RK1412T ROTOCRUSHER

RK1412T ROTOCRUSHER

March 2005 Issue

RK1412T ROTOCRUSHER

Operation Manual

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

CONTENTS

March 2005 Issue

TABLE OF CONTENTS

SECTION 1:
1.0
1.1
1.2
1.3
1.4
1.5

EU directive
Declaration of conformity
Machine specification details
Foreword/reservation of rights
Familiarisation
General specification

SECTION 2:
2.0
2.1
2.2
2.3
2.4

SAFETY

Safety introduction
Safety
Position of emergency stops
Emergency situation
Lockout procedure

SECTION 3:
3.0
3.1
3.2

INTRODUCTION

TRACKING INSTRUCTIONS

Tracking familiarisation
Starting the engine
Tracking using the dog lead

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

CONTENTS

March 2005 Issue

TABLE OF CONTENTS

SECTION 4:
4.0
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
4.11
4.12
4.13
4.14

Set-up procedure safety


Installation
Loading & off-loading
Prior to starting the engine
Engine starting procedure
Tracking familiarisation
Tracking the machine using the dog lead
Positioning
Preparing for initial start-up
Product conveyor unfolding
Hopper extensions
Feed-in chute
Hoist
Crusher settings
Dust suppression

SECTION 5:
5.0
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
5.9
5.10
5.11

SET-UP PROCEDURE

OPERATION

Operation safety
Lockout procedure
General information
Pre-operation check list
Engine starting procedure
Setting engine revs
ESM main unit
Engaging clutch
Product conveyor starting
Feed conveyor starting
Machine start-up sequence
Machine shut-down sequence

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

CONTENTS

March 2005 Issue

TABLE OF CONTENTS

SECTION 6:
6.0
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10
6.11
6.12
6.13
6.14
6.15
6.16
6.17
6.18
6.19
6.20
6.21
6.22
6.23
6.24
6.25
6.26
6.27

MAINTENANCE

General information
Safety information
Opening the RK1412T rotocrusher unit
Replacing or turning the hammers
Setting the crusher gap
Replacing or turning of impact bars
Manual clutch
Hydraulic clutch
Hydraulic system
Tracks
Hydraulic fluids
Oil tank, pipes & fittings
Diesel engine
Feed conveyor & product conveyor reduction gears
Bearings & lubrication
General inspection
Routine maintenance schedule
Daily maintenance
Weekly maintenance
Six monthly maintenance
Belt tracking
V-belt tensioning
Recommended lubricants
Automatic greasing system
Autolube maintenance
Autolube troubleshooting
Recommended fluids
Fault finding

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

CONTENTS

March 2005 Issue

TABLE OF CONTENTS

SECTION 7:
7.0
7.1
7.2

Preparing for transport safety


Lockout procedure
Preparing for transport

SECTION 8:
8.0

PREPARING FOR TRANSPORT

WARRANTY

Warranty

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

RK1412T ROTOCRUSHER

March 2005 Issue

RK1412T ROTOCRUSHER

Section 1
INTRODUCTION

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

INTRODUCTION

Section 1.0

1.0 EU DIRECTIVE

The TESAB RK1412T ROTOCRUSHER complies with the EU directive 89/392/


EEC and all relevant amendments.

READ THIS MANUAL CAREFULLY AND LEARN HOW TO OPERATE AND SERVICE YOUR MACHINE CORRECTLY.

FAILURE TO DO SO COULD RESULT IN PERSONAL INJURY OR EQUIPMENT


DAMAGE.

REMEMBER:

GOOD HOUSEKEEPING PAYS UNTOLD DIVIDENDS IN INCREASED PRODUCTION AND EXTENDED PLANT LIFE!

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

INTRODUCTION

Section 1.1

1.1 DECLARATION OF CONFORMITY


We hereby declare that the following machinery complies with the Essential Health
and Safety requirements of the EU Machinery Directive 89/392/EEC as amended
by 91/368/EEC, 93/44/EEC and 93/68/EEC.
Manufactured by:

Tesab Engineering Ltd.


7B Gortrush Industrial Estate
Omagh
Co. Tyrone
Northern Ireland BT78 5EJ

Machine description:

Mobile Crushing Plant

Model:

RK1412T ROTOCRUSHER

Serial No:

This machinery has been designed and manufactured in accordance with all the
relevant ESRs of the EU Machinery Directive.
A technical construction file for this machinery is retained at the following address:
Tesab Engineering Ltd.
7B Gortrush Industrial Estate
Omagh
Co. Tyrone
Northern Ireland BT78 5EJ

Signed:
Name:

Brian A. Mills

Position:

Project Manager

Date:
Being the nominated representative of TESAB ENGINEERING LTD.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

INTRODUCTION

Section 1.2

1.2 MACHINE SPECIFICATION DETAILS

MACHINE SERIAL NUMBER:

ENGINE TYPE:

ENGINE SERIAL NUMBER:

CLUTCH TYPE:

CLUTCH SERIAL NUMBER:

DISPATCH DATE:

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

INTRODUCTION

Section 1.3

1.3 FOREWORD/RESERVATION OF RIGHTS

The TESAB RK1412T ROTOCRUSHER is a robust skilfully engineered piece of


equipment incorporating diesel, hydraulic and mechanical components of the highest quality.

In the interest of continuous plant reliability, it is essential that the machine is


maintained with meticulous care and attention. This operation and maintenance
manual has been produced to assist the user to obtain the maximum output from
the machine and to trace and remedy faults, should they arise. Failure to do so
could result in personal injury or equipment damage. We recommend that the
user should pay particular attention to the maintenance and safety sections of this
manual.

Consider this manual a permanent part of your machine. Keep a copy of this
manual at the operational site.

This operation and maintenance manual must not be copied, reproduced or


loaned to a third party without written consent of TESAB ENGINEERING
LTD.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

INTRODUCTION

Section 1.4

1.4 FAMILIARISATION
The following conventions have been used throughout this operation and maintenance manual when describing component locations:
Rear

feed conveyor end of machine

Front

product conveyor end of machine

Right and left hand sides -

as viewed from the rear of the machine

REAR

RIGHT

LEFT

FRONT
Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

INTRODUCTION

Section 1.4

1.4 FAMILIARISATION cont.

1.

Hopper

2.

Feed Conveyor

3.

Crusher Unit

4.

Tracks

5.

Chassis

6.

Drive System

7.

Product Conveyor

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

INTRODUCTION

Section 1.5

1.5 GENERAL SPECIFICATION

Chassis
The chassis is constructed of heavy-duty profiles and welded steel plates ribbed
and stiffened to withstand all operational and travelling stresses. The chassis is
mounted on 3.75m (12-4") centre heavy-duty tracks, with dog lead operational
facility.
Belt Feeder
The belt feeder into the crusher is fitted with a 1200mm wide heavy duty 4 ply belt
which runs on full length 4 roll impact roller sets. The conveyor is driven through
a flexible coupling and high torque reduction gear at the rubber lagged top end
drum. The heavy duty hopper mounted on top of the conveyor is fully lined with
10mm wear plates and is ribbed and stiffened to withstand impact from the feed
source. Full length replaceable 15mm skirting is fitted to the hopper to prevent
any spillage and smooth material flow. The feed-in canopy is fully lined and can
be easily accessed through a hinged hood were any essential maintenance can
be carried out.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

INTRODUCTION

Section 1.5

1.5 GENERAL SPECIFICATION cont.


Crusher unit
The RK1412 crusher unit is fitted with four hammers, 1000mm (39.375") wide. It
has a feed opening of 1020 x 650mm (40" x 25.5") and a rotor diameter of 1200mm
(47"). There is one adjustable apron and a final bar carrier which can be adjusted
from 4 to 80mm (3/16" to 3") depending on material feed size and reduction required. Both the apron and the bar carrier are hydraulically adjustable as standard. It is driven through 8 V-Belts and the chamber can be easily accessed by
hydraulic control lever. There is a deadbox fitted under the crusher to allow easy
flow of material onto the product conveyor.
Product Conveyor
The product conveyor is fitted with a 1000mm (40") heavy duty 4 ply belt and runs
on heavy duty troughing rollers, impact bars are fitted under the crusher to give
the belt full support at the crusher exit. The conveyor is driven hydraulically through
a flexible coupling and high torque reduction gear at the rubber lagged top end
drum.
Power Unit
The engine is an electronic Caterpillar C9 (300HP at 1800rpm) Power Pack and
the crusher is driven through a heavy duty Twin Disc IBF 314 (3 plate) PTO. The
pulley on the clutch can be easily changed to alter the rotor speed or if finer tuning
is required the engine speed can vary between 1700 and 2200rpm. The tracks,
conveyors and rams are all driven hydraulically through pumps fitted to the engines auxiliary drives.
Catwalks and Guards
All relevant catwalks, handrails and guards are fitted to this machine allowing
access to all relevant maintenance points. Emergency stops are fitted to all necessary points. The machine carries the European CE mark and therefore complies with all Essential Safety Requirements.
Hydraulic Tank Capacity
500 litres (110 gallons 132 US gallons)

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

INTRODUCTION

Section 1.5

1.5 GENERAL SPECIFICATION cont.


Diesel Tank Capacity
1150 litres (255 gallons 306 US gallons)
Transport Dimensions
3.40m high x 14.40m long x 2.9m wide
(11-2" high x 47-3" long x 9-6" wide)
Machine Weight
43,000 kgs (94,800 lbs)
Options

19 KPTO hydraulic clutch


Metal detector
Hopper extension to suit shovel load
Scales
Conveyor cover
Self cleaning magnet

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

RK1412T ROTOCRUSHER

March 2005 Issue

RK1412T ROTOCRUSHER

Section 2
SAFETY

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SAFETY

Section 2.0

2.0 SAFETY INTRODUCTION


In this next section you will find the safety sign conventions used throughout this
manual and on the machine.
Please read this section carefully and become familiar with the signs used.
These signs are used frequently throughout this manual to indicate any potential
warning or danger when operating this machine.

DANGER

ELECTRICAL HAZARD
1.
2.

3.

DANGER

Electrical Hazard. Risk of serious injury or


death.
Never work on the electrical system of any
equipment unless you are fully familiar with
system details.
Work on the electrical system must be
carried out by a qualified electrician.

NIP HAZARD
1.
2.
3.

DANGER

Nip Hazard. Do not reach into an


unguarded machine.
In-running nip points can cause
serious injury or death.
Switch off and lockout machine
before opening or removing guard doors.

FALL HAZARD
1.
2.
3.

Fall Hazard. Do not climb onto moving or


working machinery.
Switch off and lockout machine before
attempting maintenance on the machine.
Always use a suitable lifting platform before
attempting maintenance above 2m (6-6).

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SAFETY

WARNING

Section 2.0

CRUSH HAZARD
1.
2.

3.

WARNING

Crush Hazard. Beware of dangerous hand


and foot crush points.
Do not use any body parts e.g. hands or
feet to check hole alignment or support
machinery.
Always use pins and/or mechanical
supports provided.

PROTECTION
1.
2.
3.

WARNING

Loose or baggy clothing can get caught in


running machinery.
Always wear correct fitting (EN/ANSI
approved) protective clothing.
Protective clothing includes Hard Hat,
Safety Clothing, Ear Defenders, Overalls,
Steel Toed Boots, and a High Visibility Vest.

CONSULT MANUAL
1.
2.
3.

WARNING

Read and understand the operators manual


before you work at this machine.
Study the different safety signs on this
machine.
Only qualified and trained personnel should
attempt to work at this machine.

LOCKOUT
1.

2.
3.

When performing maintenance or


adjustment to this machine always switch
off engine and remove the ignition key. (if
electric isolate power supply at source).
Keep ignition key on person during
maintenance.
Never work alone.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SAFETY

WARNING

HIGH PRESSURE
1.

2.
3.

CAUTION

WARNING
2.

WARNING

Fall rock hazard. Do not walk near material


discharge areas. You are at risk of serious
injury or death.
Wear a Hard Hat at all times when working
in the vicinity of the machine.

BATTERY HAZARD
1.

2.

BATTERY

Burn or Heat Hazard. Beware of hot sur


faces at engine and exhaust areas.

HEAD PROTECTION
1.

EXPLOSIVE

Beware of escaping hydraulic oil. High


pressure hydraulic oil can penetrate the
skin causing serious injuries.
Always relieve pressure from the hydraulic
system before attempting maintenance.
If oil is injected under the skin, it must be
surgically removed or gangrene will result.

HOT SURFACE
1.

