Unsuitable and surplus material, which, in the opinion of the Engineer cannot be used in the
Works, shall be removed from site by the Contractor and disposed of at the nearest tip or
other approved location in accordance with all statutory requirements.
Version 24-3
Delete the second and third sentences of the third paragraph and replace with:
Excavation in soil and ordinary rock shall be paid under the same item in all cases except
the excavation of bridge foundations.
Delete items (iv) & (v) and replace with:
iv.
v.
vi.
vii.
Items iv and v above shall also include topsoil quantities relating to embankments. Refer to
Clause 305.
Sub-Clause 301.9
Rates
Sub-Clause 301.9.1
In item (ii) replace 1000m with 2000m.
Add extra item after item (vi):
(vii) The removal from site and disposal of all surplus or unsuitable materials obtained
from excavation operations, which, in the opinion of the Engineer cannot be used in the
Works, shall be included in the Contract rate.
Version 24-3
Sub-Clause 301.9.2
This Sub-Clause shall read as :
The Contract unit rate for loosening and re-compacting at subgrade level shall include full
compensation for loosening to the specified depth, removing the loosened soil outside the
roadway excavation, rolling the surface below, breaking the clods, spreading the excavated
soil in layers, watering where necessary and compacting to the requirements.
Sub-Clause 301.9.5
Replace 1000m with 2000m in the first sentence.
Sub-Clause 301.9.6
Replace 1000m with 2000m in the first sentence.
Sub-Clause 301.9.7 Payment for geotextile
Add new Sub-Clause.
The unit rate for placing geotextile after removal of unsuitable material shall include, cutting
and lapping and all labour, materials, tools, equipment and incidental required to compete the
work in accordance with Sub-Clause 706.
Clause 304
up to 3m
3m to 6m
more than 6m
m3
m3
m3
Sub-Clause 304.5.1
Delete item (v) and replace with:
Bidder Engineer in Chief (R&B) (Admin and EAP)
Volume 2
Version 24-3
(v)
backfilling, clearing up the site and disposal of all surplus or unsuitable material,
which, in the opinion of the Engineer cannot be used in the Works, at the nearest tip or
other approved location in accordance with all statutory requirements.
Sub-Clause 304.5.3
Delete this sub-clause.
Clause 305
EMBANKMENT CONSTRUCTION
Sub-Clause 305.2.1.1
Delete the subsection (e) in the second paragraph and replace with the following:
(e)
Soils having a liquid limit exceeding 35 and a plasticity index exceeding 18; and
Sub-Clause 305.2.1.2
This Sub-Clause shall read as under:
Highly expansive soils such as CH, MH or OH exhibiting marked swell and shrinkage
properties (free swelling index exceeding 50 per cent when tested as per IS: 2720-Part 40)
shall not be used in construction of subgrade and embankment.
Sub-Clause 305.2.1.4
Delete second sentence of Sub-Clause 305.2.1.4
Sub-Clause 305.2.1.6
Add new Sub-Clause.
Material used as subgrade in embankments (depth of 500mm immediately below the
pavement) shall have a 4 day soaked CBR value at least equivalent to the CBR assumed in
the design and shown on the drawings.
Sub-Clause 305.2.1.7
Add new Sub-Clause:
Geotextile placed at the direction of the Engineer after removal of unsuitable material shall
be approved by the Engineer and shall comply with the requirements of Sub-Clause 706.
Version 24-3
The values of maximum dry density and optimum moisture content obtained in
accordance with IS: 2720 (Part 8) for each fill material intended for use.
(ii)
The graphs showing values of density against moisture content from which the
maximum dry density and optimum moisture content in (i) above were determined.
(iii)
The dry density-moisture content - CBR relationships for each of the fill materials
intended for use in the subgrade. The adopted CBR value shall be the 4 day soaked
CBR value determined in accordance with IS:2720 (Part 16).
Where material suitable for use as subgrade is available within 2 km of the work site, the
Contractor shall not source the subgrade material from borrow areas.
Sub-Clause 305.3
Construction Operations
Version 24-3
ii.
iii.
Version 24-3
Sub-Clause 305.8
Version 24-3
Sub-Clause 305.9.3
Delete this Sub-Clause
Sub-Clause 305.9.8
Delete this Sub-Clause and replace with:
The Contract unit rate for providing and laying filter material behind abutments and
compacted sand backfill to foundations shall be payment in full for carrying out the required
operations including all materials, labour, tools, equipment and incidentals to complete the
work to Specification.
Sub-Clause 305.9.11
Add new Sub-Clause:
The unit rate for placing geotextile after removal of unsuitable material shall include, cutting
and lapping and all labour, materials, tools, equipment and incidental required to compete the
work in accordance with Sub-Clause 706.
