CONSTRUCCIN

ESPECIFICACIONES TCNICAS DE CONSTRUCCIN

NDICE
Pg.
1.0.0

Especificaciones Tcnicas

01

1.1.0

Generalidades

01

a. Objeto de las Especificaciones Tcnicas

01

b. Alcance de las presentes Especificaciones Tcnicas

01

c. Normas tcnicas a adoptarse en la construccin de la obra

01

d. Definiciones y autoridad

01

e. Mtodos y unidades para las mediciones

02

f. Errores u omisiones en diseos y metrados

02

g. Condiciones climticas

02

1.2.0

Caseta de control y guardiania

03

1.3.0

Instalaciones provisionales y trabajos preliminares

03

1.3.1 Instalaciones provisionales

03

a. Campamentos y servicios propios

03

b. Cercos

03

c. Laboratorios para control de calidad

03

d. Transporte de equipo y maquinaria

04

e. Vehculos

04

f. Mantenimiento de las instalaciones provisionales

04

g. Seguridad, higiene y prevencin de accidentes

05

1.3.2 Trabajos preliminares.....

05

a. Acceso Carrozable

05

b. Desbroce, despalme y limpieza

05

Movimientos de tierra

05

1.4.1 Excavaciones

07

a. Excavacin en material suelto

07

b. Excavacin en roca suelta o conglomerado

07

c. Excavacin en roca fija

07

1.4.0

1.5.0

d. Excavacin en zona pantanosa

07

e. Excavacin para la cimentacin de la presa

08

f. Bombeo de agua para control de nivel fretico

08

Rellenos

09

a. Relleno compactado con material comn

09

b. Relleno compactado con material fino impermeable

10

c. Relleno compactado con material granular

10

d. Relleno compactado para el terrapln

10

e. Filtros graduados

12

f. Enrocado colocado con maquinaria

13

g. Manto de arcilla

14

h Preparacin de material para agregados y finos

14

1.6.0 Concreto

15

1.6.1 Materiales

15

a. Cemento

15

b. Agregados

15

c. Agua

17

d. Aditivos

17

1.6.2 Calidad del concreto

17

1.6.3 Preparacin, dosificacin y mezcla del concreto

18

a. Equipo

'.

18

b. Tiempo de mezclado

19

c. Dosificacin de mezclas

19

d. Mezcla del concreto

20

1.6.4 Transporte del concreto

20

1.6.5 Colocacin y Vaciado del Concreto

21

a. Preparacin del vaciado

21

b. Colocacin y vibrado

21

c. Temperatura del concreto

22

d. Vaciado con lluvia

22

1.6.6 Curado

22

1.6.7 Tolerancias dimensionales

23

1.6.8 Reparaciones de las superficies de concreto

23

1.6.9 Clases de concreto

24

a. Concreto armado

24

b. Concreto ciclpeo

24

1.6.10 Juntas..^,,.-... .,

1.7.0

,.

24

a. Juntas de construccin

24

b. Juntas de dilatacin y de contraccin

25

1.6.11 Tubo de Concreto armado

25

Encofrado

25

1.7.1

26

Acabados

1.8.0

Acero de Refuerzo para Concreto

26

1.9.0

Albailera

27

1.10.0 Impermeabilizantes

28

a. Geomembrana

28

b. Geotextil

28

c. Geoweb

29

1.11.0 Vlvulas

30

1.12.0 Carpintera metlica

32

1.0.0

Especificaciones Tcnicas de Construccin

1.1.0

Generalidades
a.

Objeto de las Especificaciones Tcnicas

El objeto de las presentes Especificaciones Tcnicas es definir los procedimientos constructivos,


materiales, mano de obra, equipo, instalaciones y forma de pago, que debern ser empleados
por el Contratista para la ejecucin de las Obras de Ejecucin de la Presa Azafrancucho y las
Obras Conexas segn los diseos mostrados en los planos respectivos.
b.

Alcance de las Presentes Especificaciones Tcnicas

Las presentes Especificaciones Tcnicas contienen las normas para la ejecucin y medicin a
ser aplicadas en la ejecucin de las obras siguientes:
- Camino de acceso
- Embalse Azafrancucho
- Toma y Conducto de descarga
- Aliviadero de excedencias
- Caseta de control y guardiana
- Campamento
- Aprovechamiento de las canteras de agregados
c. Normas Tcnicas a Adoptarse en la Construccin de la Obra
La construccin de la obra se efectuar de conformidad con stas Especificaciones Tcnicas, las
que hacen referencia en las secciones pertinentes de las siguientes normas:
R. N. C. (Reglamento Nacional de Construccin)
ITINTEC INDECOPI
A.C.I. (American Concrete Institute)
U.S.B.R. (U.S. Bureau of Reclamation)
A.S.T.M. (American Society for Testing Materials)
A.A.S.H.O (American Association of State Highway Oficiis
I.S.O. (International Standard Organization)
d. Definiciones y autoridad
"Entidad Contratante" propietario, es la institucin pblica (gobierno Regional de Ayacucho) que
financia y encarga la ejecucin de la Obra
"Contratista" es la empresa ejecutora de la Obra, segn convenio o contrato suscrito con la
entidad contratante, quien asume la responsabilidad de su ejecucin aplicando las
especificaciones tcnicas y las normas tcnicas sealadas anteriormente
"Representantes", Significan los representantes legales de la Entidad Contratante y del
Contratista para la suscripcin del Contrato de ejecucin de la obra y de la aprobacin de las
modificaciones que eventualmente en esta se practiquen
"Supervisor" Ingeniero Inspector es el Ingeniero colegiado designado por la entidad contratante
quien durante el curso de la ejecucin de las obras tendr la facultad de aprobar las
valorizaciones, modificar, complementar o adaptar a situaciones reales las presentes
especificaciones, con el fin de asegurar la mejor ejecucin de los trabajos de acuerdo a lo
previsto en las bases tcnicas del Proyecto.

"Residente", Ingeniero Civil colegiado, en situacin de habilidad por el Colegio de Ingenieros del
Per, encargado por el Contratista como responsable de la Direccin Tcnico
Administrativa de la obra, en forma permanente, previamente aceptada por la entidad
Contratante
"Obra", denominada tambin el Proyecto, significa todo el plan de realizacin de el
Proyecto
"Contrato", es el documento aceptado y suscrito entre la entidad contratante y el contratista,
en el que se fijan los derechos y obligaciones de ambos, en concordancia con el
Expediente Tcnico, el Reglamento nico de Licitaciones y Contrato de Obras Pblicas
RULCOP - y dems dispositivos legales vigentes.
"Planos", significa los dibujos de Ingeniera como documentos a que se hace referencia en
estas especificaciones y que hayan sido aprobados por la entidad contratante
"Planos de obra terminada "son aquellos que elabora el contratista y que entrega despus de
finalizada la obra y antes de su recepcin definitiva aplican a la obra, motivo del presente
Documento
"Especificaciones" significan todos los requerimientos y estndares de ejecucin que se s
normas para la ejecucin y medicin a ser aplicadas en la construccin de las obras, as como
las pruebas, procedimientos y servicios, operacin y mantenimiento, medidas y la ubicacin del
sitio de trabajo
Cualquier detalle no incluido en las Especificaciones u omisin aparente en ellas, o la falta de una
descripcin detallada concerniente a cualquier trabajo que deba ser realizado y materiales que
deben ser suministrado, ser considerado como que significa nicamente que se seguir la mejor
prctica de ingeniera establecida y que se usar solamente mano de obra y materiales de la
mejor calidad, debiendo ser esta la interpretacin que se d siempre a las especificaciones
"Expediente Tcnico" viene a ser el conjunto de documentos para la ejecucin de la obra, tales
como Trminos de Referencia, Memoria Descriptiva, Especificaciones Tcnicas, Cronograma de
Obras, Planos, Metrados, Anlisis de Precios Unitarios y Presupuesto
"Emplazamiento", significa los terrenos o espacios sobre, debajo, dentro o a travs de los cuales
se tenga que ej@cu^ o ttevar a cabo las oleras.
e. Mtodos y unidades para las mediciones
Los mtodos de medicin estn indicados en cada seccin de stas especificaciones. Los tems
que no constaren en estas, sern medidos de acuerdo con los dibujos, perfiles y documentos del
contrato, sin tomar en cuenta cantidades que sobrepasen las mostradas en el plano o perfil.
Los desperdicios no sern medidos, puesto que debern ser incluidos en los precios unitarios de
cada partida sin pago adicional.
f. Errores u omisiones en diseos y metrados
Los errores u omisiones que puedan encontrarse en el Proyecto tanto en diseos como en
metrados, se comunicarn por escrito al Supervisor designado para la obra, para su solucin
respectiva en un plazo no mayor de cinco das, caso contrario el Contratista acudir a la entidad
contratante quien deber absolverla en un plazo mximo de diez das. El incumplimiento o
demora de ste requisito ser de exclusiva responsabilidad del contratista y no obligar a la
Entidad contratante a pagos adicionales
g. Condiciones Climticas
El Ingeniero supervisor indicar al Ingeniero Residente de obra para que tome las medidas
adecuadas para prevenir el dao que puedan producir los cambios climticos como lluvia,

temperaturas extremas, u otro, suspendiendo la ejecucin de tal o cual partida de obra que
pueda ser afectada.
1.2.0 Caseta de control y guard lana
La caseta de control y guardiana deber proporcionar confort y abrigo, se presupuestar en un
adicional, y el tipo de material a emplearse ser a criterio del Contratista tomando en
consideracin las condiciones climticas, topogrficas, material de cimentacin, etc. y previa
aprobacin del Supervisor
Medicin y pago
Su medicin ser la unidad, y su valorizacin ser en forma global
1.3.0 Instalaciones provisionales y Trabajos preliminares
1.3.1 Instalaciones Provisionales
El Contratista deber construir, instalar y mantener las instalaciones provisionales y necesarias
para la ejecucin de la obra: "Proyecto Azafrancucho". Debiendo ejecutar las instalaciones de
acuerdo al programa de construccin propuesto
a. Campamentos y servicios propios provisionales
El contratista construir las instalaciones provisionales de oficinas, almacenes, depsitos,
comedores, vestuarios, servicios higinicos y otros ambientes requeridos, incluyendo su
equipamiento y amoblamiento, para el servicio del personal, tcnico, obrero y administrativo de la
obra y para el almacenamiento y cuidado de los materiales, herramientas y equipos durante la
construccin del Proyecto, de acuerdo a los planos elaborados por el contratista y aprobado por
el supervisor
Desmontar todas las instalaciones provisionales a la conclusin de la obra.
Limpiar todas las reas que sern ocupadas durante la construccin de la obra.
El contratista deber ubicar sus instalaciones teniendo en cuenta las necesidades de la

obra.

El contratista deber construir todas las captaciones de agua requeridas por las obras y realizar
la distribucin correspondiente para las instalaciones provisionales, equipos y zonas de trabajo.
El contratista construir y dar mantenimiento durante todo el perodo de los trabajos, todo el
acceso necesario para la ejecucin de los mismos.
Medicin y pago
El campamento ser medido en m2 y su valor incluyendo los servicios propios, ser dividido
entre el rea de construccin fijndose un precio unitario promedio.
En cada valorizacin se estimar el porcentaje de las construcciones e instalaciones concluidas
tomando como referencia el total que figura en los planos aprobados por el Supervisor
Se valorizar segn el porcentaje de avance mensual y de acuerdo al precio total para la partida
Construcciones provisionales, oficinas, viviendas, etc. del presupuesto
b. Cercos
El contratista construir los cercos y sus puertas que son elementos de cierre que delimitan el
rea del campamento u otros ambientes necesarios para la seguridad y control durante la
ejecucin de la obra, tales como almacenes descubiertos, talleres, etc.
Medicin y pago
Ser medido en metros lineales (m). Para tal efecto se medir la longitud a lo largo del cerco con
aproximacin a la unidad
Se valorizar por metro lineal y de acuerdo al precio unitario para la partida respectiva sealada
en el presupuesto

c.

Laboratorios para control de calidad

El contratista ser responsable del suministro de todo el material de insumos necesarios durante
toda la construccin, para los ensayos de suelos, concreto, cemento, y agregados y del control
de calidad de las obras a realizar, asimismo suministrar los equipos de laboratorio necesario
para los ensayos y pruebas de laboratorio.
Medicin y pago
Ser de acuerdo a la relacin de equipos a instalar
El pago se efectuar hasta un 45% luego de la instalacin completa del laboratorio, el 50% ser
prorrateado en las valorizaciones mensuales, y el 5% restante se abonar al final de la obra
d.