ACID

Section 2.0

Battery Hazard. Battery electrolyte contains


acid and can cause serious injury. Avoid
any contact.
Batteries give off flammable fumes which
can explode. Avoid the formation of sparks
and naked lights in the vicinity of the
batteries. Do not smoke when working in
this area.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SAFETY

Section 2.1

2.1 SAFETY
Operators should be trained in the
correct and safe use of all equipment including the studying of this
manual, failure to do so could result in serious injury.
Any work on and with the machine
must be executed by reliable, trained
and authorised personnel only. Statutory minimum age limits must be observed.
Work on the electrical system and
equipment of the machine must be
carried out only by a skilled electrician or by instructed persons under
the supervision and guidance of a
skilled electrician and in accordance with electrical engineering
rules and regulations.
Work on the hydraulic system must be
carried out by personnel with special
knowledge and experience of hydraulic equipment.
There are several specific signs on
your machine. Please take time to
familiarise yourself with the safety
signs and the operation and maintenance manual.
See to it that safety instructions and
warnings attached to the machine are
always complete and completely legible.

Replace unreadable or missing labels


with new ones before operating the
machine.
Wear a hard hat, protective glasses,
hearing protection, close fitting
overalls, steel toed boots and high
visibility vest (E.N. / A.N.S.I. approved) as required by job conditions.
Do not wear loose clothing or jewellery and tie back long hair that can
catch on controls or moving parts.
Make certain all protective guards
and covers are secured and in place
at all times. All guards should be
in place whenever maintenance is
not being performed. Never disable
or remove any safety mechanism or
guard.
Where possible when working close to
engines or machinery, only do so when
they are stopped. If this is not practicable, remember to keep tools, test
equipment and all other parts of your
body well away from the moving parts.

Understand service procedure before doing work. Keep all areas


clean and dry.

Keep warning and instruction labels


clean.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SAFETY

Section 2.1

2.1 SAFETY cont.


Never lubricate, clean, service or
adjust machine while it is moving.
Keep hands, feet and clothing clear
of power driven parts and nippoints. Disengage all power and
operate controls to relieve pressure.
Stop the engine. Implement lockout procedure. Allow machine to
cool.

Take the necessary precautions to


ensure that the machine is used
only when in a safe and reliable
state.

Keep all parts in good condition and


properly installed. Fix any damage immediately and replace any broken
parts with genuine TESAB parts. Remove any built up of grease, oil or debris.

Do not attempt repairs or adjustments to the machine while it is running.

For the execution of maintenance


work, tools and workshop equipment adapted to the task on hand
are absolutely indispensable.
Isolate all electrical supplies before
carrying out repairs or maintenance,
and should only be carried out by qualified personnel.
Stay clear of all rotating and moving parts. Do not attempt to clear
obstructions or debris by hand before isolating the equipment by implementing the lockout procedure.
In running nip points can cause serious injury even death. Do not reach
into an unguarded machine.

In the event of malfunctions or operational difficulty stop the machine immediately and lockout. Have any defects rectified immediately.

Relieve all pressure in hydraulic systems before any lines, fittings or related
items are disconnected or removed.
Hydraulic lines must be laid and fitted properly. Ensure that no connections are interchanged. The fittings
lengths and quality of the hoses
must comply with the technical requirements.
Always practice extreme cleanliness
when servicing hydraulic components.
Hydraulic fluid under pressure is
very dangerous, it can penetrate the
skin causing serious injury.
If fluid is injected under the skin it must
be surgically removed immediately.

Switch off engine and lockout machine before opening or removing


guards or doors.
Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SAFETY

Section 2.1

2.1 SAFETY cont.


Always use a piece of cardboard to
check for leaks. Do not use your
hand.
Use caution while removing filler caps,
filters, drain plugs or hydraulic fittings,
hold a rag over the connection to prevent being sprayed or splashed by liquids.
Diesel engine exhaust emissions
contain products of combustion
which may be harmful to your
health. Ensure the machine is in a
well ventilated area, if the machine
is operating in an enclosed area
vent the emissions elsewhere.
Observe the regulations in force at that
site.
Dust found on the machine or produced during operation should be
removed by extraction not blowing.
Disconnect the battery leads and tape
the leads to prevent accidental start up
when performing maintenance or servicing.
Battery electrolyte contains acid
and can cause serious injury. Avoid
contact with skin and eyes. Use
gloves and protective glasses.

Batteries give off flammable fumes


which can explode. Ensure that
there is proper ventilation. Avoid
the formation of sparks and naked
lights in the vicinity of the batteries.
Do not smoke when working in this
area.
Fires may result from lubricating oil or
fuel spraying on hot surfaces.
Avoid smoking whilst refuelling or
in the refuelling area.
Do not climb on conveyor belts or stand
on components that cannot support
your weight, always use ladders, steps
and walkways when mounting and dismounting machine.
Only use emergency stop buttons
in an emergency situation or during
safety checks.
Do not use fingers to check hole alignments as this can cause serious injury.
Do not stand beneath equipment as
it is being raised or lowered into position.
Never check the tension of V-belts
whilst machine is running.
Whenever maintenance and servicing is being carried out a minimum
of two persons must be present at
all times.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SAFETY

Section 2.1

2.1 SAFETY cont.


The preparations to transport the
machine should be supervised by a
minimum of two persons.
TESAB ENGINEERING LTD. have
provided walkways and platforms to
enable operatives to carry out daily inspection and maintenance from a position of safety. More irregular maintenance tasks will necessitate persons
to work on the machine at a height
were fall hazards exist. (It is the responsibility of the operators management to provide the necessary safe
working access).
Falling from and/or onto a TESAB
machine can cause serious injury
or even death. Do not climb on the
machine and never use machine
parts as a climbing aid.
Always use an E.N./A.N.S.I. approved
harness if reaching any points 2m (7ft)
or more above ground level.
Keep all handles, steps, handrails,
walkways and ladders free from dirt,
oil, snow and ice.
Observe the adjusting, maintenance
and intervals set out in these operating instructions, except where warning
light or indicator calls for immediate
action or adverse conditions require
more frequent servicing.

When the machine is completely shut


down for maintenance or repair work,
it must be secured against inadvertent starting by implementing the lockout procedure (see lockout section for
details).
Never allow anyone to remove large
or heavy components without adequate lifting tackle.
To avoid the risk of accidents, individual parts and large assemblies being removed for replacement purposes
should be carefully attached to the lifting tackle and secured.
The fastening of loads and the instructing of crane operators should
be entrusted to experienced personnel only.
Any safety devices removed for setup,
maintenance or repair must be fitted
and checked immediately upon completion of the work.
Before activating the machine in any
manner, or energising the electrical
and/or hydraulic controls, make certain that no person or obstruction
is standing in or in the immediate
vicinity of the machine.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SAFETY

Section 2.1

2.1 SAFETY cont.


Always be aware that fully automatic machinery with moving parts
may move at any time without warning. Never assume the machine to
be safe because of the lack of movement.
Never alter any equipment or parts of
any equipment which may effect safety
without consulting and gaining permission from TESAB ENGINEERING
LTD.
Improperly disposing of waste can
threaten the environment and ecology. Potentially harmful waste used
with the TESAB machine include oil,
fuel, coolant, filters and batteries.
Use leakproof containers when draining fluids. Do not use food or beverage containers that may mislead
someone into drinking from them.

Do not open any door of the crusher


until the rotor has stopped completely and the control power have
been broken, in the case of the diesel powered unit the clutch is disengaged, the engine has stopped
and the ignition key has been removed.
Never start the machine until all doors
on the crusher are closed and locked.
When removing hammers and impact plates always use protective
goggles.
When the crusher chamber has been
opened ensure that the chamber is
pinned open.
When working at the inside of the
crusher lock the rotor inserting a
locating bar.

Do not pour the fluids onto the


ground, down a drain or into any
water source.
Ensure that all consumables and replaced parts are disposed of correctly
and with the minimum environmental
impact.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SAFETY

Section 2.2

1 & 2.
LHS & RHS

5.
DOG LEAD

3 & 4.
LHS & RHS

2.2 POSITION OF EMERGENCY STOPS

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SAFETY

2.3

Section 2.3

EMERGENCY SITUATION

IMPORTANT:

In the case of an incident of any part failure on the machine the


following procedure must be followed.

Engage the nearest emergency stop.

Switch off engine and remove the ignition key.

Implement the lockout procedure (see Section 2.4).

Only when the machine is fully switched off and the crusher rotor has completely stopped revolving (approximately 120 seconds), should an attempt
be made to solve the problem.

It is always important to never work alone.

2.3.1

Restart after Emergency Stop

Ensure the problem has been rectified.

Ensure that all personnel are clear of the machine.

Ensure that all guards and relevant safety devices have been fitted/refitted
correctly.

Release all emergency stops.

Restart the machine (see section 4.4)

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SAFETY

2.4

Section 2.4

LOCKOUT PROCEDURE

WARNING
When carrying out maintenance, repairs or adjustment to the TESAB RK1412T
ROTOCRUSHER the following lockout procedure MUST be followed.

Deactivate all controls, switch off engine and remove key.


Activate, or, if fitted, lock one emergency stop button.
Relieve all pressures in the hydraulic system.

IMPORTANT:

The person carrying out the work on the machine must keep the
keys with them at all times.
Ensure the isolator switch is in the OFF position prior to welding.

Isolator in OFF position Isolator in ON position

Engine canopy

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

RK1412T ROTOCRUSHER

March 2005 Issue

RK1412T ROTOCRUSHER

Section 3
TRACKING INSTRUCTIONS

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

TRACKING INSTRUCTIONS

Section 3.0

3.0 TRACKING FAMILIARISATION


READ THIS SECTION CAREFULLY BEFORE OPERATING TRACKS ON YOUR
TESAB RK1412T ROTOCRUSHER.
FAILURE TO DO SO COULD RESULT IN PERSONAL INJURY OR EQUIPMENT
DAMAGE.

1.

Main engine starter panel

2.

Dog lead controller

3.

Emergency stop

4.

Fast track console

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

TRACKING INSTRUCTIONS

3.0

Section 3.0

TRACKING FAMILIARISATION cont.

THIS RK1412T ROTOCRUSHER IS FITTED WITH TWO MANUAL VALVES FOR


CONTROLLING THE CRUSHING AND TRACKING OPERATIONS. PLEASE
READ THE FOLLOWING CAREFULLY SO AS TO UNDERSTAND THE OPERATION OF THE SYSTEM.
When tracking the machine please ensure the both levers inside the fast track
console are located in the TRACK position prior to starting the engine (see picture
below).

Both levers in
TRACK position

WARNING

Do not activate levers while engine is running

Always ensure both valves are in the TRACK or CRUSH position prior to
starting the engine

Never operate the machine with either valve in the neutral (vertical)
position

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

TRACKING INSTRUCTIONS

3.1

Section 3.1

STARTING THE ENGINE

NOTE:

Check that there is a clear area around the machine and that all control
levers including the clutch lever are in the neutral position.

Engine control panel

Position 1
A

Position 3

Check that no emergency stops are in the on position, if an emergency


stop is in the on position lamp A (green) will NOT be illuminated.

Turn the starter ignition key B to position 1 which is the ON position.

Turn the key to position 3 and hold, the start delay siren will sound for
approximately 7 seconds then the engine will crank and start.

Release the key when the engine has started.

NOTE:

Do not activate the starter for more than 20 seconds at a time.


You will protect the batteries if you wait one minute between each starting attempt.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

TRACKING INSTRUCTIONS

3.1

Section 3.1

STARTING THE ENGINE cont.


Set the engine revs to approximately 1200rpm. This can be done by adjusting
the throttle scroll button (pushing button up increases engine revs, pushing
button down decreases engine revs).

- revs

+ revs
Increase revs

Decrease revs

Revs displayed on LCD

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

TRACKING INSTRUCTIONS

3.2

Section 3.2

TRACKING THE MACHINE USING THE DOG LEAD

The following procedure is to be carried out to allow the operator to track the
machine using the dog lead.

Ensure that the control switch (E) is in the DOG LEAD position and the Track
Switch on the main engine starter panel is in the ON position prior to
operating the dog lead.

Track switch

Start the engine as per previous instructions (it is important that the emergency stop status is checked before starting the engine).

NOTE:

For safety reasons there is an emergency stop button (F) fitted to the
dog lead.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

TRACKING INSTRUCTIONS

3.2

Section 3.2

TRACKING THE MACHINE USING THE DOG LEAD cont.

IMPORTANT:

Once the machine has been tracked into position, remove the
dog lead and place in a secure place (ideally the works office or
shovel cab)

To track the machine, move the relevant toggle buttons on the dog lead
control (as shown above). For safety reasons Tesab have fitted a siren and
orange beacon to make other persons in the vicinity aware that the machine
is going to be, or is being, moved. It is always important for the operator to
be aware of his surroundings.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

RK1412T ROTOCRUSHER

March 2005 Issue

RK1412T ROTOCRUSHER

Section 4
SET-UP PROCEDURE

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SET-UP PROCEDURE

Section 4.0

4.0 SET-UP PROCEDURE SAFETY


Please read this section carefully and become familiar with the signs used.
These signs are used frequently throughout this manual to indicate any potential
warning or danger when operating this machine.

DANGER

ELECTRICAL HAZARD
1.
2.

3.

DANGER

Electrical Hazard. Risk of serious injury or


death.
Never work on the electrical system of any
equipment unless you are fully familiar with
system details.
Work on the electrical system must be
carried out by a qualified electrician.

