Professional Documents
Culture Documents
Agenda
Diversity of an IT plant
Configuration Management
Data Centers
Q&A
11/28/2012
Scale
Support personnel
High availability/resiliency
11/28/2012
11/28/2012
Unix / linux
Windows
SAN / NAS
5
11/28/2012
Diversity of an IT plant
Every effort is made to have uniform components (e.g. hw models,
software components)
Avoid vendor locking (price competition, delivery capability, service quality)
Lifecycle management (HW and SW), decommission is often a pain
Custom solutions
11/28/2012
Security components
Cross-platform authentication
Kerberos
11/28/2012
11/28/2012
Approval process
11/28/2012
10
11/28/2012
Support model
Why do we need support model?
Who are the customers?
ITIL (Service Desk, L1-L2-L3-Eng, ECC, local IT support), Service
Managers, SLA
Follow the Sun
525
99.9999%
52
99.99999%
11
11/28/2012
Data Centers
Problem
Design
11/28/2012
Political stability
Economy
HP - Wynyard
HOURS
8000
7500
7000
6500
6000
5500
5000
Power sources
Network connections
11/28/2012
14
11/28/2012
Requirements
Single non-redundant distribution path serving the IT
equipment
Non-redundant capacity components
Basic site infrastructure guaranteeing 99.671% availability
Fulfils all Tier 1 requirements
Redundant site infrastructure capacity components
guaranteeing 99.741% availability
Fulfils all Tier 1 & Tier 2 requirements
Multiple independent distribution paths serving the IT
equipment
All IT equipment must be dual-powered and fully
compatible with the topology of a site's architecture
Concurrently maintainable site infrastructure guaranteeing
99.982% availability
Fulfils all Tier 1, Tier 2 and Tier 3 requirements
All cooling equipment is independently dual-powered,
including chillers and Heating, Ventilating and Air
Conditioning (HVAC) systems
Fault tolerant site infrastructure with electrical power
storage and distribution facilities guaranteeing 99.995%
availability
Operation model
Rent computing power from the Cloud
(Amazon, HP, Oracle)
Rent a facility with personnel
Buy a facility
BCP site ration models
15
11/28/2012
Hardware Implementation
Traditional solutions:
blade chassis, IBM iDataPlex HP Spartans
with top-of-rack switch
16
11/28/2012
Q&A
17
11/28/2012
How would you make the Grid power consumption more efficient?
18