You are on page 1of 3

SKOPIPELINE&

REJUVENATIONPROJECT
DOCUMENTCOVERPAGE

CASA ARMADA
SDN BHD

PurchaseOrderNumber:

4120093857

PurchaseOrderTitle:

PROVISIONOFSUPPLYNITROGENSKIDANDACCESSORIESFORPL381OF
SKOPIPELINEREPLACEMENTANDFACILITIESREJUVENATIONPROJECT

VendorsName:

CASAARMADASDNBHD

VendorDocumentNo.and
Revision:

2015101ME001

TransmittalNo:

025/PM

Vendor(PreparedBy):

MOHDSYAFIQDAUD

Date:12/3/2015

Vendor(CheckedBy):

MUKHSINOMAR

Date:12/3/2015

Vendor(ApprovedBy):

ZAFIZALISMAIL

Date:12/3/2015

Rev:B

DocumentDescription:EQUIPMENTDATASHEETSTKP-A
Equipment/TagNumber(s):A5910

ReviewCodeandStatus

Date:

CodeA

ReviewedWithNoCommentsWorkMayProceed

CodeB

ReviewedWithMinorCommentsReviseAndWorkMayProceed

CodeC

ReviewedWithMajorCommentsWorkMayNotProceed.ReviseAnd
Resubmit

CodeD

NotAccepted

CodeE

InformationOnlyAcknowledgeReceipt
Sign:

Equipment No
Equipment Name
Quantity

MECHANICAL DATASHEET

NITROGEN SKID

:
:
:

A-5910
NITROGEN SKID
One (1) skid

1
2
3

Tag No.
Quantity

A-5910
One (1) skid (Note 1)

Detail Drawing No.


P&ID No.

2015-101-PR-001

4
5
6
7

Installation

TKP-A
PROCESS DATA
Nitrogen

Service Fluid

10
11

Gas Flowrate (normal / max.)


Molecular weight
Estimated duration of use for the stated flowrate

12
13
14

SCFM
g/mol
min

6.7
28
10

15

Pressure -Working Pressure


-Design Pressure
-Estimated Pressure Drop

16
17
18

barg
barg
barg

2.5 (Purge Pressure)


245
0.05

19
o

Temperature -Working Temperature


-Design Temperature (min / max)

20
21

C
C

Amb. (Purge Temperature)


0 / 65

22

Parameters of Piping Outlet Skid :


- Design / Operating Pressure
- Operating Temperature
- Design Temperature (min / max)
- Outside connection

23
24
25
26
27

barg
o
C
o
C

245 / 2.5
AMB
0 / 65
20 mm NS, 150# rated,Stainless Steel
DESIGN REQUIREMENT

28
29

Cylinder

30
31

- Design Code
- Material

EN 1964-2, ISO 9809-2


Approval by Company Steel 34CrMo4 - WNR.1.7220 to DIN 17200
or CM ASTM A372-Type VIII or ISO 4954-C31

32
33

- Volume
- Size (Dx H)
- No. of Cylinders
- Certificate Requirement

34
35
36
37

litre
mm

38

Lifting Lugs (on structure)


External Support
Support ( Structural Parts)
Spreader Bar
Foundation Bolts/Nuts
Earthing Boss (2 nos.)
Nameplate
WEIGHT DATA
Erected Weight (for lifting)
Operating Weight

39
40
41
42
43
44
45
46
47
48

300
300

49

50
229 x 1500
2 (Operating/Stand By)
Yes/Approval by Company/Approval from Malaysia Statutory Authorities
STRUCTURE AND ACCESSORIES
YES
YES
YES
YES
YES
YES
SS 316L
PROTECTIVE COATING
kg
Surface Preparation (External)
YES; PTS 30.48.00.31
Painting (External)
kg
NOTES

50
51
52

1.

53
54
55
56

2.
3.
4.

57
58
59
60
61
62
63

5.
6.
7.
8.
9.
10.