NIP HAZARD
1.
2.
3.

DANGER

Nip Hazard. Do not reach into an


unguarded machine.
In-running nip points can cause
serious injury or death.
Switch off and lockout machine
before opening or removing guard doors.

FALL HAZARD
1.
2.
3.

Fall Hazard. Do not climb onto moving or


working machinery.
Switch off and lockout machine before
attempting maintenance on the machine.
Always use a suitable lifting platform before
attempting maintenance above 2m (6-6).

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SET-UP PROCEDURE

WARNING

Section 4.0

CRUSH HAZARD
1.
2.

3.

WARNING

Crush Hazard. Beware of dangerous hand


and foot crush points.
Do not use any body parts e.g. hands or
feet to check hole alignment or support
machinery.
Always use pins and/or mechanical
supports provided.

PROTECTION
1.
2.
3.

WARNING

Loose or baggy clothing can get caught in


running machinery.
Always wear correct fitting (EN/ANSI
approved) protective clothing.
Protective clothing includes Hard Hat,
Safety Clothing, Ear Defenders, Overalls,
Steel Toed Boots, and a High Visibility Vest.

CONSULT MANUAL
1.
2.
3.

WARNING

Read and understand the operators manual


before you work at this machine.
Study the different safety signs on this
machine.
Only qualified and trained personnel should
attempt to work at this machine.

LOCKOUT
1.

2.
3.

When performing maintenance or


adjustment to this machine always switch
off engine and remove the ignition key. (if
electric isolate power supply at source).
Keep ignition key on person during
maintenance.
Never work alone.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SET-UP PROCEDURE

WARNING

HIGH PRESSURE
1.

2.
3.

CAUTION

WARNING
2.

WARNING

Fall rock hazard. Do not walk near material


discharge areas. You are at risk of serious
injury or death.
Wear a Hard Hat at all times when working
in the vicinity of the machine.

BATTERY HAZARD
1.

2.

BATTERY

Burn or Heat Hazard. Beware of hot sur


faces at engine and exhaust areas.

HEAD PROTECTION
1.

EXPLOSIVE

Beware of escaping hydraulic oil. High


pressure hydraulic oil can penetrate the
skin causing serious injuries.
Always relieve pressure from the hydraulic
system before attempting maintenance.
If oil is injected under the skin, it must be
surgically removed or gangrene will result.

HOT SURFACE
1.

ACID

Section 4.0

Battery Hazard. Battery electrolyte contains


acid and can cause serious injury. Avoid
any contact.
Batteries give off flammable fumes which
can explode. Avoid the formation of sparks
and naked lights in the vicinity of the
batteries. Do not smoke when working in
this area.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SET-UP PROCEDURE

4.1

Section 4.1

INSTALLATION

The following section will take you step by step through the installation of your
RK1412T ROTOCRUSHER.
NOTE:

Due to different transport and shipping regulations throughout the world


the RK1412T ROTOCRUSHER will be delivered in different packing
arrangements. For the purposes of this manual it will be considered
that the machine is delivered in its most unassembled configuration
therefore some of the installation sections may not be applicable. If
this is the case ignore that particular instruction/section and proceed to
next section.

Before installing the RK1412T ROTOCRUSHER ensure that you have read all
sections of this manual in order to familiarise yourself with the machine and its
function, paying particular attention to SECTION 2: SAFETY.
Installation, operation, and maintenance of the RK1412T ROTOCRUSHER must
be carried out by reliable, authorised personnel only, statutory minimum age limits
must be observed.
TESAB ENGINEERING LTD. recommend that the installation of the RK1412T
ROTOCRUSHER is carried out by a recommended TESAB dealer and/or service
department.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SET-UP PROCEDURE

4.2

Section 4.2

LOADING AND OFF LOADING

Loading and off loading the RK1412T should be carried out by trained and experienced personnel only. They should first read the operation manual paying particular attention to the safety and installation sections.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SET-UP PROCEDURE

4.3

Section 4.3

PRIOR TO STARTING THE ENGINE

THIS RK1412T ROTOCRUSHER IS FITTED WITH TWO MANUAL VALVES FOR


CONTROLLING THE CRUSHING AND TRACKING OPERATIONS. PLEASE
READ THE FOLLOWING CAREFULLY SO AS TO UNDERSTAND THE OPERATION OF THE SYSTEM.
Before starting the engine please ensure that the two diverter valves shown in the
picture below are in one of the following positions:

TRACK: When the machine has to be moved


CRUSH: When the machine is in its working position and ready to work

Both levers in
TRACK position

WARNING

Do not activate levers while engine is running

Always ensure both valves are in the TRACK or CRUSH position prior to
starting the engine

Never operate the machine with either valve in the neutral (vertical)
position

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SET-UP PROCEDURE

4.3

Section 4.3

PRIOR TO STARTING THE ENGINE cont.

The engine starter panel is located at the engine catwalk as highlighted below.

This area can be accessed by lowering the access steps (A). It is important, for
safety reasons, that when these steps have been unfolded they are locked into
position using the clamps at both sides (move bolt from point B to point C). This
is illustrated below.

C
Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SET-UP PROCEDURE

4.4

Section 4.4

ENGINE STARTING PROCEDURE

NOTE:

Before starting the engine check diesel and engine oil levels.

Engine control panel


Throttle scroll
button

Position 1

Position 3

Check that no emergency stops are in the on position, if an emergency stop


is in the on position lamp A (green) will NOT be illuminated.

Turn the starter ignition key C to position 1 which is the ON position.

Turn the key to position 3 and hold, the start delay siren will sound for
approximately 7 seconds then the engine will crank and start.

Release the key when the engine has started.

NOTE:

Do not activate the starter for more than 20 seconds at a time.


You will protect the batteries if you wait one minute between each starting attempt.

Set the engine revs to approximately 1200 rpm. This can be done by adjusting the throttle scroll button (pushing button up increases engine revs,
pushing button down decreases engine revs).
Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SET-UP PROCEDURE

4.4

Section 4.4

ENGINE STARTING PROCEDURE cont.

IMPORTANT:

Before tracking we recommend that you fold up the engine area


access steps in order to prevent them from fouling unneccessarily.

WARNING
ENSURE MACHINE IS CLEAR OF ALL OVER HEAD CABLES

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SET-UP PROCEDURE

Section 4.5

4.5 TRACKING FAMILIARISATION


READ THIS SECTION CAREFULLY BEFORE OPERATING TRACKS ON YOUR
TESAB RK1412T ROTOCRUSHER.
FAILURE TO DO SO COULD RESULT IN PERSONAL INJURY OR EQUIPMENT
DAMAGE.

1.

Main engine starter panel

2.

Dog lead controller

3.

Emergency stop

4.

Fast track console

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SET-UP PROCEDURE

4.5

Section 4.5

TRACKING FAMILIARISATION cont.

THIS RK1412T ROTOCRUSHER IS FITTED WITH TWO MANUAL VALVES FOR


CONTROLLING THE CRUSHING AND TRACKING OPERATIONS. PLEASE
READ THE FOLLOWING CAREFULLY SO AS TO UNDERSTAND THE OPERATION OF THE SYSTEM.
When tracking the machine please ensure the both levers inside the fast track
console are located in the TRACK position prior to starting the engine (see picture
below).

Both levers in
TRACK position

WARNING

Do not activate levers while engine is running

Always ensure both valves are in the TRACK or CRUSH position prior to
starting the engine

Never operate the machine with either valve in the neutral (vertical)
position

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SET-UP PROCEDURE

4.6

Section 4.6

TRACKING THE MACHINE USING THE DOG LEAD

The following procedure is to be carried out to allow the operator to track the
machine using the dog lead.

Ensure that the control switch (E) is in the DOG LEAD position and the Track
Switch on the main engine starter panel is in the ON position prior to
operating the dog lead.

Track switch

Start the engine as per previous instructions (it is important that the emergency stop status is checked before starting the engine).

NOTE:

For safety reasons there is an emergency stop button (F) fitted to the
dog lead.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SET-UP PROCEDURE

4.6

Section 4.6

TRACKING THE MACHINE USING THE DOG LEAD cont.

IMPORTANT:

Once the machine has been tracked into position, remove the
dog lead and place in a secure place (ideally the works office or
shovel cab)

To track the machine, move the relevant toggle buttons on the dog lead
control (as shown above). For safety reasons Tesab have fitted a siren and
orange beacon to make other persons in the vicinity aware that the machine
is going to be, or is being, moved. It is always important for the operator to
be aware of his surroundings.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SET-UP PROCEDURE

Section 4.7

4.7 POSITIONING
Before the RK1412T ROTOCRUSHER is positioned on site it is necessary to
have a level surface and spacious surroundings, if required level the work-site
foundation using a loading shovel.
The machine must be placed on solid ground capable of carrying its weight.
Track the machine into the desired position and ensure the machine is level. This
can be done with the aid of a spirit level (ensure that it is level both along the
chassis and across the chassis).
We recommend that when the machine is positioned correctly the dog lead and
the remote control (if fitted) are located in a safe place (ideally in the works office
or shovel cab).

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SET-UP PROCEDURE

Section 4.8

4.8 PREPARING FOR INITIAL START-UP

If required, fit the pre-cleaner and exhaust. We would recommend that if the
machine has to be tracked for a long distance that you fit these items as
soon as possible.

Pre-cleaner

Exhaust

For safety reasons, once the machine is in the correct working position switch
the tracks off. This disables the system and prevents the machine from
moving if the dog lead is touched accidentally. Move switch to OFF position
on control panel to disable tracks (see picture below). It is also advisable
to switch the manual control valves to the CRUSH position in order to prepare
the machine for working (see below).

Both levers
in CRUSH
position

Tracks ON/OFF switch

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SET-UP PROCEDURE

Section 4.8

4.8 PREPARING FOR INITIAL START-UP cont.

WARNING

Do not activate levers while engine is running

Always ensure both valves are in the TRACK or CRUSH position prior to
starting the engine

Never operate the machine with either valve in the neutral (vertical) position

Remove any parts, which have been packed on the catwalks and hopper. This is
to give full access to all control areas and reduces any fall hazards.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SET-UP PROCEDURE

Section 4.9

4.9 PRODUCT CONVEYOR UNFOLDING

Set the engine revs to approximately 1200* rpm. This can be done by adjusting the throttle scroll button (pushing button up increases engine revs,
pushing button down decreases engine revs).

- revs

+ revs
Increase revs

Decrease revs

Revs displayed on LCD

Fold the conveyor up more to relieve the weight from the transport bracket
using the lever as shown below.

Product conveyor
folding lever

* NOTE: If having difficulty unfolding the conveyor, increase the engine revs to
achieve the desired hydraulic pressure.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SET-UP PROCEDURE

Section 4.9

4.9 PRODUCT CONVEYOR UNFOLDING cont.

Unhook the transport bracket, hinge it around and hook it on to the side of
the conveyor.

Using the same control lever, unfold the conveyor into its working position.

NOTE:

Ensure that the holes marked A in the picture below line up.
B

Transport
bracket

Insert pins into holes (A) to secure. The pins can be found in the tool box.

IMPORTANT:

Ensure that the R pin is inserted into the end of each pin.

Unpin bracket (B) at point C and re-pin at point D.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SET-UP PROCEDURE

Section 4.10

4.10 HOPPER EXTENSIONS


IMPORTANT:

Assembling the hopper extension unit will require the use of a


crane. The fastening of loads and the instruction of crane operators should be entrusted to experienced personnel only.

Remove the crossmember (A).


A

Using the crane, lower the extension unit into place and bolt to secure.

To raise the sides, use appropriate lifting equipment to rotate the sides (one
at a time) into the working position and bolt to secure.

Lower the rear section into place and bolt to both the hopper and the side
extensions to secure.

Add the extension crossmember at point B below.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SET-UP PROCEDURE

Section 4.11

4.11 FEED-IN CHUTE


Due to differing height restrictions the assembled feed-in chute may be too high.
Hence the feed-in extension box, which carries the feed chains and rubber is
sometimes packed separately.
To fit the extension box, lower into position using lift point A and fasten using the 6
I-bolts.
NOTE:

Fitting the extension box will require the use of a crane. The fastening
of loads and the instructing of crane operators should be entrusted to
experienced personnel.
A

I-bolts

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SET-UP PROCEDURE

Section 4.12

4.12 HOIST
Tesab have supplied a swinging arm for use when changing hammers, etc. For
transport purposes it is folded down. To elevate the hoist, follow the steps below.

Bolt in place
using the 4 bolts

Hoist in transport
position

Pivot hoist
around hinge

IMPORTANT:

Tesab recommend that this arm is only used for changing items
up to a maximum weight of one RK1412T Hammer (Part No. 2423-3) or 200kgs.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SET-UP PROCEDURE

Section 4.13

4.13 CRUSHER SETTINGS


Before starting crushing the final stage of installation is to set the crusher gaps.
This means the distance between the hammers and the impact path at the two
impact areas. These are named as follows:

Middle apron (stroke carrier)

Bar carrier

These are adjusted hydraulically. The bar carrier gap should always be set first.

