ANALISA K UNTUK PEKERJAAN JALAN

(edisi revisi)

DAFTAR ANALISA BAHAN DAN UPAH KERJA


PEMERINTAH KOTA BLITAR TAHUN ANGGARAN 2014
( Triwulan I Tahun 2015 )
ANALISA HARGA SATUAN
LAP. PENETRASI / PERMUKAAN MACADAM 50 MM
LAPEN ( MENGGUNAKAN BURUH )

DINAS PEKERJAAN UMUM


DAERAH KOTA BLITAR
PROPINSI
JAWA TIMUR

KODE :
35

URAIAN :
1. Semprotkan aspal tack coat 0.8 l / m
2. Hamparkan agregat pokok 3-5,25
m / m dan padatkan
3. Hamparkan split 2-3;45 m / m
dan padatkan
4. Semprotkan aspal ( 2,5 kg / m )
5. Hamparkan agregat pengunci split
6. Semprotkan aspal 1,5 kg / m & gilas
7. Taburkan pasir rata - rata 400 m / m

PEKERJA

PEKERJA
Mandor
Operator terampil
Sopir
Buruh tak terampil
Buruh terampil

MATERIAL

MATERIAL

PERALATAN
PERALATAN

VOLUME

HARI

KODE

JML. VOL.
(hari orang)

2
2
1
66
2

3
3
3
3
3

L.061
L.081
L.091
L.101
L.106

6
6
3
198
6

JUMLAH
VOLUME
56
31
15.5
3.5
6270
450
8.1

Batu pecah 3/5 cm


Batu pecah 2/3 cm
Batu pecah 1/2 cm
Pasir beton
Aspal panas drum
Minyak bakar
Alat bantu

Roller 3 wheeled 6-8 T


Sprayer aspal 1000 Lt
Dump truck 3,5 T-115 HP

KOTA :
KODE :
DISIAPKAN OLEH :
BLITAR
4
ANGGAPAN / ASUMSI :
1. Menggunakan tenaga buruh
2. Harga material(aggregat pokok, agregat pengunci, agregat penutup, aspal)
adalah harga di lokasi proyek
3. Volume aspal cair untuk tack coat/prime coat 0.8 lt/m
4. Tebal lapisan penetrasi 5 cm
5. Agregat dikirim ke lokasi pek. oleh leveransir

TOTAL
VOLUME
56
31
15.5
3.5
6270
450
8.1

SAT

KODE

M3
M3
M3
M3
Kg
Lt
Set

M.023
M.024
M.025
M.041
M.061
M.065
M.170

JUMLAH
ALAT

HARI

KODE

JAM
KERJA

1
1
1

3
3
3

E.080
E.154
E.221

15
15
15

UPAH
(Rp/Org/Hari)
75,000.00
59,000.00
59,000.00
44,000.00
49,000.00

HARGA
SATUAN (Rp.)
229,300.00
255,500.00
280,100.00
127,300.00
22,100.00
22,500.00
1,100.00
BIAYA
(Rp./Jam)
554,500.00
86,400.00
199,700.00

KODE :
35

URAIAN :
1. Material disiapkan di lokasi pekerjaan
2. Menghampar pasir setebal 5 cm
3. Batu pecah berukuran besar ( 15 - 20 cm )
disusun berdiri
4. Batu pecah yang lebih kecil merata
kemudian dipadatkan/digilas dengan
mesin gilas

PEKERJA

PEKERJA
BIAYA
(Rp.)
12,840,800.00
7,920,500.00
4,341,550.00
445,550.00
138,567,000.00
10,125,000.00
8,910.00
MATERIAL
BIAYA
(Rp.)

Mandor
Operator terampil
Buruh tak terampil

MATERIAL

9,987,000.00
SUB JUMLAH
(Rp.)

174,249,310.00
SUB JUMLAH
(Rp.)

8,317,500.00
1,296,000.00
2,995,500.00
12,609,000.00
196,845,310.00

140,603.79 Per M2
140,600.00 Per M2

ANALISA HARGA SATUAN


KONSTRUKSI LAPIS PONDASI BAWAH (LPB)
TELFORD ( MENGGUNAKAN BURUH )

DINAS PEKERJAAN UMUM


DAERAH KOTA BLITAR

PEKERJA

SUB JUMLAH
(Rp.)

1,400.00 Satuan M2
Harga Satuan Rp.
Dibulatkan
Rp.

PROPINSI
JAWA TIMUR

TANGGAL :
- 2013

450,000.00
354,000.00
177,000.00
8,712,000.00
294,000.00

PERALATAN
JUMLAH
Volume =

ATERIAL

BIAYA
(Rp.)

KODE
K.618

KOTA :
KODE :
DISIAPKAN OLEH :
BLITAR
4
ANGGAPAN / ASUMSI :
1. Menggunakan tenaga manusia 400 m per hari
2. Material-material dikirim ke tempat pekerjaan oleh leveransir
3. Batu sudah dipecah
4. Tanah dasar sudah disiapkan
5. Dipadatkan sampai tebal 20 cm

VOLUME

HARI

KODE

JML. VOL.
(hari orang)

3
1
99

1
1
1

L.061
L.081
L.101

3
1
99

JUMLAH
VOLUME

SAT

KODE

TOTAL
VOLUME

Lembar 1

UPAH
(Rp/Org/Hari)
75,000.00
59,000.00
44,000.00

HARGA
SATUAN (Rp.)

BIAYA
(Rp.)

KODE
K.516.a

TANGGAL :
- 2012

SUB JUMLAH
(Rp.)

225,000.00
59,000.00
4,356,000.00
PEKERJA
BIAYA
(Rp.)

4,640,000.00
SUB JUMLAH
(Rp.)

MATERIAL

Batu belah 15/20


Batu pecah 5/7
Pasir beton
Alat bantu

50
20
30
4

PERALATAN

PERALATAN

Roller 3 wheeled 8 - 10 t

m3
m3
m3
Set

M.020
M.022
M.040
M.170

50
20
30
4

JUMLAH
ALAT

HARI

KODE

JAM
KERJA

E.080

180,300.00
192,600.00
127,300.00
1,100.00

BIAYA
(Rp./Jam)
554,500.00

9,015,000.00
3,852,000.00
3,819,000.00
4,400.00
MATERIAL
BIAYA
(Rp.)
2,772,500.00

PERALATAN
JUMLAH
Volume =

16,690,400.00
SUB JUMLAH
(Rp.)

2,772,500.00
24,102,900.00

80.00 Satuan M3
Harga Satuan Rp.
Dibulatkan
Rp.

Lembar 2

301,286.25 Per M3
301,280.00 Per M3

ANALISA HARGA SATUAN


KONSTRUKSI LAPIS PONDASI BAWAH (LPB)
TELFORD ( MENGGUNAKAN BURUH )

DINAS PEKERJAAN UMUM


DAERAH KOTA BLITAR
PROPINSI
JAWA TIMUR

KODE :
35

URAIAN :
1. Material disiapkan di lokasi pekerjaan
2. Menghampar pasir setebal 5 cm
3. Batu pecah berukuran besar ( 10 - 15 cm )
disusun berdiri
4. Batu pecah yang lebih kecil merata
kemudian dipadatkan/digilas dengan
mesin gilas

PEKERJA

PEKERJA
Mandor
Operator terampil
Buruh tak terampil

MATERIAL

MATERIAL
Batu belah 10/15
Batu pecah 5/7
Pasir beton
Alat bantu

PERALATAN

PERALATAN
Roller 3 wheeled 6-8 T

KOTA :
KODE :
DISIAPKAN OLEH :
BLITAR
4
ANGGAPAN / ASUMSI :
1. Menggunakan tenaga manusia 400 m per hari
2. Material-material dikirim ke tempat pekerjaan oleh leveransir
3. Batu sudah dipecah
4. Tanah dasar sudah disiapkan
5. Dipadatkan sampai tebal 15 cm

VOLUME

HARI

KODE

JML. VOL.
(hari orang)

3
1
75

1
1
1

L.061
L.081
L.101

3
1
75

JUMLAH
VOLUME

SAT

KODE

TOTAL
VOLUME

37.5
15
22.5
3

m3
m3
m3
Set

M.020
M.022
M.040
M.170

37.5
15
22.5
3

JUMLAH
ALAT

HARI

KODE

JAM
KERJA

E.080

UPAH
(Rp/Org/Hari)
75,000.00
59,000.00
44,000.00
HARGA
SATUAN (Rp.)
180,300.00
192,600.00
127,300.00
1,100.00

BIAYA
(Rp./Jam)
554,500.00

BIAYA
(Rp.)
225,000.00
59,000.00
3,300,000.00
PEKERJA
BIAYA
(Rp.)

MATERIAL
BIAYA
(Rp.)

PEKERJA
MATERIAL

MATERIAL
Pasir beton
Aspal curah
Filler
Alat bantu (set @ 3 alat)
Batu pecah 1- 2
Batu pecah 0.5-1

ERALATAN

PERALATAN

12,517,800.00
SUB JUMLAH
(Rp.)

2,772,500.00
18,874,300.00

314,571.67 Per M3
314,570.00 Per M3

ANALISA HARGA SATUAN


MEMPRODUKSI LAPIS TIPIS ASPAL BETON
(LATASTON) MENGGUNAKAN ALAT/MESIN
KODE :
35

URAIAN :
1. Semua material dikirim oleh leveransir
2. Loader menjaga agar bin tetap penuh
3. Hasil produksi 100 ton/hari
4. Pengangkutan dengan dump truk tertutup
dengan terpal untuk mempertahankan suhu
5. Dumptruk membongkar langsung kedalam
mesin penghampar aspal

Mandor
Operator terampil
Operator semi terampil
Sopir
Pembantu sopir
Buruh tak terampil
Buruh semi terampil

3,584,000.00
SUB JUMLAH
(Rp.)

60.00 Satuan M3

DINAS PEKERJAAN UMUM


DAERAH KOTA BLITAR

PEKERJA

SUB JUMLAH
(Rp.)

2,772,500.00

Harga Satuan Rp.


Dibulatkan
Rp.

PROPINSI
JAWA TIMUR

TANGGAL :
- 2012

6,761,250.00
2,889,000.00
2,864,250.00
3,300.00

PERALATAN
JUMLAH
Volume =

KODE
K.516.b

KODE
K.035

KOTA :
KODE :
DISIAPKAN OLEH :
BLITAR
4
ANGGAPAN / ASUMSI :
1. HRS dari AMP dengan produksi 100 ton/hari
2. Dipakai aggregat pecah tersaring
3. Aspal dipanaskan dahulu agar siap pada waktunya
4. Biaya produksi termasuk pengangkutan sejauh 10 km dari HMP
5. Produksi dimuat dengan truk 5 ton, diantar ke tempat pekerjaan
6. Rata-rata umur alat bantu 1 bulan, 1 orang/set
7. Spek BM No. 12/PT/83 (tabel 3.3)

VOLUME

HARI

KODE

JML. VOL.
(hari orang)

1
3
3
4
4
6
3

1
1
1
1
1
1
1

L.061
L.081
L.083
L.091
L.099
L.101
L.106

1
3
3
4
4
6
3

JUMLAH
VOLUME

SAT

KODE

TOTAL
VOLUME

31
7300
90
0.24
16.5
6

m3
kg
40 kg
Set
m3
m3

M.041
M.061
M.080
M.170
M.025
M.026

31
7300
90
0.24
16.5
6

JUMLAH
ALAT

HARI

KODE

JAM
KERJA

Lembar 3

UPAH
(Rp/Org/Hari)
75,000.00
59,000.00
49,000.00
59,000.00
44,000.00
44,000.00
49,000.00

HARGA
SATUAN (Rp.)
127,300.00
18,600.00
2,000.00
1,100.00
280,100.00
294,100.00

BIAYA
(Rp./Jam)

BIAYA
(Rp.)

TANGGAL :
- 2013

SUB JUMLAH
(Rp.)

75,000.00
177,000.00
147,000.00
236,000.00
176,000.00
264,000.00
147,000.00
PEKERJA
BIAYA
(Rp.)

1,222,000.00
SUB JUMLAH
(Rp.)

3,946,300.00
135,780,000.00
180,000.00
264.00
4,621,650.00
1,764,600.00
MATERIAL
BIAYA
(Rp.)

146,292,814.00
SUB JUMLAH
(Rp.)

PERALATAN

Wheel loader 115 H

1
1
4

Asphalt Mixing Plant 30 T/h


Dump truk 5 ton/145 Hp

1
1
1

E.052
E.155
E.212

5
5
24

505,500.00
4,978,300.00
443,900.00

2,527,500.00
24,891,500.00
10,653,600.00
PERALATAN
JUMLAH

Volume =

38,072,600.00
185,587,414.00

100.00 Satuan : ton


Harga Satuan Rp.
Dibulatkan
Rp.

Lembar 4

1,855,874.14 Per ton


1,855,870.00 Per ton

ANALISA HARGA SATUAN


PENGHAMPARAN DAN PEMADATAN LATASTON
(MENGGUNAKAN ALAT)

DINAS PEKERJAAN UMUM


DAERAH KOTA BLITAR
PROPINSI
JAWA TIMUR

KODE :
35

URAIAN :
1. Pengiriman material sampai ke bin preader
2. Material dihampar dengan mesin spreader
dipadatkan dengan mesin gilas roda baja
dan roda ban pneumatic
3. Hamparan lapisan tack/ pengikat aspal
cutback @ 0.51 l/m@

PEKERJA

PEKERJA
Mandor
Operator terampil
Pembantu operator
Buruh tak terampil
Buruh terampil

MATERIAL

MATERIAL
Aspal curah
Minyak bakar
Alat bantu
Campuran lataston

PERALATAN

PERALATAN

Tandem Roller 6 - 10 t
Peumatic Roller 8 - 15 t
Asphalt Sprayer Towed 1000 L
Asphalt Finisher 1820mm/30 Hp
Compressor Air 210 m3/Jam

KODE
K.636

KOTA :
KODE :
DISIAPKAN OLEH :
BLITAR
4
ANGGAPAN / ASUMSI :
1. Menggunakan alat berat 1500 m2/hari
2. Asbuton campuran panas dikirim oleh leveransir ke tempat pekerjaan
3. BJ asbuton padat 2,2 ton/m3
4. Spek BM No. 12/DT/B/1983
5. Rata-rata tebal lapisan 3 cm

VOLUME

HARI

KODE

JML. VOL.
(hari orang)

1
4
4
12
8

1
1
1
1
1

L.061
L.081
L.083
L.101
L.106

1
4
4
12
8

JUMLAH
VOLUME

SAT

KODE

TOTAL
VOLUME

600
150
0.48
100

kg
ltr
Set
ton

M.061
M.065
M.170
K.035

600
150
0.48
100

JUMLAH
ALAT

HARI

KODE

JAM
KERJA

1
1
1
1
1

1
1
1
1
1

E.081
E.084
E.153
E.157
E.301

5
5
5
5
4

UPAH
(Rp/Org/Hari)
75,000.00
59,000.00
49,000.00
44,000.00
49,000.00
HARGA
SATUAN (Rp.)

BIAYA
(Rp.)
75,000.00
236,000.00
196,000.00
528,000.00
392,000.00
PEKERJA
BIAYA
(Rp.)

18,600.00
22,500.00
1,100.00
1,855,870.00

BIAYA
(Rp./Jam)

MATERIAL
BIAYA
(Rp.)

328,400.00
530,000.00
86,400.00
427,700.00
183,900.00

Mandor
Operator terlatih
Pembantu Operator
Sopir
Pembantu sopir
Buruh tak terlatih
Buruh terlatih
MATERIAL

M
A
T
E
R

Pasir beton/Pasir pasang


Aspal curah
Filler
Alat bantu / alat kerja

7,598,100.00
209,147,628.00

139,431.75 Per M2
139,430.00 Per M2

ANALISA HARGA SATUAN


MEMPRODUKSI DAN MENGANGKUT ASPAL BETON

KODE
K.40

(MENGGUNAKAN ALAT/AMP)
KODE :
35

URAIAN :
1. Semua material dikirim oleh Leveransir
2. Loader menjaga agar bin tetap penuh
3. Produksi 30 t/jam - 5 jam/hari
4. Dump truk memuat dan membongkar sampai
sceeder

P
E
K
E
R
J
A

200,122,528.00
SUB JUMLAH
(Rp.)

1,500.00 Satuan M2

DINAS PEKERJAAN UMUM


DAERAH KOTA BLITAR

PEKERJA

1,427,000.00
SUB JUMLAH
(Rp.)

1,642,000.00
2,650,000.00
432,000.00
2,138,500.00
735,600.00

Harga Satuan Rp.


Dibulatkan
Rp.

PROPINSI
JAWA TIMUR

SUB JUMLAH
(Rp.)

11,160,000.00
3,375,000.00
528.00
185,587,000.00

PERALATAN
JUMLAH
Volume =

TANGGAL :
- 2013

KOTA :
BLITAR

KODE :
4

DISIAPKAN OLEH :

TANGGAL :
- 2013

ANGGAPAN / ASUMSI:
1. Memakai alat berat ( 100 t/hari )
2. Memakai agregat pecah tersaring
3. AMP didirikan didekat penimbunan material
4. Aspal dipanaskan lebih dahulu agar aspal sudah siap saat dimulai
5. Hasil diangkut dengan truk 5 t dan dikirim sampai spreader
6. Harga produksi termasuk pengiriman sejauh 10 km
7. Rata-rata umur alat bantu 1 bulan/orang/set
8. Spesifikasi BM No. 13/PT/B/1983
VOLUME

1.00
3.00
3.00
4.00
4.00
6.00
3.00
JUMLAH
VOLUME

27.00
7,000.00
100.00
0.24

HARI

KODE

JML. VOL.
(hari orang)

1
1
1
1
1
1
1

L 061
L 071
L 081
L 082
L 091
L 101
L 103

1
3
3
4
4
6
3

SAT

KODE

TOTAL
VOLUME

m3
Kg
Kg
Set

M 041
M 061 A
M 080F
M 170
Lembar 5

UPAH
(Rp/Org/Hari)

75,000.00
59,000.00
49,000.00
59,000.00
49,000.00
44,000.00
49,000.00
HARGA
SATUAN (Rp.)

127,300.00
18,600.00
2,000.00
1,100.00

BIAYA
(Rp.)

SUB JUMLAH
(Rp.)

75,000.00
177,000.00
147,000.00
236,000.00
196,000.00
264,000.00
147,000.00
BIAYA
(Rp.)

3,437,100.00
130,200,000.00
200,000.00
264.00

1,242,000.00
SUB JUMLAH
(Rp.)

I
A
L

Krikil pecah tersaring ( chruisser )

JUMLAH
ALAT

PERALATAN

P'
A
L
A
T
A
N

27.50

Wheeled Loader 115 H


Asphalt Mixing Plant 30 T/h
Dump Truck 5 T/145 Hp

1.00
1.00
6.00

m3

K 017

294,100.00

HARI

KODE

JAM
KERJA

1
1
1

E 052 A
E 155 A
E 212 A

5
5
24

BIAYA
(Rp./Jam)

505,500.00
4,978,300.00
443,900.00

8,087,750.00
MATERIAL
BIAYA
(Rp.)

2,527,500.00
24,891,500.00
10,653,600.00

PERALATAN
JUMLAH
Volume =

141,925,114.00
SUB JUMLAH
(Rp.)

38,072,600.00
181,239,714.00

900.00 Satuan M2
Harga Satuan Rp.
Dibulatkan
Rp.

Lembar 6

1,812,397.14 Per M2
1,812,390.00 Per M2

DINAS PEKERJAAN UMUM

ANALISA HARGA SATUAN

KODE

MENGHAMPAR LAPIS PERMUKAAN LASTON (ASPAL BETON)

K.641b

DAERAH KOTA BLITAR


PROPINSI
JAWA TIMUR

(MENGGUNAKAN ALAT/AMP)
KODE :
28

2. Material dihamparkan dengan spreader dan dipadatkan


dengan mesin gilas roda baja dan roda ban pneumatik
3. Suhu pemadatan awal min. 110 derajat, pemadatan akhir
60 derajat

PEKERJA

PEKERJA
Mandor
Operator terampil
Pembantu operator
Buruh tak terampil
Buruh terampil

MATERIAL

MATERIAL

Pasir beton/Pasir pasang


Aspal curah
Minyak bakar
Alat bantu / alat kerja
Campuran laston

PERALATAN

PERALATAN

Roller 3 wheeled 8 - 10 t
Tandem Roller 6 - 10 t
Peumatic Roller 8 - 15 t
Asphalt Sprayer Towed 1000 L
Asphalt Finisher 1820mm/30 Hp
Compressor Air 210 m3/Jam

KOTA :
BLITAR

KODE :
5

DISIAPKAN OLEH :

ANGGAPAN / ASUMSI:
1. Menggunakan peralatan
2. Hotmix dikirim leveransir sampai ke spreader
3. BJ padat 2.25 t/m3 tebal padat 4 cm
4. Produksi 900 m2 padat
5. Disemprot tack coat 0.4 t/m2
6. Spec BM no. B/PT/BM o. 13/PT/B/1983

VOLUME

HARI

KODE

JML. VOL.
(hari orang)

1
5
5
15
10

1
1
1
1
1

L.061
L.081
L.083
L.101
L.106

1
5
5
15
10

JUMLAH
VOLUME

SAT

KODE

TOTAL
VOLUME

0.72
360
90
0.38
80

m3
Kg
Lt
Set
Ton

M.061
M.065
M.170
K.035
M 041

0.72
360
90
0.38
80

JUMLAH
ALAT

HARI

KODE

JAM
KERJA

1
1
1
1
1
1

1
1
1
1
1
1

E.080
E.081
E.084
E.153
E.157
E.301

5
5
5
3
5
4

UPAH
(Rp/Org/Hari)
75,000.00
59,000.00
49,000.00
44,000.00
49,000.00
HARGA
SATUAN (Rp.)
127,300.00
18,600.00
22,500.00
1,100.00
1,812,390.00
BIAYA
(Rp./Jam)
554,500.00
328,400.00
530,000.00
86,400.00
427,700.00
183,900.00

BIAYA
(Rp.)

SUB JUMLAH
(Rp.)

75,000.00
295,000.00
245,000.00
660,000.00
490,000.00
PEKERJA
BIAYA
(Rp.)

1,765,000.00
SUB JUMLAH
(Rp.)

91,656.00
6,696,000.00
2,025,000.00
418.00
144,991,200.00
MATERIAL
BIAYA
(Rp.)

153,804,274.00
SUB JUMLAH
(Rp.)

2,772,500.00
1,642,000.00
2,650,000.00
259,200.00
2,138,500.00
735,600.00
PERALATAN
JUMLAH

Volume =

TANGGAL :
- 2013

10,197,800.00
165,767,074.00

900.00 Satuan M2
Harga Satuan Rp.
Dibulatkan
Rp.

Lembar 7

184,185.64 Per M2
184,185.00 Per M2

ANALISA

LAMPIRAN
NOMOR
TENTANG

EI

:
:
:

SK WALIKOTA BLITAR
188 /
/ HK / 410.010 / 2014
ANALISA EI UNTUK PEKERJAAN JALAN

DAFTAR ANALISA BAHAN DAN UPAH KERJA


PEMERINTAH KOTA BLITAR TAHUN ANGGARAN 2014
( Triwulan I Tahun 2015 )
Analisa EI-312
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KEGIATAN/PROYEK
PAKET
NAMA KONTRAK
PROVINSI
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:
:
:
;
:

JAWA TIMUR
3.2 (1)
CHIPPING ASPHALT BITUMEN
M3

KOMPONEN

A.
1
2

TENAGA
Pekerja
Mandor

(L01)
(L03)

PERKIRAAN KUANTITAS
TOTAL HARGA (Rp.)
% THD. BIAYA PROYEK

SATUAN

PERKIRAAN
KUANTITAS

Jam
Jam

0.1077
0.0359

:
:
:

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

6,125.00
9,375.00

JUMLAH HARGA TENAGA


B.
1

BAHAN
Material Timbunan

(M08)

M3

996.23

1.2000

0.00

JUMLAH HARGA BAHAN


PERALATAN
Cold Milling
Dump Truck
Alat Bantu

D.

JUMLAH HARGA PERALATAN


HARGA SATUAN TENAGA, BAHAN DAN PERALATAN ( A + B + C )
Dibulatkan

Jam
Jam
Ls

0.0359
0.1342
1.0000

Note : 1

472,000.00
199,700.00
1,100.00

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan termasuk PPN yang dibayar
dari kontrak

Lembar 8

0.00

0.00

C.
1
2
3

(E36)
(E09)

659.66
336.56

16,944.80
26,799.74
1,100.00
44,844.54
45,840.77
45,800.00

NALISA BAHAN DAN UPAH KERJA


KOTA BLITAR TAHUN ANGGARAN 2014
( Triwulan I Tahun 2015 )
Analisa EI-312

ORMULIR STANDAR UNTUK


NALISA MASING-MASING HARGA SATUAN

JUMLAH
HARGA
(Rp.)

Lembar 9

ANALISA

LAMPIRAN
NOMOR
TENTANG

EI

:
:
:

SK WALIKOTA BLITAR
188 /
/ HK / 410.010 / 2014
ANALISA EI UNTUK PEKERJAAN JALAN

DAFTAR ANALISA BAHAN DAN UPAH KERJA


PEMERINTAH KOTA BLITAR TAHUN ANGGARAN 2014
( Triwulan I Tahun 2015 )
Analisa EI-321.a
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KEGIATAN/PROYEK
PAKET
NAMA KONTRAK
PROVINSI
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:
:
:
:
:

JAWA TIMUR
3.2 (1)
URUGAN (KEMBALI) BIASA
M3

KOMPONEN

A.
1
2

TENAGA
Pekerja
Mandor

(L01)
(L03)

PERKIRAAN KUANTITAS
TOTAL HARGA (Rp.)
% THD. BIAYA PROYEK

SATUAN

PERKIRAAN
KUANTITAS

Jam
Jam

0.08
0.02

:
:
:

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

6,125.00
9,375.00

JUMLAH HARGA TENAGA


B.
1

BAHAN
Material Timbunan

(M08)

M3

669.50

1.20

0.00

JUMLAH HARGA BAHAN


PERALATAN
Wheel Loader
Dump Truck
Alat Bantu

D.

JUMLAH HARGA PERALATAN


HARGA SATUAN TENAGA, BAHAN DAN PERALATAN ( A + B + C )
Dibulatkan

Jam
Jam
Ls

0.02
0.06
1.00

Note : 1

505,500.00
199,700.00
1,100.00

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan termasuk PPN yang dibayar
dari kontrak

Lembar 10

0.00

0.00

C.
1
2
3

(E15)
(E09)

483.88
185.63

10,008.90
11,183.20
1,100.00
22,292.10
22,961.60
22,900.00

Analisa EI-321.b
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KEGIATAN/PROYEK
PAKET
NAMA KONTRAK
PROVINSI
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:
:
:
:
:

JAWA TIMUR
3.2 (1)
URUGAN BIASA
M3

KOMPONEN

A.
1
2

TENAGA
Pekerja
Mandor

(L01)
(L03)

PERKIRAAN KUANTITAS
TOTAL HARGA (Rp.)
% THD. BIAYA PROYEK

SATUAN

PERKIRAAN
KUANTITAS

Jam
Jam

0.08
0.02

:
:
:

HARGA
SATUAN
(Rp.)

6,125.00
9,375.00

JUMLAH HARGA TENAGA


B.
1

BAHAN
Material Timbunan

(M08)

M3

1.20

82,300.00

PERALATAN
Wheel Loader
Dump Truck
Alat Bantu

D.

JUMLAH HARGA PERALATAN


HARGA SATUAN TENAGA, BAHAN DAN PERALATAN ( A + B + C )
Dibulatkan

0.02
0.06
1.00

Note : 1

505,500.00
199,700.00
1,100.00

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan termasuk PPN yang dibayar
dari kontrak

Lembar 11

98,760.00

98,760.00

C.
1
2
3

Jam
Jam
Ls

483.88
185.63
669.50

JUMLAH HARGA BAHAN

(E15)
(E09)

JUMLAH
HARGA
(Rp.)

10,008.90
11,183.20
1,100.00
22,292.10
121,721.60
121,700.00

Analisa EI-311
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
KEGIATAN/PROYEK
PAKET
NAMA KONTRAK
PROVINSI
ITEM PEMBAYARAN NO.
JENIS PEKERJAAN
SATUAN PEMBAYARAN

NO.

:
:
:
:
:
:
:

JAWA TIMUR
3.1 (1)
GALIAN BIASA
M3

KOMPONEN

A.
1
2

TENAGA
Pekerja
Mandor

(L01)
(L03)

PERKIRAAN KUANTITAS
TOTAL HARGA (Rp.)
% THD. BIAYA PROYEK

SATUAN

PERKIRAAN
KUANTITAS

Jam
Jam

0.15
0.08

:
:
:

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

6,125.00
9,375.00

JUMLAH HARGA TENAGA


B.
1

BAHAN
Material Timbunan

(M08)

M3

1,658.64

1.20

0.00

JUMLAH HARGA BAHAN


PERALATAN
Excavator
Alat Bantu

D.

JUMLAH HARGA PERALATAN


HARGA SATUAN TENAGA, BAHAN DAN PERALATAN ( A + B + C )
Dibulatkan

Jam
Ls

0.08
1.00

Note : 1

495,200.00
1,100.00

SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan termasuk PPN yang dibayar
dari kontrak

Lembar 12

0.00

0.00

C.
1
2

(E10)

939.58
719.06

37,981.84
1,100.00
39,081.84
40,740.48
40,700.00

BOW

LAMPIRAN
NOMOR
TENTANG

:
:
:

SK WALIKOTA BLITAR
188 /
/ HK / 410.010 / 2014
ANALISA BOW UNTUK BAHAN DAN
UPAH KERJA PEKERJAAN JALAN

DAFTAR ANALISA BAHAN DAN UPAH KERJA


PEMERINTAH KOTA BLITAR TAHUN ANGGARAN 2014
( Triwulan I Tahun 2015 )

1.An. W1

1 m3 Urugan Pasir di Bawah Alas Jalan


1.200
0.380
0.020

m3

orang
orang

Pasir urug
Pekerja
Mandor

Rp.
Rp.
Rp.

Jumlah Bahan dan Upah =


Rp

2.An. DPUTL-7

Rp

= Rp.
= Rp.
= Rp.
= Rp.

130,320.00

= Rp.
= Rp.

150,432.50
150,430.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

5,100,000.00
1,302,000.00
264,500.00
1,210,000.00

8,000,000.00

= Rp.

15,876,500.00

192,600.00
108,600.00
49,000.00
75,000.00

= Rp.
= Rp.
= Rp.
= Rp.

1,540,800.00
217,200.00

20,112.50
Dibulatkan

130,320.00

18,620.00
1,492.50
20,112.50

Biaya Menggilas 1 Bulan

600.000
20.000
5.000

liter
liter
kg

Solar
Minyak pelumas
Gemuk pelumas

20.000
20.000
20.000
100.000

orang
orang
orang
orang

Operator
Pemb. Operator
Penjaga
Pekerja

Jumlah Bahan dan Upah =


Rp

3.An.W3

130,320.00

108,600.00
49,000.00
75,000.00

Rp.
8,500.00
Rp.
65,100.00
Rp.
52,900.00
Biaya pemeliharaan 1 (satu) bula
Rp.
59,000.00
Rp.
47,000.00
Rp.
49,000.00
Rp.
49,000.00

7,876,500.00

Rp

7,876,500.00

1,180,000.00
940,000.00
980,000.00
4,900,000.00
8,000,000.00

100 m2 Pasang Slylaag Tebal 6 cm ( LPA )


m3
8.000
Batu belah 5/7
Rp.
m3
2.000
Pasir urug
Rp.
7.500
orang
Pekerja
Rp.
0.375
orang
Mandor
Rp.
Penggilasan 2/75 dari Biaya Gilas 1 Bulan (An.DPUTL) =
0.027
x (
Rp
7,876,500.00
+

Rp

8,000,000.00

) = Rp.
= Rp.

210,040.00
1,968,040.00

Jumlah Bahan dan Upah 1 m-2 =


1/100
x (
Rp

Rp

608,958.33
Dibulatkan

) = Rp.
= Rp.

25,769.98
25,760.00

6,490.80

4.An.A1+G2

1,968,040.00

367,500.00
28,125.00
213,333.33
608,958.33

1 m3 Pasang Batu Tepi


0.036

m3

0.750
0.025
1.500
0.075

orang
orang
orang
orang

Batu belah 15/20

Rp.

180,300.00

= Rp.

Buruh tak terampil


Tukang batu
Pekerja
Mandor

Rp.
Rp.
Rp.
Rp.

44,000.00
65,000.00
49,000.00
75,000.00

Rp.

113,750.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.

6,490.80
3,791.67

3,791.67
Dibulatkan

= Rp.
= Rp.

10,282.47
10,280.00

Upah per M = 1/30 x


Jumlah Bahan dan Upah =
Rp
6,490.80

Rp

Lembar 13

33,000.00
1,625.00
73,500.00
5,625.00
113,750.00

LAMPIRAN
NOMOR
TENTANG

BOW

:
:
:

SK WALIKOTA BLITAR
188 /
/ HK / 422.010 / 2014
ANALISA BOW UNTUK BAHAN DAN
UPAH KERJA BANGUNAN GEDUNG

DAFTAR ANALISA BAHAN DAN UPAH KERJA


PEMERINTAH KOTA BLITAR TAHUN ANGGARAN 2014
( Triwulan I Tahun 2015 )

I. PEKERJAAN TANAH
I.1.A.14 1 m3 Urugan Tanah dengan Membilas
1.200 m3
0.250 Oh
0.010 Oh

Tanah Urug

Rp.

Pekerja

Rp.
Rp.

Mandor

82,300.00 = Rp.

98,760.00

Sub Total
49,000.00 = Rp.

12,250.00

=Rp.

75,000.00 = Rp
Sub Total

98,760.00

750.00
=Rp.

13,000.00

=Rp.
=Rp.

111,760.00
111,760.00

=Rp.

57,500.00

Sub Total
Total

=Rp.
=Rp.

17,750.00
75,250.00

Dibulatkan

=Rp.

75,250.00

=Rp.

225,000.00

=Rp.
=Rp.
=Rp.

17,750.00
242,750.00
242,750.00

=Rp.

95,980.00

Total
Dibulatkan

II. PEKERJAAN ATAP


II.1.H.2.1

1 m2

Pasang Genteng Flams/Press


25.00 Bh

II.2.H.2.3

1 m2

Genteng Press Jawa/lokal

Rp.

2,300.00 =Rp.

0.20 Oh
0.10 Oh

Pekerja
Tukang Kayu

Rp.
Rp.

Sub Total
49,000.00 =Rp.
65,000.00 =Rp.

0.01 Oh
0.01 Oh

Kepala Tukang Kayu


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

57,500.00
9,800.00
6,500.00
700.00
750.00

Pasang Genteng Karangpilang (Wisma-Surabaya)


25.00 Bh

Genteng Karangpilang "Wisma"

Rp.

9,000.00 =Rp.
Sub Total

225,000.00

0.20 Oh
0.10 Oh

Pekerja
Tukang Kayu

Rp.
Rp.

49,000.00 =Rp.
65,000.00 =Rp.

9,800.00
6,500.00

0.01 Oh
0.01 Oh

Kepala Tukang Kayu


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

700.00
750.00

Sub Total
Total
Dibulatkan

II.3.H.6.2

1 m1

Pasang Genteng Bubungan Karangpilang (Wisma-Surabaya)


5.00 bh

Rp.

14,700.00 =Rp.

73,500.00

0.16 zak Semen PC


0.032 m3 Pasir Pasang

Genteng Bubungan

Rp.
Rp.

115,900.00 =Rp.
123,000.00 =Rp.

18,544.00
3,936.00

0.400 Oh

Pekerja

Rp.

Sub Total
49,000.00 =Rp.

19,600.00

0.200 Oh
0.020 Oh

Tukang Batu
Kepala Tukang Batu

Rp.
Rp.

65,000.00 =Rp.
70,000.00 =Rp.

13,000.00
1,400.00

0.002 Oh

Mandor

Rp.

75,000.00 =Rp.
Sub Total

150.00

Total
Dibulatkan

=Rp.

34,150.00

=Rp.
=Rp.

130,130.00
130,130.00

=Rp.

253,539.00

II.4.H.18 10 m1 Pasang Brombong Talang Dia. 12 cm


2.78 lbr Seng Datar (80 x 180 cm), BJLS 27
0.25 dos Paku Sumbat

Rp.
Rp.

88,800.00 =Rp.
26,700.00 =Rp.

246,864.00
6,675.00

2.250 Oh

Pekerja

Rp.

Sub Total
49,000.00 =Rp.

110,250.00

3.750 Oh
0.375 Oh

Tukang Besi
Kepala Tukang Besi

Rp.
Rp.

65,000.00 =Rp.
70,000.00 =Rp.

243,750.00
26,250.00

0.110 Oh

Mandor

Rp.

75,000.00 =Rp.
Sub Total
Total
1 m1 pasang brombong talang
Dibulatkan

III. PEKERJAAN BONGKARAN

Lembar 14

8,250.00
=Rp.

388,500.00

=Rp.
=Rp.

642,039.00
64,203.90

=Rp.

64,200.00

III.1.L.3 1 m3 Membongkar pasangan dinding tembok yang lebih tebal dari 2 batu dan bata dari bongkaran
yang Masih Dapat Dipakai Dibersihkan
4.000 Oh
0.400 Oh

2.000 Oh
0.200 Oh

Pekerja
Mandor

Rp.
Rp.

49,000.00 =Rp.

196,000.00

30,000.00
=Rp.
Total
Dibulatkan
=Rp.
(Jikalau tidak dengan membersihkan dihitung setengahnya)

Pekerja
Mandor

Rp.
Rp.

75,000.00 = Rp

49,000.00 =Rp.
75,000.00 = Rp

226,000.00
226,000.00

98,000.00
15,000.00

=Rp.
Total
sehingga 1 m3 menurunkan rangka atap dari kayu menjadi =Rp.

113,000.00
11,300.00

=Rp.

11,300.00

Dibulatkan

Lembar 15

III.2.L.4 1 m3 Membongkar dinding tembok yang tipis, terhitung dengan membersihkan bata-batanya
2.000 Oh
0.100 Oh

Pekerja

Rp.
Rp.

Mandor

49,000.00 =Rp.

98,000.00

75,000.00 = Rp

7,500.00

Total
Dibulatkan

=Rp.

105,500.00

=Rp.

105,500.00

III.3.L.5 10 m2 Membongkar lantai lama, berikut pekerjaan membersihkan bata-bata atau ubin-ubin yang
dibongkar
2.000 Oh
0.100 Oh

Pekerja
Mandor

Rp.
Rp.

49,000.00 =Rp.
75,000.00 = Rp

98,000.00
7,500.00
=Rp.
=Rp.

105,500.00
10,550.00

=Rp.
Dibulatkan
(Jikalau tidak dengan pekerjaan membersihkan, dihitung 1/4 dari analis ini)

10,550.00

Total
1 m2 membongkar lantai lama

0.500 Oh
0.025 Oh

Pekerja
Mandor

Rp.
Rp.

49,000.00 =Rp.
75,000.00 = Rp

24,500.00
1,875.00

=Rp.
Total
sehingga 1 m2 membongkar lantai lama menjadi =Rp.
=Rp.
Dibulatkan

26,375.00
2,637.50
2,630.00

III.4.L.7 10 m2 Menurunkan Atap Genteng atau Sirap, Jikalau Genteng atau Sirap itu Hendak Dipakai Lagi
2.000 Oh
0.100 Oh

Pekerja

Rp.
Rp.

Mandor

49,000.00 =Rp.

98,000.00

75,000.00 = Rp

7,500.00
=Rp.
Total
1 m2 menurunkan atap genteng / sirap =Rp.

=Rp.
Dibulatkan
(Jikalau genteng atau sirap tidak dipakai lagi, dihitung 1/2 dari analis ini)
1.000 Oh
0.050 Oh

Pekerja
Mandor

Rp.
Rp.

49,000.00 =Rp.
75,000.00 = Rp

105,500.00
10,550.00
10,550.00

49,000.00
3,750.00

=Rp.
Total
sehingga 1 m2 menurunkan genteng atau sirap menjadi =Rp.

52,750.00
5,275.00

=Rp.

5,270.00

=Rp.

81,500.00

=Rp.
=Rp.

8,150.00
8,150.00

=Rp.
=Rp.

70,750.00
7,075.00

=Rp.
Dibulatkan
(Jikalau usuk/reng tidak dipakai lagi dalam analis tersebut diatas,

7,070.00

Dibulatkan

III.5.L.8 10 m2 Menurunkan Atap Seng


1.000 Oh
0.500 Oh

Pekerja

Rp.
Rp.

Tukang Besi

49,000.00 =Rp.

49,000.00

65,000.00 = Rp

32,500.00

Total
1 m2 menurunkan atap seng
Dibulatkan

III.6.L.9 10 m2 Membongkar Usuk/Reng untuk Dipergunakan Lagi


1.000 Oh
0.250 Oh
0.025 Oh
0.050 Oh

Pekerja
Tukang Kayu

Rp.
Rp.

49,000.00 =Rp.
65,000.00 =Rp.

49,000.00
16,250.00

Kepala Tukang Kayu


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 = Rp

1,750.00
3,750.00

Total
'1 m2 menurunkan usuk/reng

1.000 Oh
0.050 Oh

Pekerja

tukang kayu dan kepala tukang kayu dapat diabaikan)


49,000.00 =Rp.
49,000.00
Rp.

Mandor

Rp.

75,000.00 = Rp

3,750.00
=Rp.
Total
sehingga 1 m2 menurunkan usuk/reng menjadi =Rp.

52,750.00
5,275.00

=Rp.

5,270.00

Total

=Rp.

148,700.00

Dibulatkan

=Rp.
=Rp.

14,870.00
14,870.00

Total

=Rp.

105,500.00

Dibulatkan

=Rp.
=Rp.

10,550.00
10,550.00

Dibulatkan

III.7.L.11 10 m2 Membongkar Pyan / Dinding Partisi


(Kayu Bongkaran Dipakai Lagi)
2.000 Oh
0.600 Oh
0.060 Oh
0.100 Oh

Pekerja

Rp.

49,000.00 =Rp.

98,000.00

Tukang Kayu
Kepala Tukang Kayu

Rp.
Rp.
Rp.

65,000.00 =Rp.
70,000.00 =Rp.

39,000.00
4,200.00

75,000.00 = Rp

7,500.00

Mandor

Biaya Bongkar per 1 m2

(Jika Bongkaran Tidak Dipakai Lagi)


2.000 Oh

Pekerja

Rp.

49,000.00 =Rp.

98,000.00

0.100 Oh

Mandor

Rp.

75,000.00 =Rp.

7,500.00

Biaya Bongkar per 1 m2

III.8.L.12 1 m3 Membongkar Kayu dari Balok Loteng, Kuda-kuda, Gelagar Jembatan, dan sebagainya
(Kayu Bongkaran Dipakai Lagi)
4.000 Oh

Pekerja

Rp.

Lembar 16

49,000.00 =Rp.

196,000.00

6.000 Oh
0.600 Oh
0.200 Oh

Tukang Kayu

Rp.

65,000.00 =Rp.

390,000.00

Kepala Tukang Kayu


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 = Rp

42,000.00
15,000.00

Total
Dibulatkan

=Rp.
=Rp.

643,000.00
643,000.00

III.9.L.13 1 m3 Untuk membongkar kayu-kayu dari bangunan yang dinding temboknya tidak lebih tinggi dari 3,50 m,
diambil 2/3 dari Analis L.12
Total
Dibulatkan

Lembar 17

=Rp.

428,666.67

=Rp.

428,660.00

HASIL
OBSERVASI

LAMPIRAN
NOMOR

:
:

SK WALIKOTA BLITAR
188 /
/ HK / 422.010 / 2014

TENTANG

HASIL OBSERVASI LAPANGAN


UNTUK BAHAN DAN UPAH KERJA

DAFTAR ANALISA BAHAN DAN UPAH KERJA


PEMERINTAH KOTA BLITAR TAHUN ANGGARAN 2014
( Triwulan I Tahun 2015 )

I. PEKERJAAN TANAH
OL.I.1

1 m3

Bongkaran Pasangan Pondasi Batu Kali


6.6670 Oh

Pekerja

Rp.

49,000.00 = Rp.

326,683.00

Total
Dibulatkan

OL.I.2

1 m3

Pekerja
Mandor

Rp.
Rp.

49,000.00 = Rp.
75,000.00 = Rp.

326,680.00

= Rp.
= Rp.

29,034.00
29,030.00

=Rp.

73,489.20

=Rp.
=Rp.
=Rp.

22,187.50
95,676.70
95,670.00

=Rp.

52,612.00

= Rp
= Rp

9,181.00
61,793.00

=Rp.

61,790.00

=Rp.

1,571,400.00

=Rp.
=Rp.
=Rp.
=Rp.

463,325.00
2,034,725.00
678,241.67
678,240.00

=Rp.

203,370.00

=Rp.
=Rp.
=Rp.

14,307.50
217,677.50
217,670.00

25,284.00
3,750.00

Total
Dibulatkan

1 m2

326,683.00

= Rp.

Pembuangan Tanah Sejauh 150 m (atau Lebih)


0.5160 Oh
0.0500 Oh

OL.I.3

= Rp.

Pasang Paving Stone 3 Berlian Merah (Tebal 6 cm)


1.0000 m2
0.0220 m3

Paving Stone 3 Berlian, Tebal 6 cm


Pasir Urug

Rp.
Rp.

0.2500
0.1250
0.0125
0.0125

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Rp.
Rp.
Rp.
Rp.

Oh
Oh
Oh
Oh

71,100.00 =Rp.
108,600.00 =Rp.
49,000.00
65,000.00
70,000.00
75,000.00

Sub Total
=Rp.
=Rp.
=Rp.
=Rp.

71,100.00
2,389.20
12,250.00
8,125.00
875.00
937.50

Sub Total
Total
Dibulatkan

II. PEKERJAAN PASANGAN

OL.II.1

1 m2

Pasangan Batako 1 pc : 4 ps (Tebal 10 cm)


12.5000 bh
4.0000 kg
0.0140 m3

Batako
Semen PC
Pasir Pasang

Rp.
Rp.
Rp.

0.1140 Oh

Pekerja

Rp.

0.0430 Oh
0.0050 Oh
0.0060 Oh

Tukang Batu
Kepala Tukang Batu
Mandor

Rp.
Rp.
Rp.

3,400.00 =Rp.
2,097.50 =Rp.
123,000.00 =Rp.
Sub total
49,000.00 =Rp.

42,500.00
8,390.00
1,722.00

65,000.00 =Rp.
70,000.00 =Rp.
75,000.00 =Rp.
Sub Total
Total

2,795.00
350.00
450.00

5,586.00

Dibulatkan

OL.II.2

1 m2

Pasang Bronjong Kawat Galvano Ukuran 0,5 x 2 x 3 m


45.0000 kg
3.0000 m3
1.8000
2.2000
4.5000
0.1550

OL.II.3

OL.II.4

1 m2

1 m2

Oh
Oh
Oh
Oh

Kawat BWG.10
Batu Kali Belah 15/20
Pekerja Anyam
Tukang Anyam
Pekerja Pengisi Batu
Mandor

Rp.
Rp.

22,900.00 =Rp.

1,030,500.00

180,300.00 =Rp.
540,900.00
Sub Total
Rp.
49,000.00 =Rp.
88,200.00
Rp.
65,000.00 =Rp.
143,000.00
Rp.
49,000.00 =Rp.
220,500.00
Rp.
75,000.00 =Rp.
11,625.00
Sub Total
Total
1 m3 anyam bronjong = 1/3 x Rp.
2,034,725.00
Dibulatkan

Pemasangan Wall Paper


1.1000 m2
0.2000 kg

Wall paper Kansai


Lemvinyl

Rp.
Rp.

0.0200
0.2000
0.0020
0.0025

Pekerja
Tukang Cat
Kepala Tukang Cat
Mandor

Rp.
Rp.
Rp.
Rp.

Oh
Oh
Oh
Oh

177,900.00 = Rp.
38,400.00 = Rp.
Sub Total
49,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.
75,000.00 =Rp.
Sub Total
Total
Dibulatkan

195,690.00
7,680.00
980.00
13,000.00
140.00
187.50

Pemasangan Pagar Panel Beton Mutu K.300 Ukuran Tebal 0.05 mtr. Lbr 0.40 mtr. Pjg 2.40 mtr
1.0417 Lbr

Pagar Panel Beton

Rp.

0.1250 Oh
0.3750 Oh

Pekerja
Tukang Cat

Rp.
Rp.

Lembar 18

256,300.00 = Rp.
Sub Total
49,000.00 =Rp.
65,000.00 =Rp.

266,987.71
=Rp.
6,125.00
24,375.00

266,987.71

0.0120 Oh
0.0190 Oh

OL.II.5

1 m2

Kepala Tukang Cat


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.
Sub Total
Total
Dibulatkan

840.00
1,425.00

211,300.00 = Rp.
Sub Total
49,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.
75,000.00 =Rp.
Sub Total
Total
Dibulatkan

211,300.00

=Rp.
=Rp.
=Rp.

32,765.00
299,752.71
299,750.00

=Rp.

211,300.00

=Rp.
=Rp.
=Rp.

16,382.50
227,682.50
227,680.00

Pemasangan Kolom Beton Mutu K.300 Ukuran 0.18 x 0.18 mtr


1.0000 Lbr

Pagar Panel Beton

Rp.

0.0625
0.1875
0.0060
0.0095

Pekerja
Tukang Cat
Kepala Tukang Cat
Mandor

Rp.
Rp.
Rp.
Rp.

Oh
Oh
Oh
Oh

Lembar 19

3,062.50
12,187.50
420.00
712.50

III. PEKERJAAN PLESTERAN


OL.III.1

1 m2

Plesteran Waterproof
0.5000 kg

Semen PC

Rp.

2,097.50 =Rp.

1,048.75

0.3000 kg

Waterproof "Multiroof"

Rp.

70,200.00 =Rp.

21,060.00

0.0060 m3

Pasir Pasang

Rp.

0.3000 Oh
0.2000 Oh

Pekerja
Tukang Batu

Rp.
Rp.

49,000.00 =Rp.
65,000.00 =Rp.

14,700.00
13,000.00

0.0200 Oh

Kepala Tukang Batu

Rp.

70,000.00 =Rp.

1,400.00

0.0150 Oh

Mandor

Rp.

75,000.00 =Rp.
Sub Total

1,125.00

123,000.00 =Rp.
Sub Total

738.00
=Rp.

Total
Dibulatkan

OL.III.2

1 m2

22,846.75

=Rp.

30,225.00

=Rp.
=Rp.

53,071.75
53,070.00

=Rp.

139,426.68

Plesteran Ampyang (Beton Sikat)


5.6800 kg
0.1440 kg

Semen PC
Semen Warna

Rp.
Rp.

2,097.50 =Rp.
3,020.00 =Rp.

0.0110 m

Pasir Pasang

Rp.

123,000.00 =Rp.

Kerikil Batu Alor (Ampyang)

Rp.

11.7500 kg

Lembar 20

10,700.00 =Rp.
Sub Total

11,913.80
434.88
1,353.00
125,725.00

0.5000 Oh
0.2000 Oh

Pekerja
Tukang Batu

Rp.
Rp.

49,000.00 =Rp.
65,000.00 =Rp.

24,500.00
13,000.00

0.0200 Oh

Kepala Tukang Batu

Rp.

70,000.00 =Rp.

1,400.00

0.0020 Oh

Mandor

Rp.

75,000.00 =Rp.
Sub Total

150.00
=Rp.

39,050.00

=Rp.
=Rp.

178,476.68
178,470.00

=Rp.

11,029.20

Sub Total
Total

=Rp.
=Rp.

12,990.00
24,019.20

Dibulatkan

=Rp.

24,010.00

=Rp.

4,195.00

=Rp.
=Rp.
=Rp.

7,250.00
11,445.00
11,440.00

=Rp.
=Rp.
=Rp.

50,875.00
5,087.50
5,080.00

=Rp.

14,412,005.00

=Rp.
=Rp.
=Rp.

1,626,500.00
16,038,505.00
16,038,500.00

=Rp.

301,576.50

=Rp.
=Rp.
=Rp.

175,650.00
477,226.50
477,220.00

=Rp.

567,539.00

=Rp.
=Rp.
=Rp.

186,200.00
753,739.00
753,730.00

Total
Dibulatkan

OL.III.3

OL.III.4

OL.III.5

1 m2

1 m1

10 m2

Finishing Siar Pasangan Batu Kali 1 pc : 2 ps


4.3200 kg

Semen PC

Rp.

2,097.50 =Rp.

9,061.20

0.0160 m3

Pasir Pasang

Rp.

123,000.00 =Rp.

1,968.00

0.1500 Oh

Pekerja

Rp.

Sub Total
49,000.00 =Rp.

0.0700 Oh
0.0070 Oh

Tukang Batu
Kepala Tukang Batu

Rp.
Rp.

65,000.00 =Rp.
70,000.00 =Rp.

4,550.00
490.00

0.0080 Oh

Mandor

Rp.

75,000.00 =Rp.

600.00

7,350.00

Benangan (Khusus untuk Listplank Beton)


2.0000 kg

Semen PC

Rp.

0.1000 Oh
0.0100 Oh

Tukang Batu
Mandor

Rp.
Rp.

2,097.50 =Rp.
Sub Total
65,000.00 =Rp.
75,000.00 =Rp.
Sub Total
Total
Dibulatkan

4,195.00
6,500.00
750.00

Mengupas Plesteran Lama


1.000 Oh
0.025 Oh

Pekerja
Mandor

49,000.00 =Rp.
75,000.00 = Rp

Rp.
Rp.

49,000.00
1,875.00

Total
1 m2 mengupas plesteran lama
Dibulatkan

IV. PEKERJAAN KAYU DAN ATAP

OL.IV.1

1 m3

Pasang Kusen Pintu dan Jendela (Mutu Kayu Klas II atau III)
1.1000 m3

Kayu Klas II (Balok Kayu Kamper)

Rp.

1.2500 kg
1.0000 kg

Paku 3"
Lem Kayu Rajawali

Rp.
Rp.

Pekerja
Tukang Kayu

Rp.
Rp.

Kepala Tukang Kayu


Mandor

Rp.
Rp.

6.0000 Oh
18.0000 Oh
2.0000 Oh
0.3000 Oh

OL.IV.2

OL.IV.3

OL.IV.4

1 m2

1 m2

1 m2

13,045,800.00 =Rp.

14,350,380.00

21,300.00 =Rp.
35,000.00 =Rp.
Sub Total
49,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.
75,000.00 =Rp.
Sub Total
Total
Dibulatkan

26,625.00
35,000.00
294,000.00
1,170,000.00
140,000.00
22,500.00

Pasang Daun Pintu Plywood Rangkap, Rangka Tertutup Kayu Klas II (Lebar s.d. 90 cm)
0.0125
0.0300
0.5000
1.0000

m3
kg
kg
lbr

Kayu Klas II (Papan Kayu Kamper)


Paku 3"
Lem Kayu
Plywood (90 x 210) cm, Tebal 4 mm

Rp.
Rp.
Rp.
Rp.

14,091,000.00
21,300.00
35,000.00
107,300.00

0.6000
2.0000
0.2000
0.0300

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.
Rp.

49,000.00
65,000.00
70,000.00
75,000.00

=Rp.
=Rp.
=Rp.
=Rp.
Sub Total
=Rp.
=Rp.
=Rp.
=Rp.
Sub Total
Total
Dibulatkan

176,137.50
639.00
17,500.00
107,300.00

=Rp.
=Rp.
=Rp.
=Rp.
Sub Total
=Rp.
=Rp.
=Rp.
=Rp.
Sub Total
Total
Dibulatkan

409,000.00
639.00
10,500.00
147,400.00

29,400.00
130,000.00
14,000.00
2,250.00

Pasang Daun Pintu Teakwood Rangkap, Rangka Mutu Kayu Klas I


0.0125
0.0300
0.3000
1.0000

m3
kg
kg
lbr

Kayu Klas I (Papan Kayu Jati Kw. I Lokal)


Paku 3"
Lem Kayu
Teakwood 90 x 210 cm, Tebal 4 mm

Rp.
Rp.
Rp.
Rp.

32,720,000.00
21,300.00
35,000.00
147,400.00

0.8000
2.0000
0.2000
0.0400

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.
Rp.

49,000.00
65,000.00
70,000.00
75,000.00

Pasang Daun Pintu Teakwood Rangkap Lapis Formika, Rangka Mutu Kayu Klas II
Lembar 21

39,200.00
130,000.00
14,000.00
3,000.00

0.0125 m3
0.0300 kg

Kayu Klas II (Papan Kayu Kamper)


Paku 3"

Rp.
Rp.

14,091,000.00 =Rp.
21,300.00 =Rp.

176,137.50
639.00

0.8000 kg

Lem Kayu

Rp.

35,000.00 =Rp.

28,000.00

1.0000 lbr
0.5000 lbr

Plywood 90 x 210 cm, Tebal 4 mm


Formika 4' x 8'

Rp.
Rp.

117,600.00 =Rp.
264,100.00 =Rp.

117,600.00
132,050.00

Sub Total
0.8000 Oh

Pekerja

Rp.

49,000.00 =Rp.

39,200.00

2.5000 Oh
0.2500 Oh

Tukang Kayu
Kepala Tukang Kayu

Rp.
Rp.

65,000.00 =Rp.
70,000.00 =Rp.

162,500.00
17,500.00

0.0400 Oh

Mandor

Rp.

75,000.00 =Rp.
Sub Total

Lembar 22

=Rp.

454,426.50

=Rp.

3,000.00

Total

=Rp.

222,200.00
676,626.50

Dibulatkan

=Rp.

676,620.00

OL.IV.5

OL.IV.6

OL.IV.7

OL.IV.8

OL.IV.9

OL.IV.10

OL.IV.11

1 m2

1 m2

1 m2

1 m1

1 m1

1 m2

1 m2

Pasang Rangka Atap Genteng Kanmuri (Mutu Kayu Klas II)


0.0140 m3
0.0060 m3

Kayu Klas II (Usuk Kayu Kamper 5/7)


Kayu Klas II (Reng Kayu Kamper 3/5)

Rp.
Rp.

12,420,200.00 =Rp.
12,733,000.00 =Rp.

173,882.80
76,398.00

0.2500 kg

Paku 2,5" dan Paku 4"

Rp.

21,300.00 =Rp.

5,325.00
4,900.00

0.1000 Oh

Pekerja

Rp.

Sub Total
49,000.00 =Rp.

=Rp.

255,605.80

0.1000 Oh
0.0100 Oh

Tukang Kayu
Kepala Tukang Kayu

Rp.
Rp.

65,000.00 =Rp.
70,000.00 =Rp.

6,500.00
700.00

0.0050 Oh

Mandor

Rp.

75,000.00 =Rp.
Sub Total
Total

375.00
=Rp.
=Rp.

12,475.00
268,080.80

Dibulatkan

=Rp.

268,080.00

=Rp.

202,466.88

Sub Total
Total

=Rp.
=Rp.

12,475.00
214,941.88

Dibulatkan

=Rp.

214,940.00

=Rp.

88,401.60

=Rp.
=Rp.
=Rp.

30,975.00
119,376.60
119,370.00

=Rp.

86,676.00

=Rp.
=Rp.
=Rp.

20,025.00
106,701.00
106,700.00

=Rp.

127,884.00

=Rp.
=Rp.
=Rp.

20,025.00
147,909.00
147,900.00

=Rp.

299,857.80

=Rp.
=Rp.
=Rp.

40,350.00
340,207.80
340,200.00

Pasang Rangka Atap Genteng Biasa/Prentul (Mutu Kayu Klas II)


0.0120 m3
0.0036 m3

Kayu Klas II (Usuk Kayu Balau 4/6)


Kayu Klas II (Reng Kayu Balau 2/3)

Rp.
Rp.

12,677,500.00 =Rp.
12,503,300.00 =Rp.

152,130.00
45,011.88

0.2500 kg

Paku 2,5" dan Paku 4"

Rp.

21,300.00 =Rp.

5,325.00
4,900.00

0.1000 Oh

Pekerja

Rp.

Sub Total
49,000.00 =Rp.

0.1000 Oh
0.0100 Oh

Tukang Kayu
Kepala Tukang Kayu

Rp.
Rp.

65,000.00 =Rp.
70,000.00 =Rp.

6,500.00
700.00

0.0050 Oh

Mandor

Rp.

75,000.00 =Rp.

375.00

Pasang Rangka Langit-langit 50 x 100 cm (Mutu Kayu Klas II atau III)


0.0120 m3
0.2000 kg

Kayu Klas III (Usuk Kayu Meranti 5/7)


Paku 3"

Rp.
Rp.

0.1500 Oh
0.2500 Oh

Pekerja
Tukang Kayu

Rp.
Rp.

0.0250 Oh
0.0750 Oh

Kepala Tukang Kayu


Mandor

Rp.
Rp.

7,011,800.00 =Rp.
21,300.00 =Rp.
Sub Total
49,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.
75,000.00 =Rp.
Sub Total
Total
Dibulatkan

84,141.60
4,260.00
7,350.00
16,250.00
1,750.00
5,625.00

Pasang Listplank Ukuran 3 x 20 cm (Mutu Kayu Klas I atau II)


0.0060 m3

Kayu Klas II (Papan Kayu Kamper 3/20)

Rp.

0.1000 kg

Paku 3"

Rp.

0.1000 Oh
0.2000 Oh
0.0250 Oh

Pekerja
Tukang Kayu
Kepala Tukang Kayu

Rp.
Rp.
Rp.

0.0050 Oh

Mandor

Rp.

14,091,000.00 =Rp.
21,300.00 =Rp.
Sub Total
49,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.

84,546.00
2,130.00
4,900.00
13,000.00
1,750.00

75,000.00 =Rp.
Sub Total
Total
Dibulatkan

375.00

14,091,000.00 =Rp.
21,300.00 =Rp.
Sub Total
49,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.
75,000.00 =Rp.
Sub Total
Total
Dibulatkan

126,819.00
1,065.00

Pasang Listplank Ukuran 3 x 30 cm (Mutu Kayu Klas I atau II)


0.0090 m3
0.0500 kg

Kayu Klas II (Papan Kayu Kamper 3/30)


Paku 3"

Rp.
Rp.

0.1000
0.2000
0.0250
0.0050

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.
Rp.

Oh
Oh
Oh
Oh

4,900.00
13,000.00
1,750.00
375.00

Pasang Dinding Pemisah Teakwood Rangkap, Rangka Mutu Kayu Klas II


0.0140
0.5600
0.7000
0.1500

m3
kg
lbr
kg

Kayu Klas II (Usuk Kayu Kamper 5/7)


Lem Kayu
Teakwood 90 x 210, Tebal 4 mm
Paku 3"

Rp.
Rp.
Rp.
Rp.

12,420,200.00
35,000.00
147,400.00
21,300.00

0.1500
0.4500
0.0450
0.0080

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.
Rp.

49,000.00
65,000.00
70,000.00
75,000.00

=Rp.
=Rp.
=Rp.
=Rp.
Sub Total
=Rp.
=Rp.
=Rp.
=Rp.
Sub Total
Total
Dibulatkan

173,882.80
19,600.00
103,180.00
3,195.00
7,350.00
29,250.00
3,150.00
600.00

Pasang Dinding Pemisah Plywood Rangkap, Rangka Mutu Kayu Klas II


0.0140 m3
0.5600 kg
0.7000 lbr

Kayu Klas II (Usuk Kayu Kamper 5/7)


Lem Kayu
Plywood 4' x 8', Tebal 4 mm

Lembar 23

Rp.
Rp.
Rp.

12,420,200.00 =Rp.
35,000.00 =Rp.
117,600.00 =Rp.

173,882.80
19,600.00
82,320.00

0.1500 kg

OL.IV.12

1 m1

Paku 3"

Rp.

21,300.00 =Rp.
Sub Total

3,195.00
=Rp.

0.1500 Oh
0.4500 Oh

Pekerja
Tukang Kayu

Rp.
Rp.

49,000.00 =Rp.
65,000.00 =Rp.

7,350.00
29,250.00

0.0450 Oh
0.0080 Oh

Kepala Tukang Kayu


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

3,150.00
600.00

278,997.80

Sub Total

=Rp.

40,350.00

Total
Dibulatkan

=Rp.
=Rp.

319,347.80
319,340.00

=Rp.

158,436.66

Pasang Talang Datar/Miring


1.1000 m1

Seng Talang BJLS 27 (l = 90 cm)

Rp.

52,700.00 =Rp.

57,970.00

0.0150 kg
0.0096 m3

Paku 1"
Kayu Klas III (Papan Kayu Kruing 2/20)

Rp.
Rp.

22,500.00 =Rp.
9,604,600.00 =Rp.

337.50
92,204.16

0.2500 kg

Meni Besi

Rp.

31,700.00 =Rp.

7,925.00

Sub Total

Lembar 24

0.1500 Oh
0.4000 Oh

Pekerja
Tukang Kayu

Rp.
Rp.

49,000.00 =Rp.
65,000.00 =Rp.

7,350.00
26,000.00

0.0250 Oh

Kepala Tukang Kayu

Rp.

70,000.00 =Rp.

1,750.00

0.0013 Oh

Mandor

Rp.

75,000.00 =Rp.
Sub Total

93.75

Total
Dibulatkan

=Rp.

35,193.75

=Rp.
=Rp.

193,630.41
193,630.00

=Rp.

127,056.00

=Rp.
= Rp
= Rp
= Rp
= Rp

46,150.00
173,206.00
173,200.00
173,200.00
86,600.00

=Rp.

127,056.00

=Rp.
= Rp

46,150.00
173,206.00

= Rp
= Rp
= Rp

173,200.00
173,200.00
86,600.00

=Rp.

238,418.50

= Rp
= Rp
= Rp
= Rp
= Rp

58,575.00
296,993.50
296,990.00
296,990.00
148,495.00

=Rp.

247,441.00

= Rp
= Rp
= Rp
= Rp
= Rp

58,575.00
306,016.00
306,010.00
306,010.00
153,005.00

V. PEKERJAAN BEKISTING
OL.V.1

OL.V.2

1 m2

1 m2

Pasang Bekisting Untuk Pondasi (Mutu Kayu Klas IV)


0.0400 m3
0.1000 ltr
0.3000 kg

Kayu Klas IV (Papan Kayu Tahun 3/20)


Minyak Bekisting/Solar
Paku 3"

Rp.
Rp.
Rp.

0.5200
0.2600
0.0260
0.0260

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.
Rp.

Oh
Oh
Oh
Oh

2,997,900.00 =Rp.
119,916.00
7,500.00 =Rp.
750.00
21,300.00 =Rp.
6,390.00
Sub Total
49,000.00 =Rp.
25,480.00
65,000.00 =Rp.
16,900.00
70,000.00 =Rp.
1,820.00
75,000.00 =Rp.
1,950.00
Sub Total
Total
Dibulatkan
1 m2 bekisting (dihitung 1x pakai)
1 m2 bekisting (dihitung 2x pakai)

Pasang Bekisting Untuk Sloof (Mutu Kayu Klas IV)


0.0400 m3
0.1000 ltr
0.3000 kg

Kayu Klas IV (Papan Kayu Tahun 3/20)


Minyak Bekisting/Solar
Paku 3"

Rp.
Rp.
Rp.

0.5200 Oh

Pekerja

Rp.

0.2600 Oh
0.0260 Oh
0.0260 Oh

Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.

2,997,900.00 =Rp.
7,500.00 =Rp.
21,300.00 =Rp.
Sub Total
49,000.00 =Rp.

119,916.00
750.00
6,390.00

65,000.00 =Rp.
70,000.00 =Rp.
75,000.00 =Rp.
Sub Total
Total

16,900.00
1,820.00
1,950.00

25,480.00

Dibulatkan
1 m2 bekisting (dihitung 1x pakai)
1 m2 bekisting (dihitung 2x pakai)

OL.V.3

1 m2

Pasang Bekisting Untuk Kolom Struktur (Mutu Kayu Klas IV)


0.0400 m3

Kayu Klas IV (Papan Kayu Tahun 3/20)

Rp.

2,997,900.00 =Rp.

0.4000
0.2000
0.0150
0.3500
2.0000

kg
ltr
m3
lbr
btg

Paku 3"
Minyak Bekisting/Solar
Kayu Klas IV (Usuk Kayu Tahun 5/7)
Tripleks 3 mm
Bambu Apus 6-10 x 600cm

Rp.
Rp.
Rp.
Rp.
Rp.

21,300.00
7,500.00
3,007,500.00
78,200.00
18,000.00

0.6600
0.3300
0.0330
0.0330

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.
Rp.

49,000.00
65,000.00
70,000.00
75,000.00

119,916.00

=Rp.
=Rp.
=Rp.
=Rp.
=Rp.

8,520.00
1,500.00
45,112.50
27,370.00
36,000.00

Sub Total
=Rp.
=Rp.
=Rp.
=Rp.

32,340.00
21,450.00
2,310.00
2,475.00

Sub Total
Total
Dibulatkan
1 m2 bekisting (dihitung 1x pakai)
1 m2 bekisting (dihitung 2x pakai)

OL.V.4

OL.V.5

1 m2

1 m2

Pasang Bekisting Untuk Balok Struktur (Mutu Kayu Klas IV)


0.0400
0.4000
0.2000
0.0180
0.3500
2.0000

m3
kg
ltr
m3
lbr
btg

Kayu Klas IV (Papan Kayu Tahun 3/20)


Paku 3"
Minyak Bekisting/Solar
Kayu Klas IV (Usuk Kayu Tahun 5/7)
Tripleks 3 mm
Bambu Apus 6-10 x 600cm

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

0.6600
0.3300
0.0330
0.0330

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.
Rp.

2,997,900.00
21,300.00
7,500.00
3,007,500.00
78,200.00
18,000.00

=Rp.
119,916.00
=Rp.
8,520.00
=Rp.
1,500.00
=Rp.
54,135.00
=Rp.
27,370.00
=Rp.
36,000.00
Sub Total
49,000.00 =Rp.
32,340.00
65,000.00 =Rp.
21,450.00
70,000.00 =Rp.
2,310.00
75,000.00 =Rp.
2,475.00
Sub Total
Total
Dibulatkan
1 m2 bekisting (dihitung 1x pakai)
1 m2 bekisting (dihitung 2x pakai)

Pasang Bekisting Untuk Lantai (Mutu Kayu Klas IV)


0.0400
0.4000
0.2000
0.0150

m3
kg
ltr
m3

Kayu Klas IV (Papan Kayu Tahun 3/20)


Paku 3"
Minyak Bekisting/Solar
Kayu Klas IV (Usuk Kayu Tahun 5/7)

Lembar 25

Rp.
Rp.
Rp.
Rp.

2,997,900.00
21,300.00
7,500.00
3,007,500.00

=Rp.
=Rp.
=Rp.
=Rp.

119,916.00
8,520.00
1,500.00
45,112.50

0.3500 lbr
6.0000 btg

Tripleks 3 mm
Bambu Apus 6-10 x 600cm

Rp.
Rp.

78,200.00 =Rp.
18,000.00 =Rp.

27,370.00
108,000.00

0.6600 Oh
0.3300 Oh

Pekerja
Tukang Kayu

Rp.
Rp.

49,000.00 =Rp.
65,000.00 =Rp.

32,340.00
21,450.00

0.0330 Oh
0.0330 Oh

Kepala Tukang Kayu


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

2,310.00
2,475.00

Sub Total

=Rp.