Transporte de equipo y maquinaria

En esta partida el Contratista deber ejecutar las acciones necesarias para suministrar y
transportar los equipos bsicos de construccin y repuestos, desde el lugar de procedencia al
lugar de la obra y viceversa, incluye personal profesional y obreros calificados, equipo mecnico,
materiales y herramientas.
El monto de esta partida deber ser elaborado considerando el equipo necesario a ser utilizado
en la ejecucin de la obra, para lo cual el Contratista deber presentar la relacin de equipos
especificando: equipo, nmero, tipo, edad y caractersticas (peso, potencia, capacidad, etc.) de la
misma manera los repuestos, herramientas y el nmero de personal. Cuando se trate de equipo
usado, el Contratista deber contar con el visto bueno de la Supervisin para la aceptacin en la
obra.
El Contratista previa autorizacin escrita de la Supervisin y dentro del plazo establecido de
ejecucin de la obra y del cronograma de utilizacin del equipo, podr efectuar modificaciones en
cuanto al equipo necesario, sin que esto represente variacin en el monto de esta partida.
Medicin y pago
Se pagar en forma global (Glb). En cada valorizacin se considerar el transporte de los
equipos y maquinaria de acuerdo a la recepcin o salida de la obra en forma proporcional, de
acuerdo a la partida "Movilizacin y Desmovilizacin" del presupuesto. Se considerar 60%,
cuando se ha cumplido con la movilizacin del equipo ofertado y 40% si se ha desmovilizado
e. Vehculos
El contratista suministrar vehculos para uso de la supervisin y del propietario durante todo el
tiemfio de la construccin.
Los vehculos debern ser aptos para todos los terrenos y accesos donde se realizarn las obras
y llevarn un extintor de llamas para carros
Medicin y pago
Se establecer un precio por cada unidad vehicular en funcin de los precios del mercado local
Los pagos se efectuarn otorgando el 15% como anticipo segn entrega de los vehculos, el 80%
prorrateado en cada valorizacin mensual de los vehculos entregados y el 5% al concluir la obra
f. Mantenimiento de las instalaciones provisionales
El mantenimiento de las instalaciones provisionales comprender todos los trabajos necesarios
para el mantenimiento y operacin de los servicios ptilicos como abastecimiento de energa
elctrica, agua, desage, recoleccin de desechos, etc., no incluye suministro de enseres de
limpieza e higiene personal.
Medicin y pago
La valorizacin parafinesde pago se har por Mes, durante el plazo de ejecucin de obra.

g. Seguridad, higiene y prevencin de accidentes


Comprende todas las actividades necesarias que deber tener en cuenta el Ingeniero Residente,
se tomarn todas las medidas de seguridad razonables para prevenir accidentes de trabajo, daos
a la obra o a terceros.
Se exigir en forma permanente al personal las siguientes medidas: el uso de los protectores
para cada tipo de trabajo, el uso adecuado de las herramientas, materiales y equipos.

1.3.2. Trabajos Preliminares


a. Acceso carrozable
Se ejecutar el camino de acceso en el lugar indicado y de acuerdo al plano respectivo, o a lo
ordenado por el supervisor
lUledicin y pago
El camino de acceso se medir por kilmetro
El pago se realizar considerando el 60% para prorratearlo en las valorizaciones mensuales
despus de haber terminado su construccin, y el 40% prorrateado en las valorizaciones
restantes despus de haber terminado el arreglo del terreno ocupado
b. Desbroce, despalme y limpieza
Este tem comprende la remocin de la capa superficial del terreno natural, dentro de las reas
que van a ser ocupadas por la construccin de las obras permanentes, para depsito y/o
extraccin de materiales, para campamento e instalaciones provisionales segn lo indicado en
los planos o indicado por el supervisor, con la finalidad de eliminar toda clase de races, hierbas,
humus y otros materiales que resulten inadecuados para la cimentacin de estructuras, o como
material seleccionado.
La profundidad mxima que se considera como desbroce es de veinte centmetros, y la
profundidad mxima del despalme es de un metro con ochenta centmetros
Medicin y pago
El desbroce y despalme se medir en m2
EFpago se efectuarsegn el avance mensual de acuerdo al precio unitario
c. Desvo del Ro
Para la construccin de la Presa ser necesario desviar el flujo actual del agua, mediante drenes,
bombeo si fuera necesario de tal forma que mantengan la zona de trabajo en condiciones
apropiadas.
Despus de haber cumplido el objetivo, todos los trabajos de proteccin se retirarn del cauce
del ro o se nivelarn para dar una apariencia agradable.
El Contratista ser quien opte por la mejor opcin para el desvo del ro.
Medicin y pago
La unidad de pago, ser el DA de control permanente de las bombas y todas las actividades
previas y posteriores.
1.4.0

Movimientos de Tierra
De acuerdo a las especificaciones contenidas en este captulo, el Contratista tendr que
aplicarias para la ejecucin de todas las excavaciones en superficie, los previstos en los planos o
como ordene la Supervisin.

Las excavaciones sern efectuadas segn los ejes, rasantes y niveles indicados en los planos o
indicados por la Supervisin y, solo despus que este haya verificado que los trabajos de'
limpieza y desbroce necesarios del terreno hayan sido realizados satisfactoriamente.
Las condiciones que se encuentren en el terreno, durante la excavacin podr requerir la
variacin de las lneas de excavacin de diseos indicados en los planos. El Supervisor podr
por lo tanto establecer nuevos ejes, gradientes y niveles para la excavacin, que difieren de las
indicadas en los planos.
Las excavaciones a realizarse estn indicadas en los planos respectivos mediante lneas de
excavacin, todos estos trabajos deben ser coordinados y autorizados por el supervisor.
Es aplicable tambin a la actividad de explotacin de canteras o zona para prstamo de
materiales para rellenos y/o agregados en lo concerniente a sta partida
En esta partida se considera incluidos los trabajos de limpieza de las secciones de excavacin,
la remocin del material producto de las excavaciones a las zonas de colocacin libre, de tal
forma que no interfieran con el normal desarrollo de los trabajos, as como la conservacin de
dichas excavaciones por el tiempo que se requiera para la construccin satisfactoria de los trabajos
correspondientes.

Durante el curso de las excavaciones, el Contratista tomar todas las medidas necesarias para
evitar inundaciones y eliminar escurrimientos superficiales de agua que puedan daar
estructuras, producir derrumbes y obstruir reas de trabajo y acceso. Las aguas de filtracin de la
napa fretica o de manantiales que comprometen las excavaciones, sern alineadas por medio
de pequeos diques, canaleta de drenaje y si fuera necesario, por medio de bombas,
descargndolas a una distancia tal que no se regrese en el rea de trabajo.
Los sistemas empleados para el agotamiento y la eliminacin de las aguas, sern tales que
eviten daos a las obras permanentes.
El material de excavacin ser descargado generalmente talud abajo de las excavaciones
ejecutadas, con el objeto de reducir en lo posible operaciones de transporte; cuando no sea
posible o por orden de la Supervisin, el material ser transportado a lugares aprobados para las
ampliaciones de reas de trabajo, y otras construcciones necesarias.
Estas excavaciones se realizarn en las obras de Presa, aliviadero, toma y conducto de
descarga.
Cuando los materiales excavados sean juzgados aptos por la Supervisin para agregados de
concreto, rellenos, terraplenes, enrocados, etc., el Contratista podr utilizar limitando al mnimo
posible la explotacin de canteras de prstamo. De todas maneras ser necesario efectuar los
anlisis respectivos de estos materiales en el Laboratorio de Suelos.
Los derrumbes de materiales que ocurran en las obras y las ocasionadas fuera de las lneas
fijadas para las sobre excavaciones, sern removidas y los taludes sern regularizados llenando
si es necesario los vacos, segn las disposiciones de la Supervisin.
El Contratista tomar las precauciones razonables para evitar quebrantamiento de la roca, o
derrumbe fuera de las lneas de excavacin indicadas en los pianos y aprobados por la
Supervisin.
Cuando la sobre-excavacin ocurra en una zona destinada a estar en contacto con el concreto o
el revestimiento, los espacios dejados debern ser rellenados con concreto de la misma calidad
de la estructura en directo contacto.
Durante las excavaciones y hasta el momento que sean rellenados y/o revestidos, el Contratista
tomar todas las medidas tcnicamente correctas y adecuadas con el objetivo de asegurar la
estabilidad de las superficies, empleando donde sea necesario, apuntalamiento, armadura y
shotcrete en cantidades suficientes para garantizar la seguridad del trabajo. La supervisin podr
ordenar el empleo de armaduras adicionales a las empleadas por el Contratista, cuando juzgue
que existen peligros para la seguridad de los trabajadores o para la buena conservacin de las
obras permanentes.

Las obras de proteccin de las excavaciones debern dejar espacio suficiente para permitir a la
Supervisin el acceso permanente a las obras.
Despus de terminada la obra, deber ser removida toda proteccin o armadura de carcter
provisional, que haya quedado en el sitio siempre y cuando la Supervisin no corVsidere lo
contrario. En este caso los servicios de proteccin provisional sern reconocidos, valorizados y
pagados por el Gobierno Regional de Ayacucho
a. Excavacin en Material Suelto Comn
Esta excavacin consiste en el levantamiento de todos los materiales que puedan ser removidos a mano,
con excavadora, o con equipo de movimiento de tierra sin escarificador.
El Contratista deber proceder a las excavaciones en material suelto, despus de que se haya procedido a
la limpieza y ai levantamiento de secciones transversales para calcular el cubicado.

Medicin y Pago
La unidad de pago es por m3. Para tal efecto se calcularn los volmenes excavados, utilizando
el mtodo del promedio de reas extremas entre estaciones de veinte (20) m, o las que se
requieran segn la configuracin del terreno en base a las secciones de antes de la excavacin y
a las secciones correspondientes despus de concluida la excavacin prevista
La valorizacin por m3 de excavacin ser reconocida al precio unitario de acuerdo a la
clasificacin del material
b. Excavacin en Roca Suelta o conglomerado

La excavacin en roca descompuesta consiste en la remocin de todos los materiales que


puedan ser removidas a mano, pala mecnica o equipo pesado de movimiento de tierra de una
capacidad no menor de la de un tractor de 190-240 HP con escarificador, sin tener que recurrir a
disparos, voladuras continuas, sistemticas y acuamientos; con uso ocasional de pequeas
cargas explosivas; la remocin de piedras o bloques de rocas individuales de menos de 1 metro
cbico de volumen, ser clasificada tambin como excavacin en roca descompuesta.
El Contratista deber proceder a la excavacin de la roca descompuesta despus de que este
material haya sido examinado, clasificado y cubicado.
Medicin y Pago
La unidad de pago es por m3. Para tal efecto se calcularn los volmenes excavados, utilizando
el mtodo del promedio de reas extremas entre estaciones de veinte (20) m, o las que se
requieran segn la configuracin del terreno en base a las secciones de antes de la excavacin y
a las secciones correspondientes despus de concluida la excavacin prevista
La valorizacin por m3 de excavacin ser reconocida al precio unitario de acuerdo a la
clasificacin del material
c. Excavacin en Roca Fija
La excavacin en roca fija, consiste en la remocin de todos los materiales que no puedan ser
removidos a mano, por pala mecnica o por equipos de movimiento de tierra, pero s con
continuos y sistemticos disparos o voladuras, barrenos y acuamientos. La remocin de piedras
o bloques de rocas individuales de ms de un metro cbico de volumen ser clasificado como
excavacin en roca.
Cuando se encuentra material al que el Contratista quiera clasificar como excavacin en roca,
stos materiales debern ser puestos al descubierto, cubicados y expuestos para hacer su
correspondiente clasificacin conjuntamente con la Supervisin.
Medicin y Pago
La unidad de pago es por m3. Para tal efecto se calcularn los volmenes excavados, utilizando
el mtodo del promedio de reas extremas entre estaciones de veinte (20) m, o las que se
requieran segn la configuracin del terreno en base a las secciones de antes de la excavacin y
a las secciones correspondientes despus de concluida la excavacin prevista

La valorizacin por m3 de excavacin ser reconocida al precio unitario de acuerdo a la


clasificacin del material
d. Excavacin en zona pantanosa
Las superficies excavadas para obras de carcter permanente debern mantenerse libres del
nivel fretico hasta una profundidad que no afecte la resistencia del suelo
Los alineamientos y las dimensiones de las secciones transversales del proyecto estarn sujetos
a cambios que sean necesarios segn criterio de la Supervisin, para adaptar la cimentacin a
las condiciones expuestas por la excavacin. El afinamiento exacto de los taludes no ser
necesario, pero stas debern ajustarse con la mayor precisin posible a las lneas y niveles
establecidos.
Medicin y Pago
La unidad de pago es por m3. Para tal efecto se calcularn los volmenes excavados, utilizando
el mtodo del promedio de reas extremas entre estaciones de veinte (20) m, o las que se
requieran segn la configuracin del terreno en base a las secciones de antes de la excavacin y
a las secciones correspondientes despus de concluida la excavacin prevista
La valorizacin por m3 de excavacin ser reconocida al precio unitario de acuerdo a la
clasificacin del material
e. Excavacin para la cimentacin de la presa
Toda el rea que va a ocupar el terrapln de la presa, deben despalmarse a suficiente
profundidad para eliminar todos los materiales que no sean aprovechables, estos materiales son:
tierra vegetal, escombros, races y todo material perjudicial.
Se excavar una zanja para el dentelln de tierra en la cimentacin del terrapln de la presa a las
cotas y dimensiones indicadas en los planos
Medicin y Pago
La unidad de pago es por m3. Para tal efecto se calcularn los volmenes excavados, utilizando
el mtodo del promedio de reas extremas entre estaciones de veinte (20) m, o las que se
requieran segn la configuracin del terreno en base a las secciones de antes de la excavacin y
a las secciones correspondientes despus de concluida la excavacin prevista
La valorizacin por m3 de excavacin ser reconocida al precio unitario de acuerdo a la
clasificacin del material
f. Bombeo de agua para control del nivel fretico
El sistema instalado deber garantizar que todas las aguas de escurrimiento del nivel fretico
sern evacuadas a un cauce natural o dren, cuidando de no causar perjuicios de cualquier ndole
a cualquier bien o persona. Una vez terminada la obra para lo cual se necesit la contencin del
nivel fretico, el contratista deber inmediata y completamente desalojar el sistema de
contencin, removindolo de tal manera que la subida del nivel fretico no cause dao alguno a
la textura del suelo, incluyendo la reparacin de eventuales daos producidos en el terreno y/o en
tos cauces que sirvieron para la evacuacin del agua
El contratista elegir el mtodo ms conveniente para la depresin y evacuacin del nivel fretico
en un rea circundante a la ejecucin de la obra. El contratista estar obligado a instalar en cada
caso, medidores de agua con el fin de controlar el gasto instalado, as como el caudal bombeado.
Igualmente estar obligado a tener en reserva una cantidad suficiente de bombas para garantizar
la operacin del sistema instalado en caso de insuficiencia o fallas.
El contratista llevar un protocolo de bombeo y lo presentar al Supervisor junto con los reportes
diarios respectivos formando parte inseparable de stos ltimos
Medicin y pago

Para las mediciones de las excavaciones bajo agua se aforarn los caudales mediante
medidores con contador volumtrico acumulativo para llegar a la unidad de metros cbicos
evacuados, dejando constancia de las mediciones en los protocolos de los reportes diarios.
La valorizacin se efectuar en metros cbicos evacuados segn el volumen mensual de
acuerdo al precio unitario de la partida respectiva sealada en el presupuesto.