Clause 306
Sub-Clause 306.4
Rates
Sub-Clause 308.2
Materials
A.
Seeds
Version 24-3
The Contractors attention is drawn to the lead time that may be required to procure some
native seed species. The Contractor shall submit to the Engineer the name(s) of the proposed
seed supplier(s) within two weeks of the acceptance of the tender.
The native seed shall be delivered to the site in separate lots for each species and variety,
clearly labelled to show species, variety and weight. Grass seed shall be pre-packed
commercially with an accompanying certificate of germination. The Contractor shall advise
the Engineer of the unavailability of any of the specified seed species at least six weeks in
advance of sowing.
The Contractor shall notify the Engineer in writing at least five days prior to commencing
vegetation of an area. Fertiliser used shall be an organic type having an N:P:K analysis
(stated in elemental form) within the following range:
N:
P:
K:
5.0% to 9.0%
1.0% to 4.0%
2.0% to 4.0%
Fertilizer shall be delivered to the site in unopened standard bags or containers bearing the
manufacturers description, analysis of constituents and quantity. The Contractor shall advise
the Engineer at least two days before applying fertiliser to allow the Engineer to inspect the
unopened bags or containers. Straw to be used in mulching operations shall be derived from
cereal crops comprising wheat, oats or rice. Meadow hay or weeds shall not be used. Water
used shall be potable.
B.
Top soil
Bituminous Emulsion
Version 24-3
Maintenance
Version 24-3
During the maintenance period the Contractor shall be responsible for keeping seeded areas
secure from damage by animals or other sources.
Sub-Clause 308.7
Rate
50% of payment due for the relevant items after completion of seeding and mulching
to the satisfaction of the Engineer.
remaining 50% to be paid 12 months after seeding. This part of the payment is to be
made in proportion to the area over which a strong grass cover as determined by the
Engineer, has been established.
Sub-Clause 308.8
SURFACE/SUB-SURFACE DRAINS
Sub-Clause 309.2
Surface Drains
Version 24-3
702. Granular filter material for subsoil drains shall meet the grading requirements of Class
II material as shown in Table 300-3.
Sub-Clause 309.4
Rates
In the first sentence delete except for removal of unsuitable material for which the lead shall
be 1000m and replace with including removal from site and disposal of all surplus or
unsuitable materials, which, in the opinion of the Engineer cannot be used in the Works.
In the second sentence delete gratings, sumps,.
Delete the third sentence and replace with:
The rate for subsoil drain shall also include geotextile, granular backfill, perforated pipe,
connection to pipes or sumps and construction of outlets as detailed. The rate for concrete
lined drain shall also include bedding concrete and jointing.
Clause 310
TREE PLANTING
Version 24-3
Sub-Clause 314.1
Scope
This Sub-Clause covers the planting (including mulching and fertilising), watering and
maintenance of trees as shown on the Drawings, listed in the Specification, or as directed by
the Engineer.
Sub-Clause 314.2
Timing
Unless otherwise directed by the Superintendent, planting shall be carried out within seven
(7) days of seeding operations, to avoid unnecessary disturbance of areas of existing
vegetation and of areas of the works previously topsoiled and seeded, or straw mulched.
Sub-Clause 314.3
Procedures
Version 24-3
All work specified shall be carried out under the supervision of an experienced
landscape tradesman satisfactory to the Engineer.
Planting work includes:
(a)
(b)
Allowance shall be made in the rates quoted for the supply of any water or
watering facilities necessary for the planting and maintenance of the trees.
Water shall be free from oils, salts, acids, alkalis, organic matter and any other
matter which would affect the growth of plants. Plant root systems shall be
maintained moist at all times with particular attention prior to and immediately
after planting.
(c)
(d)
(i)
(ii)
(iii)
(iv)
Method of Work
The Contractor shall organise his planting work and methods so as to
minimise damage to surface vegetative work already done under this Contract,
by topsoiling and seeding, or by other methods. Damage to the existing
vegetation caused by the Contractors tree planting operation shall be rectified
at the Contractors expense.
(e)
(f)
Setting Out
The positions of all plantings shall be set out in accordance with the Drawings,
or as directed by the Engineer. An inspection shall be undertaken by the
Engineer prior to the commencement of planting operations.
Sub-Clause 314.4
(ii)
(iii)
The mulch shall be free of soil, weeds, stones, vermin, insects nor other foreign
material. The Contractor shall submit proposals for mulch to the Engineer for
approval, 21 days before planting.