Sub Total

= Rp

58,575.00

Total
Dibulatkan

= Rp
= Rp

368,993.50
368,990.00

= Rp
= Rp

368,990.00
184,495.00

1 m2 bekisting (dihitung 1x pakai)


1 m2 bekisting (dihitung 2x pakai)

Lembar 26

310,418.50

OL.V.6

OL.V.7

OL.V.8

1 m2

1 m2

1 m2

Pasang Bekisting Untuk Dinding (Mutu Kayu Klas IV)


0.0300
0.4000
0.2000
0.0200
0.3500
3.0000
4.0000

m3
kg
ltr
m3
lbr
btg
btg

Kayu Klas IV (Papan Kayu Tahun 3/20)


Paku 3"
Minyak Bekisting/Solar
Kayu Klas IV (Usuk Kayu Tahun 5/7)
Tripleks 3 mm
Bambu Apus 6-10 x 600cm
Penjaga Jarak Bekisting (Bambu Apus)

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

0.6600
0.3300
0.0330
0.0330

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.
Rp.

2,997,900.00
21,300.00
7,500.00
3,007,500.00
78,200.00
18,000.00
18,000.00

=Rp.
89,937.00
=Rp.
8,520.00
=Rp.
1,500.00
=Rp.
60,150.00
=Rp.
27,370.00
=Rp.
54,000.00
=Rp.
72,000.00
Sub Total
49,000.00 =Rp.
32,340.00
65,000.00 =Rp.
21,450.00
70,000.00 =Rp.
2,310.00
75,000.00 =Rp.
2,475.00
Sub Total
Total
Dibulatkan
1 m2 bekisting (dihitung 1x pakai)
1 m2 bekisting (dihitung 2x pakai)

OL.V.10

1 m2

1 m2

313,477.00

= Rp
= Rp
= Rp
= Rp
= Rp

58,575.00
372,052.00
372,050.00
372,050.00
186,025.00

=Rp.

208,064.50

= Rp
= Rp
= Rp
= Rp
= Rp

58,575.00
266,639.50
266,630.00
266,630.00
133,315.00

=Rp.

100,924.56

= Rp
= Rp
= Rp

11,550.00
112,474.56
112,470.00

= Rp
= Rp

112,470.00
56,235.00

=Rp.

132,186.00

= Rp
= Rp
= Rp
= Rp
= Rp

38,910.00
171,096.00
171,090.00
171,090.00
85,545.00

=Rp.

245,941.00

= Rp
= Rp
= Rp

39,890.00
285,831.00
285,830.00

Pasang Bekisting Untuk Tangga (Mutu Kayu Klas IV)


0.0300
0.4000
0.1500
0.0150
0.3500
2.0000

m3
kg
ltr
m3
lbr
btg

Kayu Klas IV (Papan Kayu Tahun 3/20)


Paku 3"
Minyak Bekisting/Solar
Kayu Klas IV (Usuk Kayu Tahun 5/7)
Tripleks 3 mm
Bambu Apus 6-10 x 600cm

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

0.6600
0.3300
0.0330
0.0330

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.
Rp.

2,997,900.00
21,300.00
7,500.00
3,007,500.00
78,200.00
18,000.00

=Rp.
89,937.00
=Rp.
8,520.00
=Rp.
1,125.00
=Rp.
45,112.50
=Rp.
27,370.00
=Rp.
36,000.00
Sub Total
49,000.00 =Rp.
32,340.00
65,000.00 =Rp.
21,450.00
70,000.00 =Rp.
2,310.00
75,000.00 =Rp.
2,475.00
Sub Total
Total
Dibulatkan
1 m2 bekisting (dihitung 1x pakai)
1 m2 bekisting (dihitung 2x pakai)

Pasang Bekisting Untuk Duiker/Jembatan (Mutu Kayu Klas IV)


0.0264 m3
0.6000 kg
0.5000 btg

Kayu Klas IV (Papan Kayu Tahun 3/20)


Paku 3"
Bambu Apus 6-10 x 600cm

Rp.
Rp.
Rp.

0.1500
0.0500
0.0050
0.0080

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.
Rp.

Oh
Oh
Oh
Oh

2,997,900.00 =Rp.
21,300.00 =Rp.
18,000.00 =Rp.
49,000.00
65,000.00
70,000.00
75,000.00

Sub Total
=Rp.
=Rp.
=Rp.
=Rp.
Sub Total
Total
Dibulatkan

79,144.56
12,780.00
9,000.00
7,350.00
3,250.00
350.00
600.00

1 m2 bekisting (dihitung 1x pakai)


1 m2 bekisting (dihitung 2x pakai)

OL.V.9

=Rp.

Pasang Bekisting Kolom Praktis (Mutu Kayu Klas IV)


0.0400 m3
0.4000 kg
0.1500 kg

Kayu Klas IV (Papan Kayu Tahun 3/20)


Paku 3"
Bendrat

Rp.
Rp.
Rp.

0.3000
0.3300
0.0330
0.0060

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.
Rp.

Oh
Oh
Oh
Oh

2,997,900.00 =Rp.
119,916.00
21,300.00 =Rp.
8,520.00
25,000.00 =Rp.
3,750.00
Sub Total
49,000.00 =Rp.
14,700.00
65,000.00 =Rp.
21,450.00
70,000.00 =Rp.
2,310.00
75,000.00 =Rp.
450.00
Sub Total
Total
Dibulatkan
1 m2 bekisting (dihitung 1x pakai)
1 m2 bekisting (dihitung 2x pakai)

Pasang Bekisting Balok Anak (Mutu Kayu Klas IV)


0.3500
0.0180
0.0400
0.4000
2.0000

0.3200
0.3300
0.0330
0.0060

lbr
m3
m3
kg
btg

Oh
Oh
Oh
Oh

Tripleks 3 mm
Kayu Klas IV (Usuk Kayu Tahun 4/6)
Kayu Klas IV (Papan Kayu Tahun 3/20)
Paku 3"
Bambu Apus 6-10 x 600cm

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

Lembar 27

78,200.00
3,007,500.00
2,997,900.00
21,300.00
18,000.00

49,000.00
65,000.00
70,000.00
75,000.00

=Rp.
=Rp.
=Rp.
=Rp.
=Rp.
Sub Total
=Rp.
=Rp.
=Rp.
=Rp.
Sub Total
Total
Dibulatkan

27,370.00
54,135.00
119,916.00
8,520.00
36,000.00

15,680.00
21,450.00
2,310.00
450.00

1 m2 bekisting (dihitung 1x pakai)


1 m2 bekisting (dihitung 2x pakai)

= Rp
= Rp

285,830.00
142,915.00

=Rp.

11,587.50

VI. PEKERJAAN LANGIT-LANGIT


OL.VI.1

1 m1

Pasang List Plafond (Kayu Profil)


1.0500 m1
0.0250 kg

List Kayu Profil 4/4


Paku 1"

Rp.
Rp.

10,500.00 =Rp.
22,500.00 =Rp.

11,025.00
562.50

0.0210 Oh
0.0210 Oh

Pekerja
Tukang Kayu

Rp.
Rp.

49,000.00 =Rp.
65,000.00 =Rp.

1,029.00
1,365.00

0.0020 Oh

Kepala Tukang Kayu

Rp.

70,000.00 =Rp.

140.00

0.0010 Oh

Mandor

Rp.

75,000.00 =Rp.
Sub Total

Sub Total

Total
Dibulatkan

Lembar 28

75.00
=Rp.

2,609.00

=Rp.
=Rp.

14,196.50
14,190.00

OL.VI.2

1 m1

Pasang List Eternit


1.0500 m1
0.0900 kg

List Kayu Tahun 1/4


Paku 1"

Rp.
Rp.

6,700.00 =Rp.
22,500.00 =Rp.

0.0200 Oh
0.0400 Oh

Pekerja
Tukang kayu

Rp.
Rp.

49,000.00 =Rp.
65,000.00 =Rp.

7,035.00
2,025.00

Sub Total

OL.VI.3

1m

=Rp.

9,060.00

Sub Total
Total

=Rp.
=Rp.

3,580.00
12,640.00

Dibulatkan

=Rp.

12,640.00

=Rp.

25,350.00

980.00
2,600.00

Pasang List Gypsum


0.5000 btg

List Gypsum, Uk. 10 x 200 cm

Rp.

33,200.00 =Rp.

0.2500 kg

Perekat Gypsum

Rp.

35,000.00 =Rp.
Sub Total

16,600.00
8,750.00

0.0600 Oh

Pekerja

Rp.

49,000.00 =Rp.

2,940.00

0.1200 Oh

Tukang kayu

Rp.

65,000.00 =Rp.
Sub Total

7,800.00

Total
Dibulatkan

OL.VI.4

1 m2

1 m2

0.3600 lbr

Plywood 4 mm (4' x 8')

Rp.

117,600.00 =Rp.

42,336.00

0.0300 kg

Paku Tripleks

Rp.

27,700.00 =Rp.

831.00

0.0700 Oh
0.1000 Oh

Pekerja
Tukang Kayu

Rp.
Rp.

Sub Total
49,000.00 =Rp.
65,000.00 =Rp.

1 m2

0.0100 Oh
0.0035 Oh

Kepala Tukang Kayu


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

OL.VI.8

1 m2

1 m2

43,167.00

=Rp.
=Rp.
=Rp.

10,892.50
54,059.50
54,050.00

=Rp.

46,983.00

700.00
262.50

Pasang Langit-langit Plywood 6 mm (Ukuran 30 x 60 cm)


0.3600 lbr
0.0300 kg

Plywood 6 mm (4' x 8')


Paku Tripleks

Rp.
Rp.

0.0700
0.1000
0.0100
0.0035

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.
Rp.

Oh
Oh
Oh
Oh

128,200.00 =Rp.
27,700.00 =Rp.
Sub Total
49,000.00
65,000.00
70,000.00
75,000.00

=Rp.
=Rp.
=Rp.
=Rp.
Sub Total

46,152.00
831.00
3,430.00
6,500.00
700.00
262.50
=Rp.

10,892.50

=Rp.
=Rp.

57,875.50
57,870.00

=Rp.

53,895.00

=Rp.
=Rp.
=Rp.

10,892.50
64,787.50
64,780.00

=Rp.

56,106.00

=Rp.
=Rp.
=Rp.

10,892.50
66,998.50
66,990.00

=Rp.

102,143.60

=Rp.
=Rp.

32,535.00
134,678.60

Pasang Langit-langit Teakwood 4 mm (Ukuran 30 x 60 cm)


0.3600 lbr
0.0300 kg

Teakwood 4 mm (4' x 8')


Paku Tripleks

Rp.
Rp.

0.0700
0.1000
0.0100
0.0035

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.
Rp.

Oh
Oh
Oh
Oh

147,400.00 =Rp.
27,700.00 =Rp.
49,000.00
65,000.00
70,000.00
75,000.00

Sub Total
=Rp.
=Rp.
=Rp.
=Rp.

53,064.00
831.00
3,430.00
6,500.00
700.00
262.50

Sub Total
Total
Dibulatkan

OL.VI.7

=Rp.
3,430.00
6,500.00

Total
Dibulatkan

OL.VI.6

10,740.00
36,090.00
36,090.00

Pasang Langit-langit Plywood 4 mm (Ukuran 30 x 60 cm)

Sub Total
Total
Dibulatkan

OL.VI.5

=Rp.
=Rp.
=Rp.

Pasang Langit-langit Teakwood 4 mm (Ukuran 60 x 120 cm)


0.3750 lbr
0.0300 kg

Teakwood 4 mm (4' x 8')


Paku Tripleks

Rp.
Rp.

0.0700
0.1000
0.0100
0.0035

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.
Rp.

Oh
Oh
Oh
Oh

147,400.00 =Rp.
27,700.00 =Rp.
Sub Total
49,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.
75,000.00 =Rp.
Sub Total
Total
Dibulatkan

55,275.00
831.00
3,430.00
6,500.00
700.00
262.50

Pasang Langit-langit Eternit (1,00 x 1,00) m, Rangka Mutu Kayu Klas III
0.0120
0.0600
1.1000
0.0200

m3
kg
lbr
kg

Kayu Klas III (Usuk Kayu Meranti 4/6)


Paku 3"
Eternit Lokal
Paku Eternit

Rp.
Rp.
Rp.
Rp.

7,011,800.00
21,300.00
14,700.00
27,700.00

0.1800
0.3200
0.0320
0.0090

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.
Rp.

49,000.00
65,000.00
70,000.00
75,000.00

Lembar 29

=Rp.
=Rp.
=Rp.
=Rp.
Sub Total
=Rp.
=Rp.
=Rp.
=Rp.
Sub Total
Total

84,141.60
1,278.00
16,170.00
554.00
8,820.00
20,800.00
2,240.00
675.00

Dibulatkan

OL.VI.9

1 m2

=Rp.

134,670.00

=Rp.

132,114.60

Pasang Langit-langit Plywood 4 mm, Rangka Mutu Kayu Klas III


0.0120 m3
0.0600 kg

Kayu Klas III (Usuk Kayu Meranti 4/6)


Paku 3"

Rp.
Rp.

7,011,800.00 =Rp.
21,300.00 =Rp.

84,141.60
1,278.00

0.3900 lbr

Plywood 4 mm (4' x 8')

Rp.

117,600.00 =Rp.

45,864.00

0.0300 kg

Paku Tripleks

Rp.

27,700.00 =Rp.
Sub Total

0.2700 Oh
0.4000 Oh

Pekerja
Tukang Kayu

Rp.
Rp.

49,000.00 =Rp.
65,000.00 =Rp.

13,230.00
26,000.00

0.0400 Oh

Kepala Tukang Kayu

Rp.

70,000.00 =Rp.

2,800.00

0.0135 Oh

Mandor

Rp.

75,000.00 =Rp.
Sub Total

1,012.50

Total
Dibulatkan

Lembar 30

831.00

=Rp.

43,042.50

=Rp.
=Rp.

175,157.10
175,150.00

VII. PEKERJAAN SANITASI


OL.VII.1

OL.VII.2

1 btg

1 unit

Pasang Drain Hole PVC Jarak 2 m


0.6000 m1

Pipa PVC Tipe D "Maspion" (Dia. 2")

Rp.

20,000.00 =Rp.

12,000.00

0.2500 kg

Ijuk

Rp.

33,400.00 =Rp.

8,350.00
4,900.00
1,300.00
7,500.00

0.1000 Oh

Pekerja

Rp.

Sub Total
49,000.00 =Rp.

0.0200 Oh
0.1000 Oh

Tukang Batu
Mandor

Rp.
Rp.

65,000.00 =Rp.
75,000.00 =Rp.

=Rp.

Sub Total

=Rp.

13,700.00

Total
Dibulatkan

=Rp.
=Rp.

34,050.00
34,050.00

=Rp.

6,494,100.00

=Rp.

6,494,100.00

=Rp.

206,983.00

=Rp.
=Rp.
=Rp.

224,080.00
431,063.00
431,060.00

=Rp.

330,724.50

=Rp.
=Rp.
=Rp.

108,940.00
439,664.50
439,660.00

=Rp.

502,239.50

=Rp.
=Rp.
=Rp.

172,280.00
674,519.50
674,510.00

Pembuatan Septictank dan Sumur Peresapan untuk 10 Orang


- Septictank ( l = 1,00 x 1,50 x 2,50 ) m
- Sumur Peresapan 1 - sedalam 3 m.

=Rp.

5,494,100.00

=Rp.
Total

1,000,000.00

Dibulatkan

OL.VII.3

1 buah

Pasang Bak Kontrol Pasangan Batu Bata Uk. 30 x 30 cm, Tinggi 35 cm (Termasuk Tutup)
Batu Bata Kelas I
72.5000 bh
Rp.
800.00 =Rp.
58,000.00
Semen PC
44.0000 kg
Rp.
2,097.50 =Rp.
92,290.00
0.0700 m3

Pasir Pasang

Rp.

123,000.00 =Rp.

8,610.00

0.0700 m3

Batu Kali Pecah 2/3

Rp.

255,500.00 =Rp.

17,885.00

0.0600 m
1.6000 kg

Pasir Beton
Besi Beton Polos

Rp.
Rp.

127,300.00 =Rp.
14,100.00 =Rp.

7,638.00
22,560.00

3.2000
1.0150
0.0015
0.0160

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Rp.
Rp.
Rp.
Rp.

Oh
Oh
Oh
Oh

49,000.00
65,000.00
70,000.00
75,000.00

Sub Total
=Rp.
=Rp.
=Rp.
=Rp.

156,800.00
65,975.00
105.00
1,200.00

Sub Total
Total
Dibulatkan

OL.VII.4

1 buah

Pasang Bak Kontrol Pasangan Batu Bata Uk. 45 x 45 cm, Tinggi 50 cm


125.0000 bh
77.0000 kg
0.1300 m3

Batu Bata Kelas I


Semen PC
Pasir Pasang

Rp.
Rp.
Rp.

800.00 =Rp.
2,097.50 =Rp.
123,000.00 =Rp.

100,000.00
161,507.50
15,990.00

0.0200 m3
0.0900 m3
2.6000 kg

Batu Kali Pecah 2/3


Pasir Beton
Besi Beton Polos

Rp.
Rp.
Rp.

255,500.00 =Rp.
127,300.00 =Rp.
14,100.00 =Rp.

5,110.00
11,457.00
36,660.00

1.4200
0.4730
0.0470
0.0710

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Rp.
Rp.
Rp.
Rp.

Oh
Oh
Oh
Oh

49,000.00
65,000.00
70,000.00
75,000.00

Sub Total
=Rp.
=Rp.
=Rp.
=Rp.

69,580.00
30,745.00
3,290.00
5,325.00

Sub Total
Total
Dibulatkan

OL.VII.5

1 buah

20,350.00

Bak Kontrol Pasangan Batu Bata Uk. 60 x 60 cm, Tinggi 65 cm


185.5000
114.0000
0.1840
0.0330
4.8500
0.1200

bh
kg
m3
m3
kg
m3

Batu Bata Kelas I


Semen PC
Pasir Pasang
Batu Kali Pecah 2/3
Besi Beton Polos
Pasir Beton

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2.1600
0.1000
0.7200
0.0720
0.1080

Oh
Oh
Oh
Oh
Oh

Pekerja
Tukang Gali
Tukang Batu
Kepala Tukang Batu
Mandor

Rp.
Rp.
Rp.
Rp.
Rp.

800.00 =Rp.
=Rp.
=Rp.
=Rp.
=Rp.
=Rp.
Sub Total
49,000.00 =Rp.
65,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.
75,000.00 =Rp.
Sub Total
Total
Dibulatkan

2,097.50
123,000.00
255,500.00
14,100.00
127,300.00

148,400.00
239,115.00
22,632.00
8,431.50
68,385.00
15,276.00
105,840.00
6,500.00
46,800.00
5,040.00
8,100.00

VIII. PEKERJAAN BESI DAN ALUMINIUM


OL.VIII.1

1 lbr

Pasang Daun Pintu Aluminium


1.0000 lbr

Pintu Aluminium 70 x 200 cm (Kw. II)

Rp.

0.0850
0.8500
0.0850
0.0042

Pekerja
Tukang Besi
Kepala Tukang Besi
Mandor

Rp.
Rp.
Rp.
Rp.

Oh
Oh
Oh
Oh

Lembar 31

1,163,600.00 =Rp.
1,163,600.00
Sub Total
=Rp.
49,000.00 =Rp.
4,165.00
65,000.00 =Rp.
55,250.00
70,000.00 =Rp.
5,950.00
75,000.00 =Rp.
315.00
Sub Total
=Rp.
Total
=Rp.
Dibulatkan
=Rp.

1,163,600.00

65,680.00
1,229,280.00
1,229,280.00

OL.VIII.2

1 m2

Pasang Teralis Besi


1.0000 m2

Teralis Besi

Rp.

564,000.00 =Rp.

564,000.00

Sub Total

OL.VIII.3

1 m2

=Rp.

1.6700 Oh
1.6700 Oh

Pekerja
Tukang Besi

Rp.
Rp.

49,000.00 =Rp.
65,000.00 =Rp.

81,830.00
108,550.00

0.1670 Oh
0.0830 Oh

Kepala Tukang Besi


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

11,690.00
6,225.00

564,000.00

Sub Total

=Rp.

208,295.00

Total
Dibulatkan

=Rp.
=Rp.

772,295.00
772,290.00

=Rp.

75,320.00

Pasang Kawat Nyamuk


1.1000 m2

Kawat Nyamuk Kasa Aluminium

Rp.

43,700.00 =Rp.

0.0200 kg

Paku 1"

Rp.

22,500.00 =Rp.

4.0000 m

List Kayu Tahun 1/4

Rp.

Lembar 32

6,700.00 =Rp.
Sub Total

48,070.00
450.00
26,800.00

0.1000 Oh
0.1000 Oh

Pekerja
Tukang Kayu

Rp.
Rp.

49,000.00 =Rp.
65,000.00 =Rp.

4,900.00
6,500.00

0.0100 Oh

Kepala Tukang Kayu

Rp.

70,000.00 =Rp.

700.00

0.0050 Oh

Mandor

Rp.

75,000.00 =Rp.
Sub Total

375.00

Total
Dibulatkan

OL.VIII.4

1 m1

=Rp.

12,475.00

=Rp.
=Rp.

87,795.00
87,790.00

=Rp.

332,340.00

Pasang Jendela Nako dan Tralis


7.0000 daun Jendela Nako, l = 70 cm (includ Kerangka)

Rp.

44,500.00 =Rp.

311,500.00

2.0000 m1

Besi Plat Strip (Tebal = 3 mm)

Rp.

8,150.00 =Rp.

16,300.00

Paku Sekrup 1"

Rp.

0.2000 Oh
0.2000 Oh

Pekerja
Tukang Kayu

Rp.
Rp.

49,000.00 =Rp.
65,000.00 =Rp.

9,800.00
13,000.00

0.0200 Oh

Kepala Tukang Kayu

Rp.

70,000.00 =Rp.

1,400.00

0.0010 Oh

Mandor

Rp.

75,000.00 =Rp.
Sub Total

10.0000 bh

454.00 =Rp.
Sub Total

4,540.00

75.00

Total
Dibulatkan

=Rp.

24,275.00

=Rp.
=Rp.

356,615.00
356,610.00

=Rp.

30,473.00

=Rp.
=Rp.
=Rp.

9,017.50
39,490.50
39,490.00

=Rp.

36,813.00

=Rp.
=Rp.
=Rp.

9,017.50
45,830.50
45,830.00

=Rp.

739.50

=Rp.
=Rp.
=Rp.

7,609.50
8,349.00
8,340.00

=Rp.

2,380.00

=Rp.
=Rp.
=Rp.

2,507.50
4,887.50
4,880.00

=Rp.

6,507.00

IX. PEKERJAAN PENGECATAN


OL.IX.1

OL.IX.2

1 m2

1 m2

Mengecat Bidang Kayu Lama


0.1500 kg

Plamir Kayu

Rp.

30,800.00 =Rp.

0.1700 kg
0.2500 lbr

Cat Kayu "Emco Tanda Bintang"


Kertas Gosok

Rp.
Rp.

88,400.00 =Rp.
5,300.00 = Rp.

0.2500 ltr

Thinner

Rp.

0.0700 Oh
0.0750 Oh
0.0075 Oh

Pekerja
Tukang Cat
Kepala Tukang Cat

Rp.
Rp.
Rp.

38,000.00 = Rp.
Sub Total
49,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.

0.0025 Oh

Mandor

Rp.

75,000.00 =Rp.
Sub Total
Total
Dibulatkan

4,620.00
15,028.00
1,325.00
9,500.00
3,430.00
4,875.00
525.00
187.50

Mengecat Bidang Kayu Baru


0.2000
0.1500
0.1700
0.2500
0.2500

kg
kg
kg
lbr
ltr

Meni Kayu Cap Pedang


Plamir Kayu
Cat Kayu "Emco Tanda Bintang"
Kertas Gosok
Thinner

Rp.
Rp.
Rp.
Rp.
Rp.

31,700.00
30,800.00
88,400.00
5,300.00
38,000.00

=Rp.
=Rp.
=Rp.
= Rp.
= Rp.

0.0700
0.0750
0.0075
0.0025

Oh
Oh
Oh
Oh

Pekerja
Tukang Cat
Kepala Tukang Cat
Mandor

Rp.
Rp.
Rp.
Rp.

49,000.00
65,000.00
70,000.00
75,000.00

Sub Total
=Rp.
=Rp.
=Rp.
=Rp.

6,340.00
4,620.00
15,028.00
1,325.00
9,500.00
3,430.00
4,875.00
525.00
187.50

Sub Total
Total
Dibulatkan

OL.IX.3

OL.IX.4

OL.IX.5

1 m2

1 m2

1 m2

Melabur Tembok Baru dengan Gamping


0.0015 kg
0.1000 lbr
0.0100 bh

Gamping
Kertas Gosok
Kuas 4"

Rp.
Rp.
Rp.

0.1500
0.0010
0.0001
0.0025

Pekerja
Tukang Cat
Kepala Tukang Cat
Mandor

Rp.
Rp.
Rp.
Rp.

Oh
Oh
Oh
Oh

1,000.00 =Rp.
5,300.00 =Rp.
20,800.00 =Rp.
Sub Total
49,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.
75,000.00 =Rp.
Sub Total
Total
Dibulatkan

1.50
530.00
208.00
7,350.00
65.00
7.00
187.50

Melabur Tembok Lama dengan Gamping


0.3000 kg
0.1000 bh

Gamping
Kuas 4"

Rp.
Rp.

0.0400
0.0050
0.0005
0.0025

Pekerja
Tukang Cat
Kepala Tukang Cat
Mandor

Rp.
Rp.
Rp.
Rp.

Oh
Oh
Oh
Oh

1,000.00 =Rp.
20,800.00 =Rp.
Sub Total
49,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.
75,000.00 =Rp.
Sub Total
Total
Dibulatkan

300.00
2,080.00

24,100.00 =Rp.
Sub Total

6,507.00

1,960.00
325.00
35.00
187.50

Mengecat Eternit
0.2700 kg

Cat Decolith

Rp.

Lembar 33

OL.IX.6

1m

0.2250 Oh
0.0230 Oh

Tukang Cat
Kepala Tukang Cat

Rp.
Rp.

65,000.00 =Rp.
70,000.00 =Rp.

14,625.00
1,610.00

0.0080 Oh

Mandor

Rp.

75,000.00 =Rp.

600.00

=Rp.
Total

=Rp.
=Rp.

16,835.00
23,342.00

Dibulatkan

=Rp.

23,340.00

=Rp.

55,080.00

Coating
0.6800 kg

Coating

Rp.

81,000.00 =Rp.
Sub Total

0.0700 Oh

Pekerja

Rp.

49,000.00 =Rp.

3,430.00

0.0090 Oh
0.0060 Oh

Tukang Cat
Kepala Tukang Cat

Rp.
Rp.

65,000.00 =Rp.
70,000.00 =Rp.

585.00
420.00

0.0030 Oh

Mandor

Rp.

75,000.00 =Rp.
=Rp.

225.00

Total
Dibulatkan

Lembar 34

55,080.00

=Rp.

4,660.00

=Rp.

59,740.00

=Rp.

59,740.00

OL.IX.7

OL.IX.8

OL.IX.9

1 m2

1 m2

1m

Mengecat Kanstin/Kerb
0.1000 kg
0.2000 lbr

Plamir Tembok
Kertas Gosok

Rp.
Rp.

36,800.00 = Rp.
5,300.00 = Rp.

3,680.00
1,060.00

0.2240 kg

Cat "Emco"

Rp.

88,400.00 = Rp.

19,801.60

0.2260 ltr

Thinner A

Rp.

38,000.00 = Rp.
Sub Total

8,588.00

0.1500 Oh
0.0950 Oh

Pekerja
Tukang Cat

Rp.
Rp.

49,000.00 =Rp.
65,000.00 =Rp.

7,350.00
6,175.00

0.0100 Oh

Kepala Tukang Cat

Rp.

70,000.00 =Rp.

700.00

0.0025 Oh

Mandor

Rp.

75,000.00 =Rp.
Sub Total

187.50

=Rp.

=Rp.

14,412.50

Total

=Rp.

47,542.10

Dibulatkan

=Rp.

47,540.00

=Rp.

38,844.00

Sub Total
Total

=Rp.
=Rp.

14,412.50
53,256.50

Dibulatkan

=Rp.

53,250.00

=Rp.

63,544.00

=Rp.
=Rp.

41,812.50
105,356.50

=Rp.

105,350.00

=Rp.

142,909.60

=Rp.
=Rp.
=Rp.

36,000.00
178,909.60
178,900.00

Mengecat Tembok Eksterior


0.2260 kg
0.2600 kg

Cat Tembok Wallsealer (Cat Dasar)


Cat Tembok Mowilex

Rp.
Rp.

39,000.00 = Rp.
115,500.00 = Rp.

8,814.00
30,030.00

0.1500 Oh

Pekerja

Rp.

Sub Total
49,000.00 =Rp.

7,350.00

0.0950 Oh

Tukang Cat

Rp.

65,000.00 =Rp.

6,175.00

0.0100 Oh
0.0025 Oh

Kepala Tukang Cat


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

700.00
187.50

Mengecat Marka Jalan


0.4200 kg

Thermoplas

Rp.

0.1000 kg
0.0400 kg
1.0000 set

Glees beads
Cat Premier (Marka Jalan)
Alat Bantu

Rp.
Rp.
Rp.

0.5000 Oh

Pekerja

Rp.

0.2550 Oh
0.0025 Oh
0.0075 Oh

Tukang Cat
Kepala Tukang Cat
Mandor

Rp.
Rp.
Rp.

55,000.00 = Rp.

23,100.00

79,200.00 = Rp.
188,100.00 = Rp.
25,000.00 = Rp.
Sub Total
49,000.00 =Rp.

7,920.00
7,524.00
25,000.00

65,000.00 =Rp.
70,000.00 =Rp.
75,000.00 =Rp.
Sub Total
Total

16,575.00
175.00
562.50

24,500.00

Dibulatkan

OL.IX.10

1 m2

33,129.60

Plituran Sanding Filler


0.7730
0.1290
0.7730
0.8590
1.2900
0.2580

ltr
ltr
ltr
ltr
lbr
set

0.5000 Oh
0.0500 Oh

Wood Filler "Impra"


Wood Stain "Impra"
Sanding Sealer "Impra"
Thinner A
Kertas Gosok
Alat Bantu

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Tukang Cat
Kepala Tukang Cat

Rp.
Rp.

Lembar 35

46,900.00
81,500.00
70,800.00
38,000.00
5,300.00
7,500.00

= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
Sub Total
65,000.00 =Rp.
70,000.00 =Rp.
Sub Total
Total
Dibulatkan

36,253.70
10,513.50
54,728.40
32,642.00
6,837.00
1,935.00
32,500.00
3,500.00

SNI

LAMPIRAN
NOMOR

:
:

SK WALIKOTA BLITAR
188 /
/ HK / 422.010 / 2014

TENTANG

ANALISA SNI UNTUK BAHAN DAN UPAH


KERJA BANGUNAN GEDUNG

STANDAR NASIONAL INDONESIA

DAFTAR ANALISA BAHAN DAN UPAH KERJA


PEMERINTAH KOTA BLITAR TAHUN ANGGARAN 2014
( Triwulan I Tahun 2015 )

I. PEKERJAAN PERSIAPAN
I.1.6.2

1 m1

Pemasangan Pagar Sementara dari Seng Gelombang (Tinggi 2 m)


Kayu Klas IV (Gelam Dia. 10-12 / 400 cm)
1.2500 btg
Semen PC
2.5000 kg

Rp.

583,900.00 = Rp.

Rp.

2,097.50 = Rp.

729,875.00
5,243.75

1.2000 lbr
0.0050 m3

Seng Gelombang BJLS 30 (80 x 180 cm)


Pasir Beton

Rp.
Rp.

98,700.00 = Rp.
127,300.00 = Rp.

118,440.00
636.50

0.0090 m3
0.0720 m3
0.0600 kg

Koral Beton
Kayu Klas IV (Usuk Kayu Tahun 5/7)

Rp.
Rp.

255,500.00 = Rp.
3,007,500.00 = Rp.

2,299.50
216,540.00

Paku 3"

Rp.

21,300.00 = Rp.

0.4500 kg

Meni Besi

Rp.

31,700.00 = Rp.
Sub Total

14,265.00

0.4000 Oh
0.2000 Oh
0.0200 Oh
0.0200 Oh

Pekerja
Tukang Kayu

Rp.
Rp.

49,000.00 = Rp.
65,000.00 = Rp.

19,600.00
13,000.00

Kepala Tukang Kayu


Mandor

Rp.
Rp.

70,000.00 = Rp.
75,000.00 = Rp.
Sub Total

1,278.00
= Rp.

1,400.00
1,500.00

Total
Dibulatkan
I.2.6.4

1 m2

Pemasangan Bouwplank
Kayu Klas IV (Usuk Kayu Tahun 5/7)
0.0120 m3
Paku 3"
0.0200 kg
Kayu Klas IV (Papan Kayu Tahun 3/20)
0.0070 m3
0.1000 Oh
0.1000 Oh
0.0100 Oh
0.0050 Oh

I.3.6.5

1 m2

1 m2

Rp.
Rp.
Rp.
Rp.

Pembuatan Kantor Sementara (Direksi Keet), dengan Lantai Plesteran


Kayu Klas IV (Gelam Dia. 10-12 / 400 cm)
1.2500 btg
Kayu Klas III (Balok Kruing 8/12)
0.1800 m3
0.0850 m3
0.3000 m1
35.0000 kg
0.1500 m3
0.1000 m3

I.4.6.6

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.

3,007,500.00 = Rp.
21,300.00 = Rp.
2,997,900.00 = Rp.
Sub Total
49,000.00
65,000.00
70,000.00
75,000.00

583,900.00 = Rp.
8,682,400.00 = Rp.

Kayu Klas III (Usuk Kayu Kruing 5/7)


Besi Plat Strip 3 mm
Semen PC
Pasir Pasang
Pasir Beton

Rp.
Rp.
Rp.
Rp.
Rp.

8,268,300.00
48,900.00
2,097.50
123,000.00
127,300.00

0.1500
30.0000
0.2500
2.0000
0.0800
0.1500
0.0600

m3
bh
lbr
bh
m2
bh
lbr

Koral Beton
Bata Merah Kelas I
Seng Gelombang BJLS 30 (80 x 180 cm)
Jendela Nako (Termasuk Rangka)
Kaca Polos 5 mm
Kunci Tanam Besar 2x Putar
Plywood 4 mm (4' x 8')

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

255,500.00
800.00
98,700.00
44,500.00
88,700.00
105,600.00
117,600.00

2.0000
1.0000
2.0000
0.3000
0.0500

Oh
Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.
Rp.
Rp.

49,000.00
65,000.00
65,000.00
70,000.00
75,000.00

Pembuatan Gudang Semen dan Alat-alat


Kayu Klas IV (Gelam Dia. 10-12 / 400 cm)
1.7000 btg
Kayu Klas III (Balok Kruing 8/12)
0.2100 m3
Paku 3"
0.3000 kg
Semen PC
10.5000 kg
3
Pasir Beton
0.0300 m
Koral Beton
0.0500 m3
Seng Gelombang BJLS 30 (80 x 180 cm)
1.5000 lbr
1.0000 Oh
2.0000 Oh

Pekerja
Tukang Kayu

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Lembar 36

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

= Rp.

35,500.00

= Rp.
= Rp.

1,124,077.75
1,124,070.00

= Rp.

57,501.30

= Rp.
= Rp.
= Rp.

12,475.00
69,976.30
69,970.00

= Rp.

3,320,767.00

= Rp.
= Rp.
= Rp.

317,750.00
3,638,517.00
3,638,510.00

36,090.00
426.00
20,985.30

= Rp.
= Rp.
= Rp.
= Rp.
Sub Total
Total
Dibulatkan

Rp.
Rp.

1,088,577.75

4,900.00
6,500.00
700.00
375.00

729,875.00
1,562,832.00
702,805.50
14,670.00
73,412.50
18,450.00
12,730.00

= Rp.
38,325.00
= Rp.
24,000.00
= Rp.
24,675.00
= Rp.
89,000.00
= Rp.
7,096.00
= Rp.
15,840.00
= Rp.
7,056.00
Sub Total
= Rp.
98,000.00
= Rp.
65,000.00
= Rp.
130,000.00
= Rp.
21,000.00
= Rp.
3,750.00
Sub Total
Total
Dibulatkan

583,900.00
8,682,400.00
21,300.00
2,097.50
127,300.00
255,500.00
98,700.00

= Rp.
992,630.00
= Rp.
1,823,304.00
= Rp.
6,390.00
= Rp.
22,023.75
= Rp.
3,819.00
= Rp.
12,775.00
= Rp.
148,050.00
Sub Total
= Rp.
49,000.00 = Rp.
49,000.00
65,000.00 = Rp.
130,000.00

3,008,991.75

0.2000 Oh
0.0500 Oh

I.5.6.8

1 m2

Kepala Tukang Kayu


Mandor

Rp.
Rp.

Pembersihan Lapangan dan Perataan


Pekerja
0.1000 Oh
0.0500 Oh

Mandor

70,000.00 = Rp.
75,000.00 = Rp.
Sub Total

= Rp.

196,750.00

Total
Dibulatkan

= Rp.
= Rp.

3,205,741.75
3,205,740.00

= Rp.

8,650.00

= Rp.

8,650.00

Rp.

49,000.00 = Rp.

4,900.00

Rp.

75,000.00 = Rp.
Total

3,750.00

Dibulatkan

Lembar 37

14,000.00
3,750.00

I.6.6.10

1 m2

Pembuatan Bak Adukan (Ukuran 40 x 50 x 20 cm)


Kayu Klas IV (Papan Kayu Tahun 3/20)
0.0360 m3
0.0800 kg
0.0140 m3

Paku 3"
Kayu Klas IV (Usuk Kayu Tahun 5/7)

Rp.

2,997,900.00

= Rp.

107,924.40

Rp.
Rp.

21,300.00 = Rp.
3,007,500.00 = Rp.

1,704.00
42,105.00

Rp.
Rp.

65,000.00 = Rp.
75,000.00 = Rp.

Sub Total
0.3000 Oh
0.0015 Oh

Tukang Kayu
Mandor

= Rp.

151,733.40

= Rp.
= Rp.

19,612.50
171,345.90

= Rp.

171,340.00

= Rp.

34,150.00

= Rp.
= Rp.

14,470.00
48,620.00

= Rp.

48,620.00

= Rp.

45,609.00

= Rp.
= Rp.

52,750.00
98,359.00

= Rp.

98,350.00

= Rp.

351,658.00

= Rp.

351,650.00

49,000.00 = Rp.
326,683.00
75,000.00 = Rp.
2,475.00
Total
= Rp.
Dibulatkan
= Rp.

329,158.00
329,150.00

19,500.00
112.50

Sub Total
Total
Dibulatkan

I.7.6.11

1 m2

Pembuatan Stegger dari Bambu


Bambu Ori (Diameter 10-12 / 600 cm)
1.0000 btg
Tali Ijuk
0.2500 kg
0.2500 Oh
0.0170 Oh
0.0020 Oh
0.0130 Oh

Rp.

25,800.00 = Rp.

25,800.00

Rp.

33,400.00 = Rp.

8,350.00

Pekerja

Rp.

Sub Total
49,000.00 = Rp.

Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.

65,000.00 = Rp.
70,000.00 = Rp.
75,000.00 = Rp.

12,250.00
1,105.00
140.00
975.00

Sub Total
Total
Dibulatkan
I.8.6.12

1 m2

Pembuatan Jalan Sementara (Tebal 25 cm)


Batu Kali Belah 15/20
0.1500 m3
Batu Kali Pecah 5/7
0.0900 m3
Pasir Pasang
0.0100 m3
1.0000 Oh
0.0500 Oh

Rp.
Rp.
Rp.

Pekerja
Mandor

Rp.
Rp.

180,300.00 = Rp.
192,600.00 = Rp.
123,000.00 = Rp.

27,045.00
17,334.00
1,230.00

Sub Total
49,000.00 = Rp.
75,000.00 = Rp.
Sub Total
Total

49,000.00
3,750.00

Dibulatkan
I.9.6.13

1 m3

Bongkaran Beton Bertulang


6.6670 Oh
Pekerja
0.3330 Oh
Mandor

Rp.
Rp.

49,000.00 = Rp.
75,000.00 = Rp.
Total

326,683.00
24,975.00

Dibulatkan
I.10.6.14

1 m3

Bongkaran Dinding Tembok Bata Merah


6.6670 Oh
0.0330 Oh

Pekerja
Mandor

Rp.
Rp.

II. PEKERJAAN TANAH


II.1.6.1

1 m3

Galian Tanah Biasa (Sedalam 1 m)


0.7500 Oh
Pekerja
0.0250 Oh

II.2.6.2

II.3.6.3

II.4.6.4

II.5.6.5

1 m3

1 m3

1 m3

1 m3

Mandor

Galian Tanah Biasa (Sedalam 2 m)


0.9000 Oh
Pekerja
0.0450 Oh
Mandor

Rp.

49,000.00 = Rp.

Rp.

75,000.00 = Rp.
Total
Dibulatkan

Rp.
Rp.

Galian Tanah Biasa (Sedalam 3 m)


1.0500 Oh
Pekerja
0.0670 Oh
Mandor

Rp.
Rp.

Galian Tanah Keras (Sedalam 1 m)


1.0000 Oh
Pekerja
0.0320 Oh
Mandor

Rp.
Rp.

Galian Tanah Cadas (Sedalam 1 m)


1.5000 Oh
Pekerja
0.0600 Oh
Mandor

Rp.
Rp.

Lembar 38

36,750.00
1,875.00
= Rp.
= Rp.

38,625.00
38,620.00

49,000.00 = Rp.
44,100.00
75,000.00 = Rp.
3,375.00
Total
= Rp.
Dibulatkan
= Rp.

47,475.00
47,470.00

49,000.00 = Rp.
51,450.00
75,000.00 = Rp.
5,025.00
Total
= Rp.
Dibulatkan
= Rp.

56,475.00
56,470.00

49,000.00 = Rp.
49,000.00
75,000.00 = Rp.
2,400.00
Total
= Rp.
Dibulatkan
= Rp.

51,400.00
51,400.00

49,000.00 = Rp.
73,500.00
75,000.00 = Rp.
4,500.00
Total
= Rp.
Dibulatkan
= Rp.

78,000.00
78,000.00

II.6.6.6

1 m3

Galian Tanah Berlumpur (Sedalam 1 m)


1.2000 Oh
0.0450 Oh

II.7.6.7

1 m3

Pekerja
Mandor

Rp.
Rp.

49,000.00 = Rp.
75,000.00 = Rp.

58,800.00
3,375.00

Total

= Rp.

62,175.00

Dibulatkan

= RP.

62,170.00

Total

= Rp.

2,825.00

Dibulatkan

= Rp.

2,820.00

Pekerjaan Stripping Tanah Tebing (Setinggi 1 m)


0.0500 Oh
0.0050 Oh

Pekerja
Mandor

Rp.
Rp.

Lembar 39

49,000.00 = Rp.
75,000.00 = Rp.

2,450.00
375.00

II.8.6.8

1 m3

Pembuangan Tanah Sejauh 30 m


0.3300 Oh
Pekerja
0.0100 Oh

Mandor

Rp.

49,000.00 = Rp.

16,170.00

Rp.

75,000.00 = Rp.
Total

750.00
= Rp.

16,920.00

= Rp.

16,920.00

= Rp.

12,872.50

= Rp.

12,870.00

= Rp.

15,825.00

= Rp.

15,825.00

Total

= Rp.

18,822.50

Dibulatkan

= Rp.

18,820.00

= Rp.

17,135.83

= Rp.

17,130.00

= Rp.

26,000.00

= Rp.

26,000.00

49,000.00 = Rp.
24,500.00
75,000.00 = Rp.
3,750.00
Total
= Rp.
Dibulatkan
= Rp.

28,250.00
28,250.00

Dibulatkan
II.9.6.9.a

1 m3

Urugan Kembali (Untuk Tanah Biasa, dengan Kedalaman 1 m)


0.2500 Oh

Pekerja

Rp.

49,000.00 = Rp.

12,250.00

0.0083 Oh

Mandor

Rp.

75,000.00 = Rp.
Total

622.50

Dibulatkan
II.9.6.9.b

1 m3

Urugan Kembali (Untuk Tanah Biasa, dengan Kedalaman 2 m)


0.3000 Oh

Pekerja

Rp.

49,000.00 = Rp.

14,700.00

0.0150 Oh

Mandor

Rp.

75,000.00 = Rp.
Total

1,125.00

Dibulatkan
II.9.6.9.c

1 m3

Urugan Kembali (Untuk Tanah Biasa, dengan Kedalaman 3 m)


0.3500 Oh
0.0223 Oh

II.9.6.9.d

1 m3

Pekerja
Mandor

Rp.
Rp.

49,000.00 = Rp.
75,000.00 = Rp.

17,150.00
1,672.50

Urugan Kembali (Untuk Tanah Keras, dengan Kedalaman 1 m)


0.3333 Oh
0.0107 Oh

Pekerja
Mandor

Rp.
Rp.

49,000.00 = Rp.
75,000.00 = Rp.
Total

16,333.33
802.50

Dibulatkan
II.9.6.9.e

1 m3

Urugan Kembali (Untuk Tanah Cadas, dengan Kedalaman 1 m)


0.5000 Oh
Pekerja
Rp.
0.0200 Oh
Mandor
Rp.

49,000.00 = Rp.
75,000.00 = Rp.
Total

24,500.00
1,500.00

Dibulatkan
II.10.6.10

1 m3

Pemadatan Tanah (Per 20 cm)


0.5000 Oh
0.0500 Oh

II.11.6.11

1 m3

Urugan Pasir
1.2000 m3
0.3000 Oh
0.0100 Oh

Pekerja
Mandor

Rp.
Rp.

Pasir Urug

Rp.

Pekerja
Mandor

Rp.
Rp.

108,600.00 =Rp.
Sub Total
49,000.00 =Rp.
75,000.00 =Rp.
Sub Total

130,320.00
= Rp.

Total
Dibulatkan
II.12.6.14

1 m2

Pemasangan Lapisan Ijuk (Setebal 10 cm)


6.0000 kg
Ijuk
0.1500 Oh
0.0150 Oh

II.13.6.15

1 m3

Rp.

Pekerja
Mandor

Rp.
Rp.

Urugan Sirtu (Untuk Peninggian Lantai Bangunan)


1.2000 m3
Pasir Batu (Sirtu)
0.2500 Oh
0.0250 Oh

Pekerja
Mandor

Rp.
Rp.
Rp.

130,320.00

14,700.00
750.00

33,400.00 =Rp.
200,400.00
Sub Total
49,000.00 =Rp.
7,350.00
75,000.00 =Rp.
1,125.00
Sub Total
Total
Dibulatkan

114,900.00 =Rp.
137,880.00
Sub Total
49,000.00 =Rp.
12,250.00
75,000.00 =Rp.
1,875.00
Sub Total
Total
Dibulatkan

= Rp.

15,450.00

= Rp.
= Rp.

145,770.00
145,770.00

= Rp.

200,400.00

= Rp.
= Rp.
= Rp.

8,475.00
208,875.00
208,870.00

= Rp.

137,880.00

= Rp.
= Rp.
= Rp.

14,125.00
152,005.00
152,000.00

=Rp.

699,710.00

III. PEKERJAAN PONDASI


III.1.6.1

1 m3

Pasang Pondasi Batu Kali Belah 1 pc : 3 ps


1.2000 m3
Batu Kali Belah 15/20
202.0000 kg
Semen PC
0.4850 m3
Pasir Pasang
1.5000 Oh
0.6000 Oh
0.0600 Oh

Rp.
Rp.
Rp.

Pekerja
Tukang Batu
Kepala Tukang Batu

Rp.
Rp.
Rp.

Lembar 40

180,300.00 =Rp.
2,097.50 =Rp.
123,000.00 =Rp.
Sub total
49,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.

216,360.00
423,695.00
59,655.00
73,500.00
39,000.00
4,200.00

0.0750 Oh

Mandor

Rp.

75,000.00 =Rp.
Sub Total

5,625.00

Total
Dibulatkan
III.2.6.2

1 m3

= Rp

122,325.00

= Rp.

822,035.00

= Rp.

822,030.00

=Rp.

622,212.50

Pasang Pondasi Batu Kali Belah 1 pc : 4 ps


1.2000 m3
163.0000 kg
0.5200 m3

Batu Kali Belah 15/20


Semen PC

Rp.
Rp.

180,300.00 =Rp.
2,097.50 =Rp.

Pasir Pasang

Rp.

123,000.00 =Rp.
Sub total

Lembar 41

216,360.00
341,892.50
63,960.00

1.5000 Oh

Pekerja

Rp.

49,000.00 =Rp.

73,500.00

0.6000 Oh

Tukang Batu

Rp.

65,000.00 =Rp.

39,000.00

0.0600 Oh
0.0750 Oh

Kepala Tukang Batu


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

4,200.00
5,625.00

Sub Total
Total
Dibulatkan
III.3.6.3

1 m3

1.2000 m3

Batu Kali Belah 15/20

Rp.

180,300.00 =Rp.

216,360.00

Semen PC
Pasir Pasang

Rp.
Rp.

2,097.50 =Rp.
123,000.00 =Rp.

285,260.00
66,912.00

1.5000 Oh

Pekerja

Rp.

Sub total
49,000.00 =Rp.

73,500.00

0.6000 Oh

Tukang Batu

Rp.

65,000.00 =Rp.

39,000.00

0.0600 Oh
0.0750 Oh

Kepala Tukang Batu


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

4,200.00
5,625.00

Sub Total
Total
Dibulatkan

III.5.6.5

1 m3

1 m3

Pasang Pondasi Batu Kali Belah 1 pc : 6 ps


1.2000 m3
Batu Kali Belah 15/20

Rp.

180,300.00 =Rp.

216,360.00

117.0000 kg
0.5610 m3

Semen PC
Pasir Pasang

Rp.
Rp.

2,097.50 =Rp.
123,000.00 =Rp.

245,407.50
69,003.00

1.5000 Oh
0.6000 Oh

Pekerja
Tukang Batu

Rp.
Rp.

0.0600 Oh
0.0750 Oh

Kepala Tukang Batu


Mandor

Rp.
Rp.

Pasang Pondasi Batu Kali Belah 1 pc : 8 ps


1.2000 m3
Batu Kali Belah 15/20
91.0000 kg
Semen PC
3
0.5840 m
Pasir Pasang
1.5000
0.6000
0.0600
0.0750

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Rp.
Rp.
Rp.
Rp.

Sub total
49,000.00 =Rp.
65,000.00 =Rp.

1 m3

Pasang Pondasi Batu Kali Belah 1 kp : 1 sm : 2 pp


1.2000 m3
Batu Kali Belah 15/20
0.1700 m3
Kapur Padam
0.1700 m3
Semen Merah
0.3400 m3
Pasir Pasang
1.5000
0.6000
0.0600
0.0750

III.7.6.7

1 m3

1 m3

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Pasang Pondasi Batu Kali Belah 1 pc : 3 kp : 10 pp


1.2000 m3
Batu Kali Belah 15/20
61.0000 kg
Semen PC
0.1470 m3
Kapur Padam
0.4920 m3
Pasir Pasang
1.5000
0.6000
0.0600
0.0750

III.8.6.8

= Rp.

744,530.00

=Rp.

568,532.00

= Rp
= Rp.
= Rp.

122,325.00
690,857.00
690,850.00

=Rp.

530,770.50

= Rp
= Rp.
= Rp.

122,325.00
653,095.50
653,090.00

=Rp.

479,064.50

73,500.00
39,000.00

70,000.00 =Rp.
75,000.00 =Rp.
Sub Total
Total
Dibulatkan

180,300.00 =Rp.
2,097.50 =Rp.
123,000.00 =Rp.
Sub total
49,000.00
65,000.00
70,000.00
75,000.00

4,200.00
5,625.00

216,360.00
190,872.50
71,832.00

=Rp.
=Rp.
=Rp.
=Rp.
Sub Total

73,500.00
39,000.00
4,200.00
5,625.00

Total
Dibulatkan
III.6.6.6

122,325.00
744,537.50

Pasang Pondasi Batu Kali Belah 1 pc : 5 ps


136.0000 kg
0.5440 m3

III.4.6.4

= Rp
= Rp.

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Pasang Pondasi Batu Kali Belah 1/4 pc : 1 kp : 4 pp


1.2000 m3
Batu Kali Belah 15/20
41.0000 kg
Semen PC
0.1310 m3
Kapur Padam

Lembar 42

Rp.
Rp.
Rp.
Rp.

180,300.00
433,300.00
380,000.00
123,000.00

Rp.
Rp.
Rp.
Rp.

49,000.00
65,000.00
70,000.00
75,000.00

Rp.
Rp.
Rp.
Rp.

180,300.00
2,097.50
433,300.00
123,000.00

Rp.
Rp.
Rp.
Rp.

49,000.00
65,000.00
70,000.00
75,000.00

Rp.
Rp.
Rp.

=Rp.
216,360.00
=Rp.
73,661.00
=Rp.
64,600.00
=Rp.
41,820.00
Sub total
=Rp.
73,500.00
=Rp.
39,000.00
=Rp.
4,200.00
=Rp.
5,625.00
Sub Total
Total
Dibulatkan

=Rp.
216,360.00
=Rp.
127,947.50
=Rp.
63,695.10
=Rp.
60,516.00
Sub total
=Rp.
73,500.00
=Rp.
39,000.00
=Rp.
4,200.00
=Rp.
5,625.00
Sub Total
Total
Dibulatkan

180,300.00 =Rp.
2,097.50 =Rp.
433,300.00 =Rp.

216,360.00
85,997.50
56,762.30

= Rp

122,325.00

= Rp.
= Rp.

601,389.50
601,380.00

=Rp.

396,441.00

= Rp
= Rp.
= Rp.

122,325.00
518,766.00
518,760.00

=Rp.

468,518.60

= Rp
= Rp.
= Rp.

122,325.00
590,843.60
590,840.00

III.9.6.9

1 m3

0.5230 m3

Pasir Pasang

Rp.

123,000.00 =Rp.
Sub total

64,329.00

1.5000 Oh

Pekerja

Rp.

49,000.00 =Rp.

73,500.00

0.6000 Oh
0.0600 Oh

Tukang Batu
Kepala Tukang Batu

Rp.
Rp.

65,000.00 =Rp.
70,000.00 =Rp.

39,000.00
4,200.00

0.0750 Oh

Mandor

Rp.

75,000.00 =Rp.
Sub Total

=Rp.

423,448.80

5,625.00
= Rp

122,325.00

Total

= Rp.

545,773.80

Dibulatkan

= Rp.

545,770.00

=Rp.

263,275.20

Pasang Pondasi Batu Kosong (Aanstampeng)


1.2000 m3
0.4320 m3

Batu Kali Belah 15/20


Pasir Urug

Rp.
Rp.

180,300.00 =Rp.
108,600.00 =Rp.
Sub total

Lembar 43

216,360.00
46,915.20

0.7800 Oh

Pekerja

Rp.

49,000.00 =Rp.

38,220.00

0.3900 Oh

Tukang Batu

Rp.

65,000.00 =Rp.

25,350.00

0.0390 Oh
0.0390 Oh

Kepala Tukang Batu


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

2,730.00
2,925.00

Sub total
Total

=Rp.
= Rp.

69,225.00
332,500.20

Dibulatkan

= Rp.

332,500.00

=Rp.

192,305.63

IV. PEKERJAAN DINDING


IV.1.6.2

1 m2

Pasangan Batu Merah Tebal 1 Bata, 1 pc : 3 pp (Rollag)


140.0000 bh
32.9500 kg

Bata Merah Kelas I


Semen PC

Rp.
Rp.

800.00 =Rp.
2,097.50 =Rp.

112,000.00
69,112.63

0.0910 m3

Pasir Pasang

Rp.

0.6000 Oh

Pekerja

Rp.

49,000.00 =Rp.

29,400.00

0.2000 Oh
0.0200 Oh

Tukang Batu
Kepala Tukang Batu

Rp.
Rp.

65,000.00 =Rp.
70,000.00 =Rp.

13,000.00
1,400.00

0.0300 Oh

Mandor

Rp.

75,000.00 =Rp.
Sub Total

123,000.00 =Rp.
Sub total

11,193.00

2,250.00

Total
Dibulatkan
IV.2.6.3

1 m2

1 m2

Bata Merah Kelas I


Semen PC

Rp.
Rp.

0.0930 m3

Pasir Pasang

Rp.

0.6000 Oh
0.2000 Oh
0.0200 Oh

Pekerja
Tukang Batu
Kepala Tukang Batu

Rp.
Rp.
Rp.

0.0300 Oh

Mandor

Rp.

800.00 =Rp.
2,097.50 =Rp.

Bata Merah Kelas I


Semen PC
Pasir Pasang

Rp.
Rp.
Rp.

0.3000 Oh

Pekerja

Rp.

0.1000 Oh
0.0100 Oh
0.0150 Oh

Tukang Batu
Kepala Tukang Batu
Mandor

Rp.
Rp.
Rp.

Pasangan Batu Merah Tebal 1/2 Bata, 1 pc : 3 pp


70.0000 bh
Bata Merah Kelas I
14.3700 kg
Semen PC
0.0400 m3
Pasir Pasang
0.3000
0.1000
0.0100
0.0150

IV.5.6.9

1 m2

1 m2

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Pasangan Batu Merah Tebal 1/2 Bata, 1 pc : 4 pp


70.0000 bh
Bata Merah Kelas I
11.5000 kg
Semen PC
0.0430 m3
Pasir Pasang
0.3000
0.1000
0.0100
0.0150

IV.6.6.10

238,350.00

=Rp.

179,127.63

= Rp
= Rp.
= Rp.

46,050.00
225,177.63
225,170.00

=Rp.

100,421.63

= Rp
= Rp.

23,025.00
123,446.63

= Rp.

123,440.00

112,000.00
55,688.63

123,000.00 =Rp.
Sub total
49,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.
75,000.00 =Rp.
Sub Total
Total
Dibulatkan

11,439.00
29,400.00
13,000.00
1,400.00
2,250.00

800.00 =Rp.
2,097.50 =Rp.
123,000.00 =Rp.
Sub total
49,000.00 =Rp.

56,000.00
39,747.63
4,674.00

65,000.00 =Rp.
70,000.00 =Rp.
75,000.00 =Rp.
Sub Total
Total

6,500.00
700.00
1,125.00

14,700.00

Dibulatkan
1 m2

= Rp.

Pasangan Batu Merah Tebal 1/2 Bata, 1 pc : 2 pp (Trasraam)


70.0000 bh
18.9500 kg
0.0380 m3

IV.4.6.8

46,050.00
238,355.63

Pasangan Batu Merah Tebal 1 Bata, 1 pc : 4 pp


140.0000 bh
26.5500 kg

IV.3.6.7

= Rp
= Rp.

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Pasangan Batu Merah Tebal 1/2 Bata, 1 pc : 5 pp


70.0000 bh
Bata Merah Kelas I
9.6800 kg
Semen PC
3
0.0450 m
Pasir Pasang

Lembar 44

Rp.
Rp.
Rp.

800.00 =Rp.
56,000.00
2,097.50 =Rp.
30,141.08
123,000.00 =Rp.
4,920.00
Sub total
=Rp.
49,000.00 =Rp.
14,700.00
65,000.00 =Rp.
6,500.00
70,000.00 =Rp.
700.00
75,000.00 =Rp.
1,125.00
Sub Total
= Rp
Total
= Rp.
Dibulatkan
= Rp.

800.00 =Rp.
56,000.00
2,097.50 =Rp.
24,121.25
123,000.00 =Rp.
5,289.00
Sub total
=Rp.
49,000.00 =Rp.
14,700.00
65,000.00 =Rp.
6,500.00
70,000.00 =Rp.
700.00
75,000.00 =Rp.
1,125.00
Sub Total
= Rp
Total
= Rp.
Dibulatkan
= Rp.

800.00 =Rp.
2,097.50 =Rp.
123,000.00 =Rp.

56,000.00
20,303.80
5,535.00

91,061.08

23,025.00
114,086.08
114,080.00

85,410.25

23,025.00
108,435.25
108,430.00

0.3000 Oh

Pekerja

Rp.

Sub total
49,000.00 =Rp.

0.1000 Oh

Tukang Batu

Rp.

65,000.00 =Rp.

6,500.00

0.0100 Oh
0.0150 Oh

Kepala Tukang Batu


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

700.00
1,125.00

Sub Total
Total
Dibulatkan
IV.7.6.11

1 m2

=Rp.

81,838.80

= Rp
= Rp.

23,025.00
104,863.80

= Rp.

104,860.00

=Rp.

79,478.20

14,700.00

Pasangan Batu Merah Tebal 1/2 Bata, 1 pc : 6 pp


70.0000 bh
8.3200 kg
0.0490 m3

Bata Merah Kelas I

Rp.

800.00 =Rp.

56,000.00

Semen PC
Pasir Pasang

Rp.
Rp.

2,097.50 =Rp.
123,000.00 =Rp.

17,451.20
6,027.00

Sub total

Lembar 45

0.3000 Oh

Pekerja

Rp.

49,000.00 =Rp.

14,700.00

0.1000 Oh

Tukang Batu

Rp.

65,000.00 =Rp.

6,500.00

0.0100 Oh
0.0150 Oh

Kepala Tukang Batu


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

700.00
1,125.00

Sub Total
Total
Dibulatkan
IV.8.6.12

1 m2

Bata Merah Kelas I

Rp.

800.00 =Rp.

56,000.00

6.5000 kg
0.0500 m3

Semen PC
Pasir Pasang

Rp.
Rp.

2,097.50 =Rp.
123,000.00 =Rp.

13,633.75
6,150.00

0.3000 Oh

Pekerja

Rp.

Sub total
49,000.00 =Rp.

0.1000 Oh

Tukang Batu

Rp.

65,000.00 =Rp.

6,500.00

0.0100 Oh
0.0150 Oh

Kepala Tukang Batu


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

700.00
1,125.00

Pasangan Batu Merah Tebal 1/2 Bata, 1 pc : 3 kp : 10 pp


70.0000 bh
Bata Merah Kelas I
0.0150 m3
Kapur Padam
4.5000 kg
Semen PC
3
0.0500 m
Pasir Pasang
0.3000
0.1000
0.0100
0.0150

IV.10.6.14

1 m2

IV.12.6.22

1 m2

1 m2

1 m2

102,500.00

=Rp.

75,783.75

= Rp
= Rp.
= Rp.

23,025.00
98,808.75
98,800.00

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Rp.
Rp.
Rp.
Rp.

800.00
433,300.00
2,097.50
123,000.00

Rp.
Rp.
Rp.
Rp.

49,000.00
65,000.00
70,000.00
75,000.00

Rp.
Rp.
Rp.
Rp.

800.00
433,300.00
380,000.00
123,000.00

Rp.
Rp.
Rp.
Rp.

49,000.00
65,000.00
70,000.00
75,000.00

=Rp.
56,000.00
=Rp.
6,499.50
=Rp.
9,438.75
=Rp.
6,150.00
Sub total
=Rp.
=Rp.
14,700.00
=Rp.
6,500.00
=Rp.
700.00
=Rp.
1,125.00
Sub Total
=Rp.
Total
= Rp.
Dibulatkan
= Rp.

=Rp.
56,000.00
=Rp.
7,799.40
=Rp.
6,840.00
=Rp.
2,214.00
Sub total
=Rp.
=Rp.
14,700.00
=Rp.
6,500.00
=Rp.
700.00
=Rp.
1,125.00
Sub Total
=Rp.
Total
= Rp.
Dibulatkan
= Rp.

78,088.25

23,025.00
101,113.25
101,110.00

72,853.40

23,025.00
95,878.40
95,870.00

Pasangan Batu Merah Tebal 1/2 Bata, 1 kp : 1 sm : 2 pp


70.0000
0.0140
0.0140
0.0280

bh
m3
m3
m3

Bata Merah Kelas I


Kapur Padam
Semen Merah
Pasir Pasang

Rp.
Rp.
Rp.
Rp.

800.00
433,300.00
380,000.00
123,000.00

0.3000
0.1000
0.0100
0.0150

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Rp.
Rp.
Rp.
Rp.

49,000.00
65,000.00
70,000.00
75,000.00

Pasang Dinding Roster / Terawang, 1 pc : 3 pp


30.0000 bh
Roster Beton 10 x 30 cm
14.0000 kg
Semen PC
0.0320 m3
Pasir Pasang
0.3000
0.1000
0.0100
0.0150

IV.13.6.23

Oh
Oh
Oh
Oh

Pasangan Batu Merah Tebal 1/2 Bata, 1 kp : 1 sm : 1 pp


70.0000 bh
Bata Merah Kelas I
0.0180 m3
Kapur Padam
0.0180 m3
Semen Merah
0.0180 m3
Pasir Pasang
0.3000
0.1000
0.0100
0.0150

IV.11.6.15

= Rp.

14,700.00

Sub Total
Total
Dibulatkan
1 m2

23,025.00
102,503.20

Pasangan Batu Merah Tebal 1/2 Bata, 1 pc : 8 pp


70.0000 bh

IV.9.6.13

= Rp
= Rp.

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Rp.
Rp.
Rp.
Rp.

Pasang Dinding Roster / Terawang, 1 pc : 4 pp


30.0000 bh
Roster Beton 10 x 30 cm
11.0000 kg
Semen PC
3
0.0350 m
Pasir Pasang
0.3000 Oh

Rp.
Rp.
Rp.

Pekerja

Rp.

Lembar 46

=Rp.
56,000.00
=Rp.
6,066.20
=Rp.
5,320.00
=Rp.
3,444.00
Sub total
=Rp.
=Rp.
14,700.00
=Rp.
6,500.00
=Rp.
700.00
=Rp.
1,125.00
Sub Total
= Rp
Total
= Rp.
Dibulatkan
= Rp.

15,400.00 =Rp.
462,000.00
2,097.50 =Rp.
29,365.00
123,000.00 =Rp.
3,936.00
Sub total
49,000.00 =Rp.
14,700.00
65,000.00 =Rp.
6,500.00
70,000.00 =Rp.
700.00
75,000.00 =Rp.
1,125.00
Sub Total
Total
Dibulatkan

15,400.00 =Rp.
2,097.50 =Rp.
123,000.00 =Rp.
Sub total
49,000.00 =Rp.

70,830.20

23,025.00
93,855.20
93,850.00

=Rp.

495,301.00

= Rp
= Rp.
= Rp.

23,025.00
518,326.00
518,320.00

=Rp.

489,377.50

462,000.00
23,072.50
4,305.00
14,700.00

0.1000 Oh
0.0100 Oh

Tukang Batu
Kepala Tukang Batu

Rp.
Rp.

65,000.00 =Rp.
70,000.00 =Rp.

6,500.00
700.00

0.0150 Oh

Mandor

Rp.

75,000.00 =Rp.

1,125.00

Sub Total
Total
Dibulatkan

= Rp
= Rp.

23,025.00
512,402.50

= Rp.

512,400.00

=Rp.

23,904.84

V. PEKERJAAN PLESTERAN
V.1.6.2

1 m2

Plesteran 1 pc : 2 pp (Tebal 15 mm) Trasraam


10.2240 kg
Semen PC
0.0200 m3

Pasir Pasang

Rp.

2,097.50 =Rp.

21,444.84

Rp.

123,000.00 =Rp.

2,460.00

Sub total

Lembar 47

V.2.6.3

1 m2

0.2000 Oh

Pekerja

Rp.

49,000.00 =Rp.

9,800.00

0.1500 Oh

Tukang Batu

Rp.

65,000.00 =Rp.

9,750.00

0.0150 Oh
0.0100 Oh

Kepala Tukang Batu


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

1,050.00
750.00

Sub Total
Total

= Rp
= Rp.

21,350.00
45,254.84

Dibulatkan

= Rp.

45,250.00

=Rp.

19,139.16

Plesteran 1 pc : 3 pp (Tebal 15 mm)


7.7760 kg

Semen PC

Rp.

0.0230 m3

Pasir Pasang

Rp.

2,097.50 =Rp.

0.2000 Oh
0.1500 Oh

Pekerja
Tukang Batu

Rp.
Rp.

49,000.00 =Rp.
65,000.00 =Rp.

9,800.00
9,750.00

0.0150 Oh

Kepala Tukang Batu

Rp.

70,000.00 =Rp.

1,050.00

0.0100 Oh

Mandor

Rp.

75,000.00 =Rp.
Sub Total

123,000.00 =Rp.
Sub total

16,310.16
2,829.00

750.00

Total
Dibulatkan
V.3.6.4

1 m2

V.5.6.6

1 m2

1 m2

6.2400 kg
0.0240 m3

Semen PC
Pasir Pasang

Rp.
Rp.

0.2000 Oh

Pekerja

Rp.

Sub total
49,000.00 =Rp.

9,800.00

0.1500 Oh
0.0150 Oh
0.0100 Oh

Tukang Batu
Kepala Tukang Batu
Mandor

Rp.
Rp.
Rp.

65,000.00 =Rp.
70,000.00 =Rp.
75,000.00 =Rp.

9,750.00
1,050.00
750.00

Plesteran 1 pc : 5 pp (Tebal 15 mm)


5.1840 kg
Semen PC
0.0260 m3
Pasir Pasang

1 m2

Pekerja
Tukang Batu
Kepala Tukang Batu

Rp.
Rp.
Rp.

0.0100 Oh

Mandor

Rp.

Plesteran 1 pc : 6 pp (Tebal 15 mm)


4.4160 kg
Semen PC
0.0270 m3
Pasir Pasang

Plesteran 1
0.0070
0.0070
0.0150
0.2200
0.1200
0.0120
0.0110

V.7.6.13

1 m2

Rp.
Rp.

0.2000 Oh
0.1500 Oh
0.0150 Oh

0.2000
0.1500
0.0150
0.0100

V.6.6.12

21,350.00
40,489.16
40,480.00

=Rp.

16,040.40

= Rp
= Rp
= Rp

21,350.00
37,390.40
37,390.00

=Rp.

14,071.44

= Rp
= Rp
= Rp

21,350.00
35,421.44
35,420.00

=Rp.

12,583.56

= Rp
= Rp
= Rp

21,350.00
33,933.56
33,930.00

Plesteran 1 pc : 4 pp (Tebal 15 mm)


2,097.50 =Rp.
123,000.00 =Rp.

13,088.40
2,952.00

Sub Total
Total
Dibulatkan
V.4.6.5

= Rp
= Rp.
= Rp.

Oh
Oh
Oh
Oh

Rp.
Rp.

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Rp.
Rp.
Rp.
Rp.

sm : 1 kp : 2 pp (Tebal 15 mm)
m3
Semen Merah
m3
Kapur Padam
m3
Pasir Pasang

Rp.
Rp.
Rp.

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Plesteran 1 pc : 2 pp (Tebal 20 mm) Trasraam


13.6320 kg
Semen PC
0.0270 m3
Pasir Pasang
0.2600
0.2000
0.0200
0.0130

Oh
Oh
Oh
Oh

Rp.
Rp.

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Rp.
Rp.
Rp.
Rp.