1.5.0

Relleno
El presente tem contiene las Especificaciones Tcnicas a ser aplicadas por el Contratista en la
ejecucin de las operaciones de explotacin de canteras o reas de prstamo, de preparacin de
las superficies de fundacin, de formacin y compactacin de rellenos, de conformidad con los
planos y/o las indicaciones del Supervisor. El trmino "terrapln de presa" incluye todos los
materiales del terrapln de la presa que en seguida se detallan:
-

Material del ncleo de grava arcillosa


Material de los espaldones roca triturada o de grava
Material de filtro
Paramento de enrocado
Manto de arcilla
Manto de geomembrana
Manto de geotextil
Geoweb
Cubierta de tierra vegetal sembrada sobre el talud del vaso

Los rellenos sern ejecutados segn el trazo, alineamiento y secciones transversales, indicadas
en los planos.
El Supervisor tendr la facultad de aumentar o disminuir el ancho de la fundacin, o los taludes y
ordenar cualquier otro cambio en las secciones de los rellenos, si lo juzga necesario, para
mejorar la estabilidad de las estructuras o por razones econmicas.
Cualquier material que despus de ser colocado en el relleno demuestre ser inadecuado a
criterio del Residente, deber ser removido y reemplazado por un material adecuado,
requirindose previamente la aprobacin del Supervisor.
La preparacin de la superficie de apoyo para materiales comunes excavados ser hecha
humedecindola con agua y apisonndola con pasadas de rodillos vibratorios.
Si en la superficie de cimentacin hubiere roca suelta o fija, la superficie se preparar regndola
con agua.
a. Relleno compactado con material comn
Esta especificacin se aplicar a los rellenos para el canal aliviadero y camino de acceso
Todos los materiales adecuados para el relleno compactado podrn usarse siempre y cuando no
tengan linros, ramas de rboles, races de plantas, basura, etc.
El contenido de materia orgnica no podr ser superior al 5% y el material que pasa la malla N
40 tendr un lmite mximo de 40% y un ndice de plasticidad mximo de 10%.
El material ser colocado una vez compactada la superficie de fundacin; en capas de espesores
unifomies de 0.30 m. extendindolo y distribuyndolo sobre la zona de terrapln, de acuerdo a
los alineamientos y cotas establecidas.
La superficie de la capa ser horizontal y uniforme.
Antes de colocar cualquier capa, la compactacin de la precedente tendr que ser verificada por
el Supervisor y su superficie escarificada y humedecida superficialmente para aumentar la
adherencia de la capa siguiente.

La densidad (seca) de la fraccin de suelo de material cohesivo compactado no deber ser


menor que el 95% de la densidad mxima del Proctor Modificado. En el caso de material granular
la densidad relativa ser superior al 80%. En caso de que el canal, o estructura estuviera
totalmente en relleno, la densidad relativa en la rasante del canal deber ser 90% como mnimo.
El ptimo contenido de humedad ser obtenido en el laboratorio para cada material de relleno a
usarse. Antes de iniciar la compactacin deber verificarse que el material a usarse en obra
tenga un contenido de humedad con ms o menos 2% de tolerancia con respecto a la humedad
ptima.
La humedad deber mantenerse uniforme en cada capa.
El traslape lateral de cada pasada del equipo de compactacin no debe ser menor de 0.50 m. En
los casos en que fuera requerido algn tipo de ensayo especial para el control de contenido de
humedad y grado de compactacin ste ser aprobado por el Supervisor.
Medicin y pago
Las mediciones de los rellenos se realizarn segn las lneas de relleno indicadas en los planos.
La unidad de pago es por m3. Para tal efecto se calcularn los volmenes de relleno, utilizando
el mtodo del promedio de reas extremas entre estaciones de veinte (20) m, o las requeridas
segn la configuracin del terreno a partir de las secciones del terreno desmontado y/o
desbrozado antes de iniciar el trabajo
La valorizacin se efectuar segn el avance mensual de acuerdo al precio unitario de la
partida correspondiente en el presupuesto
b. Relleno compactado con material fino impermeable
En los casos en que los planos de diseo o la Supervisin indiquen que los rellenos para
estructuras debern ser impermeables, stos estarn constituidos por arcillas, arcilla limosa o
limos arcillosos, o una combinacin de estos con limos, arenas, gravas y/o gravillas, segn sea
la naturaleza de la obra, obtenidos de las excavaciones realizadas o de reas de prstamos
adecuadas siempre y cuando no contengan ramas de rboles, races de plantas, arbustos,
basuras, etc. y que cumplan con los siguientes requisitos:
-

Lmite Lquido

: 25 <

LL <

45

ndice de Plasticidad

: 5 ^ IP ^ 20

Permeabilidad

: 1 0 - s cm./seg.

Materia Orgnica

: ^

5%

Ningn punto de la seccin del terrapln quedar a una distancia mayor a cinco cm. de los
correspondientes a las secciones de diseo
Medicin y pago
La unidad de pago es por m3. Para tal efecto se calcularn los volmenes de relleno, utilizando
el mtodo del promedio de reas extremas entre estaciones de veinte (20) m, o las requeridas
segn la configuracin de terreno a partir de las secciones del terreno desmontado y/o
desbrozado antes de iniciar el trabajo
La valorizacin se efectuar segn el avance mensual de acuerdo al precio unitario de la
partida correspondiente en el presupuesto
c. Relleno compactado con material granular
Para el camino de servicio se usar este tipo de material, este relleno se construir con los
materiales provenientes de las excavaciones y/o de las canteras indicadas en la memoria
descriptiva.
Medicin y pago

La unidad de pago es por rnS. Para tal efecto se calcularn los volmenes de relleno, utilizando
el mtodo del promedio de reas extremas entre estaciones de veinte (20) m, o las requeridas
segn la configuracin del terreno a partir de las secciones del terreno desmontado y/o
desbrozado antes de iniciar el trabajo
La valorizacin se efectuar segn el avance mensual de acuerdo al precio unitario de la partida
correspondiente en el presupuesto.

d. Relleno compactado para el terrapln de presa


Las secciones del terrapln colocadas para la cimentacin de la estructura se construirn de
acuerdo con las indicaciones que se hacen en esta seccin.
Ningn material se colocara en cualquier seccin del terrapln de la presa hasta que la
cimentacin de esa seccin se haya desaguado y preparado en forma apropiada por el
Contratista.
Todas las excavaciones hechas para pozos de prueba, o para otras investigaciones
subterrneas, y todas las dems cavidades existentes que queden dentro del rea que se va a
cubrir con el terrapln que se extiendan abajo de las lneas establecidas para la excavacin para
la cimentacin del terrapln, se llenaran con material compactado
La cimentacin para rellenarse se preparar nivelndola y pasndole rodillo, de manera que los
materiales de la cimentacin estn tan compactos y bien unidos a la primera capa de terrapln,
como aqu se especifica para las capas subsiguientes.
Las superficies sobre o contra las que se vayan a colocar el material del terrapln debern
limpiarse de todos los materiales sueltos o perjudiciales en la forma apropiada inmediatamente
antes de colocar la primera capa del terrapln. Las superficies de cada porcin de la cimentacin,
inmediatamente antes de colocar el terrapln, debern haberse desaguado las depresiones,
haberse humedecido bien y estar suficientemente limpias para obtener la unin apropiada con el
terrapln.
El material para el cuerpo de la presa se obtendr de las canteras indicadas en los planos
respectivos, el material para filtro se obtendr del ro Chaco
El contenido agua del material antes y durante la compactacin se distribuir uniformemente en
cada capa de material.
Las variaciones permisibles de humedad para su colocacin se basan en las condiciones del
proyecto. En general, la humedad media durante la construccin del terrapln mantendr la
humedad ptima de laboratorio obtenida con la prueba de Proctor estndar.
Las pruebas de compactacin de Proctor las har el Contratista pudiendo elegir el procedimiento
del Bureau of Reclamation, D698 - 42 T de la ASTM, o por el mtodo Standard de la AASHO T
99-49
La densidad del material compactado no debe ser menor del 95% de la mxima obtenida en el
laboratorio con la prueba estndar de compactacin Proctor, con los materiales que se
compactan.
Se har todo lo posible para que el material tenga la humedad correcta en la cantera antes de la
excavacin. Si necesario aadir mas agua, se aadir al material regando el terrapln
mezclndola uniformemente en toda la capa.
La distribucin y granulometra de los materiales en todo el terrapln sern las especificadas, y
sern tales que en los terraplenes no se formen lentes, acumulaciones, fajas, o capas de material
que difiera sustancialmente en textura o granulometra del material vecino.
Los materiales con mayor contenido de finos sern colocados en la zona adyacente al ncleo
impermeable y los materiales con mayor cantidad de gruesos, hacia el lado exterior del talud
aguas arriba.

Las operaciones combinadas de excavacin y colocacin debern hacerse en forma tal, que los
materiales cuando se compactan en el terrapln estarn suficientemente mezclados para obtener
el mejor grado de compactacin y de estabilidad.
Las capas sucesivas de material se vaciaran sobre el terrapln en forma que se obtenga la mepr
distribucin del material, sujeta a la aprobacin del Supervisor, y puede designar los lugares del
terrapln donde deben depositarse las cargas individuales.
Los materiales impermeables se colocaran en la parte central de la presa (ncleo) y los
materiales permeables se colocaran en los espaldones de la presa.
El material debe colocarse en el terrapln en capas continuas, aproximadamente horizontales no
mayores de 15 cm. de espesor despus de haberse compactado como aqu se especifica.
Si, en la opinin del Supervisor, la superficie de la cimentacin preparada o de la superficie
compactada de cualquier capa de la presa esta demasiado seca o tersa para unirse
correctamente con la capa que se va a colocar encima, deber humedecerse y/.o rastrillarse o
escarificarse, con el equipo adecuado y en la forma aprobada a la profundidad necesaria para
producir una superficie de unin apropiada antes de colocar la capa siguiente de material para el
terrapln. Si, en opinin del Supervisor, la superficie compactada de cualquier capa de terrapln
colocada esta muy hmeda para la correcta compactacin del material que se va a colocar
encima, deber quitarse; dejarse secar; rasparse con una rastra, escarificador u otro equipo
adecuado para reducir la humedad necesaria; que luego se compactar antes de colocar la capa
siguiente de material.
Se usaran rodillos compactadores para compactar el terrapln. El contratista proporcionara los
compactadores.
El peso del lastre de los rodillos y su operacin sern los que se requieran para obtener la
compactacin deseada. Si se usa ms de un rodillo en cualquier capa de terrapln, todos tos
rodillos usados debern ser del mismo tipo y esencialmente de las mismas dimensiones, segn
lo ordene el Supervisor
Los tractores usados para arrastrar los rodillos debern tener potencia suficiente para arrastrar
los rodillos satisfactoriamente cuando tengan todo el lastre de arena y agua. Durante las
operaciones de compactacin, el contratista debe mantener libres de materiales los espacios que
quedan entre las patas que disminuyan la eficacia de los rodillos compactadores.
Si la proporcin de agua es menor que la necesaria, no se proseguir con la compactacin,
excepto que se tenga la autorizacin del Supervisor y, en ese caso, se proseguir con la
compactacin, conforme lo ordene la Supervisin, para obtener la compactacin necesaria, y no
se har ningn ajuste en precio por esta compactacin adicional. Si la humedad es mayor que la
necesaria, el material se levantar formando montones, para usarse posteriormente, o la
compactacin debe posponerse, hasta que el material se haya secado hasta tener la humedad
necesaria, y no se har ningn ajuste al precio, por las operaciones de levantar el material y
formar montones, o por el secado de los materiales. Si, con la humedad necesaria, se encuentra
conveniente dar mas o menos de 12 pasadas a cada capa de 15 cm para obtener la
compactacin necesaria, se cambiara el nmero de pasadas, segn lo ordene el Supervisor, y se
harn modificaciones al precio unitario aprobado para el terrapln de la presa por cada pasada
en exceso o en defecto que sea necesaria.
IMedicin y pago
La medida, para pago, en la fabricacin de terraplenes se hace de todo el terrapln compactado
en el lugar, a las lneas y rasantes establecidas, incluyendo los rellenos de las estructuras
ordenadas por el Supervisor.
El pago del terrapln se har al precio unitario por metro cbico aprobado, incluyndose en el
precio el costo de colocar, mojar y compactar el material del terrapln
e. Filtros graduados

