You are on page 1of 6

CLIMATE KEEPERS

183 /2,Lenin Sarani,(2nd Floor) Kol-13


Phone : 2212 9443, Fax 2212-9810

Dear sir,
Re:

Quotation for supply, Installation and Erection of


4000 M.T Potato Cold Storage

As discussed, we are pleased to submit the quotation for supply,


installation and erection for potato cold storage of 4000 M.T.
Sl.

Description

Qty

Rate(Rs.
)

Amount(R
s.)

4,62,000.
00

13,86,000.
00

2,30,000.
00

6,90,000.0
0

Compressor
1.

2.

Kirloskar make, model KCX -3 heavy duty


single
acting
reciprocal
Ammonia
Compressor with water cooled heads, unloader, flywheel, suction / discharge service
valve, pressure gauge and cut-out mounted
on gaze board, motor-pulley, V- belts, beltguard, anchor bolt, nuts, washer, special
tools, service manual, complete with all
accessories.
T.R52,
R.P.M850,
Evaporating
O
Temperature - 5

Motor & Starter :


Kirloskar make 57 KW 75 HP AC
415 V 3 phase 50 CY 1500 RPM
SPDP Slip ring Motor suitable for
Kirloskar
3
KCX 3 compressor with BBE
make Oil Immersed Starter.

Oil Seperator

High Pressure Ammonia Oil


Separator of 500 mm dia X 1500
mm long fabricated from tested
MS plates of 10 mm thickness
for shell and 12 mm for dish end 1
complete with internal baffles
plates
and
outlet
pipe
connection. The Oil separator
shall be tested to hydraulic
Pressure of 30kg/cm2
Condenser :
Atmospheric type condenser
shall be made of 50 mm n.b. c.
class Tata make pipe and 150
mm center to center U Bend
made of same pipe. Each stand
shall be 12 pipe high, 6 m long 16
with U Bend. There shall be 3
pairs of MS Angles stand for
supporting the condenser. Each
stand shall be provided
With 50mm n.b. G.I.(M) sprinkler
pipe.
(Rate per set) with Inlet & Outlet
valves
Ammonia Receiver :
Ammonia Liquid Receiver shall
be fabricated from tested MS
plates having a diameter of 750
mm X 5000 mm length. MS 1
plates shall be 16 mm thickness
for shell and 20 mm for dish-end.
The same shall be tested to
hydraulic pressure of 30 Kg/Cm.
sq. with liquid Inlet & Outlet
valve,Safety valve,Gauge glass
valve & Oil drain Valve etc.
Cooling Coil :

24,000.00

24,000.00

52,000.00

8,32,000.0
0

2,10,000.
00

2,10,000.0
0

The cooling coil shall be 12


fabricated with 40 mm n.b. C
class Tata make ERW pipe fitted
with 100 mm x 100 mm sq. pipe
fitted with Fin made of 20 SWG
CRC sheet with a raised collar of
12.50 mm high in the middle for
press fittings. The cooling coil
shall be 12 mtr long x 4 pipe
wide x 2 pipe high connected to
100 mm Gas and Liquid Header
with 40 mm C class U Bend.
(Rate per set).
6
Electronic
Liquid
Level
Controller
complete
with
Solenoid Valves, Liquid Level
Indicator modules and 15 mm &
20 mm Valves and other fittings.
Surge Accumulator :
Surge Accumulator shall be
vertically design with 450 mm 6
dia x 1200 mm long with 150
mm n.b.c. C class Tata pipe
750 mm long liquid leg. The
surge accumulator shall be
complete baffles and inlet/outlet
pipe connection.
Pump Set
Kirloskar
make
5
x
5
centrifugal Pump Model NW- 1
10D ( 245 impeller) with 15 HP
Kirloskar make 415 Volt 1500
RPM squirrel cage motor fitted
on a base frame with Starter.
Insulation
Cost of EPS of 100mm with 18Kg. in M/3 for
roof,80 mm with 18 Kg.
Density in M/3 for wall and 50 mm, with 18 Kg.

1,42,000.
00

17,04,000.
00

54,000.00

3,24,000.0
0

22,000.00

1,32,000.0
0

72,000.00

72,000
.00

density for floor


i
Bitumen-85/25 for fixing of EPS
Other fixing materials like G.I.Net
G.I.Wire, G.I.Nut,
Washer oil cloth favicol etc.
ii
Insulated Door & Windows

10

11.

12

Refrigeration Piping & Valves


Fittings:
Lot
Refrigeration Piping, Fittings,
Valves, Supports etc with interconnecting
piping
between
various equipment for erection &
installation
of
Refrigeration
System
G.I.Piping :
Condenser
Cooling
Water
Connection, Compressor Cooling Lot
Water connection, Drain Line of
D-Pan
and
Fire
FightingEquipment.
Elecirical wiring& Connection Lot
:

52,000,00
.00

52,000,00.
00

8,50,000.
00

8,50,00
0.00

2,50,000.
00

2,50,000
.00

12,00,000
.00

12,00,000.
00

3,50,000.
00

3,50,000.0
0

4,00,000.
00
TOTAL

4,00,00
0.00
1,36,24,0
00.00

Installation of
a)500 KVA Transformer
b)Generator set
c) Panel Board, Motor, Starter, cable lying
strength outing and connection.
d) LIT wiring,Light Fan and area light and
Earthing system.
e)Commissioning, Testing ,
.

.
13
14

Refrigerant for 1 st charge. likes


compressor Oil & Gas
Lot
Labour Charges
commissioning

for

erection,
Lot.

Rupees: One crore thirty two Lac twenty four thousand only.
Other Terms and Conditions:
1) Payment : 60% advance against Confirmed order, 30%
against
Delivery of the plant & machinery and
equipment,
materials
etc.
10%
after
commissioning of the plant.
2)Delivery :
order along

Within14 / 16 weeks from the receipt of the


with advance.

3) Taxes :
extra. The

Tax are to be charged as per prevailed rate as


tax is not included in the quotation.

4) Transport :

5) Others:
arranged by

Kolkata to your site is on your cost.

Power, Fuel required for erection are to be


you.
Accommodation including light for our staf

during the
erection period are to be arranged.
We shall not be liable for any damages
caused due to
natural calamities beyond our control.

This quotation is valid for 30 days only from the date of issue.
Thanking you.

Yours faithfully,
FOR CLIMATE KEEPER
S. CHAUDHURY
Partner