Lembar 48

2,097.50 =Rp.
123,000.00 =Rp.
Sub total
49,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.
75,000.00 =Rp.
Sub Total
Total
Dibulatkan

2,097.50 =Rp.
123,000.00 =Rp.
49,000.00
65,000.00
70,000.00
75,000.00

Sub total
=Rp.
=Rp.
=Rp.
=Rp.
Sub Total
Total
Dibulatkan

10,873.44
3,198.00
9,800.00
9,750.00
1,050.00
750.00

9,262.56
3,321.00
9,800.00
9,750.00
1,050.00
750.00

380,000.00 =Rp.
2,660.00
433,300.00 =Rp.
3,033.10
123,000.00 =Rp.
1,845.00
Sub total
=Rp.
49,000.00 =Rp.
10,780.00
65,000.00 =Rp.
7,800.00
70,000.00 =Rp.
840.00
75,000.00 =Rp.
825.00
Sub Total
= Rp
Total
= Rp
Dibulatkan
= Rp

2,097.50 =Rp.
28,593.12
123,000.00 =Rp.
3,321.00
Sub total
=Rp.
49,000.00 =Rp.
12,740.00
65,000.00 =Rp.
13,000.00
70,000.00 =Rp.
1,400.00
75,000.00 =Rp.
975.00
Sub Total
= Rp
Total
= Rp.
Dibulatkan
= Rp.

7,538.10

20,245.00
27,783.10
27,780.00

31,914.12

28,115.00
60,029.12
60,020.00

V.8.6.14

1 m2

Plesteran 1 pc : 3 pp (Tebal 20 mm)


10.3680 kg
Semen PC
0.0310 m3
Pasir Pasang
0.2600
0.2000
0.0200
0.0130

Oh
Oh
Oh
Oh

Rp.
Rp.

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Rp.
Rp.
Rp.
Rp.

Lembar 49

2,097.50 =Rp.
21,746.88
123,000.00 =Rp.
3,813.00
Sub total
=Rp.
49,000.00 =Rp.
12,740.00
65,000.00 =Rp.
13,000.00
70,000.00 =Rp.
1,400.00
75,000.00 =Rp.
975.00
Sub Total
= Rp
Total
= Rp.
Dibulatkan
= Rp.

25,559.88

28,115.00
53,674.88
53,670.00

V.9.6.15

1 m2

Plesteran 1 pc : 4 pp (Tebal 20 mm)


8.3200 kg
Semen PC
0.0320 m3
Pasir Pasang
0.2600
0.2000
0.0200
0.0130

V.10.6.16

1 m2

1 m2

1 m2

Plesteran 1
0.0090
0.0090
0.0180
0.2860
0.2200
0.0220
0.0140

V.13.6.19

1 m2

V.15.6.23

1 m1

1 m2

Oh
Oh
Oh
Oh

Rp.
Rp.

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Rp.
Rp.
Rp.
Rp.

Oh
Oh
Oh
Oh

Rp.
Rp.

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Rp.
Rp.
Rp.
Rp.

sm : 1 kp : 2 pp (Tebal 20 mm)
m3
Semen Merah
m3
Kapur Padam
3
m
Pasir Pasang

Rp.
Rp.
Rp.

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Plesteran Berapen 1 pc : 5 pp (Tebal 15 mm)


5.1840 kg
Semen PC
0.0260 m3
Pasir Pasang
0.1500
0.0700
0.0070
0.0080

V.14.6.20

Rp.
Rp.
Rp.
Rp.

Plesteran 1 pc : 6 pp (Tebal 20 mm)


5.8880 kg
Semen PC
0.0360 m3
Pasir Pasang
0.2600
0.2000
0.0200
0.0130

V.12.6.18

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Plesteran 1 pc : 5 pp (Tebal 20 mm)


6.9120 kg
Semen PC
0.0350 m3
Pasir Pasang
0.2600
0.2000
0.0200
0.0130

V.11.6.17

Oh
Oh
Oh
Oh

Rp.
Rp.

Oh
Oh
Oh
Oh

Rp.
Rp.

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Rp.
Rp.
Rp.
Rp.

2,097.50 =Rp.
17,451.20
123,000.00 =Rp.
3,936.00
Sub total
=Rp.
49,000.00 =Rp.
12,740.00
65,000.00 =Rp.
13,000.00
70,000.00 =Rp.
1,400.00
75,000.00 =Rp.
975.00
Sub Total
= Rp
Total
= Rp
Dibulatkan
= Rp

2,097.50 =Rp.
14,497.92
123,000.00 =Rp.
4,305.00
Sub total
=Rp.
49,000.00 =Rp.
12,740.00
65,000.00 =Rp.
13,000.00
70,000.00 =Rp.
1,400.00
75,000.00 =Rp.
975.00
Sub Total
= Rp
Total
= Rp
Dibulatkan
= Rp

2,097.50 =Rp.
12,350.08
123,000.00 =Rp.
4,428.00
Sub total
=Rp.
49,000.00 =Rp.
12,740.00
65,000.00 =Rp.
13,000.00
70,000.00 =Rp.
1,400.00
75,000.00 =Rp.
975.00
Sub Total
= Rp
Total
= Rp
Dibulatkan
= Rp

380,000.00 =Rp.
3,420.00
433,300.00 =Rp.
3,899.70
123,000.00 =Rp.
2,214.00
Sub total
=Rp.
49,000.00 =Rp.
14,014.00
65,000.00 =Rp.
14,300.00
70,000.00 =Rp.
1,540.00
75,000.00 =Rp.
1,050.00
Sub Total
= Rp
Total
= Rp
Dibulatkan
= Rp

2,097.50 =Rp.
10,873.44
123,000.00 =Rp.
3,198.00
Sub total
=Rp.
49,000.00 =Rp.
7,350.00
65,000.00 =Rp.
4,550.00
70,000.00 =Rp.
490.00
75,000.00 =Rp.
600.00
Sub Total
= Rp
Total
= Rp
Dibulatkan
= Rp

Plesteran Sponing 1 pc : 2 pp (Lebar 10 mm), untuk Kusen Pintu dan Jendela


0.5000 kg
Semen PC
Rp.
2,097.50 =Rp.
1,048.75
0.0130 m3
Pasir Pasang
Rp.
123,000.00 =Rp.
1,599.00
Sub total
=Rp.
0.0570 Oh
Pekerja
Rp.
49,000.00 =Rp.
2,793.00
0.3800 Oh
Tukang Batu
Rp.
65,000.00 =Rp.
24,700.00
0.0380 Oh
Kepala Tukang Batu
Rp.
70,000.00 =Rp.
2,660.00
0.0030 Oh
Mandor
Rp.
75,000.00 =Rp.
225.00
Sub Total
= Rp
Total
= Rp
Dibulatkan
= Rp
Plesteran Ciprat 1 pc : 2 pp
4.3200 kg
Semen PC
0.0060 m3
Pasir Pasang
0.2500
0.1000
0.0100
0.0130

Oh
Oh
Oh
Oh

Rp.
Rp.

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Rp.
Rp.
Rp.
Rp.

Lembar 50

2,097.50 =Rp.
9,061.20
123,000.00 =Rp.
738.00
Sub total
=Rp.
49,000.00 =Rp.
12,250.00
65,000.00 =Rp.
6,500.00
70,000.00 =Rp.
700.00
75,000.00 =Rp.
975.00
Sub Total
= Rp
Total
= Rp
Dibulatkan
= Rp

21,387.20

28,115.00
49,502.20
49,500.00

18,802.92

28,115.00
46,917.92
46,910.00

16,778.08

28,115.00
44,893.08
44,890.00

9,533.70

30,904.00
40,437.70
40,430.00

14,071.44

12,990.00
27,061.44
27,060.00

2,647.75

30,378.00
33,025.75
33,020.00

9,799.20

20,425.00
30,224.20
30,220.00

V.16.6.27

1 m2

Acian Beton
3.2500 kg

Semen PC

Rp.

2,097.50 =Rp.

6,816.88

0.1500 Oh

Pekerja

Rp.

Sub Total
49,000.00 =Rp.

0.1000 Oh

Tukang Batu

Rp.

65,000.00 =Rp.

6,500.00

0.0100 Oh
0.0080 Oh

Kepala Tukang Batu


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

700.00
600.00

Lembar 51

=Rp.

6,816.88

Sub Total
Total

=Rp.
=Rp.

15,150.00
21,966.88

Dibulatkan

=Rp.

21,960.00

7,350.00

VI. PEKERJAAN KAYU


VI.1.6.1

1 m3

Pasang Kusen Pintu dan Jendela (Mutu Kayu Klas I)


1.1000 m3
1.2500 kg

Kayu Klas I (Balok Kayu Jati Kw. I Lokal)


Paku 3"

Rp.
Rp.

1.0000 kg

Lem Kayu Rajawali

Rp.

35,000.00 =Rp.
Sub Total

6.0000 Oh

Pekerja

Rp.

49,000.00 =Rp.

294,000.00

Tukang Kayu
Kepala Tukang Kayu

Rp.
Rp.

65,000.00 =Rp.
70,000.00 =Rp.

1,300,000.00
140,000.00

Mandor

Rp.

75,000.00 =Rp.

22,500.00

20.0000 Oh
2.0000 Oh
0.3000 Oh

VI.2.6.3

VI.3.6.5

VI.4.6.6

1 m2

1 m2

1 m2

29,163,300.00 =Rp.
21,300.00 =Rp.

32,079,630.00
26,625.00
35,000.00
=Rp.

32,141,255.00

Sub Total
Total

=Rp.
=Rp.

1,756,500.00
33,897,755.00

Dibulatkan

=Rp.

33,897,750.00

=Rp.

564,705.00

Sub Total

=Rp.

Total
Dibulatkan

=Rp.
=Rp.

94,100.00
658,805.00
658,800.00

=Rp.

581,140.00

=Rp.
=Rp.
=Rp.

232,750.00
813,890.00
813,890.00

=Rp.

269,774.40

=Rp.
=Rp.
=Rp.

186,200.00
455,974.40
455,970.00

=Rp.

919,324.00

=Rp.
=Rp.
=Rp.

268,750.00
1,188,074.00
1,188,070.00

=Rp.

15,343,160.00

=Rp.
=Rp.
=Rp.

1,075,000.00
16,418,160.00
16,418,160.00

Pasang Daun Pintu Klamp Standar (Mutu Kayu Klas II)


0.0400 m3
0.0500 kg

Kayu Klas II (Papan Kayu Kamper)


Paku 3"

Rp.
Rp.

0.3500 Oh
1.0500 Oh

Pekerja
Tukang Kayu

Rp.
Rp.

Sub Total
49,000.00 =Rp.
65,000.00 =Rp.

0.1050 Oh
0.0180 Oh

Kepala Tukang Kayu


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

Pasang Daun Pintu Panel (Mutu Kayu Klas I atau II)


0.0400 m3
Kayu Klas II (Papan Kayu Kamper)
0.5000 kg
Lem Kayu Rajawali

Rp.
Rp.

1.0000 Oh
2.5000 Oh
0.2500 Oh

Pekerja
Tukang Kayu
Kepala Tukang Kayu

Rp.
Rp.
Rp.

0.0500 Oh

Mandor

Rp.

Pasang Daun Pintu dan Jendela Kaca (Mutu Kayu Klas I atau II)
0.0184 m3
Kayu Klas II (Papan Kayu Kamper)
Rp.
0.3000 kg
Lem Kayu Rajawali
Rp.
0.8000
2.0000
0.2000
0.0400

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.
Rp.

14,091,000.00 =Rp.
21,300.00 =Rp.

563,640.00
1,065.00
17,150.00
68,250.00
7,350.00
1,350.00

14,091,000.00 =Rp.
35,000.00 =Rp.
Sub Total
49,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.

563,640.00
17,500.00
49,000.00
162,500.00
17,500.00

75,000.00 =Rp.
Sub Total
Total
Dibulatkan

14,091,000.00 =Rp.
35,000.00 =Rp.
49,000.00
65,000.00
70,000.00
75,000.00

3,750.00

259,274.40
10,500.00

Sub Total
=Rp.
=Rp.
=Rp.
=Rp.

39,200.00
130,000.00
14,000.00
3,000.00

Sub Total
Total
Dibulatkan
VI.5.6.7

VI.6.6.13

1 m2

1 m3

Pasang Daun Pintu dan Jendela Jalusi/Krepyak (Mutu Kayu Klas I atau II)
0.0640 m3
Kayu Klas II (Papan Kayu Kamper)
Rp.
14,091,000.00 =Rp.
901,824.00
0.5000 kg
Lem Kayu Rajawali
Rp.
35,000.00 =Rp.
17,500.00
Sub Total
1.0000 Oh
Pekerja
Rp.
49,000.00 =Rp.
49,000.00
3.0000 Oh
Tukang Kayu
Rp.
65,000.00 =Rp.
195,000.00
0.3000 Oh
Kepala Tukang Kayu
Rp.
70,000.00 =Rp.
21,000.00
0.0500 Oh
Mandor
Rp.
75,000.00 =Rp.
3,750.00
Sub Total
Total
Dibulatkan
Pasang Konstruksi
1.1000 m3
15.0000 kg
5.6000 kg
4.0000
12.0000
1.2000
0.2000

VI.7.6.14

1 m3

Oh
Oh
Oh
Oh

Kuda-kuda Konvensional (Mutu Kayu Klas I, II, dan III), Bentang 6 m


Kayu Klas II (Balok Kayu Balau)
Rp.
13,490,800.00 =Rp.
14,839,880.00
Besi Plat Begel
Rp.
25,600.00 =Rp.
384,000.00
Paku 3"
Rp.
21,300.00 =Rp.
119,280.00
Sub Total
Pekerja
Rp.
49,000.00 =Rp.
196,000.00
Tukang Kayu
Rp.
65,000.00 =Rp.
780,000.00
Kepala Tukang Kayu
Rp.
70,000.00 =Rp.
84,000.00
Mandor
Rp.
75,000.00 =Rp.
15,000.00
Sub Total
Total
Dibulatkan

Pasang Konstruksi Kuda-kuda Ekspos (Mutu Kayu Klas I)


1.2000 m3
Kayu Klas I (Balok Kayu Jati Kw. I Lokal)
15.0000 kg
Besi Plat Begel

Lembar 52

Rp.
Rp.

29,163,300.00 =Rp.
25,600.00 =Rp.

34,995,960.00
384,000.00

5.6000 kg

Paku 3"

Rp.

21,300.00 =Rp.
Sub Total

119,280.00

6.0000 Oh

Pekerja

Rp.

49,000.00 =Rp.

294,000.00

Tukang Kayu
Kepala Tukang Kayu

Rp.
Rp.

65,000.00 =Rp.
70,000.00 =Rp.

1,300,000.00
140,000.00

Mandor

Rp.

75,000.00 =Rp.
Sub Total

20.0000 Oh
2.0000 Oh
0.3000 Oh

=Rp.

22,500.00

Total
Dibulatkan
VI.8.6.15

1 m3

35,499,240.00

=Rp.

1,756,500.00

=Rp.

37,255,740.00

=Rp.

37,255,740.00

=Rp.

15,287,180.00

Pasang Konstruksi Gording (Mutu Kayu Klas II)


1.1000 m3
15.0000 kg
3.0000 kg

Kayu Klas II (Balok Kayu Balau)


Baut/Mur

Rp.
Rp.

Paku 4"

Rp.

Lembar 53

13,490,800.00 =Rp.
25,600.00 =Rp.
21,100.00 =Rp.
Sub Total

14,839,880.00
384,000.00
63,300.00

VI.9.6.17

1 m2

2.4000 Oh

Pekerja

Rp.

49,000.00 =Rp.

117,600.00

7.2000 Oh

Tukang Kayu

Rp.

65,000.00 =Rp.

468,000.00

0.7200 Oh
0.1200 Oh

Kepala Tukang Kayu


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

50,400.00
9,000.00

Sub Total
Total

=Rp.
=Rp.

645,000.00
15,932,180.00

Dibulatkan

=Rp.

15,932,180.00

=Rp.

257,829.80

Sub Total
Total

=Rp.
=Rp.

12,475.00
270,304.80

Dibulatkan

=Rp.

270,300.00

= Rp

759,993.47

= Rp
= Rp

73,650.00
833,643.47

= Rp

833,640.00

= Rp

949,788.49

=Rp.
= Rp
= Rp

104,850.00
1,054,638.49
1,054,630.00

= Rp

1,041,945.09

=Rp.
= Rp
= Rp

104,850.00
1,146,795.09
1,146,790.00

= Rp

1,110,110.14

=Rp.
= Rp
= Rp

104,850.00
1,214,960.14
1,214,960.00

Pasang Rangka Atap Genteng Beton (Mutu Kayu Klas II)


0.0140 m3

Kayu Klas II (Usuk Kayu Balau 5/7)

Rp.

12,677,500.00 =Rp.

177,485.00

0.0060 m3
0.2500 kg

Kayu Klas II (Reng Kayu Balau 3/5)


Paku 2,5" dan Paku 4"

Rp.
Rp.

12,503,300.00 =Rp.
21,300.00 =Rp.

75,019.80
5,325.00

0.1000 Oh

Pekerja

Rp.

Sub Total
49,000.00 =Rp.

4,900.00

0.1000 Oh

Tukang Kayu

Rp.

65,000.00 =Rp.

6,500.00

0.0100 Oh
0.0050 Oh

Kepala Tukang Kayu


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

700.00
375.00

VII. PEKERJAAN BETON


VII.1.6.4

1 m3

Membuat Beton Lantai Kerja Mutu f'c = 7,4 MPa (K100), Slump (3-6 cm), w/c = 0,87
(Setara Beton Tumbuk/Beton Rabat 1 PC : 3 Ps : 5 Kr)
230.0000 kg
Semen PC
0.6379 m3
0.7607 m3
200.0000 ltr

Rp.

Pasir Beton
Batu Kali Pecah 2/3 (Maksimum 30 mm)
Air Bersih

Rp.
Rp.
Rp.

1.2000 Oh

Pekerja

Rp.

0.2000 Oh
0.0200 Oh
0.0060 Oh

Tukang Batu
Kepala Tukang Batu
Mandor

Rp.
Rp.
Rp.

2,097.50 =Rp.

482,425.00

127,300.00 =Rp.
255,500.00 =Rp.
10.00 =Rp.
Sub Total
49,000.00 =Rp.

81,199.21
194,369.26
2,000.00

65,000.00 =Rp.
70,000.00 =Rp.
75,000.00 =Rp.
Sub Total
Total

13,000.00
1,400.00
450.00

58,800.00

Dibulatkan
VII.2.6.5

1 m3

Membuat Beton Mutu f'c = 14,5 MPa (K175), Slump (12 2 cm), w/c = 0,66
(Setara Beton 1 PC : 2 Ps : 3 Kr)
326.0000 kg
Semen PC
0.5429 m3
Pasir Beton
0.7622 m3
Batu Kali Pecah 2/3 (Maksimum 30 mm)
215.0000 ltr
Air Bersih
1.6500
0.2500
0.0250
0.0800

VII.3.6.7

VII.4.6.9

VII.5.6.10

1 m3

1 m3

1 m3

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,097.50
127,300.00
255,500.00
10.00
49,000.00
65,000.00
70,000.00
75,000.00

=Rp.
683,785.00
=Rp.
69,105.71
=Rp.
194,747.78
=Rp.
2,150.00
Sub Total
=Rp.
80,850.00
=Rp.
16,250.00
=Rp.
1,750.00
=Rp.
6,000.00
Sub Total
Total
Dibulatkan

Membuat Beton Mutu f'c = 19,3 MPa (K225), Slump (12 2 cm), w/c = 0,58
371.0000 kg
Semen PC
Rp.
2,097.50 =Rp.
778,172.50
0.4986 m3
Pasir Beton
Rp.
127,300.00 =Rp.
63,468.14
0.7756 m3
Batu Kali Pecah 2/3 (Maksimum 30 mm)
Rp.
255,500.00 =Rp.
198,154.44
215.0000 ltr
Air Bersih
Rp.
10.00 =Rp.
2,150.00
Sub Total
1.6500 Oh
Pekerja
Rp.
49,000.00 =Rp.
80,850.00
0.2500 Oh
Tukang Batu
Rp.
65,000.00 =Rp.
16,250.00
0.0250 Oh
Kepala Tukang Batu
Rp.
70,000.00 =Rp.
1,750.00
0.0800 Oh
Mandor
Rp.
75,000.00 =Rp.
6,000.00
Sub Total
Total
Dibulatkan
Membuat Beton Mutu f'c = 24,0 MPa (K275), Slump (12 2 cm), w/c = 0,53
406.0000 kg
Semen PC
Rp.
2,097.50 =Rp.
851,585.00
0.4886 m3
Pasir Beton
Rp.
127,300.00 =Rp.
62,195.14
0.7600 m3
Batu Kali Pecah 2/3 (Maksimum 30 mm)
Rp.
255,500.00 =Rp.
194,180.00
215.0000 ltr
Air Bersih
Rp.
10.00 =Rp.
2,150.00
Sub Total
1.6500 Oh
Pekerja
Rp.
49,000.00 =Rp.
80,850.00
0.2500 Oh
Tukang Batu
Rp.
65,000.00 =Rp.
16,250.00
0.0250 Oh
Kepala Tukang Batu
Rp.
70,000.00 =Rp.
1,750.00
0.0800 Oh
Mandor
Rp.
75,000.00 =Rp.
6,000.00
Sub Total
Total
Dibulatkan
Membuat Beton Mutu f'c = 26,4 MPa (K300), Slump (12 2 cm), w/c = 0,52
413.0000 kg
Semen PC
Rp.
2,097.50 =Rp.

Lembar 54

866,267.50

0.4864 m3
0.7563 m3
215.0000 ltr
1.6500
0.2500
0.0250
0.0800

Oh
Oh
Oh
Oh

Pasir Beton
Batu Kali Pecah 2/3 (Maksimum 30 mm)
Air Bersih
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Lembar 55

127,300.00 =Rp.
61,922.36
255,500.00 =Rp.
193,233.70
10.00 =Rp.
2,150.00
Sub Total
49,000.00 =Rp.
80,850.00
65,000.00 =Rp.
16,250.00
70,000.00 =Rp.
1,750.00
75,000.00 =Rp.
6,000.00
Sub Total
Total
Dibulatkan

= Rp

1,123,573.56

=Rp.
= Rp
= Rp

104,850.00
1,228,423.56
1,228,420.00

VII.6.6.12

VII.7.6.16

1 m3

1 m1

Membuat Beton Mutu f'c = 31,2 MPa (K350), Slump (12 2 cm), w/c = 0,48
448.0000 kg
Semen PC
Rp.
2,097.50 =Rp.
939,680.00
0.4764 m3
Pasir Beton
Rp.
127,300.00 =Rp.
60,649.36
3
0.7407 m
Batu Kali Pecah 2/3 (Maksimum 30 mm)
Rp.
255,500.00 =Rp.
189,259.26
215.0000 ltr
Air Bersih
Rp.
10.00 =Rp.
2,150.00
Sub Total
2.1000 Oh
Pekerja
Rp.
49,000.00 =Rp.
102,900.00
0.3500 Oh
Tukang Batu
Rp.
65,000.00 =Rp.
22,750.00
0.0350 Oh
Kepala Tukang Batu
Rp.
70,000.00 =Rp.
2,450.00
0.1050 Oh
Mandor
Rp.
75,000.00 =Rp.
7,875.00
Sub Total
Total
Dibulatkan
Memasang PVC Waterstop (Lebar 230-320 mm)
1.0500 m1
PVC Waterstop "Maspion" (Lebar 250 mm)
0.0800
0.0400
0.0040
0.0040

VII.8.6.17.a

VII.8.6.17.b

1 kg

1 kg

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Rp.
Rp.
Rp.
Rp.
Rp.

Pembesian dengan Besi Polos


1.0500 kg
Besi Beton Polos

Rp.

14,100.00 =Rp.

Kawat Beton

Rp.

375.00

0.0070 Oh

Pekerja

Rp.

25,000.00 =Rp.
Sub Total
49,000.00 =Rp.

0.0070 Oh
0.0007 Oh
0.0004 Oh

Tukang Besi
Kepala Tukang Besi
Mandor

Rp.
Rp.
Rp.

65,000.00 =Rp.
70,000.00 =Rp.
75,000.00 =Rp.
Sub Total
Total
Dibulatkan

455.00
49.00
30.00

0.0070
0.0070
0.0007
0.0004

Oh
Oh
Oh
Oh

Pekerja
Tukang Besi
Kepala Tukang Besi
Mandor

1,191,738.62

=Rp.
= Rp
= Rp

135,975.00
1,327,713.62
1,327,710.00

82,400.00 =Rp.
86,520.00
Sub Total
= Rp
49,000.00 =Rp.
3,920.00
65,000.00 =Rp.
2,600.00
70,000.00 =Rp.
280.00
75,000.00 =Rp.
300.00
Sub Total
=Rp.
Total
= Rp
Dibulatkan
= Rp

0.0150 kg

Pembesian dengan Besi Ulir


1.0500 kg
Besi Beton Ulir
0.0150 kg
Kawat Beton

= Rp

Rp.
Rp.

16,000.00 =Rp.
25,000.00 =Rp.
Sub Total

Rp.
Rp.
Rp.
Rp.

49,000.00
65,000.00
70,000.00
75,000.00

=Rp.
=Rp.
=Rp.
=Rp.
Sub Total

86,520.00

7,100.00
93,620.00
93,620.00

14,805.00
=Rp.

15,180.00

=Rp.
= Rp
= Rp

877.00
16,057.00
16,050.00

=Rp.

17,175.00

343.00

16,800.00
375.00
343.00
455.00
49.00
30.00

Total
Dibulatkan

=Rp.

877.00

= Rp
= Rp

18,052.00
18,050.00

VIII. PEKERJAAN PENUTUP ATAP


VIII.1.6.2

1 m2

Pasang Genteng Prentul Ex. Trenggalek


25.0000 Bh
Genteng Prentul Ex. Trenggalek
0.1500
0.0750
0.0080
0.0080

VIII.2.6.3

1 m2

1 m1

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.
Rp.

Pasang Genteng Kanmuri Glasur


15.0000 Bh
Genteng Kanmuri Glasur
0.1500
0.0600
0.0060
0.0080

VIII.3.6.4

Oh
Oh
Oh
Oh

Rp.

Oh
Oh
Oh
Oh

Pasang Bubungan
5.0000 Bh
8.0000 kg
0.0320 m3
0.4000 Oh
0.2000 Oh
0.0200 Oh

Rp.

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.
Rp.

Genteng Kanmuri Glasur


Bubungan Genteng Kanmuri Glasur
Semen PC
Pasir Pasang
Pekerja
Tukang Kayu
Kepala Tukang Kayu

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Lembar 56

2,400.00 =Rp.
60,000.00
Sub Total
Rp.
49,000.00 =Rp.
7,350.00
65,000.00 =Rp.
4,875.00
70,000.00 =Rp.
560.00
75,000.00 =Rp.
600.00
Sub Total
= Rp
Total
=Rp.
Dibulatkan
=Rp.

13,400.00 =Rp.
201,000.00
Sub Total
Rp.
49,000.00 =Rp.
7,350.00
65,000.00 =Rp.
3,900.00
70,000.00 =Rp.
420.00
75,000.00 =Rp.
600.00
Sub Total
Rp.
Total
=Rp.
Dibulatkan
=Rp.

27,600.00 =Rp.
2,097.50 =Rp.
123,000.00 =Rp.
Sub Total
49,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.

60,000.00

13,385.00
73,385.00
73,380.00

201,600.00

12,270.00
213,870.00
213,870.00

138,000.00
16,780.00
3,936.00
=Rp.
19,600.00
13,000.00
1,400.00

158,716.00

0.0020 Oh

Mandor

Rp.

75,000.00 =Rp.
Sub Total

150.00

Total
Dibulatkan
VIII.4.6.6

1 m1

=Rp.

34,150.00

=Rp.

192,866.00

=Rp.

192,860.00

=Rp.

64,716.00

Pasang Bubungan Genteng Prentul Ex. Trenggalek


5.0000 Bh
8.0000 kg

Bubungan Genteng Prentul Ex. Trenggalek


Semen PC

Rp.
Rp.

0.0320 m3

Pasir Pasang

Rp.

Lembar 57

8,800.00 =Rp.
2,097.50 =Rp.
123,000.00 =Rp.
Sub Total

44,000.00
16,780.00
3,936.00

VIII.5.6.7

1 m2

0.4000 Oh

Pekerja

Rp.

49,000.00 =Rp.

19,600.00

0.2000 Oh

Tukang Kayu

Rp.

65,000.00 =Rp.

13,000.00

0.0200 Oh
0.0020 Oh

Kepala Tukang Kayu


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

1,400.00
150.00

Sub Total
Total

=Rp.
=Rp.

34,150.00
98,866.00

Dibulatkan

=Rp.

98,860.00

=Rp.

65,745.00

Pasang Roof Light Fiberglass (Tidak Termasuk Rangka)


0.6000 lbr

Roof Light Fiberglass "Kano Flash"

Rp.

0.0500 kg

Paku 3"

Rp.

107,800.00 =Rp.
21,300.00 =Rp.
Sub Total

64,680.00
1,065.00

0.1400 Oh
0.0670 Oh

Pekerja
Tukang Kayu

Rp.
Rp.

49,000.00 =Rp.
65,000.00 =Rp.

6,860.00
4,355.00

0.0070 Oh

Kepala Tukang Kayu

Rp.

70,000.00 =Rp.

490.00

0.0070 Oh

Mandor

Rp.

75,000.00 =Rp.
Sub Total

525.00

Total
Dibulatkan
VIII.6.6.12

1 m2

VIII.8.6.30

1 m1

1 m2

0.3500 lbr
6.0000 bh

Asbes Gelombang Kecil, t = 4 mm


Paku Pancing

Rp.
Rp.

0.1400 Oh

Pekerja

Rp.

Sub Total
49,000.00 =Rp.

6,860.00

0.0700 Oh
0.0070 Oh
0.0070 Oh

Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.

65,000.00 =Rp.
70,000.00 =Rp.
75,000.00 =Rp.

4,550.00
490.00
525.00

Pasang Nok/Bubungan Asbes Gelombang 1,05 m


2.1000 lbr
Asbes Bubung Gelombang Kecil, t = 4 mm
6.0000 bh
Paku Sekrup

1 m2

Pekerja
Tukang Kayu
Kepala Tukang Kayu

Rp.
Rp.
Rp.

0.0040 Oh

Mandor

Rp.

Pasang Genteng Beton


11.0000 bh
Genteng Beton
0.0300 kg
Paku 3"

1 m2

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Pasang Nok/Bubungan Genteng Beton


3.5000 bh
Bubungan Genteng Beton
0.0500 kg
Paku 3"
10.8000 kg
Semen PC
0.0320 m3
Pasir Pasang
1.0000 kg
Semen Warna
0.4000
0.2000
0.0200
0.0200

VIII.10.6.38

Rp.
Rp.

0.0840 Oh
0.1250 Oh
0.0130 Oh

0.2000
0.1000
0.0100
0.0100

VIII.9.6.34

12,230.00
77,975.00
77,970.00

=Rp.

66,710.00

=Rp.
=Rp.
=Rp.

12,425.00
79,135.00
79,130.00

=Rp.

97,224.00

=Rp.
=Rp.
=Rp.

13,451.00
110,675.00
110,670.00

=Rp.

74,339.00

=Rp.
=Rp.
=Rp.

17,750.00
92,089.00
92,080.00

=Rp.

60,424.00

=Rp.
=Rp.
=Rp.

35,500.00
95,924.00
95,920.00

=Rp.

69,744.00

Pasang Atap Asbes Gelombang 1,05 x 3,00 m


118,600.00 =Rp.
4,200.00 =Rp.

41,510.00
25,200.00

Sub Total
Total
Dibulatkan
VIII.7.6.23

=Rp.
=Rp.
=Rp.

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Pasang Atap Seng Gelombang


0.7000 lbr
Seng Gelombang BJLS 30 (80 x 180 cm)
0.0200 Kg
Paku Payung
0.1200
0.0600
0.0060
0.0060

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

75,000.00 =Rp.
Sub Total
Total
Dibulatkan

Rp.
Rp.

6,700.00 =Rp.
21,300.00 =Rp.

Rp.
Rp.
Rp.
Rp.

49,000.00
65,000.00
70,000.00
75,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

8,500.00
21,300.00
2,097.50
123,000.00
3,020.00

Rp.
Rp.
Rp.
Rp.

49,000.00
65,000.00
70,000.00
75,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Lembar 58

45,000.00 =Rp.
454.00 =Rp.
Sub Total
49,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.

Sub Total
=Rp.
=Rp.
=Rp.
=Rp.
Sub Total
Total
Dibulatkan

=Rp.
=Rp.
=Rp.
=Rp.
=Rp.
Sub Total
=Rp.
=Rp.
=Rp.
=Rp.
Sub Total
Total
Dibulatkan

98,700.00 =Rp.
32,700.00 =Rp.
Sub Total
49,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.
75,000.00 =Rp.

94,500.00
2,724.00
4,116.00
8,125.00
910.00
300.00

73,700.00
639.00
9,800.00
6,500.00
700.00
750.00

29,750.00
1,065.00
22,653.00
3,936.00
3,020.00
19,600.00
13,000.00
1,400.00
1,500.00

69,090.00
654.00
5,880.00
3,900.00
420.00
450.00

VIII.11.6.39

1 m2

Sub Total
Total

=Rp.
=Rp.

10,650.00
80,394.00

Dibulatkan

=Rp.

80,390.00

=Rp.

31,938.00

Pasang Nok/Bubungan Seng Gelombang


0.3000 lbr

Seng Datar BJLS 30 (80 x 180 cm)

Rp.

0.0400 Kg

Paku Payung

Rp.

102,100.00 =Rp.
32,700.00 =Rp.
Sub Total

1,308.00

0.1500 Oh
0.0700 Oh

Pekerja
Tukang Kayu

Rp.
Rp.

49,000.00 =Rp.
65,000.00 =Rp.

7,350.00
4,550.00

0.0080 Oh

Kepala Tukang Kayu

Rp.

70,000.00 =Rp.

560.00

0.0060 Oh

Mandor

Rp.

75,000.00 =Rp.
Sub Total

450.00

Total
Dibulatkan

Lembar 59

30,630.00

=Rp.

12,910.00

=Rp.
=Rp.

44,848.00
44,840.00

IX. PEKERJAAN LANGIT-LANGIT


IX.1.6.1

IX.2.6.5

IX.3.6.7

IX.4.6.9

1 m2

1 m2

1 m2

1 m2

Pasang Langit-langit Asbes Semen/Eternit tebal 4 - 6 mm


1.1000 lbr
0.0100 kg

Eternit Lokal
Paku Eternit

Rp.
Rp.

14,700.00 =Rp.
27,700.00 =Rp.

16,170.00
277.00

0.0300 Oh

Pekerja

Rp.

Sub Total
49,000.00 =Rp.

1,470.00

0.0700 Oh

Tukang Kayu

Rp.

65,000.00 =Rp.

4,550.00

0.0070 Oh
0.0020 Oh

Kepala Tukang Kayu


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

490.00
150.00

=Rp.

16,447.00

Sub Total

=Rp.

6,660.00

Total
Dibulatkan

=Rp.
=Rp.

23,107.00
23,100.00

=Rp.

29,964.00

Pasang Langit-langit Tripleks (Tebal 3 - 6 mm)


0.3750 lbr
0.0300 kg

Tripleks 4' x 8' (Tebal 3 mm)


Paku 3"

Rp.
Rp.

78,200.00 =Rp.
21,300.00 =Rp.

0.0700 Oh
0.1000 Oh

Pekerja
Tukang Kayu

Rp.
Rp.

Sub Total
49,000.00 =Rp.
65,000.00 =Rp.

0.0100 Oh
0.0040 Oh

Kepala Tukang Kayu


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

Pasang Langit-langit Gypsum Board (Tebal 9 mm)


0.3640 lbr
Gypsum Board 9 mm (122 x 244 cm)

Rp.

0.1100 kg

Paku Gypsum

Rp.

0.1000 Oh
0.0500 Oh
0.0050 Oh

Pekerja
Tukang Kayu
Kepala Tukang Kayu

Rp.
Rp.
Rp.

0.0050 Oh

Mandor

Rp.

29,325.00
639.00
3,430.00
6,500.00
700.00
300.00

Sub Total

=Rp.

10,930.00

Total
Dibulatkan

=Rp.
=Rp.

40,894.00
40,890.00

=Rp.

41,086.40

=Rp.
=Rp.
=Rp.

8,875.00
49,961.40
49,960.00

=Rp.

12,924.00

=Rp.
=Rp.
=Rp.

6,275.00
19,199.00
19,190.00

=Rp.

1,809,102.00

=Rp.
=Rp.
=Rp.

245,900.00
2,055,002.00
2,055,000.00

=Rp.

207,215.00

=Rp.
=Rp.
=Rp.

169,000.00
376,215.00
376,210.00

102,600.00 =Rp.

37,346.40

34,000.00 =Rp.
Sub Total
49,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.

3,740.00
4,900.00
3,250.00
350.00

75,000.00 =Rp.
Sub Total
Total
Dibulatkan

375.00

Pasang List Langit-langit Kayu Profil


1.0500 m1
0.0100 kg

List Kayu Profil 5 x 5 cm


Paku 1,5"

Rp.
Rp.

0.0500 Oh
0.0500 Oh

Pekerja
Tukang Kayu

Rp.
Rp.

0.0050 Oh
0.0030 Oh

Kepala Tukang Kayu


Mandor

Rp.
Rp.

12,100.00 =Rp.
21,900.00 =Rp.
Sub Total
49,000.00 =Rp.
65,000.00 =Rp.

12,705.00
219.00
2,450.00
3,250.00

70,000.00 =Rp.
75,000.00 =Rp.
Sub Total
Total
Dibulatkan

350.00
225.00

X. PEKERJAAN SANITASI
X.1.6.1

1 buah

Pasang Kloset Duduk/Monoblok


1.0000 bh
Kloset Duduk INA
6.0000 %
Perlengkapan
3.3000
1.1000
0.0100
0.1600

X.2.6.2

1 buah

1 buah

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Rp.
Rp.
Rp.
Rp.

Pasang Kloset Jongkok Porselen


1.0000 bh
Kloset Jongkok INA
6.0000 kg
Semen PC
0.0100 m3
Pasir Pasang
1.0000
1.5000
0.1500
0.1600

X.3.6.4

Oh
Oh
Oh
Oh

Rp.
Rp.

Oh
Oh
Oh
Oh

Pasang Urinoir
1.0000 bh

Rp.
Rp.
Rp.

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Rp.
Rp.
Rp.
Rp.

Urinoir INA

Rp.

Lembar 60

1,706,700.00 =Rp.
1,706,700.00
1,706,700.00 =Rp.
102,402.00
Sub Total
49,000.00 =Rp.
161,700.00
65,000.00 =Rp.
71,500.00
70,000.00 =Rp.
700.00
75,000.00 =Rp.
12,000.00
Sub Total
Total
Dibulatkan

193,400.00 =Rp.
193,400.00
2,097.50 =Rp.
12,585.00
123,000.00 =Rp.
1,230.00
Sub Total
49,000.00 =Rp.
49,000.00
65,000.00 =Rp.
97,500.00
70,000.00 =Rp.
10,500.00
75,000.00 =Rp.
12,000.00
Sub Total
Total
Dibulatkan

1,735,900.00 =Rp.

1,735,900.00

30.0000 %
6.0000 kg
0.0100 m3

Perlengkapan
Semen PC

Rp.
Rp.

1,735,900.00 =Rp.
2,097.50 =Rp.

520,770.00
12,585.00

Pasir Pasang

Rp.

123,000.00 =Rp.

1,230.00

1.0000 Oh

Pekerja

Rp.

Sub Total
49,000.00 =Rp.

1.0000 Oh
0.1000 Oh

Tukang Batu
Kepala Tukang Batu

Rp.
Rp.

65,000.00 =Rp.
70,000.00 =Rp.

65,000.00
7,000.00

0.1000 Oh

Mandor

Rp.

75,000.00 =Rp.

7,500.00

Lembar 61

=Rp.

2,270,485.00

Sub Total
Total

=Rp.
=Rp.

128,500.00
2,398,985.00

Dibulatkan

=Rp.

2,398,980.00

49,000.00

X.4.6.5

1 buah

Pasang Wastafel
1.0000 bh
12.0000 %
6.0000 kg
0.0100 m3

X.5.6.7

1 buah

Wastafel Warna Tua ITO

Rp.

350,000.00 =Rp.

350,000.00

Perlengkapan
Semen PC

Rp.
Rp.

350,000.00 =Rp.
2,097.50 =Rp.

42,000.00
12,585.00

Pasir Pasang

Rp.

123,000.00 =Rp.

1,230.00

1.2000 Oh

Pekerja

Rp.

Sub Total
49,000.00 =Rp.

=Rp.

405,815.00

1.4500 Oh
0.1500 Oh

Tukang Batu
Kepala Tukang Batu

Rp.
Rp.

65,000.00 =Rp.
70,000.00 =Rp.

94,250.00
10,500.00

0.1000 Oh

Mandor

Rp.

75,000.00 =Rp.
Sub Total
Total

7,500.00
=Rp.
=Rp.

171,050.00
576,865.00

Dibulatkan

=Rp.

576,860.00

=Rp.

570,766.00

58,800.00

Pasang Bak Mandi Fiberglass


1.0000 bh

Bak Mandi Fiberglass (isi 0,5 m3)

Rp.

483,700.00 =Rp.

Perlengkapan

Rp.

483,700.00 =Rp.
Sub Total

1.8000 Oh
2.7000 Oh

Pekerja
Tukang Batu

Rp.
Rp.

49,000.00 =Rp.
65,000.00 =Rp.

88,200.00
175,500.00

0.5400 Oh

Kepala Tukang Batu

Rp.

70,000.00 =Rp.

37,800.00

0.1100 Oh

Mandor

Rp.

75,000.00 =Rp.
Sub Total

18.0000 %

483,700.00
87,066.00

8,250.00

Total
Dibulatkan
X.6.6.8

1 buah

Pasang Bak
200.0000
120.0000
0.3000
3.8000

Mandi
bh
kg
m3
m2

Pasangan Batu Bata, Vol. 0,30 m3 (Uk. 50 x 60 x 100 cm)


Batu Bata Kelas I
Rp.
800.00 =Rp.
Semen PC
Rp.
2,097.50 =Rp.
Pasir Pasang
Rp.
123,000.00 =Rp.
Keramik Asia (20 x 25)cm
Rp.
63,200.00 =Rp.

160,000.00
251,700.00
36,900.00
240,160.00

6.0000 kg

PC Super Nut

Rp.

110,400.00

6.0000
3.0000
0.3000
0.3000

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Rp.
Rp.
Rp.
Rp.

Oh
Oh
Oh
Oh

18,400.00 =Rp.
Sub Total
49,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.
75,000.00 =Rp.
Sub Total
Total

1 m1

1 m1

1.1000
13.5000
3.9200
0.0560
0.0240

bh
bh
kg
m3
m3

Pipa Beton (Buis Beton Dia. 20 cm)


Batu Bata Kelas I
Semen PC
Pasir Pasang
Pasir Urug

Rp.
Rp.
Rp.
Rp.
Rp.

74,300.00
800.00
2,097.50
123,000.00
108,600.00

0.1400
0.0700
0.0070
0.0070

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Rp.
Rp.
Rp.
Rp.

49,000.00
65,000.00
70,000.00
75,000.00

Buis Beton,
1.1000
81.0000
10.3000
0.0610
0.0690
0.3800
0.1900
0.0190
0.0190

1 m1

Buis Beton,
1.1000
81.0000
10.3000
0.0610
0.0690

Dia. 30 ( P = 100 cm )
bh
Pipa Beton (Buis Beton Dia. 30 cm)
bh
Batu Bata Kelas I
kg
Semen PC
m3
Pasir Pasang
m3
Pasir Urug

Rp.
Rp.
Rp.
Rp.
Rp.

91,100.00
800.00
2,097.50
123,000.00
108,600.00

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

49,000.00
65,000.00
70,000.00
75,000.00

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

( harga buis beton sesuaikan diameter yang dibutuhkan

X.8.6.15.a

=Rp.

799,160.00

=Rp.
=Rp.

532,500.00
1,331,660.00

=Rp.

1,331,660.00

=Rp.

110,246.60

=Rp.
=Rp.
=Rp.

12,425.00
122,671.60
122,670.00

=Rp.

201,610.65

=Rp.
=Rp.
=Rp.

33,725.00
235,335.65
235,330.00

=Rp.

172,680.65

Buis Beton, Dia. 15 - 20 cm ( P = 100 cm )

( harga buis beton sesuaikan diameter yang dibutuhkan

X.8.6.15

309,750.00
880,516.00
880,510.00

294,000.00
195,000.00
21,000.00
22,500.00

Dibulatkan
X.7.6.14

=Rp.
=Rp.
=Rp.

U-30 ( P = 100 cm )
bh
Pipa Beton (Buis Beton U-30 cm)
bh
Batu Bata Kelas I
kg
Semen PC
3
m
Pasir Pasang
3
m
Pasir Urug

0.3800 Oh
0.1900 Oh
0.0190 Oh

Pekerja
Tukang Batu
Kepala Tukang Batu

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Lembar 62

64,800.00
800.00
2,097.50
123,000.00
108,600.00

=Rp.
=Rp.
=Rp.
=Rp.
=Rp.
Sub Total
=Rp.
=Rp.
=Rp.
=Rp.
Sub Total
Total
Dibulatkan

81,730.00
10,800.00
8,222.20
6,888.00
2,606.40
6,860.00
4,550.00
490.00
525.00

=Rp.
100,210.00
=Rp.
64,800.00
=Rp.
21,604.25
=Rp.
7,503.00
=Rp.
7,493.40
Sub Total
=Rp.
18,620.00
=Rp.
12,350.00
=Rp.
1,330.00
=Rp.
1,425.00
Sub Total
Total
Dibulatkan

=Rp.
=Rp.
=Rp.
=Rp.
=Rp.
Sub Total
49,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.

71,280.00
64,800.00
21,604.25
7,503.00
7,493.40
18,620.00
12,350.00
1,330.00

0.0190 Oh

X.8.6.15.b

1 m1

Buis Beton,
1.1000
81.0000
10.3000
0.0610
0.0690
0.3800
0.1900
0.0190
0.0190

Mandor

Rp.

75,000.00 =Rp.
Sub Total
( harga buis beton sesuaikan diameter yang dibutuhkan )
Total
Dibulatkan

Dia. 40 ( P = 100 cm )
bh
Pipa Beton (Buis Beton Dia. 40 cm)
bh
Batu Bata Kelas I
kg
Semen PC
m3
Pasir Pasang
m3
Pasir Urug

Rp.
Rp.
Rp.
Rp.
Rp.

101,500.00
800.00
2,097.50
123,000.00
108,600.00

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

49,000.00
65,000.00
70,000.00
75,000.00

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

( harga buis beton sesuaikan diameter yang dibutuhkan

Lembar 63

1,425.00

=Rp.
111,650.00
=Rp.
64,800.00
=Rp.
21,604.25
=Rp.
7,503.00
=Rp.
7,493.40
Sub Total
=Rp.
18,620.00
=Rp.
12,350.00
=Rp.
1,330.00
=Rp.
1,425.00
Sub Total
Total
Dibulatkan

=Rp.
=Rp.
=Rp.

33,725.00
206,405.65
206,400.00

=Rp.

213,050.65

=Rp.
=Rp.
=Rp.

33,725.00
246,775.65
246,770.00

X.9.6.19

1 m1

Pasang Pipa Galvanis Medium A (Dia. 1/2" - 1 ")


1.2000 m1
35.0000 %

Pipa Galvanis Med. A (Dia. 1/2", t = 2,4 mm)


Perlengkapan (kali Harga Pipa)

Rp.
Rp.

30,683.33 =Rp.
30,683.33 =Rp.

36,820.00
10,739.17

0.0540 Oh
0.0900 Oh

Pekerja
Tukang Pipa

Rp.
Rp.

49,000.00 =Rp.
65,000.00 =Rp.

2,646.00
5,850.00

0.0090 Oh
0.0270 Oh

Kepala Tukang Pipa


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

630.00
2,025.00

Sub Total

( harga pipa sesuaikan diameter yang dibutuhkan

X.10.6.22

1 m1

Pasang Pipa Galvanis Medium A (Dia. 1,5" - 3")


1.2000 m1
Pipa Galvanis Med. A (Dia. 1,5", t = 3 mm)
35.0000 %

Perlengkapan (kali Harga Pipa)

=Rp.

Sub Total

=Rp.

11,151.00

Total
Dibulatkan

=Rp.
=Rp.

58,710.17
58,710.00

=Rp.

140,765.83

Sub Total
Total

=Rp.
=Rp.

18,657.00
159,422.83

Dibulatkan

=Rp.

159,420.00

Rp.

90,816.67 =Rp.

108,980.00

Rp.

90,816.67 =Rp.

31,785.83

0.1080 Oh

Pekerja

Rp.

Sub Total
49,000.00 =Rp.

0.1800 Oh
0.0180 Oh

Tukang Pipa
Kepala Tukang Pipa

Rp.
Rp.

65,000.00 =Rp.
70,000.00 =Rp.

11,700.00
1,260.00

0.0054 Oh

Mandor

Rp.

75,000.00 =Rp.

405.00

( harga pipa sesuaikan diameter yang dibutuhkan

Lembar 64

47,559.17

5,292.00

X.11.6.24

1 m1

Pasang Pipa Galvanis Dia. 4"


1.2000 m1
Pipa Galvanis Med. A (Dia. 4", t = 4 mm)

Rp.

264,716.67 =Rp.

Perlengkapan (kali Harga Pipa)

Rp.

264,716.67 =Rp.
Sub Total

0.1350 Oh

Pekerja

Rp.

49,000.00 =Rp.

6,615.00

0.2250 Oh
0.0225 Oh

Tukang Pipa
Kepala Tukang Pipa

Rp.
Rp.

65,000.00 =Rp.
70,000.00 =Rp.

14,625.00
1,575.00

0.0068 Oh

Mandor

Rp.

75,000.00 =Rp.
Sub Total

35.0000 %

X.11.6.24.a

1 m1

Pasang Besi Canal C 125.50.3


1.2000 m1
Besi Canal C 125.50.3
35.0000 %
Perlengkapan (kali Harga Besi)
0.1350
0.2250
0.0225
0.0068

X.11.6.24.b

1 m1

1 m1

1 m1

1 m1

Rp.
Rp.

Pekerja
Tukang Pipa
Kepala Tukang Pipa
Mandor

Oh
Oh
Oh
Oh

Rp.
Rp.

Pekerja
Tukang Pipa
Kepala Tukang Pipa
Mandor

Oh
Oh
Oh
Oh

Rp.
Rp.

Pasang Pipa PVC Tipe AW Dia. 1/2" - 1,5"


1.2000 m1
Pipa Tipe AW Maspion Dia. 1/2"
35.0000 %
Perlengkapan (kali Harga Pipa)
0.0360
0.0600
0.0060
0.0018

Oh
Oh
Oh
Oh

Rp.
Rp.

Pekerja
Tukang Pipa
Kepala Tukang Pipa
Mandor

Rp.
Rp.
Rp.
Rp.

( harga pipa sesuaikan diameter yang dibutuhkan

X.13.6.29

1 m1

Pasang Pipa PVC Tipe AW Dia. 2"


1.2000 m1
Pipa Tipe AW Maspion Dia. 2"
35.0000 %
Perlengkapan (kali Harga Pipa)
0.0540
0.0900
0.0090
0.0027

Oh
Oh
Oh
Oh

Rp.
Rp.

Pekerja
Tukang Pipa
Kepala Tukang Pipa
Mandor

Rp.
Rp.
Rp.
Rp.

Lembar 65

=Rp.

23,325.00

Total

=Rp.

433,635.83

Dibulatkan

=Rp.

433,630.00

=Rp.

198,322.50

=Rp.
=Rp.
=Rp.

23,325.00
221,647.50
221,640.00

27,650.00 =Rp.
33,180.00
27,650.00 =Rp.
9,677.50
Sub Total
=Rp.
49,000.00 =Rp.
6,615.00
65,000.00 =Rp.
14,625.00
70,000.00 =Rp.
1,575.00
75,000.00 =Rp.
510.00
Sub Total
=Rp.
Total
=Rp.
Dibulatkan
=Rp.

Rp.
Rp.
Rp.
Rp.

410,310.83

510.00

68,575.00 =Rp.
82,290.00
68,575.00 =Rp.
24,001.25
Sub Total
=Rp.
49,000.00 =Rp.
6,615.00
65,000.00 =Rp.
14,625.00
70,000.00 =Rp.
1,575.00
75,000.00 =Rp.
510.00
Sub Total
=Rp.
Total
=Rp.
Dibulatkan
=Rp.

Rp.
Rp.
Rp.
Rp.

Pekerja
Tukang Pipa
Kepala Tukang Pipa
Mandor

=Rp.

60,250.00 =Rp.
72,300.00
60,250.00 =Rp.
21,087.50
Sub Total
=Rp.
49,000.00 =Rp.
6,615.00
65,000.00 =Rp.
14,625.00
70,000.00 =Rp.
1,575.00
75,000.00 =Rp.
510.00
Sub Total
=Rp.
Total
=Rp.
Dibulatkan
=Rp.

Rp.
Rp.
Rp.
Rp.

Pasang Besi Siku L.30.30.3


1.2000 m1
Besi Siku L.30.30.3
35.0000 %
Perlengkapan (kali Harga Besi)
0.1350
0.2250
0.0225
0.0068

X.12.6.25

Oh
Oh
Oh
Oh

92,650.83

127,950.00 =Rp.
153,540.00
127,950.00 =Rp.
44,782.50
Sub Total
49,000.00 =Rp.
6,615.00
65,000.00 =Rp.
14,625.00
70,000.00 =Rp.
1,575.00
75,000.00 =Rp.
510.00
Sub Total
Total
Dibulatkan

Rp.
Rp.
Rp.
Rp.

Pasang Besi Siku L.50.50.6


1.2000 m1
Besi Siku L.50.50.6
35.0000 %
Perlengkapan (kali Harga Besi)
0.1350
0.2250
0.0225
0.0068

X.11.6.24.d

Pekerja
Tukang Pipa
Kepala Tukang Pipa
Mandor

Pasang Besi Canal C 75.40.3


1.2000 m1
Besi Canal C 75.40.3
35.0000 %
Perlengkapan (kali Harga Besi)
0.1350
0.2250
0.0225
0.0068

X.11.6.24.c

Oh
Oh
Oh
Oh

Rp.
Rp.

317,660.00

8,600.00 =Rp.
10,320.00
8,600.00 =Rp.
3,010.00
Sub Total
=Rp.
49,000.00 =Rp.
1,764.00
65,000.00 =Rp.
3,900.00
70,000.00 =Rp.
420.00
75,000.00 =Rp.
135.00
Sub Total
=Rp.
Total
=Rp.
Dibulatkan
=Rp.

32,775.00 =Rp.
39,330.00
32,775.00 =Rp.
11,471.25
Sub Total
=Rp.
49,000.00 =Rp.
2,646.00
65,000.00 =Rp.
5,850.00
70,000.00 =Rp.
630.00
75,000.00 =Rp.
202.50
Sub Total
=Rp.
Total
=Rp.
Dibulatkan
=Rp.

93,387.50

23,325.00
116,712.50
116,710.00

106,291.25

23,325.00
129,616.25
129,610.00

42,857.50

23,325.00
66,182.50
66,180.00

13,330.00

6,219.00
19,549.00
19,540.00

50,801.25

9,328.50
60,129.75
60,120.00

X.14.6.31

1 m1

Pasang Pipa PVC Tipe AW Dia. 3" - 4"


1.2000 m1
35.0000 %

Pipa Tipe AW Maspion Dia. 3"


Perlengkapan (kali Harga Pipa)

Rp.
Rp.

58,125.00 =Rp.
58,125.00 =Rp.

69,750.00
20,343.75

0.0810 Oh
0.1350 Oh

Pekerja
Tukang Pipa

Rp.
Rp.

49,000.00 =Rp.
65,000.00 =Rp.

3,969.00
8,775.00

0.0135 Oh
0.0041 Oh

Kepala Tukang Pipa


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

945.00
307.50

Sub Total

( harga pipa sesuaikan diameter yang dibutuhkan

X.15.6.33

1 buah

Pasang Bak Cuci Piring Stainles Steel


1.0000 bh
Bak Cuci Piring Stainles Steel
1.0000 set

X.16.6.34

1 buah

1 buah

=Rp.

13,996.50

Total
Dibulatkan

=Rp.
=Rp.

104,090.25
104,090.00

=Rp.

736,348.00

Sub Total
Total

=Rp.
=Rp.

23,182.50
759,530.50

Dibulatkan

=Rp.

759,530.00

=Rp.

232,948.00

=Rp.
=Rp.
=Rp.

38,637.50
271,585.50
271,580.00

=Rp.

89,232.50

=Rp.
=Rp.
=Rp.

8,065.00
97,297.50
97,290.00

Rp.

729,700.00 =Rp.

729,700.00

Rp.

55,400.00 =Rp.

6,648.00
1,470.00

0.0300 Oh

Pekerja

Rp.

0.3000 Oh
0.0300 Oh

Tukang Batu
Kepala Tukang Batu

Rp.
Rp.

65,000.00 =Rp.
70,000.00 =Rp.

19,500.00
2,100.00

0.0015 Oh

Mandor

Rp.

75,000.00 =Rp.

112.50

Pasang Bak Cuci Piring Teraso


1.0000 bh
Bak Cuci Piring Teraso

Rp.

178,200.00 =Rp.

178,200.00

Waterdrain dan Aksesories


Semen PC

Rp.
Rp.

55,400.00 =Rp.
2,097.50 =Rp.

6,648.00
41,950.00

0.0500 m3

Pasir Pasang

Rp.

0.0500 Oh
0.5000 Oh
0.0500 Oh

Pekerja
Tukang Batu
Kepala Tukang Batu

Rp.
Rp.
Rp.

0.0025 Oh

Mandor

Rp.

Pasang Kran Air Stainles Steel Dia. 1/2" - 3/4"


1.0000 bh
Kran Air Stainles Steel Dia. 1/2"
0.0250 bh
Seal Tape
0.0100
0.1000
0.0100
0.0050

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

123,000.00 =Rp.
Sub Total
49,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.
75,000.00 =Rp.
Sub Total
Total
Dibulatkan

Rp.
Rp.

88,900.00 =Rp.
13,300.00 =Rp.

Rp.
Rp.
Rp.
Rp.

49,000.00
65,000.00
70,000.00
75,000.00

( harga kran sesuaikan jenis dan diameter yang dibutuhkan

Lembar 66

90,093.75

Sub Total

Sub Total
49,000.00 =Rp.

1.0000 set
20.0000 kg

X.17.6.35

Waterdrain dan Aksesories

=Rp.

Sub Total
=Rp.
=Rp.
=Rp.
=Rp.
Sub Total
Total
Dibulatkan

6,150.00
2,450.00
32,500.00
3,500.00
187.50

88,900.00
332.50
490.00
6,500.00
700.00
375.00

X.18.6.36

1 buah

Pasang Floor Drain


1.0000 bh

Floor Drain

Rp.

96,300.00 =Rp.
Sub Total

96,300.00
=Rp.

0.0100 Oh
0.1000 Oh

Pekerja
Tukang Batu

Rp.
Rp.

49,000.00 =Rp.
65,000.00 =Rp.

490.00
6,500.00

0.0100 Oh
0.0050 Oh

Kepala Tukang Batu


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

700.00
375.00

96,300.00

Sub Total

=Rp.

8,065.00

Total
Dibulatkan

=Rp.
=Rp.

104,365.00
104,360.00

=Rp.

19,090.00

XI. PEKERJAAN BESI DAN ALUMINIUM


XI.1.6.2

XI.2.6.3

1 kg

100 kg

Pasang Rangka Atap/Kuda-kuda Baja IWF


1.1500 kg

Baja Profil IWF 200 - 500 mm

Rp.

16,600.00 =Rp.
Sub Total

19,090.00

0.0600 Oh

Pekerja

Rp.

49,000.00 =Rp.

2,940.00

0.0600 Oh
0.0060 Oh

Tukang Besi
Kepala Tukang Besi

Rp.
Rp.

65,000.00 =Rp.
70,000.00 =Rp.

3,900.00
420.00

0.0003 Oh

Mandor

Rp.

75,000.00 =Rp.
Sub Total

22.50
=Rp.

7,282.50

Total

=Rp.

26,372.50

Dibulatkan

=Rp.

26,370.00

=Rp.

14,010.00

Pekerjaan Perakitan
1.0000 ltr
0.1000 ltr

Solar
Minyak Pelumas

Rp.
Rp.

0.0080 jam

Sewa Alat Las (harga sesuaikan lapangan)

Rp.

0.1000
0.1000
0.0010
0.0050

Pekerja
Tukang Besi
Kepala Tukang Besi
Mandor

Rp.
Rp.
Rp.
Rp.

Oh
Oh
Oh
Oh

7,500.00 =Rp.
65,100.00 =Rp.
Sub Total
- =Rp.
Sub Total

7,500.00
6,510.00

49,000.00
65,000.00
70,000.00
75,000.00

4,900.00
6,500.00
70.00
375.00

=Rp.
=Rp.
=Rp.
=Rp.
Sub Total

=Rp.

Total
1 kg pekerjaan perakitan
Dibulatkan
XI.3.6.10

1 m2

Pasang Rolling Door Aluminium


1.0000 m2
Rolling Door Aluminium
1.0000
1.0000
0.1000
0.0500

Oh
Oh
Oh
Oh

Rp.

Pekerja
Tukang Besi
Kepala Tukang Besi
Mandor

Rp.
Rp.
Rp.
Rp.

841,000.00 =Rp.
49,000.00
65,000.00
70,000.00
75,000.00

Sub Total
=Rp.
=Rp.
=Rp.
=Rp.

1 m1

Pasang Kusen Pintu Aluminium


1.1000 m1
Kusen Pintu Aluminium Coklat YKK 5/10
2.0000 bh
Paku Sekrup 1"
0.0600 tube
Sealent
0.0430
0.0430
0.0043
0.0021

XI.4.6.11.b

1 m1

Oh
Oh
Oh
Oh

Pekerja
Tukang Besi
Kepala Tukang Besi
Mandor

Rp.
Rp.
Rp.
Rp.

Pasang Kusen Jendela Aluminium


1.1000 m1
Kusen Jendela Aluminium Coklat YKK 5/10
2.0000 bh
Paku Sekrup 1"
0.0600 tube
Sealent
0.0430
0.0430
0.0043
0.0021

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.

Pekerja
Tukang Besi
Kepala Tukang Besi
Mandor

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

=Rp.

11,845.00

=Rp.
=Rp.
=Rp.

25,855.00
258.55
250.00

=Rp.

841,000.00

=Rp.
=Rp.
=Rp.

124,750.00
965,750.00
965,750.00

=Rp.

400,404.00

=Rp.
=Rp.
=Rp.

5,360.50
405,764.50
405,760.00

841,000.00
49,000.00
65,000.00
7,000.00
3,750.00

Sub Total
Total
Dibulatkan
XI.4.6.11.a

360,500.00 =Rp.
396,550.00
454.00 =Rp.
908.00
49,100.00 =Rp.
2,946.00
Sub Total
49,000.00 =Rp.
2,107.00
65,000.00 =Rp.
2,795.00
70,000.00 =Rp.
301.00
75,000.00 =Rp.
157.50
Sub Total
Total
Dibulatkan

360,500.00 =Rp.
396,550.00
454.00 =Rp.
908.00
49,100.00 =Rp.
2,946.00
Sub Total
49,000.00 =Rp.
2,107.00
65,000.00 =Rp.
2,795.00
70,000.00 =Rp.
301.00
75,000.00 =Rp.
157.50
Sub Total
Total
Dibulatkan

=Rp.

400,404.00

=Rp.
=Rp.
=Rp.

5,360.50
405,764.50
405,760.00

150,000.00 =Rp.
Sub Total

=Rp.

150,000.00

XII. PEKERJAAN KUNCI DAN KACA


XII.1.6.1

1 buah

Pasang Kunci Tanam Antik


1.0000 bh
Kunci Tanam Antik "Miller" (dengan handel)

Lembar 67

Rp.

150,000.00

0.0600
0.6000
0.0600
0.0030

XII.2.6.2

1 buah

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.
Rp.

Pasang Kunci Pintu


1.0000 bh
Kunci Pintu "Cap Kuda 2x Putar"
0.0100
0.5000
0.0100
0.0050

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.
Rp.
Rp.

Lembar 68

49,000.00
65,000.00
70,000.00
75,000.00

=Rp.
2,940.00
=Rp.
39,000.00
=Rp.
4,200.00
=Rp.
225.00
Sub Total
=Rp.
Total
=Rp.
Dibulatkan
=Rp.

105,600.00 =Rp.
105,600.00
Sub Total
49,000.00 =Rp.
490.00
65,000.00 =Rp.
32,500.00
70,000.00 =Rp.
700.00
75,000.00 =Rp.
375.00
Sub Total
Total
Dibulatkan

46,365.00
196,365.00
196,360.00

=Rp.

105,600.00

=Rp.
=Rp.
=Rp.

34,065.00
139,665.00
139,660.00

XII.3.6.3

1 buah

Pasang Kunci Tanam KM/WC


1.0000 bh
Kunci Tanam KM/WC "Miller"
0.0050
0.5000
0.0050
0.0025

XII.4.6.4

1 buah

1 set

1 set

XII.8.6.8

1 set

1 buah

1 set

1 buah

Rp.
Rp.
Rp.
Rp.

Oh
Oh
Oh
Oh

Rp.

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.
Rp.

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

49,000.00
65,000.00
70,000.00
75,000.00

Rp.
Rp.

0.0200 Oh
0.0100 Oh

Kepala Tukang Kayu


Mandor

Rp.
Rp.

Rp.

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.
Rp.

Pasang Hak Angin Maju-Mundur


1.0000 set
Hak Angin Lurus (Maju/Mundur) "SES"
Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.
Rp.

Pasang Door Closer


1.0000 bh
Door Closer "Belucci"
0.0500 Oh
0.5000 Oh
0.0500 Oh

Rp.

Rp.

Pekerja
Tukang Kayu
Kepala Tukang Kayu

Rp.
Rp.
Rp.

Lembar 69

=Rp.
=Rp.
=Rp.
=Rp.
Sub Total
Total
Dibulatkan

46,300.00 =Rp.
Sub Total
49,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.
75,000.00 =Rp.
Sub Total
Total
Dibulatkan

33,282.50
131,782.50
131,780.00

207,400.00

=Rp.
=Rp.
=Rp.

33,282.50
240,682.50
240,680.00

56,700.00

11,591.25
68,291.25
68,290.00

16,500.00
=Rp.

16,500.00

=Rp.
=Rp.
=Rp.

7,727.50
24,227.50
24,220.00

=Rp.

46,300.00

=Rp.
=Rp.
=Rp.

16,130.00
62,430.00
62,430.00

490.00
6,500.00
700.00
37.50

46,300.00
980.00
13,000.00
1,400.00
750.00

32,800.00 =Rp.
32,800.00
Sub Total
=Rp.
49,000.00 =Rp.
735.00
65,000.00 =Rp.
9,750.00
70,000.00 =Rp.
1,050.00
75,000.00 =Rp.
56.25
Sub Total
=Rp.
Total
=Rp.
Dibulatkan
=Rp.

96,900.00 =Rp.
96,900.00
Sub Total
=Rp.
49,000.00 =Rp.
735.00
65,000.00 =Rp.
9,750.00
70,000.00 =Rp.
1,050.00
75,000.00 =Rp.
56.25
Sub Total
=Rp.
Total
=Rp.
Dibulatkan
=Rp.

175,000.00 =Rp.
Sub Total
49,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.

98,500.00

=Rp.

56,700.00 =Rp.
56,700.00
Sub Total
=Rp.
49,000.00 =Rp.
735.00
65,000.00 =Rp.
9,750.00
70,000.00 =Rp.
1,050.00
75,000.00 =Rp.
56.25
Sub Total
=Rp.
Total
=Rp.
Dibulatkan
=Rp.

Rp.
Rp.
Rp.
Rp.

Pekerja
Tukang Kayu

Oh
Oh
Oh
Oh

207,400.00 =Rp.
207,400.00
Sub Total
49,000.00 =Rp.
245.00
65,000.00 =Rp.
32,500.00
70,000.00 =Rp.
350.00
75,000.00 =Rp.
187.50
Sub Total
Total
Dibulatkan

16,500.00 =Rp.
Sub Total

Rp.

Pasang Spring Knip


1.0000 bh
Spring Knip "Picasso"

98,500.00 =Rp.
98,500.00
Sub Total
=Rp.
49,000.00 =Rp.
245.00
65,000.00 =Rp.
32,500.00
70,000.00 =Rp.
350.00
75,000.00 =Rp.
187.50
Sub Total
=Rp.
Total
=Rp.
Dibulatkan
=Rp.

Rp.

0.0200 Oh
0.2000 Oh

0.0150
0.1500
0.0150
0.0008

XII.10.6.10

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Pasang Hak Angin Sikutan Biasa


1.0000 set
Hak Angin Sikutan Biasa

0.0150
0.1500
0.0150
0.0008

XII.9.6.9

Oh
Oh
Oh
Oh

Rp.

Pasang Engsel Jendela Kupu-kupu


1.0000 set
Engsel Jendela Kupu-kupu
0.0100
0.1000
0.0100
0.0005

XII.7.6.7

Rp.
Rp.
Rp.
Rp.

Pasang Engsel Pintu


1.0000 set
Engsel Pintu "Union"
0.0150
0.1500
0.0150
0.0008

XII.6.6.6

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Pasang Kunci Silinder


1.0000 bh
Kunci Silinder "SES"
0.0050
0.5000
0.0050
0.0025

XII.5.6.5

Oh
Oh
Oh
Oh

Rp.

32,800.00

11,591.25
44,391.25
44,390.00

96,900.00

11,591.25
108,491.25
108,490.00

175,000.00
=Rp.
2,450.00
32,500.00
3,500.00

175,000.00

0.0025 Oh

Mandor

Rp.

Lembar 70

75,000.00 =Rp.
Sub Total

187.50
=Rp.

38,637.50

Total

=Rp.

213,637.50

Dibulatkan

=Rp.

213,630.00

XII.11.6.11

1 buah

Pasang Kunci Slot


1.0000 bh

XII.12.6.12

1 set

Kunci Slot 2 Putaran "Yale" (Lengkap)

Rp.

139,700.00 =Rp.
Sub Total

139,700.00
=Rp.

0.0200 Oh
0.2000 Oh

Pekerja
Tukang Kayu

Rp.
Rp.

49,000.00 =Rp.
65,000.00 =Rp.

980.00
13,000.00

0.0200 Oh
0.0010 Oh

Kepala Tukang Kayu


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

1,400.00
75.00

Pasang Pegangan Pintu


1.0000 set
Pegangan Pintu Standar (p = 20 cm)

Rp.

Sub Total

=Rp.

15,455.00

Total
Dibulatkan

=Rp.
=Rp.

155,155.00
155,150.00

=Rp.

120,200.00

120,200.00 =Rp.

120,200.00

Sub Total

XII.13.6.13

XII.14.6.14

1 buah

1 buah

0.0500 Oh
0.5000 Oh

Pekerja
Tukang Kayu

Rp.
Rp.

49,000.00 =Rp.
65,000.00 =Rp.

2,450.00
32,500.00

0.0500 Oh
0.0025 Oh

Kepala Tukang Kayu


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

3,500.00
187.50

Pasang Door Stoper


1.0000 bh
Door Stoper "Belucci"
0.0100 Oh
0.1000 Oh

Tukang Kayu

0.0100 Oh
0.0005 Oh

Kepala Tukang Kayu


Mandor

Rp.
0 Rp.
Rp.
Rp.
Rp.

Pasang Rel Pintu Dorong


1.0000 bh
Rel Pintu Dorong Biasa
0.0600
0.6000
0.0600
0.0030

Oh
Oh
Oh
Oh

Rp.