Los materiales para estos filtros se obtendrn de los lugares de prstamo debidamente
autorizados por la Supervisin debiendo preverse un almacenamiento limpio en el lugar mismo
de la construccin. Se recomienda que se utilice la siguiente granulometra:
Tamao de Malla

Rango de porcentaje

(Abertura)

Acumulado que pasa

200 mm

100

150 mm

80-100

3"

43 - 80

2"

35 - 70

y"

25 - 50

NM

15-35

N10

10-28

N40

5-15

N 200

0-5

Los granos han de ser en lo posible de forma cbica y/o esfrica, y el volumen de los poros
habr de ser del orden del 25% al 45%. El contenido de sustancias extraas ser menor del 5% y
el material habr de ser lavado y transportado en medios de transporte limpios El filtro ser
colocado en capas con espesores de acuerdo a lo que indican los planos y las disposiciones del
Supervisor en la obra. Este deber colocarse segn los distintos granos, se guiaran por los
niveles indicados en los planos, as como los declives y espesores que se especifican. La arena
y la grava se colocaran y se compactaran en su lugar de manera que no se mezclen.
Cuando es necesario compactar materiales sin cohesin como las arenas y gravas, se
depositara el material en capas horizontales y se compactar la densidad relativa no menor del
70% determinada por las pruebas estndar del Bureau of Reclamation para suelos sin cohesin
que drenan con facilidad
El espesor de las capas horizontales, despus de la compactacin, no ser mayor de 15 cm., si
la compactacin se ejecuta con compactadores o rodillos, y no ser mayor de 30 cm. si la
compactacin se realiza con tractores del tipo de orugas, vibradores superficiales; o con equipo
semejante; ni mayor de la profundidad de penetracin, si la compactacin se realiza con
vibradores interiores.
RAedicin y pago
El relleno con filtros graduados se medir en metros cbicos
Para tal efecto se determinar el volumen de material de filtro compactado de acuerdo a las
rdenes del Supervisor, usando el mtodo promedio de las reas extremas entre estaciones de
veinte metros o las que se requieran segn la configuracin del terreno.
La valorizacin se efectuar segn el avance mensual de acuerdo al precio unitario para la
partida correspondiente sealada en el presupuesto
F

. Enrocado colocado con maquinaria

La primera tarea a realizar ser la limpieza de la cantera que sea necesaria, tanto del contenido
de materia orgnica, como de material suelto o roca alterada
Durante la explotacin de la cantera ser necesario cuidar que el material cumpla las
especificaciones del proyecto, separando y eliminando todo el que no sea apropiado como sea
requerido

El transporte de la roca entre la cantera y el lugar de colocacin final ser realizado a travs de la
ruta mas corta posible o aquella que seale el Supervisor, quedando asimisnno el Contratista
obligado a construir caminos de acceso o empalmes necesarios para estos fines.
Los fragmentos de roca pueden no compactarse, pero debern ser colocados y acomodados de
manera que queden regularmente distribuidos, con las ms pequeas en la parte inferior y las
ms grandes en la parte superior y que sus caras ms planas queden expuestas
En el caso del RIP RAP no es necesario compactarlos, solamente se descargarn al volteo y se
acomodarn de manera que los fragmentos grandes de roca queden uniformemente distribuidos
y que los pequeos sirvan para llenar los espacios entre los fragmentos grandes, de manera que
las capas de enrocamiento queden uniformes y compactas y del espesor especificado. Se
recomienda que se utilice la siguiente granulometra:
Malla (cm)

% acumulado que pasa

Abertura
60

100

45

70- -100

35

50- -92

25

40- -70

15

20-40

12

10-20

El material que se utilice para enrocado deber consistir de granos slidos y no deleznables, o
fragmentos rocosos resistentes a la abrasin de grado "A" segn se determina por el "ensayo de
los ngeles", es decir con menos del 35% de prdida de peso despus de 500 revoluciones.
Se colocar el enrocado en los lugares mostrados en los planos y /o donde lo indique el
Supervisor
hAedicin y pago
El suministro de la roca colocada con maquinaria ser medido en metros cbicos. Para tal efecto
el Supervisor determinar el volumen de roca colocada de acuerdo a las secciones de diseo
tomando como base las dimensiones especificadas en los planos de secciones transversales, sin
aumento y/o deduccin de los volmenes excedentes que se encuentran dentro de las
teterancias permitidas.
El pago se efectuar segn el avance mensual de acuerdo al precio unitario por metro cbico de
roca

g. Manto de arcilla
Se colocar una capa de arcilla compactada de 0.20 m de espesor, libres de piedras y sustancias
nocivas, sobre ella se colocarn los mantos de geomembrana, geotextil y Geoweb como se
indica en la especificacin 1.10.0

Medicin y pago
El suministro de la arcilla ser medido en metros cbicos. Para tal efecto el Supervisor
determinar el volumen de arcilla colocada de acuerdo a las secciones de diseo tomando como
base las dimensiones especificadas en los planos de secciones transversales, sin aumento y/o
deduccin de los volmenes excedentes que se encuentran dentro de las tolerancias permitidas.
El pago se efectuar segn el avance mensual de acuerdo al precio unitario por metro cbico de
arcilla
h. Preparacin de material para agregados y finos

Esta partida ser empleada cuando el procesamiento requiera mayores operaciones que la del
simple zarandeo la cual ya esta considerada en las partidas pertinentes al relleno compactado,
incluyendo las tareas de extraccin, triturado, chancado, tamizado y almacenamiento en planta
de manera que quede a disposicin para ser empleado en las labores de colocacin segn el tipo
de obra a realizar
Estos materiales deben ser humedecidos en la zona de explotacin a fin de evitar segregacin
en las operaciones de carga y transporte
Medicin y pago
El procesamiento de materiales para prstamo ser medido en metros cbicos. El volumen se
determinar en el lugar de amontonamiento del material procesado
El pago se efectuar segn el avance mensual de acuerdo al precio unitario correspondiente
sealado en el presupuesto

1.6.0 Concreto
Este captulo se refiere a las prescripciones tcnicas requeridas para todas las construcciones de
concreto incorporadas en las obras, tal como se especifica en esta y como lo indica en los
planos. Los trabajos incluyen el suministro de equipo, materiales puestos en obra y la mano de
obra necesario para la dosificacin, mezclado, transporte, colocacin, acabado y curado del
concreto, encofrado, suministro y colocacin del acero de refuerzo y accesorios especficos.
1.6.1 IVIateriales
a. Cemento
El cemento Portland para todo el concreto, mortero o mampostera, corresponder a las normas
ITINTEC
La utilizacin del cemento de alta calidad con el fin de acortar los tiempos para desencofrar
correr por cuenta del Contratista y en todo caso se exigir siempre la autorizacin del
Supervisor
Cada lote de cemento en bolsa ser almacenada para permitir el acceso necesario para su
inspeccin o identificacin, adecuadamente protegido de la humedad. El cemento estar libre de
grumos o endurecimiento debido a un almacenaje prolongado
El Supervisor puede solicitar los certificados en la fbrica en cualquier momento durante el
progreso de la obra e indicar su conformidad sobre el acuerdo a los que est recibiendo; sin
embargo, la aceptacin del cemento en planta, no elimina el derecho del Supervisor, de probar el
cemento en cualquier momento durante la ejecucin de la obra.
b. Agregados
Los agregados debern ser almacenados de forma tal, que se evite su humedecimiento o su
mezcla con materiales extraos de diferente granulometra.
El almacenamiento de stos materiales sobre suelo natural no ser permitido
Agregado fino
La arena para la mezcla del concreto y para sus usos como mortero ser arena limpia, de origen
natural, con un tamao mximo de partculas de 3/16". La arena ser obtenida de depsitos
naturales o procesada en el lugar de la obra o una combinacin de ambos.
El porcentaje de material que pasa el tamiz N" 200 (Designacin ASTM-C-117) no exceder del
3% en peso.
En la Tabla 1, de sta especificacin se sealan las caractersticas que deber cumplir y los
ensayos a efectuarse para la seleccin y empleo del agregado fino.
El agregado fino cumplir con las normas ASTM-C-33-78.

El Contratista realizar el muestreo a su costo y har las pruebas necesarias para el agregado
fino, segn sea ennpleado en la obra.

Tabia 1
Requisitos Granulomtricos para agregado fino y lmites para sustancias perjudiciales
en agregado fino y grueso segn ASTM C-33

P ' i l M ^ M ^ t Granulomtricos
1 Tamiz Estndar
Lmites
Totales
(Abertura Cuadrada)
% Pasante
100
3/8"

N4
N8
N16
N''30

95 a 100
80 a 100
50 a 85
25 a 60

Limites para sustancias perfudiciAes iKi agmgados grueso y*^no'' .'-I' -' W^l""^:
Descripcin
Agregado
Agregado Grueso
Fino
1) Lentes
de
arcilla
y
Partculas
Desmenuzables
2) Material menor que la Malla N" 200
3) Carbn y Lignito
4) Partculas ligeras (G< 2.4)
5) Suma de 1,3 y 4

3%

t"- '

(c) 2.0% a 10.0

(a) 3.0% a 5.0 ni.o%


(b) 0.5% a 1.0 (d) 0.5% a 1.0

(e) 3.0% a 8.0

(f) 3.0% a 10.0

50.0%
10%
12.0%
15%
18.0%

6) Abrasin
7) Desgaste en Sulfato de Sodio
N 100
1
8) Desgaste con Sulfato de Magnesio
1 Observaciones
1 (a) 3% Para concretos sujetos a Abrasin y 5% para los dems.
1
(b) 1% Para elementos interiores, 0.5% para ios dems
(c) 2% y 3% para concreto estructural en clima severo y moderado, 3% para losas y pavimentos expuestos a liumedecimiento, 5% en estructuras
interiores y 10% en zapatas y columnas interiores.
(d) 0.5% en concreto exterior, 1 % en el resto.
(e) 3% en concreto arquitectnico, 5% en concreto a la intemperie, 8% en el resto.
(f) 3% y 5% para concreto estructural en clima severo y moderado, 7% en concreto a la intemperie, 10% en el resto
(*) Este lmite puede incrementarse a 1.5% si el material < Malla 200 no es arcilla si el agregado fino tiene un % <Malla 200 inferior al lmite
permisible, en cuyo caso, el lmite para el agregado grueso se calcular con la frmula L = 1 + |(p)/(100-p)| (t-A) donde L es el nuevo lmite, P es el
% de arena con respecto al total de agregados T es el lmite de la Tabla para la arena y A es el % de Material < Malla 200 existente en la arena.
|
NOSO

10 a 30
2a10

Agregado Grueso
El agregado para la mezcla del concreto consiste en tamaos de agregados comprendidos entre
3/16" y 2" de tamao natural. El agregado grueso para concreto ser de grava natural limpia o
piedra triturada.
Los agregados gruesos consistirn en fragmentos de roca gnea duros, fuertes, densos y
durables, sin estar cubiertos de otros materiales.
El Supervisor, muestrear y har pruebas necesarias para el agregado grueso, segn sea
empleado en la obra. El tamao mximo del agregado grueso a utilizarse en concreto para
estructuras ser de 2".
En la tabla 1 de las presentes especificaciones se sealan las caractersticas que deber cumplir
y los ensayos a efectuarse para la seleccin y empleo del agregado grueso.
De encontrar que los agregados gruesos provenientes de canteras ubicadas en la zona del
Proyecto no cumplen con las especificaciones aqu exigidas; pero que, pruebas especiales o la
experiencia, indican que producen concreto de la resistencia y durabilidad adecuadas, pueden
ser utilizados con la autorizacin del Supervisor.
c. Agua
El agua que se emplea para la mezcla y curado del concreto estar limpia y libre de cantidades
dainas de sales, aceites, cidos, lcalis, materia orgnica o mineral y otras impurezas que en
opinin del Supervisor, pueden reducir la resistencia, durabilidad o calidad del concreto.
Segn la norma ITINTEC 339.088, el agua se considera apta para la mezcla o el curado si sus
propiedades y contenidos en sustancias disueltas estn comprendidas en los siguientes lmites:
El contenido mximo de materia orgnica expresada en oxgeno consumido ser de 3 mg
por litro (3 p. p. m.)
El contenido de residuo slido no ser mayor de 5 gi/lt (5 000 p. p.m.)
El ph estar comprendido entre 5.5 y 8
El contenido de sulfates, expresado en sulfato ion (S04) ser menor de 600 p. p.m.
El contenido de cloruros expresado en ion cloruro (CL) ser menor de 1 g/lt (1 OOOp. p.m.)
El contenido de carbonates y bicarbonatos alcalinos (alcalinidad total), expresadas en
NaC03, ser menor de 1 g/lt (1 OOOp pm.)
d.

