CHO/2012/DFHD/193 : PROVISION FOR HOOK-UP, COMMISSIONING AND

TOPSIDE MAJOR MAINTENANCE SERVICES FOR 2013-2017


DFHD/2014/042A/001 : PROVISION FOR HUC WORK
FOR TOPSIDE MODIFICATION FOR SKO PIPELINE
REJUVENATION PROJECT PL 381/210

Work Order No
& Title

JOBCARD ID NO

X X X

- P - 0 0 1

- A

GENERAL
JOB DESCRIPTION

WORK CATEGORY

Lift-up & move pipe spools to laydown area

SYS NO
DISCIPLINE
SCHEDULE

SISO

Onshore

Offshore

Prefabrication

Hook-Up

OPS MODE

SIPROD
SIPCOM
Pre Shutdown

WORK
PHASE

XXX

SYS DESC

N/A

Hook-Up

Demolition

PIPING

LOCATION

CD

Commissioning

Decommissioning

Early Start

Late Start

Actual Start

Plan Duration

Early Finish

Late Finish

Actual Finish

Actual Duration

Shutdown

Post Shutdown
Percent
Weight

HEALTH, SAFETY & ENVIRONMENT (HSE)


PERSONNEL PROTECTIVE EQUIPMENT

PERMIT TO WORK

JOB SAFETY ANALYSIS

Standart PPE

Body Harness

Personal H2S Monitor

Cold Work

Lifting

Hearing Protection

Chemical Protection

Others (specify below)

Hot Work

Radiation

Work Vest

Breathing Apparatus

_____________________

Electrical

QUALITY

TEST
REQUIREMENT

VI

UT

Hydrotest

Valve Leak Test

Cable Tests

Calibration

Function Test / Test Run

RT

MPI

Reinstatement

RV Pop Test

Tubing Leak Test

Loopcheck

Others

MANPOWER RESOURCES

TASK
NO

TASK DESCRIPTION

WORK VOLUME

TRADE

PLAN MHRS

Unit

Total

Unit

Total

TOOLS / EQUIPMENTS PREPARATION

RG

PAX

3.00

0.50

1.50

LIFT-UP & MOVE PIPE SPOOLS TO LAYDOWN AREA

RG

PCS

25.00

1.10

27.50

TOOLS / EQUIPMENTS / MATERIAL HANDLING

RG

LOT

0.75

27.50

20.63

HOUSEKEEPING

RG

PAX

3.00

0.5

1.50

DIRECT MANHOURS SUMMARY

Contractor
Personnel

RS

PF

PWL

SF

SWL

FW

MW

IT

IF

ELE

BP

RG

51.125

Third Party
Personnel

NDT

PT

BT

IS

CC

VR

WH

Total, Direct Manhours


Special Services
Requirement

L&R-001

Job Constraints /
Hold Points

Page 1 of 18

TOOL & EQUIPMENT RESOURCES

Item No

Unit

Utility Requirements

Qty

Description

Utility Air

Instrument Air

MESC No

Material Type Codes P = Project Material

Qty

Potable Water

Description

Power

VAC

Others __________

Description

T = Temporary (construction) Material

Type

Unit

C = Consumable Material S = Commissioning Spares

REFERENCE DRAWINGS & DOCUMENTS


Dwg / Doc No

Service / Firewater

Unit

MATERIALS

Item No

Item No

Rev

Drawing / Document Title

NOTES

JOBCARD
APPROVAL
Name
Designation

CONTRACTOR
Prepared By
Muhd Hasril Rahaman
Piping Engineer

Reviewed By

Agreed By

PCSB
Approved by

Workpack Team Leader

Project Manager

HUC Engineer

Signature
Date
L&R-001

Page 2 of 18

JOBCARD
APPROVAL
Name
Designation

CONTRACTOR

PCSB

Presented By

Verified By

Confirmed By

Accepted By

Foreman / Supervisor

Construction Superintendent

Discipline Inspector

HUC Engineer

Signature
Date

L&R-001

Page 3 of 18

SISO
SIPROD
SIPCOM
Pre Shutdown
Shutdown
Post Shutdown

JOB SAFETY ANALYSIS

Function Test / Test Run


Others

ACT
MHRS

ECT MANHOURS SUMMARY


Total
51.13
Total
0.00
51.13

L&R-001

Page 4 of 18

Description

Others ___________

Qty

S = Commissioning Spares
Drawing / Document Title

PCSB
Approved by
HUC Engineer

L&R-001

Page 5 of 18

PCSB
Accepted By
HUC Engineer

L&R-001

Page 6 of 18

CHO/2012/DFHD/193 : PROVISION FOR HOOK-UP, COMMISSIONING AND


TOPSIDE MAJOR MAINTENANCE SERVICES FOR 2013-2017
DFHD/2014/042A/001 : PROVISION FOR HUC WORK
FOR TOPSIDE MODIFICATION FOR SKO PIPELINE
REJUVENATION PROJECT PL 381/210