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.
Rp.

Sub Total

=Rp.

38,637.50

Total
Dibulatkan

=Rp.
=Rp.

158,837.50
158,830.00

=Rp.

62,200.00

=Rp.
=Rp.
=Rp.

7,727.50
69,927.50
69,920.00

=Rp.

204,400.00

=Rp.
=Rp.
=Rp.

46,365.00
250,765.00
250,760.00

=Rp.

15,000.00

=Rp.
=Rp.
=Rp.

19,318.75
34,318.75
34,310.00

62,200.00 =Rp.
Sub Total
49,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.
75,000.00 =Rp.
Sub Total
Total
Dibulatkan

204,400.00 =Rp.
49,000.00
65,000.00
70,000.00
75,000.00

Sub Total
=Rp.
=Rp.
=Rp.
=Rp.

62,200.00
490.00
6,500.00
700.00
37.50

204,400.00
2,940.00
39,000.00
4,200.00
225.00

Sub Total
Total
Dibulatkan
XII.15.6.15

1 buah

Pasang Kunci Lemari


1.0000 bh
Kunci Lemari "Wing"
0.0250
0.2500
0.0250
0.0013

Oh
Oh
Oh
Oh

Rp.

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.
Rp.

15,000.00 =Rp.
49,000.00
65,000.00
70,000.00
75,000.00

Sub Total
=Rp.
=Rp.
=Rp.
=Rp.

15,000.00
1,225.00
16,250.00
1,750.00
93.75

Sub Total
Total
Dibulatkan
XII.16.6.16

1 m2

Pasang Kaca Polos 3 mm


1.1000 m2
Kaca Polos 3 mm
0.0150
0.1500
0.0150
0.0008

XII.17.6.17

1 m2

1 m2

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.
Rp.

Pasang Kaca Polos 5 mm


1.1000 m2
Kaca Polos 5 mm
0.0150
0.1500
0.0150
0.0008

XII.18.6.19

Oh
Oh
Oh
Oh

Rp.

Oh
Oh
Oh
Oh

Rp.

Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.
Rp.

Pasang Kaca Buram 5 mm


1.1000 m2
Kaca Buram 5 mm

Rp.

Lembar 71

139,700.00

88,700.00 =Rp.
97,570.00
Sub Total
=Rp.
49,000.00 =Rp.
735.00
65,000.00 =Rp.
9,750.00
70,000.00 =Rp.
1,050.00
75,000.00 =Rp.
56.25
Sub Total
=Rp.
Total
=Rp.
Dibulatkan
=Rp.

133,700.00 =Rp.
147,070.00
Sub Total
49,000.00 =Rp.
735.00
65,000.00 =Rp.
9,750.00
70,000.00 =Rp.
1,050.00
75,000.00 =Rp.
56.25
Sub Total
Total
Dibulatkan

145,000.00 =Rp.

159,500.00

97,570.00

11,591.25
109,161.25
109,160.00

=Rp.

147,070.00

=Rp.
=Rp.
=Rp.

11,591.25
158,661.25
158,660.00

0.0250 Oh

Pekerja

Rp.

Sub Total
49,000.00 =Rp.

0.2500 Oh

Tukang Kayu

Rp.

65,000.00 =Rp.

16,250.00

0.0250 Oh
0.0013 Oh

Kepala Tukang Kayu


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

1,750.00
93.75

Lembar 72

=Rp.

159,500.00

Sub Total
Total

=Rp.
=Rp.

19,318.75
178,818.75

Dibulatkan

=Rp.

178,810.00

1,225.00

XII.19.6.20

1 m2

Pasang Kaca Cermin 3 mm


1.1000 m2

XII.20.6.23

1 m2

Kaca Cermin 3 mm

Rp.

181,600.00 =Rp.
Sub Total

199,760.00
=Rp.

0.0150 Oh
0.1500 Oh

Pekerja
Tukang Kayu

Rp.
Rp.

49,000.00 =Rp.
65,000.00 =Rp.

735.00
9,750.00

0.0150 Oh
0.0008 Oh

Kepala Tukang Kayu


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

1,050.00
56.25

Pasang Kaca Rayban 5 mm


1.1000 m2
Kaca Rayban 5 mm

Rp.

199,760.00

Sub Total

=Rp.

11,591.25

Total
Dibulatkan

=Rp.
=Rp.

211,351.25
211,350.00

=Rp.

120,340.00

109,400.00 =Rp.

120,340.00

Sub Total
0.0150 Oh
0.1500 Oh

Pekerja
Tukang Kayu

Rp.
Rp.

49,000.00 =Rp.
65,000.00 =Rp.

735.00
9,750.00

0.0150 Oh
0.0008 Oh

Kepala Tukang Kayu


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

1,050.00
56.25

Sub Total

=Rp.

11,591.25

Total
Dibulatkan

=Rp.
=Rp.

131,931.25
131,930.00

=Rp.

80,249.00

= Rp
=Rp.

23,640.00
103,889.00

=Rp.

103,880.00

=Rp.

87,341.40

= Rp
=Rp.
=Rp.

23,640.00
110,981.40
110,980.00

=Rp.

331,716.50

= Rp
=Rp.
=Rp.

21,865.00
353,581.50
353,580.00

=Rp.

255,740.00

= Rp
=Rp.
=Rp.

22,750.00
278,490.00
278,490.00

XIII. PEKERJAAN PENUTUP LANTAI DAN DINDING


XIII.1.6.3

1 m2

Pasang Lantai Tegel Abu-abu, Uk. 20 x 20 cm


1.0000 m2
10.4000 kg
0.0450 m3

Tegel PC Abu-abu 20 x 20 cm
Semen PC
Pasir Pasang

Rp.
Rp.
Rp.

0.2700 Oh

Pekerja

Rp.

0.1300 Oh
0.0130 Oh
0.0140 Oh

Tukang Batu
Kepala Tukang Batu
Mandor

Rp.
Rp.
Rp.

52,900.00 =Rp.
2,097.50 =Rp.
123,000.00 =Rp.
Sub total
49,000.00 =Rp.

52,900.00
21,814.00
5,535.00

65,000.00 =Rp.
70,000.00 =Rp.
75,000.00 =Rp.
Sub Total
Total

8,450.00
910.00
1,050.00

13,230.00

Dibulatkan
XIII.2.6.6

1 m2

Pasang Lantai Tegel Wafel/Galar, Uk. 20 x 20 cm


1.0000 m2
10.4000 kg
1.6200 kg

XIII.3.6.9

1 m2

Tegel Wafel/Galar 20 x 20 cm
Semen PC
Semen Putih

Rp.
Rp.
Rp.

0.0450 m3

Pasir Pasang

Rp.

0.2700 Oh
0.1300 Oh
0.0130 Oh

Pekerja
Tukang Batu
Kepala Tukang Batu

Rp.
Rp.
Rp.

0.0140 Oh

Mandor

Rp.

Pasang Lantai Tegel Granito, Uk. 40 x 40 cm


1.0000 m2
Tegel Granito 40 x 40 cm
9.8000 kg
Semen PC
1.3000 kg
Semen Putih
3
0.0450 m
Pasir Pasang
0.2500
0.1200
0.0120
0.0130

XIII.4.6.10

1 m2

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Pasang Lantai Tegel Granito, Uk. 30 x 30 cm


1.0000 m2
Tegel Granito 30 x 30 cm
10.0000 kg
Semen PC
1.5000 kg
Semen Putih
0.0450 m3
Pasir Pasang
0.2600
0.1250
0.0130
0.0130

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Lembar 73

55,100.00 =Rp.
2,097.50 =Rp.
3,020.00 =Rp.
123,000.00 =Rp.
Sub total
49,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.
75,000.00 =Rp.
Sub Total
Total
Dibulatkan

Rp.
Rp.
Rp.
Rp.

301,700.00
2,097.50
3,020.00
123,000.00

Rp.
Rp.
Rp.
Rp.

49,000.00
65,000.00
70,000.00
75,000.00

Rp.
Rp.
Rp.
Rp.

224,700.00
2,097.50
3,020.00
123,000.00

Rp.
Rp.
Rp.
Rp.

49,000.00
65,000.00
70,000.00
75,000.00

55,100.00
21,814.00
4,892.40
5,535.00
13,230.00
8,450.00
910.00
1,050.00

=Rp.
301,700.00
=Rp.
20,555.50
=Rp.
3,926.00
=Rp.
5,535.00
Sub total
=Rp.
12,250.00
=Rp.
7,800.00
=Rp.
840.00
=Rp.
975.00
Sub Total
Total
Dibulatkan

=Rp.
224,700.00
=Rp.
20,975.00
=Rp.
4,530.00
=Rp.
5,535.00
Sub total
=Rp.
12,740.00
=Rp.
8,125.00
=Rp.
910.00
=Rp.
975.00
Sub Total
Total
Dibulatkan

XIII.5.6.25

1 m1

Pasang Tegel Plint Keramik Warna, Uk. 10 x 30 cm


1.0000 m1
1.1400 kg

Tegel Plint Keramik Warna 10 x 30 cm


Semen PC

Rp.
Rp.

0.1000 kg

Semen Putih

Rp.

0.0030 m3

Pasir Pasang

Rp.

0.0900 Oh
0.0900 Oh

Pekerja
Tukang Batu

Rp.
Rp.

49,000.00 =Rp.
65,000.00 =Rp.

4,410.00
5,850.00

0.0090 Oh

Kepala Tukang Batu

Rp.

70,000.00 =Rp.

630.00

0.0050 Oh

Mandor

Rp.

75,000.00 =Rp.
Sub Total

375.00

Lembar 74

48,300.00 =Rp.
2,097.50 =Rp.

48,300.00
2,391.15

3,020.00 =Rp.

302.00

123,000.00 =Rp.
Sub total

369.00
=Rp.

51,362.15

= Rp

11,265.00

Total

=Rp.

62,627.15

Dibulatkan

=Rp.

62,620.00

XIII.6.6.27

XIII.7.6.34

1 m1

1 m2

Pasang List Keramik/Border, Uk. 10 x 20 cm


5.0000 bh
List Keramik/Border 10 x 20 cm

Rp.

12,600.00 =Rp.

63,000.00

1.1400 kg
0.1000 kg

Semen PC
Semen Putih

Rp.
Rp.

2,097.50 =Rp.
3,020.00 =Rp.

2,391.15
302.00

0.0030 m3

Pasir Pasang

Rp.

123,000.00 =Rp.

369.00

0.0900 Oh

Pekerja

Rp.

Sub total
49,000.00 =Rp.

=Rp.

66,062.15

0.0900 Oh
0.0090 Oh

Tukang Batu
Kepala Tukang Batu

Rp.
Rp.

65,000.00 =Rp.
70,000.00 =Rp.

5,850.00
630.00

0.0050 Oh

Mandor

Rp.

75,000.00 =Rp.
Sub Total
Total

375.00
= Rp
=Rp.

11,265.00
77,327.15

Dibulatkan

=Rp.

77,320.00

=Rp.

102,605.93

4,410.00

Pasang Lantai Keramik, Uk. 40 x 40 cm


1.0000 m2

Lantai Keramik Super Milan 40 x 40 cm

Rp.

75,000.00 =Rp.

75,000.00

8.1900 kg
1.6200 kg

Semen PC
Semen Putih

Rp.
Rp.

2,097.50 =Rp.
3,020.00 =Rp.

17,178.53
4,892.40

0.0450 m3

Pasir Pasang

Rp.

0.2500 Oh

Pekerja

Rp.

49,000.00 =Rp.

12,250.00

0.1200 Oh
0.0120 Oh

Tukang Batu
Kepala Tukang Batu

Rp.
Rp.

65,000.00 =Rp.
70,000.00 =Rp.

7,800.00
840.00

0.0130 Oh

Mandor

Rp.

75,000.00 =Rp.
Sub Total

123,000.00 =Rp.
Sub total

5,535.00

975.00

Total
Dibulatkan
XIII.8.6.35

1 m2

Pasang Lantai Keramik, Uk. 30 x 30 cm


1.0000 m2
Lantai Keramik Asia 30 x 30 cm
10.0000 kg
Semen PC

Rp.
Rp.

1.5000 kg
0.0450 m3

Semen Putih
Pasir Pasang

Rp.
Rp.

0.6200
0.3500
0.0350
0.0300

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Rp.
Rp.
Rp.
Rp.

Oh
Oh
Oh
Oh

46,200.00 =Rp.
2,097.50 =Rp.
3,020.00 =Rp.
123,000.00 =Rp.
Sub total
49,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.
75,000.00 =Rp.
Sub Total

1 m2

Pasang Lantai Keramik KM/WC, Uk. 20 x 20 cm


1.0000 m2
Lantai Keramik Kasar 20 x 20 cm
10.4000 kg
Semen PC
1.6200 kg
Semen Putih
0.0450 m3
Pasir Pasang
0.6200
0.3500
0.0350
0.0300

XIII.10.6.43

1 m2

1 m2

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Pasang Lantai Marmer, Uk. 40 x 60 cm


1.0000 m2
Lantai Marmer 40 x 60 cm
8.1900 kg
Semen PC
0.6500 kg
Semen Putih
0.0450 m3
Pasir Pasang
0.6200
0.3500
0.0350
0.0300

XIII.11.6.54

Oh
Oh
Oh
Oh

Oh
Oh
Oh
Oh

Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor

Pasang Dinding Keramik, Uk. 20 x 25 cm


1.0000 m2
Dinding Keramik Asia 20 x 25 cm
9.3000 kg
Semen PC
1.9400 kg
Semen Putih
0.0180 m3
Pasir Pasang
0.6000 Oh
0.4500 Oh
0.0450 Oh

Pekerja
Tukang Batu
Kepala Tukang Batu

Rp.
Rp.
Rp.
Rp.

55,000.00
2,097.50
3,020.00
123,000.00

Rp.
Rp.
Rp.
Rp.

49,000.00
65,000.00
70,000.00
75,000.00

Rp.
Rp.
Rp.
Rp.

369,300.00
2,097.50
3,020.00
123,000.00

Rp.
Rp.
Rp.
Rp.

49,000.00
65,000.00
70,000.00
75,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Lembar 75

63,200.00
2,097.50
3,020.00
123,000.00

21,865.00
124,470.93
124,470.00

=Rp.

77,240.00

46,200.00
20,975.00
4,530.00
5,535.00
30,380.00
22,750.00
2,450.00
2,250.00
= Rp

57,830.00

=Rp.
=Rp.

135,070.00
135,070.00

Sub total
=Rp.
=Rp.
30,380.00
=Rp.
22,750.00
=Rp.
2,450.00
=Rp.
2,250.00
Sub Total
= Rp
Total
=Rp.
Dibulatkan
=Rp.

87,241.40

Total
Dibulatkan
XIII.9.6.36

= Rp
=Rp.
=Rp.

=Rp.
=Rp.
=Rp.
=Rp.

55,000.00
21,814.00
4,892.40
5,535.00

=Rp.
369,300.00
=Rp.
17,178.53
=Rp.
1,963.00
=Rp.
5,535.00
Sub total
=Rp.
30,380.00
=Rp.
22,750.00
=Rp.
2,450.00
=Rp.
2,250.00
Sub Total
Total
Dibulatkan

=Rp.
=Rp.
=Rp.
=Rp.
Sub total
49,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.

57,830.00
145,071.40
145,070.00

=Rp.

393,976.53

= Rp
=Rp.
=Rp.

57,830.00
451,806.53
451,800.00

=Rp.

90,779.55

63,200.00
19,506.75
5,858.80
2,214.00
29,400.00
29,250.00
3,150.00

0.0300 Oh

XIII.12.6.55

1 m2

Mandor

Rp.

75,000.00 =Rp.
Sub Total

2,250.00
= Rp

64,050.00

Total

=Rp.

154,829.55

Dibulatkan

=Rp.

154,820.00

=Rp.

442,630.90

Pasang Dinding Marmer, Uk. 40 x 60 cm


1.0000 m2
2.0000 bh

Lantai Marmer 40 x 60 cm
Paku 4"

Rp.
Rp.

369,300.00 =Rp.
21,100.00 =Rp.

369,300.00
42,200.00

12.4400 kg
0.6500 kg

Semen PC
Semen Putih

Rp.
Rp.

2,097.50 =Rp.
3,020.00 =Rp.

26,092.90
1,963.00

0.0250 m3

Pasir Pasang

Rp.

123,000.00 =Rp.

3,075.00

Sub total

Lembar 76

XIII.13.6.58

1 m2

0.7200 Oh

Pekerja

Rp.

49,000.00 =Rp.

35,280.00

0.6500 Oh

Tukang Batu

Rp.

65,000.00 =Rp.

42,250.00

0.0650 Oh
0.0350 Oh

Kepala Tukang Batu


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

4,550.00
2,625.00

Sub Total
Total

= Rp
=Rp.

84,705.00
527,335.90

Dibulatkan

=Rp.

527,330.00

=Rp.

159,850.63

= Rp
=Rp.
=Rp.

57,830.00
217,680.63
217,680.00

=Rp.

116,540.00

=Rp.
= Rp
= Rp

18,750.00
135,290.00
135,290.00

=Rp.

34,376.91

=Rp.
= Rp
= Rp

9,980.00
44,356.91
44,350.00

=Rp.

1,185.00

=Rp.
=Rp.
=Rp.

7,537.50
8,722.50
8,720.00

Pasang Dinding Batu Tempel Hijau


1.1000 m2

Batu Tempel Hijau

Rp.

119,000.00 =Rp.

130,900.00

Semen PC
Pasir Pasang

Rp.
Rp.

2,097.50 =Rp.
123,000.00 =Rp.

24,645.63
4,305.00

0.6200 Oh

Pekerja

Rp.

Sub total
49,000.00 =Rp.

30,380.00

0.3500 Oh

Tukang Batu

Rp.

65,000.00 =Rp.

22,750.00

0.0350 Oh
0.0300 Oh

Kepala Tukang Batu


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

2,450.00
2,250.00

11.7500 kg
0.0350 m3

Sub Total
Total
Dibulatkan
XIII.14.6.59

XIII.15.6.62

1 m2

1 m1

Pasang Lantai Vinyl Kw. I (Uk. 30 x 30) cm


1.0000 m2
Lantai Vinyl Kw. I (Uk. 30 x 30) cm

Rp.

103,100.00 =Rp.

0.3500 kg

Lem Vinyl

Rp.

38,400.00 =Rp.
Sub Total

0.1500 Oh
0.1500 Oh
0.0150 Oh

Pekerja
Tukang Kayu
Kepala Tukang Kayu

Rp.
Rp.
Rp.

49,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.

0.0080 Oh

Mandor

Rp.

75,000.00 =Rp.
Sub Total
Total
Dibulatkan

Pasang Plint Vinyl Kw. I (Uk. 10 x 30) cm dengan Perekat


3.3400 bh
Plint Vinyl Kw. I (Uk. 10 x 30) cm
0.0800 kg
Lem Vinyl

Rp.
Rp.

0.0800 Oh
0.0800 Oh

Pekerja
Tukang Kayu

Rp.
Rp.

0.0080 Oh
0.0040 Oh

Kepala Tukang Kayu


Mandor

Azzzz
Rp.

9,372.73 =Rp.
38,400.00 =Rp.
Sub Total
49,000.00 =Rp.
65,000.00 =Rp.

103,100.00
13,440.00
7,350.00
9,750.00
1,050.00
600.00

31,304.91
3,072.00
3,920.00
5,200.00

70,000.00 =Rp.
75,000.00 =Rp.
Sub Total
Total
Dibulatkan

560.00
300.00

23,700.00 Rp.
Sub Total
49,000.00 =Rp.
75,000.00 =Rp.
Sub Total
Total
Dibulatkan

1,185.00

XIV. PEKERJAAN PENGECATAN


XIV.1.6.1

1 m2

Mengerok/Mengikis Permukaan Cat Kayu Lama


0.0500 kg
Soda Api
0.1500 Oh
0.0025 Oh

XIV.2.6.10

1 m2

1 m2

Pekerja
Mandor

Rp.
Rp.

Pelaburan Bidang Kayu dengan Teak Oil


0.3600 ltr
Teak Oil
0.0400
0.0630
0.0063
0.0025

XIV.3.6.11

Rp.

Oh
Oh
Oh
Oh

Pelaburan Bidang
0.1500 kg
0.3720 ltr
2.0000 lbr
0.0600 Oh
0.0160 Oh
0.0025 Oh

Rp.

Pekerja
Tukang Cat
Kepala Tukang Cat
Mandor

Rp.
Rp.
Rp.
Rp.

Kayu dengan Politur Biasa


Politur Batangan
Politur Jadi "Impra"
Kertas Gosok

Rp.
Rp.
Rp.

Tukang Cat
Kepala Tukang Cat
Mandor

Rp.
Rp.
Rp.

Lembar 77

7,350.00
187.50

37,200.00 =Rp.
13,392.00
Sub Total
=Rp.
49,000.00 =Rp.
1,960.00
65,000.00 =Rp.
4,095.00
70,000.00 =Rp.
441.00
75,000.00 =Rp.
187.50
Sub Total
=Rp.
Total
=Rp.
Dibulatkan
=Rp.

25,800.00 =Rp.
3,870.00
74,900.00 =Rp.
27,862.80
5,300.00 =Rp.
10,600.00
Sub Total
=Rp.
65,000.00 =Rp.
3,900.00
70,000.00 =Rp.
1,120.00
75,000.00 =Rp.
187.50
Sub Total
=Rp.
Total
=Rp.
Dibulatkan
=Rp.

13,392.00

6,683.50
20,075.50
20,070.00

42,332.80

5,207.50
47,540.30
47,540.00

XIV.4.6.13

1 m2

Pelaburan Bidang Kayu dengan Vernis


0.1500 ltr
0.0500 ltr

Vernis "Glotex"
Dempul "Impra"

Rp.
Rp.

53,600.00 =Rp.
47,000.00 =Rp.

8,040.00
2,350.00

0.0100 bh

Kuas 3"

Rp.

14,600.00 =Rp.

146.00

0.1000 lbr

Kertas Gosok

Rp.

5,300.00 =Rp.
Sub Total

530.00
=Rp.

0.1600 Oh

Pekerja

Rp.

49,000.00 =Rp.

7,840.00

0.1600 Oh

Tukang Cat

Rp.

65,000.00 =Rp.

10,400.00

0.0160 Oh
0.0025 Oh

Kepala Tukang Cat


Mandor

Rp.
Rp.

70,000.00 =Rp.
75,000.00 =Rp.

1,120.00
187.50

Lembar 78

11,066.00

Sub Total

=Rp.

19,547.50

Total
Dibulatkan

=Rp.
=Rp.

30,613.50
30,610.00

XIV.5.6.14

1 m2

Mengecat Tembok Baru


0.1000 kg
Plamir Tembok
0.3600 kg
Cat Tembok "Decolith"
0.0200
0.0630
0.0063
0.0025

XIV.6.6.15

1 m2

Oh
Oh
Oh
Oh

Rp.
Rp.

Pekerja
Tukang Cat
Kepala Tukang Cat
Mandor

Rp.
Rp.
Rp.
Rp.

36,800.00 =Rp.
24,100.00 =Rp.
Sub Total
49,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.
75,000.00 =Rp.
Sub Total
Total
Dibulatkan

3,680.00
8,676.00

1 m2

12,356.00

=Rp.
=Rp.
=Rp.

5,703.50
18,059.50
18,050.00

=Rp.

7,230.00

Mengecat Tembok Lama


0.3000 kg

Cat Tembok "Decolith"

Rp.

24,100.00 =Rp.
Sub Total

7,230.00

0.0280 Oh
0.0420 Oh

Pekerja
Tukang Cat

Rp.
Rp.

49,000.00 =Rp.
65,000.00 =Rp.

1,372.00
2,730.00

0.0042 Oh

Kepala Tukang Cat

Rp.

70,000.00 =Rp.

294.00

0.0025 Oh

Mandor

Rp.

75,000.00 =Rp.
Sub Total

187.50

Total
Dibulatkan
XIV.7.6.20

=Rp.
980.00
4,095.00
441.00
187.50

=Rp.

4,583.50

=Rp.
=Rp.

11,813.50
11,810.00

=Rp.

3,316.00

=Rp.
=Rp.

16,130.00
19,446.00

=Rp.

19,440.00

Mengecat Permukaan Baja dengan Meni Besi


0.1000 kg
0.0100 bh

Meni Besi Cap Pedang


Kuas 3"

Rp.
Rp.

31,700.00 =Rp.
14,600.00 =Rp.

0.0200 Oh
0.2000 Oh
0.0200 Oh

Pekerja
Tukang Cat
Kepala Tukang Cat

Rp.
Rp.
Rp.

Sub Total
49,000.00 =Rp.
65,000.00 =Rp.
70,000.00 =Rp.

0.0100 Oh

Mandor

Rp.

75,000.00 =Rp.
Sub Total
Total
Dibulatkan

Lembar 79

3,170.00
146.00
980.00
13,000.00
1,400.00
750.00

DAFTAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA


PEMERINTAH KOTA BLITAR TAHUN ANGGARAN 2013
Semester I Tahun 2013
A. DAFTAR HARGA SATUAN BAHAN BANGUNAN

NO.

JENIS BAHAN

UKURAN

SATUAN

10/ 15, 15/20


5/7
4/6
3/5
2/3
1/2
1/1
0,5/1
2/3
(40x20x10) cm
10 x 20
20 x 20
10 x 30
20 x 20
30 x 30
10 x 20
22cm, t=3 m
28cm, t=3 m
p = 40 cm
50 kg
40 kg
50 kg
40 kg
50 kg
40 kg
20 x 20

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
kg
m3
m3
m3
m3
m3
kg
m3
m3
m3
m3
m2
bh
bh
bh
m2
m2
bh
bh
bh
bh
m2
bh
bh
bh
m3
ton
m3
zak
zak
zak
zak
zak
zak
kg
kg
bh

I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48

BAHAN PASANGAN DAN


CAMPURAN BETON
Batu kali belah
Batu kali pecah
Batu kali pecah
Batu kali pecah
Batu kali pecah
Batu kali pecah Crusher
Batu kali pecah Crusher. M 025
Batu kali pecah Crusher. K 017/ M026
Batu krikil (ayakan)
Krikil sungai
Krikil ayak tanpa pasir
Krikil batu alor (ampyang)
Pasir beton/cor
Pasir pasang
Pasir urug
Agregat Kasar
Agregat Halus
Filler
Sirtu
Tanah urug biasa
Tanah urug pilihan (campur pupuk utk taman)
Tanah katelan jalan
Gebalan rumput (utk talud)
Batako
Batu merah klas I
Batu merah klas II
Batu lempeng (tidak beraturan)
Batu hias (sand stone)
Roster beton
Roster beton
Roster batu alam
Roster batu alam
Batu tempel hijau
Tiang teras batu alam
Tiang teras batu alam
List batu hias
Kapur padam
Gamping
Semen merah
Semen Gresik (PC Gresik)
Semen Gresik (PC Gresik)
Semen Tiga Roda
Semen Tiga Roda
Semen Holcim
Semen putih
PC super nut
Ijuk
Glass block bening

Lembar : 80

HARGA STANDAR
TERTINGGI
(Rp)
5

150,000.00
167,000.00
170,000.00
199,000.00
206,000.00
221,500.00
234,500.00
234,000.00
157,000.00
107,000.00
114,000.00
8,000.00
109,000.00
104,000.00
79,000.00
135,000.00
219,100.00
1,300.00
85,800.00
70,500.00
78,600.00
81,500.00
18,000.00
2,500.00
550.00
525.00
78,700.00
100,000.00
10,000.00
8,000.00
71,500.00
88,000.00
99,000.00
1,000,000.00
1,320,000.00
12,400.00
403,500.00
1,000,000.00
154,000.00
78,000.00
65,000.00
74,800.00
61,300.00
67,300.00
90,500.00
12,100.00
22,900.00
22,300.00

20 x 20

bh

23,600.00

6/12, 6/15, 8/12

m3

32,287,500.00

4/6, 5/7

m3

30,135,000.00

2/20, 3/20, 3/25

m3

30,672,400.00

2/3, 3/5

m3

30,135,000.00

49 Glass block buram


II
1
2
3
4

BAHAN KUZEN KAYU DAN


KERANGKA ATAP
Kayu jati balok kualitas II,
Ex. Bojonegoro (mutu kayu klas I)
Kayu jati usuk kualitas II,
Ex. Bojonegoro (mutu kayu klas I)
Kayu jati papan kualitas II,
Ex. Bojonegoro (mutu kayu klas I)
Kayu jati reng kualitas II,
Ex. Bojonegoro (mutu kayu klas I)

Lembar : 81

2
5 Kayu jati balok kualitas I, lokal
(mutu kayu klas I)
6 Kayu jati usuk kualitas I, lokal
(mutu kayu klas I)
7 Kayu jati papan kualitas I, lokal
(mutu kayu klas I)
8 Kayu jati reng kualitas I, lokal
(mutu kayu klas I)
9 Kayu kamper, balok (mutu kayu klas II)
10 Kayu kamper, papan (mutu kayu klas II)
11 Kayu kamper, usuk (mutu kayu klas II)
12 Kayu kamper, reng (mutu kayu klas II)
13 Kayu meranti, balok (mutu kayu klas III)
14 Kayu meranti, papan (mutu kayu klas III)
15 Kayu meranti, usuk (mutu kayu klas III)
16 Kayu meranti, reng (mutu kayu klas III)
17 Kayu bekisting, papan (mutu kayu klas IV)
18 Kayu bekisting, usuk (mutu kayu klas IV)
19 Kayu tahun, papan (mutu kayu klas IV)
20 Kayu tahun, usuk (mutu kayu klas IV)
21 Kayu gelam (mutu kayu klas IV)
22 Kayu kruing, balok (mutu kayu klas III)
23 Kayu kruing, papan (mutu kayu klas III)
24 Kayu kruing, usuk (mutu kayu klas III)
25 Kayu kruing, reng (mutu kayu klas III)
26 Kayu balau, balok (mutu kayu klas II)
27 Kayu balau, papan (mutu kayu klas II)
28 Kayu balau, usuk (mutu kayu klas II)
29 Kayu balau, reng (mutu kayu klas II)
30 Kayu Albasiah (mutu kayu klas IV)
31 List kayu tahun
32 List kayu profil
33 List kayu profil
34 Bambu Jawa bongkotan
35 Bambu ori
36 Bambu apus
37 Gedek guling
38 Daun pintu kayu Balau, kw 1
39 Daun pintu kayu Jati, kw 1

III
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

6/12, 6/15, 8/12

m3

22,062,400.00

4/6, 5/7

m3

18,833,700.00

2/20, 3/20, 3/25

m3

24,753,000.00

2/3, 3/5

m3

16,143,000.00

6/12, 6/15, 8/12


2/20, 3/20, 3/25
4/6, 5/7
2/3, 3/5
6/12, 6/15, 8/12
2/20, 3/20, 3/25
3/5,4/6,5/7
2/3, 3/5
3/20-200
4/6-200
2/20, 3/20, 3/25
3/5, 4/6, 5/7
10-12 x 300 cm
6/12, 6/15, 8/12
2/20, 3/20, 3/25
4/6, 5/7
2/3
6/12, 6/15, 8/12
2/20, 3/20, 3/25
3/5, 4/6, 5/7
2/3
1/4
4/4
5/5
10-12 x 300cm
10-12 x 600cm
6-10 x 600cm
3,5 x 90 x 210 cm
3,5 x 90 x 210 cm

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
btg
m3
m3
m3
m3
m3
m3
m3
m3
m3
m1
m1
m1
btg
btg
btg
m2
lbr
lbr

10,517,000.00
11,133,900.00
9,972,300.00
9,681,000.00
5,800,000.00
6,204,800.00
5,800,000.00
5,255,900.00
1,375,000.00
2,167,500.00
2,420,000.00
2,662,400.00
21,000.00
7,150,000.00
8,050,000.00
6,900,000.00
6,750,000.00
10,333,900.00
11,093,900.00
9,641,600.00
9,333,800.00
1,559,900.00
5,500.00
7,800.00
9,100.00
16,000.00
25,500.00
13,100.00
9,800.00
1,338,000.00
2,500,000.00

1,05 X 3,00
1,05 X 3,00
1,05 X 1,50
1,05 X 1,80
40 x 200 cm
50 x 200 cm
60 x 200 cm
30x400
20x300
122 x 244
122 x 244
15 x 200 cm
10 x 200 cm
-

lbr
lbr
lbr
lbr
m1
m1
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
btg
btg
bh

133,100.00
98,000.00
50,800.00
60,500.00
67,600.00
39,000.00
17,500.00
19,200.00
23,100.00
111,100.00
68,900.00
9,500.00
13,500.00
16,500.00
90,000.00
98,000.00
35,000.00
25,000.00
1,500.00

BAHAN PENUTUP ATAP DAN PLAFON


Asbes gelombang besar tebal 5 mm
Asbes gelombang kecil tebal 4 mm
Asbes gelombang kecil tebal 4 mm
Asbes gelombang kecil tebal 4 mm
Asbes bubung gelombang besar tebal 5 mm
Asbes bubung gelombang kecil tebal 4 mm
Harflek 4 mm
Harflek 4 mm
Harflek 4 mm
Woodplek tebal 9 mm
Woodplek tebal 9mm
Eternit (lokal)
Eternit (kerang)
Eternit (Gresik)
Gypsum tebal 9 mm
Gypsum tebal 12 mm
List Gypsum
List Gypsum
Genteng flam press Jawa/lokal

Lembar : 82

2
20
21
22
23
24
25
26
27
28
29
30
31

Genteng kaca (model karang pilang)


Genteng karang pilang/wisma
Genteng bubung karang pilang/wisma
Genteng bubung Jawa/lokal
Genteng Bambe
Genteng bubungan Bambe
Genteng prentul ex.Trenggalek
Genteng bubungan prentul ex. Trenggalek
Genteng Mantili ex Trenggalek
Genteng Bubung Mantili ex. Trenggalek
Genteng Biasa
Genteng Beton

Lembar : 83

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

5
11,000.00
6,000.00
10,000.00
5,000.00
6,500.00
10,000.00
1,800.00
7,500.00
3,750.00
9,000.00
1,300.00
3,600.00

2
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64

IV
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

l = 90 cm
l = 90 cm
l = 60 cm
l = 45 cm
80 x 180 cm
80 x 180 cm
80 x 180 cm
80 x 300 cm
80 x 150 cm
80 x 180 cm
l = 60 cm
l = 90 cm
l = 92 cm.
( 4' x 8' )
90 x 210 cm
( 4' x 8' )
( 4' x 8' )
( 4' x 8' )
90 x 210 cm
( 4' x 8' )
( 4' x 8' )
( 4' x 8' )
( 4' x 8' )
( 4' x 8' )

bh
bh
bh
bh
bh
bh
bh
m1
m1
m1
m1
lbr
lbr
lbr
lbr
lbr
lbr
m1
m1
m1
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m1
m1
lbr

7,000.00
11,000.00
25,000.00
8,500.00
20,300.00
7,500.00
21,000.00
56,400.00
40,000.00
37,000.00
32,000.00
88,500.00
115,000.00
88,500.00
145,200.00
89,200.00
75,000.00
13,000.00
16,500.00
101,000.00
130,000.00
100,000.00
163,300.00
65,000.00
120,000.00
100,000.00
120,000.00
85,300.00
200,000.00
210,600.00
239,500.00
266,400.00
67,600.00

1" - 6 m.
1,5" - 6 m.
1/2" - 6 m.
1" - 6 m.
1,25" - 6 m.
1,5" - 6 m.
2" - 6 m.
2,5" - 6 m.
3" - 6 m.
4" - 6 m.
5" - 6 m.
4' x 8'
4' x 8'
4' x 8'
(30x6000)mm
L.60.60.6
L.50.50.6
L.30.30.3
C 125,50,3

kg
kg
kg
btg
bh
btg
btg
btg
btg
btg
btg
btg
btg
btg
lbr
lbr
lbr
m1
kg
kg
kg
btg
btg
btg
Ljr

22,000.00
12,000.00
13,000.00
143,000.00
22,000.00
151,200.00
257,400.00
317,900.00
453,700.00
620,400.00
831,600.00
1,028,500.00
1,331,000.00
1,925,000.00
700,000.00
726,000.00
1,331,000.00
42,350.00
13,700.00
13,700.00
13,700.00
363,000.00
211,700.00
91,000.00
502,000.00

Genteng Bubung Beton


Genteng Kanmuri Glasur
Genteng Kanmuri Bubung Glasur
Genteng KIA Glasur
Genteng KIA Bubung Glasur
Genteng Impresso Glasur
Genteng Bubung Impresso Glasur
Seng Talang BJLS 30
Seng Talang BJLS 27
Seng Talang BJLS 27
Seng Talang BJLS 30
Seng Datar BJLS 30
Seng Gelombang BJLS 40
Seng Gelombang BJLS 30
Seng Gelombang BJLS 30
Seng Gelombang BJLS 30
Seng Datar BJLS 27
Karet Talang
Karet Talang
Fiberglass "Kano Flash"
Teakwood tebal 3 mm
Teakwood tebal 3 mm
Tripleks tebal 9 mm
Tripleks tebal 3 mm
Plywood tebal 6 mm
Plywood tebal 4 mm
Plywood tebal 4 mm
Plywood tebal 2 mm
Multiplek 12 mm
Formica
Alumunium Coklat Merk YYK
Alumunium Silver Merk YYK
Kalsiboard tebal 4 mm
BAHAN BESI/LOGAM
Besi begel/baut
Besi beton polos
Besi beton ulir
Besi pipa air medium A (warna hijau)
Keni besi (elbouw)
Pipa besi galvanis medium A (tebal 2,4 mm)
Pipa besi galvanis medium A (tebal 3 mm)
Pipa besi galvanis medium A (tebal 3 mm)
Pipa besi galvanis medium A (tebal 3 mm)
Pipa besi galvanis medium A (tebal 3,3 mm)
Pipa besi galvanis medium A (tebal 3,3 mm)
Pipa besi galvanis medium A (tebal 3,6 mm)
Pipa besi galvanis medium A (tebal 4 mm)
Pipa besi galvanis medium A (tebal 4,2 mm)
Besi plat 2 mm,
Besi plat aluminium tebal 2 mm
Besi plat bordes tebal 3 mm
Besi plat strip panjang tebal 3 mm
Besi profil WF <= 200 mm
Besi profil WF <= 200 s.d. 400 mm
Besi profil WF <= 200 s.d. 500 mm
Besi siku "Krakatau Stell"
Besi siku "Krakatau Stell"
Besi siku "Krakatau Stell"
Besi canal

Lembar : 84

2
26
27
28
29
30
31
32
33
34
35
36
37

Kawat harmonika
Kawat ikat beton (bendrat)
Kawat nyamuk kasa alumunium
Kawat ayakan pasir (utk pasang)
Kawat ayakan pasir (utk plesteran)
Kawat duri pagar
Kawat nyamuk kasa plastik
Kawat tali Bwg 10
Kawat wire mesh
Tiang pagar BRC/PMG
Pintu dorong BRC/PMG
Pintu swing ganda BRC/PMG

Lembar : 85

3,2 mm.
2", t=120
120 x 300 cm
120 x 300 cm

m2
kg
m2
m2
m2
m1
m2
kg
kg
btg
unit
unit

5
35,000.00
22,000.00
39,000.00
35,400.00
31,000.00
13,100.00
15,000.00
19,800.00
15,000.00
88,500.00
1,402,500.00
1,471,900.00

38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74

Pagar BRC/PMG A
Bondex
Pipa besi putih
Pipa gas/hitam medium A (tebal 2,4 mm)
Pipa gas/hitam medium A (tebal 3 mm)
Pipa gas/hitam medium A (tebal 3 mm)
Pipa gas/hitam medium A (tebal 3 mm)
Pipa gas/hitam medium A (tebal 3,3 mm)
Pipa gas/hitam medium A (tebal 3,6 mm)
Pipa gas/hitam medium A (tebal 4 mm)
Pipa gas/hitam medium A (tebal 4,2 mm)
Pipa gas/hitam medium A (tebal 4,2 mm)
Pintu Alumunium (kualitas II)
Pintu PVC (kualitas baik)
Profil Alumunium
Slimar alumunium (lebar 50 mm)
Sunscreen Alumunium
Ramset/Dina Bolt
Pagar kawat jaring
Pagar besi ulir komplit dengan mainan
Pintu pagar besi ulir komplit dengan mainan
Rolling door aluminium
Pintu plat harmonika
Atap twin lite rangka pipa stainlis steel
Atap twin lite rangka pipa besi
Teralis besi
Teralis aluminium
Railling stainless steel
Usuk Galvalum
Reng Galvalum
Kusen Pintu Aluminium Silver "HC"
Kusen Pintu Aluminium Coklat "YKK"
Kusen Jendela Aluminium Silver "HC"
Kusen Jendela Aluminium Coklat "YKK"
Waterstop "Maspion"
Sealent
Manhole plat baja

120 x 240 cm
1,5" - 6 m.
3/4" - 6 m.
1" - 6 m.
1,25" - 6 m.
1,5" - 6 m.
2" - 6 m.
3" - 6 m.
4" - 6 m.
5" - 6 m.
6" - 6 m.
70 x 200 cm
70 x 210 cm
2"
4 / 12
5 / 10
4 / 12
5 / 10
250 mm
60x60 cm

unit
m2
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
unit
unit
m1
m1
m2
bh
lbr
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
tube
bh

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

BAHAN LANTAI
Paving stone per segi abu-abu, cetak kering
Paving stone per segi abu-abu, cetak basah
Paving stone 3 berlian abu-abu,cetak kering
Paving stone 3 berlian merah, cetak basah
Paving stone segi 6 abu-abu, cetak kering
Paving stone segi 6 merah, cetak basah
Paving stone persegi merah
Paving stone per segi abu-abu, cetak basah
Paving stone per segi abu-abu, cetak kering
Paving stone 3 berlian abu-abu
Paving stone 3 berlian merah
Paving stone segi 6 abu-abu
Paving stone segi 6 merah
Paving stone abu-abu, cetak basah K 300
Paving stone abu-abu, cetak kering K 400
Tegel PC Abu-abu
Tegel PC Abu-abu
Tegel PC Abu-abu
Ubin warna
Ubin warna
Ubin warna

t = 6 cm
t = 6 cm
t = 6 cm
t = 6 cm
t = 6 cm
t = 6cm
t = 6 cm
t = 8 cm
t = 8 cm
t = 8 cm
t = 8 cm
t = 8 cm
t = 8 cm
10 x 20 x 8
10 x 20 x 8
20 x 20
20 x 30
30 x 30
20 x 20
30 x 30
40 x 40

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

Lembar : 86

5
712,000.00
370,100.00
271,600.00
133,000.00
205,700.00
296,000.00
352,000.00
478,500.00
897,000.00
1,248,800.00
1,244,900.00
1,339,400.00
830,000.00
647,000.00
229,600.00
632,500.00
763,800.00
750,000.00
1,265,000.00
872,100.00
727,100.00
450,000.00
925,000.00
943,000.00
32,800.00
26,200.00
210,600.00
295,900.00
206,000.00
295,900.00
216,500.00
41,200.00
1,436,350.00

45,200.00
63,800.00
46,500.00
62,700.00
45,100.00
61,600.00
52,800.00
67,500.00
65,600.00
59,700.00
66,900.00
59,700.00
66,900.00
63,800.00
70,000.00
40,000.00
45,900.00
47,900.00
49,500.00
50,600.00
68,200.00

2
22
23
24
25
26
27
28
29
30
31
32
33

Tegel keramik
Tegel keramik polos
Tegel keramik, Claudia
Tegel keramik, Asia
Tegel keramik, berserat
Tegel keramik putih, Asia
Tegel keramik, kasar
Tegel keramik, Super Milan
Tegel keramik, Austria Blue
Tegel keramik, Mulia
Tegel keramik, KIA
Tegel keramik, Arwana

Lembar : 87

10 x 20
15 x 15
20 x 25
20 x 25
30 x 30
30 x 30
20 x 20
40 x 40
30 x 30
30 x 30
30 x 30
30 x 30

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

5
61,000.00
47,900.00
51,800.00
63,200.00
59,400.00
46,200.00
55,000.00
75,000.00
63,800.00
53,800.00
55,000.00
49,500.00

Tegel keramik, Asia


Tegel keramik, Classic
Tegel keramik, Essenza
Tegel keramik, Diamond
Tegel teraso
Tegel teraso
Tegel teraso
Tegel keramik, Granito
Tegel keramik, Granito
Tegel keramik Granite Black

30 x 30
30 x 30
40 x 40
20 x 20
20 x 20
30 x 30
40 x 40
30 x 30
40 x 40
40 x 40

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

48,800.00
63,000.00
235,000.00
55,000.00
50,500.00
52,500.00
56,400.00
209,000.00
280,500.00
292,600.00

44 Tegel keramik Granite Polish


45 Tegel galar

40 x 40

m2
m2

282,700.00

46 Tegel keramik, bermotif/warna

40 x 50

11,000.00

47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62

10 x 30
20 x 20
5 x 20
10 x 20
15 x 15
20 x 20
30 x 30
40 x 60
10 x 20
60 x 60
60 x 60
10x 40
7 x 30
60 x 60
60 x 60

30 x 30

m2
m1
m2
bh
bh
m2
m2
m2
m2
bh
m2
m2
bh
bh
m2
bh
m2

25,000.00
41,300.00
12,400.00
21,600.00
51,800.00
59,000.00
82,000.00
314,300.00
11,000.00
372,500.00
312,500.00
20,000.00
15,000.00
166,600.00
438,600.00
87,900.00

kg
kg
kg
ltr
ltr
ltr
ltr
ltr
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
ltr
ltr
ltr
ltr
ltr
kg
kg
kg
kg
lbr

72,000.00
72,000.00
22,300.00
28,800.00
22,300.00
15,700.00
15,900.00
198,000.00
33,000.00
33,000.00
24,200.00
27,000.00
13,200.00
17,600.00
18,700.00
24,000.00
50,500.00
114,900.00
66,000.00
36,700.00
72,600.00
66,200.00
45,200.00
38,500.00
33,000.00
24,200.00
11,000.00
5,000.00

34
35
36
37
38
39
40
41
42
43

VI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

20 x 20

Tegel plint keramik warna


Tegel wafel (abu-abu)
Ubin keramik artistik
Ubin keramik artistik
Ubin keramik artistik
Ubin keramik artistik
Lantai vinyl karet, kw.1
Marmer ex. Tulungagung
List Keramik/Border
Keramik Granitile Polish
Keramik Granitile Unpolish
Stepnoiseng
Stepnoiseng
Granito ex Cina
Mozaic/Granito Merk Lotus
Keramik/Tipe Alur Merk Mas/Roman
BAHAN PENGECATAN
Cat besi Emco tanda Bintang
Cat kayu Emco tanda Bintang
Meni besi/kayu, cap Pedang
Thinner A spesial "Altech"
Thinner A biasa "Power"
Thinner B spesial
Minyak cat/afduner
Cat tembok eksterior Mowilex
Cat tembok Alcabond
Cat tembok Alcaplast
Cat tembok Wallsealer
Cat tembok Vinylex
Cat tembok Decolith
Cat tembok Metrolith
Cat tembok Cathylac
Cat tembok Cendana
Cat genteng Matex
Serlak kripik "India"
Politur jadi merk "Impra"
Wood Filler "Impra"
Wood Stain 'Impra"
Sanding Sealer "Impra"
Vernis (Glotex)
Dempul Plitur (Impra)
Dempul Plitur kualitas sedang
Plitur batangan
Teer
Kertas gosok

Lembar : 88

48,400.00

2
29
30
31
32
33
34
35
36
37
38
39
40

Waterproof, Aquaproof Pro Seller


Waterproof, Multiroof
Waterproof, Nippon Paint Shield
Plamur tembok
Plamur kayu
Plamur besi
Spiritus
Lem Rajawali untuk Kayu
Lem Rajawali untuk Tembok
Lem kayu khusus (Vinyl)
Soda Api
Teak Oil

Lembar : 89

kg
kg
kg
kg
kg
kg
ltr
kg
kg
kg
kg
ltr

5
59,500.00
57,000.00
58,300.00
9,900.00
21,600.00
36,700.00
16,500.00
32,000.00
18,100.00
36,000.00
21,600.00
30,800.00

2
41
42
43
44
45
46
47

VII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33

Residu
Kuas Eterna
Kuas Eterna
Kuas Eterna
Kalsium
Coating
Wallpaper "Kansai"
BAHAN PENGGANTUNG DAN PENGUNCI
Engsel H
Engsel Kuningan
Engsel jendela (kupu - kupu)
Engsel pintu "UNION"
Engsel jendela "UNION"
Espanyolet kualitas I
Grendel
Grendel biasa (besar)
Grendel biasa (kecil)
Grendel kuningan/krom kecil
Grendel tanam kuningan besar
Kunci gembok besar, Globe
Kunci gembok sedang, Globe
Kunci tanam (808)
Kunci tanam (2x putar) besar
Kunci tanam "SES" besar (tanpa handel)
Kunci tanam (dengan handel)
Kunci tanam KM/WC
Kunci silinder "SES"
Kunci slot merk "SES" (dengan handel)
Kunci slot 2 putaran "YALE" (dengan handel)
Kunci slot 2 putaran "CAVEL" (dengan handel)
Kunci lemari, Wing
Hak angin biasa
Hak angin 4 mm (lurus)
Hak angin (sikutan) "SES"
Hak angin lurus (bisa disetel maju/mundur) "SES"
Pegangan pintu (model standar)
Spring knip
Door closer
Door stopper
Rel pintu dorong, biasa
Rel pintu dorong, J4 SES

BAHAN SANITASI
Slang spiral saluran kran wastafel
Kloset duduk porselin komplit (INA)
Kloset duduk porselin komplit (KIA)
Kloset duduk porselin komplit (TOTO)
Kloset jongkok porselin (INA)
Kloset jongkok porselin (TOTO)
Kloset jongkok teraso
Kran air stainless steel
Kran air stainless steel
Kran air (DUPONT)
Kran air kuningan
Kran shower "Toto"
Septic Tank (10 pemakai) dan Sumur
Peresapan (dalam 3,00 m)
14 Watermur besi
15 Wastafel warna muda "ITO"

3"
4"
5"
-

ltr
bh
bh
bh
kg
kg
m2

11,000.00
16,500.00
20,900.00
1,300.00
55,700.00
141,700.00

4"
4"
3"
4"
3"
8"
3"
4"
60 cm
40 mm
30 mm
8"
p = 20 cm
-

set
set
set
bh
bh
set
bh
bh
bh
bh
set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
set
set
set
set
bh
bh
bh
bh
btg
btg

48,500.00
19,000.00
15,000.00
20,300.00
17,000.00
50,500.00
33,400.00
14,400.00
5,900.00
23,100.00
152,000.00
37,400.00
24,200.00
10,500.00
84,700.00
171,900.00
150,000.00
85,800.00
171,900.00
452,800.00
139,700.00
335,000.00
13,100.00
8,500.00
18,300.00
34,000.00
77,500.00
103,000.00
22,900.00
233,200.00
66,900.00
147,600.00
244,100.00

1/2"
3/4"
1/2"
1/2"
3/4"
-

set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
set
bh

53,100.00
1,225,800.00
1,447,600.00
1,900,500.00
161,400.00
230,300.00
75,000.00
48,400.00
53,800.00
188,600.00
39,300.00
507,900.00
5,250,000.00

3/4"
-

bh
bh

12,400.00
321,500.00

VIII

1
2
3
4
5
6
7
8
9
10
11
12
13

Lembar : 90

2
16
17
18
19
20
21
22
23
24
25
26
27

Wastafel warna tua "ITO"


Rol TBA (seal tape) Jumbo
Siphon Washer, kelas sedang plastik
Water drain dan assesories
Bak mandi fiberglass
Bak cuci piring stainless steel, besar (double)
Bak cuci teraso
Tempat sabun keramik "Sotento"
Urinoir "INA" (komplit)
Floor drain stainless steel "Onde"
Kurasan (putih) stainless steel
Bak mandi porselin

Lembar : 91

0,5 m3
60 x 60 cm

bh
rol
set
set
bh
bh
bh
bh
set
bh
bh
bh

5
350,000.00
12,100.00
46,200.00
48,500.00
374,700.00
550,000.00
154,200.00
39,300.00
1,089,000.00
70,400.00
45,600.00
428,000.00

2
28
29
30
31
32
33

IX
1
2
3
4
5
6
7
8
X
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
XI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

550 ltr
-

bh
bh
set
set
bh
bh

934,000.00
305,800.00
201,300.00
351,700.00
367,000.00
437,500.00

t = 5 mm
t = 8 mm
t = 5 mm
t = 5 mm
t = 5 mm
t = 3 mm
t = 3 mm
t = 5 mm

m2
m2
m2
m2
daun
m2
m2
m2

55,700.00
66,500.00
88,500.00
121,000.00
40,000.00
90,700.00
162,200.00
-

10 x 20 cm
15 cm
20 cm
30 cm
40 cm
50 cm
60 cm
80 cm
100 cm
15 cm
20 cm
30 cm
20x30x50 cm
100x100x120 cm
150x150x120 cm

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m1
m1

1/2" - 400
5/8" - 400
3/4" - 400
1" - 400
2" - 400
3" - 400
4" - 400
5" - 400
2" - 400
3" - 400
4" - 400
5" - 400
1/2"
3/4"
2"
3"
4"
5"
400 cm
400 cm
-

btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
tube
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

Tandon air fiberglass "Penyu"


Pompa tangan "Dragon"
Hand shower plastik (termasuk slang)
Wall shower "Toto"
Pompa air "Shimizu 125 W"
Pompa air "Sanyo 125 W"
BAHAN JENIS KACA
Kaca polos
Kaca polos
Kaca rayban
Kaca es/buram
Krapyak kaca nako 15 x 70 cm (includ kerangka)
Kaca buram
Kaca cermin
Profil kaca
BAHAN BETON CETAKAN
Beton roster klingker warna merah
Buis beton (p = 100 cm)
Buis beton (p = 100 cm)
Buis beton (p = 100 cm)
Buis beton (p = 100 cm)
Buis beton (p = 50 cm)
Buis beton (p = 50 cm)
Buis beton (p = 50 cm)
Buis beton (p = 50 cm)
Buis Beton U (p = 100 cm)
Buis Beton U (p = 100 cm)
Buis Beton U (p = 100 cm)
Got talang R 15 (segmen)
Got talang R 25 (segmen)
Kerb
Box cuilvert (K-350)
Box cuilvert (K-350)
BAHAN PIPA PVC
Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW "Maspion"
Pipa PVC "Maspion" tipe D
Pipa PVC "Maspion" tipe D
Pipa PVC "Maspion" tipe D
Pipa PVC "Maspion" tipe D
Lem PVC "Wavin"
Keni PVC tipe AW
Keni PVC tipe AW
Keni PVC tipe AW
Keni PVC tipe AW
Keni PVC tipe AW
Keni PVC tipe AW
Klem PVC
Talang PVC U "Maspion"
Talang PVC U
Clam Talang PVC U

Lembar : 92

9,100.00
44,500.00
55,000.00
74,800.00
83,600.00
89,900.00
76,100.00
106,900.00
124,000.00
40,000.00
45,200.00
56,400.00
32,100.00
55,100.00
64,400.00
4,611,000.00
5,758,000.00

31,000.00
36,000.00
40,000.00
49,200.00
105,600.00
181,500.00
303,000.00
474,000.00
74,100.00
148,300.00
209,300.00
265,100.00
9,100.00
1,500.00
2,200.00
10,500.00
25,500.00
42,000.00
57,000.00
4,900.00
146,300.00
82,000.00
6,600.00

2
24
25
26
27
28
29
30
31
32
33
34
35

Shock Talang PVC U


Tutup Talang PVC U
Corong Talang PVC U
Pipa Wavin Warna Oranye
Pipa Wavin Warna Oranye
Pipa PVC "Langgeng" tipe S 12.5/MOF
Pipa PVC "Langgeng" tipe S 12.5/MOF
Pipa PVC "Langgeng" tipe S 12.5/MOF
Pipa PVC "Langgeng" tipe S 12.5/MOF
Pipa PVC "Langgeng" tipe S 12.5/MOF
Pipa PVC "Langgeng" tipe S 12.5/MOF
Pipa PVC "Langgeng" tipe S 12.5/MOF

Lembar : 93

4" - 600
6" - 600
1"
1.5"
2"
2.5"
3"
4"
6"

bh
bh
bh
btg
btg
m1
m1
m1
m1
m1
m1
m1

5
9,100.00
9,100.00
26,900.00
312,500.00
602,000.00
4,900.00
11,400.00
16,650.00
23,800.00
34,300.00
50,450.00
108,000.00

XII
1
2
3
4
5
6
7
8
9
10
11
XIII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
XIV

1"
1,5" - 2"
2,5" - 3"
4"
1"
5 cm
-

bh
kg
kg
kg
kg
kg
dos
dos
kg
bh
kg

3,200.00
19,800.00
19,800.00
19,800.00
18,300.00
29,500.00
17,000.00
22,900.00
26,900.00
1,100.00
30,200.00

250 watt
-

set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
dus
bh
bh
bh
bh
bh

21,000.00
1,600.00
2,000.00
25,300.00
30,800.00
33,000.00
38,500.00
286,000.00
111,000.00
600.00
114,000.00
63,000.00
87,000.00
77,000.00
35,000.00
8,000.00
114,000.00
45,900.00
34,100.00
92,400.00

bh

165,000.00

3 x 70 x 50 mm2
3 x 70 x 50 mm2

m1
m1
m1
m1
bh
bh
bh
unit
unit
titik
unit

7,800.00
6,100.00
7,100.00
7,100.00
57,000,000.00
76,000,000.00
579,000.00
519,129,500.00
944,185,000.00
183,000.00
2,541,000.00

150 w / 942
250 w
400 w
1000 w
2000 w
2000 w
1000 w

bh
bh
bh
bh
bh
bh
bh

2,537,100.00
2,364,200.00
2,587,900.00
22,137,500.00
23,402,500.00
26,404,000.00
13,305,500.00

ltr
ltr

4,500.00
4,500.00

BAHAN JENIS PAKU


Paku asbes gelombang (paku pancing)
Paku kayu
Paku kayu
Paku kayu
Paku kayu
Paku payung (paku seng gelombang)
Paku sekrup
Paku sumbat
Paku triplek/eternit
Paku beton
Paku kalsiboard
BAHAN PERALATAN LISTRIK
Fiting plafon
T doos PVC
Isolator kecil
Stop kontak (Broco)
Skakelar tunggal (Broco)
Skakelar ganda (Broco)
Stop kontak dan skakelar (Broco)
Skakelar / hendel pemindah arus
Zekring lengkap dengan box
Las doof
Panel box
Meinswitch
Zekring MCB thermis 10 - 16 Amp.
Zekring MCB thermis 10 Amp.
Stater lampu TL
Lampu pijar 25,40,75 / 220 V "Philips"
Bola lampu Armateur "Philips"
Lampu hemat energi 18 W / 220 V (Philips)
Lampu hemat energi 18 W / 220 V (Osram)
Lampu TL 20 W / 220 V, komplit balast
(Philips)
Lampu TL 40 W / 220 V, komplit balast
(Philips)
Kabel NYM. 2 x 2,5
Kabel NYY. 1 x 2,5
Kabel twisted Indonesia
Kabel twisted multi kabel
UPS 3,5 Kw
UPS 6,0 Kw
Exhaustfan 8''
Genzet 250 Kva Sillent
Genzet 500 Kva Sillent
Instalasi listrik
Penangkal Petir Lengkap (2 Spit), tinggi 10 m
(Tidak termasuk izin dari Depnaker)
Lampu Sorot AMAC CDMTD Ex. Artolite
Lampu Sorot AMAR E 40 + HPIT Ex Artolite
Lampu Sorot AMAR E 40 + HPIT Ex Artolite
Lampu Sorot MAXIFLOOD R.SITECO HT DE
Lampu Sorot MAXIFLOOD R.SITECO HT DE
Floodlighting EF 2000 Plus MH - IP 65
Floodlighting Epack MH - IP 65

BAHAN BBM DAN ALAT BERAT


1 Bensin
2 Solar

Lembar : 94

2
3
4
5
6
7
8
9
10
11
12
13
14

Minyak tanah non subsidi


Oli mesin Mesran
Minyak pelumas
Grease (gemuk pelumas)
Aspal panas curah
Aspal panas drum
Biaya operasional wheel loader 115 H
Biaya operasional AMP 30T/h
Biaya operasional dump truck 5 T/145 Hp
Biaya operasional dump truck 3,5 T/115 Hp
Biaya operasional asphalt finisher (penghampar)
Biaya operasional pneumetic roller 8-15 T

E.052
E.155
E.212
E.221
E.084

Lembar : 95

ltr
ltr
ltr
kg
kg
kg
jam
jam
jam
jam
jam
jam

5
9,800.00
30,250.00
39,950.00
29,925.00
10,300.00
12,300.00
348,800.00
3,525,000.00
307,500.00
151,200.00
300,000.00
347,000.00

15 Biaya operasional asphalt sprayer towed 1000 L


E.153
jam
16 Biaya operasional tandem roller 6-10 T
E.081
jam
17 Biaya operasional roller 3 wheeled 6-8 T/ 8-10 T
E.080
jam
18 Biaya operasional genset
jam
19 Biaya operasional alat bantu
jam
20 Biaya operasional bulldozer
jam
21 Biaya operasional stone crusher
jam
22 Biaya operasional compressor air 210 m3
E.301
hari
23 Biaya operasional mesin gilas (wales)
hari
24 Biaya operasional mesin gilas (wales)
E.080
hari
25 Biaya operasional motor grader
hari
26 Biaya operasional vibro roller
hari
27 Biaya operasional water tanker
hari
28 Biaya operasional coldmilling
hari
29 Teakcoat
hari
30 Biaya operasional excavator
hari
Sumber data : Hasil Survei Dinas Pekerjaan Umum Daerah Kota Blitar, Asosiasi Profesi Kota Blitar
Badan Pusat Statistik (BPS) Kota Blitar tidak ada data
Catatan :
1. Harga diatas berlaku di Kota Blitar
2. Harga diatas sudah termasuk pajak serta biaya umum dan keuntungan yang wajar
3. Harga galvalum sesuai desain dan perhitungan konstruksi merupakan hak paten produk

Mengetahui,
KEPALA DINAS PEKERJAAN UMUM
DAERAH KOTA BLITAR

Dibuat oleh,
TIM PENYUSUN HSBU
DINAS PEKERJAAN UMUM
DAERAH KOTA BLITAR
Koordinator,

HASNIL PURWANTO, SH., M.AP


Pembina Utama Muda
NIP. 19561106 198509 1 001

HERU CATUR W, ST., M.Si


Pembina
NIP. 19660427 199803 1 002

Lembar : 96

5
54,000.00
224,300.00
347,000.00
240,600.00
500.00
394,000.00
499,600.00
132,200.00
150,000.00
250,000.00
37,500.00
325,000.00
100,000.00
288,525.00
15,000.00
300,000.00

DAFTAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA


PEMERINTAH KOTA BLITAR TAHUN ANGGARAN 2013
Semester I Tahun 2013
B. DAFTAR UPAH KERJA HARIAN

NO.

JENIS BAHAN

UKURAN

SAT.

8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

MANDOR
KEPALA TK. BATU
KEPALA TK. KAYU
KEPALA TK. BESI
KEPALA TK. CAT
KEPALA TK. LISTRIK
KEPALA TK. PIPA
TUKANG BATU
TUKANG KAYU
TUKANG BESI
TUKANG CAT
TUKANG PLITUR
TUKANG ASPAL
TUKANG PIPA
TUKANG LISTRIK
TUKANG GALI TANAH
PENJAGA MALAM/ PENJAGA
MASINIS
PEMBANTU MASINIS
MEKANIK
PEMBANTU MEKANIK
OPERATOR (TERAMPIL)
PENGEMUDI/SOPIR
PENJAGA API/PENJAGA
PEMBANTU TUKANG / PEKERJA/BURUH TERAMPIL
PEKERJA TIDAK TERLATIH/BURUH TAK TERAMPIL
PEMBANTU SOPIR
PEKERJA PENGISI BATU
TUKANG GALI
OPERATOR SEMI TERAMPIL/PEMBANTU OPERATOR

HARGA STANDAR
TERTINGGI
(Rp)
5

Sumber data : Hasil Survei Dinas Pekerjaan Umum Daerah Kota Blitar dan Asosiasi Profesi Kota Blitar
Catatan :
1. Upah kerja diatas berlaku di Kota Blitar
2. Upah kerja diatas sudah termasuk pajak
Blitar,

Oktober 2011

Mengetahui,
KEPALA DINAS PEKERJAAN UMUM
DAERAH KOTA BLITAR

Dibuat oleh,
TIM PENYUSUN HSBU
DINAS PEKERJAAN UMUM
DAERAH KOTA BLITAR
Koordinator,

HASNIL PURWANTO, SH., M.AP


Pembina Utama Muda
NIP. 19561106 198509 1 001

HERU CATUR W, ST., M.Si


Pembina
NIP. 19660427 199803 1 002

Lembar : 10

60,000.00
55,000.00
55,000.00
55,000.00
55,000.00
55,000.00
55,000.00
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
45,000.00
45,000.00
40,000.00
50,000.00
45,000.00
50,000.00
50,000.00
45,000.00
40,000.00
35,000.00
35,000.00
40,000.00
40,000.00
40,000.00

DAFTAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA


PEMERINTAH KOTA BLITAR TAHUN ANGGARAN 2014
( Triwulan I Tahun 2015 )
A. DAFTAR HARGA SATUAN BAHAN BANGUNAN

NO.