Aditivos

El uso de aditivos en el concreto, tales como plastificantes, acelerantes, endurecedores, etc.,


pueden ser adicionados racionalmente a la mezcla siempre que sea necesario, en proporciones
definidas por el Contratista, conforme a las especificaciones del fabricante y aprobadas por la
Supervisin, en base a los ensayos realizados en el Laboratorio.
El Contratista deber someter las muestras de los aditivos propuestos para la aprobacin de la
Supervisin. El Supervisor puede necesitar mas pruebas en cualquier momento durante la
ejecucin de la obra.
Cuando se requiera o se permita el uso de aditivos, stos cumplirn con las normas apropiadas
sealadas:
Aditivos aceleradores-retardadores reducidores de agua
ASTM 494
Los aditivos tendrn la misma composicin y se emplearn con las proporciones sealadas en el
diseo de mezclas. No se permitir el empleo de aditivos que contengan Cloruro de Calcio en
zonas donde se embeban acero galvanizados o aluminio.
Calidad del concreto
El Contratista a su costo efectuar las pruebas necesarias de los materiales y agregados, de los
diseos propuestos de mezcla y del concreto resultante, para verificar el cumplimiento con los
requisitos tcnicos de las especificaciones de la obra.

El Contratista estar en libertad para contratar por su cuenta el personal o laboratorio que efecte
las pruebas que requiera para su propia informacin y orientacin.
Las pruebas de cilindro curados en la obra, o las pruebas necesarias por cambios efectuados en
los materiales o proporciones de ms mezclas solicitadas por el Supervisor, as como las
pruebas adicionales de concreto o materiales ocasionadas por el incumplimiento de las
especificaciones, sern por cuenta del Contratista.
Las pruebas comprendern lo siguiente:
- Pruebas de los materiales propuestos por el Contratista para verificar su cumplimiento con las
especificaciones.
- Verificacin y prueba de los diseos de mezcla propuesto por el Contratista.
- Pruebas de permeabilidad del concreto de acuerdo a normas ASTM, cuando lo sea requerido.
- Obtencin de muestras de materiales en las plantas o en los lugares de almacenamiento
durante la obra y pruebas para su cumplimiento con las especificaciones.
- Pruebas de resistencia con concreto de acuerdo con los procedimientos siguientes:
Obtener muestras de concreto de acuerdo con las especificaciones ASTM-C-172 "Mtodo para
muestrear concreto fresco".
Cada muestra para probar la resistencia del concreto sobre la base de muestrear en forma
variable la produccin de ste.
Cuando se empleen equipos de bombeo o neumticos, el muestreo se efectuar en el extremo
de la descarga.
Preparar tres testigos en base a la muestra obtenida, de acuerdo con las especificaciones ASTMC-31 "Mtodo para preparar y curar testigos de concreto para pruebas de compresin y flexin
en el campo" y curarlas bajo las condiciones normales de humedad y temperaturas de acuerdo al
mtodo indicado del ASTM.
Probar tres testigos a los 28 das, de acuerdo con las especificaciones ASTM-C-39, "Mtodo para
probar cilindros moldeados de concreto, para resistencia a la compresin". El resultado de la
prueba de 28 das ser el promedio de la resistencia de los tres testigos Si hubiese ms de un
testigo que evidencie cualquiera de los defectos indicados, la prueba total ser descartada. El
concreto tambin ser probado con un testigo a los 7 das con la finalidad de medir la rapidez de
la resistencia adquirida y el comportamiento preliminar de la mezcla ejecutada.
Se efectuar una prueba a la resistencia por cada 100 m^ para cada diseo de mezcla de
concreto vaciado en un solo da
Los resultados de las pruebas sern entregados al Supervisor y al Contratista en el mismo da de
su realizacin.
El supervisor determinar adems la frecuencia requerida para verificar lo siguiente:
Control de las operaciones de mezclado de concreto.
Revisin de los informes de fabricantes de cada remisin de cemento y acero de refuerzo y/o
conducir pruebas de laboratorio o pruebas aisladas de stos materiales, conforme sea recibidos.
El Contratista tendr a su cargo las siguientes responsabilidades:
Obtener y entregar al Supervisor, sin costo alguno, muestras representativas preliminares de los
materiales que se propone emplear y que debern ser aprobados su aceptacin.
Presentar al Supervisor el diseo de mezcla de concreto que se propone emplear y hacer una
solicitud escrita para su aprobacin.
Proveer y mantener para el empleo del Supervisor facilidades adecuadas para el
almacenamiento seguro y el curado correcto de los cilindros de prueba de concreto en la obra
durante las primeras 24 horas, segn las especificaciones ASTM-C-31.

Suministrar al Supervisor copias de los informes de las pruebas de fbrica de todos los envos de
cemento si son solicitados.
El Contratista pagar los costos que demanda la realizacin de las pruebas adicionales que
requiera ste Captulo, si no se cumple con los requisitos de resistencia de la estructura.

1.6.3

Preparacin, dosificacin y mezcla de! concreto


a. Equipo
Debido a la naturaleza del trabajo, los materiales a usarse debern ser de la calidad
especificada, asegurando desde un principio la bondad de los materiales.
En el lugar de trabajo el Contratista instalar equipos mezcladores que tengan la capacidad de
asegurar la continuidad de la produccin requerida de concreto. Los equipos mezcladores
debern ser aprobados por la Supervisin y ser capaces de combinar los componentes del
concreto en una mezcla uniforme y de descargar la misma sin segregacin de los materiales
b. Tiempo de mezclado
Por tiempo de mezclado se entiende el que se emplea desde que todos los materiales slidos se
encuentren dentro del tambor en movimiento, establecindose como condicin indispensable
que el volumen de agua se agregue antes de transcurrir el primer cuarto tiempo especificado
para el mezclado
Tiempos mnimos de mezcla:
Capacidad de la mezcladora (m3)

Tiempo de mezcla (minutos)

0.5 o menos

1.25

0.75 a 1.5

1.50

1.5 a 2.3

2.00

2.3 a 3.0

2.50

Para las mezcladoras que tengan una capacidad mayor de 3 metros cbicos, el tiempo mnimo
de mezcla ser aumentado en 15 segundos por cada Vz metro cbico adicional.
El volumen de la mezcla para cada carga no deber superar la capacidad indicada por el
fabricante.
c. Dosificacin de mezclas
El Contratista proporcionar el equipo de dosificacin y proporcionar todas las facilidades
adecuadas para la medicin y el control de cada uno de los materiales que componen la mezcla.
Se emplear mezcladores que pesen los agregados que intervienen en la mezcla, as como el
cemento y los aditivos cuando sea necesario. El cemento ser pesado con una precisin de 1%
por peso o por bolsa. En este ltimo caso, las bolsas sern de 42.5 Kg. netos y las tandas sern
proporcionadas para contener un nmero entero de bolsas. Todos los agregados sern incluidos
en la mezcla con una precisin de 2% de peso haciendo la debida compensacin para la
humedad libre y absorbida que contienen los agregados.
El agua ser mezclada por peso, volumen o medidas con una precisin de 3% de peso.
Los aditivos sern incluidos en la mezcla segn procedimiento establecido, de acuerdo con los
ensayos realizados en obra y/o recomendaciones del fabricante.
La relacin agua - cemento, no deber variar durante las operaciones de mezcla por ms de + 0.20 de los valores obtenidos a travs de la correccin de la humedad y absorcin.
Antes de utilizar los materiales de mezcla para el concreto, el Contratista har por su propia
cuenta las pruebas necesarias de los implementos de medicin y pesado sobre toda la amplitud
de medidas que involucran las operaciones de mezcla y efectuar pruebas peridicas de all en

adelante hasta la terminacin del contrato. Las pruebas sern efectuadas en presencia del
Supervisor y sern suficientemente adecuadas para demostrar la precisin de los aditamentos de
medida. El Contratista efectuar los ajustes o reemplazos que sean necesarios para cumplir con
los requisitos especificados de precisin de medida.
Los tanques de agua de las mezcladoras porttiles ser construidos en forma tal, que el indicador
que registra la cantidad de aguas descargada por tanda, as como la cantidad de agua total
utilizada por da, este dentro de los lmites especificados de precisin.
Los aditivos en polvo sern pesados o medidos por peso, segn las recomendaciones del
fabricante. La precisin de medida de cualquier aditivo estar dentro del 3%.
El tiempo de mezcla para cada tanda de concreto se considera despus de que todos los
materiales, incluyendo agua, se encuentran en el tambor.
La mezcladora girar a una velocidad uniforme por lo menos de dos revoluciones completas por
minuto despus de que todos los materiales, incluyendo el agua se encuentren en el tambor. Las
mezcladoras no sern cargadas en exceso de su capacidad indicada. Cada tanda de concreto,
ser completamente vaciado de la mezcladora antes de volver a cargar esta, y el interior del
tambor ser mantenido limpio y libre de acumulacin de concreto endurecido o mortero.
Cuando se autorice el empleo de mezcladoras o camiones mezcladores de concreto, el equipo y
los mtodos a emplearse estarn sujetos a la aprobacin del Supervisor.
El concreto manufacturado de esta forma deber cumplir en todo aspecto con las
especificaciones. El equipo de pesado y mezclado deber conformar los requisitos de las
especificaciones y el uso del equipo de mezcla y transporte del concreto deber cumplir con las
partes aplicables de ASTM-C-94 "Especificaciones para Concreto Pre Mezclado".
El Contratista deber ajustar la secuencia del mezclado, tiempo de mezclado y en general hacer
todos los cambios que considere necesario para obtener concreto de la calidad especificada, con
la aprobacin de la Supervisin.
e.

Mezcla de concreto

El Contratista disear las mezclas de concreto por peso para cumplir con los requisitos de
resistencia, durabilidad, permeabilidad y buenas condiciones de todas las obras de concreto
autorizados.
El concreto terminado deber tener la resistencia mnima a la comprensin a los 28 das de
vaciado que se indica en el cuadro siguiente:
Tipo de concreto

Resistencia

Tamao agregado

f c = 210 Kg/ cm2

210 Kg/cm2

1 Vz

fe = 175 Kg/cm2

175 Kg/cm2

Y/

Las proporciones de la mezcla sern alteradas de acuerdo a los requerimientos de la calidad de


la obra y con la aprobacin por escrito del Supervisor. Los materiales propuestos para la
fabricacin del concreto sern seleccionados por el Contratista, con la suficiente anticipacin del
tiempo en que sern requeridos en la obra, por lo menos 30 das de anticipacin al tiempo que
sern empleados en la mezcla para la preparacin del concreto.
Estas muestras sern en suficiente cantidad para permitir efectuar el nmero de pruebas que sea
necesario para determinar conveniencia y las proporciones de los materiales.
La determinacin de la resistencia a la compresin en kilos por cm^ se efectuar en cilindros de
pruebas de 6" x 12", designacin ASTM-C-39 ACI-214.
Las pruebas y anlisis de concreto sern hechas por el Supervisor a intervalos frecuentes y las
mezclas empleadas sern cambiadas cuando en opinin del Supervisor, se requiere efectuar los
cambios que aseguren la facilidad de trabajo, densidad, impermeabilidad, acabado de la
superficie y resistencia.

El Contratista podr utilizar proporciones de mezcla que produzcan concreto de la misma calidad,
con mayor economa que las proporciones determinadas por l y aprobados por la Supervisin,
quien autorizar el reemplazo, siempre y cuando se compruebe su calidad con el requerimiento
del proyecto y que cualquier resultado del aumento o reduccin del costo provenientes de stos
cambios sern por cuenta del Contratista.
1.6.4

Transporte del concreto


El concreto ser transportado al lugar de la obra en forma ms rpida posible por mtodos que
impidan la separacin prdida de ingredientes y asegure que se obtenga la calidad requerida
del concreto.
El equipo de transporte ser de un tamao y diseo que asegure el flujo continuo del concreto en
el punto de entrega que sea aprobado por la Supervisin. El equipo de conduccin y las
operaciones cumplirn con las siguientes especificaciones:
a)

Mezcladoras porttiles agitadoras y unidades no agitadores y su forma de operacin


cumplirn con los requisitos ASTM-C-94.

b)

Las canaletas o "chutes" sern de metal o revestidas de metal y tendrn una pendiente que
no exceda a 45 y no menos de uno vertical a tres horizontal.
Las canaletas o conductos de ms de 6 m. de longitud y los ductos que no cumplan con los
requisitos podrn emplearse siempre que descarguen a una tolva antes de su distribucin.