WARNING
The crusher settings must not be altered while the crusher is in operation.

4.13.1

Bar carrier adjustment

Open door A and measure the setting between the LOWER blow bar (grinding
list) and the hammer.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SET-UP PROCEDURE

Section 4.13

4.13 CRUSHER SETTINGS cont.


The gap is set as follows:

Using the control lever (B), very carefully extend the rams just enough to
compress the disc springs slightly (C).

Remove the shims (D) and again using the control lever, carefully close the
rams to allow the removal of the remaining shims (E).

Set the gap using the control lever. The gap can be checked through door
A.

Once the gap is set, replace the shims (D & E) in the necessary order.

NOTE:

Once the bar carrier gap has been set, rotate the rotor to ensure that
there is enough clearance between the hammers and the blow bars.
This is necessary as, due to wear, the size of the blow bars can change.

D
B

C
E

4.13.2

Middle apron adjustment

Using the control lever (F), very carefully extend the rams just enough to
compress the disc springs slightly (C).

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SET-UP PROCEDURE

Section 4.13

4.13 CRUSHER SETTINGS cont.

D
F

C
E

Remove the shims (D) and again using the control lever, carefully close the
rams to allow the removal of the remaining shims (E).

Set the gap using the control lever. The gap can be checked through door
A.

NOTE:

The middle apron should be adjusted by APPROXIMATELY twice the


distance (or less) that the bar carrier was adjusted. The middle apron
should overlap the top of the bar carrier by a MINIMUM of 15mm as
shown.

15mm
minimum

Once the gap is set, replace the shims (D & E) in the necessary order.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SET-UP PROCEDURE

Section 4.13

4.13 CRUSHER SETTINGS cont.


The measurement of the setting depends on the following:

The size of the feed material

Cubing or crushing required

Desired quantities of the different fractions produced

The following applies in general:

Do not adjust the crusher settings to an unnecessarily narrow gap.

Study the produced material and use that as a guide-line for your setting.

For additional advice on the settings on your RK1412T ROTOCRUSHER please


consult TESAB ENGINEERING LTD. or your local authorised TESAB dealer.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

SET-UP PROCEDURE

Section 4.14

4.14 DUST SUPPRESSION


The RK1412T crusher unit is fitted with a dust suppression system. It is the
responsibility of the customer to supply the system with clean water (see below).

Water supply
connected here

Shut-off valve

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

RK1412T ROTOCRUSHER

March 2005 Issue

RK1412T ROTOCRUSHER

Section 5
OPERATION

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

OPERATION

Section 5.0

5.0 OPERATION SAFETY


Please read this section carefully and become familiar with the signs used.
These signs are used frequently throughout this manual to indicate any potential
warning or danger when operating this machine.

DANGER

ELECTRICAL HAZARD
1.
2.

3.

DANGER

Electrical Hazard. Risk of serious injury or


death.
Never work on the electrical system of any
equipment unless you are fully familiar with
system details.
Work on the electrical system must be
carried out by a qualified electrician.

NIP HAZARD
1.
2.
3.

DANGER

Nip Hazard. Do not reach into an


unguarded machine.
In-running nip points can cause
serious injury or death.
Switch off and lockout machine
before opening or removing guard doors.

FALL HAZARD
1.
2.
3.

Fall Hazard. Do not climb onto moving or


working machinery.
Switch off and lockout machine before
attempting maintenance on the machine.
Always use a suitable lifting platform before
attempting maintenance above 2m (6-6).

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

OPERATION

WARNING

Section 5.0

CRUSH HAZARD
1.
2.

3.

WARNING

Crush Hazard. Beware of dangerous hand


and foot crush points.
Do not use any body parts e.g. hands or
feet to check hole alignment or support
machinery.
Always use pins and/or mechanical
supports provided.

PROTECTION
1.
2.
3.

WARNING

Loose or baggy clothing can get caught in


running machinery.
Always wear correct fitting (EN/ANSI
approved) protective clothing.
Protective clothing includes Hard Hat,
Safety Clothing, Ear Defenders, Overalls,
Steel Toed Boots, and a High Visibility Vest.

CONSULT MANUAL
1.
2.
3.

WARNING

Read and understand the operators manual


before you work at this machine.
Study the different safety signs on this
machine.
Only qualified and trained personnel should
attempt to work at this machine.

LOCKOUT
1.

2.
3.

When performing maintenance or


adjustment to this machine always switch
off engine and remove the ignition key. (if
electric isolate power supply at source).
Keep ignition key on person during
maintenance.
Never work alone.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

OPERATION

WARNING

HIGH PRESSURE
1.

2.
3.

CAUTION

WARNING
2.

WARNING

Fall rock hazard. Do not walk near material


discharge areas. You are at risk of serious
injury or death.
Wear a Hard Hat at all times when working
in the vicinity of the machine.

BATTERY HAZARD
1.

2.

BATTERY

Burn or Heat Hazard. Beware of hot sur


faces at engine and exhaust areas.

HEAD PROTECTION
1.

EXPLOSIVE

Beware of escaping hydraulic oil. High


pressure hydraulic oil can penetrate the
skin causing serious injuries.
Always relieve pressure from the hydraulic
system before attempting maintenance.
If oil is injected under the skin, it must be
surgically removed or gangrene will result.

HOT SURFACE
1.

ACID

Section 5.0

Battery Hazard. Battery electrolyte contains


acid and can cause serious injury. Avoid
any contact.
Batteries give off flammable fumes which
can explode. Avoid the formation of sparks
and naked lights in the vicinity of the
batteries. Do not smoke when working in
this area.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

OPERATION

5.1

Section 5.1

LOCKOUT PROCEDURE

WARNING
When carrying out maintenance, repairs or adjustment to the TESAB RK1412T
ROTOCRUSHER the following lockout procedure MUST be followed.

Deactivate all controls, switch off engine and remove key.


Activate, or, if fitted, lock one emergency stop button.
Relieve all pressures in the hydraulic system.

IMPORTANT:

The person carrying out the work on the machine must keep the
keys with them at all times.
Ensure the isolator switch is in the OFF position prior to welding.

Isolator in OFF position Isolator in ON position

Engine canopy

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

OPERATION

Section 5.2

5.2 GENERAL INFORMATION


All crushing applications differ due to material composition and customer requirements.
There are numerous adjustments that can be made in order to achieve required
results.
Therefore we recommend that you contact TESAB ENGINEERING LTD. or your
local Tesab dealer to advise you on the best customized Tesab arrangement to
suit your particular application.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

OPERATION

Section 5.3

5.3 PRE-OPERATION CHECK LIST


Before operation check and ensure the following:

Nothing on product conveyor

Nothing on feed conveyor

All guards are fitted correctly

The diesel tank has been topped up

Engine oil level has been checked and topped up if necessary

Ensure the diverter valve levers are in the CRUSH position before starting
the engine

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

OPERATION

5.4

Section 5.4

ENGINE STARTING PROCEDURE

NOTE:

Before starting the engine check diesel and engine oil levels.

Engine control panel


Throttle scroll
button

Position 1

Position 3

Check that no emergency stops are in the on position, if an emergency stop


is in the on position lamp A (green) will NOT be illuminated.

Turn the starter ignition key C to position 1 which is the ON position.

Turn the key to position 3 and hold, the start delay siren will sound for
approximately 7 seconds then the engine will crank and start.

Release the key when the engine has started.

NOTE:

Do not activate the starter for more than 20 seconds at a time.


You will protect the batteries if you wait one minute between each starting attempt.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

OPERATION

5.5

Section 5.5

SETTING ENGINE REVS


Set the engine revs to approximately 1100 rpm. This can be done by
adjusting the throttle scroll button (pushing button up increases engine revs,
pushing button down decreases engine revs).

- revs

+ revs
Increase revs

Decrease revs

Revs displayed on LCD

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

OPERATION

Section 5.6

5.6 ESM MAIN UNIT


5.6.1

Diagnostic Display

High Inlet Manifold


Temperature*
High Engine Coolant
Temperature*

Low Battery
Voltage*

High Fuel
Temperature*

High Auxiliary
Temperature*

High Auxiliary
Pressure*
Engine Derate
Low Engine Oil
Pressure*
Low Fuel
Pressure*

* IMPORTANT:

Low Engine
Coolant Level*
LCD Digital
Display

May also indicate sensor fault.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

OPERATION

Section 5.6

5.6 ESM MAIN UNIT cont.


5.6.2

Display Scroll Feature

Each time the scroll forward switch is depressed and held, EMS will page through
the engine parameters in the order listed below. The abbreviation for the parameter will be displayed. When the scroll switch is released, EMS will display the
current real time value for that parameter.
Abbreviation
Spd
GA-1
GA-2
GA-3
GA-4
Boost
IAirT
FuelT
AccrP
AccrT
Fuel
Hrs
Load

Parameter
Engine Speed
Engine Oil Pressure
Coolant Temperature
Battery Voltage
Fuel Pressure (Customer Installed Sensor)
Boost Pressure
Inlet Air Temperature
Fuel Temperature
Auxiliary Pressure
Auxiliary Temperature
Fuel Rate
Engine Hours
Engine (%) Load

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

OPERATION

Section 5.7

5.7 ENGAGING THE CLUTCH


5.7.1

Manual clutch

Start the crusher by bumping-in the clutch. Bumping-in involves several partial
engagements with the hand lever.

Engage the clutch gradually until the engine labours heavily, disengage the
clutch momentarily to allow engine torque/speed to recover.

Repeat this procedure two or three times and then engage the clutch
completely by forcing the lever to the fully over-centre position.

Operator experience often dictates the number of bumps required.

bump-in
clutch

IMPORTANT:

Engage Clutch
gradually

Read section 6.6 on manual clutch maintenance this states that


the clutch, initially when new, will require several adjustments (it
will also require further adjustments during clutch life).
It is important that this procedure is adhered to in order to achieve
prolonged clutch life.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

OPERATION

Section 5.7

5.7 ENGAGING THE CLUTCH cont.


5.7.2

Hydraulic clutch
Increase the engine revs to 1300rpm. This is done by adjusting the throttle
scroll button.

- revs

+ revs
Increase revs

Decrease revs

Revs displayed on LCD

Start the hydraulic clutch by pressing the clutch START button on the starter
panel as shown below.

Clutch START button

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

OPERATION

Section 5.7

5.7 ENGAGING THE CLUTCH cont.


NOTE:

Wait until the crusher speed has built up (approximately 45 seconds)


before proceeding.

IMPORTANT:

Read section 6.7 on hydraulic clutch maintenance

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

OPERATION

Section 5.8

5.8 PRODUCT CONVEYOR STARTING

Increase the engine revs to the desired crushing engine speed (1800-2200
rpm depending on the application). This is done by adjusting the throttle
scroll button.

- revs

+ revs
Increase revs

Decrease revs

Revs displayed on LCD

Start the product conveyor by pressing the product conveyor START button
on the starter panel as shown below.

Product conveyor
START button

NOTE:

Initially the product conveyor belt is tracked when running empty. The
belt may require re-adjustment when loaded.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

OPERATION

Section 5.8

5.8 PRODUCT CONVEYOR STARTING cont.


In order to correctly track the product conveyor belt please carry out the following
procedure:

The belt can be TENSIONED correctly at the top end drum using the adjuster
bars as shown. Slacken the 4 bolts (A) prior to tensioning belt.

NOTE:

The conveyor belt tension is factory set but due to running it over time
or climatic conditions the belt will stretch and require re-tensioning.

IMPORTANT:

DO NOT over tension the belt as this will cause excessive strain
on the bearings and drive system.

Adjuster bar

In order to track the belt correctly the return rollers must be adjusted as
shown below. For further details on the tracking of the conveyor belt see
section 6.20.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

OPERATION

Section 5.9

5.9 FEED CONVEYOR STARTING


NOTE:

Ensure that the product conveyor is started before starting the feed
conveyor.

Start the feed conveyor by pressing the feed conveyor START button on the
starter panel as shown below.

Feed conveyor
START button

NOTE:

Initially the feed conveyor belt is tracked when running empty. The belt
may require re-adjustment when loaded.

The feed conveyor belt can be correctly tracked by adjusting the drum as shown
below.

Adjuster bar

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

OPERATION

Section 5.9

5.9 FEED CONVEYOR STARTING cont.


NOTE:

The belt can be tracked by slackening as well as tensioning the adjusters.

IMPORTANT:

DO NOT over tension the belt as this will cause excessive strain
on the bearings and drive system.

For further details on the tracking of conveyor belts see section 6.20.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

OPERATION

Section 5.10

5.10 MACHINE START-UP SEQUENCE

Start engine

Set revs to engage clutch (1100rpm for manual clutch, 1300rpm for hydraulic
clutch)

Engage clutch

Increase revs to desired crushing speed

Start product conveyor

Start feed conveyor

Ready to crush!

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

OPERATION

Section 5.11

5.11 MACHINE SHUT-DOWN SEQUENCE


The following procedure should be followed when shutting the machine down at
the end of a shift.