JENIS BAHAN

UKURAN

SATUAN

10/ 15, 15/20


5/7
4/6
3/5
2/3
1/2
1/1
0,5/1
2/3
(40x20x10) cm
10 x 20
20 x 20
10 x 30
20 x 20
30 x 30
10 x 20
22cm, t=3 m
28cm, t=3 m
p = 40 cm
50 kg
40 kg
50 kg
40 kg
50 kg
40 kg
40 kg
20 x 20

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
kg
m3
m3
m3
m3
m3
kg
m3
m3
m3
m3
m2
bh
bh
bh
m2
m2
bh
bh
bh
bh
m2
bh
bh
bh
m3
ton
m3
zak
zak
zak
zak
zak
zak
zak
kg
kg
bh

I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49

BAHAN PASANGAN DAN


CAMPURAN BETON
Batu kali belah
Batu kali pecah
Batu kali pecah
Batu kali pecah
Batu kali pecah
Batu kali pecah Crusher
Batu kali pecah Crusher. M 025
Batu kali pecah Crusher. K 017/ M026
Batu krikil (ayakan)
Krikil sungai
Krikil ayak tanpa pasir
Krikil batu alor (ampyang)
Pasir beton/cor
Pasir pasang
Pasir urug
Agregat Kasar
Agregat Halus
Filler
Sirtu
Tanah urug biasa
Tanah urug pilihan (campur pupuk utk taman)
Tanah katelan jalan
Gebalan rumput (utk talud)
Batako
Batu merah klas I
Batu merah klas II
Batu lempeng (tidak beraturan)
Batu hias (sand stone)
Roster beton
Roster beton
Roster batu alam
Roster batu alam
Batu tempel hijau
Tiang teras batu alam
Tiang teras batu alam
List batu hias
Kapur padam
Gamping
Semen merah
Semen Gresik (PC Gresik)
Semen Gresik (PC Gresik)
Semen Tiga Roda
Semen Tiga Roda
Semen Holcim
Semen merah putih
Semen putih
PC super nut
Ijuk
Glass block bening

Lembar : 10

HARGA STANDAR
TERTINGGI
(Rp)
5

180,300.00
192,600.00
202,100.00
229,300.00
255,500.00
280,100.00
288,200.00
294,100.00
200,200.00
132,600.00
135,800.00
10,700.00
127,300.00
123,000.00
108,600.00
145,400.00
267,700.00
2,000.00
114,900.00
82,300.00
103,700.00
104,800.00
28,600.00
3,400.00
800.00
800.00
101,900.00
130,900.00
13,500.00
15,400.00
90,400.00
114,700.00
119,000.00
1,070,000.00
1,535,100.00
14,900.00
433,300.00
1,070,000.00
380,000.00
115,900.00
83,900.00
93,300.00
79,700.00
86,000.00
76,500.00
120,800.00
18,400.00
33,400.00
26,600.00

20 x 20

bh

27,600.00

6/12, 6/15, 8/12

m3

42,679,700.00

4/6, 5/7

m3

39,834,500.00

2/20, 3/20, 3/25

m3

40,544,800.00

2/3, 3/5

m3

39,834,500.00

50 Glass block buram


II
1
2
3
4

BAHAN KUZEN KAYU DAN


KERANGKA ATAP
Kayu jati balok kualitas II,
Ex. Bojonegoro (mutu kayu klas I)
Kayu jati usuk kualitas II,
Ex. Bojonegoro (mutu kayu klas I)
Kayu jati papan kualitas II,
Ex. Bojonegoro (mutu kayu klas I)
Kayu jati reng kualitas II,
Ex. Bojonegoro (mutu kayu klas I)

Lembar : 11

2
5 Kayu jati balok kualitas I, lokal
(mutu kayu klas I)
6 Kayu jati usuk kualitas I, lokal
(mutu kayu klas I)
7 Kayu jati papan kualitas I, lokal
(mutu kayu klas I)
8 Kayu jati reng kualitas I, lokal
(mutu kayu klas I)
9 Kayu kamper, balok (mutu kayu klas II)
10 Kayu kamper, papan (mutu kayu klas II)
11 Kayu kamper, usuk (mutu kayu klas II)
12 Kayu kamper, reng (mutu kayu klas II)
13 Kayu meranti, balok (mutu kayu klas III)
14 Kayu meranti, papan (mutu kayu klas III)
15 Kayu meranti, usuk (mutu kayu klas III)
16 Kayu meranti, reng (mutu kayu klas III)
17 Kayu bekisting, papan (mutu kayu klas IV)
18 Kayu bekisting, usuk (mutu kayu klas IV)
19 Kayu tahun, papan (mutu kayu klas IV)
20 Kayu tahun, usuk (mutu kayu klas IV)
21 Kayu gelam (mutu kayu klas IV)
22 Kayu kruing, balok (mutu kayu klas III)
23 Kayu kruing, papan (mutu kayu klas III)
24 Kayu kruing, usuk (mutu kayu klas III)
25 Kayu kruing, reng (mutu kayu klas III)
26 Kayu balau, balok (mutu kayu klas II)
27 Kayu balau, papan (mutu kayu klas II)
28 Kayu balau, usuk (mutu kayu klas II)
29 Kayu balau, reng (mutu kayu klas II)
30 Kayu Albasiah (mutu kayu klas IV)
31 Kayu jawa / lokal balok (mutu kayu klas II)
32 Kayu jawa / lokal, papan
33 Kayu jawa / lokal, usuk
34 Kayu jawa / lokal, reng
35 List kayu tahun
36 List kayu profil
37 List kayu profil
38 Bambu Jawa bongkotan
39 Bambu ori
40 Bambu apus
41 Gedek guling
42 Daun pintu kayu Balau, kw 1
43 Daun pintu kayu Jati, kw 1
44 Daun pintu kayu jawa
45 Kusen pintu kayu jawa
46 Kusen jendela kayu jawa

III
1
2
3
4
5
6
7
8
9
10
11
12
13

BAHAN PENUTUP ATAP DAN PLAFON


Asbes gelombang besar tebal 5 mm
Asbes gelombang kecil tebal 4 mm
Asbes gelombang kecil tebal 4 mm
Asbes gelombang kecil tebal 4 mm
Asbes bubung gelombang besar tebal 5 mm
Asbes bubung gelombang kecil tebal 4 mm
Harflek 4 mm
Harflek 4 mm
Harflek 4 mm
Woodplek tebal 9 mm
Woodplek tebal 9mm
Eternit (lokal)
Eternit (kerang)

6/12, 6/15, 8/12

m3

29,163,300.00

4/6, 5/7

m3

24,895,800.00

2/20, 3/20, 3/25

m3

32,720,000.00

2/3, 3/5

m3

21,339,100.00

6/12, 6/15, 8/12


2/20, 3/20, 3/25
3/5, 4/6, 5/7
2/3
6/12, 6/15, 8/12
2/20, 3/20, 3/25
3/5,4/6,5/7
2/3
3/20-200
4/6-200
2/20, 3/20, 3/25
3/5, 4/6, 5/7
10-12 x 300 cm
6/12, 6/15, 8/12
2/20, 3/20, 3/25
4/6, 5/7
2/3
6/12, 6/15, 8/12
2/20, 3/20, 3/25
3/5, 4/6, 5/7
2/3
6/12, 6/15, 8/12
2/20, 3/20, 3/25
3/5, 4/6, 5/7
3-Feb
1/4
4/4
5/5
10-12 x 300cm
10-12 x 600cm
6-10 x 600cm
3,5 x 90 x 210 cm
3,5 x 90 x 210 cm
3,5 x 90 x 210 cm
90 x 210 cm
60 x 120 cm

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
btg
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m1
m1
m1
btg
btg
btg
m2
lbr
lbr
lbr
bh
bh

13,045,800.00
14,091,000.00
12,420,200.00
12,733,000.00
7,179,000.00
7,773,000.00
7,011,800.00
6,805,400.00
2,359,900.00
2,002,200.00
2,997,900.00
3,007,500.00
583,900.00
8,682,400.00
9,604,600.00
8,268,300.00
8,588,300.00
13,490,800.00
15,114,100.00
12,677,500.00
12,503,300.00
2,302,200.00
4,920,800.00
6,114,900.00
4,423,500.00
4,095,000.00
6,700.00
10,500.00
12,100.00
19,700.00
25,800.00
18,000.00
26,400.00
2,055,000.00
3,473,300.00
367,800.00
204,300.00
136,400.00

1,05 X 3,00
1,05 X 3,00
1,05 X 1,50
1,05 X 1,80
40 x 200 cm
50 x 200 cm
60 x 200 cm
30x400
20x300
-

lbr
lbr
lbr
lbr
m1
m1
lbr
lbr
lbr
lbr
lbr
lbr
lbr

170,000.00
118,600.00
60,700.00
72,800.00
77,800.00
45,000.00
23,100.00
27,600.00
31,400.00
136,000.00
89,200.00
14,700.00
19,900.00

Lembar : 12

2
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Eternit (Gresik)
Gypsum tebal 9 mm
Gypsum tebal 12 mm
List Gypsum
List Gypsum
Genteng flam press Jawa/lokal
Genteng kaca (model karang pilang)
Genteng karang pilang/wisma
Genteng bubung karang pilang/wisma
Genteng bubung Jawa/lokal
Genteng Bambe
Genteng bubungan Bambe
Genteng prentul ex.Trenggalek
Genteng bubungan prentul ex. Trenggalek
Genteng Mantili ex Trenggalek
Genteng Bubung Mantili ex. Trenggalek
Genteng Biasa
Genteng Beton

122 x 244
122 x 244
15 x 200 cm
10 x 200 cm
-

lbr
lbr
lbr
btg
btg
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

Lembar : 13

5
22,700.00
102,600.00
126,800.00
41,400.00
33,200.00
2,300.00
15,300.00
9,000.00
14,700.00
9,900.00
6,800.00
10,000.00
2,400.00
8,800.00
4,500.00
13,800.00
2,100.00
6,700.00

2
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64

IV
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Genteng Bubung Beton


Genteng Kanmuri Glasur
Genteng Kanmuri Bubung Glasur
Genteng KIA Glasur
Genteng KIA Bubung Glasur
Genteng Impresso Glasur
Genteng Bubung Impresso Glasur
Seng Talang BJLS 30
Seng Talang BJLS 27
Seng Talang BJLS 27
Seng Talang BJLS 30
Seng Datar BJLS 30
Seng Gelombang BJLS 40
Seng Gelombang BJLS 30
Seng Gelombang BJLS 30
Seng Gelombang BJLS 30
Seng Datar BJLS 27
Karet Talang
Karet Talang
Fiberglass "Kano Flash"
Teakwood tebal 4 mm
Teakwood tebal 3 mm
Tripleks tebal 9 mm
Tripleks tebal 3 mm
Plywood tebal 6 mm
Plywood tebal 3 mm
Plywood tebal 4 mm
Plywood tebal 2 mm
Multiplek 12 mm
Formica
Alumunium Coklat Merk YYK
Alumunium Silver Merk YYK
Kalsiboard tebal 4 mm
BAHAN BESI/LOGAM
Besi begel/baut
Besi beton polos
Besi beton ulir
Besi pipa air medium A (warna hijau)
Keni besi (elbouw)
Pipa besi galvanis medium A (tebal 2,4 mm)
Pipa besi galvanis medium A (tebal 3 mm)
Pipa besi galvanis medium A (tebal 3 mm)
Pipa besi galvanis medium A (tebal 3 mm)
Pipa besi galvanis medium A (tebal 3,3 mm)
Pipa besi galvanis medium A (tebal 3,3 mm)
Pipa besi galvanis medium A (tebal 3,6 mm)
Pipa besi galvanis medium A (tebal 4 mm)
Pipa besi galvanis medium A (tebal 4,2 mm)
Besi plat 2 mm,
Besi plat aluminium tebal 2 mm
Besi plat bordes tebal 3 mm
Besi plat strip panjang tebal 3 mm
Besi profil WF <= 200 mm
Besi profil WF <= 200 s.d. 400 mm
Besi profil WF <= 200 s.d. 500 mm
Besi siku "Krakatau Stell"
Besi siku "Krakatau Stell"
Besi siku "Krakatau Stell"
Besi canal
Kawat harmonika

l = 90 cm
l = 90 cm
l = 60 cm
l = 45 cm
80 x 180 cm
80 x 180 cm
80 x 180 cm
80 x 300 cm
80 x 150 cm
80 x 180 cm
l = 60 cm
l = 90 cm
l = 92 cm.
90 x 210 cm
90 x 210 cm
90 x 210 cm
90 x 210 cm
90 x 210 cm
90 x 210 cm
90 x 210 cm
90 x 210 cm
90 x 210 cm
90 x 210 cm
( 4' x 8' )

bh
bh
bh
bh
bh
bh
bh
m1
m1
m1
m1
lbr
lbr
lbr
lbr
lbr
lbr
m1
m1
m1
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m1
m1
lbr

8,500.00
13,400.00
27,600.00
12,700.00
27,600.00
11,600.00
26,500.00
60,300.00
52,700.00
41,300.00
39,100.00
102,100.00
125,100.00
98,700.00
155,300.00
105,100.00
88,800.00
17,600.00
21,900.00
107,800.00
147,400.00
113,500.00
189,900.00
78,200.00
128,200.00
107,300.00
117,600.00
93,000.00
241,000.00
264,100.00
239,500.00
266,400.00
77,300.00

1" - 6 m.
1,5" - 6 m.
1/2" - 6 m.
1" - 6 m.
1,25" - 6 m.
1,5" - 6 m.
2" - 6 m.
2,5" - 6 m.
3" - 6 m.
4" - 6 m.
5" - 6 m.
4' x 8'
4' x 8'
4' x 8'
(30x6000)mm
L.60.60.6
L.50.50.6
L.30.30.3
C 125,50,3
-

kg
kg
kg
btg
bh
btg
btg
btg
btg
btg
btg
btg
btg
btg
lbr
lbr
lbr
m1
kg
kg
kg
btg
btg
btg
Ljr
m2

25,600.00
14,100.00
16,000.00
190,000.00
29,300.00
184,100.00
315,300.00
391,600.00
544,900.00
708,400.00
990,100.00
1,222,400.00
1,588,300.00
2,321,800.00
825,300.00
996,200.00
1,426,700.00
48,900.00
16,400.00
16,600.00
16,600.00
433,300.00
274,300.00
110,600.00
511,800.00
41,600.00

Lembar : 14

2
27
28
29
30
31
32
33
34
35
36
37

Kawat ikat beton (bendrat)


Kawat nyamuk kasa alumunium
Kawat ayakan pasir (utk pasang)
Kawat ayakan pasir (utk plesteran)
Kawat duri pagar
Kawat nyamuk kasa plastik
Kawat tali Bwg 10
Kawat wire mesh
Tiang pagar BRC/PMG
Pintu dorong BRC/PMG
Pintu swing ganda BRC/PMG

3,2 mm.
2", t=120
120 x 300 cm
120 x 300 cm

kg
m2
m2
m2
m1
m2
kg
kg
btg
unit
unit

Lembar : 15

5
25,000.00
43,700.00
36,000.00
36,300.00
39,900.00
22,000.00
22,900.00
20,000.00
108,300.00
2,026,700.00
1,831,300.00

2
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73

Pagar BRC/PMG A
Bondex
Pipa besi putih
Pipa gas/hitam medium A (tebal 2,4 mm)
Pipa gas/hitam medium A (tebal 3 mm)
Pipa gas/hitam medium A (tebal 3 mm)
Pipa gas/hitam medium A (tebal 3 mm)
Pipa gas/hitam medium A (tebal 3,3 mm)
Pipa gas/hitam medium A (tebal 3,6 mm)
Pipa gas/hitam medium A (tebal 4 mm)
Pipa gas/hitam medium A (tebal 4,2 mm)
Pipa gas/hitam medium A (tebal 4,2 mm)
Pintu Alumunium (kualitas II)
Pintu PVC (kualitas baik)
Pagar kawat jaring
Pagar besi ulir komplit dengan mainan
Pintu pagar besi ulir komplit dengan mainan
Pintu besi hollow
Pintu pagar besi hollow
Pintu Rolling door
Pintu plat harmonika
Atap twin lite rangka pipa stainlis steel
Atap twin lite rangka pipa besi
Teralis besi
Teralis aluminium
Railling stainless steel
Usuk Galvalum
Reng Galvalum
Kusen Pintu Aluminium Silver "HC"
Kusen Pintu Aluminium Coklat "YKK"
Kusen Jendela Aluminium Silver "HC"
Kusen Jendela Aluminium Coklat "YKK"
Waterstop "Maspion"
Sealent
Manhole plat baja
Besi Canal

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

BAHAN LANTAI
Paving stone per segi abu-abu, cetak kering
Paving stone per segi abu-abu, cetak basah
Paving stone 3 berlian abu-abu,cetak kering
Paving stone 3 berlian merah, cetak basah
Paving stone segi 6 abu-abu, cetak kering
Paving stone segi 6 merah, cetak basah
Paving stone persegi merah
Paving stone per segi abu-abu, cetak basah
Paving stone per segi abu-abu, cetak kering
Paving stone 3 berlian abu-abu
Paving stone 3 berlian merah
Paving stone segi 6 abu-abu
Paving stone segi 6 merah
Paving stone abu-abu, cetak basah K 300
Paving stone abu-abu, cetak kering K 400
Tegel PC Abu-abu
Tegel PC Abu-abu
Tegel PC Abu-abu
Ubin warna
Ubin warna
Ubin warna
Tegel keramik
Tegel keramik polos

120 x 240 cm
0.75 x 1.00
1,5" - 6 m.
3/4" - 6 m.
1" - 6 m.
1,25" - 6 m.
1,5" - 6 m.
2" - 6 m.
3" - 6 m.
4" - 6 m.
5" - 6 m.
6" - 6 m.
70 x 200 cm
70 x 210 cm
2"
4 / 12
5 / 10
4 / 12
5 / 10
250 mm
60x60 cm
C 75,40,3

unit
m2
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
unit
unit
lbr
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
tube
bh
Ljr

t = 6 cm
t = 6 cm
t = 6 cm
t = 6 cm
t = 6 cm
t = 6cm
t = 6 cm
t = 8 cm
t = 8 cm
t = 8 cm
t = 8 cm
t = 8 cm
t = 8 cm
10 x 20 x 8
10 x 20 x 8
20 x 20
20 x 30
30 x 30
20 x 20
30 x 30
40 x 40
10 x 20
15 x 15

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

Lembar : 16

5
870,700.00
444,700.00
354,700.00
158,800.00
241,400.00
333,800.00
407,200.00
524,900.00
959,700.00
1,267,100.00
1,414,800.00
1,694,100.00
1,163,600.00
702,100.00
286,900.00
749,600.00
899,700.00
741,700.00
790,900.00
841,000.00
1,478,300.00
938,900.00
786,100.00
564,000.00
938,600.00
1,120,500.00
81,300.00
35,300.00
214,500.00
360,500.00
211,500.00
360,500.00
82,400.00
49,100.00
1,552,500.00
241,000.00

59,400.00
71,800.00
60,500.00
71,100.00
60,200.00
73,700.00
64,700.00
80,900.00
78,000.00
72,500.00
80,600.00
72,500.00
80,600.00
102,400.00
104,100.00
52,900.00
60,200.00
64,800.00
66,400.00
70,200.00
91,400.00
78,000.00
47,900.00

2
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58

Tegel keramik, Claudia


Tegel keramik, Asia
Tegel keramik, berserat
Tegel keramik putih, Asia
Tegel keramik, kasar
Tegel keramik, Super Milan
Tegel keramik, Austria Blue
Tegel keramik, Mulia
Tegel keramik, Roman
Tegel keramik, Roman
Tegel keramik, KIA
Tegel keramik, KIA
Tegel keramik, KIA
Tegel keramik, KIA kasar
Tegel keramik, Platinum
Tegel keramik, Platinum
Tegel keramik, Platinum
Tegel keramik, Platinum kasar
Tegel keramik, Arwana Putih
Tegel keramik, Arwana Putih
Tegel keramik, Arwana Putih
Tegel keramik, Arwana Warna
Tegel keramik, Arwana Warna
Tegel keramik, Arwana Warna
Tegel keramik, Arwana Kasar
Tegel keramik, Asia Putih
Tegel keramik, Asia Putih
Tegel keramik, Asia Putih
Tegel keramik, Asia Warna
Tegel keramik, Asia Warna
Tegel keramik, Asia Warna
Tegel keramik, Asia Kasar
Tegel keramik, Classic
Tegel keramik, Essenza
Tegel keramik, Diamond

Lembar : 17

20 x 25
20 x 25
30 x 30
30 x 30
20 x 20
40 x 40
30 x 30
30 x 30
30 x 30
40 x 40
20 x 25
30 x 30
40 x 40
30 x 30
30 x 30
40 x 40
60 x 60
30 x 30
20 x 25
30 x 30
40 x 40
20 x 25
30 x 30
40 x 40
30 x 30
20 x 25
30 x 30
40 x 40
20 x 25
30 x 30
40 x 40
30 x 30
30 x 30
40 x 40
20 x 20

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

5
51,800.00
63,200.00
59,400.00
46,200.00
55,000.00
75,000.00
63,800.00
53,800.00
87,000.00
119,800.00
66,900.00
70,600.00
80,300.00
75,400.00
69,500.00
77,700.00
125,100.00
67,300.00
60,300.00
55,200.00
60,300.00
62,000.00
63,100.00
69,500.00
63,700.00
65,300.00
59,600.00
68,400.00
67,000.00
65,200.00
74,000.00
64,600.00
55,100.00
41,300.00
48,300.00

20 x 20
30 x 30
40 x 40
30 x 30
40 x 40
40 x 40

m2
m2
m2
m2
m2
m2

52,500.00
55,000.00
60,500.00
224,700.00
301,700.00
292,600.00

65 Keramik Granite Polish

60 x 60

m2

372,500.00

66 Keramik Granite Unpolish


67 Tegel galar

60 x 60

m
m2

312,500.00

68 Tegel keramik, bermotif/warna

40 x 50

41,300.00

69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84

10 x 30
20 x 20
5 x 20
10 x 20
15 x 15
20 x 20
30 x 30
40 x 60
10 x 20
60 x 60
60 x 60
10x 40
7 x 30
60 x 60
60 x 60
33 x 33

m2
m1
m2
bh
bh
bh
bh
m2
m2
bh
m2
m2
bh
bh
m2
bh
m2

48,300.00
52,200.00
13,300.00
27,400.00
63,500.00
71,500.00
103,100.00
369,300.00
12,600.00
398,500.00
369,500.00
22,300.00
17,100.00
168,800.00
470,800.00
139,300.00

kg
kg
kg
kg
kg
ltr
ltr
ltr
ltr
ltr
kg
kg
kg
kg
ltr
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg

88,700.00
65,500.00
88,400.00
71,900.00
31,700.00
38,000.00
30,000.00
21,900.00
17,300.00
115,500.00
33,000.00
33,000.00
24,200.00
40,200.00
109,100.00
24,100.00
50,900.00
47,300.00
47,500.00
27,500.00
31,700.00
21,900.00
46,900.00
24,800.00
24,800.00
21,500.00
25,600.00
33,500.00
26,700.00
29,400.00
56,700.00
48,100.00

59
60
61
62
63
64

VI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

Tegel teraso
Tegel teraso
Tegel teraso
Tegel keramik, Granito
Tegel keramik, Granito
Tegel keramik Granite Black

20 x 20

Tegel plint keramik warna


Tegel wafel (abu-abu)
Ubin keramik artistik
Ubin keramik artistik
Ubin keramik artistik
Ubin keramik artistik
Lantai vinyl karet, kw.1
Marmer ex. Tulungagung
List Keramik/Border
Keramik Granitile Polish
Keramik Granitile Unpolish
Stepnoiseng
Stepnoiseng
Granito ex Cina
Mozaic/Granito Merk Lotus
Keramik/Tipe Alur Merk Mas/Roman
BAHAN PENGECATAN
Cat besi Emco tanda Bintang
Cat besi Altex
Cat kayu Emco tanda Bintang
Cat kayu Altex
Meni besi/kayu, cap Pedang
Thinner A spesial "Altech"
Thinner A biasa "Power"
Thinner B spesial
Minyak cat/afduner
Cat tembok eksterior Mowilex
Cat tembok Alcabond
Cat tembok Alcaplast
Cat tembok Wallsealer
Cat tembok Vinylex
Cat tembok Vinylex ( exterior )
Cat tembok Decolith
Cat tembok Dulux
Cat tembok Metrolith
Cat tembok Mowilex
Cat tembok Cathylac
Cat tembok Cendana
Cat tembok Avian Paint
Cat tembok Jotun
Cat tembok Altex
Cat tembok Avitex
Cat tembok Paragon
Cat tembok Danabrite
Cat tembok Danalac
Cat tembok Danacryl
Cat tembok Danashiel
Cat genteng Matex
Cat genteng Sanlex

Lembar : 18

55,100.00

2
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
59
60
61
62

Wallsealer
No drop
Serlak kripik "India"
Politur jadi merk "Impra"
Wood Filler "Impra"
Wood Stain 'Impra"
Sanding Sealer "Impra"
Vernis (Glotex)
Dempul Plitur (Impra)
Dempul Plitur kualitas sedang
Plitur batangan
Teer
Kertas gosok
Waterproof, Aquaproof Pro Seller
Waterproof, Multiroof
Waterproof, Nippon Paint Shield
Plamur tembok
Plamur kayu
Plamur besi
Spiritus
Lem Rajawali untuk Kayu
Lem Rajawali untuk Tembok
Lem kayu khusus (Vinyl)
Soda Api
Teak Oil
Kuas Eterna
Kuas Eterna
Kuas Eterna
Kalsium

Lembar : 19

3"
4"
5"
-

ltr
kg
kg
ltr
ltr
ltr
ltr
ltr
kg
kg
kg
kg
lbr
kg
kg
kg
kg
kg
kg
ltr
kg
kg
kg
kg
ltr
bh
bh
bh
kg

5
39,000.00
106,000.00
123,000.00
74,900.00
46,900.00
81,500.00
70,800.00
53,600.00
47,000.00
33,300.00
25,800.00
11,700.00
5,300.00
72,300.00
70,200.00
72,400.00
36,800.00
30,800.00
43,700.00
20,400.00
35,000.00
20,200.00
38,400.00
23,700.00
37,200.00
14,600.00
20,800.00
26,300.00
1,600.00

2
63 Coating
64 Wallpaper "Kansai"

VII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
VIII
1
2
3
4
5
6
7
8
9

BAHAN PENGGANTUNG DAN PENGUNCI


Engsel H
Engsel Kuningan
Engsel jendela (kupu - kupu)
Engsel pintu "UNION"
Engsel jendela "UNION"
Engsel Pintu "ELT"
Engsel Jendela "ELT"
Espanyolet kualitas I
Grendel
Grendel biasa (besar)
Grendel biasa (kecil)
Grendel kuningan/krom kecil
Grendel tanam kuningan besar
Kunci gembok besar, Globe
Kunci gembok sedang, Globe
Kunci tanam (808)
Kunci tanam (2x putar) besar
Kunci tanam "SES" besar (tanpa handel)
Kunci tanam (dengan handel)
Kunci tanam "ELT" besar (tanpa handel)
Kunci tanam "SOLID" besar (tanpa handel)
Kunci tanam "SES" besar (dengan handel)
Kunci tanam "ELT" besar (dengan handel)
Kunci tanam "SOLID" besar (dengan handel)
Kunci tanam KM/WC
Kunci silinder "SES"
Kunci silinder "ELT"
Kunci silinder "SOLID"
Kunci slot merk "SES" (dengan handel)
Kunci slot merk "ELT" (dengan handel)
Kunci slot merk "SOLID" (dengan handel)
Kunci slot 2 putaran "YALE" (dengan handel)
Kunci slot 2 putaran "CAVEL" (dengan handel)
Kunci lemari, Wing
Hak angin biasa
Hak angin 4 mm (lurus)
Hak angin (sikutan) "SES"
Hak angin lurus (bisa disetel maju/mundur) "SES"
Pegangan pintu (model standar)
Pegangan pintu (model standar)
Pegangan pintu (model standar)
Spring knip
Door closer
Door stopper
Rel pintu dorong, biasa
Rel pintu dorong, J4 SES
BAHAN SANITASI
Slang spiral saluran kran wastafel
Kloset duduk porselin komplit (INA)
Kloset duduk porselin komplit (KIA)
Kloset duduk porselin komplit (TOTO)
Kloset jongkok porselin (INA)
Kloset jongkok porselin (TOTO)
Kloset jongkok teraso
Kran air stainless steel
Kran air stainless steel

Lembar : 20

kg
m2

81,000.00
177,900.00

4"
4"
3"
4"
3"
4"
3"
8"
3"
4"
60 cm
40 mm
30 mm
-

8"
p = 20 cm
p = 30 cm
p = 40 cm
-

set
set
set
bh
bh
bh
bh
set
bh
bh
bh
bh
set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
set
set
set
set
bh
bh
bh
bh
bh
bh
btg
btg

51,800.00
22,500.00
16,500.00
56,700.00
40,400.00
56,700.00
40,400.00
64,400.00
37,400.00
20,400.00
8,000.00
24,700.00
219,200.00
74,900.00
41,000.00
16,900.00
105,600.00
183,900.00
150,000.00
167,200.00
193,900.00
314,300.00
327,700.00
347,700.00
98,500.00
207,400.00
145,000.00
179,700.00
537,300.00
327,400.00
354,400.00
139,700.00
335,000.00
15,000.00
23,100.00
19,500.00
46,300.00
96,900.00
120,200.00
132,600.00
132,200.00
32,800.00
175,000.00
62,200.00
204,400.00
275,000.00

1/2"
3/4"

set
bh
bh
bh
bh
bh
bh
bh
bh

74,700.00
1,706,700.00
2,349,300.00
2,501,600.00
193,400.00
305,300.00
88,300.00
88,900.00
86,900.00

2
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

IX
1
2
3
4
5
6
7
8
9
X
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

Kran air (DUPONT)


Kran air kuningan
Kran shower "Toto"
Septic Tank (10 pemakai) dan Sumur
Peresapan (dalam 3,00 m)
Watermur besi
Wastafel warna muda "ITO"
Wastafel warna tua "ITO"
Wastafel warna tua "INA"
Wastafel warna tua "INA"
Rol TBA (seal tape) Jumbo
Siphon Washer, kelas sedang plastik
Water drain dan assesories
Bak mandi fiberglass
Bak cuci piring stainless steel, besar (double)
Bak cuci teraso
Tempat sabun keramik "Sotento"
Urinoir "INA" (komplit)
Floor drain stainless steel "Onde"
Kurasan (putih) stainless steel
Bak mandi porselin
Tandon air fiberglass "Penyu"
Pompa tangan "Dragon"
Hand shower plastik (termasuk slang)
Wall shower "Toto"
Pompa air "Shimizu 125 W"
Pompa air "Shimizu 250 W"
Pompa air "Sanyo 125 W"
Tandon air "Penguin"

1/2"
1/2"
3/4"
-

bh
bh
set
bh

218,000.00
50,800.00
607,400.00
6,494,100.00

3/4"
0,5 m3
60 x 60 cm
550 ltr
300 ltr

bh
bh
bh
bh
bh
rol
set
set
bh
bh
bh
bh
set
bh
bh
bh
bh
bh
set
set
bh
bh
bh
bh

24,200.00
481,500.00
350,000.00
481,500.00
474,500.00
13,300.00
58,800.00
55,400.00
483,700.00
729,700.00
178,200.00
42,800.00
1,735,900.00
96,300.00
58,500.00
932,900.00
1,156,100.00
367,000.00
228,500.00
455,800.00
542,300.00
1,452,700.00
638,700.00
875,000.00

t = 5 mm
t = 8 mm
t = 5 mm
t = 5 mm
t = 5 mm
t = 3 mm
t = 3 mm
t = 5 mm
t = 5 mm

m2
m2
m2
m2
daun
m2
m2
m2
m2

10 x 20 cm
15 cm
20 cm
30 cm
40 cm
50 cm
60 cm
80 cm
100 cm
15 cm
20 cm
30 cm
20x30x50 cm
100x100x120 cm
150x150x120 cm
80x80x100 cm
5 x 40 x 240 cm

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m1
m1
m1
bh

BAHAN JENIS KACA


Kaca polos
Kaca polos
Kaca rayban
Kaca es/buram
Krapyak kaca nako 15 x 70 cm (includ kerangka)
Kaca buram
Kaca cermin
Kaca hias / grafir ( putih )
Kaca hias / grafir ( warna )
BAHAN BETON CETAKAN
Beton roster klingker warna merah
Buis beton (p = 100 cm)
Buis beton (p = 100 cm)
Buis beton (p = 100 cm)
Buis beton (p = 100 cm)
Buis beton (p = 50 cm)
Buis beton (p = 50 cm)
Buis beton (p = 50 cm)
Buis beton (p = 50 cm)
Buis Beton U (p = 100 cm)
Buis Beton U (p = 100 cm)
Buis Beton U (p = 100 cm)
Got talang R 15 (segmen)
Got talang R 25 (segmen)
Kerb
Box cuilvert (K-350)
Box cuilvert (K-350)
Box cuilvert (K-350)
Pagar panel beton (K-300)

Lembar : 21

88,700.00
133,700.00
109,400.00
145,000.00
44,500.00
112,800.00
181,600.00
215,000.00
259,700.00

12,800.00
54,600.00
74,300.00
91,100.00
101,500.00
114,100.00
114,300.00
146,600.00
190,400.00
45,900.00
52,600.00
64,800.00
39,200.00
65,700.00
91,900.00
6,271,200.00
7,789,900.00
4,815,000.00
256,300.00

2
20 Kolom panel beton (K-300)

XI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58

BAHAN PIPA PVC


Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW "Wavin"
Pipa PVC tipe AW "Wavin"
Pipa PVC tipe AW "Wavin"
Pipa PVC tipe AW "Wavin"
Pipa PVC tipe AW "Wavin"
Pipa PVC tipe AW "Wavin"
Pipa PVC tipe AW "Wavin"
Pipa PVC tipe AW "Wavin"
Pipa PVC tipe AW "Wavin"
Pipa PVC tipe AW "Wavin"
Pipa PVC tipe AW "Wavin"
Pipa PVC tipe AW "Wavin"
Pipa PVC tipe AW "Wavin"
Pipa PVC tipe AW "Wavin"
Pipa PVC "Maspion" tipe D
Pipa PVC "Maspion" tipe D
Pipa PVC "Maspion" tipe D
Pipa PVC "Maspion" tipe D
Pipa PVC "Wavin" tipe D
Pipa PVC "Wavin" tipe D
Pipa PVC "Wavin" tipe D
Pipa PVC "Wavin" tipe D
Pipa PVC "Wavin" tipe D
Pipa PVC "Wavin" tipe D
Pipa PVC "Wavin" tipe D
Pipa PVC "Wavin" tipe D
Pipa PVC "Wavin" tipe D
Pipa PVC "Wavin" tipe D
Pipa PVC "Wavin" tipe D
Lem PVC "Wavin"
Keni PVC tipe AW
Keni PVC tipe AW
Keni PVC tipe AW
Keni PVC tipe AW
Keni PVC tipe AW
Keni PVC tipe AW
Klem PVC
Talang PVC U "Maspion"
Talang PVC U
Clam Talang PVC U
Shock Talang PVC U
Tutup Talang PVC U
Corong Talang PVC U
Pipa Wavin Warna Oranye
Pipa Wavin Warna Oranye
Pipa PVC "Langgeng" tipe S 12.5/MOF
Pipa PVC "Langgeng" tipe S 12.5/MOF
Pipa PVC "Langgeng" tipe S 12.5/MOF
Pipa PVC "Langgeng" tipe S 12.5/MOF
Pipa PVC "Langgeng" tipe S 12.5/MOF

18 x 18 cm 100 cm

bh

1/2" - 400
5/8" - 400
3/4" - 400
1" - 400
2" - 400
3" - 400
4" - 400
5" - 400
1/2" - 400
3/4" - 400
1" - 400
1 1/4" - 400
1 1/2" - 400
2" - 400
2 1/2" - 400
3" - 400
4" - 400
5" - 400
6" - 400
8" - 400
10" - 400
12" - 400
2" - 400
3" - 400
4" - 400
5" - 400
1 1/4" - 400
1 1/2" - 400
2" - 400
2 1/2" - 400
3" - 400
4" - 400
5" - 400
6" - 400
8" - 400
10" - 400
12" - 400
1/2"
3/4"
2"
3"
4"
5"
400 cm
400 cm
400 cm
400 cm
400 cm
400 cm
4" - 600
6" - 600
1"
1.5"
2"
2.5"
3"

btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
tube
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
btg
btg
m1
m1
m1
m1
m1

Lembar : 22

5
211,300.00

34,400.00
39,500.00
42,700.00
53,700.00
131,100.00
232,500.00
354,400.00
551,700.00
17,200.00
23,600.00
32,300.00
48,400.00
55,600.00
71,100.00
103,800.00
140,000.00
232,100.00
384,500.00
539,400.00
921,100.00
1,424,200.00
2,008,100.00
80,000.00
150,500.00
212,400.00
338,300.00
31,000.00
34,300.00
44,000.00
59,500.00
75,300.00
118,500.00
191,800.00
249,300.00
433,700.00
733,500.00
1,029,900.00
14,400.00
3,200.00
4,400.00
15,000.00
34,300.00
61,600.00
86,600.00
5,300.00
156,500.00
94,700.00
7,700.00
9,700.00
9,700.00
28,700.00
312,500.00
602,000.00
7,200.00
15,400.00
23,400.00
32,800.00
49,500.00

2
59 Pipa PVC "Langgeng" tipe S 12.5/MOF
60 Pipa PVC "Langgeng" tipe S 12.5/MOF

XII
1
2
3
4

BAHAN JENIS PAKU


Paku asbes gelombang (paku pancing)
Paku kayu
Paku kayu
Paku kayu

Lembar : 23

4"
6"

m1
m1

71,900.00
153,600.00

1"
1,5" - 2"
2,5" - 3"

bh
kg
kg
kg

4,200.00
22,500.00
21,900.00
21,300.00

2
5
6
7
8
9
10
11

XIII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
XIV
1
2
3
4
5
6
7
8

4"
1"
5 cm
-

kg
kg
dos
dos
kg
bh
kg

21,100.00
32,700.00
45,400.00
26,700.00
27,700.00
1,600.00
34,000.00

250 watt
-

set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

23,500.00
1,900.00
2,700.00
27,800.00
33,100.00
38,500.00
42,800.00
563,200.00
121,900.00
6,300.00
322,600.00
65,600.00
115,500.00
132,400.00
48,100.00
13,300.00
327,900.00
48,500.00
44,900.00
120,600.00

bh

183,500.00

3 x 70 x 50 mm2
3 x 70 x 50 mm2

m1
m1
m1
m1
bh
bh
bh
unit
unit
titik
unit

18,700.00
14,300.00
86,600.00
11,300.00
620,600.00
220,100.00
620,600.00
220,100.00
3,745,000.00

150 w / 942
250 w
400 w
1000 w
2000 w
2000 w
1000 w

bh
bh
bh
bh
bh
bh
bh

ltr
ltr

ltr
ltr
ltr
kg
kg

8,500.00
7,500.00
17,000.00
22,500.00
56,700.00
65,100.00
52,900.00
18,600.00

Paku kayu
Paku payung (paku seng gelombang)
Paku sekrup
Paku sumbat
Paku triplek/eternit
Paku beton
Paku kalsiboard
BAHAN PERALATAN LISTRIK
Fiting plafon
T doos PVC
Isolator kecil
Stop kontak (Broco)
Skakelar tunggal (Broco)
Skakelar ganda (Broco)
Stop kontak dan skakelar (Broco)
Skakelar / hendel pemindah arus
Zekring lengkap dengan box
Las doof
Panel box
Meinswitch
Zekring MCB thermis 10 - 16 Amp.
Zekring MCB thermis 10 Amp.
Stater lampu TL
Lampu pijar 25,40,75 / 220 V "Philips"
Bola lampu Armateur "Philips"
Lampu hemat energi 18 W / 220 V (Philips)
Lampu hemat energi 18 W / 220 V (Osram)
Lampu TL 20 W / 220 V, komplit balast
(Philips)
Lampu TL 40 W / 220 V, komplit balast
(Philips)
Kabel NYM. 2 x 2,5
Kabel NYY. 1 x 2,5
Kabel twisted Indonesia
Kabel twisted multi kabel
UPS 3,5 Kw
UPS 6,0 Kw
Exhaustfan 8''
Genzet 250 Kva Sillent
Genzet 500 Kva Sillent
Instalasi listrik
Penangkal Petir Lengkap (2 Spit), tinggi 10 m
(Tidak termasuk izin dari Depnaker)
Lampu Sorot AMAC CDMTD Ex. Artolite
Lampu Sorot AMAR E 40 + HPIT Ex Artolite
Lampu Sorot AMAR E 40 + HPIT Ex Artolite
Lampu Sorot MAXIFLOOD R.SITECO HT DE
Lampu Sorot MAXIFLOOD R.SITECO HT DE
Floodlighting EF 2000 Plus MH - IP 65
Floodlighting Epack MH - IP 65
BAHAN BBM DAN ALAT BERAT
Bensin
Solar
Solar Industri
Minyak tanah non subsidi
Oli mesin Mesran
Minyak pelumas
Grease (gemuk pelumas)
Aspal panas curah

Lembar : 24

2
9
10
11
12
13
14
15
16
17
18
19
20

Aspal panas drum


Biaya operasional wheel loader 115 H
Biaya operasional AMP 30T/h
Biaya operasional dump truck 5 T/145 Hp
Biaya operasional dump truck 3,5 T/115 Hp
Biaya operasional asphalt finisher (penghampar)
Biaya operasional pneumetic roller 8-15 T
Biaya operasional asphalt sprayer towed 1000 L
Biaya operasional tandem roller 6-10 T
Biaya operasional roller 3 wheeled 6-8 T/ 8-10 T
Biaya operasional genset
Biaya operasional alat bantu

E.052
E.155
E.212
E.221
E.084
E.153
E.081
E.080
-

Lembar : 25

4
kg
jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
jam

5
22,100.00
505,500.00
4,978,300.00
443,900.00
199,700.00
427,700.00
530,000.00
86,400.00
328,400.00
554,500.00
318,300.00
1,100.00

21 Biaya operasional bulldozer


jam
22 Biaya operasional stone crusher
jam
23 Biaya operasional compressor air 210 m3
E.301
hari
24 Biaya operasional mesin gilas (wales)
hari
25 Biaya operasional mesin gilas (wales)
E.080
hari
26 Biaya operasional motor grader
hari
27 Biaya operasional vibro roller
hari
28 Biaya operasional water tanker
hari
29 Biaya operasional coldmilling
hari
30 Teakcoat
hari
31 Biaya operasional excavator
hari
< 30 Km
32 Biaya mobilisasi alat berat ( jarak menengah )
unit
33 Biaya mobilisasi alat berat ( jarak menengah )
< 30 Km
unit
Sumber data : Hasil Survei Dinas Pekerjaan Umum Daerah Kota Blitar, Asosiasi Profesi Kota Blitar
Badan Pusat Statistik (BPS) Kota Blitar tidak ada data
Catatan :
1. Harga diatas berlaku di Kota Blitar
2. Harga diatas sudah termasuk pajak serta biaya umum dan keuntungan yang wajar

Mengetahui,
KEPALA DINAS PEKERJAAN UMUM
DAERAH KOTA BLITAR

Dibuat oleh,
TIM PENYUSUN HSBU
DINAS PEKERJAAN UMUM
DAERAH KOTA BLITAR
Koordinator,

HASNIL PURWANTO, SH., M.AP


Pembina Utama Muda
NIP. 19561106 198509 1 001

TONNY HERMAWANTO, ST. MT


Penata Tingkat I
NIP. 19720519 199901 1 001

Lembar : 26

5
520,400.00
659,800.00
183,900.00
282,800.00
406,500.00
495,500.00
453,200.00
208,300.00
472,000.00
245,500.00
495,200.00
3,300,800.00
8,252,000.00

DAFTAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA


PEMERINTAH KOTA BLITAR TAHUN ANGGARAN 2015
( Triwulan I Tahun 2015 )
B. DAFTAR UPAH KERJA HARIAN

NO.

JENIS BAHAN

UKURAN

SAT.

8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

MANDOR
KEPALA TK. BATU
KEPALA TK. KAYU
KEPALA TK. BESI
KEPALA TK. CAT
KEPALA TK. LISTRIK
KEPALA TK. PIPA
TUKANG BATU
TUKANG KAYU
TUKANG BESI
TUKANG CAT
TUKANG PLITUR
TUKANG ASPAL
TUKANG PIPA
TUKANG LISTRIK
TUKANG GALI TANAH
PENJAGA MALAM/ PENJAGA
MASINIS
PEMBANTU MASINIS
MEKANIK
PEMBANTU MEKANIK
OPERATOR (TERAMPIL)
PENGEMUDI/SOPIR
PENJAGA API/PENJAGA
PEMBANTU TUKANG / PEKERJA/BURUH TERAMPIL
PEKERJA TIDAK TERLATIH/BURUH TAK TERAMPIL
PEMBANTU SOPIR
PEKERJA PENGISI BATU
TUKANG GALI
OPERATOR SEMI TERAMPIL/PEMBANTU OPERATOR

HARGA STANDAR
TERTINGGI
(Rp)
5

Catatan :
1. Upah kerja diatas berlaku di Kota Blitar
2. Upah kerja diatas sudah termasuk pajak
Blitar,

Oktober 2011
Dibuat oleh,
TIM PENYUSUN HSBU
DINAS PEKERJAAN UMUM
DAERAH KOTA BLITAR
Koordinator,

Mengetahui,
KEPALA DINAS PEKERJAAN UMUM
DAERAH KOTA BLITAR

HASNIL PURWANTO, SH., M.AP


Pembina Utama Muda
NIP. 19561106 198509 1 001

TONNY HERMAWANTO, ST. MT


Penata Tingkat I
NIP. 19720519 199901 1 001

Lembar : 9

75,000.00
70,000.00
70,000.00
70,000.00
70,000.00
70,000.00
70,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
59,000.00
59,000.00
49,000.00
59,000.00
54,000.00
59,000.00
59,000.00
54,000.00
49,000.00
44,000.00
44,000.00
49,000.00
49,000.00
47,000.00

(DALAM RUPIAH)

HARGA SATUAN BANGUNAN GEDUNG NEGARA PER-M2


GEDUNG
BERTINGKAT
KLAS
SEDERHANA

GEDUNG TIDAK
BERTINGKAT

KLAS TIDAK
KLAS
KLAS TIDAK
SEDERHANA SEDERHANA SEDERHANA

RUMAH NEGARA

TIPE C

TIPE B

TIPE A

3,340,000

4,008,000

4,008,000

DATA HARGA BAHAN BANGUNAN DAN UPAH KERJA


DATA HARGA BAHAN BANGUNAN
NO
A.
1
2
3
4
5
6
B.
7
C.
8
D.
9
10
11
12
E.
13
14
F.
15
16
17
18
19
20
G.
21
22
23
24
25
26
27
H.
28
29
30
31
32
33
I.
34
35
36
37
38
39
40
41
42
43

NAMA BAHAN

SATUAN

HARGA
SURVAI (Rp)

KETERANGAN

BAHAN PASANGAN
PASIR BETON
PASIR PASANG
PASIR URUG
SEMEN PC (50 Kg)
KERIKIL BETON UK. 3 cm s/d 4 cm
KERIKIL KORAL

m3
m3
m3
zak
m3
m3

72,000
68,000
52,000
55,000
136,000
96,000

m3

144,240

m2

36,960

bh
bh
bh
bh

0
640
0
10,800

PILIH SALAH SATU SESUAI


DENGAN BAHAN YANG
TERSEDIA

lbr
lbr

11,760
0

PILIH SALAH SATU SESUAI


BAHAN YANG TERSEDIA

bh
bh
m
lbr
m
lbr

1,280
0
0
0
0

m3
m3
m3
m3
m3
lbr
lbr

23,330,640
10,436,640
11,272,800
6,218,400
1,887,920
85,840
192,800

Kg
Kg
Kg
Kg
m
m

11,280
12,800
20,000
17,040
696,560
283,760

bh
bh
bh
m
m
m
m
m
m
m

386,960
924,880
42,080
0
0
0
27,520
34,160
104,880
186,000

BAHAN PONDASI
BATU KALI / BATU BELAH / BATU GUNUNG

BAHAN LANTAI
KERAMIK 30 X 30

BAHAN DINDING
BATAKO UK. 20 X 40 X 10
BATU BATA UK. 5.5 X 11 X 23
BATU TELA UK. 20 X 30 X 10
BETON ROSTER / KERAWANG

BAHAN PENUTUP LANGIT-LANGIT


ETERNIT, UK. 100 X 100
KAYU LAPIS 4 MM UK 120 X 240

BAHAN PENUTUP ATAP


BUBUNGAN GENTENG PRENTUL Ex. TRENGGALEK
GENTENG PRENTUL Ex. TRENGGALEK
SENG DATAR BJLS 0.3
SENG GELOMBANG KECIL
BUBUNGAN ASBES GELOMBANG
ASBES GELOMBANG KECIL

BAHAN KAYU
KAYU
KAYU
KAYU
KAYU
KAYU
KAYU
KAYU

BALOK KLAS I
BALOK KLAS II
PAPAN KLAS II
PAPAN KLAS III
PAPAN KLAS IV
LAPIS 4 mm UK. 8" X 4"
LAPIS 12 mm UK. 8" X 4"

BAHAN BESI
BESI BETON POLOS DIA. 10 mm
BESI BETON ULIR DIA. 13 mm
KAWAT BENDRAT / BETON
PAKU UK. 3 CM - 7 CM
PAGAR BRC JADI (T 1M)
BESI PROFIL C a PIPA BESI DIA. 2"

BAHAN SANITAIR / SALURAN AIR


BAK MANDI FIBRE GLASS 70 X 70 X 66
BAK RESERVOIR FIGRE GLASS KAP. 1000 ltr
BUIS BETON 1/2 DIA. 20 CM
PIPA GIP DIA. 1"
PIPA GIP DIA. 1 1/2"
PIPA GIP DIA. 2"
PIPA PVC DIA. 1/2"
PIPA PVC DIA. 3/4"
PIPA PVC DIA. 2"
PIPA PVC DIA. 3"

PILIH SALAH SATU SESUAI


DENGAN BAHAN YANG
TERSEDIA

44
44
45
46
47
J
48
49
50
K.
51
52
53

PIPA PVC DIA. 4"


KLOSET DUDUK KERAMIK
KLOSET JONGKOK KERAMIK STANDAR
URINOAR KERAMIK STANDAR
WASTAFEL GANTUNG KERAMIK

m
bh
bh
bh
bh

283,520
1,365,360
154,720
1,388,720
385,200

Kg
Kg
Kg

70,960
22,000
70,720

m2
bh
titik

70,960
293,600
176,080

BAHAN FINISHING
CAT BESI
CAT DINDING
CAT KAYU

BAHAN LAIN - LAIN


KACA BENING 5 MM
POMPA TANGAN
INSTALASI LISTRIK

DATA UPAH KERJA


NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14

TENAGA KERJA
MANDOR
KEPALA TUKANG
TUKANG BATU
LADEN TUKANG BATU
TUKANG BESI
LADEN TUKANG BESI
TUKANG KAYU
LADEN TUKANG KAYU
TUKANG CAT
LADEN TUKANG CAT
TUKANG BONGKAR
PEKERJA GALIAN & URUG
TUKANG LISTRIK
TUKANG PIPA

SATUAN
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG
ORG

HARGA
SURVAI (Rp)
75,000
70,000
65,000
49,000
65,000
49,000
65,000
49,000
65,000
49,000
65,000
49,000
65,000
65,000

Blitar,

Januari 2013

Mengetahui,
KEPALA DINAS PEKERJAAN UMUM
DAERAH KOTA BLITAR

Dibuat oleh,
TIM PENYUSUN HSBU
DINAS PEKERJAAN UMUM
DAERAH KOTA BLITAR
Koordinator,

HASNIL PURWANTO, SH., M.AP


Pembina Utama Muda
NIP. 19561106 198509 1 001

HERU CATUR W, ST., M.Si


Pembina
NIP. 19660427 199803 1 002

Lampiran Berita Acara


Nomor
: 0274 /
Tanggal
:
-

/ 410.102.4 / 2
- 2012

DRAFT
DAFTAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH KOTA BLITAR TAHUN ANGGARAN 2012
(Semester II Tahun 2012)
A. DAFTAR HARGA SATUAN BAHAN BANGUNAN
HARGA SURVEI
(Rp.)
HARGA YANG
DIPAKAI DARI
ASSOSIASI KOTA HASIL SURVEI
(Rp.)
BLITAR

NO.

JENIS BAHAN

UKURAN

SAT.

1 Batu kali belah

10/ 15, 15/20

m3

100,000.00

141,645.00

120,822.50

2 Batu kali pecah

5/7

m3

150,435.00

150,435.00

3 Batu kali pecah

4/6

m3

153,820.00

4 Batu kali pecah Crusser

3/5

m3

174,805.00

5 Batu kali pecah Crusser

2/3

m3

150,000.00

6 Batu kali pecah Crusser

1/2

m3

7 Batu kali pecah Crusser

1/1

8 Batu kali pecah Crusser

DINAS PUD KOTA


BLITAR

HARGA
PEMBULATAN
(Rp.)

HARGASTANDAR
SEMESTER II
HARGA STANDAR
TERMASUK PPN 10%,
SEMESTER II
BIAYA UMUM &
TA. 2012
KEUNTUNGAN YANG
(Rp.)
WAJAR 15%
(Rp.)

KENAIKAN
HARGA (% )

10

120,800.00

151,000.00

137,800.00

9.58

150,000.00

187,500.00

152,200.00

23.19

153,820.00

153,800.00

192,250.00

154,800.00

24.19

174,805.00

174,800.00

218,500.00

181,100.00

20.65

173,560.00

161,780.00

161,700.00

202,125.00

196,200.00

3.02

180,000.00

201,202.50

190,601.25

190,600.00

238,250.00

201,400.00

18.30

m3

210,000.00

206,485.00

208,242.50

208,200.00

260,250.00

213,200.00

22.07

0,5/1

m3

209,682.50

209,682.50

209,600.00

262,000.00

221,100.00

18.50

2/3

m3

148,677.50

148,677.50

147,600.00

184,500.00

149,600.00

23.33

10 Krikil sungai

m3

107,405.00

107,405.00

107,400.00

134,250.00

97,700.00

37.41

11 Krikil ayak tanpa pasir

m3

110,045.00

110,045.00

110,000.00

137,500.00

103,600.00

32.72

12 Krikil batu alor (ampyang)

kg

6,615.00

6,615.00

6,600.00

8,250.00

7,200.00

14.58

13 Pasir beton/cor

m3

60,000.00

106,295.00

83,147.50

83,100.00

103,875.00

99,000.00

4.92

14 Pasir pasang

m3

77,500.00

96,155.00

86,827.50

86,800.00

108,500.00

93,500.00

16.04

15 Pasir urug

m3

76,837.50

76,837.50

76,800.00

96,000.00

71,500.00

34.27

16 Agregat Kasar

m3

139,150.00

139,150.00

139,150.00

173,937.50

126,600.00

37.39

17 Agregat Halus

m3

125,500.00

125,500.00

125,500.00

156,875.00

219,100.00

(28.40)

18 Filler

kg

1,067.50

1,067.50

1,000.00

1,250.00

1,200.00

4.17

19 S i r t u

m3

50,000.00

81,440.00

65,720.00

65,700.00

82,125.00

85,800.00

(4.28)

20 Tanah urug biasa

m3

45,000.00

67,947.50

56,473.75

56,400.00

70,500.00

66,000.00

6.82

21 Tanah urug pilihan (campur pupuk utk taman)

m3

78,087.50

78,087.50

78,000.00

97,500.00

71,500.00

36.36

22 Tanah katelan jalan

m3

77,117.50

77,117.50

77,100.00

96,375.00

74,100.00

30.06

23 Gebalan rumput

m2

19,797.50

19,797.50

19,700.00

24,625.00

16,500.00

49.24

(40x20x10) cm

bh

1,500.00

2,695.00

2,097.50

2,000.00

2,500.00

2,500.00

25.00

25 Batu merah klas I

bh

440.00

587.50

513.75

500.00

625.00

500.00

25.00

26 Batu merah klas II

bh

400.00

512.50

456.25

450.00

562.50

500.00

12.50

27 Batu lempeng (tidak beraturan)

m2

70,720.00

70,720.00

70,700.00

88,375.00

78,700.00

12.29

28 Batu hias (sand stone)

10 x 20

m2

101,155.00

101,155.00

101,100.00

126,375.00

93,500.00

35.16

29 Roster beton

20 x 20

bh

7,500.00

10,892.50

9,196.25

9,100.00

11,375.00

6,000.00

89.58

30 Roster beton

10 x 30

bh

7,500.00

13,265.00

10,382.50

10,300.00

12,875.00

5,500.00

134.09

BAHAN PASANGAN DAN CAMPURAN


BETON

9 Batu krikil (ayakan)

24 Batako

Lembar : 14

10

31 Roster batu alam

20 x 20

bh

64,337.50

64,337.50

64,300.00

80,375.00

71,500.00

12.41

32 Roster batu alam

30 x 30

bh

86,012.50

86,012.50

86,000.00

107,500.00

88,000.00

22.16

33 Batu tempel hijau

10 x 20

m2

88,655.00

88,655.00

88,600.00

110,750.00

99,000.00

11.87

34 Tiang teras batu alam

22cm, t=3 m

bh

907,402.50

907,402.50

907,400.00

1,134,250.00

968,000.00

17.17

35 Tiang teras batu alam

28cm, t=3 m

bh

1,196,460.00

1,196,460.00

1,196,400.00

1,495,500.00

1,320,000.00

13.30

36 List batu hias

p = 40 cm

bh

12,410.00

12,410.00

12,400.00

15,500.00

12,400.00

25.00

37 Kapur padam

m3

509,905.00

509,905.00

509,900.00

637,375.00

403,500.00

57.96

38 Gamping

ton

831,012.50

831,012.50

831,000.00

1,038,750.00

1,000,000.00

3.88

39 Semen merah

m3

145,210.00

145,210.00

145,200.00

181,500.00

154,000.00

17.86

40 Semen Gresik (PC Gresik)

50 kg

zak

70,725.00

70,725.00

70,700.00

88,375.00

78,000.00

13.30

41 Semen Gresik (PC Gresik)

40 kg

zak

49,000.00

57,555.00

53,277.50

53,200.00

66,500.00

61,600.00

7.95

42 Semen Tiga Roda

50 kg

zak

57,500.00

68,220.00

62,860.00

62,800.00

78,500.00

74,800.00

4.95

43 Semen Tiga Roda

40 kg

zak

46,500.00

55,027.50

50,763.75

50,700.00

63,375.00

59,700.00

6.16

44 Semen Holcim

50 kg

zak

56,500.00

69,713.33

63,106.67

63,100.00

78,875.00

77,400.00

1.91

45 Semen putih

40 kg

zak

73,000.00

88,512.50

80,756.25

80,700.00

100,875.00

90,500.00

11.46

46 PC super nut

kg

11,000.00

12,435.00

11,717.50

11,700.00

14,625.00

12,100.00

20.87

47 I j u k

kg

25,565.00

25,565.00

25,500.00

31,875.00

22,900.00

39.19

48 Glass block bening

20 x 20

bh

17,000.00

20,940.00

18,970.00

18,900.00

23,625.00

22,300.00

5.94

49 Glass block buram

20 x 20

bh

18,500.00

23,065.00

20,782.50

20,700.00

25,875.00

23,600.00

9.64

6/12, 6/15, 8/12

m3

28,404,750.00

28,404,750.00

28,404,700.00

35,505,875.00

32,287,500.00

9.97

4/6, 5/7

m3

25,886,100.00

25,886,100.00

25,886,100.00

32,357,625.00

30,135,000.00

7.38

2/20, 3/20, 3/25

m3

27,890,762.50

27,890,762.50

27,890,700.00

34,863,375.00

30,672,400.00

13.66

2/3, 3/5

m3

25,011,100.00

25,011,100.00

25,011,100.00

31,263,875.00

30,135,000.00

3.75

6/12, 6/15, 8/12

m3

15,000,000.00

23,088,216.67

19,044,108.33

19,044,100.00

23,805,125.00

22,062,400.00

7.90

4/6, 5/7

m3

11,500,000.00

18,717,583.33

15,108,791.67

15,108,700.00

18,885,875.00

18,833,700.00

0.28

2/20, 3/20, 3/25

m3

12,000,000.00

24,619,300.00

18,309,650.00

18,309,650.00

22,887,062.50

24,753,000.00

(7.54)

2/3, 3/5

m3

10,000,000.00

16,186,500.00

13,093,250.00

13,093,250.00

16,366,562.50

16,143,000.00

1.38

II

BAHAN KUZEN KAYU DAN KERANGKA


ATAP
1 Kayu jati balok kualitas II,
Ex. Bojonegoro (mutu kayu klas I)
2 Kayu jati usuk kualitas II,
Ex. Bojonegoro (mutu kayu klas I)
3 Kayu jati papan kualitas II,
Ex. Bojonegoro (mutu kayu klas I)
4 Kayu jati reng kualitas II,
Ex. Bojonegoro (mutu kayu klas I)
5 Kayu jati balok kualitas I, lokal
(mutu kayu klas I)
6 Kayu jati usuk kualitas I, lokal
(mutu kayu klas I)
7 Kayu jati papan kualitas I, lokal
(mutu kayu klas I)
8 Kayu jati reng kualitas I, lokal
(mutu kayu klas I)
9 Kayu kamper, balok (mutu kayu klas II)

6/12, 6/15, 8/12

m3

8,000,000.00

9,588,587.50

8,794,293.75

8,794,200.00

10,992,750.00

10,517,000.00

4.52

10 Kayu kamper, papan (mutu kayu klas II)

2/20, 3/20, 3/25

m3

8,500,000.00

9,968,250.00

9,234,125.00

9,234,100.00

11,542,625.00

11,133,900.00

3.67

11 Kayu kamper, usuk (mutu kayu klas II)

3/5,4/6,5/7

m3

7,250,000.00

8,948,290.00

8,099,145.00

8,099,100.00

10,123,875.00

9,972,300.00

1.52

12 Kayu kamper, reng (mutu kayu klas II)

2/3

m3

6,750,000.00

8,583,925.00

7,666,962.50

7,666,900.00

9,583,625.00

9,681,000.00

(1.01)

13 Kayu meranti, balok (mutu kayu klas III)

6/12, 6/15, 8/12

m3

4,125,000.00

5,941,585.00

5,033,292.50

5,033,200.00

6,291,500.00

5,800,000.00

8.47

14 Kayu meranti, papan (mutu kayu klas III)

2/20, 3/20, 3/25

m3

4,625,000.00

6,232,815.00

5,428,907.50

5,428,900.00

6,786,125.00

6,204,800.00

9.37

15 Kayu meranti, usuk (mutu kayu klas III)

3/5,4/6,5/7

m3

4,000,000.00

5,629,085.00

4,814,542.50

4,814,500.00

6,018,125.00

5,800,000.00

3.76

16 Kayu meranti, reng (mutu kayu klas III)

2/3

m3

3,750,000.00

5,398,490.00

4,574,245.00

4,574,200.00

5,717,750.00

5,255,900.00

8.79

3/20-200

m3

1,666,700.00

833,350.00

1,666,700.00

2,083,375.00

1,375,000.00

51.52

17 Kayu bekisting, papan (mutu kayu klas IV)


18 Kayu bekisting, usuk (mutu kayu klas IV)
19 Kayu tahun, papan (mutu kayu klas IV)
20 Kayu tahun, usuk (mutu kayu klas IV)

4/6-200

m3

2,004,137.50

1,002,068.75

2,004,100.00

2,505,125.00

2,167,500.00

15.58

2/20, 3/20, 3/25

m3

2,814,090.00

1,407,045.00

2,814,000.00

3,517,500.00

2,420,000.00

45.35

3/5, 4/6, 5/7

m3

3,000,000.00

2,717,717.50

2,858,858.75

2,858,800.00

3,573,500.00

2,662,400.00

34.22

Lembar : 15

10

10-12 x 300 cm

btg

29,560.00

29,560.00

29,500.00

36,875.00

21,000.00

75.60

22 Kayu kruing, balok (mutu kayu klas III)

6/12, 6/15, 8/12

m3

5,125,000.00

6,854,172.50

5,989,586.25

5,989,500.00

7,486,875.00

7,150,000.00

4.71

23 Kayu kruing, papan (mutu kayu klas III)

2/20, 3/20, 3/25

m3

5,625,000.00

7,287,565.00

6,456,282.50

6,456,200.00

8,070,250.00

8,050,000.00

0.25

24 Kayu kruing, usuk (mutu kayu klas III)

3/5,4/6,5/7

m3

4,900,000.00

6,539,342.50

5,719,671.25

5,719,600.00

7,149,500.00

6,900,000.00

3.62

25 Kayu kruing, reng (mutu kayu klas III)

2/3

m3

4,550,000.00

6,500,442.50

5,525,221.25

5,525,200.00

6,906,500.00

6,750,000.00

2.32

26 Kayu balau, balok (mutu kayu klas II)

6/12, 6/15, 8/12

m3

8,750,000.00

9,439,520.00

9,094,760.00

9,094,700.00

11,368,375.00

10,333,900.00

10.01

27 Kayu balau, papan (mutu kayu klas II)

21 Kayu gelam (mutu kayu klas IV)

2/20, 3/20, 3/25

m3

9,250,000.00

9,847,912.50

9,548,956.25

9,548,900.00

11,936,125.00

11,093,900.00

7.59

28 Kayu balau, usuk (mutu kayu klas II)

3/5, 4/6, 5/7

m3

7,500,000.00

8,838,587.50

8,169,293.75

8,169,200.00

10,211,500.00

9,641,600.00

5.91

29 Kayu balau, reng (mutu kayu klas II)

2/3

m3

7,000,000.00

8,398,755.00

7,699,377.50

7,699,300.00

9,624,125.00

9,333,800.00

3.11

m3

4,251,020.00

2,125,510.00

4,251,000.00

5,313,750.00

1,559,900.00

240.65

31 List kayu tahun

1/4

m1

5,000.00

5,530.00

5,265.00

52,000.00

65,000.00

5,500.00

1,081.82

32 List kayu profil

4/4

m1

9,000.00

8,210.00

8,605.00

8,600.00

10,750.00

7,800.00

37.82

33 List kayu profil

5/5

m1

7,000.00

9,475.00

8,237.50

8,200.00

10,250.00

9,100.00

12.64

34 Bambu Jawa bongkotan

10-12 x 300cm

btg

18,000.00

16,327.50

17,163.75

17,100.00

21,375.00

16,000.00

33.59

35 Bambu ori

10-12 x 600cm

btg

25,000.00

32,997.50

28,998.75

29,000.00

36,250.00

25,500.00

42.16

36 Bambu apus

6-10 x 600cm

btg

25,000.00

12,087.50

18,543.75

18,500.00

23,125.00

13,100.00

76.53

37 Gedek guling

m2

20,000.00

13,057.50

16,528.75

16,500.00

20,625.00

9,800.00

110.46

38 Daun pintu kayu Balau, kw 1

3,5 x 90 x 210 cm

lbr

1,070,666.67

535,333.33

1,070,600.00

1,338,250.00

13,382.50

39 Daun pintu kayu Jati, kw 1

3,5 x 90 x 210 cm

lbr

2,375,066.67

1,187,533.33

2,375,000.00

2,968,750.00

29,687.50

1 Asbes gelombang besar tebal 5 mm

1,05 X 3,00

lbr

100,000.00

125,547.50

112,773.75

112,700.00

140,875.00

133,100.00

5.84

2 Asbes gelombang kecil tebal 4 mm

1,05 X 3,00

lbr

69,750.00

97,780.00

83,765.00

83,700.00

104,625.00

93,500.00

11.90

3 Asbes gelombang kecil tebal 4 mm

1,05 X 1,50

lbr

35,000.00

54,745.00

44,872.50

44,800.00

56,000.00

48,400.00

15.70

4 Asbes gelombang kecil tebal 4 mm

1,05 X 1,80

lbr

43,500.00

58,985.00

51,242.50

51,200.00

64,000.00

57,700.00

10.92

5 Asbes bubung gelombang besar tebal 5 mm

m1

52,500.00

62,115.00

57,307.50

57,300.00

71,625.00

67,600.00

5.95

6 Asbes bubung gelombang kecil tebal 4 mm

m1

22,750.00

44,835.00

33,792.50

33,800.00

42,250.00

37,400.00

12.97

7 Harflek tebal 4 mm

40 x 200 cm

lbr

12,666.67

17,035.00

14,850.83

14,850.00

18,562.50

16,900.00

9.84

8 Harflek tebal 4 mm

50 x 200 cm

lbr

15,000.00

19,120.00

17,060.00

17,000.00

21,250.00

19,200.00

10.68

30 Kayu Albasiah (mutu kayu klas IV)

III

BAHAN PENUTUP ATAP DAN PLAFON

9 Harflek tebal 4 mm

60 x 200 cm

lbr

17,250.00

22,092.50

19,671.25

19,600.00

24,500.00

23,100.00

6.06

10 Woodplek tebal 9 mm

30x400

lbr

90,250.00

65,000.00

77,625.00

77,600.00

97,000.00

111,100.00

(12.69)

11 Woodplek tebal 9mm

20x300

lbr

54,500.00

65,000.00

59,750.00

59,750.00

74,687.50

68,900.00

8.40

12 Eternit (lokal)

lbr

10,333.33

12,300.00

11,316.67

11,300.00

14,125.00

9,100.00

55.22

13 Eternit (kerang)

lbr

9,500.00

15,087.50

12,293.75

12,300.00

15,375.00

13,200.00

16.48

14 Eternit (Gresik)

lbr

15,000.00

16,547.50

15,773.75

15,700.00

19,625.00

16,500.00

18.94

15 Gypsum tebal 9 mm

122 x 244

lbr

49,750.00

90,927.50

70,338.75

70,300.00

87,875.00

84,700.00

3.75

16 Gypsum tebal 12 mm

122 x 244

lbr

70,000.00

104,280.00

87,140.00

87,100.00

108,875.00

93,500.00

16.44

17 List Gypsum

15 x 200 cm

btg

20,000.00

36,052.50

28,026.25

28,000.00

35,000.00

27,500.00

27.27

18 List Gypsum

10 x200 cm

btg

15,000.00

22,590.00

18,795.00

18,800.00

23,500.00

20,600.00

14.08

19 Genteng flam press Jawa/lokal

bh

1,440.00

1,440.00

1,400.00

1,750.00

1,400.00

25.00

20 Genteng kaca (model Karang Pilang)

bh

20,000.00

13,267.50

16,633.75

16,600.00

20,750.00

10,500.00

97.62

21 Genteng Karang Pilang/Wisma

bh

2,500.00

5,837.50

4,168.75

4,100.00

5,125.00

5,900.00

(13.14)

22 Genteng bubung Karang Pilang/Wisma

bh

5,000.00

10,552.50

7,776.25

7,700.00

9,625.00

9,800.00

(1.79)

23 Genteng bubung Jawa/lokal

bh

4,000.00

5,862.50

4,931.25

4,900.00

6,125.00

4,500.00

36.11

24 Genteng Bambe

bh

6,515.00

6,515.00

6,500.00

8,125.00

5,500.00

47.73

25 Genteng kodok ex. Wisma

bh

6,666.67

6,666.67

6,600.00

8,250.00

1,900.00

334.21

25 Genteng bubungan Bambe

bh

10,010.00

10,010.00

10,000.00

12,500.00

9,900.00

26.26

26 Genteng prentul ex.Trenggalek

bh

1,602.50

1,602.50

1,600.00

2,000.00

1,800.00

11.11

27 Genteng bubung prentul ex. Trenggalek

bh

6,312.50

6,312.50

6,300.00

7,875.00

4,800.00

64.06

28 Genteng Mantili ex Trenggalek

bh

2,842.50

2,842.50

2,800.00

3,500.00

2,200.00

59.09

Lembar : 16

29 Genteng bubung Mantili ex Trenggalek

bh

7,512.50

7,512.50

7,500.00

9,375.00

5,200.00

80.29

30 Genteng Biasa

bh

1,033.33

1,033.33

1,000.00

1,250.00

12.50

31 Genteng Beton

bh

2,000.00

3,855.00

2,927.50

2,900.00

3,625.00

2,600.00

39.42

32 Genteng bubung Beton

bh

4,000.00

7,587.50

5,793.75

5,800.00

7,250.00

4,800.00

51.04

33 Genteng Kanmuri Glasur

bh

7,340.00

10,697.50

9,018.75

9,000.00

11,250.00

8,100.00

38.89

34 Genteng Kanmuri bubung Glasur

bh

15,700.00

25,772.50

20,736.25

20,700.00

25,875.00

20,300.00

27.46

35 Genteng KIA Glasur

bh

6,780.00

7,596.67

7,188.33

7,100.00

8,875.00

8,100.00

9.57

36 Genteng KIA bubung Glasur

bh

13,875.00

18,863.33

16,369.17

16,300.00

20,375.00

20,300.00

0.37

37 Genteng Impresso Glasur

bh

6,743.33

6,743.33

6,700.00

8,375.00

7,200.00

16.32
10.97

38 Genteng bubung Impresso Glasur

10

bh

17,493.33

17,493.33

17,400.00

21,750.00

19,600.00

39 Seng Talang BJLS 30

l = 90 cm

m1

33,250.00

51,752.50

42,501.25

42,500.00

53,125.00

56,400.00

(5.81)

40 Seng Talang BJLS 27

l = 90 cm

m1

30,000.00

41,057.50

35,528.75

35,500.00

44,375.00

36,700.00

20.91

41 Seng Talang BJLS 27

l = 60 cm

m1

21,000.00

35,390.00

28,195.00

28,100.00

35,125.00

35,400.00

(0.78)

42 Seng Talang BJLS 30

l = 45 cm

m1

19,333.33

32,302.50

25,817.92

25,800.00

32,250.00

26,400.00

22.16

43 Seng Datar BJLS 30

80 x 180 cm

lbr

57,000.00

76,637.50

66,818.75

66,800.00

83,500.00

88,500.00

(5.65)

44 Seng Gelombang BJLS 40

80 x 180 cm

lbr

72,500.00

99,710.00

86,105.00

86,100.00

107,625.00

114,100.00

(5.67)

45 Seng Gelombang BJLS 30

80 x 180 cm

lbr

67,666.67

85,390.00

76,528.33

76,500.00

95,625.00

88,500.00

8.05

46 Seng Gelombang BJLS 30

80 x 300 cm

lbr

72,000.00

129,360.00

100,680.00

100,600.00

125,750.00

145,200.00

(13.40)

47 Seng Gelombang BJLS 30

80 x 150 cm

lbr

73,600.00

73,600.00

73,600.00

92,000.00

89,200.00

3.14

48 Seng Datar BJLS 27

80 x 180 cm

lbr

74,145.00

74,145.00

74,100.00

92,625.00

73,700.00

25.68

49 Karet Talang

l = 60 cm

m1

9,625.00

12,560.00

11,092.50

11,000.00

13,750.00

12,100.00

13.64

50 Karet Talang

l = 90 cm

m1

14,250.00

17,345.00

15,797.50

15,700.00

19,625.00

15,700.00

25.00

51 Fiber glass "Kano Flash"

l = 92 cm.

m1

80,000.00

69,615.00

74,807.50

74,800.00

93,500.00

101,000.00

(7.43)

52 Teakwood tebal 3 mm

( 4' x 8' )

lbr

76,666.67

128,380.00

102,523.33

102,500.00

128,125.00

127,000.00

0.89

53 Teakwood tebal 3 mm

(90 x 210 )cm

lbr

62,500.00

98,832.50

80,666.25

80,600.00

100,750.00

95,100.00

5.94

54 Tripleks tebal 9 mm

( 4' x 8' )

lbr

110,000.00

162,577.50

136,288.75

136,200.00

170,250.00

163,300.00

4.26

55 Tripleks tebal 3 mm

( 4' x 8' )

lbr

48,125.00

72,180.00

60,152.50

60,100.00

75,125.00

60,500.00

24.17

56 Plywood tebal 6 mm

( 4' x 8' )

lbr

75,000.00

116,675.00

95,837.50

95,800.00

119,750.00

114,100.00

4.95

57 Plywood tebal 4 mm

(90 x 210) cm

lbr

70,000.00

85,312.50

77,656.25

77,600.00

97,000.00

75,400.00

28.65

58 Plywood tebal 4 mm

( 4' x 8' )

lbr

107,332.50

107,332.50

107,300.00

134,125.00

93,100.00

44.07

59 Plywood tebal 2 mm

( 4' x 8' )

lbr

78,302.50

78,302.50

78,300.00

97,875.00

85,300.00

14.74

60 Multiplek 12 mm

( 4' x 8' )

lbr

101,500.00

206,510.00

154,005.00

154,000.00

192,500.00

199,600.00

(3.56)

61 Formica

( 4' x 8' )

lbr

185,360.00

185,360.00

185,300.00

231,625.00

210,600.00

9.98

62 Alumunium Coklat Merk YYK

( 5 x 10 )cm

m1

225,000.00

109,470.00

167,235.00

167,200.00

209,000.00

239,500.00

(12.73)

63 Alumunium Silver Merk YYK

( 5 x 10 )cm

m1

200,000.00

72,430.00

136,215.00

136,200.00

170,250.00

266,400.00

(36.09)