1.6.5 Colocacin y Vaciado del Concreto


a. Preparacin del vaciado
Antes de vaciar el concreto, los encofrados y acero de refuerzo debern ser inspeccionados y
aprobados por el Supervisor en cuanto a su posicin, estabilidad y limpieza.
El concreto endurecido y los materiales extraos debern ser removidos de las superficies
terminadas y deber haberse asegurado en sitio, los anclajes, material para juntas de dilatacin y
otros materiales empotrados debern estar en su lugar, y la preparacin completa para el
vaciado deber haber sido aprobado por el Supervisor.
No ser permitido aadir agua a la mezcla de concreto, sern limpiadas a chorro de aire-agua y
estarn libres de aceite, desmontes, viruta, arena, grava y fragmentos sueltos de roca y otros
materiales o capas dainas al concreto.
l concreto deber ser vaciado en la presencia del Supervisor.
El concreto deber ser depositado lo ms cerca posible de su posicin final de modo que el flujo
se reduzca a un mnimo. Los chutes y canaletas se utilizarn para cadas mayores de 1.50 m.
b. Colocacin y vibrado
El concreto ser colocado en forma continua hasta la terminacin del vaciado y en capas de un
espesor tal que ningn concreto sea depositado sobre concreto que haya endurecido
suficientemente como para causar la formacin de vetas o planos de debilidad dentro de la
seccin. Si la seccin no puede vaciarse en forma continua se ubicarn juntas de construccin
en los lugares que se indiquen en los planos o sea aprobado por la Supervisin. El vaciado ser
llevado a un ritmo tal que el concreto fresco, sea todo plstico. El concreto que se haya
endurecido parcialmente o haya sido contaminado con sustancias extraas no ser vaciado.
Los aditamentos en los encofrados sern retirados cuando el vaciado de concreto haya llegado a
una elevacin que indique que su servicio ya no sea necesario. Podrn permanecer empotrados
en el concreto slo si son fabricados de metal o concreto y se haya obtenido la aprobacin de la
Supervisin.
La colocacin o vaciado de concreto en elementos apoyados no se iniciar hasta que el concreto
vaciado anteriormente en las columnas y muros de apoyo deje de ser plstico.

Ningn concreto se colocar dentro o a travs de agua, salvo en casos excepcionales y previa
aprobacin escrita de la Supervisin.
En cuyo caso el colocado se efectuar usando tubos trompa, todas las filtraciones que aparezcan
en los frentes rocosos contra la que se vaciar el concreto, sern controladas antes de iniciar el
vaciado. Se recomienda usar aditivos apropiados para este tipo de concreto.
Todos los vaciados de concreto sern plenamente compactados en su lugar por medio de
vibradores de tipo inmersin, aprobados por el supervisor complementando con la distribucin
hecha por los albailes con herramientas a mano, tales como esparcimiento, enrasado y
apisonado, conforme sea necesario.
La duracin de la vibracin estar limitada al mnimo necesario para producir la consolidacin
satisfactoria sin causar segregacin generalmente la duracin estar entre los 5 y 15 segundos
de tiempo. Los vibradores no sern empleados para lograr el deslizamiento horizontal de
concreto dentro de los encofrados. El propsito de la vibracin es solo para asegurar la
consolidacin del concreto.
Los vibradores mecnicos debern ser compatibles con las dimensiones de las estructuras en
ejecucin, los encofrados utilizados y debern ser operados por trabajadores competentes.
Se mantendr un vibrador de repuesto en la obra durante todas las operaciones de concreto.
No se podr iniciar el vaciado de una nueva capa antes de que el anterior haya sido
completamente vibrado.
El Contratista, a solicitud de la Supervisin someter peridicamente los vibradores a las pruebas
de control.
c. Temperatura del concreto
El concreto, cuando se vaca, siempre debe tener la temperatura baja.
En caso de que la temperatura ambiental sea mayor de 32 "C, para construcciones medianas, se
ceir a las recomendaciones ACI-305 y ACI-207.
En el diseo de las mezclas alternativas, son aceptables los procedimientos para reducir tanto los
tiempos de curado como de endurecimiento de la mezcla, pudiendo usarse algunos de los
siguientes: Mayores dosis de cemento, cemento de alta resistencia o aceleraciones de fragua o
aditivos plastificantes para reducir la relacin agua cemento.
d. Vaciado con lluvia
No se podr realizar el vaciado de concreto al aire libre durante las lluvias continuas cuya
intensidad sea mayor de 4 mm/hora, lo cual ser precisado a criterio del Supervisor.
1.6.6

Curado
El concreto recin efectuado deber ser protegido de un secado prematuro y de temperaturas
excesivamente altas, adems deber mantenerse con una prdida mnima de humedad, a una
temperatura relativamente constante, durante el perodo de tiempo necesario para hidratacin del
cemento y para el endurecimiento debido del concreto. El curado inicial deber seguir
inmediatamente a las operaciones de acabado. El curado continuar durante 7 das, teniendo
especial cuidado a las primeras 8 horas. Uno de los materiales o mtodos siguientes puede ser
usado:
- Material absorbente que mantenga constantemente humedad.
- Arena u otro tipo de cobertura que se mantenga constantemente hmeda.
- Compuestos para curado de acuerdo a las especificaciones para curado de concreto (ASTM-C309).
Estos materiales sern aplicados de acuerdo a las recomendaciones del fabricante
Inmediatamente despus del curado inicial y antes que el concreto se haya secado, se deber
continuar con un curado adicional por uno de los siguientes materiales o mtodos:
Continuacin del mtodo utilizado en el curado inicial.

Papel impermeable que cumpla con ASTM-C-171.


Otros tipos de cobertura que retengan la humedad, que sean aprobados por la Supervisin.
Si ha utilizado concreto con acelerante, el curado final deber continuarse por un total adicional
de tres das, deber impedirse el secado rpido al terminar el perodo de curado.
Los encofrados metlicos que puedan calentarse por el sol y todos los encofrados de madera en
contacto con el concreto durante el perodo final de curado debern mantenerse hmedos. Si se
requiere remover los encofrados durante el perodo de curado, deber emplearse uno de los
mtodos de curado, o materiales indicados anteriormente, de inmediato. Este tipo de curado
deber continuarse por el resto del perodo de curado, el concreto deber protegerse de
disturbios mecnicos, en especial esfuerzos por sobrecargas, impactos fuertes y vibraciones
excesivas que puedan daar el concreto. Todas las superficies terminadas de concreto debern
ser protegidas de cualquier dao causado por el equipo de construccin, materiales y por agua
de lluvia o corrientes de agua. Las estructuras que son autoportantes no debern ser cargadas
de manera tal que puedan producir esfuerzos excepcionales en el concreto.
1.6.7

Tolerancias dimensionales
Las tolerancias indicadas en el presente tem establecen los lmites de desviacin de las lneas
de las estructuras con respecto a las indicadas en los planos
Las estructuras o parte de ellas que no resulten conformes con las tolerancias establecidas,
debern ser corregidas o demolidas y reemplazadas por el Contratista, a sus expensas
Para las reparaciones se tomarn en cuenta lo especificado en el tem 6.8 "Reparaciones de las
superficies de concreto"
Las tolerancias aceptables se indican a continuacin:
-

Tolerancia de trazado o tolerancia absoluta, es decir, error mximo admisible en relacin con
los ejes de referencia de las estructuras : 5 cm. por exceso o defecto en longitud total

Tolerancia en los espesores de los elementos estructurales : 2 cm. por metro de espesor

Tolerancia en el desplazamiento absoluto de lneas horizontales, verticales e inclinadas y


variaciones en los niveles 2cm por 5 m

Tolerancia en pozo de vlvula:


-

Tolerancia en el desplazamiento absoluto del eje: 2 cm.

Tolerancia en tos niveles:2cm por 5 m

Tolerancia en las medidas interiores : 0.5% salvo para los vaciados en contacto con partes del
equipo electromecnico

En general se deber cumplir con las tolerancias establecidas en las normas del ACI-341-63
"Prcticas recomendada para encofrado de concreto".
1.6.8

Reparaciones de las superficies de concreto


Se reparar la superficie del concreto solamente despus que el Supervisor haya podido
examinar los desperfectos, excesos y defectos en los siguientes casos:
- Desperfecto debido a vaciados defectuosos
- Superficies de corte causadas por la remocin de exceso de concreto con respecto a las lneas
de los planos
- Aplicacin de sobre espesores donde las superficies de las estructuras resulten defectuosas
con respecto a las lneas de los planos
En caso de fisuras o porosidad el Contratista proceder a los resanes usando un mortero
especial y el siguiente procedimiento:
- Picar el rea afectada hasta encontrar el concreto con visibilidad del agregado grueso
- Cortar los bordes hasta el fondo con una pequea pendiente hacia el interior

- Limpiar cuidadosamente toda la superficie de residuos de polvo, suciedad, aceites, grasa


- Saturar el rea de reparacin con agua
- Aplicar una mano de lechada adhesiva
- Antes de que esta mezcla se haya secado, cubrir el rea de reparacin con mortero especial
(aditivos adherentes y libres de contraccin)
- En caso de reas horizontales, curar con aserrn hmedo por un lapso mnimo de 3 das,
dejando siempre hmeda toda el rea
1.6.9

Clases de concreto
a. Concreto armado
El concreto armado especificado para esta obra ser de una resistencia especificada de 210
Kg./cm2 con un contenido mnimo de 380 Kg. de cemento por 1 m3 de concreto
Todos los materiales que se quieran fijar al concreto sern colocados antes de iniciar el vaciado
de ste.
Todos los materiales sern ubicados con precisin y fijados para prevenir desplazamientos.
Medicin y Pago
Se proceder a efectuar la cubicacin de concreto armado mediante planos y verificando en sitio,
medicin que se realizar en m3
El pago se realizar contra valorizacin mensual y de conformidad con las indicaciones del
Cuaderno de obra
No se reconocer pago alguno por concreto o materiales que hayan sido desperdiciados o
empleados por el Contratista o rechazados por el Supervisor en las siguientes condiciones:
En operaciones de acabados no solicitados, ni ordenados.
Reemplazo de concreto daado o defectuoso.
Concreto adicional para sobre excavacin o excavaciones innecesarias u otros usos innecesarios
segn determine la Supervisin.
b. Concreto ciclpeo
Dentro de este tem se entiende el concreto simple no armado mezclado con piedra de 50mm a
250mm segn indicaciones del Supervisor
Este concreto se utilizar para las protecciones contra erosin de dentellones, aliviadero segn
indicacin del Supervisor
Este concreto puede contener hasta 25% de piedra mediana y ser vaciado sin solado previo
Medicin y Pago
Se proceder a efectuar la cubicacin de concreto armado mediante planos y verificando en sitio,
medicin que se realizar en m3
El pago se realizar contra valorizacin mensual y de conformidad con las indicaciones del
Cuaderno de obra
No se reconocer pago alguno por concreto o materiales que hayan sido desperdiciados o
empleados por el Contratista o rechazados por el Supervisor en las siguientes condiciones:
En operaciones de acabados no solicitados, ni ordenados.
Reemplazo de concreto daado o defectuoso.
Concreto adicional para sobre excavacin o excavaciones innecesarias u otros usos innecesarios
segn determine la Supervisin.
1.6.10 Juntas
a. Juntas de Construccin

La ubicacin de las juntas de construccin, se indica en los planos o sern indicados por l
Supervisor de la obra. Todo cambio en el tipo o ubicacin de las juntas de construccin estar
sujeto a la aprobacin de la Supervisin.
Las juntas de construccin, tanto horizontales como verticales, sern limpiados por medio de un
arenado hmedo de todas las materias sueltos o extraas para exponer las partculas limpias de
agregado grueso, las cuales sern lavados con chorro de agua y aire inmediatamente antes de
vaciar nuevas masas de concreto sobre stas juntas.
Las superficies de concreto sobre las cuales deber vaciar el concreto y sobre las cuales deber
adherirse el nuevo concreto y que se convierten tan rgidas que no se puedan incorporar
integralmente al concreto anteriormente vaciado sern consideradas como juntas de
construccin.
El acero de refuerzo y malla soldada de alambre que refuerce la estructura ser continuado a
travs de las juntas. Las llaves en el concreto y varillas de anclaje inclinadas sern construidas o
colocadas segn indique el Supervisor.
b. Juntas de Dilatacin
No se permitir la continuacin del acero de refuerzo y otros materiales de metal empotrados,
adheridos al concreto, anclados en pisos, a travs de las juntas de dilatacin. El material de
relleno premoldeado para juntas de dilatacin ser del tipo necesario de acuerdo a las
especificaciones del Proyecto ASTM 1850: Especificaciones para material de relleno
premoldeado para juntas de dilatacin preformado y para el tipo de masilla elstica.
Las juntas de dilatacin sern del tipo de "sellos de agua" (Water Stop) de cloruro de polivinilo y
rellenadas con masillas elstica tipo Igas Negro de Sika y de elastmeros
IVIedicin y pago
Se medir por longitud de junta en metros
Los pagos se realizarn contra valorizaciones mensuales y de acuerdo a las indicaciones del
Cuaderno de obras
1.6.11 Tubo de Concreto armado
La tubera ser de 60 cm. de dimetro interior liso construido en sitio.
Una vez que se haya compactado parte del terrapln donde se colocar la tubera, se
proceder a excavar 30 cm. a cada lado del dimetro de la tubera a usarse, con taludes
adecuados que no signifiquen peligro para personas o bienes del contratista.
La tubera se colocar chequeando cuidadosamente el eje y las alturas indicadas en los planos
o en su defecto indicadas por el Supervisor, inmediatamente se continuar con el relleno del
ncleo de la presa.
Las estructuras de entrada y salida del tubo sern de concreto armado, segn se indican en los
planos respectivos.
Medicin y pago
Se medir en metros lineales.
Los pagos se realizarn contra valorizaciones mensuales, de acuerdo a los reportes diarios
respectivos.
1.7.0 Encofrado
El encofrado previsto ser aprobado por el Supervisor y ser de tal tipo y forma que el concreto
terminado satisfaga todas las exigencias, y que a la vista se tenga un concreto impecable tipo
industrial, es decir que las superficies de las obras de concreto armado estn libres de
porosidad superficial, de fisuras y de irregularidades.
Se deber usar encofrado de madera de buena calidad, sea terciada con capa superficial de
madera dura, o tablas de madera dura, cepilladas y de igual espesor
El ancho de las tablas en caso de usarse, no debe sobrepasar de 15 cm. y no deber variar
entre ellas ms de 3 cm.