IMPORTANT:

Ensure that you allow the machine to run empty at the endof
the shift before closing the machine down. Not allowing this to
happen will put unnecessary pressure on the hydraulic system.

Stop feed conveyor

Wait and ensure crusher has cleared completely of material

Stop product conveyor

Reduce engine revs to approximately 1300rpm

Disengage clutch

Reduce engine revs to idle and run engine for 60 seconds

Switch engine off and implement lockout procedure

IMPORTANT: DO NOT LEAVE KEYS IN IGNITION

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

RK1412T ROTOCRUSHER

March 2005 Issue

RK1412T ROTOCRUSHER

Section 6
MAINTENANCE

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.0

6.0 GENERAL INFORMATION


This section provides detailed maintenance instructions as well as a maintenance
schedule for normal operating conditions.
NOTE:
Diesel engine maintenance and service required or the frequency
thereof
is outside the scope of this manual. All matters relating to
this should
be referred to the makers publication Operation and
Maintenance
Manual, a copy of which is included with this manual.
When performing maintenance on your machine please adhere to the safety information listed in the safety section.

WARNING
Implement LOCKOUT procedure
before carrying out maintenance
to your RK1412T ROTOCRUSHER

It is important to note that high repair costs and lengthy downtime will occur if
inadequate or improper maintenance is performed on your machine. Regular
maintenance is imperative.
The reliability and service life of your RK1412T unit depends on the regular and
correct maintenance of the machine.
Good housekeeping pays untold dividends in increased production and extended
plant life!

IMPORTANT:

If the RK1412T is operated for long periods of time in extreme


conditions either climatic (-15C to 33C) or very dusty, the maintenance schedule will change. If this scenario arises please consult your local Tesab dealer or Tesab Engineering technical/service department.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.1

6.1 SAFETY INFORMATION

DANGER

NIP HAZARD
1.
2.
3.

Nip Hazard. Do not reach into an


unguarded machine.
In-running nip points can cause
serious injury or death.
Switch off and lockout machine
before opening or removing guard doors.

HIGH PRESSURE

WARNING
1.

2.
3.

Beware of escaping hydraulic oil. High


pressure hydraulic oil can penetrate the
skin causing serious injuries.
Always relieve pressure from the hydraulic
system before attempting maintenance.
If oil is injected under the skin, it must be
surgically removed or gangrene will result.

FALL HAZARD

DANGER
1.
2.
3.

WARNING

Fall Hazard. Do not climb onto moving or


working machinery.
Switch off and lockout machine before
attempting maintenance on the machine.
Always use a suitable lifting platform before
attempting maintenance above 2m (6-6).

PROTECTION
1.
2.
3.

Loose or baggy clothing can get caught in


running machinery.
Always wear correct fitting (EN/ANSI
approved) protective clothing.
Protective clothing includes Hard Hat,
Safety Clothing, Ear Defenders, Overalls,
Steel Toed Boots, and a High Visibility Vest.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.2

6.2 OPENING THE RK1412T ROTOCRUSHER UNIT

Ensure that the diverter valve levers are in the CRUSH position.

Start the engine and set the revs to 1200rpm.

Unfasten the 6 I-bolts (shown below).

I-Bolts

Using the control lever (shown below) open the crusher until the holes in
brackets A and B line up and insert the crusher opening pin (this can be
found mounted on the crusher beside the hydraulic adjustment mechanism).
A

Crusher opening lever

Insert pin

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.2

6.2 OPENING THE RK1412T ROTOCRUSHER UNIT cont.

IMPORTANT:

Ensure all bolts are re-fastened


after closing

WARNING
DO NOT OPEN ANY DOOR OF THE CRUSHER UNTIL THE ROTOR HAS
STOPPED COMPLETELY AND THE CONTROL POWER HAS BEEN BROKEN,
OR, IN THE CASE OF A DIESEL POWERED CRUSHER, THE CLUTCH IS DISENGAGED, THE ENGINE HAS STOPPED AND THE IGNITION KEY HAS BEEN
REMOVED.
NEVER START THE CRUSHER UNTIL ALL DOORS ARE CLOSED AND LOCKED.
WHEN REMOVING HAMMERS AND IMPACT BARS, ALWAYS USE PROTECTIVE
GOGGLES (YOU CAN ACCIDENTALLY HIT ASKEW AND A METAL SHARD MAY
HIT YOUR EYES)

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.3

6.3 REPLACING OR TURNING THE HAMMERS

Picture 6.3.1

Open the setting (gap) of the


crusher to a maximum.

Rotate the rotor so that one


hammer appears straight up
(see picture 6.3.1). Insert a
locating bar or similar through
the rotor. The rotor is now
secured.

Clean away the stone powder


and such from around the
hammer.

Take away the securing brackets (A) at both sides of the


hammer.

The turned or new hammer is


pushed into position.

Secure the hammer with


bracket (A) at both sides.
Then remove the securing rod.

Repeat from step 2 until all


hammers are replaced.

Close and lock all doors.

Start the crusher.

Picture 6.3.2

NOTE:

Should any abnormal sound be heard (a thumping or knock), stop the


crusher immediately and check if any of the hammers are positioned
too far to one side, so it touches the side plates.
After the necessary measures have been taken, start the crusher again
and run it empty for approximately 5 minutes.
If everything is OK, make the final gap settings, close and lock all doors.
ALL SET FOR CRUSHING.
Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.4

6.4 SETTING THE CRUSHER GAP

WARNING
The crusher settings must not be altered while the crusher is in operation.

Open the door A by the bar carrier and measure the setting at the lower
impact bar B (see picture 6.4.2). The measure of the setting depends on:

The size of the feed material


Cubing or Crushing
Desired quantities of the different fractions produced.

Minimum
15mm

Picture 6.4.1

Picture 6.4.2

The following applies in general:

Do not adjust the crusher setting to an unnecessary narrow gap.

Study the produced material and use that as a guideline for your setting.

Adjust the bar carrier before the middle apron.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.4

6.4 SETTING THE CRUSHER GAP cont.


The crusher gap is set as follows:

Using the appropriate lever (see picture 6.4.3), very carefully extend the
rams just enough to compress the disc springs slightly (picture 6.4.4, item
C).

Middle apron
adjustment

Picture 6.4.3

Bar carrier
adjustment

Picture 6.4.4

Remove the shims (D) and again using the control lever, carefully close the
rams to allow the removal of the remaining shims (E).

Set the gap using the control lever. The gap can be checked through door
A.

NOTE:

The middle apron should be adjusted by APPROXIMATELY twice the


distance (or less) that the bar carrier was adjusted. The middle apron
should overlap the top of the bar carrier by a MINIMUM of 15mm as
shown in picture 6.4.2.

Once the gap is set, replace the shims (D & E) in the necessary order.

NOTE:

Once the bar carrier gap has been set, rotate the rotor to ensure that
there is enough clearance between the hammers and the blow bars.
This is necessary as, due to wear, the size of the blow bars can change.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.5

6.5 REPLACING OR TURNING OF IMPACT BARS (BLOW BARS)

Open the settings


(gap)of the crusher
(A).

Open both doors (B)


by the bar carrier.

Knock out the impact


bars (C) laterally
using an iron bar or
similar.

Clean the sockets


and insert the turned
or new impact bars.

Set the desired gap,


close and lock the
doors. CRUSH!

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.6

6.6 MANUAL CLUTCH


The Manual Power Take Off (or Clutch) in conjunction with your diesel engine is
the central part of your RK1412T ROTOCRUSHER. A lot of care and thought has
gone into its selection.
Correct maintenance of your PTO will increase its effectiveness and prolong its
life-span.
The following sections are a short simple outline of duties that the owner and
operator must perform for satisfactory service from his TWIN DISC POWER TAKE
OFF.

PTO

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.6

6.6 MANUAL CLUTCH cont.


6.6.1

Clutch Adjustment

New manual power take offs should have clutch adjustment checked before being placed in service. A newly placed in service power take off should have its
clutch adjustment checked again after the first 10 hours of operation. New clutch
plates have a wear-in period and the clutch may require several adjustments
until the new plates are worn-in. After wear in, clutch adjustments should be
checked regularly. As this is classed as a heavy duty application which has frequent engagements and relatively long periods of slip when bumping-in it will
require more frequent attention in relation to readjustment.
The clutch requires adjustment when:

The clutch is easy to engage to its fully over-centre position

The lever jumps out during operation

The clutch heats up excessively

To adjust the clutch:

Lockout the engine by removing the key from the ignition.

Remove the hand hole plate (1) in the housing and turn the clutch until the
locking pin (2) can be reached (see picture 6.6.1.1).

Disengage the adjusting locking pin (2), by pulling it out towards the pulley,
and turn the adjusting yoke or ring (3) to the right (clockwise) until the operating
lever requires a distinct pressure to engage (see picture 6.6.1.1).

Regular adjustment dictates that no more than 1 or 2 notches should be required


each time, any more than this would indicate that the clutch is not adjusted regularly.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.6

6.6 MANUAL CLUTCH cont.

Picture 6.6.1.1

NOTE:

The majority of clutch failures are not caused by a unit being under
sized for the application. Failures often are the result of the clutch not
being properly adjusted. Check and adjust the clutch on a regular
basis, to the correct engaging effort as specified on the instruction cover
plate.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.6

6.6 MANUAL CLUTCH cont.


6.6.2

Clutch Lubrication

Throwout Collar:

Apply a small amount of lubricant once a day, before


starting, through the fitting on the tapered part of the
housing.

Main Bearings:

Apply a small amount of lubricant once a week, through


the fittings highlighted below.

Lever Shaft:

Apply a small amount of lubricant once a week, through


the fittings highlighted below, please note that there
are grease nipples on both left and right hand side.

6.6.3

Lubricant Specification

Use any high grade, high temperature, lithium based gun lubricant. For further
details see recommended lubricant section in this manual.
NOTE:

Although this section details the greasing points on the clutch, it is important to note that if the machine is fitted with the Autolube system,
these points are supplied with grease by it. See the Autolube section
for further details.
Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.7

6.7 HYDRAULIC CLUTCH


The Hydraulic Power Take Off (or Clutch) in conjunction with your diesel engine is
the central part of your RK1412T ROTOCRUSHER. A lot of care and thought has
gone into its selection.
Correct maintenance of your PTO will increase its effectiveness and prolong its
life-span.
Following is a short simple outline of duties that the owner and operator must
perform for satisfactory service from his TRANSFLUID POWER TAKE OFF.

6.7.1

Clutch Maintenance

Change the oil after the first 100 working hours, and every 4000 working
hours thereafter. The correct oil level is the blue line on the oil level indicators.

After replacing the oil, run the pump with the electric valve OFF to fully fill the
heat exchanger. Re-check the oil level again once this has been done and
top-up if necessary.

Recommended oils are as follows:


AGIP
ARAL
BP
CASTROL
CHEVRON
ESSO
MOBIL
SHELL
TEXACO
TOTAL

OSO 32
VITAM GF 32
ENERGOL HLP 32
HYSPIN AWS 32
RPM EP HYDRAULIC 32
NUTO H 32
DTE 24
TELLUS 32
RANDO HD 32
AZOLLA ZS 32

Change the oil filter cartridge (25 micron) when the pressure is 1.7 bar over
the rated value and/or the pressure switch is on.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.7

6.7 HYDRAULIC CLUTCH cont.

In cases where there is considerable oil leakage the rotating seals should be
changed (see picture 6.7.1.1).

Keep the oil cooler clean. The radiator pack can be cleaned by either washing
carefully by hand or by using air pressure.

IMPORTANT:

Never use water pressure as this can damage the aluminium pack.

Check periodically (approximately every 1000 hours) that the pump chain is
the correct length (see table below). The chain can be stretched by hanging
a 20 kg weight from it.
KPTO
15
17-19
21-24
27

Max. Length (mm)


1265
1362
1556
1914

Periodically check the condition of the elastic coupling.

Pressure gauge
switch

Elastic coupling
(not shown)

Rotating seal
(not shown)

Rotating seal
(not shown)

Oil filter

Solenoid valve

Oil level
indicator
Picture 6.7.1.1

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.9

6.9 TRACKS
Each Track Frame Assembly fitted to the TESAB RK1412T ROTOCRUSHER is
comprised of five main components:

A STEEL FRAME CHASSIS onto which all other components are mounted.
The weight of the machine which is to be carried by these assemblies is
distributed along the length of the frames.

The DRIVE ASSEMBLY is a planetary gearbox, mounted at the rear of the


frame, which is driven by a hydraulic motor. A drive sprocket is bolted to
the gearbox.

A total of nine BOTTOM ROLLERS are attached to the underside of each


frame. The entire weight of the machine is carried on these rollers.

The FRONT IDLER is mounted at the opposite end of the frame to the sprocket, the idler slides on guides. The track is adjusted by a hydraulic cylinder
attached to the idler arrangement. Between the idler, and the track adjusting
cylinder is a recoil spring, which will allow the idler to movebackwards in
the event that excessive load is placed on the track.