64

Two (2) Nos. bottles (1 no. duty + 1 no. Standby) of N2 cyclinders in one skid (A-5910) at TKP-A will be served for pig trap L-1350 for purging
after pigging activity.
Material for cylinder shall be in accordance with ISO 4954 Type C31 or BS 5045 Part 1-CM or DIN 17200-W.NR.1.7220 or ASTM A372 Type VIII
All stud bolts and nuts shall be PTFE coated over electroplated nickel/zinc as per PTS 39.01.10.12. and CSP-23
Material, surface preparation and coating shall be suitable for offshore environment. Surface preparation and painting shall refer to
PTS 30.48.00.31.
Refer to Instrument datasheet for instrumentation requirements.
The cyclinder nameplate shall indicate the cylinder dry weight and respective N2 fill weight.
Skid dimension is 750mm (L) x 700mm (W) x 1800mm (H).
The weight of overall skid shall not exceed 0.7MT
Vendor shall supply one (1) number of 5m flexible hose with quick coupling (female both ends) with dust cap and hose reel.
One(1) flexible hose shall be supplied for connection from Nitrogen Bottle to instrument tubing. Flexible hose
for connection from instrument tubing to Launcher, L-1350 shall refer page 2 of datasheet.

65
66
67
68

PROJECT TITLE

DESIGN AND ENGINEERING SERVICES SKO


PIPELINES AND FACILITIES REJUVENATION
PROJECT FOR PETRONAS CARIGALI SDN BHD,
SARAWAK OPERATIONS

MMC PROJECT NUMBER

PCSB-A-1918U

WORK ORDER TITLE

Pipeline Replacement and Topside


Rejuvenation for PL-381 (TKP-A to WLDP-C)

Eng. By

Client

: PETRONAS CARIGALI SDN BHD

MMC Oil & Gas Engineering Sdn Bhd (125442-W)

B
A
REV

12.03.15
18.02.15
DATE

ISSUED FOR APPROVAL


ISSUED FOR REVIEW
REVISION DESCRIPTION
Sheet No
Datasheet No.

cont'd on sheet No.

2015-101-ME-001

(39275-U)

Rev.

MSD
MSD
PREPARED

MO
MO
MO
MO
CHECKED APPROVED

PCSB

Equipment No
:
Equipment Name :
Quantity
:

MECHANICAL DATASHEET

FLEXIBLE HOSE
DESCRIPTION

A-5910
FLEXIBLE HOSE
One (1) skid

REQUIRED

2
3
4
5

General
Quantity Required
P&ID No.

1
2015-101-PR-001

6
7
8
9

Process Data & Design Condition


Fluid Description

Nitrogen

10
11
12
13
14

Operating Pressure (max / min)


Operating Temperature (max / min)
Design Pressure (max / min)
Design Temperature (max / min)

barg
C
barg
C

2.5
AMB
18.7
65 / 0

15
16
17
18

Mechanical Data and Material of Construction

19
20
21
22

Hose
Length
Material

5m
Rubber with SS316 Wire Braid

23
24
25
26
27
28

Hose End Connections :


- One end
Type
Design and Manufacturing Code

Quick Coupling (Female)


Nach DIN 2828/MIL-C-27487

29

DN20, 150#
SS316

Size/Rating
Material
- Other end
Type
Design and Manufacturing Code

30
31
32
33
34

Quick Coupling (Female)


Nach DIN 2828/MIL-C-27487

35

DN20, 150#
SS316

Size/Rating
Material

36
37
38
39

Y (Dust Cap) - male


2
Quick Release Type
SS316 Chain

Cover / Dust Cap (Y/N)


Quantity required
Type
Attachment

40
41
42
43
44

Maxiflex

Manufacturer

45
46

As per VDRL

Vendor Data Requirement List

47
48

Required
Stainless Steel 316
0.4 m
Near Nitrogen Skid, At Cellar Deck

Hose Reel
- Material
- Size
- Location

49
50
51
52
53
54
55

NOTES

56
57
58

61

1.
2.
3.

62

4.

59
60

Flexible hose shall be non-collapsible, non-leakable type and shall be at single full specified length without joints.
Flexible hose shall be hydrotested 1.5 time design pressure
Hoses shall be suitable for offshore, marine, salt laden atmosphere.
Hoses shall be provided with a SS316 tag attached to the hose indicating working pressure,design pressure, tag number etc.

63
64
65
66
67
68
69

Eng. By

MMC Oil & Gas Engineering Sdn Bhd (125442-W)

Sheet No
Datasheet No.

Client

: PETRONAS Carigali Sdn Bhd

cont'd on sheet No.

2015-101-ME-001

(39275-U)

Rev.

You might also like