La superficie de las planchas que estar en contacto con la mezcla, se limpiarn


cuidadosamente antes de la colocacin del concreto y deber ser tratada cada vez, antes de su
uso, con un aceite o cera apropiadas. La conexin de las tablas o planchas, deber ser un
estanco para impedir la salida de la lechada de cemento durante el proceso de colocacin En
caso que haya tiempo de espera entre la realizacin del encofrado y el vaciado y, en
consecuencia, hubieren, separaciones entre las planchas o tablas, el Contratista deber regar
el encofrado hasta que esas separaciones desaparezcan, antes de comenzar el vaciado.
El Contratista deber garantizar, la estabilidad de toda clase de soporte sin que haya
deformaciones en el encofrado durante el proceso de colocacin. Cualquier concreto que salga
deformado por razones de insuficiencia de soportes ser eliminado
Esta eliminacin y la reposicin correspondiente, corrern nicamente a cargo del Contratista.
Si fuera requerido por el Supervisor, se deber presentar el clculo esttico de las
construcciones del encofrado. Los encofrados debern ser preparados, armados y atados, de la
manera que al retirar los mismos, no queden elementos metlicos sobre las superficies del
concreto, ni tampoco dentro de la masa del mismo. Los planos de encofrado sern aprobados
por el Supervisor, debiendo haber sido aprobados por l antes del hormigonado.
Se permitir tambin el uso de encofrados prefabricados y/o patentados, sean de madera o
metlicos con la debida aprobacin del Supervisor
Encofrados de paredes y en general encofrados laterales, se debern sacar despus de siete
das como mnimo, o luego de haberse aprobado la primera serie de los correspondientes
cilindros de prueba o concreto. En losas, etc., no se deber desencofrar antes de los 28 das y
de haber chequeado la segunda serie de probetas.
Medicin y Pago
La unidad de medida para el pago es el Metro Cuadrado (M^) de encofrado en contacto con el
concreto, medida de acuerdo a los planos, incluye pies derechos y todos los elementos
necesarios tirantes, ganchos, cuas, etc. para el desencofradoy el resane del concreto.
El pago se realizar contra valorizaciones mensuales y de acuerdo a las indicafciones
respectivas.
1.7.1 Acabados de la Superficie del Concreto
Los grados de acabados especificados abajo se entienden referidos tanto para las superficies
dejadas en el concreto por el encofrado como para las superficies subhorizontales y
horizontales que se realicen sin encofrado
En los planos estn anotados con las letras F y subndice respectivo segn los grados de
acabado requeridos por las diferentes superficies de concreto. En todo caso an cuando tales
anotaciones no figuren, se proceder segn se indica a continuacin, o lo que disponga el
Supervisor.
F1. Este grado de acabado se refiere a las superficies donde la aspereza no es objetable, como
superficies en que debern apoyarse rellenos de tierra u otro concreto.
Para estas superficies no se requerir ningn tratamiento, salvo la reparacin de concreto
defectuoso y el sellado de los eventuales agujeros dejados por los anclajes de los encofrados.
La correccin de la irregularidades ser necesaria solamente en caso de depresiones de mas
de 3 cm. de profundidad
F2. Este grado de acabado se requiere en superficies a vista de los interiores. Las
irregularidades no debern exceder de 1 cm. tratndose de irregularidades abruptas y de 1.5
cm. tratndose de irregularidades graduales.
F3. Este grado de acabado se requiere en superficies a vista en el exterior. Las irregularidades
superficiales no deljern exceder de 0.5 cm. tratndose de irregularidades abruptas y de 1 cm.
tratndose de irregularidades graduales.

F4. Este grado de acabado se requiere donde el alisado de la superficie es de importancia, bajo
el punto de vista hidrodinmico. No se admitirn irregularidades abrupta, mientras que las
graduales no debern exceder los 0.5 cm.
1.8.0

Acero de Refuerzo para Concreto

En este tem se consideran las barras de acero requeridas como armaduras para el concreto
armado considerado en el Proyecto.
Estas barras sern de acero corrugado, habindose realizado los clculos de armaduras
considerando aceros de calidad de GRADO 60, correspondiente a una resistencia a la traccin
de 4200 Kg. /cm2
Deber almacenarse por encima del nivel del terreno, por dimetros, sobre plataformas,
largueros u otros soportes y deber ser protegidos hasta donde sea posible, de daos
mecnicos, deterioro superficial y humedad.
Los aceros de refuerzo podrn doblarse en el taller o en el campo (cerca de la obra).La
dobladura deber efectuarse de acuerdo con las prcticas Standard aprobadas, empleando
mtodos mecnicos aprobados
Los radios para el doblado y los ganchos de ninguna manera sern menores que los indicados
en los planos o en la ltima versin del Reglamento ACI
El refuerzo debe de estar libre de aceites y suciedades de cualquier ndole que puedan afectar
su capacidad de adherencia.
El acero de refuerzo con xido, escamas de laminacin o una combinacin de ambos deber
ser limpiado con una escobilla de acero, hasta la plena satisfaccin de la Supervisin.
El montaje de la armadura se deber ejecutar de manera tal, que tenga suficiente estabilidad
propia para garantizar la correcta ubicacin de cada barra con referencia a la seccin del
concreto. La cobertura con concreto deber ser conforme a los planos y garantizada mediante
distanciadores. En caso de traslape, la longitud de ste deber ser igual a las normas
indicadas. Las dos barras del traslape, debern ser obligatoriamente del mismo dimetro, no
permitindose la conexin directa de 2 barras traslapadas con alambre.

Valores empa\m^^m-'(:<cWcTt"^!^h
Dimetro

Compresin
m

'j^^f^fw^.'.

Traccin
Superior

Otros

3/8"

30 cm.

34 cm.

34 cm.

1/2"

30 cm.

45 cm.

45 cm.

5/8"

40 cm.

57 cm.

57 cm.

3/4"

46 cm.

78 cm.

69 cm.

1"

61 cm.

139 cm.

97 cm.

IVIedIcin y Pago
La medicin para el pago del refuerzo de varillas de acero, ser la cantidad de kilogramos de
refuerzo colocados segn lo indique los planos y aprobados por la Supervisin.
La cantidad de refuerzo a ser pagado ser calculado en base al peso normal de los diversos
tamaos colocados segn se muestra en las listas aprobadas de varillas o segn lo indique la
Supervisin.
9.0 Alballera
Consiste en ejecutar obras con roca de canteras apropiadas formando muros asentados con
concreto de resistencia especificada para lo cual la piedra partida debe tener un tamao
mximo de 1/2", para conseguir un buen asentado.

Previa a la iniciacin de los trabajos de manipostera deber limpiarse el terreno, hasta


conseguir un terreno firme, o conseguirlo con un previo compactado del terreno.
La piedra deber estar limpio de terrones, las rocas blandas de mala calidad se eliminarn.
De ser necesario se cortar a la medida necesaria para encajar con las ya colocadas. Todas
las piedras sern limpiadas y lavadas con anticipacin.
Se inicia humedeciendo el terreno y luego se coloca el mortero; colocando cada piedra junta a
otro con una separacin de 1", aproximadamente.
La altura mxima que puede levantarse en un da ser de 1.50 m. para evitar asentamiento por
el peso propio.
Cuando se coristruyen muros secos, previamente las piedras deben ser preparadas,
eliminndose las salientes procurando formar caras planas para conseguir una colocacin
perfecta entre ellas. Debern formarse amarres, procurando su inamovilidad, lo que se
consigue colocando cuas de piedras pequeas, largas, planas; formando una trabazn
inamovible.
Deber colocarse las piedras del ancho del muro. Se verificar continuamente la plomada o la
inclinacin indicada en el diseo.
Medicin y^Pago
Los trabajos de mampostera se pueden calcular por volumen para su pago, en nuestro caso
ser el m^ (metro cbico).
Incluye provisin de todos los materiales: roca, agregados, cemento, agua, etc.; transporte,
colocacin, asentado y resanes.
1.10.0 Geomembrana, Geotextil y Geoweb
a. GEOMEMBRANA LISA e =1.50mm HDPE
Esta partida comprender la provisin del material y la ejecucin de todos los trabajos
necesarios para la colocacin de la Geomembrana Lisa de espesor de 1.50mm de Polietileno
de Alta Densidad para impermeabilizar suelos con las caractersticas que se indican a
continuacin.
Estos trabajos se ejecutarn de acuerdo a lo indicado en los planos, a las presentes
especificaciones y a lo que ordene el Ingeniero Supervisor.
Tanto la Geomembrana Lisa y su instalacin debern cumplir las normas aceptadas en la
ingeniera.
La Geomembrana que se colocar como revestimiento deber ser de Polietileno de Alta
Densidad (HDPE - High Density Poty-Etileno) con un espesor de 1.50mm (60 mil) y tener
superficie lisa en ambas caras. La materia prima utilizada para la fabricacin de las
geomembranas de HDPE, deben cumplir o exceder con los requerimientos especficos del
proyecto. La geomembrana det)e ser fabricada con material virgen y no presentar ms del 3%
de material reprocesado. La geomembrana deber cumplir con la siguiente especificacin
tcnica:

Propiedad

Unidad

Valor Mnimo
Promedio
Mtodo de Ensayo
por Rollo

Propiedades Fsicas
Espesor

Mm.

1.50

ASTMD5199

Densidad

gr./cc

0.94

ASTM DI 505

Propiedades de Tensin

Esfuerzo de Fluencia

KN/m

25

ASTM D638

Elongacin en Fluencia

13

TIPO IV

Esfuerzo de Rotura

KN/m

43

Elongacin en Rotura

700

Espcimen @
50mm / min.

Resistencia al Rasgado

210

ASTM DI 004

Resistencia al Punzonamiento

480

ASTM D4833

Hrs.

200

ASTM D5397

Contenido de Negro de Humo

2.0-3.0

ASTM DI603

Dispersin de Negro de Humo

Cat

12

ASTM D5596

Min.

100

ASTM D3895

Cmara de Envejecimiento a 85 C
Estndar OIT, % retenido despus de
90 das

55

Resistencia a los Rayos Ultravioleta a


Alta Presin de OIT, % retenido
despus de 1600 hrs.

50

Propiedades de Durabilidad
Resistencia
Agrietamiento

al

esfuerzo

de

Tiempo de Induccin de Oxidacin


(OIT)

ASTM D5721
ASTM D3895
GM11
ASTM D5885

Para garantizar estos valores el material deber contar con Certificacin ISO 9002.
El contratista proceder a la colocacin de la geomembrana cuando las condiciones del terreno
sean aprobadas por el Supervisor. Previa a la instalacin de la geomembrana se deber haber
colocado la cama de apoyo de material seleccionado compactado y la superficie deber estar
libre de materiales punzantes y/o cortantes, como piedras y pedazos de rocas en donde
descansar la geomembrana.
As mismo se tomarn tas medidas de seguridad para la proteccin de las reas de trabajo,
tales como sealizacin a travs de avisos de madera y delimitacin de las reas mediante
cintas de peligro.
Antes del inicio de los trabajos el Contratista deter proporcionar a la Supervisin toda la
informacin tcnica necesaria y los planos de detalle requerido para el anclaje, tendido e
instalacin de la geomembrana, y tipos de soldadura de las uniones.
La colocacin de la geomembrana se llevar a cabo mediante maniobras adecuadas para el
despliegue de los rollos no debiendo extender la geomembrana durante perodos de lluvia,
condiciones de humedad excesiva, vientos fuertes o cualquier otra condicin climtica adversa.
La colocacin de la geomembrana ser realizada en concordancia con las posiciones y niveles
indicados en los planos de diseo y de forma tal de minimizar la formacin de pliegues y/o
dobleces. Durante la colocacin e instalacin de la geomembrana se colocarn sacos de arena
(u otro material disponible de la zona) a lo largo y de forma continua, en todos los bordes del
material colocado en campo, con el fin de evitar levantamiento del material por accin del
viento.
La geomembrana ser colocada en campo de forma tal de asegurar un traslape mnimo de
lOOmm.