( 4' x 8' )

lbr

48,333.33

56,670.00

52,501.67

52,500.00

65,625.00

67,600.00

(2.92)

1 Besi begel/baut

kg

14,000.00

21,495.00

17,747.50

17,700.00

22,125.00

21,000.00

5.36

2 Besi beton polos

kg

9,250.00

11,155.00

10,202.50

10,200.00

12,750.00

10,500.00

21.43

64 Kalsiboard tebal 4 mm
IV

BAHAN BESI/LOGAM

3 Besi beton ulir

kg

9,533.33

13,157.50

11,345.42

11,300.00

14,125.00

12,000.00

17.71

1" - 6 m.

btg

145,000.00

150,132.50

147,566.25

147,500.00

184,375.00

136,400.00

35.17

1,5"

bh

8,500.00

23,462.50

15,981.25

16,000.00

20,000.00

21,100.00

(5.21)

1/2" - 6 m.

btg

122,500.00

139,890.00

131,195.00

131,100.00

163,875.00

151,200.00

8.38

7 Pipa besi galvanis medium A (tebal 3 mm)

1" - 6 m.

btg

195,000.00

235,120.00

215,060.00

215,000.00

268,750.00

257,400.00

4.41

8 Pipa besi galvanis medium A (tebal 3 mm)

1,25" - 6 m.

btg

242,500.00

294,552.50

268,526.25

268,500.00

335,625.00

317,900.00

5.58

9 Pipa besi galvanis medium A (tebal 3 mm)

1,5" - 6 m.

btg

292,500.00

370,422.50

331,461.25

331,400.00

414,250.00

453,700.00

(8.70)

10 Pipa besi galvanis medium A (tebal 3,3 mm)

2" - 6 m.

btg

460,000.00

508,335.00

484,167.50

484,100.00

605,125.00

620,400.00

(2.46)

11 Pipa besi galvanis medium A (tebal 3,3 mm)

2,5" - 6 m.

btg

600,000.00

664,517.50

632,258.75

632,200.00

790,250.00

831,600.00

(4.97)

12 Pipa besi galvanis medium A (tebal 3,6 mm)

3" - 6 m.

btg

800,000.00

817,710.00

808,855.00

808,800.00

1,011,000.00

1,028,500.00

(1.70)

4 Besi pipa air medium A (warna hijau)


5 Keni besi (elbouw)
6 Pipa besi galvanis medium A (tebal 2,4 mm)

Lembar : 17

13 Pipa besi galvanis medium A (tebal 4 mm)

4" - 6 m.

btg

1,150,000.00

1,097,992.50

1,123,996.25

1,124,000.00

1,405,000.00

1,331,000.00

14 Pipa besi galvanis medium A (tebal 4,2 mm)

5" - 6 m.

btg

1,550,000.00

1,588,900.00

1,569,450.00

1,569,400.00

1,961,750.00

1,925,000.00

1.91

15 Besi plat 2 mm,

4' x 8'

lbr

460,000.00

641,600.00

550,800.00

550,800.00

688,500.00

700,000.00

(1.64)

16 Besi plat aluminium tebal 2 mm

4' x 8'

lbr

674,927.50

674,927.50

674,900.00

843,625.00

726,000.00

16.20

17 Besi plat bordes tebal 3 mm

4' x 8'

lbr

740,000.00

1,081,990.00

910,995.00

911,000.00

1,138,750.00

1,331,000.00

(14.44)

18 Besi plat strip panjang tebal 3 mm

10
5.56

(30x6000)mm

m1

39,355.00

39,355.00

39,300.00

49,125.00

42,350.00

16.00

19 Besi profil WF <= 200 mm

kg

10,000.00

14,286.67

12,143.33

12,100.00

15,125.00

13,700.00

10.40

20 Besi profil WF <= 200 s.d. 400 mm

kg

10,000.00

13,620.00

11,810.00

11,800.00

14,750.00

13,700.00

7.66

21 Besi profil WF <= 200 s.d. 500 mm

kg

10,000.00

13,636.67

11,818.33

11,800.00

14,750.00

13,700.00

7.66

22 Besi siku

L.60.60.6

btg

309,337.50

309,337.50

309,300.00

386,625.00

363,000.00

6.51

23 Besi siku

L.50.50.6

btg

200,000.00

185,697.50

192,848.75

192,800.00

241,000.00

211,700.00

13.84

24 Besi siku

L.30.30.3

btg

55,000.00

89,397.50

72,198.75

72,200.00

90,250.00

91,000.00

(0.82)

C 125,50,3

ljr

260,000.00

416,467.50

338,233.75

338,200.00

422,750.00

502,000.00

(15.79)

26 Kawat harmonika

m2

25,000.00

39,027.50

32,013.75

32,000.00

40,000.00

30,200.00

32.45

27 Kawat ikat beton (bendrat)

kg

14,500.00

21,170.00

17,835.00

17,800.00

22,250.00

21,000.00

5.95

28 Kawat nyamuk kasa alumunium

m2

30,000.00

40,365.00

35,182.50

35,100.00

43,875.00

39,000.00

12.50

29 Kawat ayakan pasir (utk pasang)

m2

25,000.00

23,300.00

24,150.00

24,100.00

30,125.00

35,400.00

(14.90)

30 Kawat ayakan pasir (utk plesteran)

m2

25,000.00

25,190.00

25,095.00

25,000.00

31,250.00

42,000.00

(25.60)

31 Kawat duri pagar

m1

15,000.00

10,900.00

12,950.00

12,900.00

16,125.00

13,100.00

23.09

32 Kawat nyamuk kasa plastik

m2

16,295.00

16,295.00

16,200.00

20,250.00

15,000.00

35.00

33 Kawat tali Bwg 10

3,2 mm.

kg

12,750.00

19,132.50

15,941.25

15,900.00

19,875.00

19,800.00

0.38

34 Kawat wire mesh

kg

23,840.00

23,840.00

23,800.00

29,750.00

15,000.00

98.33

25 Besi canal

35 Tiang pagar BRC/PMG

2", t=120

btg

52,105.00

52,105.00

52,100.00

65,125.00

88,500.00

(26.41)

36 Pintu dorong BRC/PMG

120 x 300 cm

unit

1,384,665.00

1,384,665.00

1,384,600.00

1,730,750.00

1,402,500.00

23.40

37 Pintu swing ganda BRC/PMG

120 x 300 cm

unit

1,334,665.00

1,334,665.00

1,334,600.00

1,668,250.00

1,471,900.00

13.34

38 Pagar BRC/PMG A

120 x 240 cm

unit

140,000.00

645,613.33

392,806.67

392,800.00

491,000.00

712,000.00

(31.04)

39 Bondex

0.75X1.00

m2

320,776.67

320,776.67

320,700.00

400,875.00

370,100.00

8.32

40 Pipa besi putih

1,5" - 6 m.

btg

100,000.00

238,033.33

169,016.67

169,000.00

211,250.00

271,600.00

(22.22)

41 Pipa gas/hitam medium A (tebal 2,4 mm)

(12.03)

3/4" - 6 m.

btg

100,000.00

87,363.33

93,681.67

93,600.00

117,000.00

133,000.00

42 Pipa gas/hitam medium A (tebal 3 mm)

1" - 6 m.

btg

150,000.00

153,886.67

151,943.33

151,900.00

189,875.00

205,700.00

(7.69)

43 Pipa gas/hitam medium A (tebal 3 mm)

1,25" - 6 m.

btg

192,500.00

210,183.33

201,341.67

201,300.00

251,625.00

296,000.00

(14.99)

44 Pipa gas/hitam medium A (tebal 3 mm)

1,5" - 6 m.

btg

235,000.00

239,573.33

237,286.67

237,200.00

296,500.00

352,000.00

(15.77)

45 Pipa gas/hitam medium A (tebal 3,3 mm)

2" - 6 m.

btg

320,000.00

319,746.67

319,873.33

319,800.00

399,750.00

478,500.00

(16.46)

46 Pipa gas/hitam medium A (tebal 3,6 mm)

3" - 6 m.

btg

610,000.00

545,303.33

577,651.67

577,600.00

722,000.00

897,000.00

(19.51)

47 Pipa gas/hitam medium A (tebal 4 mm)

4" - 6 m.

btg

810,000.00

701,933.33

755,966.67

755,900.00

944,875.00

1,248,800.00

(24.34)

48 Pipa gas/hitam medium A (tebal 4,2 mm)

5" - 6 m.

btg

1,000,000.00

926,673.33

963,336.67

963,300.00

1,204,125.00

1,244,900.00

(3.28)

49 Pipa gas/hitam medium A (tebal 4,2 mm)

6" - 6 m.

btg

1,500,000.00

1,062,936.67

1,281,468.33

1,281,400.00

1,601,750.00

1,339,400.00

19.59

50 Pintu Alumunium (kualitas II)

70 x 200 cm

unit

700,000.00

638,335.00

669,167.50

669,100.00

836,375.00

299,700.00

179.07

51 Pintu PVC (kualitas baik)

70 x 210 cm

unit

371,250.00

664,976.67

518,113.33

518,100.00

647,625.00

786,500.00

(17.66)

52 Profil Alumunium

m1

53 Slimar alumunium (lebar 50 mm)

m1

139,100.00

(100.00)

54 Sunscreen Alumunium

m2

94,500.00

(100.00)

55 Ramset/Dina Bolt

bh

56 Pagar kawat jaring

lbr

229,600.00

(100.00)

57 Pagar besi ulir komplit dg mainan

m2

500,000.00

616,272.50

558,136.25

558,100.00

697,625.00

632,500.00

10.30

58 Pintu pagar besi ulir komplit dg mainan

m2

575,000.00

698,960.00

636,980.00

636,900.00

796,125.00

763,800.00

4.23

59 Pintu rolling door

m2

550,000.00

729,502.50

639,751.25

639,700.00

799,625.00

709,500.00

12.70

60 Pintu plat harmonika

m2

975,000.00

1,195,045.00

1,085,022.50

1,085,000.00

1,356,250.00

1,265,000.00

7.21

61 Atap twin lite rangka pipa stainless steel

m2

737,500.00

774,720.00

756,110.00

756,100.00

945,125.00

872,100.00

8.37

62 Atap twin lite rangka pipa besi

m2

650,000.00

640,565.00

645,282.50

645,200.00

806,500.00

727,100.00

10.92

Lembar : 18

63 Teralis besi

m2

488,567.50

488,567.50

488,500.00

610,625.00

498,300.00

22.54

64 Teralis aluminium

m2

1,200,000.00

740,310.00

970,155.00

970,100.00

1,212,625.00

1,114,300.00

8.82

2"

m2

600,000.00

964,757.50

782,378.75

782,300.00

977,875.00

898,200.00

8.87

66 Usuk Galvalum

0,8 mm

m1

14,566.67

38,360.00

26,463.33

26,400.00

33,000.00

32,800.00

0.61

67 Reng Galvalum

0,6 mm

m1

5,066.67

25,300.00

15,183.33

15,100.00

18,875.00

26,200.00

(27.96)

68 Kusen Pintu Aluminium Silver "HC"

4 / 12

m1

80,000.00

134,896.67

107,448.33

107,400.00

134,250.00

210,600.00

(36.25)

69 Kusen Pintu Aluminium Coklat "YKK"

5 / 10

m1

225,000.00

161,766.67

193,383.33

193,300.00

241,625.00

295,900.00

(18.34)

70 Kusen Jendela Aluminium Silver "HC"

4 / 12

m1

80,000.00

133,780.00

106,890.00

106,800.00

133,500.00

206,000.00

(35.19)

71 Kusen Jendela Aluminium Coklat "YKK"

5 / 10

m1

225,000.00

161,766.67

193,383.33

193,300.00

241,625.00

295,900.00

(18.34)

250 mm

m1

117,140.00

117,140.00

117,100.00

146,375.00

216,500.00

(32.39)

tube

30,000.00

38,370.00

34,185.00

34,100.00

42,625.00

41,200.00

3.46

60x60 cm

bh

1,149,080.00

1,149,080.00

1,149,000.00

1,436,250.00

14,362.50

1 Paving stone per segi abu-abu, cetak kering

t = 6 cm

m2

33,500.00

47,520.00

40,510.00

40,500.00

50,625.00

45,200.00

12.00

2 Paving stone per segi abu-abu, cetak basah

t = 6 cm

m2

53,640.00

53,640.00

53,600.00

67,000.00

63,800.00

5.02

3 Paving stone 3 berlian abu-abu, cetak kering

t = 6 cm

m2

32,000.00

45,160.00

38,580.00

38,500.00

48,125.00

46,500.00

3.49

4 Paving stone 3 berlian merah, cetak basah

t = 6 cm

m2

35,000.00

55,487.50

45,243.75

45,200.00

56,500.00

62,700.00

(9.89)

5 Paving stone segi 6 abu-abu, cetak kering

t = 6 cm

m2

33,500.00

47,660.00

40,580.00

40,500.00

50,625.00

45,100.00

12.25

6 Paving stone segi 6 merah, cetak basah

t = 6 cm

m2

35,000.00

51,707.50

43,353.75

43,300.00

54,125.00

61,600.00

(12.13)

7 Paving stone persegi merah

t = 6 cm

m2

32,000.00

50,482.50

41,241.25

41,200.00

51,500.00

52,800.00

(2.46)

8 Paving stone persegi abu-abu, cetak basah

t = 8 cm

m2

60,792.50

60,792.50

60,700.00

75,875.00

67,500.00

12.41

9 Paving stone persegi abu-abu, cetak kering

t = 8 cm

m2

57,487.50

57,487.50

57,400.00

71,750.00

65,600.00

9.38

10 Paving stone 3 berlian abu-abu

t = 8 cm

m2

54,470.00

54,470.00

54,400.00

68,000.00

59,700.00

13.90

65 Railling stainless steel

72 Waterstop "Maspion"
73 Sealent
74 Mainhole plat baja
V

10

BAHAN LANTAI

11 Paving stone 3 berlian merah

t = 8 cm

m2

58,015.00

58,015.00

5,800.00

7,250.00

66,900.00

(89.16)

12 Paving stone segi 6 abu-abu

t = 8 cm

m2

54,470.00

54,470.00

54,000.00

67,500.00

59,700.00

13.07

13 Paving stone segi 6 merah

t = 8 cm

m2

57,015.00

57,015.00

57,000.00

71,250.00

66,900.00

6.50

14 Paving stone abu-abu, cetak basah K-300

10x20x8

m2

88,743.33

88,743.33

88,700.00

110,875.00

65,400.00

69.53

15 Paving stone abu-abu, cetak basah K-400

10x20x8

m2

90,236.67

90,236.67

90,200.00

112,750.00

88,500.00

27.40

16 Tegel PC Abu-abu

20 x 20

m2

40,365.00

40,365.00

40,300.00

50,375.00

40,000.00

25.94

17 Tegel PC Abu-abu

20 x 30

m2

45,755.00

45,755.00

45,700.00

57,125.00

45,900.00

24.46

18 Tegel PC Abu-abu

30 x 30

m2

48,312.50

48,312.50

48,300.00

60,375.00

47,900.00

26.04

19 Ubin warna

20 x 20

m2

35,000.00

49,196.67

42,098.33

42,100.00

52,625.00

49,500.00

6.31

20 Ubin warna

30 x 30

m2

35,000.00

50,233.33

42,616.67

42,600.00

53,250.00

50,600.00

5.24

21 Ubin warna

40 x 40

m2

35,000.00

61,243.33

48,121.67

48,100.00

60,125.00

68,200.00

(11.84)

22 Tegel keramik

10 x 20

m2

47,663.33

47,663.33

47,600.00

59,500.00

61,000.00

(2.46)

23 Tegel keramik polos

15 x 15

m2

39,750.00

39,750.00

39,750.00

49,687.50

47,900.00

3.73

24 Tegel keramik, Claudia

20 x 25

m2

41,500.00

52,065.00

46,782.50

46,700.00

58,375.00

51,800.00

12.69

25 Tegel keramik, Asia

20 x 25

m2

39,000.00

52,666.67

45,833.33

45,800.00

57,250.00

63,200.00

(9.41)

26 Tegel keramik, berserat

30 x 30

m2

40,000.00

54,703.33

47,351.67

47,300.00

59,125.00

59,400.00

(0.46)

27 Tegel keramik putih, Asia

30 x 30

m2

32,500.00

42,250.00

37,375.00

37,300.00

46,625.00

46,200.00

0.92

28 Tegel keramik, (kasar)

20 x 20

m2

37,500.00

51,915.00

44,707.50

44,700.00

55,875.00

55,000.00

1.59

29 Tegel keramik, Super Milan

40 x 40

m2

55,250.00

65,520.00

60,385.00

60,300.00

75,375.00

73,700.00

2.27

30 Tegel keramik, Austria Blue

30 x 30

m2

48,853.33

48,853.33

48,800.00

61,000.00

63,800.00

(4.39)

31 Tegel keramik, Mulia

30 x 30

m2

33,000.00

43,660.00

38,330.00

38,300.00

47,875.00

53,800.00

(11.01)

32 Tegel keramik, KIA

30 x 30

m2

38,500.00

50,107.50

44,303.75

44,300.00

55,375.00

52,800.00

4.88

33 Tegel keramik, Arwana

30 x 30

m2

30,833.33

44,147.50

37,490.42

37,400.00

46,750.00

49,500.00

(5.56)

34 Tegel keramik, Asia Tile

30 x 30

m2

47,500.00

45,535.00

46,517.50

46,500.00

58,125.00

46,500.00

25.00

35 Tegel keramik, Classic

30 x 30

m2

57,180.00

57,180.00

57,100.00

71,375.00

60,500.00

17.98

36 Tegel keramik, Essenza

40 x 40

m2

178,000.00

197,746.67

187,873.33

187,800.00

234,750.00

245,300.00

(4.30)

Lembar : 19

37 Tegel keramik, Diamond

20 x 20

m2

42,500.00

52,386.67

47,443.33

47,400.00

59,250.00

55,000.00

38 Tegel teraso

20 x 20

m2

43,160.00

43,160.00

43,100.00

53,875.00

50,500.00

6.68

39 Tegel teraso

30 x 30

m2

47,200.00

47,200.00

47,200.00

59,000.00

52,500.00

12.38

40 Tegel teraso

40 x 40

m2

53,180.00

53,180.00

53,100.00

66,375.00

56,400.00

17.69

41 Tegel keramik, Granito

30 x 30

m2

205,500.00

205,500.00

205,500.00

256,875.00

209,000.00

22.91

42 Tegel keramik, Granito

40 x 40

m2

175,000.00

281,286.67

228,143.33

228,100.00

285,125.00

280,500.00

1.65

43 Tegel keramik Granite Black

40 x 40

m2

160,000.00

238,055.00

199,027.50

199,000.00

248,750.00

292,600.00

(14.99)

44 Tegel keramik Granite Polish

40 x 40

m2

170,000.00

263,120.00

216,560.00

216,500.00

270,625.00

282,700.00

(4.27)

45 Tegel galar

20 x 20

m2

51,326.67

51,326.67

51,300.00

64,125.00

48,400.00

32.49

46 Tegel keramik, bermotif/warna

40 x 50

m2

11,000.00

(100.00)

47 Tegel plint keramik warna

10 x 30

m1

38,960.00

38,960.00

38,900.00

48,625.00

40,000.00

21.56

48 Tegel wafel

20 x 20

m2

36,535.00

36,535.00

36,500.00

45,625.00

41,300.00

10.47

49 Ubin keramik artistik

5 x 20

bh

11,726.67

11,726.67

11,700.00

14,625.00

12,400.00

17.94

50 Ubin keramik artistik

10 x 20

bh

20,216.67

20,216.67

20,200.00

25,250.00

21,600.00

16.90

51 Ubin keramik artistik

15 x 15

bh

47,545.00

47,545.00

47,500.00

59,375.00

51,800.00

14.62

52 Ubin keramik artistik

20 x 20

bh

57,320.00

57,320.00

57,300.00

71,625.00

59,000.00

21.40

53 Lantai vinyl karet kw 1

30 x 30

m2

71,030.00

71,030.00

71,000.00

88,750.00

82,000.00

8.23

54 Marmer ex. Tulungagung

40 x 60

m2

316,113.33

316,113.33

316,100.00

395,125.00

314,300.00

25.72

55 List Keramik/Border

10 x 20

bh

4,000.00

10,043.33

7,021.67

7,000.00

8,750.00

11,000.00

(20.45)

56 Keramik Granitile Polish

60 x 60

m2

298,000.00

125,086.67

211,543.33

211,500.00

264,375.00

190,300.00

38.93

57 Keramik Granitile Unpolish

60 x 60

m2

250,000.00

202,946.67

226,473.33

226,400.00

283,000.00

412,700.00

(31.43)

58 Stepnoiseng

10x 40

bh

16,250.00

19,246.67

17,748.33

17,700.00

22,125.00

20,000.00

10.63

59 Stepnoiseng

7 x 30

bh

10,133.33

14,643.33

12,388.33

12,300.00

15,375.00

15,000.00

2.50

60 Granito ex Cina

60 x 60

m2

108,000.00

128,993.33

118,496.67

118,500.00

148,125.00

166,600.00

(11.09)

61 Mozaic/Granito Merk Lotus

60 x 60

bh

350,812.00

350,812.00

350,850.00

438,562.50

4,385.63

62 Keramik/Tipe Alur Merk Mas/Roman

30 x 30

m2

70,240.00

70,240.00

70,300.00

87,875.00

878.75

1 Cat besi Emco tanda Bintang

kg

54,375.00

56,500.00

55,437.50

55,400.00

69,250.00

72,000.00

(3.82)

2 Cat kayu Emco tanda Bintang

kg

54,166.67

58,000.00

56,083.33

56,000.00

70,000.00

72,000.00

(2.78)

3 Meni besi/kayu, cap Pedang

kg

18,875.00

24,875.00

21,875.00

21,800.00

27,250.00

22,300.00

22.20

4 Thinner A spesial "Altech"

ltr

25,000.00

28,625.00

26,812.50

26,800.00

33,500.00

28,800.00

16.32

5 Thinner A biasa "Power"

ltr

15,000.00

24,125.00

19,562.50

19,500.00

24,375.00

22,300.00

9.30

6 Thinner B spesial

ltr

9,375.00

16,250.00

12,812.50

12,800.00

16,000.00

15,700.00

1.91

7 Minyak cat/afduner

ltr

7,500.00

14,875.00

11,187.50

11,100.00

13,875.00

15,900.00

(12.74)

8 Cat tembok eksterior Mowilex

ltr

180,000.00

120,000.00

150,000.00

150,000.00

187,500.00

169,300.00

10.75

9 Cat tembok Alcabond

kg

30,000.00

31,833.33

30,916.67

30,900.00

38,625.00

28,200.00

36.97

10 Cat tembok Alcaplast

kg

30,000.00

27,933.33

28,966.67

28,900.00

36,125.00

9,100.00

296.98
360.59

VI

10
7.73

BAHAN PENGECATAN

11 Cat tembok Wallsealer

kg

22,000.00

39,600.00

30,800.00

74,800.00

93,500.00

20,300.00

12 Cat tembok Vinylex

kg

21,712.50

21,712.50

21,700.00

27,125.00

21,000.00

29.17

13 Cat tembok Decolith

kg

12,000.00

17,047.50

14,523.75

14,500.00

18,125.00

32,100.00

(43.54)

14 Cat tembok Metrolith

kg

16,000.00

19,825.00

17,912.50

17,900.00

22,375.00

62,300.00

(64.09)

15 Cat tembok Cathylac

kg

17,000.00

20,325.00

18,662.50

18,600.00

23,250.00

44,600.00

(47.87)

16 Cat tembok Cendana

kg

19,000.00

17,533.33

18,266.67

18,200.00

22,750.00

91,200.00

(75.05)

17 Cat genteng Matex

kg

43,466.67

43,466.67

43,400.00

54,250.00

50,500.00

7.43

18 Serlak kripik "India"

kg

95,450.00

95,450.00

95,450.00

119,312.50

114,900.00

3.84

19 Politur jadi merk "Impra"

ltr

48,000.00

61,975.00

54,987.50

54,900.00

68,625.00

51,100.00

34.30

20 Wood Filler "Impra"

ltr

27,375.00

38,466.67

32,920.83

32,900.00

41,125.00

36,700.00

12.06

21 Wood Stain 'Impra"

ltr

50,900.00

64,366.67

57,633.33

57,600.00

72,000.00

72,600.00

(0.83)

22 Sanding Sealer "Impra"

ltr

43,250.00

52,100.00

47,675.00

47,600.00

59,500.00

66,200.00

(10.12)

Lembar : 20

10

23 Vernis (Glotex)

ltr

42,500.00

42,750.00

42,625.00

42,600.00

53,250.00

45,200.00

17.81

24 Dempul Plitur (Impra)

kg

37,625.00

37,625.00

37,600.00

47,000.00

38,500.00

22.08

25 Dempul Plitur kualitas sedang

kg

27,625.00

27,625.00

27,600.00

34,500.00

33,000.00

4.55

26 Plitur batangan

kg

21,525.00

21,525.00

21,500.00

26,875.00

24,200.00

11.05

27 T e e r

kg

9,875.00

9,875.00

9,800.00

12,250.00

11,000.00

11.36

28 Kertas gosok

lbr

2,666.67

3,750.00

3,208.33

3,200.00

4,000.00

5,000.00

(20.00)

29 Waterproof, Aquaproof Pro Seller

kg

45,000.00

56,875.00

50,937.50

50,900.00

63,625.00

59,500.00

6.93

30 Waterproof, Multiroof

kg

61,000.00

61,000.00

61,000.00

76,250.00

57,000.00

33.77

31 Waterproof, Nippon Paint Shield

kg

78,000.00

68,325.00

73,162.50

73,100.00

91,375.00

58,300.00

56.73

32 Plamur tembok

kg

11,672.50

11,672.50

11,600.00

14,500.00

9,900.00

46.46

33 Plamur kayu

kg

23,600.00

23,600.00

23,600.00

29,500.00

21,600.00

36.57

34 Plamur besi

kg

37,050.00

37,050.00

37,000.00

46,250.00

36,700.00

26.02

35 Spiritus

ltr

15,087.50

15,087.50

15,000.00

18,750.00

14,850.00

26.26

36 Lem Rajawali untuk kayu

kg

25,833.33

40,750.00

33,291.67

33,200.00

41,500.00

40,000.00

3.75

37 Lem Rajawali untuk tembok

kg

9,125.00

14,533.33

11,829.17

11,800.00

14,750.00

18,100.00

(18.51)

38 Lem kayu khusus (Vinyl)

kg

32,500.00

25,200.00

28,850.00

28,850.00

36,062.50

26,200.00

37.64

39 Soda Api

kg

22,500.00

18,250.00

20,375.00

20,300.00

25,375.00

21,600.00

17.48

40 Teak Oil

ltr

35,000.00

29,550.00

32,275.00

32,200.00

40,250.00

30,800.00

30.68

41 Residu

ltr

42 Kuas Eterna

3"

bh

8,166.67

15,625.00

11,895.83

11,800.00

14,750.00

11,000.00

34.09

43 Kuas Eterna

4"

bh

13,166.67

20,375.00

16,770.83

16,700.00

20,875.00

16,500.00

26.52

44 Kuas Eterna

5"

bh

16,333.33

23,133.33

19,733.33

19,700.00

24,625.00

20,900.00

17.82

45 Kalsium

kg

1,000.00

1,350.00

1,175.00

1,100.00

1,375.00

1,300.00

5.77

46 Coating

kg

60,000.00

38,166.67

49,083.33

49,000.00

61,250.00

55,700.00

9.96

47 Wallpaper "Kansai"

m2

78,900.00

78,900.00

78,900.00

98,625.00

141,700.00

(30.40)

1 Engsel H

4"

set

13,775.00

13,775.00

13,700.00

17,125.00

48,500.00

(64.69)

2 Engsel Kuningan

4"

set

17,487.50

17,487.50

17,400.00

21,750.00

18,700.00

16.31

3 Engsel jendela (kupu - kupu)

3"

set

68,000.00

11,562.50

39,781.25

39,700.00

49,625.00

15,000.00

230.83

4 Engsel pintu "UNION"

4"

bh

20,825.00

20,825.00

20,800.00

26,000.00

20,300.00

28.08

5 Engsel jendela "UNION"

3"

bh

26,250.00

26,250.00

26,200.00

32,750.00

17,000.00

92.65

6 Espanyolet kualitas I

set

44,966.67

44,966.67

44,900.00

56,125.00

50,500.00

11.14

7 Grendel

bh

28,600.00

28,600.00

28,600.00

35,750.00

33,400.00

7.04

8 Grendel biasa (besar)

8"

bh

10,000.00

14,912.50

12,456.25

12,400.00

15,500.00

14,400.00

7.64

9 Grendel biasa (kecil)

3"

bh

5,750.00

6,625.00

6,187.50

6,100.00

7,625.00

5,900.00

29.24

VII

BAHAN PENGGANTUNG DAN PENGUNCI

10 Grendel kuningan/krom kecil

4"

bh

10,000.00

20,866.67

15,433.33

15,400.00

19,250.00

23,100.00

(16.67)

11 Grendel tanam kuningan besar

60 cm

set

120,000.00

122,966.67

121,483.33

121,400.00

151,750.00

246,400.00

(38.41)

12 Kunci gembok besar, Globe

40 mm

bh

10,000.00

35,650.00

22,825.00

22,800.00

28,500.00

37,400.00

(23.80)

13 Kunci gembok sedang, Globe

30 mm

bh

8,000.00

27,662.50

17,831.25

17,800.00

22,250.00

24,200.00

(8.06)

14 Kunci tanam (808)

bh

8,000.00

12,087.50

10,043.75

10,000.00

12,500.00

10,500.00

19.05

15 Kunci tanam (2x putar) besar

bh

83,400.00

83,400.00

93,400.00

116,750.00

84,700.00

37.84

16 Kunci tanam "SES" besar (tanpa handel)

bh

140,000.00

260,750.00

200,375.00

200,300.00

250,375.00

171,900.00

45.65

17 Kunci tanam (dengan handel)

bh

110,000.00

119,266.67

114,633.33

114,600.00

143,250.00

245,300.00

(41.60)

18 Kunci tanam KM/WC

bh

85,325.00

85,325.00

85,300.00

106,625.00

85,800.00

24.27

19 Kunci silinder "SES"

bh

140,000.00

121,383.33

130,691.67

130,600.00

163,250.00

271,600.00

(39.89)

20 Kunci slot merk "SES" (dengan handel)

bh

360,000.00

388,900.00

374,450.00

374,400.00

468,000.00

452,800.00

3.36

21 Kunci slot 2 putaran "YALE" (dengan handel)

bh

130,612.50

130,612.50

130,600.00

163,250.00

139,700.00

16.86

22 Kunci slot 2 putaran "CAVEL" (dengan handel)

bh

260,000.00

276,000.00

268,000.00

268,000.00

335,000.00

357,000.00

(6.16)

23 Kunci lemari, Wing

bh

8,000.00

7,175.00

7,587.50

7,500.00

9,375.00

13,100.00

(28.44)

Lembar : 21

24 Hak angin biasa

8"

set

12,000.00

8,300.00

10,150.00

10,100.00

12,625.00

8,500.00

48.53

25 Hak angin 4 mm (lurus)

set

11,862.50

11,862.50

11,800.00

14,750.00

18,300.00

(19.40)

26 Hak angin (sikutan) "SES"

set

30,000.00

24,550.00

27,275.00

27,200.00

34,000.00

42,600.00

(20.19)

27 Hak angin lurus (bisa disetel maju/mundur) "SES"

set

55,000.00

69,166.67

62,083.33

62,000.00

77,500.00

82,500.00

(6.06)

p = 20 cm

bh

82,400.00

82,400.00

82,400.00

103,000.00

160,100.00

(35.67)

29 Spring knip

bh

30,000.00

33,266.67

31,633.33

31,600.00

39,500.00

22,900.00

72.49

30 Door closer

bh

267,000.00

227,733.33

247,366.67

247,300.00

309,125.00

233,200.00

32.56

31 Door stopper

bh

34,000.00

49,833.33

41,916.67

41,900.00

52,375.00

66,900.00

(21.71)

32 Rel pintu dorong, biasa

btg

155,000.00

157,650.00

156,325.00

156,300.00

195,375.00

147,600.00

32.37

33 Rel pintu dorong, J4 SES

btg

170,000.00

242,875.00

206,437.50

206,400.00

258,000.00

244,100.00

5.69

1 Slang spiral saluran kran wastafel

set

28,750.00

53,550.00

41,150.00

41,100.00

51,375.00

53,100.00

(3.25)

2 Kloset duduk porselin komplit (INA)

bh

916,666.67

1,240,000.00

1,078,333.33

1,078,300.00

1,347,875.00

1,225,800.00

9.96

3 Kloset duduk porselin komplit (KIA)

bh

1,325,000.00

1,355,000.00

1,340,000.00

1,340,000.00

1,675,000.00

1,447,600.00

15.71

4 Kloset duduk porselin komplit (TOTO)

bh

1,521,666.67

1,817,500.00

1,669,583.33

1,669,500.00

2,086,875.00

1,900,500.00

9.81

5 Kloset jongkok porselin (INA)

bh

96,875.00

143,125.00

120,000.00

120,000.00

150,000.00

161,400.00

(7.06)

6 Kloset jongkok porselin (TOTO)

bh

173,000.00

202,066.67

187,533.33

157,500.00

196,875.00

230,300.00

(14.51)

7 Kloset jongkok teraso

bh

62,000.00

62,000.00

62,000.00

77,500.00

34,100.00

127.27

8 Kran air stainless steel

1/2"

bh

50,000.00

49,100.00

49,550.00

49,500.00

61,875.00

48,400.00

27.84

9 Kran air stainless steel

3/4"

bh

60,000.00

57,575.00

58,787.50

58,700.00

73,375.00

53,800.00

36.38

10 Kran air (DUPONT)

1/2"

bh

125,000.00

92,912.50

108,956.25

108,900.00

136,125.00

188,600.00

(27.82)

11 Kran air kuningan

1/2"

bh

24,916.67

32,458.33

32,400.00

40,500.00

39,300.00

3.05

12 Kran shower "Toto"

3/4"

set

484,000.00

484,000.00

484,000.00

605,000.00

507,900.00

19.12

bh

5,666,666.67

5,666,666.67

5,666,600.00

7,083,250.00

5,250,000.00

34.92

28 Pegangan pintu (model standar)

VIII

10

BAHAN SANITASI

13 Septic Tank (10 pemakai) dan Sumur

40,000.00

Peresapan (dalam 3,00 m)


3/4"

bh

12,000.00

11,712.50

11,856.25

11,800.00

14,750.00

12,400.00

18.95

15 Wastafel warna muda "ITO"

bh

265,000.00

405,150.00

335,075.00

335,000.00

418,750.00

321,500.00

30.25

16 Wastafel warna tua "ITO"

bh

292,000.00

465,950.00

378,975.00

378,900.00

473,625.00

378,400.00

25.17

17 Rol TBA (seal tape) Jumbo

rol

8,000.00

14,033.33

11,016.67

11,000.00

13,750.00

12,100.00

13.64

18 Siphon Washer, kelas sedang plastik

set

30,000.00

31,233.33

30,616.67

30,600.00

38,250.00

46,200.00

(17.21)
0.26

14 Watermur besi

19 Water drain dan assesories

set

45,000.00

32,933.33

38,966.67

38,900.00

48,625.00

48,500.00

0,5 m3

bh

360,000.00

264,000.00

312,000.00

312,000.00

390,000.00

374,700.00

4.08

21 Bak cuci piring stainless steel, besar (double)

bh

700,000.00

575,000.00

637,500.00

637,500.00

796,875.00

550,000.00

44.89

22 Bak cuci teraso

bh

149,133.33

149,133.33

149,100.00

186,375.00

154,200.00

20.87

23 Tempat sabun keramik "Sotento"

bh

20,000.00

37,250.00

28,625.00

28,600.00

35,750.00

39,300.00

(9.03)

24 Urinoir "INA" (komplit)

set

1,075,000.00

959,125.00

1,017,062.50

1,017,000.00

1,271,250.00

1,089,000.00

16.74

25 Floor drain stainless steel "Onde"

bh

103,250.00

56,975.00

80,112.50

80,100.00

100,125.00

70,400.00

42.22

26 Kurasan (putih) stainless steel

bh

27,500.00

35,037.50

31,268.75

31,200.00

39,000.00

45,600.00

(14.47)

60 x 60 cm

bh

300,000.00

385,100.00

342,550.00

342,500.00

428,125.00

489,500.00

(12.54)

550 ltr

bh

600,000.00

894,600.00

747,300.00

747,300.00

934,125.00

1,066,400.00

(12.40)

29 Pompa tangan "Dragon"

bh

263,600.00

263,600.00

263,600.00

329,500.00

305,800.00

7.75

30 Hand shower plastik (termasuk slang)

set

201,300.00

150,900.00

150,900.00

188,625.00

201,300.00

(6.30)

31 Wall shower "Toto"

set

335,500.00

335,500.00

335,500.00

419,375.00

351,700.00

19.24

32 Pompa air "Shimizu 125 W"

bh

293,666.67

431,200.00

362,433.33

362,400.00

453,000.00

519,700.00

(12.83)

33 Pompa air "Sanyo 125 W"

bh

350,000.00

550,000.00

450,000.00

450,000.00

562,500.00

550,000.00

2.27

20 Bak mandi fiberglass

27 Bak mandi porselin


28 Tandon air fiberglass "Penyu"

100,500.00
-

IX

BAHAN JENIS KACA


1 Kaca polos

t = 5 mm

m2

55,000.00

62,987.50

58,993.75

59,000.00

73,750.00

55,700.00

32.41

2 Kaca polos

t = 8 mm

m2

78,512.50

78,512.50

78,500.00

98,125.00

66,500.00

47.56

Lembar : 22

10

3 Kaca rayban

t = 5 mm

m2

60,000.00

91,912.50

75,956.25

75,900.00

94,875.00

88,500.00

7.20

4 Kaca es/buram

t = 5 mm

m2

100,000.00

121,187.50

110,593.75

110,500.00

138,125.00

121,000.00

14.15

5 Krapyak kaca nako 15 x 70 cm (includ kerangka)

t = 5 mm

daun

31,500.00

31,500.00

31,500.00

39,375.00

72,100.00

(45.39)

6 Kaca buram

t = 3 mm

m2

91,875.00

91,875.00

91,800.00

114,750.00

90,700.00

26.52

7 Kaca cermin

t = 3 mm

m2

128,675.00

128,675.00

128,600.00

160,750.00

162,200.00

(0.89)

8 Profil kaca

t = 5 mm

m2

###

BAHAN BETON CETAKAN


1 Roster klingker warna merah

10 x 20 cm

bh

7,333.33

7,333.33

7,300.00

9,125.00

9,100.00

0.27

2 Buis beton (p = 100 cm)

15 cm

bh

27,500.00

51,012.50

39,256.25

39,200.00

49,000.00

44,500.00

10.11

3 Buis beton (p = 100 cm)

20 cm

bh

35,000.00

63,250.00

49,125.00

49,100.00

61,375.00

55,000.00

11.59

4 Buis beton (p = 100 cm)

30 cm

bh

46,250.00

79,075.00

62,662.50

62,600.00

78,250.00

74,800.00

4.61

5 Buis beton (p = 100 cm)

40 cm

bh

53,750.00

89,400.00

71,575.00

71,500.00

89,375.00

83,600.00

6.91

6 Buis beton (p = 50 cm)

50 cm

bh

45,000.00

102,200.00

73,600.00

73,600.00

92,000.00

89,900.00

2.34

7 Buis beton (p = 50 cm)

60 cm

bh

56,250.00

79,350.00

67,800.00

67,800.00

84,750.00

76,100.00

11.37

8 Buis beton (p = 50 cm)

80 cm

bh

81,250.00

97,300.00

89,275.00

89,200.00

111,500.00

106,900.00

4.30

9 Buis beton (p = 50 cm)

100 cm

bh

97,500.00

112,200.00

104,850.00

104,800.00

131,000.00

124,000.00

5.65

10 Buis Beton U (p = 100 cm)

15 cm

bh

15,000.00

42,166.67

28,583.33

28,500.00

35,625.00

40,000.00

(10.94)

11 Buis Beton U (p = 100 cm)

20 cm

bh

17,500.00

47,987.50

32,743.75

32,700.00

40,875.00

45,200.00

(9.57)

12 Buis Beton U (p = 100 cm)

30 cm

bh

22,500.00

58,725.00

40,612.50

40,600.00

50,750.00

56,400.00

(10.02)

13 Got talang R 15 (segmen)

bh

24,433.33

24,433.33

24,400.00

30,500.00

32,100.00

(4.98)

14 Got talang R 25 (segmen)

bh

41,766.67

41,766.67

41,700.00

52,125.00

55,100.00

(5.40)

20x30x50 cm

bh

51,500.00

51,500.00

51,500.00

64,375.00

643.75

16 Box cuilvert (K-350)

100x100x120 cm

m1

3,688,666.00

3,688,666.00

3,688,600.00

4,610,750.00

46,107.50

17 Box cuilvert (K-350)

150x150x120 cm

m1

4,606,250.00

4,606,250.00

4,606,200.00

5,757,750.00

57,577.50

1 Pipa PVC tipe AW "Maspion"

1/2" - 400

btg

17,250.00

33,450.00

25,350.00

25,300.00

31,625.00

30,100.00

5.07

2 Pipa PVC tipe AW "Maspion"

5/8" - 400

btg

29,300.00

29,300.00

29,300.00

36,625.00

29,500.00

24.15

3 Pipa PVC tipe AW "Maspion"

3/4" - 400

btg

21,000.00

41,616.67

31,308.33

31,300.00

39,125.00

38,000.00

2.96

4 Pipa PVC tipe AW "Maspion"

1" - 400

btg

26,250.00

51,950.00

39,100.00

39,100.00

48,875.00

49,200.00

(0.66)

5 Pipa PVC tipe AW "Maspion"

2" - 400

btg

70,500.00

94,800.00

82,650.00

82,600.00

103,250.00

105,600.00

(2.23)

6 Pipa PVC tipe AW "Maspion"

3" - 400

btg

131,000.00

201,600.00

166,300.00

166,300.00

207,875.00

181,500.00

14.53

7 Pipa PVC tipe AW "Maspion"

4" - 400

btg

187,500.00

298,333.33

242,916.67

242,900.00

303,625.00

272,800.00

11.30

8 Pipa PVC tipe AW "Maspion"

5" - 400

btg

290,000.00

468,566.67

379,283.33

379,200.00

474,000.00

423,500.00

11.92

9 Pipa PVC "Maspion" tipe D

2" - 400

btg

35,000.00

72,033.33

53,516.67

53,500.00

66,875.00

74,100.00

(9.75)

10 Pipa PVC "Maspion" tipe D

3" - 400

btg

75,000.00

118,566.67

96,783.33

96,700.00

120,875.00

148,300.00

(18.49)

11 Pipa PVC "Maspion" tipe D

4" - 400

btg

103,500.00

163,500.00

133,500.00

133,500.00

166,875.00

209,300.00

(20.27)

12 Pipa PVC "Maspion" tipe D

5" - 400

btg

165,000.00

267,433.33

216,216.67

216,200.00

270,250.00

265,100.00

1.94

13 Lem PVC "Wavin"

tube

6,500.00

8,150.00

7,325.00

7,300.00

9,125.00

9,100.00

0.27

14 Keni PVC tipe AW

1/2"

bh

1,100.00

1,500.00

1,300.00

1,300.00

1,625.00

1,500.00

8.33

15 Keni PVC tipe AW

3/4"

bh

1,550.00

2,225.00

1,887.50

1,800.00

2,250.00

2,200.00

2.27

16 Keni PVC tipe AW

2"

bh

6,500.00

7,200.00

6,850.00

6,800.00

8,500.00

10,500.00

(19.05)

17 Keni PVC tipe AW

3"

bh

23,000.00

13,050.00

18,025.00

18,000.00

22,500.00

25,500.00

(11.76)

18 Keni PVC tipe AW

4"

bh

47,000.00

18,500.00

32,750.00

32,700.00

40,875.00

42,000.00

(2.68)

19 Keni PVC tipe AW

5"

bh

65,000.00

25,550.00

45,275.00

45,200.00

56,500.00

57,000.00

(0.88)

bh

500.00

4,912.50

2,706.25

2,700.00

3,375.00

4,900.00

(31.12)

21 Talang PVC U "Maspion"

400 cm

btg

67,500.00

95,650.00

81,575.00

81,500.00

101,875.00

146,300.00

(30.37)

22 Talang PVC U

400 cm

btg

73,075.00

73,075.00

73,000.00

91,250.00

82,000.00

11.28

23 Clam Talang PVC U

400 cm

bh

4,000.00

7,050.00

5,525.00

5,500.00

6,875.00

6,600.00

4.17

15 Kerb

XI

BAHAN PIPA PVC

20 Klem PVC

Lembar : 23

10

24 Shock Talang PVC U

400 cm

bh

4,000.00

7,050.00

5,525.00

5,500.00

6,875.00

9,100.00

(24.45)

25 Tutup Talang PVC U

400 cm

bh

4,000.00

7,050.00

5,525.00

5,500.00

6,875.00

9,100.00

(24.45)

26 Corong Talang PVC U

400 cm

bh

15,000.00

18,450.00

16,725.00

16,700.00

20,875.00

26,900.00

(22.40)

27 Pipa Wavin Warna Oranye

4" - 600

btg

250,000.00

250,000.00

250,000.00

312,500.00

3,125.00

28 Pipa Wavin Warna Oranye

6,018.75

6" - 600

btg

481,500.00

481,500.00

481,500.00

601,875.00

29 Pipa PVC "Langgeng" tipe S 12.5/MOF

1"

m1

3,920.00

3,920.00

3,920.00

4,900.00

49.00

30 Pipa PVC "Langgeng" tipe S 12.5/MOF

1.5"

m1

9,120.00

9,120.00

9,120.00

11,400.00

114.00

31 Pipa PVC "Langgeng" tipe S 12.5/MOF

2"

m1

13,320.00

13,320.00

13,320.00

16,650.00

166.50

32 Pipa PVC "Langgeng" tipe S 12.5/MOF

2.5"

m1

19,040.00

19,040.00

19,040.00

23,800.00

238.00

33 Pipa PVC "Langgeng" tipe S 12.5/MOF

3"

m1

27,440.00

27,440.00

27,440.00

34,300.00

343.00

34 Pipa PVC "Langgeng" tipe S 12.5/MOF

4"

m1

40,360.00

40,360.00

40,360.00

50,450.00

504.50

35 Pipa PVC "Langgeng" tipe S 12.5/MOF

6"

m1

86,400.00

86,400.00

86,400.00

108,000.00

1,080.00

1 Paku asbes gelombang (paku pancing)

bh

1,250.00

2,116.67

1,683.33

1,600.00

2,000.00

3,200.00

(37.50)

2 Paku kayu

1"

kg

14,000.00

19,075.00

16,537.50

16,500.00

20,625.00

19,800.00

4.17

3 Paku kayu

1,5" - 2"

kg

12,500.00

19,075.00

15,787.50

15,700.00

19,625.00

19,800.00

(0.88)

4 Paku kayu

2,5" - 3"

kg

12,000.00

18,950.00

15,475.00

15,400.00

19,250.00

19,800.00

(2.78)

5 Paku kayu

4"

kg

12,000.00

17,900.00

14,950.00

14,900.00

18,625.00

18,300.00

1.78

6 Paku payung (paku seng gelombang)

kg

20,000.00

24,125.00

22,062.50

22,000.00

27,500.00

29,500.00

(6.78)

7 Paku sekrup

1"

dos

12,000.00

16,275.00

14,137.50

14,100.00

17,625.00

17,000.00

3.68

8 Paku sumbat

dos

26,750.00

26,750.00

26,700.00

33,375.00

22,900.00

45.74

XII

BAHAN JENIS PAKU

9 Paku triplek/eternit

kg

25,875.00

25,875.00

25,800.00

32,250.00

26,900.00

19.89

5 cm

bh

1,200.00

637.50

918.75

900.00

1,125.00

1,100.00

2.27

kg

20,000.00

29,187.50

24,593.75

24,500.00

30,625.00

30,200.00

1.41

1 Fiting plafon

bh

16,850.00

16,850.00

16,800.00

21,000.00

11,100.00

89.19

2 T doos PVC

bh

500.00

1,537.50

1,018.75

1,000.00

1,250.00

1,600.00

(21.88)

3 Isolator kecil

bh

1,612.50

1,612.50

1,600.00

2,000.00

1,400.00

42.86

4 Stop kontak (Broco)

bh

10,000.00

25,450.00

17,725.00

17,700.00

22,125.00

25,300.00

(12.55)

5 Skakelar tunggal (Broco)

bh

8,900.00

22,950.00

15,925.00

15,900.00

19,875.00

30,800.00

(35.47)

6 Skakelar ganda (Broco)

bh

12,500.00

33,000.00

22,750.00

22,700.00

28,375.00

33,000.00

(14.02)

7 Stop kontak dan skakelar (Broco)

bh

27,500.00

27,500.00

27,500.00

34,375.00

38,500.00

(10.71)

8 Skakelar/hendel pemindah arus

bh

308,000.00

308,000.00

308,000.00

385,000.00

286,000.00

34.62

9 Zekring lengkap dengan box

bh

88,875.00

88,875.00

88,800.00

111,000.00

88,000.00

26.14

10 Las doof

bh

6,700.00

6,700.00

6,700.00

8,375.00

600.00

1,295.83

10 Paku beton
11 Paku kalsiboard
XIII

BAHAN PERALATAN LISTRIK

11 Panel box

bh

91,325.00

91,325.00

91,300.00

114,125.00

60,000.00

90.21

12 Meinswitch

bh

50,750.00

50,750.00

50,700.00

63,375.00

32,800.00

93.22

13 Zekring MCB thermis 10 - 16 Amp.

bh

69,625.00

69,625.00

69,600.00

87,000.00

60,000.00

45.00

14 Zekring MCB thermis 10 Amp.

bh

61,666.67

61,666.67

61,600.00

77,000.00

46,500.00

65.59

15 Stater lampu TL

dus

40,000.00

40,000.00

40,000.00

50,000.00

35,000.00

42.86

16 Lampu pijar 25,40,75 / 220 V "Philips"

bh

6,833.33

6,833.33

6,800.00

8,500.00

8,000.00

6.25

250 watt

bh

91,500.00

91,500.00

91,500.00

114,375.00

148,000.00

(22.72)

18 Lampu hemat energi 18 W / 220 V (Philips)

bh

30,000.00

38,500.00

34,250.00

34,200.00

42,750.00

45,900.00

(6.86)

19 Lampu hemat energi 18 W / 220 V (Osram)

bh

31,500.00

31,900.00

31,700.00

31,700.00

39,625.00

34,100.00

16.20

20 Lampu TL 20 W / 220 V, komplit balast

bh

88,100.00

88,100.00

88,100.00

110,125.00

92,400.00

19.18

127,500.00

127,500.00

127,500.00

159,375.00

165,000.00

(3.41)

17 Bola lampu Armateur "Philips"

(Philips)
21 Lampu TL 40 W / 220 V, komplit balast
(Philips)

bh

Lembar : 24

10

22 Kabel NYM. 2 x 2,5

m1

6,375.00

6,375.00

6,300.00

7,875.00

11,000.00

23 Kabel NYY. 1 x 2,5

m1

4,925.00

4,925.00

4,900.00

6,125.00

7,800.00

(21.47)

24 Kabel twisted Indonesia

3 x 70 x 5 mm2

m1

13,883.33

13,883.33

13,800.00

17,250.00

7,100.00

142.96

25 Kabel twisted multi kabel

m1

7,100.00

(100.00)

26 UPS 3,5 Kw

bh

45,654,340.00

45,654,340.00

45,654,300.00

57,067,875.00

570,678.75

27 UPS 6,0 Kw

bh

60,872,453.33

60,872,453.33

60,872,400.00

76,090,500.00

760,905.00

28 Exhaustfan 8''

bh

463,770.00

463,770.00

463,700.00

579,625.00

5,796.25

29 Genzet 250 Kva Sillent

unit

377,674,000.00

452,933,250.00

415,303,625.00

415,303,600.00

519,129,500.00

5,191,295.00

30 Genzet 500 Kva Sillent

unit

755,348,000.00

755,348,000.00

755,348,000.00

944,185,000.00

9,441,850.00

31 Instalasi Listrik

titik

150,000.00

150,000.00

150,000.00

187,500.00

183,000.00

2.46

32 Penangkal Petir Lengkap (2 Spit), tinggi 10 m

unit

2,460,000.00

2,460,000.00

2,460,000.00

3,075,000.00

2,541,000.00

21.02

(28.41)

(Tidak termasuk izin dari Depnaker)


33 Lampu Sorot AMAC CDMTD Ex. Artolite

150 w / 942

bh

2,029,667.20

2,029,667.20

2,029,667.20

2,537,084.00

25,370.84

34 Lampu Sorot AMAR E 40 + HPIT Ex Artolite

250 w

bh

1,891,327.20

1,891,327.20

1,891,327.20

2,364,159.00

23,641.59

35 Lampu Sorot AMAR E 40 + HPIT Ex Artolite

400 w

bh

2,070,299.20

2,070,299.20

2,070,299.20

2,587,874.00

25,878.74

36 Lampu Sorot MAXIFLOOD R.SITECO HT DE

1000 w

bh

17,710,000.00

17,710,000.00

17,710,000.00

22,137,500.00

221,375.00

37 Lampu Sorot MAXIFLOOD R.SITECO HT DE

2000 w

bh

18,722,000.00

18,722,000.00

18,722,000.00

23,402,500.00

234,025.00

38 Floodlighting EF 2000 Plus MH - IP 65

2000 w

bh

21,123,200.00

21,123,200.00

21,123,200.00

26,404,000.00

264,040.00

39 Floodlighting Epack MH - IP 65

1000 w

bh

10,644,400.00

10,644,400.00

10,644,400.00

13,305,500.00

133,055.00

1 Bensin

ltr

4,500.00

4,500.00

4,500.00

4,500.00

4,500.00

4,500.00

2 Solar

ltr

4,500.00

4,500.00

4,500.00

4,500.00

4,500.00

4,500.00

3 Minyak tanah non subsidi

ltr

9,800.00

9,833.33

9,800.00

9,800.00

9,800.00

5,500.00

78.18

4 Oli mesin Mesran

ltr

30,250.00

30,250.00

30,250.00

30,250.00

30,250.00

33,000.00

(8.33)

5 Minyak pelumas

ltr

39,950.00

39,950.00

39,950.00

39,950.00

39,950.00

37,400.00

6.82

6 Grease (gemuk pelumas)

kg

29,925.00

29,925.00

29,925.00

37,406.25

31,350.00

19.32

7 Aspal panas curah

kg

10,300.00

9,733.33

10,016.67

10,000.00

10,300.00

9,200.00

11.96

kg

12,300.00

12,300.00

12,300.00

12,300.00

10,350.00

18.84

XIV

BBM DAN ALAT BERAT

8 Aspal panas drum


9 Biaya operasional wheel loader 115 H

E.052

jam

285,000.00

285,000.00

285,000.00

285,000.00

348,800.00

(18.29)

10 Biaya operasional AMP 30T/h

E.155

jam

4,629,000.00

4,629,000.00

4,629,000.00

4,629,000.00

3,525,000.00

31.32

11 Biaya operasional dump truck 5 T/145 Hp

E.212

jam

297,000.00

297,000.00

297,000.00

297,000.00

307,500.00

(3.41)

12 Biaya operasional dump truck 3,5 T/115 Hp

E.221

jam

235,000.00

235,000.00

235,000.00

235,000.00

151,200.00

55.42

13 Biaya operasional asphalt finisher (penghampar)

jam

319,000.00

319,000.00

319,000.00

319,000.00

300,000.00

6.33

14 Biaya operasional pneumetic roller 8-15 T

E.084

jam

278,000.00

278,000.00

278,000.00

278,000.00

347,000.00

(19.88)

15 Biaya operasional asphalt sprayer towed 1000 L

E.153

jam

132,000.00

132,000.00

132,000.00

132,000.00

54,000.00

144.44

16 Biaya operasional tandem roller 6-10 T

E.081

jam

297,000.00

297,000.00

297,000.00

297,000.00

224,300.00

32.41

17 Biaya operasional roller 3 wheeled 6-8 T/ 8-10 T

E.080

jam

185,000.00

185,000.00

185,000.00

185,000.00

347,000.00

(46.69)

18 Biaya operasional genset

jam

334,000.00

334,000.00

334,000.00

334,000.00

240,600.00

38.82

19 Biaya operasional alat bantu

jam

25,000.00

25,000.00

25,000.00

25,000.00

500.00

4,900.00

20 Biaya operasional bulldozer

jam

297,000.00

297,000.00

297,000.00

297,000.00

394,000.00

(24.62)

21 Biaya operasional stone crusher

jam

450,000.00

450,000.00

450,000.00

450,000.00

499,600.00

(9.93)

E.301

jam

90,000.00

90,000.00

90,000.00

90,000.00

132,200.00

(31.92)

23 Biaya operasional mesin gilas (wales)

hari

150,000.00

130,000.00

140,000.00

140,000.00

140,000.00

150,000.00

(6.67)

24 Biaya operasional mesin gilas (wales)

E.080

hari

250,000.00

185,000.00

217,500.00

217,500.00

217,500.00

250,000.00

(13.00)

25 Biaya operasional motor grader

hari

329,000.00

329,000.00

329,000.00

329,000.00

37,500.00

777.33

26 Biaya operasional vibro roller

hari

325,000.00

325,000.00

325,000.00

325,000.00

325,000.00

27 Biaya operasional water tanker

hari

280,000.00

280,000.00

280,000.00

280,000.00

100,000.00

180.00

28 Biaya operasional coldmilling

hari

618,000.00

618,000.00

618,000.00

618,000.00

288,525.00

114.19

22 Biaya operasional compressor air 210 m3

Lembar : 25

29 Teakcoat

hari

15,000.00

(100.00)

30 Biaya operasional excavator

hari

287,000.00

287,000.00

287,000.00

287,000.00

300,000.00

(4.33)

Blitar,

Juni 2012

Mengetahui,

Dibuat oleh,

KEPALA DINAS PEKERJAAN UMUM

TIM PENYUSUN HSBU

DAERAH KOTA BLITAR

DINAS PEKERJAAN UMUM


DAERAH KOTA BLITAR
Koordinator,

HERU CATUR W, ST., M.Si

HASNIL PURWANTO, SH. M.AP


Pembina Utama Muda
NIP. 19561106 198509 1 001

Pembina
NIP. 19660427 199803 1 002

Lembar : 26

10

: 0274 /
:
-

/ 410.102.4 / 2012
- 2012

DRAFT
UAN BAHAN BANGUNAN DAN UPAH KERJA
KOTA BLITAR TAHUN ANGGARAN 2012
Semester II Tahun 2012)

PENETAPAN
HARGA STANDAR
HARGA STANDAR
SEMESTER I
SEMESTER I
KAB. BLITAR
TA. 2013
(Rp.)
(Rp.)

11

12

163,000.00

150,000.00

170,000.00

167,000.00

175,000.00

170,000.00

212,000.00

199,000.00

235,000.00

206,000.00

235,000.00

221,500.00

240,000.00

234,500.00

240,000.00

234,000.00

160,000.00

157,000.00

107,000.00

114,000.00

8,000.00

125,000.00

109,000.00

110,000.00

104,000.00

85,000.00

79,000.00

135,000.00

219,100.00

1,300.00

85,800.00

80,000.00

70,500.00

95,000.00

78,600.00

90,000.00

81,500.00

25,000.00

18,000.00

3,250.00

2,500.00

650,000.00

550.00

550,000.00

525.00

70,000.00

78,700.00

100,000.00

100,000.00

15,000.00

10,000.00

20,000.00

8,000.00

Lembar : 27

11

12

65,000.00

71,500.00

90,000.00

88,000.00

90,000.00

99,000.00

1,000,000.00

1,000,000.00

1,300,000.00

1,320,000.00

12,500.00

12,400.00

500,000.00

403,500.00

800,000.00

1,000,000.00

140,000.00

154,000.00

71,000.00

78,000.00

57,000.00

65,000.00

69,000.00

74,800.00

55,000.00

61,300.00

67,000.00

67,500.00

95,000.00

90,500.00

15,000.00

12,100.00

30,000.00

22,900.00

22,000.00

22,300.00

25,000.00

23,600.00

30,000,000.00

32,287,500.00

28,000,000.00

30,135,000.00

31,000,000.00

30,672,400.00

28,000,000.00

30,135,000.00

24,000,000.00

22,062,400.00

20,000,000.00

18,833,700.00

25,000,000.00

24,753,000.00

16,500,000.00

16,143,000.00

10,000,000.00

10,517,000.00

10,250,000.00

11,133,900.00

9,000,000.00

9,972,300.00

8,500,000.00

9,681,000.00

6,000,000.00

5,800,000.00

6,250,000.00

6,204,800.00

5,500,000.00

5,800,000.00

5,500,000.00

5,255,900.00

2,000,000.00

1,375,000.00

2,500,000.00

2,167,500.00

2,500,000.00

2,420,000.00

2,700,000.00

2,662,400.00

Lembar : 28

11

12

40,000.00

21,000.00

7,000,000.00

7,150,000.00

7,250,000.00

8,050,000.00

6,500,000.00

6,900,000.00

6,500,000.00

6,750,000.00

10,000,000.00

10,333,900.00

10,250,000.00

11,093,900.00

9,000,000.00

9,641,600.00

8,500,000.00

9,333,800.00

4,500,000.00

1,559,900.00

5,500.00

5,500.00

8,000.00

7,800.00

10,000.00

9,100.00

17,500.00

16,000.00

45,000.00

25,500.00

12,500.00

13,100.00

17,500.00

9,800.00

1,338,000.00

2,500,000.00

2,500,000.00

130,000.00

133,100.00

110,000.00

98,000.00

60,000.00

50,800.00

70,000.00

60,500.00

60,000.00

67,600.00

50,000.00

39,000.00

16,000.00

17,500.00

17,500.00

19,200.00

20,000.00

23,100.00

111,100.00

68,900.00

15,000.00

9,500.00

16,000.00

13,500.00

16,000.00

16,500.00

100,000.00

90,000.00

110,000.00

98,000.00

40,000.00

35,000.00

20,000.00

25,000.00

1,500.00

1,500.00

15,000.00

11,000.00

5,500.00

6,000.00

10,000.00

10,000.00

7,000.00

5,000.00

6,500.00

6,500.00

1,900.00

10,000.00

1,650.00

1,800.00

7,500.00

7,500.00

3,750.00

3,750.00

Lembar : 29

11

12
9,000.00

9,000.00

1,300.00

1,300.00

4,000.00

3,600.00

9,000.00

7,000.00

12,500.00

11,000.00

30,000.00

25,000.00

8,500.00

20,300.00

7,500.00

21,000.00

55,000.00

56,400.00

45,000.00

40,000.00

40,000.00

37,000.00

40,000.00

32,000.00

65,000.00

88,500.00

115,000.00

115,000.00

85,000.00

88,500.00

117,500.00

145,200.00

70,000.00

89,200.00

75,000.00

75,000.00

13,000.00

13,000.00

20,000.00

16,500.00

75,000.00

101,000.00

140,000.00

130,000.00

120,000.00

100,000.00

150,000.00

163,300.00

80,000.00

65,000.00

120,000.00

120,000.00

100,000.00

100,000.00

120,000.00

120,000.00

80,000.00

85,300.00

200,000.00

200,000.00

200,000.00

210,600.00

239,500.00

266,400.00

100,000.00

67,600.00

24,000.00

22,000.00

11,000.00

12,000.00

12,000.00

13,000.00

150,000.00

143,000.00

22,000.00

22,000.00

148,000.00

151,200.00

240,000.00

257,400.00

300,000.00

317,900.00

350,000.00

453,700.00

480,000.00

620,400.00

600,000.00

831,600.00

750,000.00

1,028,500.00

Lembar : 30

11

12

1,000,000.00

1,331,000.00

1,350,000.00

1,925,000.00

550,000.00

700,000.00

650,000.00

726,000.00

1,331,000.00

45,000.00

42,350.00

13,700.00

13,700.00

13,700.00

330,000.00

363,000.00

200,000.00

211,700.00

85,000.00

91,000.00

375,000.00

502,000.00

44,000.00

35,000.00

24,000.00

22,000.00

40,000.00

39,000.00

23,000.00

35,400.00

25,000.00

31,000.00

14,000.00

13,100.00

15,000.00

15,000.00

20,000.00

19,800.00

15,000.00

90,000.00

88,500.00

1,402,500.00

1,471,900.00

750,000.00

712,000.00

370,100.00

271,600.00

133,000.00

205,700.00

296,000.00

352,000.00

478,500.00

897,000.00

1,248,800.00

1,244,900.00

1,339,400.00

600,000.00

830,000.00

400,000.00

647,000.00

229,600.00

550,000.00

632,500.00

600,000.00

763,800.00

750,000.00

750,000.00

1,125,000.00

1,265,000.00

750,000.00

872,100.00

650,000.00

727,100.00

Lembar : 31

11

12

450,000.00

450,000.00

925,000.00

1,000,000.00

943,000.00

32,800.00

26,200.00

125,000.00

210,600.00

150,000.00

295,900.00

110,000.00

206,000.00

140,000.00

295,900.00

216,500.00

41,200.00

1,436,350.00

50,000.00

45,200.00

50,000.00

63,800.00

45,000.00

46,500.00

55,000.00

62,700.00

55,000.00

45,100.00

48,000.00

61,600.00

48,000.00

52,800.00

60,000.00

67,500.00

57,000.00

65,600.00

55,000.00

59,700.00

57,000.00

66,900.00

55,000.00

59,700.00

55,000.00

66,900.00

75,000.00

63,800.00

70,000.00

40,000.00

40,000.00

45,000.00

45,900.00

47,000.00

47,900.00

45,000.00

49,500.00

47,000.00

50,600.00

50,000.00

68,200.00

42,000.00

61,000.00

47,900.00

57,000.00

51,800.00

47,000.00

63,200.00

52,000.00

59,400.00

40,000.00

46,200.00

50,000.00

55,000.00

60,000.00

75,000.00

63,800.00

46,000.00

53,800.00

46,000.00

55,000.00

42,000.00

49,500.00

42,000.00

48,800.00

50,000.00

63,000.00

235,000.00

Lembar : 32

11

12
-

55,000.00

50,000.00

50,500.00

50,000.00

52,500.00

55,000.00

56,400.00

209,000.00

280,500.00

292,600.00

282,700.00

45,000.00

48,400.00

11,000.00

25,000.00

41,300.00

12,400.00

21,600.00

51,800.00

59,000.00

82,000.00

314,300.00

10,000.00

11,000.00

372,500.00

312,500.00

20,000.00

15,000.00

166,600.00

438,600.00

87,900.00

55,000.00

72,000.00

66,000.00

72,000.00

30,000.00

22,300.00

32,000.00

28,800.00

30,000.00

22,300.00

22,000.00

15,700.00

20,000.00

15,900.00

198,000.00

33,000.00

33,000.00

24,200.00

24,000.00

27,000.00

17,500.00

13,200.00

22,000.00

17,600.00

22,000.00

18,700.00

24,000.00

50,500.00

114,900.00

66,000.00

66,000.00

36,700.00

72,600.00

66,200.00

Lembar : 33

11

12

50,000.00

45,200.00

38,000.00

38,500.00

35,000.00

33,000.00

20,000.00

24,200.00

10,000.00

11,000.00

8,250.00

5,000.00

60,000.00

59,500.00

65,000.00

57,000.00

75,000.00

58,300.00

13,000.00

9,900.00

27,500.00

21,600.00

44,000.00

36,700.00

16,500.00

16,500.00

44,000.00

32,000.00

13,000.00

18,100.00

35,000.00

36,000.00

20,000.00

21,600.00

30,000.00

30,800.00

20,000.00

11,000.00

25,000.00

16,500.00

30,000.00

20,900.00

1,300.00

1,300.00

55,700.00

140,000.00

141,700.00

48,500.00

20,000.00

19,000.00

12,000.00

15,000.00

25,000.00

20,300.00

17,000.00

50,500.00

33,400.00

20,000.00

14,400.00

7,500.00

5,900.00

20,000.00

23,100.00

65,000.00

152,000.00

50,000.00

37,400.00

40,000.00

24,200.00

15,000.00

10,500.00

84,700.00

171,900.00

150,000.00

85,800.00

171,900.00

375,000.00

452,800.00

125,000.00

139,700.00

325,000.00

335,000.00

13,100.00

Lembar : 34

11

12

10,000.00

8,500.00

15,000.00

18,300.00

30,000.00

34,000.00

70,000.00

77,500.00

75,000.00

103,000.00

40,000.00

22,900.00

225,000.00

233,200.00

50,000.00

66,900.00

200,000.00

147,600.00

250,000.00

244,100.00

55,000.00

53,100.00

1,200,000.00

1,225,800.00

1,300,000.00

1,447,600.00

1,500,000.00

1,900,500.00

150,000.00

161,400.00

200,000.00

230,300.00

75,000.00

75,000.00

50,000.00

48,400.00

60,000.00

53,800.00

188,600.00

39,300.00

507,900.00

6,500,000.00

5,250,000.00

25,000.00

12,400.00

300,000.00

321,500.00

325,000.00

350,000.00

15,000.00

12,100.00

46,200.00

48,500.00

250,000.00

374,700.00

600,000.00

550,000.00

150,000.00

154,200.00

50,000.00

39,300.00

950,000.00

1,089,000.00

60,000.00

70,400.00

45,600.00

300,000.00

428,000.00

1,000,000.00

934,000.00

305,800.00

201,300.00

351,700.00

367,000.00

437,500.00

82,000.00

55,700.00

66,500.00

Lembar : 35

11

12

99,000.00

88,500.00

120,000.00

121,000.00

38,500.00

40,000.00

99,000.00

90,700.00

120,000.00

162,200.00

15,000.00

9,100.00

55,000.00

44,500.00

66,000.00

55,000.00

82,500.00

74,800.00

93,500.00

83,600.00

104,500.00

89,900.00

85,000.00

76,100.00

110,000.00

106,900.00

124,000.00

44,000.00

40,000.00

49,000.00

45,200.00

60,500.00

56,400.00

32,100.00

55,100.00

64,400.00

4,611,000.00

5,758,000.00

48,400.00

31,000.00

36,000.00

60,500.00

40,000.00

72,600.00

49,200.00

105,600.00

217,800.00

181,500.00

326,700.00

303,000.00

508,200.00

474,000.00

108,900.00

74,100.00

133,100.00

148,300.00

181,500.00

209,300.00

302,500.00

265,100.00

36,300.00

9,100.00

1,500.00

2,200.00

10,500.00

25,500.00

42,000.00

57,000.00

4,900.00

146,300.00

82,000.00

6,600.00

Lembar : 36

11

12
-

9,100.00

9,100.00

26,900.00

312,500.00

602,000.00

4,900.00

11,400.00

16,650.00

23,800.00

34,300.00

50,450.00

108,000.00

3,200.00

22,000.00

19,800.00

22,000.00

19,800.00

22,000.00

19,800.00

22,000.00

18,300.00

30,000.00

29,500.00

20,000.00

17,000.00

35,000.00

22,900.00

35,000.00

26,900.00

750.00

1,100.00

35,000.00

30,200.00

25,000.00

21,000.00

1,500.00

1,600.00

2,000.00

2,000.00

30,000.00

25,300.00

25,000.00

30,800.00

40,000.00

33,000.00

38,500.00

286,000.00

125,000.00

111,000.00

600.00

600.00

150,000.00

114,000.00

75,000.00

63,000.00

100,000.00

87,000.00

75,000.00

77,000.00

40,000.00

35,000.00

8,000.00

25,000.00

114,000.00

35,000.00

45,900.00

40,000.00

34,100.00

100,000.00

92,400.00

125,000.00

165,000.00

Lembar : 37

11

12
4,000.00

7,800.00

3,500.00

6,100.00

7,100.00

7,100.00

57,000,000.00

76,000,000.00

579,000.00

519,129,500.00

944,185,000.00

150,000.00

183,000.00

2,500,000.00

2,541,000.00

2,537,100.00

2,364,200.00

2,587,900.00

22,137,500.00

23,402,500.00

26,404,000.00

13,305,500.00

4,500.00

4,500.00

4,500.00

4,500.00

9,800.00

30,250.00

37,000.00

39,950.00

29,925.00

10,500.00

10,300.00

11,500.00

12,300.00

348,800.00

3,525,000.00

307,500.00

151,200.00

300,000.00

347,000.00

54,000.00

224,300.00

347,000.00

240,600.00

500.00

394,000.00

499,600.00

132,200.00

150,000.00

250,000.00

37,500.00

325,000.00

100,000.00

288,525.00

Lembar : 38

11

12
-

15,000.00

300,000.00

Lembar : 39

Lampiran Berita Acara


Nomor
: 0274 /
Tanggal
:
-

/ 410.102.4 / 2012
- 2012

DRAFT
DAFTAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH KOTA BLITAR TAHUN ANGGARAN 2012
(Semester II Tahun 2012)
B. DAFTAR UPAH KERJA HARIAN
HARGA SURVEI

RENCANA
HARGA SURVEI
HARGA UPAH
RATA-RATA
KERJA
HARGA STANDAR
(KOLOM 5, 6 & 7)
SEM. II
SEM. I KOTA BLITAR
ATAU HARGA
ASSOSIASI KOTA
(+PPh)
(Rp.)
TERTINGGI
BLITAR
KOTA BLITAR
(Rp.)
(Rp.)