Sub-Clause 314.4.4 Plant Material
The plants are to be supplied by the Contractor. All plants are to be supplied in the
containers as specified below and shall have grown to the approved heights as
specified below :
CONTAINER SIZE
Super Advanced
45 Litres
Sub-Clause 314.5
Planting Operations
Immediately after back filling, mulch shall be spread to a depth as required by the
Drawings and this specification. The mulch material is not to be mixed with the
underlying soil during excavation and backfilling. Mulch material shall be kept just
clear of the stems of plants. Trees shall be protected by steel cages in accordance with
the detail on the Drawings and this Specification. Super-Advanced size plant shall
receive 50 litres of water per plant, in a manner which causes minimum disturbance to
the mulch, immediately after the planting operation is complete.
Sub-Clause 314.6
Maintenance
The Contractor shall water, control weeds, control insects and disease, apply fertilizer
and generally maintain the works in good condition regardless of weather conditions
in accordance with Clauses in this specification.
(a)
Maintenance Period
The maintenance period for planting shall end at the completion of the defects
liability period for the relevant road section or 12 months from the completion
of planting, whichever occurs later. The Contractor shall be responsible for all
maintenance requirements from the time of seeding and planting to the end of
the maintenance period.
During this period the Contractor shall make good all defects and leave the
site in a clean and tidy condition to the satisfaction of the Engineer. During
the maintenance period the Contractor shall be responsible for keeping all
plants and materials secure from damage by animals or theft.
(b)
Maintenance Inspections
Routine maintenance shall be carried out at minimum monthly intervals in
accordance with site requirements and prevailing weather conditions. In
addition to routine maintenance visits, the Contractor shall visit the site during
periods of adverse climatic conditions or as directed by the Engineer to
determine status and effectiveness of maintenance previously carried out and
in progress and the need for future maintenance activities.
(c)
Records
The Contractor shall submit a written report to the Superintendent within four
(4) days of each maintenance inspection. The report shall include date of visit,
maintenance works completed, maintenance works in progress and
maintenance works required. The report shall also give details of damaged or
missing plants together with a location diagram. Observations and/or
recommendations for additional work considered necessary for ongoing
maintenance shall also be included in the report. Maintenance work required
shall be approved by the Engineer or his representative before work can
commence and with exception to those specifically required in the Contract.
(d)
Watering
From commencement of the maintenance period plants shall be watered by
minimum monthly applications. Each watering shall comprise the application
of twenty (20) litres of water per plant to ensure that a distinct level of
moisture is maintained. The frequency of watering the works may be reduced
Mulch
The Contractor shall maintain mulch areas in a weed free condition and where
deemed necessary, at the absolute discretion of the Engineer, reinstate the
mulch until completion of the maintenance period.
(f)
(g)
During the maintenance period, plants shall be sprayed to control disease and
insect infestation. The Contractor shall obtain the Engineers written approval
to the type of chemical proposed for spraying before spraying is carried out.
Spraying shall only be carried out in accordance with the manufacturers
recommendations and only on windless days. The Superintendent shall be
advised 24 hours prior to an intended spraying operation. Additional spraying
may be directed by the Engineer as required. In no circumstances are
pesticides to be used without the written consent of the Engineer. Where
required to be used, pesticides and their application shall comply with
requirements of the relevant laws and regulations.
Plant Replacement
Missing or dead plants, plants in poor condition or plants nominated by the
Engineer as unsatisfactory shall be removed and replaced by the Contractor, at
his own cost, within 14 days of notification by the Engineer. Plant Material
shall conform to Sub-Clause 314.4. Replacement plants shall be of similar size
and quality and of identical species and variety to the plant being replaced
unless otherwise directed by the Engineer. Replacement plants shall be
planted and watered in accordance with requirements in this Specification.
Sub-Clause 314.7
The unit of measurement for tree planting shall be per each plant. The unit of
measurement for protection of trees (steel cages) shall be per each plant protected in
accordance with the details on the drawings.
Sub-Clause 314.8
Rates
The rate for the planting is to include supply from storage site, site preparation,
excavation (in all types of material), backfilling, mulching, fertilizing, watering and
maintenance of trees of the specified size.
Payment of 25% of the scheduled rate will be paid at the satisfactory completion of
planting. A second payment of 25% will be paid at 3 months for those trees which are
in a healthy state after
this period. For trees which have been replaced, the second payment will only be
made 3 months after the trees are replanted. The final payment of 50% will be made
at the end of the maintenance period for those trees which are healthy at that time.
Final payment will be made for trees planted less than 6 months before the end of the
maintenance period, at the discretion of the Engineer.
Payment for tree protection shall be payment in full for carrying out all operations
including fill compensation for all materials labour, equipment and incidentals
required to complete the works in accordance with the specifications and drawings.
Payment for tree protection works will be made in the same proportions and at the
same times as the payment for planting of super advanced trees. The final payment
for tree protection will only be made for trees which are healthy at the end of the
maintenance period. Final payment for protection of trees planted less than 6 months
before the end of the maintenance period will be made at the discretion of the
Engineer.