Una inspeccin visual ser realizada para el material previo a su instalacin, con el fin de
determinar e identificar posibles defectos de fabricacin o daos producidos durante el
transporte.
El supervisor efectuar exmenes visuales de las uniones a fin de evaluar su integridad. El
supervisor solicitar al Contratista que realice ensayos no destructivos de cmara de vaco y de
aire a presin en todas las uniones soldadas segn lo requiera.
La prueba de presin de aire ser realizada en el canal vaco dejado en la soldadura por fusin
(cua) y se realiza a una presin mnima de 186 kPa (27 psi) hasta una presin mxima de
241 kPa (35 psi) recomendado por el GRI-GM6 para geomembranas de espesor 1.50mm por
un perodo de 3 minutos en este tiempo no deber haber una cada de la presin en el canal de
aire mayor a 20.7 kPa (3 psi).
Las uniones realizadas por extrusin sern revisadas con la cmara de vaco y no deber
tomas ms de 5 segundos por prueba.
Antes de comenzar la instalacin el tcnico deber calibrar su equipo con una muestra la cual
servir como patrn de produccin en campo.
Se proceder con la reparacin de las soldaduras de campo, en los casos en que no cumplan
con los criterios de diseo y control de calidad.
Los defectos que pudieran presentarse en el transcurso de los trabajos de instalacin como
rayones, punzonados, rasgados, ampollas, huecos, etc., sern debidamente marcados,
identificados, reparados y ensayados.
Medicin y pago
El mtodo de medicin es por metro cuadrado de geomembrana lisa de espesor 1.50mm
HDPE colocada y aceptada por la Supervisin; de acuerdo a las medidas indicadas en los
planos.
La cantidad determinada segn el mtodo de medicin ser pagada al precio unitario del
contrato establecida para esta partida.
b. GEOTEXTIL
NO TEJIDO DE AMORTIGUAMIENTO
GEOMEMBRANA 325gr/in2 Valor MARV.

PROTECCIN

DE

Esta partida comprender la provisin del material y la ejecucin de todos los trabajos
necesarios para la colocacin de un manto Geotextil para amortiguamiento y proteccin de
geomembrana con las caractersticas que se indican a continuacin.
Estos trabajos se ejecutarn de acuerdo a lo indicado en los planos, a las presentes
especificaciones y a lo que ordene el ingeniero Supervisor.
Tanto el Geotextil para amortiguamiento y proteccin y su instalacin debern cumplir las
normas aceptadas en la ingeniera.
El geotextil ser un material flexible, no tejido, constituido por filamentos de polipropileno. Este
geotextil deber cumplir con las siguientes caractersticas:

Propiedad

Unidad

Valor Mnimo
Promedio por
Rollo
(M.A.R.V.)

Mtodo de
Ensayo

Propiedades Mecnicas
Resistencia a la Tira Ancha

kN/m

17.50

ASTM D 4595

Elongacin a la Tira Ancha

50

ASTM D 4595

Resistencia a la Tensin Grab.

1310

ASTM D 4632

Elongacin a la Tensin Grab.

50

ASTM D 4632

Resistencia al Punzonamiento

755

ASTM D 4833

Resistencia al Reventado

kPa

3580

ASTM D3786

Resistencia al Rasgado Trapezoidal

485

ASTM D4533

Mm.

0.150

ASTM D 4751

30x10-2

ASTM D4491

325

ASTM D5261

Propiedades Hidrulicas
Tamao de Abertura Aparente
Permeabilidad

cm./seg.

Propiedades Fsicas
Peso por unidad de rea

gr./m^

Espesor

Mm.

2.6

ASTM D5199

70

ASTM D4355

Resistencia a los rayos UV


% Retenido a las 500 hrs.

Para garantizar estos valores el material deber contar con Certificacin ISO 9002 por su
calidad en el proceso de fabricacin.
El almacenamiento de este material deber efectuarse protegindolo convenientemente de la
luz solar directa y de la lluvia.
El sitio de la instalacin debe prepararse mediante la presentacin de la zona de geomembrana
sobre la cual se va a colocar el geotextil. Dicha rea deber estar limpia y libre de elementos
ptreos punzantes que puedan quedar atrapados.
Los puntos de pliegues de geomembrana debern ser adecuadamente acomodados antes de la
colocacin del geotextil.
El geotextil no tejido de polipropileno debe quedar instalado libre de arrugas y dobleces.
El geotextil no tejido debe traslaparse, coserse o unirse segn los requerimientos de los planos.
En caso de escoger uniones traslapadas el ancho del traslape ser de 0.30m.
B traslaf ssWf*#ef borde de geotextil aguas arriba sobre el borde de geotextil aguas abajo y f
borde de geotextil talud arriba sobre el borde de geotextil talud abajo como referencia.
En las curvas el geotextil puede doblarse o cortarse para conformar el alineamiento. El doblez o
el traslape se realiza en la direccin de la construccin y mantenido en su sitio en este caso por
el material de relleno.
Antes de la colocacin de la cobertura de Geoweb sobre el geotextil, ste debe ser revisado por
el Ingeniero Supervisor para asegurar que no haya sido daado durante la instalacin (por
ejemplo, agujeros, rasgaduras, uniones descosidas, etc.).
Si la colocacin de la cobertura de Geoweb causa daos al geotextil, el rea daada debe ser
reparada tal como se indica lineas abajo. Los procedimientos de colocacin deben ser entonces
modificados para eliminar posibles daos adicionales.
Una inspeccin visual ser realizada para el material previo a su instalacin, con el fin de
determinar e identificar posibles defectos de fabricacin o daos producidos durante el
transporte. El supervisor efectuar exmenes visuales de las uniones a fin de evaluar su
integridad.
Los geotextiles daados, como lo haya identificado el Ingeniero Supervisor, debern ser
reparados inmediatamente. Se debe cubrir el rea daada con un parche de geotextil que se
extienda ms all del rea afectada en una cantidad igual al traslape requerido.
iVIedicin y pago

El mtodo de medicin es por metro cuadrado de geotextil no tejido de amortiguamiento de 325


gr./m2 valor MARV, colocado y aceptado por la supervisin, de acuerdo a las medidas
indicadas en los planos.
La cantidad determinada segn el mtodo de medicin ser pagada al precio unitario del
contrato establecido para esta partida.
c.

GEOWEB GW30V4 (e =100mm) TEXTURADO Y PERFORADO.

Esta partida comprender la provisin del material y la ejecucin de todos los trabajos
necesarios para la colocacin del Geoweb GW30V4 espesor 100mm relleno con suelocemento especificado, para lograr el control de erosin del revestimiento de geomembrana
impermeabilizante y a la vez de dar un mayor grado de proteccin contra los daos a la hora de
realizar el mantenimiento sobre dicho material.
Estos trabajos se ejecutarn de acuerdo a lo indicado en los planos, en las especificaciones y a
lo que ordene el ingeniero Supervisor. Tanto el Geoweb y su instalacin debern cumplir las
normas aceptadas en la ingeniera.
El Geoweb est compuesto por fajas laminares de HDPE conectadas entre s mediante
soldadura ultrasnica a todo lo ancho, desfasadas y alineadas perpendicularmente al eje
longitudinal de las fajas. Cuando se estiran, las fajas interconectadas forman las paredes de
una estructura tridimensional flexible de confinamiento celular en la que se puede colocar el
material de relleno especificado.
Las secciones una vez expandidas muestran en su superficie una estructura en forma de
malla tipo panal de abejas, compuesta de un sin nmero de celdas, toda esta rea es adecuada
como para recibir material en un espesor determinado de profundidad.
Al ser llenado con suelo-cemento, la seccin adopta una forma de estrato de soporte flexible y
mediante un adecuado nivel de texturado y perforado de las paredes de las celdas da como
resultado un cuerpo plano con gran resistencia a la abrasin y con capacidad de disipacin de
carga.
El Geoweb que se colocar en la base del embalse deber ser de Polietileno de Alta Densidad
(HOPE - High Density Poly-Ethylene) con un espesor de 1.27mm (50 mil) y tener superficie
texturada en ambas caras y perforada con las caractersticas que se indican a continuacin:

Ihr^pittiad

Unidad

Valor

Mtodo d@ Ensayo r

GW30V40829PT
Perforado y texturado

Tipo de seccin
Ancho de celda nominal

Mm.

320

Medido

Largo de celda nominal

Mm.

287

Medido

Profundidad de celda nominal

Mm.

100

Medido

Espesor de pared

Mm.

1.27mm-5%+10%

ASTM D5199

Espesor pared incluye texturado.

Mm.

1.52mm 0.15mm

ASTM D5199

Densidad

gr./cm3

Estabilizador Negro de Humo


Resistencia al Agrietamiento
exposicin al Medio Ambiente

%
por

horas

0.935 - 0.965
1.5%-2.0%
3000

ASTM D-1505
_
ASTM D1693

Propiedades de Texturado

Indentaciones
romboidales (forma de
diamante).

Densidad superficial
22-31 indentaciones
por m2.

Capacidad del 85% del


ngulo de friccin de la
arena silcea #40 al
interactuar con ella el
texturado y perforado
segn Ensayo de Corte
Directo
ASTMD5321.

Tamao de perforaciones

Tipo de unin

mm

10 mm separacin en
hileras de 19mm entre
centros.

Soldadura Ultrasnica

Las perforaciones
restarn 16% 1 % del
rea de la pared de la
celda.
_

Resistencia de las uniones a corto


plazo.

1000

GL-86-19 U.S. Army


Corps of Engineers.
Apndice A

Resistencia Mnima de unin de


banda de 102mm de ancho color
negro, a SOdias

712

Temperatura de
ambiente segn ASTM
E41

Accesorios
Grapas de unin galvanizadas

V2

Debido a lo elaborado del proceso de manufactura el Geoweb deber contar con certificacin
ISO 9002 para garantizar un excelente estndar de fabricacin.
El contratista proceder a la colocacin del Geoweb cuando las condiciones de la zona de
aplicacin sean aprobadas por el Supervisor. La superficie de instalacin estar libre de
materiales punzantes y/o cortantes, como piedras y pedazos de rocas donde descansar el
Geoweb.
As mismo se tomarn las medidas de seguridad para la proteccin de las reas de trabajo,
tales como sealizacin a travs de avisos de madera y delimitacin de las reas mediante
cintiai.de peligro.
. , , . . - - . - . - "*"; ""
Antes del inicio de los trabajos el Contratista deber proporcionar a la Supervisin toda la
informacin tcnica necesaria y los planos de detalle requerido para el anclaje, tendido e
instalacin del Geoweb, tipos de accesorios y uniones.
Previa a la colocacin del Geoweb se colocar el geotextil no tejido de amortiguamiento y
proteccin sobre la geomembrana.
La colocacin del Geoweb se inicia con el armado de cada seccin con la ayuda de
expansores temporales, de grapas galvanizadas proporcionadas para tal fin y el uso de
engrapadoras neumticas como equipo porttil de instalacin.
Asegurarse de lastrar adecuadamente el Geoweb antes de verter el suelo-cemento.
Se puede caminar sobre el Geoweb colocando tablas para tal fin cuando est vaco.
Una vez vertido el suelo-cemento dentro de cada celda se deber asegurar el llenado y el
acabado con la rugosidad requerida con el uso de rastrillos y frotachos. Luego se proceder al
curado para la puesta en operacin.
Es de extrema importancia notar que el patrn de texturado en las dos caras y el patrn de
perforado de cada pared de celda garantiza que el suelo-cemento dentro de cada celda no
pueda salir y genera un mecanismo de trabazn y resistencia al corte contra la extraccin del

mdulo de suelo-cemento. El ingeniero Supervisor deber verificar que el


proporcionado cumpla con esta caracterstica.

material

Una inspeccin visual ser realizada para el material previo a su instalacin, con el fin de
determinar e identificar posibles defectos de fabricacin o daos producidos durante el
transporte.
Se proceder con la reparacin de las uniones de campo, en los casos en que no cumplan con
los criterios de diseo y control de calidad.
Los defectos que pudieran presentarse en el transcurso de los trabajos de instalacin como
rayones, punzonadas, rasgaduras, etc., sern debidamente marcados, identificados y
reparados con la ayuda del sistema de engrapado neumtico.
Medicin y pago
El mtodo de medicin es por metro cuadrado de Geoweb GW30V4 e =1000mm Texturado y
Perforado, colocado y aceptado por la Supervisin de acuerdo a las medidas indicadas en los
planos.
La cantidad determinada segn el mtodo de medicin ser pagada al precio unitario del
contrato establecida para esta partida.

1.11.0 Vlvulas
Las vlvulas sern de 16" de dimetro, con bridas de acero empotradas en el concreto, llevarn
un aditamento que evitar que el agua eleve su nivel en el pozo de maniobras
Medicin y pago
Su medida es la unidad.
El pago se realizar contra valorizacin mensual y de acuerdo a los reportes diarios respectivos
1.12.0 Escaleras
Las escaleras debern ser de acero galvanizado al fuego y tener un ancho de 40 cm. El
espaciamiento de los escalones no ser mayor de 30 cm. y el dimetro de los mismos no
menor de 15 mm. Se deber fijar la escalera en el concreto mediante anclajes apropiados. El
distanciamiento de estos anclajes no deber sobrepasar 1 m
En caso que sea necesario usar soldaduras, despus de la galvanizacin, las zonas
influenciadas debern ser pintadas con dos manos de pintura anticorrosiva a base de xido de
zinc y con dos manos de pintura a base de resina artificial, rica en polvo de zinc.
La distancia mnima desde el piso hasta el ltimo escaln, no deber sobrepasar 30 cm. y la
distancia mnima desde el borde superior de la estructura hasta el primer escaln, no ser
mayor de 15 cm.
Medicin y pago
Se medir en metros lineales, dejando constancia en los reportes diarios
Los pagos se realizarn contra valorizaciones mensuales y de acuerdo a los reportes diarios
respectivos