(Rp.)

NO.

JENIS BAHAN

UKURAN

SAT.

8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari

Org/hr
Org/hr
Org/hr
Org/hr

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
26
24
25
26

MANDOR
KEPALA TK. BATU
KEPALA TK. KAYU
KEPALA TK. BESI
KEPALA TK. CAT
KEPALA TK. LISTRIK
KEPALA TK. PIPA
TUKANG BATU
TUKANG KAYU
TUKANG BESI
TUKANG CAT
TUKANG PLITUR
TUKANG ASPAL
TUKANG PIPA
TUKANG LISTRIK
TUKANG GALI TANAH
PENJAGA MALAM
MASINIS
PEMBANTU MASINIS
MEKANIK
PEMBANTU MEKANIK
OPERATOR
PENGEMUDI/SOPIR
PENJAGA API
PEMBANTU TUKANG/PEKERJA
PEKERJA TIDAK TERLATIH
PEMBANTU SOPIR
PEKERJA PENGISI BATU
TUKANG GALI
OPERATOR SEMI TERAMPIL/PEMBANTU OPERATO

DINAS PUD KOTA


BLITAR

BPS KOTA BLITAR

7
-

8
52,500.00
50,000.00
50,000.00
50,000.00
50,000.00
52,000.00
50,000.00
45,000.00
45,000.00
45,000.00
45,000.00
45,000.00
45,000.00
45,000.00
47,000.00
40,000.00
40,000.00
40,000.00
37,500.00
45,000.00
40,000.00
42,500.00
45,000.00
42,500.00
35,000.00
32,000.00
-

9
52,500.00
50,000.00
50,000.00
50,000.00
50,000.00
52,000.00
50,000.00
45,000.00
45,000.00
45,000.00
45,000.00
45,000.00
45,000.00
45,000.00
47,000.00
40,000.00
40,000.00
40,000.00
37,500.00
45,000.00
40,000.00
42,500.00
45,000.00
42,500.00
35,000.00
32,000.00
-

UPAH KERJA SEM. I


KAB.
BLITAR
(Rp.)

10

55,125.00
52,500.00
52,500.00
52,500.00
52,500.00
54,600.00
52,500.00
47,250.00
47,250.00
47,250.00
47,250.00
47,250.00
47,250.00
47,250.00
49,350.00
42,000.00
42,000.00
42,000.00
39,375.00
47,250.00
42,000.00
44,625.00
47,250.00
44,625.00
36,750.00
33,600.00
-

55,000.00
50,000.00
50,000.00
50,000.00
50,000.00
52,000.00
50,000.00
45,000.00
45,000.00
45,000.00
45,000.00
45,000.00
45,000.00
45,000.00
47,000.00
40,000.00
40,000.00
40,000.00
35,000.00
45,000.00
40,000.00
45,000.00
45,000.00
40,000.00
35,000.00
32,000.00
32,000.00
35,000.00
35,000.00
35,000.00

Catatan : harga tersebut belum diperhitungkan bila terjadi kenaikan BBM

Blitar,

Juni 2012

Mengetahui,

Dibuat oleh,

KEPALA DINAS PEKERJAAN UMUM

TIM PENYUSUN HSBU

DAERAH KOTA BLITAR

DINAS PEKERJAAN UMUM


DAERAH KOTA BLITAR
Koordinator,

HERU CATUR W, ST., M.Si

HASNIL PURWANTO, SH. M.AP


Pembina Utama Muda
NIP. 19561106 198509 1 001

Pembina
NIP. 19660427 199803 1 002

Lembar : 14

11
68,000.00
60,000.00
60,000.00
60,000.00
60,000.00
60,000.00
60,000.00
55,000.00
55,000.00
55,000.00
55,000.00
55,000.00
55,000.00
55,000.00
55,000.00
55,000.00
55,000.00
55,000.00
49,000.00
55,000.00
51,000.00
38,000.00
38,000.00
38,000.00
-

DRAFT
AHAN BANGUNAN DAN UPAH KERJA
LITAR TAHUN ANGGARAN 2012
ter II Tahun 2012)

HARGA UPAH
KERJA
SEM. II
(+ PPN /PPh)
KOTA
BLITAR
(Rp.)

KENAIKAN
(%)

12
60,000.00
55,000.00
55,000.00
55,000.00
55,000.00
55,000.00
55,000.00
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
45,000.00
45,000.00
40,000.00
50,000.00
45,000.00
50,000.00
50,000.00
45,000.00
40,000.00
35,000.00
35,000.00
40,000.00
40,000.00
40,000.00

Lembar : 15

13
0.23
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
5.00
12.50
5.00
5.00
(0.83)
5.00
11.56
5.00
5.00
(100.00)
(100.00)
(100.00)
(100.00)

DAFTAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA


PEMERINTAH KOTA BLITAR
Semester II TA. 2012
ALAMAT

: ................................................................

B. DAFTAR UPAH KERJA HARIAN


SURVEI UPAH KERJA (Rp.)
NO.

1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

JENIS BAHAN

UKURAN

SAT.

MANDOR
KEPALA TK. BATU
KEPALA TK. KAYU
KEPALA TK. BESI
KEPALA TK. CAT
KEPALA TK. LISTRIK
KEPALA TK. PIPA
TUKANG BATU
TUKANG KAYU
TUKANG BESI
TUKANG CAT
TUKANG PLITUR
TUKANG ASPAL
TUKANG PIPA
TUKANG LISTRIK
TUKANG GALI TANAH
PENJAGA MALAM
MASINIS
PEMBANTU MASINIS
MEKANIK
PEMBANTU MEKANIK
OPERATOR
PENGEMUDI/SOPIR
PENJAGA API
PEMBANTU TUKANG/PEKERJA
PEKERJA TIDAK TERLATIH

8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

HASIL RATARATA (Rp.)

UPAH KERJA
SEM. I
KOTA BLITAR
(Rp.)

UPAH KERJA
SEM. I
KAB. BLITAR
(Rp.)

ASKUMINDO

GAPENSI

WIJAYA MANDIRI

CIPTA SARANA

10

11

12

55,000.00
50,000.00
50,000.00
50,000.00
50,000.00
52,000.00
50,000.00
45,000.00
45,000.00
45,000.00
45,000.00
45,000.00
45,000.00
45,000.00
47,000.00
40,000.00
40,000.00
40,000.00
35,000.00
45,000.00
40,000.00
45,000.00
45,000.00
40,000.00
35,000.00
-

75,000.00
60,000.00
65,000.00
60,000.00
60,000.00
60,000.00
60,000.00
50,000.00
55,000.00
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
55,000.00
60,000.00
50,000.00
65,000.00
50,000.00
65,000.00
60,000.00
50,000.00
40,000.00
-

68,000.00
60,000.00
60,000.00
60,000.00
60,000.00
60,000.00
60,000.00
55,000.00
55,000.00
55,000.00
55,000.00
55,000.00
55,000.00
55,000.00
55,000.00
55,000.00
49,000.00
55,000.00
49,000.00
55,000.00
49,000.00
55,000.00
55,000.00
49,000.00
38,000.00
-

68,000.00
60,000.00
60,000.00
60,000.00
60,000.00
60,000.00
60,000.00
55,000.00
55,000.00
55,000.00
55,000.00
55,000.00
55,000.00
55,000.00
55,000.00
55,000.00
37,000.00
47,000.00
37,000.00
55,000.00
38,000.00
55,000.00
51,000.00
37,000.00
38,000.00
-

66,500.00
57,500.00
58,500.00
57,500.00
57,500.00
58,000.00
57,500.00
51,000.00
52,500.00
51,000.00
51,000.00
51,000.00
51,000.00
51,000.00
51,500.00
50,000.00
45,000.00
50,500.00
42,500.00
55,000.00
44,000.00
55,000.00
52,500.00
44,000.00
37,500.00
-

55,000.00
50,000.00
50,000.00
50,000.00
50,000.00
52,000.00
50,000.00
45,000.00
45,000.00
45,000.00
45,000.00
45,000.00
45,000.00
45,000.00
47,000.00
40,000.00
40,000.00
40,000.00
35,000.00
45,000.00
40,000.00
45,000.00
45,000.00
40,000.00
35,000.00
32,000.00

68,000.00
60,000.00
60,000.00
60,000.00
60,000.00
60,000.00
60,000.00
55,000.00
55,000.00
55,000.00
55,000.00
55,000.00
55,000.00
55,000.00
55,000.00
55,000.00
55,000.00
55,000.00
49,000.00
55,000.00
51,000.00
38,000.00
38,000.00
38,000.00

C:>my documents/arsip2007/bintek/program kegiatan/harga satuan bahan/triwulan 1-4 2007/master file/triwulan 4


Catatan : harga tersebut belum diperhitungkan bila terjadi kenaikan BBM

Lembar : 16

RENCANA UPAH
KERJA SEM. II
KOTA BLITAR
(Rp.)

13

Lampiran Berita Acara


Nomor
: 0274 /
Tanggal
:
-

/ 410.102.4 / 2
- 2012

DRAFT
DAFTAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH KOTA BLITAR TAHUN ANGGARAN 2012
(Semester II Tahun 2012)
A. DAFTAR HARGA SATUAN BAHAN BANGUNAN
HARGA SURVEI
(Rp.)
HARGA YANG
DIPAKAI DARI
ASSOSIASI KOTA HASIL SURVEY
(Rp.)
BLITAR

NO.

JENIS BAHAN

UKURAN

SAT.

1 Batu kali belah

10/ 15, 15/20

m3

100,000.00

141,645.00

120,822.50

2 Batu kali pecah

5/7

m3

150,435.00

150,435.00

3 Batu kali pecah

4/6

m3

153,820.00

4 Batu kali pecah Crusser

3/5

m3

174,805.00

5 Batu kali pecah Crusser

2/3

m3

150,000.00

6 Batu kali pecah Crusser

1/2

m3

7 Batu kali pecah Crusser

1/1

8 Batu kali pecah Crusser

DINAS PUD KOTA


BLITAR

HARGA
PEMBULATAN
(Rp.)

HARGASTANDAR
TRIWULAN III
HARGA STANDAR
TERMASUK PPN 10%,
SEMESTER
BIAYA UMUM &
SEBELUMNYA
KEUNTUNGAN YANG TA. 2012
WAJAR 15%
(Rp.)
(Rp.)

KENAIKAN
HARGA (% )

10

120,800.00

151,000.00

137,800.00

9.58

150,000.00

187,500.00

152,200.00

23.19

153,820.00

153,800.00

192,250.00

154,800.00

24.19

174,805.00

174,800.00

218,500.00

181,100.00

20.65

173,560.00

161,780.00

161,700.00

202,125.00

196,200.00

3.02

180,000.00

201,202.50

190,601.25

190,600.00

238,250.00

201,400.00

18.30

m3

210,000.00

206,485.00

208,242.50

208,200.00

260,250.00

213,200.00

22.07

0,5/1

m3

209,682.50

209,682.50

209,600.00

262,000.00

221,100.00

18.50

2/3

m3

148,677.50

148,677.50

147,600.00

184,500.00

149,600.00

23.33

10 Krikil sungai

m3

107,405.00

107,405.00

107,400.00

134,250.00

97,700.00

37.41

11 Krikil ayak tanpa pasir

m3

110,045.00

110,045.00

110,000.00

137,500.00

103,600.00

32.72

12 Krikil batu alor (ampyang)

kg

6,615.00

6,615.00

6,600.00

8,250.00

7,200.00

14.58

13 Pasir beton/cor

m3

60,000.00

106,295.00

83,147.50

83,100.00

103,875.00

99,000.00

4.92

14 Pasir pasang

m3

77,500.00

96,155.00

86,827.50

86,800.00

108,500.00

93,500.00

16.04

15 Pasir urug

m3

76,837.50

76,837.50

76,800.00

96,000.00

71,500.00

34.27

16 Agregat Kasar

m3

139,150.00

139,150.00

139,150.00

173,937.50

126,600.00

37.39

17 Agregat Halus

m3

125,500.00

125,500.00

125,500.00

156,875.00

219,100.00

(28.40)

18 Filler

kg

1,067.50

1,067.50

1,000.00

1,250.00

1,200.00

4.17

19 S i r t u

m3

50,000.00

81,440.00

65,720.00

65,700.00

82,125.00

85,800.00

(4.28)

20 Tanah urug biasa

m3

45,000.00

67,947.50

56,473.75

56,400.00

70,500.00

66,000.00

6.82

21 Tanah urug pilihan (campur pupuk utk taman)

m3

78,087.50

78,087.50

78,000.00

97,500.00

71,500.00

36.36

22 Tanah katelan jalan

m3

77,117.50

77,117.50

77,100.00

96,375.00

74,100.00

30.06

23 Gebalan rumput

m2

19,797.50

19,797.50

19,700.00

24,625.00

16,500.00

49.24

(40x20x10) cm

bh

1,500.00

2,695.00

2,097.50

2,000.00

2,500.00

2,500.00

25.00

25 Batu merah klas I

bh

440.00

587.50

513.75

500.00

625.00

500.00

25.00

26 Batu merah klas II

bh

400.00

512.50

456.25

450.00

562.50

500.00

12.50

27 Batu lempeng (tidak beraturan)

m2

70,720.00

70,720.00

70,700.00

88,375.00

78,700.00

12.29

28 Batu hias (sand stone)

10 x 20

m2

101,155.00

101,155.00

101,100.00

126,375.00

93,500.00

35.16

29 Roster beton

20 x 20

bh

7,500.00

10,892.50

9,196.25

9,100.00

11,375.00

6,000.00

89.58

30 Roster beton

10 x 30

bh

7,500.00

13,265.00

10,382.50

10,300.00

12,875.00

5,500.00

134.09

BAHAN PASANGAN DAN CAMPURAN


BETON

9 Batu krikil (ayakan)

24 Batako

Lembar : 17

10

31 Roster batu alam

20 x 20

bh

64,337.50

64,337.50

64,300.00

80,375.00

71,500.00

12.41

32 Roster batu alam

30 x 30

bh

86,012.50

86,012.50

86,000.00

107,500.00

88,000.00

22.16

33 Batu tempel hijau

10 x 20

m2

88,655.00

88,655.00

88,600.00

110,750.00

99,000.00

11.87

34 Tiang teras batu alam

22cm, t=3 m

bh

907,402.50

907,402.50

907,400.00

1,134,250.00

968,000.00

17.17

35 Tiang teras batu alam

28cm, t=3 m

bh

1,196,460.00

1,196,460.00

1,196,400.00

1,495,500.00

1,320,000.00

13.30

36 List batu hias

p = 40 cm

bh

12,410.00

12,410.00

12,400.00

15,500.00

12,400.00

25.00

37 Kapur padam

m3

509,905.00

509,905.00

509,900.00

637,375.00

403,500.00

57.96

38 Gamping

ton

831,012.50

831,012.50

831,000.00

1,038,750.00

962,500.00

7.92

39 Semen merah

m3

145,210.00

145,210.00

145,200.00

181,500.00

154,000.00

17.86

40 Semen Gresik (PC Gresik)

50 kg

zak

70,725.00

70,725.00

70,700.00

88,375.00

78,000.00

13.30

41 Semen Gresik (PC Gresik)

40 kg

zak

49,000.00

57,555.00

53,277.50

53,200.00

66,500.00

61,600.00

7.95

42 Semen Tiga Roda

50 kg

zak

57,500.00

68,220.00

62,860.00

62,800.00

78,500.00

74,800.00

4.95

43 Semen Tiga Roda

40 kg

zak

46,500.00

55,027.50

50,763.75

50,700.00

63,375.00

59,700.00

6.16

44 Semen Holcim

50 kg

zak

56,500.00

69,713.33

63,106.67

63,100.00

78,875.00

77,400.00

1.91

45 Semen putih

40 kg

zak

73,000.00

88,512.50

80,756.25

80,700.00

100,875.00

90,500.00

11.46

46 PC super nut

kg

11,000.00

12,435.00

11,717.50

11,700.00

14,625.00

12,100.00

20.87

47 I j u k

kg

25,565.00

25,565.00

25,500.00

31,875.00

22,900.00

39.19

48 Glass block bening

20 x 20

bh

17,000.00

20,940.00

18,970.00

18,900.00

23,625.00

22,300.00

5.94

49 Glass block buram

20 x 20

bh

18,500.00

23,065.00

20,782.50

20,700.00

25,875.00

23,600.00

9.64

6/12, 6/15, 8/12

m3

28,404,750.00

28,404,750.00

28,404,700.00

35,505,875.00

32,287,500.00

9.97

4/6, 5/7

m3

25,886,100.00

25,886,100.00

25,886,100.00

32,357,625.00

30,135,000.00

7.38

2/20, 3/20, 3/25

m3

27,890,762.50

27,890,762.50

27,890,700.00

34,863,375.00

30,672,400.00

13.66

2/3, 3/5

m3

25,011,100.00

25,011,100.00

25,011,100.00

31,263,875.00

30,135,000.00

3.75

6/12, 6/15, 8/12

m3

15,000,000.00

23,088,216.67

19,044,108.33

19,044,100.00

23,805,125.00

22,062,400.00

7.90

4/6, 5/7

m3

11,500,000.00

18,717,583.33

15,108,791.67

15,108,700.00

18,885,875.00

18,833,700.00

0.28

2/20, 3/20, 3/25

m3

12,000,000.00

24,619,300.00

18,309,650.00

18,309,650.00

22,887,062.50

24,753,000.00

(7.54)

2/3, 3/5

m3

10,000,000.00

16,186,500.00

13,093,250.00

13,093,250.00

16,366,562.50

16,143,000.00

1.38

II

BAHAN KUZEN KAYU DAN KERANGKA


ATAP
1 Kayu jati balok kualitas II,
Ex. Bojonegoro (mutu kayu klas I)
2 Kayu jati usuk kualitas II,
Ex. Bojonegoro (mutu kayu klas I)
3 Kayu jati papan kualitas II,
Ex. Bojonegoro (mutu kayu klas I)
4 Kayu jati reng kualitas II,
Ex. Bojonegoro (mutu kayu klas I)
5 Kayu jati balok kualitas I, lokal
(mutu kayu klas I)
6 Kayu jati usuk kualitas I, lokal
(mutu kayu klas I)
7 Kayu jati papan kualitas I, lokal
(mutu kayu klas I)
8 Kayu jati reng kualitas I, lokal
(mutu kayu klas I)
9 Kayu kamper, balok (mutu kayu klas II)

6/12, 6/15, 8/12

m3

8,000,000.00

9,588,587.50

8,794,293.75

8,794,200.00

10,992,750.00

10,517,000.00

4.52

10 Kayu kamper, papan (mutu kayu klas II)

2/20, 3/20, 3/25

m3

8,500,000.00

9,968,250.00

9,234,125.00

9,234,100.00

11,542,625.00

11,133,900.00

3.67

11 Kayu kamper, usuk (mutu kayu klas II)

3/5,4/6,5/7

m3

7,250,000.00

8,948,290.00

8,099,145.00

8,099,100.00

10,123,875.00

9,972,300.00

1.52

12 Kayu kamper, reng (mutu kayu klas II)

2/3

m3

6,750,000.00

8,583,925.00

7,666,962.50

7,666,900.00

9,583,625.00

9,681,000.00

(1.01)

13 Kayu meranti, balok (mutu kayu klas III)

6/12, 6/15, 8/12

m3

4,125,000.00

5,941,585.00

5,033,292.50

5,033,200.00

6,291,500.00

5,800,000.00

8.47

14 Kayu meranti, papan (mutu kayu klas III)

2/20, 3/20, 3/25

m3

4,625,000.00

6,232,815.00

5,428,907.50

5,428,900.00

6,786,125.00

6,204,800.00

9.37

15 Kayu meranti, usuk (mutu kayu klas III)

3/5,4/6,5/7

m3

4,000,000.00

5,629,085.00

4,814,542.50

4,814,500.00

6,018,125.00

5,800,000.00

3.76

16 Kayu meranti, reng (mutu kayu klas III)

2/3

m3

3,750,000.00

5,398,490.00

4,574,245.00

4,574,200.00

5,717,750.00

5,255,900.00

8.79

3/20-200

m3

1,666,700.00

833,350.00

1,666,700.00

2,083,375.00

1,375,000.00

51.52

17 Kayu bekisting, papan (mutu kayu klas IV)


18 Kayu bekisting, usuk (mutu kayu klas IV)
19 Kayu tahun, papan (mutu kayu klas IV)
20 Kayu tahun, usuk (mutu kayu klas IV)

4/6-200

m3

2,004,137.50

1,002,068.75

2,004,100.00

2,505,125.00

2,167,500.00

15.58

2/20, 3/20, 3/25

m3

2,814,090.00

1,407,045.00

2,814,000.00

3,517,500.00

2,420,000.00

45.35

3/5, 4/6, 5/7

m3

3,000,000.00

2,717,717.50

2,858,858.75

2,858,800.00

3,573,500.00

2,662,400.00

34.22

Lembar : 18

10

10-12 x 300 cm

btg

29,560.00

29,560.00

29,500.00

36,875.00

21,000.00

75.60

22 Kayu kruing, balok (mutu kayu klas III)

6/12, 6/15, 8/12

m3

5,125,000.00

6,854,172.50

5,989,586.25

5,989,500.00

7,486,875.00

7,150,000.00

4.71

23 Kayu kruing, papan (mutu kayu klas III)

2/20, 3/20, 3/25

m3

5,625,000.00

7,287,565.00

6,456,282.50

6,456,200.00

8,070,250.00

8,050,000.00

0.25

24 Kayu kruing, usuk (mutu kayu klas III)

3/5,4/6,5/7

m3

4,900,000.00

6,539,342.50

5,719,671.25

5,719,600.00

7,149,500.00

6,900,000.00

3.62

25 Kayu kruing, reng (mutu kayu klas III)

2/3

m3

4,550,000.00

6,500,442.50

5,525,221.25

5,525,200.00

6,906,500.00

6,750,000.00

2.32

26 Kayu balau, balok (mutu kayu klas II)

6/12, 6/15, 8/12

m3

8,750,000.00

9,439,520.00

9,094,760.00

9,094,700.00

11,368,375.00

10,333,900.00

10.01

27 Kayu balau, papan (mutu kayu klas II)

21 Kayu gelam (mutu kayu klas IV)

2/20, 3/20, 3/25

m3

9,250,000.00

9,847,912.50

9,548,956.25

9,548,900.00

11,936,125.00

11,093,900.00

7.59

28 Kayu balau, usuk (mutu kayu klas II)

3/5, 4/6, 5/7

m3

7,500,000.00

8,838,587.50

8,169,293.75

8,169,200.00

10,211,500.00

9,641,600.00

5.91

29 Kayu balau, reng (mutu kayu klas II)

2/3

m3

7,000,000.00

8,398,755.00

7,699,377.50

7,699,300.00

9,624,125.00

9,333,800.00

3.11

m3

4,251,020.00

2,125,510.00

4,251,000.00

5,313,750.00

1,559,900.00

240.65

31 List kayu tahun

1/4

m1

5,000.00

5,530.00

5,265.00

52,000.00

65,000.00

5,500.00

1,081.82

32 List kayu profil

4/4

m1

9,000.00

8,210.00

8,605.00

8,600.00

10,750.00

7,800.00

37.82

33 List kayu profil

5/5

m1

7,000.00

9,475.00

8,237.50

8,200.00

10,250.00

9,100.00

12.64

34 Bambu Jawa bongkotan

10-12 x 300cm

btg

18,000.00

16,327.50

17,163.75

17,100.00

21,375.00

16,000.00

33.59

35 Bambu ori

10-12 x 600cm

btg

25,000.00

32,997.50

28,998.75

29,000.00

36,250.00

25,500.00

42.16

36 Bambu apus

6-10 x 600cm

btg

25,000.00

12,087.50

18,543.75

18,500.00

23,125.00

13,100.00

76.53

37 Gedek guling

m2

20,000.00

13,057.50

16,528.75

16,500.00

20,625.00

9,800.00

110.46

38 Daun pintu kayu Balau, kw 1

3,5 x 90 x 210 cm

lbr

1,070,666.67

535,333.33

1,070,600.00

1,338,250.00

13,382.50

39 Daun pintu kayu Jati, kw 1

3,5 x 90 x 210 cm

lbr

2,375,066.67

1,187,533.33

2,375,000.00

2,968,750.00

29,687.50

1 Asbes gelombang besar tebal 5 mm

1,05 X 3,00

lbr

100,000.00

125,547.50

112,773.75

112,700.00

140,875.00

133,100.00

5.84

2 Asbes gelombang kecil tebal 4 mm

1,05 X 3,00

lbr

69,750.00

97,780.00

83,765.00

83,700.00

104,625.00

93,500.00

11.90

3 Asbes gelombang kecil tebal 4 mm

1,05 X 1,50

lbr

35,000.00

54,745.00

44,872.50

44,800.00

56,000.00

48,400.00

15.70

4 Asbes gelombang kecil tebal 4 mm

1,05 X 1,80

lbr

43,500.00

58,985.00

51,242.50

51,200.00

64,000.00

57,700.00

10.92

5 Asbes bubung gelombang besar tebal 5 mm

m1

52,500.00

62,115.00

57,307.50

57,300.00

71,625.00

67,600.00

5.95

6 Asbes bubung gelombang kecil tebal 4 mm

m1

22,750.00

44,835.00

33,792.50

33,800.00

42,250.00

37,400.00

12.97

7 Harflek tebal 4 mm

40 x 200 cm

lbr

12,666.67

17,035.00

14,850.83

14,850.00

18,562.50

16,900.00

9.84

8 Harflek tebal 4 mm

50 x 200 cm

lbr

15,000.00

19,120.00

17,060.00

17,000.00

21,250.00

19,200.00

10.68

30 Kayu Albasiah (mutu kayu klas IV)

III

BAHAN PENUTUP ATAP DAN PLAFON

9 Harflek tebal 4 mm

60 x 200 cm

lbr

17,250.00

22,092.50

19,671.25

19,600.00

24,500.00

23,100.00

6.06

10 Woodplek tebal 9 mm

30x400

lbr

90,250.00

65,000.00

77,625.00

77,600.00

97,000.00

111,100.00

(12.69)

11 Woodplek tebal 9mm

20x300

lbr

54,500.00

65,000.00

59,750.00

59,750.00

74,687.50

68,900.00

8.40

12 Eternit (lokal)

lbr

10,333.33

12,300.00

11,316.67

11,300.00

14,125.00

9,100.00

55.22

13 Eternit (kerang)

lbr

9,500.00

15,087.50

12,293.75

12,300.00

15,375.00

13,200.00

16.48

14 Eternit (Gresik)

lbr

15,000.00

16,547.50

15,773.75

15,700.00

19,625.00

16,500.00

18.94

15 Gypsum tebal 9 mm

122 x 244

lbr

49,750.00

90,927.50

70,338.75

70,300.00

87,875.00

84,700.00

3.75

16 Gypsum tebal 12 mm

122 x 244

lbr

70,000.00

104,280.00

87,140.00

87,100.00

108,875.00

93,500.00

16.44

17 List Gypsum

15 x 200 cm

btg

20,000.00

36,052.50

28,026.25

28,000.00

35,000.00

27,500.00

27.27

18 List Gypsum

10 x200 cm

btg

15,000.00

22,590.00

18,795.00

18,800.00

23,500.00

20,600.00

14.08

19 Genteng flam press Jawa/lokal

bh

1,440.00

1,440.00

1,400.00

1,750.00

1,400.00

25.00

20 Genteng kaca (model Karang Pilang)

bh

20,000.00

13,267.50

16,633.75

16,600.00

20,750.00

10,500.00

97.62

21 Genteng Karang Pilang/Wisma

bh

2,500.00

5,837.50

4,168.75

4,100.00

5,125.00

5,900.00

(13.14)

22 Genteng bubung Karang Pilang/Wisma

bh

5,000.00

10,552.50

7,776.25

7,700.00

9,625.00

9,800.00

(1.79)

23 Genteng bubung Jawa/lokal

bh

4,000.00

5,862.50

4,931.25

4,900.00

6,125.00

4,500.00

36.11

24 Genteng Bambe

bh

6,515.00

6,515.00

6,500.00

8,125.00

5,500.00

47.73

25 Genteng kodok ex. Wisma

bh

6,666.67

6,666.67

6,600.00

8,250.00

1,900.00

334.21

25 Genteng bubungan Bambe

bh

10,010.00

10,010.00

10,000.00

12,500.00

9,900.00

26.26

26 Genteng prentul ex.Trenggalek

bh

1,602.50

1,602.50

1,600.00

2,000.00

1,800.00

11.11

27 Genteng bubung prentul ex. Trenggalek

bh

6,312.50

6,312.50

6,300.00

7,875.00

4,800.00

64.06

28 Genteng Mantili ex Trenggalek

bh

2,842.50

2,842.50

2,800.00

3,500.00

2,200.00

59.09

Lembar : 19

29 Genteng bubung Mantili ex Trenggalek

bh

7,512.50

7,512.50

7,500.00

9,375.00

5,200.00

80.29

30 Genteng Biasa

bh

1,033.33

1,033.33

1,000.00

1,250.00

12.50

31 Genteng Beton

bh

2,000.00

3,855.00

2,927.50

2,900.00

3,625.00

2,600.00

39.42

32 Genteng bubung Beton

bh

4,000.00

7,587.50

5,793.75

5,800.00

7,250.00

4,800.00

51.04

33 Genteng Kanmuri Glasur

bh

7,340.00

10,697.50

9,018.75

9,000.00

11,250.00

8,100.00

38.89

34 Genteng Kanmuri bubung Glasur

bh

15,700.00

25,772.50

20,736.25

20,700.00

25,875.00

20,300.00

27.46

35 Genteng KIA Glasur

bh

6,780.00

7,596.67

7,188.33

7,100.00

8,875.00

8,100.00

9.57

36 Genteng KIA bubung Glasur

bh

13,875.00

18,863.33

16,369.17

16,300.00

20,375.00

20,300.00

0.37

37 Genteng Impresso Glasur

bh

6,743.33

6,743.33

6,700.00

8,375.00

7,200.00

16.32
10.97

38 Genteng bubung Impresso Glasur

10

bh

17,493.33

17,493.33

17,400.00

21,750.00

19,600.00

39 Seng Talang BJLS 30

l = 90 cm

m1

33,250.00

51,752.50

42,501.25

42,500.00

53,125.00

56,400.00

(5.81)

40 Seng Talang BJLS 27

l = 90 cm

m1

30,000.00

41,057.50

35,528.75

35,500.00

44,375.00

36,700.00

20.91

41 Seng Talang BJLS 27

l = 60 cm

m1

21,000.00

35,390.00

28,195.00

28,100.00

35,125.00

35,400.00

(0.78)

42 Seng Talang BJLS 30

l = 45 cm

m1

19,333.33

32,302.50

25,817.92

25,800.00

32,250.00

26,400.00

22.16

43 Seng Datar BJLS 30

80 x 180 cm

lbr

57,000.00

76,637.50

66,818.75

66,800.00

83,500.00

88,500.00

(5.65)

44 Seng Gelombang BJLS 40

80 x 180 cm

lbr

72,500.00

99,710.00

86,105.00

86,100.00

107,625.00

114,100.00

(5.67)

45 Seng Gelombang BJLS 30

80 x 180 cm

lbr

67,666.67

85,390.00

76,528.33

76,500.00

95,625.00

88,500.00

8.05

46 Seng Gelombang BJLS 30

80 x 300 cm

lbr

72,000.00

129,360.00

100,680.00

100,600.00

125,750.00

145,200.00

(13.40)

47 Seng Gelombang BJLS 30

80 x 150 cm

lbr

73,600.00

73,600.00

73,600.00

92,000.00

89,200.00

3.14

48 Seng Datar BJLS 27

80 x 180 cm

lbr

74,145.00

74,145.00

74,100.00

92,625.00

73,700.00

25.68

49 Karet Talang

l = 60 cm

m1

9,625.00

12,560.00

11,092.50

11,000.00

13,750.00

12,100.00

13.64

50 Karet Talang

l = 90 cm

m1

14,250.00

17,345.00

15,797.50

15,700.00

19,625.00

15,700.00

25.00

51 Fiber glass "Kano Flash"

l = 92 cm.

m1

80,000.00

69,615.00

74,807.50

74,800.00

93,500.00

101,000.00

(7.43)

52 Teakwood tebal 3 mm

( 4' x 8' )

lbr

76,666.67

128,380.00

102,523.33

102,500.00

128,125.00

127,000.00

0.89

53 Teakwood tebal 3 mm

(90 x 210 )cm

lbr

62,500.00

98,832.50

80,666.25

80,600.00

100,750.00

95,100.00

5.94

54 Tripleks tebal 9 mm

( 4' x 8' )

lbr

110,000.00

162,577.50

136,288.75

136,200.00

170,250.00

163,300.00

4.26

55 Tripleks tebal 3 mm

( 4' x 8' )

lbr

48,125.00

72,180.00

60,152.50

60,100.00

75,125.00

60,500.00

24.17

56 Plywood tebal 6 mm

( 4' x 8' )

lbr

75,000.00

116,675.00

95,837.50

95,800.00

119,750.00

114,100.00

4.95

57 Plywood tebal 4 mm

(90 x 210) cm

lbr

70,000.00

85,312.50

77,656.25

77,600.00

97,000.00

75,400.00

28.65

58 Plywood tebal 4 mm

( 4' x 8' )

lbr

107,332.50

107,332.50

107,300.00

134,125.00

93,100.00

44.07

59 Plywood tebal 2 mm

( 4' x 8' )

lbr

78,302.50

78,302.50

78,300.00

97,875.00

85,300.00

14.74

60 Multiplek 12 mm

( 4' x 8' )

lbr

101,500.00

206,510.00

154,005.00

154,000.00

192,500.00

199,600.00

(3.56)

61 Formica

( 4' x 8' )

lbr

185,360.00

185,360.00

185,300.00

231,625.00

210,600.00

9.98

62 Alumunium Coklat Merk YYK

( 5 x 10 )cm

m1

225,000.00

109,470.00

167,235.00

167,200.00

209,000.00

239,500.00

(12.73)

63 Alumunium Silver Merk YYK

( 5 x 10 )cm

m1

200,000.00

72,430.00

136,215.00

136,200.00

170,250.00

266,400.00

(36.09)

( 4' x 8' )

lbr

48,333.33

56,670.00

52,501.67

52,500.00

65,625.00

67,600.00

(2.92)

1 Besi begel/baut

kg

14,000.00

21,495.00

17,747.50

17,700.00

22,125.00

21,000.00

5.36

2 Besi beton polos

kg

9,250.00

11,155.00

10,202.50

10,200.00

12,750.00

10,500.00

21.43

64 Kalsiboard tebal 4 mm
IV

BAHAN BESI/LOGAM

3 Besi beton ulir

kg

9,533.33

13,157.50

11,345.42

11,300.00

14,125.00

12,000.00

17.71

1" - 6 m.

btg

145,000.00

150,132.50

147,566.25

147,500.00

184,375.00

136,400.00

35.17

1,5"

bh

8,500.00

23,462.50

15,981.25

16,000.00

20,000.00

21,100.00

(5.21)

1/2" - 6 m.

btg

122,500.00

139,890.00

131,195.00

131,100.00

163,875.00

151,200.00

8.38

7 Pipa besi galvanis medium A (tebal 3 mm)

1" - 6 m.

btg

195,000.00

235,120.00

215,060.00

215,000.00

268,750.00

257,400.00

4.41

8 Pipa besi galvanis medium A (tebal 3 mm)

1,25" - 6 m.

btg

242,500.00

294,552.50

268,526.25

268,500.00

335,625.00

317,900.00

5.58

9 Pipa besi galvanis medium A (tebal 3 mm)

1,5" - 6 m.

btg

292,500.00

370,422.50

331,461.25

331,400.00

414,250.00

453,700.00

(8.70)

10 Pipa besi galvanis medium A (tebal 3,3 mm)

2" - 6 m.

btg

460,000.00

508,335.00

484,167.50

484,100.00

605,125.00

620,400.00

(2.46)

11 Pipa besi galvanis medium A (tebal 3,3 mm)

2,5" - 6 m.

btg

600,000.00

664,517.50

632,258.75

632,200.00

790,250.00

831,600.00

(4.97)

12 Pipa besi galvanis medium A (tebal 3,6 mm)

3" - 6 m.

btg

800,000.00

817,710.00

808,855.00

808,800.00

1,011,000.00

1,028,500.00

(1.70)

4 Besi pipa air medium A (warna hijau)


5 Keni besi (elbouw)
6 Pipa besi galvanis medium A (tebal 2,4 mm)

Lembar : 20

13 Pipa besi galvanis medium A (tebal 4 mm)

4" - 6 m.

btg

1,150,000.00

1,097,992.50

1,123,996.25

1,124,000.00

1,405,000.00

1,331,000.00

14 Pipa besi galvanis medium A (tebal 4,2 mm)

5" - 6 m.

btg

1,550,000.00

1,588,900.00

1,569,450.00

1,569,400.00

1,961,750.00

1,925,000.00

1.91

15 Besi plat 2 mm,

4' x 8'

lbr

460,000.00

641,600.00

550,800.00

550,800.00

688,500.00

700,000.00

(1.64)

16 Besi plat aluminium tebal 2 mm

4' x 8'

lbr

674,927.50

674,927.50

674,900.00

843,625.00

726,000.00

16.20

17 Besi plat bordes tebal 3 mm

4' x 8'

lbr

740,000.00

1,081,990.00

910,995.00

911,000.00

1,138,750.00

1,331,000.00

(14.44)

18 Besi plat strip panjang tebal 3 mm

10
5.56

(30x6000)mm

m1

39,355.00

39,355.00

39,300.00

49,125.00

42,350.00

16.00

19 Besi profil WF <= 200 mm

kg

10,000.00

14,286.67

12,143.33

12,100.00

15,125.00

13,700.00

10.40

20 Besi profil WF <= 200 s.d. 400 mm

kg

10,000.00

13,620.00

11,810.00

11,800.00

14,750.00

13,700.00

7.66

21 Besi profil WF <= 200 s.d. 500 mm

kg

10,000.00

13,636.67

11,818.33

11,800.00

14,750.00

13,700.00

7.66

22 Besi siku

L.60.60.6

btg

309,337.50

309,337.50

309,300.00

386,625.00

363,000.00

6.51

23 Besi siku

L.50.50.6

btg

200,000.00

185,697.50

192,848.75

192,800.00

241,000.00

211,700.00

13.84

24 Besi siku

L.30.30.3

btg

55,000.00

89,397.50

72,198.75

72,200.00

90,250.00

91,000.00

(0.82)

C 125,50,3

ljr

260,000.00

416,467.50

338,233.75

338,200.00

422,750.00

502,000.00

(15.79)

26 Kawat harmonika

m2

25,000.00

39,027.50

32,013.75

32,000.00

40,000.00

30,200.00

32.45

27 Kawat ikat beton (bendrat)

kg

14,500.00

21,170.00

17,835.00

17,800.00

22,250.00

21,000.00

5.95

28 Kawat nyamuk kasa alumunium

m2

30,000.00

40,365.00

35,182.50

35,100.00

43,875.00

39,000.00

12.50

29 Kawat ayakan pasir (utk pasang)

m2

25,000.00

23,300.00

24,150.00

24,100.00

30,125.00

35,400.00

(14.90)

30 Kawat ayakan pasir (utk plesteran)

m2

25,000.00

25,190.00

25,095.00

25,000.00

31,250.00

42,000.00

(25.60)

31 Kawat duri pagar

m1

15,000.00

10,900.00

12,950.00

12,900.00

16,125.00

13,100.00

23.09

32 Kawat nyamuk kasa plastik

m2

16,295.00

16,295.00

16,200.00

20,250.00

15,000.00

35.00

33 Kawat tali Bwg 10

3,2 mm.

kg

12,750.00

19,132.50

15,941.25

15,900.00

19,875.00

19,800.00

0.38

34 Kawat wire mesh

kg

23,840.00

23,840.00

23,800.00

29,750.00

15,000.00

98.33

25 Besi canal

35 Tiang pagar BRC/PMG

2", t=120

btg

52,105.00

52,105.00

52,100.00

65,125.00

88,500.00

(26.41)

36 Pintu dorong BRC/PMG

120 x 300 cm

unit

1,384,665.00

1,384,665.00

1,384,600.00

1,730,750.00

1,402,500.00

23.40

37 Pintu swing ganda BRC/PMG

120 x 300 cm

unit

1,334,665.00

1,334,665.00

1,334,600.00

1,668,250.00

1,471,900.00

13.34

38 Pagar BRC/PMG A

120 x 240 cm

unit

140,000.00

645,613.33

392,806.67

392,800.00

491,000.00

712,000.00

(31.04)

39 Bondex

0.75X1.00

m2

320,776.67

320,776.67

320,700.00

400,875.00

370,100.00

8.32

40 Pipa besi putih

1,5" - 6 m.

btg

100,000.00

238,033.33

169,016.67

169,000.00

211,250.00

271,600.00

(22.22)

41 Pipa gas/hitam medium A (tebal 2,4 mm)

(12.03)

3/4" - 6 m.

btg

100,000.00

87,363.33

93,681.67

93,600.00

117,000.00

133,000.00

42 Pipa gas/hitam medium A (tebal 3 mm)

1" - 6 m.

btg

150,000.00

153,886.67

151,943.33

151,900.00

189,875.00

205,700.00

(7.69)

43 Pipa gas/hitam medium A (tebal 3 mm)

1,25" - 6 m.

btg

192,500.00

210,183.33

201,341.67

201,300.00

251,625.00

296,000.00

(14.99)

44 Pipa gas/hitam medium A (tebal 3 mm)

1,5" - 6 m.

btg

235,000.00

239,573.33

237,286.67

237,200.00

296,500.00

352,000.00

(15.77)

45 Pipa gas/hitam medium A (tebal 3,3 mm)

2" - 6 m.

btg

320,000.00

319,746.67

319,873.33

319,800.00

399,750.00

478,500.00

(16.46)

46 Pipa gas/hitam medium A (tebal 3,6 mm)

3" - 6 m.

btg

610,000.00

545,303.33

577,651.67

577,600.00

722,000.00

897,000.00

(19.51)

47 Pipa gas/hitam medium A (tebal 4 mm)

4" - 6 m.

btg

810,000.00

701,933.33

755,966.67

755,900.00

944,875.00

1,248,800.00

(24.34)

48 Pipa gas/hitam medium A (tebal 4,2 mm)

5" - 6 m.

btg

1,000,000.00

926,673.33

963,336.67

963,300.00

1,204,125.00

1,244,900.00

(3.28)

49 Pipa gas/hitam medium A (tebal 4,2 mm)

6" - 6 m.

btg

1,500,000.00

1,062,936.67

1,281,468.33

1,281,400.00

1,601,750.00

1,339,400.00

19.59

50 Pintu Alumunium (kualitas II)

70 x 200 cm

lbr

700,000.00

638,335.00

669,167.50

669,100.00

836,375.00

299,700.00

179.07

51 Pintu PVC (kualitas baik)

70 x 210 cm

lbr

371,250.00

664,976.67

518,113.33

518,100.00

647,625.00

786,500.00

(17.66)

52 Profil Alumunium

m1

53 Slimar alumunium

m1

139,100.00

(100.00)

54 Sunscreen Alumunium

m2

94,500.00

(100.00)

55 Ramset/Dina Bolt

bh

56 Pagar kawat jaring

lbr

229,600.00

(100.00)

57 Pagar besi ulir komplit dg mainan

m2

500,000.00

616,272.50

558,136.25

558,100.00

697,625.00

632,500.00

10.30

58 Pintu pagar besi ulir komplit dg mainan

m2

575,000.00

698,960.00

636,980.00

636,900.00

796,125.00

763,800.00

4.23

59 Pintu rolling door

m2

550,000.00

729,502.50

639,751.25

639,700.00

799,625.00

709,500.00

12.70

60 Pintu plat harmonika

m2

975,000.00

1,195,045.00

1,085,022.50

1,085,000.00

1,356,250.00

1,265,000.00

7.21

61 Atap twin lite rangka pipa stainless steel

m2

737,500.00

774,720.00

756,110.00

756,100.00

945,125.00

872,100.00

8.37

62 Atap twin lite rangka pipa besi

m2

650,000.00

640,565.00

645,282.50

645,200.00

806,500.00

727,100.00

10.92

Lembar : 21

63 Teralis besi

m2

488,567.50

488,567.50

488,500.00

610,625.00

498,300.00

22.54

64 Teralis aluminium

m2

1,200,000.00

740,310.00

970,155.00

970,100.00

1,212,625.00

1,114,300.00

8.82

2"

m2

600,000.00

964,757.50

782,378.75

782,300.00

977,875.00

898,200.00

8.87

66 Usuk Galvalum

0,8 mm

m1

14,566.67

38,360.00

26,463.33

26,400.00

33,000.00

32,800.00

0.61

67 Reng Galvalum

0,6 mm

m1

5,066.67

25,300.00

15,183.33

15,100.00

18,875.00

26,200.00

(27.96)

68 Kusen Pintu Aluminium Silver "HC"

4 / 12

m1

80,000.00

134,896.67

107,448.33

107,400.00

134,250.00

210,600.00

(36.25)

69 Kusen Pintu Aluminium Coklat "YKK"

5 / 10

m1

225,000.00

161,766.67

193,383.33

193,300.00

241,625.00

295,900.00

(18.34)

70 Kusen Jendela Aluminium Silver "HC"

4 / 12

m1

80,000.00

133,780.00

106,890.00

106,800.00

133,500.00

206,000.00

(35.19)

71 Kusen Jendela Aluminium Coklat "YKK"

5 / 10

m1

225,000.00

161,766.67

193,383.33

193,300.00

241,625.00

295,900.00

(18.34)

250 mm

m1

117,140.00

117,140.00

117,100.00

146,375.00

216,500.00

(32.39)

tube

30,000.00

38,370.00

34,185.00

34,100.00

42,625.00

41,200.00

3.46

60x60 cm

bh

1,150,000.00

575,000.00

575,000.00

718,750.00

7,187.50

1 Paving stone per segi abu-abu, cetak kering

t = 6 cm

m2

33,500.00

47,520.00

40,510.00

40,500.00

50,625.00

45,200.00

12.00

2 Paving stone per segi abu-abu, cetak basah

t = 6 cm

m2

53,640.00

53,640.00

53,600.00

67,000.00

63,800.00

5.02

3 Paving stone 3 berlian abu-abu, cetak kering

t = 6 cm

m2

32,000.00

45,160.00

38,580.00

38,500.00

48,125.00

46,500.00

3.49

4 Paving stone 3 berlian merah, cetak basah

t = 6 cm

m2

35,000.00

55,487.50

45,243.75

45,200.00

56,500.00

62,700.00

(9.89)

5 Paving stone segi 6 abu-abu, cetak kering

t = 6 cm

m2

33,500.00

47,660.00

40,580.00

40,500.00

50,625.00

45,100.00

12.25

6 Paving stone segi 6 merah, cetak basah

t = 6 cm

m2

35,000.00

51,707.50

43,353.75

43,300.00

54,125.00

61,600.00

(12.13)

7 Paving stone persegi merah

t = 6 cm

m2

32,000.00

50,482.50

41,241.25

41,200.00

51,500.00

52,800.00

(2.46)

8 Paving stone per segi abu-abu, cetak basah

t = 8 cm

m2

60,792.50

60,792.50

60,700.00

75,875.00

67,500.00

12.41

9 Paving stone per segi abu-abu, cetak kering

t = 8 cm

m2

57,487.50

57,487.50

57,400.00

71,750.00

65,600.00

9.38

10 Paving stone 3 berlian abu-abu

t = 8 cm

m2

54,470.00

54,470.00

54,400.00

68,000.00

59,700.00

13.90

65 Railling stainless steel

72 Waterstop "Maspion"
73 Sealent
74 Manhole plat baja
V

10

BAHAN LANTAI

11 Paving stone 3 berlian merah

t = 8 cm

m2

58,015.00

58,015.00

5,800.00

7,250.00

66,900.00

(89.16)

12 Paving stone segi 6 abu-abu

t = 8 cm

m2

54,470.00

54,470.00

54,000.00

67,500.00

59,700.00

13.07

13 Paving stone segi 6 merah

t = 8 cm

m2

57,015.00

57,015.00

57,000.00

71,250.00

66,900.00

6.50

14 Paving stone abu-abu, cetak basah K-300

10x20x8

m2

88,743.33

88,743.33

88,700.00

110,875.00

65,400.00

69.53

15 Paving stone abu-abu, cetak basah K-400

10x20x8

m2

90,236.67

90,236.67

90,200.00

112,750.00

88,500.00

27.40

16 Tegel PC Abu-abu

20 x 20

m2

40,365.00

40,365.00

40,300.00

50,375.00

40,000.00

25.94

17 Tegel PC Abu-abu

20 x 30

m2

45,755.00

45,755.00

45,700.00

57,125.00

45,900.00

24.46

18 Tegel PC Abu-abu

30 x 30

m2

48,312.50

48,312.50

48,300.00

60,375.00

47,900.00

26.04

19 Ubin warna

20 x 20

m2

35,000.00

49,196.67

42,098.33

42,100.00

52,625.00

49,500.00

6.31

20 Ubin warna

30 x 30

m2

35,000.00

50,233.33

42,616.67

42,600.00

53,250.00

50,600.00

5.24

21 Ubin warna

40 x 40

m2

35,000.00

61,243.33

48,121.67

48,100.00

60,125.00

68,200.00

(11.84)

22 Tegel keramik

10 x 20

m2

47,663.33

47,663.33

47,600.00

59,500.00

61,000.00

(2.46)

23 Tegel keramik polos

15 x 15

m2

39,750.00

39,750.00

39,750.00

49,687.50

47,900.00

3.73

24 Tegel keramik, Claudia

20 x 25

m2

41,500.00

52,065.00

46,782.50

46,700.00

58,375.00

51,800.00

12.69

25 Tegel keramik, Asia

20 x 25

m2

39,000.00

52,666.67

45,833.33

45,800.00

57,250.00

63,200.00

(9.41)

26 Tegel keramik, berserat

30 x 30

m2

40,000.00

54,703.33

47,351.67

47,300.00

59,125.00

59,400.00

(0.46)

27 Tegel keramik putih, Asia

30 x 30

m2

32,500.00

42,250.00

37,375.00

37,300.00

46,625.00

46,200.00

0.92

28 Tegel keramik, (kasar)

20 x 20

m2

37,500.00

51,915.00

44,707.50

44,700.00

55,875.00

55,000.00

1.59

29 Tegel keramik, Super Milan

40 x 40

m2

55,250.00

65,520.00

60,385.00

60,300.00

75,375.00

73,700.00

2.27

30 Tegel keramik, Austria Blue

30 x 30

m2

48,853.33

48,853.33

48,800.00

61,000.00

63,800.00

(4.39)

31 Tegel keramik, Mulia

30 x 30

m2

33,000.00

43,660.00

38,330.00

38,300.00

47,875.00

53,800.00

(11.01)

32 Tegel keramik, KIA

30 x 30

m2

38,500.00

50,107.50

44,303.75

44,300.00

55,375.00

52,800.00

4.88

33 Tegel keramik, Arwana

30 x 30

m2

30,833.33

44,147.50

37,490.42

37,400.00

46,750.00

49,500.00

(5.56)

34 Tegel keramik, Asia Tile

30 x 30

m2

47,500.00

45,535.00

46,517.50

46,500.00

58,125.00

46,500.00

25.00

35 Tegel keramik, Classic

30 x 30

m2

57,180.00

57,180.00

57,100.00

71,375.00

60,500.00

17.98

36 Tegel keramik, Essenza

40 x 40

m2

178,000.00

197,746.67

187,873.33

187,800.00

234,750.00

245,300.00

(4.30)

Lembar : 22

10

37 Tegel keramik, Diamond

20 x 20

m2

42,500.00

52,386.67

47,443.33

47,400.00

59,250.00

55,000.00

38 Tegel teraso

20 x 20

m2

43,160.00

43,160.00

43,100.00

53,875.00

50,500.00

6.68

39 Tegel teraso

30 x 30

m2

47,200.00

47,200.00

47,200.00

59,000.00

52,500.00

12.38

40 Tegel teraso

40 x 40

m2

53,180.00

53,180.00

53,100.00

66,375.00

56,400.00

17.69

41 Tegel keramik, Granito

30 x 30

m2

205,500.00

205,500.00

205,500.00

256,875.00

209,000.00

22.91

42 Tegel keramik, Granito

40 x 40

m2

175,000.00

281,286.67

228,143.33

228,100.00

285,125.00

280,500.00

1.65

43 Tegel keramik Granite Black

40 x 40

m2

160,000.00

238,055.00

199,027.50

199,000.00

248,750.00

292,600.00

(14.99)

44 Tegel keramik Granite Polish

40 x 40

m2

170,000.00

263,120.00

216,560.00

216,500.00

270,625.00

282,700.00

(4.27)

45 Tegel galar

20 x 20

m2

51,326.67

51,326.67

51,300.00

64,125.00

48,400.00

32.49

46 Tegel keramik, bermotif/warna

40 x 50

m2

11,000.00

(100.00)

47 Tegel plint keramik warna

10 x 30

m1

38,960.00

38,960.00

38,900.00

48,625.00

40,000.00

21.56

48 Tegel wafel

20 x 20

m2

36,535.00

36,535.00

36,500.00

45,625.00

41,300.00

10.47

49 Ubin keramik artistik

5 x 20

bh

11,726.67

11,726.67

11,700.00

14,625.00

12,400.00

17.94

50 Ubin keramik artistik

10 x 20

bh

20,216.67

20,216.67

20,200.00

25,250.00

21,600.00

16.90

51 Ubin keramik artistik

15 x 15

bh

47,545.00

47,545.00

47,500.00

59,375.00

51,800.00

14.62

52 Ubin keramik artistik

20 x 20

bh

57,320.00

57,320.00

57,300.00

71,625.00

59,000.00

21.40

53 Lantai vinyl karet kw 1

30 x 30

m2

71,030.00

71,030.00

71,000.00

88,750.00

82,000.00

8.23

54 Marmer ex. Tulungagung

40 x 60

m2

316,113.33

316,113.33

316,100.00

395,125.00

314,300.00

25.72

55 List Keramik/Border

10 x 20

bh

4,000.00

10,043.33

7,021.67

7,000.00

8,750.00

11,000.00

(20.45)

56 Keramik Granitile Polish

60 x 60

m2

298,000.00

125,086.67

211,543.33

211,500.00

264,375.00

190,300.00

38.93

57 Keramik Granitile Unpolish

60 x 60

m2

250,000.00

202,946.67

226,473.33

226,400.00

283,000.00

412,700.00

(31.43)

58 Stepnoiseng

10x 40

bh

16,250.00

19,246.67

17,748.33

17,700.00

22,125.00

20,000.00

10.63

59 Stepnoiseng

7 x 30

bh

10,133.33

14,643.33

12,388.33

12,300.00

15,375.00

15,000.00

2.50

60 Granito ex Cina

60 x 60

m2

108,000.00

128,993.33

118,496.67

118,500.00

148,125.00

166,600.00

(11.09)

7.73

61 Mozaic/granito 60x60 cm

bh

350,000.00

350,000.00

350,000.00

437,500.00

4,375.00

62 Keramik/Tipe alur 33x33 cm merk mas/roman

m2

70,000.00

70,000.00

70,000.00

87,500.00

875.00

1 Cat besi Emco tanda Bintang

kg

54,375.00

56,500.00

55,437.50

55,400.00

69,250.00

72,000.00

(3.82)

2 Cat kayu Emco tanda Bintang

kg

54,166.67

58,000.00

56,083.33

56,000.00

70,000.00

72,000.00

(2.78)

3 Meni besi/kayu, cap Pedang

kg

18,875.00

24,875.00

21,875.00

21,800.00

27,250.00

22,300.00

22.20

4 Thinner A spesial "Altech"

ltr

25,000.00

28,625.00

26,812.50

26,800.00

33,500.00

28,800.00

16.32

5 Thinner A biasa "Power"

ltr

15,000.00

24,125.00

19,562.50

19,500.00

24,375.00

22,300.00

9.30

6 Thinner B spesial

ltr

9,375.00

16,250.00

12,812.50

12,800.00

16,000.00

15,700.00

1.91

7 Minyak cat/afduner

ltr

7,500.00

14,875.00

11,187.50

11,100.00

13,875.00

15,000.00

(7.50)

8 Cat tembok eksterior Mowilex

ltr

180,000.00

120,000.00

150,000.00

150,000.00

187,500.00

169,300.00

10.75

9 Cat tembok Alcabond

kg

30,000.00

31,833.33

30,916.67

30,900.00

38,625.00

28,200.00

36.97

10 Cat tembok Alcaplast

kg

30,000.00

27,933.33

28,966.67

28,900.00

36,125.00

9,100.00

296.98
360.59

VI

BAHAN PENGECATAN

11 Cat tembok Wallsealer

kg

110,000.00

39,600.00

74,800.00

74,800.00

93,500.00

20,300.00

12 Cat tembok Vinylex

kg

21,712.50

21,712.50

21,700.00

27,125.00

21,000.00

29.17

13 Cat tembok Decolith

kg

12,000.00

17,047.50

14,523.75

14,500.00

18,125.00

32,100.00

(43.54)

14 Cat tembok Metrolith

kg

16,000.00

19,825.00

17,912.50

17,900.00

22,375.00

62,300.00

(64.09)

15 Cat tembok Cathylac

kg

17,000.00

20,325.00

18,662.50

18,600.00

23,250.00

44,600.00

(47.87)

16 Cat tembok Cendana

kg

19,000.00

17,533.33

18,266.67

18,200.00

22,750.00

91,200.00

(75.05)

17 Cat genteng Matex

kg

43,466.67

43,466.67

43,400.00

54,250.00

50,500.00

7.43

18 Serlak kripik "India"

kg

95,450.00

95,450.00

95,450.00

119,312.50

114,900.00

3.84

19 Politur jadi merk "Impra"

ltr

48,000.00

61,975.00

54,987.50

54,900.00

68,625.00

51,100.00

34.30

20 Wood Filler "Impra"

ltr

27,375.00

38,466.67

32,920.83

32,900.00

41,125.00

36,700.00

12.06

21 Wood Stain 'Impra"

ltr

50,900.00

64,366.67

57,633.33

57,600.00

72,000.00

72,600.00

(0.83)

22 Sanding Sealer "Impra"

ltr

43,250.00

52,100.00

47,675.00

47,600.00

59,500.00

66,200.00

(10.12)

Lembar : 23

10

23 Vernis (Glotex)

ltr

42,500.00

42,750.00

42,625.00

42,600.00

53,250.00

45,200.00

17.81

24 Dempul Plitur (Impra)

kg

37,625.00

37,625.00

37,600.00

47,000.00

38,500.00

22.08

25 Dempul Plitur kualitas sedang

kg

27,625.00

27,625.00

27,600.00

34,500.00

33,000.00

4.55

26 Plitur batangan

kg

21,525.00

21,525.00

21,500.00

26,875.00

24,200.00

11.05

27 T e e r

kg

9,875.00

9,875.00

9,800.00

12,250.00

11,000.00

11.36

28 Kertas gosok

lbr

2,666.67

3,750.00

3,208.33

3,200.00

4,000.00

5,000.00

(20.00)

29 Waterproof, Aquaproof Pro Seller

kg

45,000.00

56,875.00

50,937.50

50,900.00

63,625.00

59,500.00

6.93

30 Waterproof, Multiroof

kg

61,000.00

61,000.00

61,000.00

76,250.00

57,000.00

33.77

31 Waterproof, Nippon Paint Shield

kg

78,000.00

68,325.00

73,162.50

73,100.00

91,375.00

58,300.00

56.73

32 Plamur tembok

kg

11,672.50

11,672.50

11,600.00

14,500.00

9,900.00

46.46

33 Plamur kayu

kg

23,600.00

23,600.00

23,600.00

29,500.00

21,600.00

36.57

34 Plamur besi

kg

37,050.00

37,050.00

37,000.00

46,250.00

36,700.00

26.02

35 Spiritus

ltr

15,087.50

15,087.50

15,000.00

18,750.00

14,850.00

26.26

36 Lem Rajawali untuk kayu

kg

25,833.33

40,750.00

33,291.67

33,200.00

41,500.00

40,000.00

3.75

37 Lem Rajawali untuk tembok

kg

9,125.00

14,533.33

11,829.17

11,800.00

14,750.00

18,100.00

(18.51)

38 Lem kayu khusus (Vinyl)

kg

32,500.00

25,200.00

28,850.00

28,850.00

36,062.50

26,200.00

37.64

39 Soda Api

kg

22,500.00

18,250.00

20,375.00

20,300.00

25,375.00

21,600.00

17.48

40 Teak Oil

ltr

35,000.00

29,550.00

32,275.00

32,200.00

40,250.00

30,800.00

30.68

41 Residu

ltr

42 Kuas Eterna

3"

bh

8,166.67

15,625.00

11,895.83

11,800.00

14,750.00

11,000.00

34.09

43 Kuas Eterna

4"

bh

13,166.67

20,375.00

16,770.83

16,700.00

20,875.00

16,500.00

26.52

44 Kuas Eterna

5"

bh

16,333.33

23,133.33

19,733.33

19,700.00

24,625.00

20,900.00

17.82

45 Kalsium

kg

1,000.00

1,350.00

1,175.00

1,100.00

1,375.00

1,300.00

5.77

46 Coating

kg

60,000.00

38,166.67

49,083.33

49,000.00

61,250.00

55,700.00

9.96

47 Wallpaper "Kansai"

m2

78,900.00

78,900.00

78,900.00

98,625.00

141,700.00

(30.40)

1 Engsel H

4"

set

13,775.00

13,775.00

13,700.00

17,125.00

48,500.00

(64.69)

2 Engsel Kuningan

4"

set

17,487.50

17,487.50

17,400.00

21,750.00

18,700.00

16.31

3 Engsel jendela (kupu - kupu)

3"

set

68,000.00

11,562.50

39,781.25

39,700.00

49,625.00

15,000.00

230.83

4 Engsel pintu "UNION"

4"

bh

20,825.00

20,825.00

20,800.00

26,000.00

20,300.00

28.08

5 Engsel jendela "UNION"

3"

bh

26,250.00

26,250.00

26,200.00

32,750.00

17,000.00

92.65

6 Espanyolet kualitas I

set

44,966.67

44,966.67

44,900.00

56,125.00

50,500.00

11.14

7 Grendel

bh

28,600.00

28,600.00

28,600.00

35,750.00

33,400.00

7.04

8 Grendel biasa (besar)

8"

bh

10,000.00

14,912.50

12,456.25

12,400.00

15,500.00

14,400.00

7.64

9 Grendel biasa (kecil)

3"

bh

5,750.00

6,625.00

6,187.50

6,100.00

7,625.00

5,900.00

29.24

VII

BAHAN PENGGANTUNG DAN PENGUNCI

10 Grendel kuningan/krom kecil

4"

bh

10,000.00

20,866.67

15,433.33

15,400.00

19,250.00

23,100.00

(16.67)

11 Grendel tanam kuningan besar

60 cm

set

120,000.00

122,966.67

121,483.33

121,400.00

151,750.00

246,400.00

(38.41)

12 Kunci gembok besar, Globe

40 mm

bh

10,000.00

35,650.00

22,825.00

22,800.00

28,500.00

37,400.00

(23.80)

13 Kunci gembok sedang, Globe

30 mm

bh

8,000.00

27,662.50

17,831.25

17,800.00

22,250.00

24,200.00

(8.06)

14 Kunci tanam (808)

bh

8,000.00

12,087.50

10,043.75

10,000.00

12,500.00

10,500.00

19.05

15 Kunci tanam (2x putar) besar

bh

83,400.00

83,400.00

93,400.00

116,750.00

84,700.00

37.84

16 Kunci tanam "SES" besar (tanpa handel)

bh

140,000.00

260,750.00

200,375.00

20,300.00

25,375.00

171,900.00

(85.24)

17 Kunci tanam (dengan handel)

bh

110,000.00

119,266.67

114,633.33

114,600.00

143,250.00

245,300.00

(41.60)

18 Kunci tanam KM/WC

bh

85,325.00

85,325.00

85,300.00

106,625.00

85,800.00

24.27

19 Kunci silinder "SES"

bh

140,000.00

121,383.33

130,691.67

130,600.00

163,250.00

271,600.00

(39.89)

20 Kunci slot merk "SES" (dengan handel)

bh

360,000.00

388,900.00

374,450.00

374,400.00

468,000.00

452,800.00

3.36

21 Kunci slot 2 putaran "YALE" (dengan handel)

bh

130,612.50

130,612.50

130,600.00

163,250.00

139,700.00

16.86

22 Kunci slot 2 putaran "CAVEL" (dengan handel)

bh

260,000.00

276,000.00

268,000.00

268,000.00

335,000.00

357,000.00

(6.16)

23 Kunci lemari, Wing

bh

8,000.00

7,175.00

7,587.50

7,500.00

9,375.00

13,100.00

(28.44)

Lembar : 24

24 Hak angin biasa

8"

set

12,000.00

8,300.00

10,150.00

10,100.00

12,625.00

8,500.00

48.53

25 Hak angin 4 mm (lurus)

set

11,862.50

11,862.50

11,800.00

14,750.00

18,300.00

(19.40)

26 Hak angin (sikutan) "SES"

set

30,000.00

24,550.00

27,275.00

27,200.00

34,000.00

42,600.00

(20.19)

27 Hak angin lurus (bisa disetel maju/mundur) "SES"

set

55,000.00

69,166.67

62,083.33

62,000.00

77,500.00

82,500.00

(6.06)

p = 20 cm

bh

82,400.00

82,400.00

82,400.00

103,000.00

160,100.00

(35.67)

29 Spring knip

bh

30,000.00

33,266.67

31,633.33

31,600.00

39,500.00

22,900.00

72.49

30 Door closer

bh

267,000.00

227,733.33

247,366.67

247,300.00

309,125.00

233,200.00

32.56

31 Door stopper

bh

34,000.00

49,833.33

41,916.67

41,900.00

52,375.00

66,900.00

(21.71)

32 Rel pintu dorong, biasa

btg

155,000.00

157,650.00

156,325.00

156,300.00

195,375.00

147,600.00

32.37

33 Rel pintu dorong, J4 SES

btg

170,000.00

242,875.00

206,437.50

206,400.00

258,000.00

244,100.00

5.69

1 Slang spiral saluran kran wastafel

set

28,750.00

53,550.00

41,150.00

41,100.00

51,375.00

53,100.00

(3.25)

2 Kloset duduk porselin komplit (INA)

bh

916,666.67

1,240,000.00

1,078,333.33

1,078,300.00

1,347,875.00

1,225,800.00

9.96

3 Kloset duduk porselin komplit (KIA)

bh

1,325,000.00

1,355,000.00

1,340,000.00

1,340,000.00

1,675,000.00

1,447,600.00

15.71

4 Kloset duduk porselin komplit (TOTO)

bh

1,521,666.67

1,817,500.00

1,669,583.33

1,669,500.00

2,086,875.00

1,900,500.00

9.81

5 Kloset jongkok porselin (INA)

bh

96,875.00

143,125.00

120,000.00

120,000.00

150,000.00

161,400.00

(7.06)

6 Kloset jongkok porselin (TOTO)

bh

173,000.00

202,066.67

187,533.33

157,500.00

196,875.00

230,300.00

(14.51)

7 Kloset jongkok teraso

bh

62,000.00

62,000.00

62,000.00

77,500.00

34,100.00

127.27

8 Kran air stainless steel

1/2"

bh

50,000.00

49,100.00

49,550.00

49,500.00

61,875.00

48,400.00

27.84

9 Kran air stainless steel

3/4"

bh

60,000.00

57,575.00

58,787.50

58,700.00

73,375.00

53,800.00

36.38

10 Kran air (DUPONT)

1/2"

bh

125,000.00

92,912.50

108,956.25

108,900.00

136,125.00

188,600.00

(27.82)

11 Kran air kuningan

1/2"

bh

24,916.67

32,458.33

32,400.00

40,500.00

39,300.00

3.05

12 Kran shower "Toto"

3/4"

set

484,000.00

484,000.00

484,000.00

605,000.00

507,900.00

19.12

bh

5,666,666.67

5,666,666.67

5,666,600.00

7,083,250.00

5,250,000.00

34.92

28 Pegangan pintu (model standar)

VIII

10

BAHAN SANITASI

13 Septic Tank (10 pemakai) dan Sumur

40,000.00

Peresapan (dalam 3,00 m)


3/4"

bh

12,000.00

11,712.50

11,856.25

11,800.00

14,750.00

12,400.00

18.95

15 Wastafel warna muda "ITO"

bh

265,000.00

405,150.00

335,075.00

335,000.00

418,750.00

321,500.00

30.25

16 Wastafel warna tua "ITO"

bh

292,000.00

465,950.00

378,975.00

378,900.00

473,625.00

378,400.00

25.17

17 Rol TBA (seal tape) Jumbo

rol

8,000.00

14,033.33

11,016.67

11,000.00

13,750.00

12,100.00

13.64

18 Siphon Washer, kelas sedang plastik

set

30,000.00

31,233.33

30,616.67

30,600.00

38,250.00

46,200.00

(17.21)
0.26

14 Watermur besi

19 Water drain dan assesories

set

45,000.00

32,933.33

38,966.67

38,900.00

48,625.00

48,500.00

0,5 m3

bh

360,000.00

264,000.00

312,000.00

312,000.00

390,000.00

374,700.00

4.08

21 Bak cuci piring stainless steel, besar (double)

bh

700,000.00

575,000.00

637,500.00

637,500.00

796,875.00

550,000.00

44.89

22 Bak cuci teraso

bh

149,133.33

149,133.33

149,100.00

186,375.00

154,200.00

20.87

23 Tempat sabun keramik "Sotento"

bh

20,000.00

37,250.00

28,625.00

28,600.00

35,750.00

39,300.00

(9.03)