The TRACK ASSEMBLY comprises of sectional chain with triple bar grouser
shoes bolted to it.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.9

6.9 TRACKS cont.


TO ENSURE TROUBLE FREE TRACK OPERATION, IT IS IMPORTANT THAT
THE FOLLOWING MAINTENANCE OPERATIONS ARE ADHERED TO.
6.9.1 Track Adjustment
Check if the track is correctly adjusted. As the track wears it will become slack
and should be checked regularly.
To establish if the track requires adjustment move the machine backwards and
forwards a few metres on level ground and in a straight line (do not slew). This
enables the track to adopt its natural degree of tension.

Measure the droop as shown on figure 6.9.1.1. This measurement should


not exceed 30mm (1.25).
30mm approx.
Equal

Equal

Figure 6.9.1.1

Inspection
Cover

The adjustment of the track is accessed via the inspection cover on the side of the
track frame as shown in figure 6.9.1.1. Remove the cover using a 6mm allen key.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.9

6.9 TRACKS cont.


Adjustment is carried out as follows:

To increase track tension:

Ensure the grease fitting is tight, using a 22mm socket or ring spanner.

Using the special grease gun adapter (M1442), fitted to a standard


grease gun, filled with the correct grease, pump the track out to the
correct adjustment.

M1442 adapter

IMPORTANT:

Do not tension the track too tightly as this places unacceptable


loads on the gearbox bearings and idler bearings. It will lead to
accelerated wear and premature failures.

To release the track tension:

Slacken the grease fitting on the end of the hydraulic track tensioning
cylinder, by one half turn only, using a 22mm spanner.

WARNING
Grease under extreme pressure is released by this action. Personal injury could
result if the fitting is removed whilst under pressure.

When the track droop appears to be correct, move the machine backwards
and forwards and re-check the droop.

Add more grease if required. Replace the inspection cover when the correct
adjustment has been made.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.9

6.9 TRACKS cont.


6.9.2 Gearbox Oil Level
Cleanliness is absolutely essential as gearbox life will be dramatically reduced if
dirt is allowed to enter. Use only clean oil, in clean containers.
The oil level must be checked every 200 working hours (see section 6.9.6 for
correct grade of oil).
To drain the gearbox:

Move the machine until the filler plugs are in the position as shown in figure
6.9.2.1.
Draining

Figure 6.9.2.1

Clean the area around both plugs and remove any surrounding debris.

Remove both plugs and allow to drain.

More effective draining will occur if this operation is carried out when the oil
is hot.

IMPORTANT:

Do not move the machine (except to reposition the plug holes for
refilling) without oil in the gearboxes.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.9

6.9 TRACKS cont.


To refill the gearbox:

Ensure machine is on level ground and track until the filler plugs are in the
correct position (see figure 6.9.2.2).
Filling

Level

Figure 6.9.2.2

Clean the area around the plugs and remove any surrounding debris.

Remove both plugs and fill through the upper plug hole.

Wait a few minutes until any trapped air has escaped then re-check the
level.

Add more oil if necessary.

NOTE:

Approximate oil quantity 5 litres per gearbox

The oil should be drained from the gearboxes after the first 200 hours of operation, and refilled with the correct lubricant (see section 6.9.6).
Following this initial oil change the oil should then be replaced after 2000 hours of
use or at least once per year.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.9

6.9 TRACKS cont.


6.9.3 Leakage
Check daily for any signs of oil leakage, particularly around the front idler seals,
roller seals and gearbox.
If any leakage is found, action must be taken to correct the problem before the
machine is used.

6.9.4 Bottom Rollers and Idlers


These components are lubricated at the time of manufacture and are termed lubricated for life.
No servicing is therefore required.
If however an oil leak is detected on any of these components, an exchange unit
should be fitted before using machine again.
NOTE:

Removal of the filler plug invalidates the warranty.

6.9.5 Loose Bolts


It is the responsibility of the operator to check the machine on a daily basis for any
loose bolts, or signs of undue wear.
In the event that any bolts are found to be loose, they should be re-tightened to
the following torque:
Bottom Roller Bolts
Sprocket Mounting Bolts
Gearbox Mounting Bolts
Motion Valve
Track Shoes

350 ft lbs.
350 ft lbs.
350 ft lbs.
33 ft lbs.
120 ft lbs. plus 1/3 turn

It is the operators responsibility to ensure that the machine is properly maintained


and does not pose a safety hazard to himself or others.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.9

6.9 TRACKS cont.


6.9.6 Track Lubrication
Gear oil should conform to the following specifications:
MIL-L-2105

or

API GL5 Grade 80W/90

Examples of oil to these specifications are:


Texaco

Geartex EP-B 80W/90

Century Oils

BOA

80W/90

All leading lubricating oil suppliers offer equivalents.


For track adjustment, a good quality all purpose grease such as TEXACO EP2
ALL PURPOSE GREASE should be used.
All leading lubricating oil suppliers offer equivalents.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.10

6.10 HYDRAULIC FLUIDS


Hydraulic fluids play a most important part in any hydraulic system. They have
three main functions:

To transmit power
To lubricate moving parts
To seal clearances between parts

As a power transmitting medium the fluid must flow easily and be as incompressible as possible. In most hydraulic components, internal lubrication is provided by
fluid only. For long component life, fluids are available containing additives which
have high anti-water properties. The fluids are known as anti-wear type hydraulic
oils, which are recommended for your RK 1412T ROTOCRUSHER. In most cases
the fluid is the oil seal present. For example there are no sealing rings between
the spool and the body of the directional valve. As the sealing characteristics of
the fluid depends on its retaining viscosity, it is important that the oil selected is
capable of maintaining the minimum viscosity change over a wide range of operating temperatures.
Some adverse effects of incorrect viscosity are:

High oil temperatures


Entrapment of air in oil
Increased pressure drop
Excessive wear or even seizure under heavy load
Poor pump/system performance

In addition to qualities outlined earlier the selected fluid should also:

Prevent rot
Depress foaming
Prevent formation of sludge, gum and varnish
Retain its own stability, thereby reducing fluid replacement
Prevent corrosion and pitting

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.10

6.10 HYDRAULIC FLUIDS cont.


For best operating results it is strongly recommended that the hydraulic fluid used
is selected from the recommended range listed in section 6.26.
In the service it is recommended that the hydraulic system is drained and refilled
at least once every 1500 hours of operation. The hydraulic fluid should be changed
after the machine has stopped work.
The drain plug for the hydraulic system is mounted on the side of the tank.
In the event of pump or motor failure, both suction and return line filter elements
must be changed.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.11

6.11 OIL TANK, PIPES & FITTINGS


In order to prevent contamination, the oil tank on the RK1412T ROTOCRUSHER
is of sealed construction. Access to the tank, if required, is via an inspection
cover which is mounted on top of the tank. The tank must be thoroughly cleaned
before the removal of this cover.
It is very important that the hydraulic pipes and hoses are checked regularly for
leaks, scuffing and wear. Loose fittings should be securely tightened. Worn or
leaking hosing should be replaced. Replacement hoses are available on request.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.12

6.12 DIESEL ENGINE


The diesel engine is the heart of your RK1412T ROTOCRUSHER and a great
deal of care and thought has gone into its selection. All engines are put through
rigorous test programmes by the manufacturers before reaching us, to be assembled into the RK1412T.
On completion machines are again run and tested for several hours before dispatch. This is to guarantee the dependability of TESAB equipment.
In the interest of continued peak performance from your RK1412T
ROTOCRUSHER the engine must be maintained and cared for with meticulous
attention in accordance with the manufacturers instructions as detailed in the Operation and Maintenance Manual a copy of which is included with this manual.

IMPORTANT:

The engine water trap (A) must be drained every day (as per
sticker) and replaced every engine service.

Sticker

A
Sediment bowl

Tap
6.12.1

Draining the water trap

The water trap should be drained by opening the tap on the bottom of the sediment bowl and allowing all the water to drain out. When diesel is flowing out,
close the tap.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.13

6.13 FEED CONVEYOR & PRODUCT CONVEYOR REDUCTION GEARS


Maintenance can be routine or unscheduled.

IMPORTANT:

6.13.1

All maintenance activities must be carried out under safety conditions.

Routine Maintenance

The operator is responsible for routine maintenance and must carry out the following activities.

After a brief operating period of about 100 hours (breaking-in), change the
oil in the gear unit (Grade EP150 or equivalent).

Check that there are no foreign metallic parts in the magnetic plug of the
gear unit.

Change the oil in the gear unit while it is hot so that it is easier to drain
(taking precautions to avoid burns).

Subsequent oil changes should be made every 200-250 hours at operation,


or, in any case, every year.

Do not mix different types of oil.

Periodically check the level (about once a month) and top up if necessary.

IMPORTANT:

When checking the oil levels in gear unit, if the levels have risen
this means that oil is penetrating from the rotary seal. Contact
the local Brevini Service Dealer.

It is recommended that you keep a chart for your reduction gear to record details
of maintenance performed.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.13

6.13 FEED CONVEYOR & PRODUCT CONVEYOR REDUCTION GEARS cont.


6.13.2

Oil Change

To drain the oil from the reduction gear, unscrew the drain plug and the filler
plug. Once the oil has been emptied, replace the plugs.

Wash the interior of the gear unit with a suitable cleaning liquid that is recommended by the lubricant manufacturer. Put the liquid into the gear unit
and run it at high speed for few minutes, then remove the cleaning liquid
from the unit and fill with appropriate gear oil.

The Brevini recommended method of filling the reduction gear is as follows:

Unscrew the filler and oil level plugs.

Pour oil into the filler port and when it starts to flow out of the oil level port,
stop filling and replace the plugs. The approximate volumes required are:
Feed conveyor reduction gear (11.2:1)
Product conveyor reduction gear (6.3:1)

2.0 litres
1.25 litres

Run the gear unit for a few minutes to eliminate any air pockets and then
check the level.
Drain plug

Oil level
plug

Breather & filler plug

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.13

6.13 FEED CONVEYOR & PRODUCT CONVEYOR REDUCTION GEARS cont.


6.13.3

Unscheduled Maintenance

Brevini Riduttori prohibits the gear unit to be opened to carry out any operation
that is not included in routine maintenance procedures. Brevini Riduttori do not
undertake any liability for all those operations out of routine maintenance which
may have caused damages to people or things. When the need arises, contact
the nearest Brevini Service Centre.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.14

6.14 BEARINGS AND LUBRICATION

The bearings of the crusher are spherical roller bearings with labyrinth
packings.

The bearings are to be lubricated once a week at single shifts.

Force feed the grease until it is forced out into the labyrinths, so as to press out
any impurities.
Use only lithium based grease (i.e. SKF LGEP 2)

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.15

6.15 GENERAL INSPECTION


Check all abrasion of hammers, blow bars and wear plates regularly. Adjustments of the bar carrier may be necessary.
Careful inspection of all wearing components is essential as excessive wear will
cause damage to the crusher chamber.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.16

6.16 ROUTINE MAINTENANCE SCHEDULE


In addition to the daily, weekly and six monthly maintenance schedule, the engine
and air cleaner must be meticulously maintained.
Diesel engine maintenance is detailed in the Operation and Maintenance Manual
a copy of which is included with this manual. Details on the air filter maintenance
are also found in that publication. Failure to comply with this will reduce engine
performance and life-span and may effect your customer warranty rights.

WARNING
No guards should be removed while the machine is in operation.

NOTE:

Provided in this section is a greasing schedule for your machine. This


section is only applicable for machines that do not incorporate the
Autolube system. If your machine uses the Autolube system please
ignore this section.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.8

6.8 HYDRAULIC SYSTEM


The hydraulic system which is used in the RK1412T ROTOCRUSHER was chosen for its effectiveness and resistance to climatic and operating conditions. This
must be topped up with the correct hydraulic fluid and regular checks must be
made to ensure this. The system should be checked for leaks and drained every
1500 hours.
6.8.1

Filtration

In order to maintain the hydraulic oil at its peak performance, two high pressure
filters are used in the system of the RK1412T ROTOCRUSHER. These are coupled with 2 strainer valves fitted inside the tank.
Regular monitoring of gauges on the filters is essential. The filter element requires changing when the indicator is in the red at operating temperature.

High pressure filters

DANGER

HIGH PRESSURE

The filter element


needs to be changed
when the indicator
turns red

High Pressure Filters - 2 x High pressure filters are fitted to


the main pressure lines between the pump and manual spool
valves, and they are used to prevent any tiny particles contaminating the system which could cause damage to the pumps or
motors. The filter elements should be checked regularly and
changed in accordance with the routine maintenance schedule.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.17

6.17 DAILY MAINTENANCE


The purpose of daily maintenance is to discover minor irregularities in your machine before they develop into major problems.

