Presented by:
Roger Bergeron
Contributors:
Karim Slimani
Researcher Appareillage lectrique
Louis Lamarche Researcher Communication System
Bruno Cantin
Researcher Communication System
Issues Addressed
!
!
!
Present practice
New concept
Economical issue
Present Practice :
Power System for Residential Area
!
!
!
!
!
Present Practice:
Underground Infrastructure
Variable number of buried cables
Using connection boxes
Side
walk
Trench
TV and
Telephone
cables
MV
system
LV system
PRESTIGE Mai 2000 A
Medium-voltage system
located in peripheral of
living area
Up to 60
houses
with 1.6
km of
cable
0,5-2,5 MVA
Proposed simplified
infrastructure for underground
Simplified cable plow approach with 1 cable (no trench to dig)
Simplified connection box in two sections (power and multimedia)
Each connection box serves two houses.
Side
walk
To house # 1
To house # 2
600-V and
optical fibers
600 V-120/240V
Electronic transformer
Cable Plow
" Up to 3 inches
" Up to 42 inches deep
" Speed action with vibration
Sidewalk Approach
Electronic Transformer
at the Main Entrance
Example of Electronic
Transformer Topology
K5
K1
Tr
Ei
K3
E
Eo
Em
K4
K2
K6
Em
Ei
0 degree
45 degree
PRESTIGE Mai 2000 A
Eo
Why Intermediate
Voltage Approach?
!
152 892
256 256
37 200
1 594 780
6 457$
PRESTIGE Mai 2000 A
($)
Infrastru
8 000
-50%
794 112
3 215$
Conclusions
Conclusion
Questions ..