Work Order No
& Title

JOBCARD ID NO

X X X

- P - 0 0 2

- A

GENERAL
JOB DESCRIPTION

WORK CATEGORY

Lift-up & move manual valves (SD) to laydown area

SYS NO
DISCIPLINE
SCHEDULE

SISO

Onshore

Offshore

Prefabrication

Hook-Up

OPS MODE

SIPROD
SIPCOM
Pre Shutdown

WORK
PHASE

XXX

SYS DESC

N/A

Hook-Up

Demolition

PIPING

LOCATION

CD

Commissioning

Decommissioning

Early Start

Late Start

Actual Start

Plan Duration

Early Finish

Late Finish

Actual Finish

Actual Duration

Shutdown

Post Shutdown
Percent
Weight

HEALTH, SAFETY & ENVIRONMENT (HSE)


PERSONNEL PROTECTIVE EQUIPMENT

PERMIT TO WORK

JOB SAFETY ANALYSIS

Standart PPE

Body Harness

Personal H2S Monitor

Cold Work

Lifting

Hearing Protection

Chemical Protection

Others (specify below)

Hot Work

Radiation

Work Vest

Breathing Apparatus

_____________________

Electrical

QUALITY

TEST
REQUIREMENT

VI

UT

Hydrotest

Valve Leak Test

Cable Tests

Calibration

Function Test / Test Run

RT

MPI

Reinstatement

RV Pop Test

Tubing Leak Test

Loopcheck

Others

MANPOWER RESOURCES

TASK
NO

TASK DESCRIPTION

WORK VOLUME

TRADE

PLAN MHRS

Unit

Total

Unit

Total

TOOLS / EQUIPMENTS PREPARATION

RG

PAX

4.00

0.50

2.00

LIFT-UP & MOVE MANUAL VALVE TO LAYDOWN AREA

RG

NOS

14.00

1.60

22.40

TOOLS / EQUIPMENTS / MATERIAL HANDLING

RG

PAX

22.40

0.75

16.80

HOUSEKEEPING

RG

PAX

4.00

0.5

2.00

DIRECT MANHOURS SUMMARY

Contractor
Personnel

RS

PF

PWL

SF

SWL

FW

MW

IT

IF

ELE

BP

RG

43.2

Third Party
Personnel

NDT

PT

BT

IS

CC

VR

WH

Total, Direct Manhours


Special Services
Requirement

L&R-002

Job Constraints /
Hold Points

Page 7 of 18

TOOL & EQUIPMENT RESOURCES

Item No

Unit

Utility Requirements

Qty

Description

Utility Air

Instrument Air

MESC No

Material Type Codes P = Project Material

Qty

Potable Water

Description

Power

VAC

Others __________

Description

T = Temporary (construction) Material

Type

Unit

C = Consumable Material S = Commissioning Spares

REFERENCE DRAWINGS & DOCUMENTS


Dwg / Doc No

Service / Firewater

Unit

MATERIALS

Item No

Item No

Rev

Drawing / Document Title

NOTES

JOBCARD
APPROVAL
Name
Designation

CONTRACTOR
Prepared By
Muhd Hasril Rahaman
Piping Engineer

Reviewed By

Agreed By

PCSB
Approved by

Workpack Team Leader

Project Manager

HUC Engineer

Signature
Date
L&R-002

Page 8 of 18

JOBCARD
APPROVAL
Name
Designation

CONTRACTOR

PCSB

Presented By

Verified By

Confirmed By

Accepted By

Foreman / Supervisor

Construction Superintendent

Discipline Inspector

HUC Engineer

Signature
Date

L&R-002

Page 9 of 18

SISO
SIPROD
SIPCOM
Pre Shutdown
Shutdown
Post Shutdown

JOB SAFETY ANALYSIS

Function Test / Test Run


Others

ACT
MHRS

ECT MANHOURS SUMMARY


Total
43.20
Total
0.00
43.20

L&R-002

Page 10 of 18

Description

Others ___________

Qty

S = Commissioning Spares
Drawing / Document Title

PCSB
Approved by
HUC Engineer

L&R-002

Page 11 of 18

PCSB
Accepted By
HUC Engineer

L&R-002

Page 12 of 18

CHO/2012/DFHD/193 : PROVISION FOR HOOK-UP, COMMISSIONING AND


TOPSIDE MAJOR MAINTENANCE SERVICES FOR 2013-2017
DFHD/2014/042A/001 : PROVISION FOR HUC WORK
FOR TOPSIDE MODIFICATION FOR SKO PIPELINE
REJUVENATION PROJECT PL 381/210