Check the machine for loose parts, check that all bolts and nuts are secure

Check the hydraulic oil level in the tank and top up if necessary

Ensure that all safety systems are intact (ie. all the wires to sensors are
intact)

Check that fuel oil level in the tank and the supply line to the engine

Check all the hydraulic motors, pumps, cylinders and hoses for oil leaks and
tighten if necessary. When tightening the hydraulic fittings always use two
spanners, one for holding, one for tightening

Ensure that all the troughing and return rollers are free running and clear of
obstructions

Check for material build up

Check conveyor belts for alignment and adjust them if necessary

Check air filter for clogging

Visually inspect the conveyor belting for tears etc.

Grease clutch (manual clutch only - see section 6.6)

Drain the water trap on the engine

When all checks have been made, close and fasten all the guards before operating the machine. At the end of the day carefully clean the machine and the ground
immediately around the machine, of all the material and debris build up.
Good housekeeping pays untold dividends in increased production and extended
plant life.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.18

6.18 WEEKLY MAINTENANCE (50 hours)


In addition to the daily programme:

Grease feed and product conveyor bearings using the correct lubricant

Grease crusher bearings using the correct lubricant

Check all skirting rubbers (i.e. that they bear down lightly on the conveyor
belt)

Check the acid level in the batteries and top up with distilled water if necessary

Check the gauges on the hydraulic filters

Adjust belt scrapper blades, renew if necessary

Check clutch setting and adjust if necessary

Check quality and tension of crusher V belts

Check rubbers on machine, renew if necessary

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.19

6.19 SIX MONTHLY MAINTENANCE

Drain and refill hydraulic system with the correct hydraulic fluid. Refer to the
recommended lubricants for the correct hydraulic oils to suit various ambient
temperature conditions.

Drain and reduction gears with the correct gear oil. Refer to the recommended
lubricants section.

Check the alignment of the plant with a precision spirit level.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.20

6.20 BELT TRACKING


6.20.1

Belt Tension

The belts on your RK1412T ROTOCRUSHER will normally have to be tensioned


a number of times during the machines lifetime due to the natural stretching of the
belt. It is very important the belts are tensioned evenly to the correct level, not too
tight and not too loose, ensuring efficient belt running and skirting alignment. A
loose belt can cause slippage and reduced throughput, an over tight belt can
reduce drum and bearing life.
6.20.2

Trouble Tracing

Oblique travel may cause a fast deterioration, although the belts on the RK1412T
ROTOCRUSHER is of the highest quality. In order to assist we have compiled
some of the reasons for oblique travel with appropriate correction action.
REASONS FOR
OBLIQUE TRAVEL
Insufficient aligning of
drums and idlers

REMEDIES

EXAMPLES OF OBLIQUE TRAVEL

Align non-drive drum, carrying idlers, and


return idlers at right angles to the travelling direction of the belt.
Check that all drums and idlers are level
to each other
If a & b are as above then perform the
following.
Adjustment is made as indicated on Figs
6.21.2.1,2&3 by turning non-drive drum
and carrying idlers in direction of arrow
until the belt is running straight and centred on the conveyor.
Also return idlers may cause oblique belt
travel and therefore they must be aligned
at right angles to the travelling direction
of the belt and after that adjustment can
be made.

Misalignment of
frame

Oblique travel can be reduced by turning forward outer carrying idlers 1-3 degrees in travelling direction of the belt.
See Fig 6.21.2.4. If this does not correct
the oblique travel then align the frame.

Material build up on
drums and idlers

Clean idlers and drums. Check belt


cleaners and replace if necessary. Possibly change to more efficient type.

Fig 6.21.2.1: Turning carrying idlers

Fig 6.21.2.2: Turn Drum

Fig 6.21.2.3: Turn both Drum and carrying


idlers

Fig 6.21.2.4: Turning forward carrying idlers

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.21

6.21 V-BELT TENSIONING


6.21.1

Crusher V-Belts

The RK1412 ROTOCRUSHER is driven through eight SPC V-belts.


The belts can be tensioned as follows:

Loosen bolts at the four points highlighted below.

2 bolts either side


of engine stand

Adjust engine stand using the adjusters (2 off) as highlighted.

Adjuster

IMPORTANT:

Do not over-tighten V belts as this will cause excessive pressure


on the clutch bearings leading to premature clutch failure.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.21

6.21 V-BELT TENSIONING cont.


6.21.2

One shot tensioning

Put the belts around the pulleys and set them to the appropriate tension
value as stated in the tension forces table below (using the belt tension
indicator as shown).

Run the drive under load for 30 minutes.

Stop the drive, check the tension and reset to the catalogue value if necessary.

On a proper designed drive for the application there will be no need for further
attention during the life of the drive.
The setting tensions below are designed to cover a wide range of drives. A precise setting force for individual applications can be calculated. Please consult
Fenner Technical Services.
Belt tension indicator
applied to mid-centre
distance

CE
NT
RE

DI
ST
AN
CE

16
pe mm
r 1 de
m fle
of ctio
sp
an n

Belt
Section
SPB
SPC

Force required to deflect belt 16mm


per metre of span
Small Pulley
Diameter (mm)

80 to 132
140 to 200
112 to 224
236 to 315

Newtons (N)

25 to 35
35 to 45
45 to 65
65 to 85

Kg - Force (kg.f)

2.5
3.6
4.6
6.6

to
to
to
to

3.6
4.6
6.6
8.7

For short centre distance drives where the deflection of the belt is too small to
measure accurately, it is recommended that both deflection and applied force be
doubled.
Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.21

6.21 V-BELT TENSIONING cont.


6.21.3

Method of Belt Tensioning using Fenner Belt Tension Indicator

Calculate the deflection in mm on a basis of 16mm per metre of centre


distance:
Centre distance (m) x 16 = deflection (mm)

Set the lower marker ring at the deflection distance required in mm on the
lower scale.

Set the upper marker ring against the bottom edge of the top tube.

Place the belt tension indicator on top of the belt at the centre of span,
and
apply a force at right angles to the belt deflecting it to the point where
the
lower marker ring is level with the top of the adjacent belt.

Read off the force indicated by the top edge of the upper marker ring.

Compare this force to the kg.f value shown in the table on the previous page.

If a Fenner Belt Tension Indicator is not available, a spring balance and rule will
suffice.
With branded belts use a bar across the band width to ensure even distribution of
the force measured by the number of belts in the band for comparison with the
values in the table.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.21

6.21 V-BELT TENSIONING cont.


NOTE:

For single belt drives a straight edge should be placed across the two
pulleys to act as a datum for measuring the amount of deflection.

If the measured force falls within the values given, the drive should be satisfactory. A new drive should be tensioned to the higher value to allow for the normal
drop in tension during the run in period.
After the drive has been running for 30 minutes, the tension should be checked
and readjusted to the higher value, if necessary.

6.21.4

Trouble Shooting

Small cracks on V-belt side and base:

Generally caused by shortage of belt tension but excessive heat and/or chemical
fumes can also give same failure.

V-belt swelling or softening:

Caused by excessive contamination by oil, certain cutting fluids or rubber


solvent.

Whipping during running:

Usually caused by incorrect tensioning, principally on long centre drives. If a slightly


higher (or lower) tension does not cure the problem there amy be a critical vibration
frequency in the system which requires redesign or a banded belt. Consult Fenner
Technical Services.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.22

6.22 RECOMMENDED LUBRICANTS


Below are listed the recommended alternatives suitable for use with your RK1412T
ROTOCRUSHER.
The special greases are Class 2 lithium based greases with extreme pressure
additives.
They work within special conditions up to 120C.
SPECIAL SCREEN
GREASE

BP

Energrease LS-EP2

Total

Multis EP2

Duckhams

Adamax LEP2

Castrol

Spheerol EPL2

Shell

Alvania EP2

Esso

Becon EP2

Texaco

Multifak EP2

Chevron

Duralith EP2

Gulf

Gulfcrown EP2

Mobile

Modilux EP2

Century

Regulus A2EP

F.A.G.

Arcanol L135

Rocol

Sapphire

Optimol

Longtime PD

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.22

6.22 RECOMMENDED LUBRICANTS cont.


1

6-8

2
Pos.

No. of
Locations

Description

Frequency
(Hours)

Qty

Product Conveyor TED* Bearings

50 (weekly)

4g

Product Conveyor BED* Bearings

50 (weekly)

4g

Crusher Rotor Bearings

50 (weekly)

8g

Feed Conveyor TED* Bearings

50 (weekly)

4g

Feed Conveyor BED* Bearings

50 (weekly)

4g

Clutch Main Bearings

50 (weekly)

4g

Clutch Lever Shaft

50 (weekly)

4g

Clutch Throw-out Collar

10 (daily)

4g

NOTE:

Four grams of grease is the equivalent of three shots/pumps from the


grease gun. Positions 6-8 are only relevant where a manual clutch is
fitted.

TED* - Top End Drum


BED* - Bottom End Drum
Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.23

6.23 AUTOMATIC GREASING SYSTEM


Your RK1412T Rotocrusher may be equipped with a Automatic Lubrication System (AUTOLUBE) to ensure that all necessary equipment is lubricated at regular
intervals in order to maintain the operational efficiency of the equipment. Please
note that this feature is not standard.
The Autolube grease points are shown in the diagram below.
1

1.

Product Conveyor top end drum (2 points)

2.

Product Conveyor bottom end drum (2 points)

3.

Main Crusher bearings (2 points)

4.

Feed Conveyor top end drum (2 points)

5.

Feed Conveyor bottom end drum (2 points)

6.

Clutch (manual clutch only) (4 points)

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.23

6.23 AUTOMATIC GREASING SYSTEM cont.


The grease is pumped by a Quicklube central lubricating pump. It is a compact
multiline pump consisting of the following.
1.

Reservoir

2.

Pump Element

3.

Safety Valve

4.

Filling Fitting (For


special cartridge gun)

5.

Connection Plug 2A1


(To push button)

6.

Filling Fitting, Pump

7.

P.C.B. and Rotary


Time Switches

8.

Connection Plug 1A1


(Power Supply to pump)

2
6

7
The Quicklube system operates according to cycles (pause and operating times).
During the operation time the pump dispenses lubricant to the connected lube
points via one or more metering device.
Operational Notes:

The Quicklube system is designed for the delivery of greases up to NLGI


grade 2 at temperatures from -25C to 70C.

Can be used at low temperatures down to -40C (lubricants must still be


pumpable at these temperatures).

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.24

6.24 AUTOLUBE MAINTENANCE


Basically the only maintenance required is to refill the reservoir in good time with
clean lubricant. However check regularly that lubricant is actually reaching all
lubricants points.
Also check the high-pressure plastic hoses and plastic tubes for damage. If necessary replace them.
If the Autolube system is not functioning properly then the following will occur:

During the pump operation the indicator pin in the control value mounted
beside the Autolube pump (A) will move in and out approximately every
40 seconds. If this is not happening then one of the following may have
occurred:

The pump is out of grease


Pump operating failure
The pump element needs to be replaced
There is a blockage in the system or bearing

If lubricant is emerging from the pressure relief valve, (B) this indicates a
blockage in the system and the fault should be immediately rectified.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.24

6.24 AUTOLUBE MAINTENANCE cont.


6.24.1

Cleaning

Whenever work is done on the Autolube system, particular attention should be


given to absolute cleanliness. Dirt in the system will cause problems.
For cleaning the system use naphtha or petroleum benzine. Tri or Per or similar
solvents must not be used. Do not use polar organic solvents such as alcohol,
methyl alcohol, acetone or similar.
6.24.2

Filling Pump Reservoir

Fill the reservoir via the grease nipple filling fitting (B), female port filling fitting (A)
or (C) up to the max mark on the reservoir. A special cartridge filler gun is
supplied with each pump.

C
B
A

IMPORTANT:

The grease/oil must be free from impurities and must not be


liable to change its consistency in the course of time.

If the reservoir has been completely emptied, the pump may


require 10 minutes operation before it operates with its full
output again.

Induce several lubrication cycles by pressing the Autolube


button on the main engine control panel for a minimum of 5
seconds. Then check that the indicator pin is moving.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.24

6.24 AUTOLUBE MAINTENANCE cont.


6.24.3

Test Run / Triggering and Additional Lubrication

There is a facility on your Autolube system where by the following functions can
be performed:

Test run on system to ensure correct operation.


Additional cycle to top up grease points.

To carry out either of the above, depress the test button on the main control panel
as shown below for at least 5 seconds.

Autolube
test button

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.25

6.25 AUTOLUBE TROUBLESHOOTING


Consult the troubleshooting table below in order to fix system fault.
Fault: Motor does not run
CAUSE
Voltage supply interrupted

REMEDY

Electric motor defective

Check voltage supply and fuses. If


necessary rectify the fault and replace
fuses.
Check the line leading from the fuses to the
pump plug.
Check voltage supply to motor.
If necessary replace motor.

Fault: Pump does not deliver lubricant


CAUSE
Reservoir empty

REMEDY

Refill reservoir with clean grease or


oil. Allow pump to run (additional lubricant)
until lubricant issues from all lubrication
points.
Check the line leading from the
fuses to the pump plug.

NOTE: Depending on the ambient temperature and


or type of lubricant it may take 10 minutes of
operation until the pump elements will reach their
full lubricant output.
Air Pockets in Lubricant

Trigger an additional lubrication (see


previous page). Loosen the outlet fitting or
main line on safety valve. Lubricant must
issue without air bubbles.

Unsuitable lubricant has been


used.

Renew the lubricant. See lubricant list.

Suction hole of pump element


clogged.

Remove pump element. Check suction hole


for foreign particles. If found remove.

Pump piston worn

Replace pump element.

Check valve in pump element


defective or clogged.

Replace pump element.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.26

6.26 RECOMMENDED FLUIDS

HYDRAULIC OIL EQUIVALENTS


AMBIENT TEMPERATURE RANGE
10 - 20C
(58 - 68F)

20 - 30C
(58 - 68F)

30 - 48C
(86 - 120F)

ESSO

NUTO H 32

NUTO H 68

UNIVIS N 68

BP

ENERGOL HLP 32

ENERGOL HLP 68

ENERGOL SHF 68

MOBIL

DTE 13

DTE 15

DTE 16

SHELL

TELLUS R37

TELLUS R37

TELLUS R37

TEXACO

RANDO HD 32

RANDO HD 68

RANDO HD 100

TOTAL

AZOLLA 32

AZOLLA 68

EQUIVIS ZS 68

NOTE:

The use of brands, other than those shown above should be subject to
the approval of TESAB ENGINEERING LTD.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.27

6.27 FAULT FINDING


SYMPTOM

POSSIBLE FAULT

REMEDY

Engine wont start

Clutch engaged

Disengage clutch

Safety circuit tripped

Check each circuit


component

Crusher jammed

Clear obstruction

Low fuel level

Top up tank and


bleed system

Obstruction or break
in the fuel line system

Repair and bleed


system

Engine stops

NOTE:

See engine manufacturers publication Operators Handbook troubleshooting section for detailed analysis of engine trouble.

No response
from any hydraulic
system

Low oil level

Top up hydraulic
system

Choked suction line


filter

Wash and clean filter


element

Pump shaft broken

Replace pump

Worn pump

Replace pump

Pressure relief valve


stuck in open position

Repair or replace
valve cartridge

Restricted or broken suction


line

Check restriction in
tank, repair if
broken

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.27

6.27 FAULT FINDING cont.


SYMPTOM

POSSIBLE FAULT

REMEDY

Machine
operating slowly,
no external oil
leaks.

Low oil level

Top up hydraulic
system

Incorrect hydraulic fluid

Drain tank and replace with correct


fluid

Choked suction line filter

Replace filter element

Leaking relief valve

Repair or replace
relief valve

Worn control valve

Replace control
valve

Worn pump

Replace pump

Worn head drum motor

Replace head drum


motor

Engine performance not


to standard

Consult your engine


manual fault finding
section

Choked suction line filter

Replace filter element

Damaged pump coupling

Replace pump

Low oil level pump cavitating

Top up hydraulic
tank

Loose connections in suction


line

Tighten all joints

Flexible suction hose worn

Replace hose

Excessive noise
from hydraulic
pump

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

MAINTENANCE

Section 6.27

6.27 FAULT FINDING cont.


SYMPTOM

POSSIBLE FAULT

REMEDY

Screeching noise
when conveyors
are running

Lack of bearing lubricants

Grease all bearings

Conveyor wedged, rubbing


against fixed parts

Clear obstructions,
adjust and re-track
conveyor belt

Belt drive coupling broken


or loose

Replace or tighten
coupling

Top end drum belt scrapper


too tight

Ease pressure at
scraper

Conveyor belt
tends to run back
if stopped with a
load on the belt

Non-return valve worn

Repair or replace
non-return run back
valve

Product conveyor
wont fold position

Conveyor still bolted in

Unbolt at relevant
point

Crusher not
turning when
rest of system
operational

V belts slipping

Tighten belts

Crusher wont
turn, machine
not operational

Material jammed in crusher

Clear obstruction

If you cannot identify the cause of the trouble or are unable to put it right yourself,
please contact TESAB ENGINEERING LTD. or your local TESAB authorised
dealer.
Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

RK1412T ROTOCRUSHER

March 2005 Issue

RK1412T ROTOCRUSHER

Section 7
PREPARING FOR TRANSPORT

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

PREPARING FOR
TRANSPORT

RK1412T ROTOCRUSHER

Section 7.0

7.0 PREPARING FOR TRANSPORT SAFETY


In order to transport the RK1412T ROTOCRUSHER the following preparations
should be followed to ensure correct and safe movement of the machine.
NOTE:

Some of the functions carried out when preparing the machine for transport will require the use of a crane.

The fastening of loads and the instructing of crane operators should be entrusted
to experienced personnel.
Check with local authorities regarding transport restrictions, you may not have to
carry out all the instructions listed below.
Observe all safety instructions and warnings, all work is to be carried out by qualified personnel only.
Please read this section carefully and become familiar with the signs used.
These signs are used frequently throughout this manual to indicate any potential
warning or danger when operating this machine.

DANGER

ELECTRICAL HAZARD
1.
2.

3.

DANGER

Electrical Hazard. Risk of serious injury or


death.
Never work on the electrical system of any
equipment unless you are fully familiar with
system details.
Work on the electrical system must be
carried out by a qualified electrician.

NIP HAZARD
1.
2.
3.

Nip Hazard. Do not reach into an


unguarded machine.
In-running nip points can cause
serious injury or death.
Switch off and lockout machine
before opening or removing guard doors.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

PREPARING FOR
TRANSPORT

WARNING

RK1412T ROTOCRUSHER

Section 7.0

CRUSH HAZARD
1.
2.

3.

WARNING

Crush Hazard. Beware of dangerous hand


and foot crush points.
Do not use any body parts e.g. hands or
feet to check hole alignment or support
machinery.
Always use pins and/or mechanical
supports provided.

PROTECTION
1.
2.
3.

WARNING

Loose or baggy clothing can get caught in


running machinery.
Always wear correct fitting (EN/ANSI
approved) protective clothing.
Protective clothing includes Hard Hat,
Safety Clothing, Ear Defenders, Overalls,
Steel Toed Boots, and a High Visibility Vest.

CONSULT MANUAL
1.
2.
3.

WARNING

Read and understand the operators manual


before you work at this machine.
Study the different safety signs on this
machine.
Only qualified and trained personnel should
attempt to work at this machine.

LOCKOUT
1.

2.
3.

When performing maintenance or


adjustment to this machine always switch
off engine and remove the ignition key. (if
electric isolate power supply at source).
Keep ignition key on person during
maintenance.
Never work alone.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

PREPARING FOR
TRANSPORT

WARNING

RK1412T ROTOCRUSHER

Section 7.0

HIGH PRESSURE
1.
Beware of escaping hydraulic oil. High
pressure hydraulic oil can penetrate the
skin causing serious injuries.
2.
Always relieve pressure from the hydraulic
system before attempting maintenance.
3.
If oil is injected under the skin, it must be
surgically removed or gangrene will result.

CAUTION

HOT SURFACE
1.

WARNING

HEAD PROTECTION
1.

2.

WARNING
2.

EXPLOSIVE

BATTERY

Fall rock hazard. Do not walk near material


discharge areas. You are at risk of serious
injury or death.
Wear a Hard Hat at all times when working
in the vicinity of the machine.

BATTERY HAZARD
1.

ACID

Burn or Heat Hazard. Beware of hot sur


faces at engine and exhaust areas.

Battery Hazard. Battery electrolyte contains


acid and can cause serious injury. Avoid
any contact.
Batteries give off flammable fumes which
can explode. Avoid the formation of sparks
and naked lights in the vicinity of the
batteries. Do not smoke when working in
this area.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

PREPARING FOR
TRANSPORT

7.1

RK1412T ROTOCRUSHER

Section 7.1

LOCKOUT PROCEDURE

WARNING
When carrying out maintenance, repairs or adjustment to the TESAB RK1412T
ROTOCRUSHER the following lockout procedure MUST be followed.

Deactivate all controls, switch off engine and remove key.


Activate, or, if fitted, lock one emergency stop button.
Relieve all pressures in the hydraulic system.

IMPORTANT:

The person carrying out the work on the machine must keep the
keys with them at all times.
Ensure the isolator switch is in the OFF position prior to welding.

Isolator in OFF position Isolator in ON position

Engine canopy

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

PREPARING FOR
TRANSPORT

RK1412T ROTOCRUSHER

Section 7.2

7.2 PREPARING FOR TRANSPORT


Fold and position the machine ready for transport as follows:

Remove any ramp that may have been used to load the machine and tidy
around the tracks to ensure a clear exit.

Track machine to a clear space away from the working area (for full details
on tracking machine see section 3).

Remove feed-in chute extension box (A).

Fold up product conveyor. Ensure that the transport bracket is fitted.

Transport bracket fitted

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

PREPARING FOR
TRANSPORT

RK1412T ROTOCRUSHER

Section 7.2

7.2 PREPARING FOR TRANSPORT cont.

Lower hoist to transport position.

Remove the
4 bolts

Hoist in transport
position

Pivot hoist
around hinge

Ensure that all items which have been removed for transport purposes and
repositioned on the machine have been well secured (ie. all items are tied
down satisfactorily around the catwalk area).

Ensure all bolts/brackets have been placed in a secure location (ie. the
toolbox).

Remove the exhaust and pre-cleaner remembering to fit the rain-cap on the
exhaust opening and fit the cover over the air filter casing. Tesab have
supplied a specially adapted cover for this function still allowing the filtration
system to breath but preventing any ingression of water etc.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

PREPARING FOR
TRANSPORT

RK1412T ROTOCRUSHER

Section 7.2

7.2 PREPARING FOR TRANSPORT cont.

Pre-cleaner

NOTE:

Exhaust

In some cases you may have to track the machine relatively long distances from the working area to the loading area. If this is the case
Tesab recommend that the exhaust and pre-cleaner remain on the
machine until after loading.

Ensure that the engine access steps are folded up when tracking the machine
before and after loading thus reducing the possibility of fouling.

IMPORTANT:

TESAB ENGINEERING LTD. recommend that the loading and


off-loading of the RK1412T ROTOCRUSHER is carried out by
trained and experienced personnel only.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

RK1412T ROTOCRUSHER

March 2005 Issue

RK1412T ROTOCRUSHER

Section 8
WARRANTY

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

WARRANTY

Section 8.0

8.0 WARRANTY
All conditions and warranties expressed or implied by any statue common law.
Trade usage or otherwise are hereby excluded. No liability is accepted by TESAB
ENGINEERING LTD. for any loss, damage or injury to property or persons arising
directly or indirectly from any failure or direct in the machinery supplied. The
materials employed by TESAB ENGINEERING LTD. in the manufacture of their
machinery, to the best of their knowledge, are the highest available quality of their
respective kinds. TESAB ENGINEERING LTD. undertakes to replace or repay
free of cost any part supplied by them direct to the customer of which they shall
receive notice and which shall be proved to the satisfaction of TESAB ENGINEERING LTD. within a period of twelve months of delivery to be defective in
workmanship or materials provided.
A:

That written notice of complaint is given within seven days of the discovery
of the defect.

B:

That the part is returned carriage paid to TESAB ENGINEERING LTD. and
shall, in the event of replacement become their property.

C:

That the defect has not been caused by carelessness or improper or inadequate lubrication.

D:

TESAB ENGINEERING LTD. shall not be liable for the cost of removal of
the defective part or the cost of fitting a new part.

E:

That the guarantee period shall be proportionally reduced if the machinery


is run for more that one eight hour shift per day.

No unauthorised alteration or modification has been made to the plant or machine


or component the subject of the claim.
The new part will be delivered by TESAB ENGINEERING LTD., carriage paid to
the customers nearest station in the U.K. or F.A.S. port of exportation.
In case of parts or components not manufactured by TESAB ENGINEERING
LTD. the customer shall be entitled to the benefits in so far as it may be transmitted to the customer, of any guarantees given by the manufacturer in respect thereof
and TESAB ENGINEERING LTD. liability in respect of such goods is limited to
making the benefits of the manufacturers guarantees available to the customer to
the extent aforesaid.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.

RK1412T ROTOCRUSHER

WARRANTY

Section 8.0

8.0 WARRANTY cont.


This understanding is in lieu of and excludes any other conditions guarantees, or
warranties expressed or implied, statutory or otherwise. In no event shall TESAB
ENGINEERING LTD. be liable (except to the extent of any of its undertaking as
aforesaid) for any loss injury or damage howsoever caused or arising.
The guarantee contained aforesaid is personal to TESAB ENGINEERING LTD.
customer and may not be assigned.

IMPORTANT:

TESAB ENGINEERING LTD. hereby emphasise that a dust suppression system must be used when the RK1412T is in operation.
TESAB ENGINEERING LTD. cannot be held responsible for any
failure due to the disregard of dust suppression.

Tesab Engineering Ltd., Unit 7B Gortrush Industrial Estate, Omagh, N.Ireland.