Work Order No
& Title

JOBCARD ID NO

X X X

- P - 0 0 2

- A

GENERAL
JOB DESCRIPTION

WORK CATEGORY

Lift-up & move gaskets & stud bolts (SD) to laydown area

SYS NO
DISCIPLINE
SCHEDULE

SISO

Onshore

Offshore

Prefabrication

Hook-Up

OPS MODE

SIPROD
SIPCOM
Pre Shutdown

WORK
PHASE

XXX

SYS DESC

N/A

Hook-Up

Demolition

PIPING

LOCATION

CD

Commissioning

Decommissioning

Early Start

Late Start

Actual Start

Plan Duration

Early Finish

Late Finish

Actual Finish

Actual Duration

Shutdown

Post Shutdown
Percent
Weight

HEALTH, SAFETY & ENVIRONMENT (HSE)


PERSONNEL PROTECTIVE EQUIPMENT

PERMIT TO WORK

JOB SAFETY ANALYSIS

Standart PPE

Body Harness

Personal H2S Monitor

Cold Work

Lifting

Hearing Protection

Chemical Protection

Others (specify below)

Hot Work

Radiation

Work Vest

Breathing Apparatus

_____________________

Electrical

QUALITY

TEST
REQUIREMENT

VI

UT

Hydrotest

Valve Leak Test

Cable Tests

Calibration

Function Test / Test Run

RT

MPI

Reinstatement

RV Pop Test

Tubing Leak Test

Loopcheck

Others

MANPOWER RESOURCES

TASK
NO

TASK DESCRIPTION

WORK VOLUME

TRADE

PLAN MHRS

Unit

Total

Unit

Total

TOOLS / EQUIPMENTS PREPARATION

RG

PAX

2.00

0.50

1.00

LIFT-UP & MOVE GASKET & STUD BOLTS TO LAYDOWN AREA

RG

LOT

2.00

1.60

3.20

TOOLS / EQUIPMENTS / MATERIAL HANDLING

RG

PAX

3.20

0.75

2.40

HOUSEKEEPING

RG

PAX

2.00

0.5

1.00

DIRECT MANHOURS SUMMARY

Contractor
Personnel

RS

PF

PWL

SF

SWL

FW

MW

IT

IF

ELE

BP

RG

7.6

Third Party
Personnel

NDT

PT

BT

IS

CC

VR

WH

Total, Direct Manhours


Special Services
Requirement

L&R-003

Job Constraints /
Hold Points

Page 13 of 18

TOOL & EQUIPMENT RESOURCES

Item No

Unit

Utility Requirements

Qty

Description

Utility Air

Instrument Air

MESC No

Material Type Codes P = Project Material

Qty

Potable Water

Description

Power

VAC

Others __________

Description

T = Temporary (construction) Material

Type

Unit

C = Consumable Material S = Commissioning Spares

REFERENCE DRAWINGS & DOCUMENTS


Dwg / Doc No

Service / Firewater

Unit

MATERIALS

Item No

Item No

Rev

Drawing / Document Title

NOTES

JOBCARD
APPROVAL
Name
Designation

CONTRACTOR
Prepared By
Muhd Hasril Rahaman
Piping Engineer

Reviewed By

Agreed By

PCSB
Approved by

Workpack Team Leader

Project Manager

HUC Engineer

Signature
Date
L&R-003

Page 14 of 18

JOBCARD
APPROVAL
Name
Designation

CONTRACTOR

PCSB

Presented By

Verified By

Confirmed By

Accepted By

Foreman / Supervisor

Construction Superintendent

Discipline Inspector

HUC Engineer

Signature
Date

L&R-003

Page 15 of 18

SISO
SIPROD
SIPCOM
Pre Shutdown
Shutdown
Post Shutdown

JOB SAFETY ANALYSIS

Function Test / Test Run


Others

ACT
MHRS

ECT MANHOURS SUMMARY


Total
7.60
Total
0.00
7.60

L&R-003

Page 16 of 18

Description

Others ___________

Qty

S = Commissioning Spares
Drawing / Document Title

PCSB
Approved by
HUC Engineer

L&R-003

Page 17 of 18

PCSB
Accepted By
HUC Engineer

L&R-003

Page 18 of 18