24 Urinoir "INA" (komplit)

set

1,075,000.00

959,125.00

1,017,062.50

1,017,000.00

1,271,250.00

1,089,000.00

16.74

25 Floor drain stainless steel "Onde"

bh

103,250.00

56,975.00

80,112.50

80,100.00

100,125.00

70,400.00

42.22

26 Kurasan (putih) stainless steel

bh

27,500.00

35,037.50

31,268.75

31,200.00

39,000.00

45,600.00

(14.47)

60 x 60 cm

bh

300,000.00

385,100.00

342,550.00

342,500.00

428,125.00

489,500.00

(12.54)

550 ltr

bh

600,000.00

894,600.00

747,300.00

747,300.00

934,125.00

1,066,400.00

(12.40)

29 Pompa tangan "Dragon"

bh

263,600.00

263,600.00

263,600.00

329,500.00

305,800.00

7.75

30 Hand shower plastik (termasuk slang)

set

201,300.00

150,900.00

150,900.00

188,625.00

201,300.00

(6.30)

31 Wall shower "Toto"

set

335,500.00

335,500.00

335,500.00

419,375.00

351,700.00

19.24

32 Pompa air "Shimizu 125 W"

bh

293,666.67

431,200.00

362,433.33

362,400.00

453,000.00

519,700.00

(12.83)

33 Pompa air "Sanyo 125 W"

bh

350,000.00

550,000.00

450,000.00

450,000.00

562,500.00

550,000.00

2.27

20 Bak mandi fiberglass

27 Bak mandi porselin


28 Tandon air fiberglass "Penyu"

100,500.00
-

IX

BAHAN JENIS KACA


1 Kaca polos

t = 5 mm

m2

55,000.00

62,987.50

58,993.75

59,000.00

73,750.00

55,700.00

32.41

2 Kaca polos

t = 8 mm

m2

78,512.50

78,512.50

78,500.00

98,125.00

66,500.00

47.56

Lembar : 25

10

3 Kaca rayban

t = 5 mm

m2

60,000.00

91,912.50

75,956.25

75,900.00

94,875.00

88,500.00

7.20

4 Kaca es/buram

t = 5 mm

m2

100,000.00

121,187.50

110,593.75

110,500.00

138,125.00

121,000.00

14.15

5 Krapyak kaca nako 15 x 70 cm (includ kerangka)

t = 5 mm

daun

31,500.00

31,500.00

31,500.00

39,375.00

72,100.00

(45.39)

6 Kaca buram

t = 3 mm

m2

91,875.00

91,875.00

91,800.00

114,750.00

90,700.00

26.52

7 Kaca cermin

t = 3 mm

m2

128,675.00

128,675.00

128,600.00

160,750.00

162,200.00

(0.89)

8 Profil kaca

t = 5 mm

m2

###

BAHAN BETON CETAKAN


1 Roster klingker warna merah

10 x 20 cm

bh

7,333.33

7,333.33

7,300.00

9,125.00

9,100.00

0.27

2 Buis beton (p = 100 cm)

15 cm

bh

27,500.00

51,012.50

39,256.25

39,200.00

49,000.00

44,500.00

10.11

3 Buis beton (p = 100 cm)

20 cm

bh

35,000.00

63,250.00

49,125.00

49,100.00

61,375.00

55,000.00

11.59

4 Buis beton (p = 100 cm)

30 cm

bh

46,250.00

79,075.00

62,662.50

62,600.00

78,250.00

74,800.00

4.61

5 Buis beton (p = 100 cm)

40 cm

bh

53,750.00

89,400.00

71,575.00

71,500.00

89,375.00

83,600.00

6.91

6 Buis beton (p = 50 cm)

50 cm

bh

45,000.00

102,200.00

73,600.00

73,600.00

92,000.00

89,900.00

2.34

7 Buis beton (p = 50 cm)

60 cm

bh

56,250.00

79,350.00

67,800.00

67,800.00

84,750.00

76,100.00

11.37

8 Buis beton (p = 50 cm)

80 cm

bh

81,250.00

97,300.00

89,275.00

89,200.00

111,500.00

106,900.00

4.30

9 Buis beton (p = 50 cm)

100 cm

bh

97,500.00

112,200.00

104,850.00

104,800.00

131,000.00

124,000.00

5.65

10 Buis Beton U (p = 100 cm)

15 cm

bh

15,000.00

42,166.67

28,583.33

28,500.00

35,625.00

40,000.00

(10.94)

11 Buis Beton U (p = 100 cm)

20 cm

bh

17,500.00

47,987.50

32,743.75

32,700.00

40,875.00

45,200.00

(9.57)

12 Buis Beton U (p = 100 cm)

30 cm

bh

22,500.00

58,725.00

40,612.50

40,600.00

50,750.00

56,400.00

(10.02)

13 Got talang R 15 (segmen)

bh

24,433.33

24,433.33

24,400.00

30,500.00

32,100.00

(4.98)

14 Got talang R 25 (segmen)

bh

41,766.67

41,766.67

41,700.00

52,125.00

55,100.00

(5.40)

15 Kerb/20x30x50 cm

bh

51,500.00

51,500.00

51,500.00

64,375.00

643.75

16 Box cuilvert100x100x120cm(k350)

m1

3,688,666.00

3,688,666.00

3,688,600.00

4,610,750.00

46,107.50

17 Box cuilvert150x150x120cm(k350)

m1

4,606,250.00

4,606,250.00

4,606,200.00

5,757,750.00

57,577.50

1 Pipa PVC tipe AW "Maspion"

1/2" - 400

btg

17,250.00

33,450.00

25,350.00

25,300.00

31,625.00

30,100.00

5.07

2 Pipa PVC tipe AW "Maspion"

5/8" - 400

btg

29,300.00

29,300.00

29,300.00

36,625.00

29,500.00

24.15

3 Pipa PVC tipe AW "Maspion"

3/4" - 400

btg

21,000.00

41,616.67

31,308.33

31,300.00

39,125.00

38,000.00

2.96

4 Pipa PVC tipe AW "Maspion"

1" - 400

btg

26,250.00

51,950.00

39,100.00

39,100.00

48,875.00

49,200.00

(0.66)

5 Pipa PVC tipe AW

2" - 400

btg

70,500.00

94,800.00

82,650.00

82,600.00

103,250.00

105,600.00

(2.23)

6 Pipa PVC tipe AW

3" - 400

btg

131,000.00

201,600.00

166,300.00

166,300.00

207,875.00

181,500.00

14.53

7 Pipa PVC tipe AW

4" - 400

btg

187,500.00

298,333.33

242,916.67

242,900.00

303,625.00

272,800.00

11.30

8 Pipa PVC tipe AW

5" - 400

btg

290,000.00

468,566.67

379,283.33

379,200.00

474,000.00

423,500.00

11.92

9 Pipa PVC "Maspion" tipe D

2" - 400

btg

35,000.00

72,033.33

53,516.67

53,500.00

66,875.00

74,100.00

(9.75)

10 Pipa PVC "Maspion" tipe D

3" - 400

btg

75,000.00

118,566.67

96,783.33

96,700.00

120,875.00

148,300.00

(18.49)

11 Pipa PVC "Maspion" tipe D

4" - 400

btg

103,500.00

163,500.00

133,500.00

133,500.00

166,875.00

209,300.00

(20.27)

12 Pipa PVC "Maspion" tipe D

5" - 400

btg

165,000.00

267,433.33

216,216.67

216,200.00

270,250.00

265,100.00

1.94

13 Lem PVC "Wavin"

tube

6,500.00

8,150.00

7,325.00

7,300.00

9,125.00

9,100.00

0.27

14 Keni PVC tipe AW

1/2"

bh

1,100.00

1,500.00

1,300.00

1,300.00

1,625.00

1,500.00

8.33

15 Keni PVC tipe AW

3/4"

bh

1,550.00

2,225.00

1,887.50

1,800.00

2,250.00

2,200.00

2.27

16 Keni PVC tipe AW

2"

bh

6,500.00

7,200.00

6,850.00

6,800.00

8,500.00

10,500.00

(19.05)

17 Keni PVC tipe AW

3"

bh

23,000.00

13,050.00

18,025.00

18,000.00

22,500.00

25,500.00

(11.76)

18 Keni PVC tipe AW

4"

bh

47,000.00

18,500.00

32,750.00

32,700.00

40,875.00

42,000.00

(2.68)

19 Keni PVC tipe AW

5"

bh

65,000.00

25,550.00

45,275.00

45,200.00

56,500.00

57,000.00

(0.88)

bh

500.00

4,912.50

2,706.25

2,700.00

3,375.00

4,900.00

(31.12)

21 Talang PVC U "Maspion"

400 cm

btg

67,500.00

95,650.00

81,575.00

81,500.00

101,875.00

146,300.00

(30.37)

22 Talang PVC U

400 cm

btg

73,075.00

73,075.00

73,000.00

91,250.00

82,000.00

11.28

23 Clam Talang PVC U

400 cm

bh

4,000.00

7,050.00

5,525.00

5,500.00

6,875.00

6,600.00

4.17

XI

BAHAN PIPA PVC

20 Klem PVC

Lembar : 26

24 Shock Talang PVC U

400 cm

bh

4,000.00

7,050.00

5,525.00

5,500.00

6,875.00

9,100.00

(24.45)

25 Tutup Talang PVC U

400 cm

bh

4,000.00

7,050.00

5,525.00

5,500.00

6,875.00

9,100.00

(24.45)

26 Corong Talang PVC U

400 cm

bh

15,000.00

18,450.00

16,725.00

16,700.00

20,875.00

26,900.00

(22.40)

1 Paku asbes gelombang (paku pancing)

bh

1,250.00

2,116.67

1,683.33

1,600.00

2,000.00

3,200.00

(37.50)

2 Paku kayu

1"

kg

14,000.00

19,075.00

16,537.50

16,500.00

20,625.00

19,800.00

4.17

3 Paku kayu

1,5" - 2"

kg

12,500.00

19,075.00

15,787.50

15,700.00

19,625.00

19,800.00

(0.88)

4 Paku kayu

2,5" - 3"

kg

12,000.00

18,950.00

15,475.00

15,400.00

19,250.00

19,800.00

(2.78)

5 Paku kayu

4"

kg

12,000.00

17,900.00

14,950.00

14,900.00

18,625.00

18,300.00

1.78

6 Paku payung (paku seng gelombang)

kg

20,000.00

24,125.00

22,062.50

22,000.00

27,500.00

29,500.00

(6.78)

7 Paku sekrup

1"

dos

12,000.00

16,275.00

14,137.50

14,100.00

17,625.00

17,000.00

3.68

8 Paku sumbat

dos

26,750.00

26,750.00

26,700.00

33,375.00

22,900.00

45.74

XII

10

BAHAN JENIS PAKU

9 Paku triplek/eternit

kg

25,875.00

25,875.00

25,800.00

32,250.00

26,900.00

19.89

5 cm

bh

1,200.00

637.50

918.75

900.00

1,125.00

1,100.00

2.27

kg

20,000.00

29,187.50

24,593.75

24,500.00

30,625.00

30,200.00

1.41

1 Fiting plafon

bh

16,850.00

16,850.00

16,800.00

21,000.00

11,100.00

89.19

2 T doos PVC

bh

500.00

1,537.50

1,018.75

1,000.00

1,250.00

1,600.00

(21.88)

3 Isolator kecil

bh

1,612.50

1,612.50

1,600.00

2,000.00

1,400.00

42.86

4 Stop kontak (Broco)

bh

10,000.00

25,450.00

17,725.00

17,700.00

22,125.00

25,300.00

(12.55)

5 Skakelar tunggal (Broco)

bh

8,900.00

22,950.00

15,925.00

15,900.00

19,875.00

30,800.00

(35.47)

6 Skakelar ganda (Broco)

bh

12,500.00

33,000.00

22,750.00

22,700.00

28,375.00

33,000.00

(14.02)

7 Stop kontak dan skakelar (Broco)

bh

27,500.00

27,500.00

27,500.00

34,375.00

38,500.00

(10.71)

8 Skakelar/hendel pemindah arus

bh

308,000.00

308,000.00

308,000.00

385,000.00

286,000.00

34.62

9 Zekring lengkap dengan box

bh

88,875.00

88,875.00

88,800.00

111,000.00

88,000.00

26.14

10 Las doof

bh

6,700.00

6,700.00

6,700.00

8,375.00

600.00

1,295.83

10 Paku beton
11 Paku kalsiboard
XIII

BAHAN PERALATAN LISTRIK

11 Panel box

bh

91,325.00

91,325.00

91,300.00

114,125.00

60,000.00

90.21

12 Meinswitch

bh

50,750.00

50,750.00

50,700.00

63,375.00

32,800.00

93.22

13 Zekring MCB thermis 10 - 16 Amp.

bh

69,625.00

69,625.00

69,600.00

87,000.00

60,000.00

45.00

14 Zekring MCB thermis 10 Amp.

bh

61,666.67

61,666.67

61,600.00

77,000.00

46,500.00

65.59

15 Stater lampu TL

bh

40,000.00

40,000.00

40,000.00

50,000.00

35,000.00

42.86

16 Lampu pijar 25,40,75 / 220 V "Philips"

bh

6,833.33

6,833.33

6,800.00

8,500.00

8,000.00

6.25

250 watt

bh

91,500.00

91,500.00

91,500.00

114,375.00

148,000.00

(22.72)

18 Lampu hemat energi 18 W / 220 V (Philips)

bh

30,000.00

38,500.00

34,250.00

34,200.00

42,750.00

45,900.00

(6.86)

19 Lampu hemat energi 18 W / 220 V (Osram)

bh

31,500.00

31,900.00

31,700.00

31,700.00

39,625.00

34,100.00

16.20

20 Lampu TL 20 W / 220 V, komplit balast

bh

88,100.00

88,100.00

88,100.00

110,125.00

92,400.00

19.18

127,500.00

127,500.00

127,500.00

159,375.00

165,000.00

(3.41)
(28.41)

17 Bola lampu Armateur "Philips"

(Philips)
21 Lampu TL 40 W / 220 V, komplit balast

bh

(Philips)

22 Kabel NYM. 2 x 2,5

m1

6,375.00

6,375.00

6,300.00

7,875.00

11,000.00

23 Kabel NYY. 1 x 2,5

m1

4,925.00

4,925.00

4,900.00

6,125.00

7,800.00

(21.47)

24 Kabel twisted Indonesia

3 x 70 x 5 mm2

m1

13,883.33

13,883.33

13,800.00

17,250.00

7,100.00

142.96

25 Kabel twisted multi kabel

m1

7,100.00

(100.00)

26 UPS 3,5 Kw

bh

45,654,340.00

45,654,340.00

45,654,300.00

57,067,875.00

570,678.75

27 UPS 6,0 Kw

bh

60,872,453.33

60,872,453.33

60,872,400.00

76,090,500.00

760,905.00

28 Exhaustfan 8''

bh

463,770.00

463,770.00

463,700.00

579,625.00

5,796.25

29 Genzet 250 Kva Cartepillar

unit

4,529,332,500.00

4,529,332,500.00

4,529,332,500.00

5,661,665,625.00

56,616,656.25

30 Instalasi Listrik

titik

150,000.00

150,000.00

150,000.00

187,500.00

183,000.00

2.46

Lembar : 27

unit

2,460,000.00

2,460,000.00

2,460,000.00

3,075,000.00

1 Pipa Tembaga 1 1/4" x 1,2 mm

m1

2 Pipa Tembaga 1" x 1,2 mm

m1

4,500.00

(100.00)

3 Pipa Tembaga 3/4" x 1,2 mm

m1

4,500.00

(100.00)

4 Pipa Tembaga 1/2" x 1,2 mm

m1

5,500.00

(100.00)

5 Pipa Tembaga 3/8" x 1,2 mm

m1

33,000.00

(100.00)

6 Wall Outlet Oxygen merk C&U Japan

bh

37,400.00

(100.00)

7 Wall Outlet N2O merk C&U Japan

bh

31,350.00

(100.00)

8 Wall Outlet Vacuum merk C&U Japan

bh

9,200.00

(100.00)

9 Ceiling Outlet ONV merk C&U Japan

unit

10,350.00

(100.00)

10 Box Valve ONV Lokal

unit

348,800.00

(100.00)

11 Box Valve OV Lokal

unit

3,525,000.00

(100.00)

12 Sentral Oxygen Uk. 2 x 5 cyl. Manual Syst.

unit

307,500.00

(100.00)

13 Sentral N2O Uk. 2 x 3 cyl. Manual Syst.

unit

151,200.00

(100.00)

14 Sentral Mesin Vacuum kap. 1 x 200 1/mnt

unit

347,000.00

(100.00)

15 Incenerator Nova-500 LFH 0,5 m3/jam

unit

54,000.00

(100.00)

16 Incenerator Nova-800 LFH 0,8 m3/jam

unit

224,300.00

(100.00)

17 Fire Extuinguisher 5 Kg (Ganebo)

bh

347,000.00

(100.00)

18 Fire Extuinguisher 3,5 Kg (Ganebo)

bh

240,600.00

(100.00)

19 Fire Extuinguisher 3,0 Kg (Powder)

bh

500.00

(100.00)

1 Bensin

ltr

4,500.00

4,500.00

4,500.00

4,500.00

4,500.00

4,500.00

2 Solar

ltr

4,500.00

4,500.00

4,500.00

4,500.00

4,500.00

4,500.00

3 Minyak tanah non subsidi

ltr

9,800.00

9,833.33

9,800.00

9,800.00

9,800.00

5,500.00

78.18

4 Oli mesin Mesran

ltr

30,250.00

30,250.00

30,250.00

30,250.00

30,250.00

33,000.00

(8.33)

5 Minyak pelumas

ltr

39,950.00

39,950.00

39,950.00

39,950.00

39,950.00

37,400.00

6.82

6 Grease (gemuk pelumas)

kg

29,925.00

29,925.00

29,925.00

37,406.25

31,350.00

19.32

7 Aspal panas curah

kg

10,300.00

9,733.33

10,016.67

10,000.00

10,300.00

9,200.00

11.96

kg

12,300.00

12,300.00

12,300.00

12,300.00

10,350.00

18.84

31 Penangkal Petir Lengkap (2 Spit), tinggi 10 m

10

2,541,000.00

21.02

(Tidak termasuk izin dari Depnaker)


XIV

BAHAN PIPA MEDIS


-

merk BUSCH

XV

BBM DAN ALAT BERAT

8 Aspal panas drum


9 Biaya operasional wheel loader 115 H

E.052

jam

474,400.00

474,400.00

474,400.00

593,000.00

348,800.00

70.01

10 Biaya operasional AMP 30T/h

E.155

jam

4,762,500.00

4,762,500.00

4,762,500.00

5,953,125.00

3,525,000.00

68.88

11 Biaya operasional dump truck 5 T/145 Hp

E.212

jam

328,750.00

328,750.00

328,750.00

410,937.50

307,500.00

33.64

12 Biaya operasional dump truck 3,5 T/115 Hp

E.221

jam

151,200.00

(100.00)
30.21

13 Biaya operasional asphalt finisher (penghampar)

jam

312,500.00

312,500.00

312,500.00

390,625.00

300,000.00

14 Biaya operasional pneumetic roller 8-15 T

E.084

jam

262,150.00

262,150.00

262,150.00

327,687.50

347,000.00

(5.57)

15 Biaya operasional asphalt sprayer towed 1000 L

E.153

jam

54,000.00

54,000.00

54,000.00

67,500.00

54,000.00

25.00

16 Biaya operasional tandem roller 6-10 T

E.081

jam

366,000.00

366,000.00

366,000.00

457,500.00

224,300.00

103.97

17 Biaya operasional roller 3 wheeled 6-8 T/ 8-10 T

E.080

jam

474,400.00

474,400.00

474,400.00

593,000.00

347,000.00

70.89

18 Biaya operasional genset

jam

240,500.00

240,500.00

240,500.00

300,625.00

240,600.00

24.95

19 Biaya operasional alat bantu

jam

5,000.00

5,000.00

5,000.00

6,250.00

500.00

1,150.00

20 Biaya operasional bulldozer

jam

394,000.00

(100.00)

21 Biaya operasional stone crusher

jam

499,600.00

(100.00)

E.301

jam

171,666.67

171,666.67

171,600.00

214,500.00

132,200.00

62.25

23 Biaya operasional mesin gilas (wales)

hari

150,000.00

258,333.33

204,166.67

204,100.00

150,000.00

###

24 Biaya operasional mesin gilas (wales)

E.080

hari

250,000.00

250,000.00

250,000.00

250,000.00

250,000.00

250,000.00

22 Biaya operasional compressor air 210 m3

Lembar : 28

25 Biaya operasional motor grader

hari

37,500.00

(100.00)

26 Biaya operasional vibro roller

hari

325,000.00

(100.00)

27 Biaya operasional water tanker

hari

100,000.00

(100.00)

28 Biaya operasional coldmilling

hari

288,525.00

(100.00)

29 Teakcoat

hari

15,000.00

(100.00)

30 Biaya operasional excavator

hari

300,000.00

(100.00)

Blitar,

Juni 2012

Mengetahui,

Dibuat oleh,

KEPALA DINAS PEKERJAAN UMUM

TIM PENYUSUN HSBU

DAERAH KOTA BLITAR

DINAS PEKERJAAN UMUM


DAERAH KOTA BLITAR
Koordinator,

HERU CATUR W, ST., M.Si

HASNIL PURWANTO, SH. M.AP


Pembina Utama Muda
NIP. 19561106 198509 1 001

Pembina
NIP. 19530222 198103 1 003

Lembar : 29

10

: 0274 /
:
-

/ 410.102.4 / 2012
- 2012

DRAFT
UAN BAHAN BANGUNAN DAN UPAH KERJA
KOTA BLITAR TAHUN ANGGARAN 2012
Semester II Tahun 2012)

PENETAPAN
HARGA STANDAR
HARGA STANDAR
SEMESTER I
SEMESTER II
KAB. BLITAR
TA. 2012
(Rp.)
(Rp.)

11

12

163,000.00

150,000.00

170,000.00

167,000.00

175,000.00

170,000.00

212,000.00

199,000.00

235,000.00

206,000.00

235,000.00

221,500.00

240,000.00

234,500.00

240,000.00

234,000.00

160,000.00

157,000.00

107,000.00

114,000.00

8,000.00

125,000.00

109,000.00

110,000.00

104,000.00

85,000.00

79,000.00

135,000.00

219,100.00

1,300.00

85,800.00

80,000.00

70,500.00

95,000.00

78,600.00

90,000.00

81,500.00

25,000.00

18,000.00

3,250.00

2,500.00

650,000.00

550.00

550,000.00

525.00

70,000.00

78,700.00

100,000.00

100,000.00

15,000.00

10,000.00

20,000.00

8,000.00

Lembar : 30

11

12

65,000.00

71,500.00

90,000.00

88,000.00

90,000.00

99,000.00

1,000,000.00

1,000,000.00

1,300,000.00

1,320,000.00

12,500.00

12,400.00

500,000.00

403,500.00

800,000.00

962,500.00

140,000.00

154,000.00

71,000.00

78,000.00

57,000.00

61,600.00

69,000.00

74,800.00

55,000.00

59,700.00

67,000.00

77,400.00

95,000.00

90,500.00

15,000.00

12,100.00

30,000.00

22,900.00

22,000.00

22,300.00

25,000.00

23,600.00

30,000,000.00

32,287,500.00

28,000,000.00

30,135,000.00

31,000,000.00

30,672,400.00

28,000,000.00

30,135,000.00

24,000,000.00

22,062,400.00

20,000,000.00

18,833,700.00

25,000,000.00

24,753,000.00

16,500,000.00

16,143,000.00

10,000,000.00

10,517,000.00

10,250,000.00

11,133,900.00

9,000,000.00

9,972,300.00

8,500,000.00

9,681,000.00

6,000,000.00

5,800,000.00

6,250,000.00

6,204,800.00

5,500,000.00

5,800,000.00

5,500,000.00

5,255,900.00

2,000,000.00

1,375,000.00

2,500,000.00

2,167,500.00

2,500,000.00

2,420,000.00

2,700,000.00

2,662,400.00

Lembar : 31

11

12

40,000.00

21,000.00

7,000,000.00

7,150,000.00

7,250,000.00

8,050,000.00

6,500,000.00

6,900,000.00

6,500,000.00

6,750,000.00

10,000,000.00

10,333,900.00

10,250,000.00

11,093,900.00

9,000,000.00

9,641,600.00

8,500,000.00

9,333,800.00

4,500,000.00

1,559,900.00

5,500.00

5,500.00

8,000.00

7,800.00

10,000.00

9,100.00

17,500.00

16,000.00

45,000.00

25,500.00

12,500.00

13,100.00

17,500.00

9,800.00

2,500,000.00

2,500,000.00

130,000.00

133,100.00

110,000.00

98,000.00

60,000.00

50,800.00

70,000.00

60,500.00

60,000.00

67,600.00

50,000.00

39,000.00

16,000.00

17,500.00

17,500.00

19,200.00

20,000.00

23,100.00

111,100.00

68,900.00

15,000.00

9,500.00

16,000.00

13,500.00

16,000.00

16,500.00

100,000.00

90,000.00

110,000.00

98,000.00

40,000.00

35,000.00

20,000.00

25,000.00

1,500.00

1,500.00

15,000.00

11,000.00

5,500.00

6,000.00

10,000.00

10,000.00

7,000.00

5,000.00

6,500.00

6,500.00

1,900.00

10,000.00

1,650.00

1,800.00

7,500.00

7,500.00

3,750.00

3,750.00

Lembar : 32

11

12
9,000.00

9,000.00

1,300.00

1,300.00

4,000.00

3,600.00

9,000.00

7,000.00

12,500.00

11,000.00

30,000.00

25,000.00

8,500.00

20,300.00

7,500.00

21,000.00

55,000.00

56,400.00

45,000.00

40,000.00

40,000.00

37,000.00

40,000.00

32,000.00

65,000.00

88,500.00

115,000.00

115,000.00

85,000.00

88,500.00

117,500.00

145,200.00

70,000.00

89,200.00

75,000.00

75,000.00

13,000.00

13,000.00

20,000.00

16,500.00

75,000.00

101,000.00

140,000.00

130,000.00

120,000.00

100,000.00

150,000.00

163,300.00

80,000.00

65,000.00

120,000.00

120,000.00

100,000.00

100,000.00

120,000.00

120,000.00

80,000.00

85,300.00

200,000.00

200,000.00

200,000.00

210,600.00

239,500.00

266,400.00

100,000.00

67,600.00

24,000.00

22,000.00

11,000.00

11,000.00

12,000.00

12,000.00

150,000.00

143,000.00

22,000.00

22,000.00

148,000.00

151,200.00

240,000.00

257,400.00

300,000.00

317,900.00

350,000.00

453,700.00

480,000.00

620,400.00

600,000.00

831,600.00

750,000.00

1,028,500.00

Lembar : 33

11

12

1,000,000.00

1,331,000.00

1,350,000.00

1,925,000.00

550,000.00

735,000.00

650,000.00

762,300.00

1,397,550.00

45,000.00

44,467.50

14,385.00

14,385.00

14,385.00

330,000.00

381,150.00

200,000.00

222,285.00

85,000.00

95,550.00

375,000.00

527,100.00

44,000.00

31,710.00

24,000.00

22,050.00

40,000.00

40,950.00

23,000.00

37,170.00

25,000.00

44,100.00

14,000.00

13,755.00

15,000.00

15,750.00

20,000.00

20,790.00

15,750.00

90,000.00

92,925.00

1,472,625.00

1,545,495.00

750,000.00

747,600.00

388,605.00

285,180.00

139,650.00

215,985.00

310,800.00

369,600.00

502,425.00

941,850.00

1,311,240.00

1,307,145.00

1,406,370.00

600,000.00

314,685.00

400,000.00

825,825.00

146,055.00

99,225.00

241,080.00

550,000.00

664,125.00

600,000.00

801,990.00

750,000.00

744,975.00

1,125,000.00

1,328,250.00

750,000.00

915,705.00

650,000.00

763,455.00

Lembar : 34

11

12

450,000.00

523,215.00

1,170,015.00

1,000,000.00

943,110.00

34,440.00

27,510.00

125,000.00

221,130.00

150,000.00

310,695.00

110,000.00

216,300.00

140,000.00

310,695.00

227,325.00

43,260.00

50,000.00
50,000.00
45,000.00
55,000.00
55,000.00
48,000.00
48,000.00
60,000.00
57,000.00
55,000.00
57,000.00
55,000.00
55,000.00
75,000.00
40,000.00
45,000.00
47,000.00
45,000.00
47,000.00
50,000.00
42,000.00
57,000.00
47,000.00
52,000.00
40,000.00
50,000.00
60,000.00
46,000.00
46,000.00
42,000.00
42,000.00
50,000.00
Lembar : 35

11

12
-

50,000.00
50,000.00
55,000.00
45,000.00
10,000.00
-

55,000.00
66,000.00
30,000.00
32,000.00
30,000.00
22,000.00
20,000.00
24,000.00
17,500.00
22,000.00
22,000.00
66,000.00
Lembar : 36

11

12

50,000.00
38,000.00
35,000.00
20,000.00
10,000.00
8,250.00
60,000.00
65,000.00
75,000.00
13,000.00
27,500.00
44,000.00
16,500.00
44,000.00
13,000.00
35,000.00
20,000.00
30,000.00
20,000.00
25,000.00
30,000.00
1,300.00
140,000.00

20,000.00
12,000.00
25,000.00
20,000.00
7,500.00
20,000.00
65,000.00
50,000.00
40,000.00
15,000.00
375,000.00
125,000.00
325,000.00
Lembar : 37

11

12

10,000.00
15,000.00
30,000.00
70,000.00
75,000.00
40,000.00
225,000.00
50,000.00
200,000.00
250,000.00

55,000.00
1,200,000.00
1,300,000.00
1,500,000.00
150,000.00
200,000.00
75,000.00
50,000.00
60,000.00
6,500,000.00
25,000.00
300,000.00
325,000.00
15,000.00
250,000.00
600,000.00
150,000.00
50,000.00
950,000.00
60,000.00
300,000.00
1,000,000.00
-

82,000.00
Lembar : 38

11

12

99,000.00
120,000.00
38,500.00
99,000.00
120,000.00
-

15,000.00
55,000.00
66,000.00
82,500.00
93,500.00
104,500.00
85,000.00
110,000.00
44,000.00
49,000.00
60,500.00
-

48,400.00
60,500.00
72,600.00
217,800.00
326,700.00
508,200.00
108,900.00
133,100.00
181,500.00
302,500.00
36,300.00
Lembar : 39

11

12
-

22,000.00
22,000.00
22,000.00
22,000.00
30,000.00
20,000.00
35,000.00
35,000.00
750.00
35,000.00

25,000.00
1,500.00
2,000.00
30,000.00
25,000.00
40,000.00

125,000.00
600.00
150,000.00
75,000.00
100,000.00
75,000.00
40,000.00
25,000.00
35,000.00
40,000.00
100,000.00
125,000.00
4,000.00
3,500.00
150,000.00
Lembar : 40

11

12

2,500,000.00

4,500.00
4,500.00
37,000.00
10,500.00
11,500.00
Lembar : 41

11

12
-

Lembar : 42

DAFTAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA


PEMERINTAH KOTA BLITAR TAHUN ANGGARAN 2011
( Triwulan IV TAHUN ANGGARAN 2012 )

A. DAFTAR HARGA SATUAN BAHAN BANGUNAN


HARGA SURVEI
NO.

I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
II

JENIS BAHAN

BAHAN PASANGAN DAN CAMPURAN


BETON
Batu kali belah
Batu kali pecah
Batu kali pecah
Batu kali pecah
Batu kali pecah
Batu kali pecah Crusser
Batu kali pecah Crusser
Batu kali pecah Crusser
Batu krikil (ayakan)
Krikil sungai
Krikil ayak tanpa pasir
Krikil batu alor (ampyang)
Pasir beton/cor
Pasir pasang
Pasir urug
Agregat Kasar
Agregat Halus
Filler
Sirtu
Tanah urug biasa
Tanah urug pilihan (campur pupuk utk taman)
Tanah katelan jalan
Gebalan rumput
Batako
Batu merah klas I
Batu merah klas II
Batu lempeng (tidak beraturan)
Batu hias (sand stone)
Roster beton
Roster beton
Roster batu alam
Roster batu alam
Batu tempel hijau
Tiang teras batu alam
Tiang teras batu alam
List batu hias
Kapur padam
Gamping
Semen merah
Semen Gresik (PC Gresik)
Semen Gresik (PC Gresik)
Semen Tiga Roda
Semen Tiga Roda
Semen Holcim
Semen putih
PC super nut
Ijuk
Glass block bening
Glass block buram

BAHAN KUZEN KAYU DAN KERANGKA


ATAP
1 Kayu jati balok kualitas II,
Ex. Bojonegoro (mutu kayu klas I)
2 Kayu jati usuk kualitas II,
Ex. Bojonegoro (mutu kayu klas I)
3 Kayu jati papan kualitas II,
Ex. Bojonegoro (mutu kayu klas I)
4 Kayu jati reng kualitas II,

UKURAN

SAT.

15/20
5/7
4/6
3/5
2/3
1/2
1/1
0,5/1
2/3
(40x20x10) cm
10 x 20
20 x 20
10 x 30
20 x 20
30 x 30
10 x 20
22cm, t=3 m
28cm, t=3 m
p = 40 cm
kg
kg
1
50 kg
40 kg
50 kg
40 kg
50 kg
40 kg
20 x 20
20 x 20

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
kg
m3
m3
m3
m3
m3
kg
m3
m3
m3
m3
m2
bh
bh
bh
m2
m2
bh
bh
bh
bh
m2
bh
bh
bh
m3
ton
m3
zak
zak
zak
zak
zak
zak
kg
kg
bh
bh

6/12, 6/15, 8/12

m3

4/6, 5/7

m3

2/20, 3/20, 3/25

m3

2/3, 3/5

m3

TOKO KERAMIK
SUMBER
SUBUR

TOKO KUNING

GRAHA
BANGUNAN

TOKO TRIPUTRA
SELARAS

115,000.00
125,000.00
125,000.00
135,000.00
150,000.00

50,000.00
40,000.00

50,000.00
35,000.00
40,000.00
55,000.00
5,000.00
2,250.00
450.00
420.00
75,000.00
50,000.00
4,000.00
4,000.00
35,000.00
45,000.00
55,000.00
350,000.00
450,000.00

TOKO PERDANA
PAINT

Material pak Sis ,


P. Zainal, P sayuti

(Rp.)

TOKO TIGA
PUTRA

TOKO RIMBA
AGUNG

TOKO MATERIAL /
CV. PENATARAN

PASAR PASIR

10

100,000.00

150,000.00
150,000.00

60,000.00
55,000.00

125,000.00
90,000.00

50,000.00
45,000.00

440.00
400.00

1,700.00
550.00
450.00

7,500.00
7,500.00

350,000.00
100,000.00
50,000.00
60,000.00
48,000.00
47,000.00
85,000.00
13,000.00

50,000.00

45,500.00
55,000.00
44,000.00

50,000.00
60,000.00
60,000.00

17,000.00

18,000.00
20,000.00

Lembar : 43

2
Ex. Bojonegoro (mutu kayu klas I)
5 Kayu jati balok kualitas I, lokal
(mutu kayu klas I)
6 Kayu jati usuk kualitas I, lokal
(mutu kayu klas I)
7 Kayu jati papan kualitas I, lokal
(mutu kayu klas I)
8 Kayu jati reng kualitas I, lokal
(mutu kayu klas I)
9 Kayu kamper, balok (mutu kayu klas II)
10 Kayu kamper, papan (mutu kayu klas II)
11 Kayu kamper, usuk (mutu kayu klas II)
12 Kayu kamper, reng (mutu kayu klas II)
13 Kayu meranti, balok (mutu kayu klas III)
14 Kayu meranti, papan (mutu kayu klas III)
15 Kayu meranti, usuk (mutu kayu klas III)
16 Kayu meranti, reng (mutu kayu klas III)
17 Kayu bekisting, papan (mutu kayu klas IV)
18 Kayu bekisting, usuk (mutu kayu klas IV)
19 Kayu tahun, papan (mutu kayu klas IV)
20 Kayu tahun, usuk (mutu kayu klas IV)
21 Kayu gelam (mutu kayu klas IV)
22 Kayu kruing, balok (mutu kayu klas III)
23 Kayu kruing, papan (mutu kayu klas III)
24 Kayu kruing, usuk (mutu kayu klas III)
25 Kayu kruing, reng (mutu kayu klas III)
26 Kayu balau, balok (mutu kayu klas II)
27 Kayu balau, papan (mutu kayu klas II)
28 Kayu balau, usuk (mutu kayu klas II)
29 Kayu balau, reng (mutu kayu klas II)
30 Kayu Albasiah (mutu kayu klas IV)
31 List kayu tahun
32 List kayu profil
33 List kayu profil
34 Bambu Jawa bongkotan
35 Bambu ori
36 Bambu apus
37 Gedek guling
38 Daun pintu kayu Balau, kw 1
39 Daun pintu kayu Jati, kw 1

III
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
30
31
32
33

BAHAN PENUTUP ATAP DAN PLAFON


Asbes gelombang besar tebal 5 mm
Asbes gelombang kecil tebal 4 mm
Asbes gelombang kecil tebal 4 mm
Asbes gelombang kecil tebal 4 mm
Asbes bubung gelombang besar tebal 5 mm
Asbes bubung gelombang kecil tebal 4 mm
Harflek tebal 4 mm
Harflek tebal 4 mm
Harflek tebal 4 mm
Woodplek tebal 9mm
Woodplek tebal 9mm
Eternit (lokal)
Eternit (kerang)
Eternit (Gresik)
Gypsum tebal 9 mm
Gypsum tebal 12 mm
List Gypsum
List Gypsum
Genteng flam press Jawa/lokal
Genteng kaca (model Karang Pilang)
Genteng Karang Pilang/Wisma
Genteng bubung Karang Pilang/Wisma
Genteng bubung Jawa/lokal
Genteng Bambe
Genteng bubungan Bambe
Genteng prentul ex.Trenggalek
Genteng bubung prentul ex. Trenggalek
Genteng Mantili ex Trenggalek
Genteng bubung Mantili ex Trenggalek
Genteng Biasa
Genteng Beton
Genteng bubung Beton
Genteng Kanmuri Glasur
Genteng Kanmuri bubung Glasur

6/12, 6/15, 8/12

m3

15,000,000.00

4/6, 5/7

11,500,000.00

2/20, 3/20, 3/25

m3

12,500,000.00

2/3, 3/5

m3

6/12, 6/15, 8/12


2/20, 3/20, 3/25
4/6, 5/7
2/3, 3/5
6/12, 6/15, 8/12
2/20, 3/20, 3/25
3/5,4/6,5/7
2/3, 3/5
3/20-200
4/6-200
2/20, 3/20, 3/25
3/5, 4/6, 5/7
10-12 x 300 cm
6/12, 6/15, 8/12
2/20, 3/20, 3/25
4/6, 5/7
2/3
6/12, 6/15, 8/12
2/20, 3/20, 3/25
3/5, 4/6, 5/7
2/3
1/4
4/4
5/5
10-12 x 300cm
10-12 x 600cm
6-10 x 600cm
3,5 x 90 x 210 cm
3,5 x 90 x 210 cm

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
btg
m3
m3
m3
m3
m3
m3
m3
m3
m3
m1
m1
m1
btg
btg
btg
m2
lbr
lbr

1,05X 3,00
1,05 X 3,00
1,05 X 2,80
1,05 X 1,80
40 x 200 cm
50 x 200 cm
60 x 200 cm
30x400
20x400
122 x 244
122 x 244
15 x 200 cm
10 x200 cm
-

lbr
lbr
lbr
lbr
m1
m1
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
btg
btg
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

10,000,000.00
9,000,000.00
9,500,000.00
9,000,000.00
9,000,000.00
4,000,000.00
4,500,000.00
4,000,000.00
4,000,000.00
750,000.00
2,500,000.00
500,000.00
2,500,000.00

7,500,000.00
8,000,000.00
6,000,000.00
6,000,000.00
4,000,000.00
4,500,000.00
4,000,000.00
3,800,000.00

9,000,000.00
1,000,000.00
9,000,000.00
9,000,000.00
4,750,000.00
5,250,000.00
4,500,000.00
4,500,000.00

5,000,000.00
5,500,000.00
5,000,000.00
5,000,000.00
7,000,000.00
7,500,000.00
7,000,000.00
7,000,000.00

5,000,000.00
5,500,000.00
4,800,000.00
4,000,000.00
9,000,000.00
9,500,000.00
7,000,000.00
5,000,000.00

6,000,000.00
6,500,000.00
5,750,000.00
5,750,000.00
9,500,000.00
10,000,000.00
9,000,000.00
9,000,000.00

4,000.00
6,000.00
7,000.00
10,000.00
20,000.00
10,000.00
10,000.00
1,000,000.00
1,500,000.00

75,590.00
64,890.00
45,440.00
38,975.00

75,000.00
37,500.00
45,000.00
48,000.00
21,000.00
11,500.00
14,000.00
17,000.00
90,000.00
60,000.00

10,000.00
125,000.00
15,500.00

6,000.00
8,000.00
12,000.00
48,000.00
58,000.00
21,000.00
17,000.00

10,000.00
15,000.00
55,000.00

6,000.00

1,100.00
4,500.00
2,000.00
7,000.00
2,500.00
4,000.00
8,000.00
14,000.00

Lembar : 44

10

2
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63

IV
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44

Genteng KIA Glasur


Genteng KIA bubung Glasur
Genteng Impresso Glasur
Genteng bubung Impresso Glasur
Seng Talang BJLS 30
Seng Talang BJLS 20
Seng Talang BJLS 20
Seng Talang BJLS 30
Seng Datar BJLS 30
Seng Gelombang BJLS 40
Seng Gelombang BJLS 30
Seng Gelombang BJLS 30
Seng Gelombang BJLS 30
Seng Datar BJLS 20
Karet Talang
Karet Talang
Fiber glass gelombnag "Laser light"
Teakwood tebal 3 mm
Teakwood tebal 3 mm
Tripleks tebal 9 mm
Tripleks tebal 3 mm
Plywood tebal 6 mm
Plywood tebal 3 mm
Plywood tebal 2 mm
Tripleks Melamin tebal 2 mm
Multiplek 12 mm
Formica
Alumunium Coklat Merk YYK
Alumunium Silver Merk YYK
Kalsiboard tebal 4 mm
BAHAN BESI/LOGAM
Besi begel/baut
Besi beton polos
Besi beton ulir
Besi pipa air medium A (warna hijau)
Keni besi (elbouw)
Pipa besi galvanis medium A (tebal 2,4 mm)
Pipa besi galvanis medium A (tebal 3 mm)
Pipa besi galvanis medium A (tebal 3 mm)
Pipa besi galvanis medium A (tebal 3 mm)
Pipa besi galvanis medium A (tebal 3,3 mm)
Pipa besi galvanis medium A (tebal 3,3 mm)
Pipa besi galvanis medium A (tebal 3,6 mm)
Pipa besi galvanis medium A (tebal 4 mm)
Pipa besi galvanis medium A (tebal 4,2 mm)
Besi plat 2 mm,
Besi plat aluminium tebal 2 mm
Besi plat bordes tebal 3 mm
Besi plat strip panjang tebal 3 mm
Besi profil WF <= 200 mm
Besi profil WF <= 200 s.d. 400 mm
Besi profil WF <= 200 s.d. 500 mm
Besi siku "Krakatau Stell"
Besi siku "Krakatau Stell"
Besi siku "Krakatau Stell"
Besi canal
Kawat harmonika
Kawat ikat beton (bendrat)
Kawat nyamuk kasa alumunium
Kawat ayakan pasir (utk pasang)
Kawat ayakan pasir (utk plesteran)
Kawat duri pagar
Kawat nyamuk kasa plastik
Kawat tali Bwg 10
Kawat wire mesh
Tiang pagar BRC/PMG
Pintu dorong BRC/PMG
Pintu swing ganda BRC/PMG
Pagar BRC/PMG A
Bondex
Pipa besi putih
Pipa gas/hitam medium A (tebal 2,4 mm)
Pipa gas/hitam medium A (tebal 3 mm)
Pipa gas/hitam medium A (tebal 3 mm)
Pipa gas/hitam medium A (tebal 3 mm)

l = 90 cm
l = 90 cm
l = 60 cm
l = 45 cm
80 x 180 cm
80 x 180 cm
80 x 180 cm
80 x 300 cm
80 x 150 cm
80 x 180 cm
l = 60 cm
l = 90 cm
80 x 300 cm
4' x 8'
90 x 210 cm
120 x 240 cm
120 x 240 cm
90 x 210 cm
90 x 210 cm
4' x 8'
120x 240 cm
( 4' x 8' )
( 4' x 8' )
m
m
( 4' x 8' )

bh
bh
bh
bh
m1
m1
m1
m1
lbr
lbr
lbr
lbr
lbr
lbr
m1
m1
m1
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m1
m1
lbr

1" - 6 m.
1,5"
1/2" - 6 m.
1" - 6 m.
1,25" - 6 m.
1,5" - 6 m.
2" - 6 m.
2,5" - 6 m.
3" - 6 m.
4" - 6 m.
5" - 6 m.
4' x 8'
4' x 8'
4' x 8'
(30x6000)mm
L.60.60.6
L.50.50.5
L.30.30.3
C 125,50,3
3,2 mm.

kg
kg
kg
btg
bh
btg
btg
btg
btg
btg
btg
btg
btg
btg
lbr
lbr
lbr
m1
kg
kg
kg
btg
btg
btg
ljr
m2
kg
m2
m2
m2
kg
m2
kg
kg
btg
unit
unit
unit
m2
btg
btg
btg
btg
btg

2", t=120
120 x 300 cm
120 x 300 cm
120 x 240 cm
1,5" - 6 m.
3/4" - 6 m.
1" - 6 m.
1,25" - 6 m.
1,5" - 6 m.

7
8,000.00
14,000.00

35,000.00
32,000.00
23,000.00
18,000.00
65,000.00
88,000.00
65,000.00
108,000.00

35,000.00
24,000.00
16,000.00
20,000.00

51,000.00

55,000.00
9,000.00
15,000.00

8,000.00
12,500.00

80,000.00
60,000.00
120,000.00
45,000.00

72,500.00
68,000.00
105,000.00
47,500.00
55,000.00

70,000.00
62,500.00
150,000.00

50,000.00

45,000.00

8,500.00
8,750.00
90,000.00

21,000.00
9,000.00
9,500.00
140,000.00

110,000.00
210,000.00
280,000.00
320,000.00
440,000.00
550,000.00
720,000.00
1,080,000.00
1,480,000.00
450,000.00

95,000.00
140,000.00
190,000.00
240,000.00
325,000.00
435,000.00
525,000.00
750,000.00
1,010,000.00
212,000.00
220,000.00

740,000.00
603,750.00
9,500.00
9,500.00
9,500.00
260,000.00
180,000.00
60,000.00
250,000.00

195,000.00
140,000.00
45,000.00
25,000.00
19,000.00

12,000.00

21,000.00
21,000.00
17,000.00
5,000.00
15,000.00

25,000.00
15,000.00
14,000.00

350,000.00

85,000.00
135,000.00
180,000.00
210,000.00

92,500.00
112,000.00
170,000.00

Lembar : 45

10

2
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74

Pipa gas/hitam medium A (tebal 3,3 mm)


Pipa gas/hitam medium A (tebal 3,6 mm)
Pipa gas/hitam medium A (tebal 4 mm)
Pipa gas/hitam medium A (tebal 4,2 mm)
Pipa gas/hitam medium A (tebal 4,2 mm)
Pintu Alumunium (kualitas II)
Pintu PVC (kualitas baik)
Profil Alumunium
Slimar alumunium
Sunscreen Alumunium
Ramset/Dina Bolt
Pagar kawat jaring
Pagar besi ulir komplit dg mainan
Pintu pagar besi ulir komplit dg mainan
Pintu rolling door
Pintu plat harmonika
Atap twin lite rangka pipa stainless steel
Atap twin lite rangka pipa besi
Teralis besi
Teralis aluminium
Railling stainless steel
Usuk Galvalum 0,75
Reng Galvalum 0,45
Kusen Pintu Aluminium Silver "HC"
Kusen Pintu Aluminium Coklat "YKK"
Kusen Jendela Aluminium Silver "HC"
Kusen Jendela Aluminium Coklat "YKK"
Waterstop "Maspion"
Sealent
Manhole plat baja

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44

BAHAN LANTAI
Paving stone per segi abu-abu, cetak kering
Paving stone per segi abu-abu, cetak basah
Paving stone 3 berlian abu-abu, cetak kering
Paving stone 3 berlian merah, cetak basah
Paving stone segi 6 abu-abu, cetak kering
Paving stone segi 6 merah, cetak basah
Paving stone persegi merah
Paving stone per segi abu-abu, cetak basah
Paving stone per segi abu-abu, cetak kering
Paving stone 3 berlian abu-abu
Paving stone 3 berlian merah
Paving stone segi 6 abu-abu
Paving stone segi 6 merah
Paving stone abu-abu, cetak basah K-300
Paving stone abu-abu, cetak basah K-400
Tegel PC Abu-abu
Tegel PC Abu-abu
Tegel PC Abu-abu
Ubin warna
Ubin warna
Ubin warna
Tegel keramik
Tegel keramik polos
Tegel keramik, Claudia
Tegel keramik, Asia
Tegel keramik, berserat
Tegel keramik putih, Asia
Tegel keramik, (kasar)
Tegel keramik, Super Milan
Tegel keramik, Austria Blue
Tegel keramik, Mulia
Tegel keramik, KIA
Tegel keramik, Arwana
Tegel keramik, Asia Tile
Tegel keramik, Classic
Tegel keramik, Essenza
Tegel keramik, Diamond
Tegel teraso
Tegel teraso
Tegel teraso
Tegel keramik, Granito
Tegel keramik, Granito
Tegel keramik Granite Black
Tegel keramik Granite Polish

2" - 6 m.
3" - 6 m.
4" - 6 m.
5" - 6 m.
6" - 6 m.
70 x 200 cm
70 x 210 cm
(80-90) cm x 600 cm
2"
0,8 mm
0,6 mm
4 / 12
5 / 10
4 / 12
5 / 10
250 mm
60x60 cm

btg
btg
btg
btg
btg
lbr
lbr
m1
m1
m2
bh
lbr
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
tube
bh

t = 6 cm
t = 6 cm
t = 6 cm
t = 6 cm
t = 6 cm
t = 6cm
t = 6 cm
t = 8 cm
t = 8 cm
t = 8 cm
t = 8 cm
t = 8 cm
t = 8 cm
10x20x8
10x20x8
20 x 20
20 x 30
30 x 30
20 x 20
30 x 30
40 x 40
10 x 20
15 x 15
20 x 25
20 x 25
30 x 30
30 x 30
20 x 20
40 x 40
30 x 30
30 x 30
30 x 30
30 x 30
40 x 40
30 x 30
40 x 40
20 x 20
20 x 20
30 x 30
40 x 40
40 x 40
60 x 60
40 x 40
40 x 40

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

320,000.00
520,000.00
980,000.00

10

220,000.00

800,000.00
250,000.00
90,000.00

325,000.00
400,000.00
300,000.00
500,000.00
900,000.00
800,000.00
150,000.00

78,000.00
35,000.00
350,000.00
425,000.00
350,000.00
425,000.00

1,150,000.00

35,000.00
35,000.00
38,000.00
40,000.00

35,000.00
35,000.00
40,000.00
37,000.00
40,000.00
40,000.00

45,000.00
30,000.00

45,000.00
42,500.00
40,000.00
45,000.00
60,000.00

40,000.00
38,000.00
40,000.00
45,000.00
48,000.00

38,000.00
40,000.00
32,500.00
38,000.00
52,000.00

37,500.00
50,000.00
35,000.00
50,000.00

36,000.00
40,000.00
36,000.00
52,000.00

32,000.00
34,000.00
30,000.00
35,000.00

175,000.00
45,000.00

180,000.00
45,000.00

185,000.00
200,000.00

180,000.00
210,000.00

Lembar : 46

2
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62

VI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
VII
1
2
3
4
5
6
7

20 x 20
40 x 50
10 x 30
20 x 20
5 x 20
10 x 20
15 x 15
20 x 20
30 x 30
40 x 60
10 x 20
60 x 60
-

m
m2
m1
m2
bh
bh
m2
m2
m2
m2
bh
m2
m2
bh
bh
m2
bh
m2

BAHAN PENGECATAN
Cat besi Emco tanda Bintang
Cat kayu Emco tanda Bintang
Meni besi/kayu, cap Pedang
Thinner A spesial "Altech"
Thinner A biasa "Power"
Thinner B spesial (merek apa?)
Minyak cat/afduner (merek apa?)
Cat tembok eksterior Mowilex
Cat tembok Alcabond
Cat tembok Alcaplast
Cat tembok Wallsealer
Cat tembok Vinylex
Cat tembok Decolith
Cat tembok Metrolith
Cat tembok Cathylac
Cat tembok Cendana
Cat genteng Matex
Serlak kripik "India"
Politur jadi merk "Impra"
Wood Filler "Impra"
Wood Stain 'Impra"
Sanding Sealer "Impra"
Vernis (Glotex)
Dempul Plitur (Impra)
Dempul Plitur kualitas sedang
Plitur batangan
Teer
Kertas gosok
Waterproof, Aquaproof Pro Seller
Waterproof, Multiroof
Waterproof, Nippon Paint Shield
Plamur tembok
Plamur kayu
Plamur besi
Spiritus
Lem Rajawali untuk kayu
Lem Rajawali untuk tembok
Lem kayu khusus (Vinyl)
Soda Api
Teak Oil
Residu
Kuas Eterna
Kuas Eterna
Kuas Eterna
Kalsium
Coating
Wallpaper "Kansai"

3"
4"
5"
-

kg
kg
kg
ltr
ltr
ltr
ltr
2,5 ltr
kg
kg
2,5 ltr
kg
kg
kg
kg
kg
kg
kg
ltr
ltr
ltr
ltr
ltr
kg
kg
kg
kg
lbr
kg
kg
kg
kg
kg
kg
ltr
kg
kg
kg
kg
ltr
ltr
bh
bh
bh
kg
kg
m2

BAHAN PENGGANTUNG DAN PENGUNCI


Engsel H
Engsel Kuningan arch asli
Engsel jendela (kupu - kupu)
Engsel pintu "UNION"
Engsel jendela "UNION"
Espanyolet kualitas I
Grendel AEG "ELT"

4"
4"
3"
4"
3"
-

set
set
set
bh
bh
set
bh

Tegel galar
Tegel keramik, bermotif/warna
Tegel plint keramik warna
Tegel wafel
Ubin keramik artistik
Ubin keramik artistik
Ubin keramik artistik
Ubin keramik artistik
Lantai vinyl karet kw 1
Marmer ex. Tulungagung
List Keramik/Border
Keramik Granitile 60x60 Polish
Keramik Granitile 60x60 Unpolish
Stepnoiseng 10x40
Stepnoiseng 7x30
Granito ex Cina
Mozaic/granito 60x60 cm
Keramik/Tipe alur 33x33 cm merk mas/roman

10,000.00
7,000.00

12,500.00
9,500.00

140,000.00
165,000.00
12,000.00
8,000.00
95,000.00
350,000.00
70,000.00

55,000.00
55,000.00
20,000.00
15,000.00
18,000.00
190,000.00
35,000.00

57,500.00
57,500.00
19,500.00

7,500.00

49,000.00
49,000.00
16,500.00
25,000.00
20,000.00
17,500.00
15,000.00

19,000.00

12,500.00

187,500.00

75,000.00
14,000.00
17,000.00
17,000.00
19,000.00

14,000.00

12,000.00

25,000.00
14,000.00

19,000.00
41,800.00
189,900.00

45,000.00
25,000.00
50,000.00
45,000.00
40,000.00

27,500.00
51,000.00
42,000.00

2,000.00

2,000.00

15,000.00
20,000.00

19,000.00

13,000.00
20,000.00
9,000.00

19,800.00
9,000.00

40,000.00
26,000.00

37,500.00
18,000.00
15,000.00

25,100.00
50,000.00
41,800.00
33,400.00

3,000.00
37,000.00
40,000.00
40,000.00
6,000.00
15,000.00
49,000.00
9,500.00
29,000.00
9,000.00
28,000.00
15,000.00

2,500.00
39,700.00

8,000.00
12,500.00
15,000.00
800.00
40,000.00

5,900.00
11,900.00
16,400.00
800.00

35,700.00
10,000.00
18,500.00
8,500.00
19,700.00
9,000.00
11,400.00

3,000.00
7,500.00
12,000.00
15,000.00
1,000.00
60,000.00

9,000.00
15,000.00
16,500.00
58,000.00

65,000.00

4,000.00

Lembar : 47

10

1
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
VIII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
IX
1
2
3
4
5
6
7
8
X

Grendel biasa (besar)


Grendel biasa (kecil) merek apa?
Grendel kuningan/krom kecil "Belucci"
Grendel tanam kuningan besar "Cavel"
Kunci gembok besar
Kunci gembok sedang
Kunci tanam (808)
Kunci tanam cap KUDA (2x putar) besar
Kunci tanam "SES" besar (tanpa handel)
Kunci tanam antik "cavel" (dengan handel)
Kunci tanam KM/WC cavel
Kunci silinder "SES"
Kunci slot merk "SES" (dengan handel)
Kunci slot 2 putaran "YALE" (dengan handel)
Kunci slot 2 putaran "CAVEL" (dengan handel)
Kunci lemari, Wing
Hak angin biasa (merek apa?)
Hak angin 4 mm (lurus) merek apa?
Hak angin (sikutan) "SES"
Hak angin lurus (bisa disetel maju/mundur) "SES"
Pegangan pintu (model standar) Handel marmer
Spring knip ELT
Door closer Cavel
Door stopper Cavel
Rel pintu dorong, biasa
Rel pintu dorong, J4 SES

8"
3"
4"
60 cm
40 mm
30 mm
8"
p = 20 cm
-

bh
bh
bh
set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
set
set
set
set
bh
bh
bh
bh
btg
btg

1/2"
3/4"
1/2"
1/2"
3/4"
-

set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
set
bh

3/4"
0,5 m3
60 x 60 cm
550 ltr
-

bh
bh
bh
rol
set
set
bh
bh
bh
bh
set
bh
bh
bh
bh
bh
set
set
bh
bh

t = 3 mm
t = 5 mm
t = 5 mm
t = 5 mm
t = 5 mm
t = 3 mm
t = 3 mm
t = 5 mm

m2
m2
m2
m2
daun
m2
m2
m2

10 x 20 cm
15 cm

bh
bh

BAHAN SANITASI
Slang spiral saluran kran wastafel
Kloset duduk porselin komplit (INA)
Kloset duduk porselin komplit (KIA)
Kloset duduk porselin komplit (TOTO)
Kloset jongkok porselin (INA)
Kloset jongkok porselin (TOTO)
Kloset jongkok teraso
Kran air stainless steel
Kran air stainless steel
Kran air (DUPONT)
Kran air kuningan
Kran shower "Toto"
Septic Tank ( 10 pemakai) dan Sumur
Peresapan (dalam 3,00 m)
Watermur besi
Wastafel American Standart
Wastafel lengkap ( cermin )
Rol TBA (seal tape) Jumbo
Siphon Washer, kelas sedang plastik
Water drain dan assesories
Bak mandi fiberglass
Bak cuci piring stainless steel, besar (double)
Bak cuci teraso
Tempat sabun keramik
Urinoir "INA" (komplit)
Floor drain stainless steel
Kurasan (putih) stainless steel
Bak mandi porselin
Tandon air fiberglass "Penyu"
Pompa tangan "Dragon"
Hand shower plastik (termasuk slang)
Wall shower "Toto"
Pompa air "Shimizu 125 W"
Pompa air "Sanyo 125 W"
BAHAN JENIS KACA
Kaca polos
Kaca polos
Kaca rayban
Kaca es/buram
Krapyak kaca nako 15 x 70 cm (includ kerangka)
Kaca buram
Kaca cermin
Profil kaca

BAHAN BETON CETAKAN


1 Roster klingker warna merah
2 Buis beton (p = 100 cm)

10,000.00
4,000.00
8,000.00
150,000.00

29,000.00
19,000.00

10

15,000.00
5,000.00
15,000.00
50,000.00
30,000.00
9,000.00
55,000.00

8,000.00
150,000.00
320,000.00
80,000.00
150,000.00
380,000.00

50,000.00

320,000.00
10,000.00
6,000.00

152,500.00

30,000.00
35,000.00
90,000.00
25,000.00
180,000.00
40,000.00
170,000.00
180,000.00

25,000.00

375,000.00
95,000.00
325,000.00
12,000.00

12,000.00
17,500.00

25,000.00
1,100,000.00

21,000.00
20,000.00
188,000.00
188,000.00

55,000.00
150,000.00
25,000.00
85,000.00
35,000.00
185,000.00
235,000.00

1,650,000.00
150,000.00
200,000.00

45,000.00
1,050,000.00
1,350,000.00
1,500,000.00
120,000.00
170,000.00

35,000.00
40,000.00
150,000.00
35,000.00

60,000.00
80,000.00
110,000.00
40,000.00

20,000.00
25,000.00

13,000.00
290,000.00
700,000.00
7,000.00
30,000.00
70,000.00
260,000.00
550,000.00

7,000.00
295,000.00

650,000.00

950,000.00
1,000,000.00
1,250,000.00
95,000.00
150,000.00

50,000.00

20,000.00
1,200,000.00
70,000.00
20,000.00
1,400,000.00
650,000.00
320,000.00
300,000.00
350,000.00

50,000.00

50,000.00
60,000.00
75,000.00
90,000.00
90,000.00
13,000.00
80,000.00

65,000.00
80,000.00

35,000.00

Lembar : 48

25,000.00

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

XI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
XII
1
2
3
4
5
6
7
8
9
10
11
XIII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

20 cm
30 cm
40 cm
50 cm
60 cm
80 cm
100 cm
15 cm
20 cm
30 cm
-

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m1
m1

1/2" - 400
5/8" - 400
3/4" - 400
1" - 400
2" - 400
3" - 400
4" - 400
5" - 400
2" - 400
3" - 400
4" - 400
5" - 400
1/2"
3/4"
2"
3"
4"
5"
400 cm
400 cm
400 cm
400 cm
400 cm
400 cm

btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
tube
bh
bh
bh
bh
bh
bh
bh
btg
btg
bh
bh
bh
bh

BAHAN JENIS PAKU


Paku asbes gelombang (paku pancing)
Paku kayu
Paku kayu
Paku kayu
Paku kayu
Paku payung (paku seng gelombang)
Paku sekrup
Paku sumbat
Paku triplek/eternit
Paku beton
Paku kalsiboard

1"
1,5" - 2"
2,5" - 3"
4"
1"
5 cm
-

bh
kg
kg
kg
kg
kg
dos
dos
kg
dos
kg

BAHAN PERALATAN LISTRIK


Fiting plafon
T doos PVC
Isolator kecil
Stop kontak (Broco)
Skakelar tunggal (Broco)
Skakelar ganda (Broco)
Stop kontak dan skakelar (Broco)
Skakelar/hendel pemindah arus
Zekring lengkap dengan box
Las doof
Panel box
Meinswitch
Zekring MCB thermis 10 - 16 Amp.
Zekring MCB thermis 10 Amp.
Stater lampu TL
Lampu pijar 25,40,75 / 220 V "Philips"
Bola lampu Armateur "Philips"
Lampu hemat energi 18 W / 220 V (Philips)

250 watt
-

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

Buis beton (p = 100 cm)


Buis beton (p = 100 cm)
Buis beton (p = 100 cm)
Buis beton (p = 50 cm)
Buis beton (p = 50 cm)
Buis beton (p = 50 cm)
Buis beton (p = 50 cm)
Buis Beton U (p = 100 cm)
Buis Beton U (p = 100 cm)
Buis Beton U (p = 100 cm)
Got talang R 15 (segmen)
Got talang R 25 (segmen)
Kerb/20x30x50 cm
boxcuilvert100x100x120cm(k350)
boxcuilvert150x150x120cm(k350)
BAHAN PIPA PVC
Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW
Pipa PVC tipe AW
Pipa PVC tipe AW
Pipa PVC tipe AW
Pipa PVC "Maspion" tipe D
Pipa PVC "Maspion" tipe D
Pipa PVC "Maspion" tipe D
Pipa PVC "Maspion" tipe D
Lem PVC "Wavin"
Keni PVC tipe AW
Keni PVC tipe AW
Keni PVC tipe AW
Keni PVC tipe AW
Keni PVC tipe AW
Keni PVC tipe AW
Klem PVC
Talang PVC U "Maspion"
Talang PVC U
Clam Talang PVC U
Shock Talang PVC U
Tutup Talang PVC U
Corong Talang PVC U

10
40,000.00
50,000.00
55,000.00

65,000.00
90,000.00
100,000.00
25,000.00
27,500.00
32,500.00

51,500.00
3,688,666.00
4,606,250.00

17,000.00
22,000.00
27,000.00
70,000.00
128,000.00
188,000.00
295,000.00
33,000.00
72,000.00
105,000.00
165,000.00
6,000.00
1,500.00
2,000.00
9,000.00
23,000.00
47,000.00
65,000.00
65,000.00
60,000.00
3,000.00
4,000.00
15,000.00

1,000.00
15,000.00
12,000.00
12,000.00
12,000.00
20,000.00
8,000.00
20,000.00
15,000.00
20,000.00

1,250.00
14,000.00
12,000.00
12,000.00
12,000.00

20,000.00

Lembar : 49

35,000.00
45,000.00
55,000.00
45,000.00
55,000.00
80,000.00
15,000.00
17,500.00
22,500.00

2
19 Lampu hemat energi 18 W / 220 V (Osram)
20 Lampu TL 20 W / 220 V, komplit balast
(Philips)
21 Lampu TL 40 W / 220 V, komplit balast
(Philips)
22 Kabel NYM. 2 x 2,5
23 Kabel NYY. 1 x 2,5
24 Kabel twisted Indonesia
25 Kabel twisted multi kabel
26 Instalasi Listrik
27 Penangkal Petir Lengkap (2 Spit), tinggi 10 m
(Tidak termasuk izin dari Depnaker)

XIV
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

BAHAN BBM DAN ALAT BERAT


Bensin
Solar
Minyak tanah
Oli mesin Mesran
Minyak pelumas
Grease (gemuk pelumas)
Aspal panas curah
Aspal panas drum
Biaya operasional wheel loader
Biaya operasional AMP
Biaya operasional dump truck 5 ton
Biaya operasional dump truck 3,5 ton
Biaya operasional asphalt finisher
Biaya operasional asphalt sprayer
Biaya operasional tandem roller
Biaya operasional tire roller
Biaya operasional genset
Biaya operasional alat bantu
Biaya operasional bulldozer
Biaya operasional stone crusher
Biaya operasional compressor
Biaya operasional mesin gilas (wales)
Biaya operasional mesin gilas (wales)

bh
bh

bh

3 x 70 x 5 mm2
-

m1
m1
m1
m1
titik
unit

ltr
ltr
ltr
ltr
ltr
kg
kg
kg
jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
hari
hari

1-3 ton
6-8 ton

884

Lembar : 50

10

BAHAN BANGUNAN DAN UPAH KERJA


BLITAR TAHUN ANGGARAN 2011
TAHUN ANGGARAN 2012 )

HARGA SURVEI

(Rp.)
HARGA SURVEI
RATA-RATA
(Rp.)

HARI ALUMUNIUM
11

12

107,500.00

150,000.00
150,000.00
#DIV/0!

92,500.00
65,000.00

50,000.00
40,000.00

1,500.00
480.00
423.00

5,500.00
5,500.00

48,500.00
58,000.00
46,000.00
53,500.00
85,000.00
13,000.00
17,500.00
20,000.00

Lembar : 51

11

12

15,000,000.00
11,500,000.00
12,500,000.00
10,000,000.00
8,500,000.00
6,166,500.00
8,000,000.00
8,000,000.00
4,250,000.00
4,750,000.00
4,166,500.00
4,100,000.00

2,500,000.00
5,333,000.00
5,833,000.00
5,183,000.00
4,916,500.00
8,500,000.00
9,000,000.00
7,666,500.00
7,000,000.00
4,000.00
6,000.00
7,000.00
10,000.00
20,000.00
10,000.00
10,000.00

75,500.00
69,500.00
41,000.00
41,500.00
48,000.00
21,000.00
10,500.00
69,500.00
16,000.00
90,000.00
60,000.00
6,000.00
9,000.00
13,500.00
51,500.00
58,000.00
21,000.00
17,000.00
6,000.00
#DIV/0!
#DIV/0!
#DIV/0!

2,500.00
4,000.00
8,000.00
14,000.00

Lembar : 52

11

12
8,000.00
14,000.00

35,000.00
28,000.00
19,500.00
19,000.00
65,000.00
88,000.00
58,000.00
108,000.00

8,500.00
13,500.00
#DIV/0!
76,000.00
64,000.00
112,500.00
46,000.00
#DIV/0!
55,000.00

150,000.00
#DIV/0!
#DIV/0!
47,500.00

21,000.00
8,500.00
9,000.00
115,000.00
#DIV/0!
102,500.00
175,000.00
235,000.00
280,000.00
382,500.00
492,500.00
622,500.00
915,000.00
1,245,000.00
331,000.00
740,000.00
9,500.00
9,500.00
9,500.00
160,000.00
52,500.00
250,000.00
25,000.00
15,500.00
#DIV/0!
21,000.00
23,000.00
16,000.00
14,500.00

350,000.00
#DIV/0!
88,500.00
123,500.00
180,000.00
190,000.00

Lembar : 53

11

12
270,000.00
520,000.00
980,000.00
#DIV/0!
#DIV/0!
750,000.00
250,000.00

700,000.00

550,000.00
650,000.00
550,000.00
950,000.00
475,000.00
400,000.00
350,000.00

437,500.00
525,000.00
425,000.00
725,000.00
687,500.00
600,000.00
#DIV/0!
#DIV/0!
78,000.00
35,000.00
215,000.00
325,000.00
200,000.00
275,000.00

80,000.00
225,000.00
50,000.00
125,000.00
30,000.00

30,000.00
1,150,000.00

35,000.00
38,000.00
40,000.00
37,000.00
40,000.00
40,000.00

#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
41,000.00
40,000.00
37,500.00
42,500.00
53,000.00
35,000.00
41,000.00
33,500.00
45,500.00
177,500.00
45,000.00

205,000.00
#DIV/0!
#DIV/0!

Lembar : 54

11

12

#DIV/0!
140,000.00
165,000.00
12,000.00
8,500.00
95,000.00
350,000.00
70,000.00

53,500.00
53,500.00
18,500.00
25,000.00
17,500.00
13,500.00
15,000.00
188,500.00
35,000.00
#DIV/0!
75,000.00
13,500.00
17,000.00
18,000.00
19,000.00

42,500.00
25,500.00
50,000.00
42,500.00
36,500.00

2,000.00
38,000.00
37,500.00

22,000.00
9,000.00
28,000.00
13,000.00
3,000.00
7,500.00
12,500.00
15,500.00
500.00
52,500.00

#DIV/0!

Lembar : 55

11

12
18,000.00
9,000.00
11,500.00
150,000.00
50,000.00
30,000.00
8,500.00
150,000.00
320,000.00
150,000.00
377,500.00
265,500.00
11,000.00
9,000.00
27,500.00
45,000.00
23,500.00
132,500.00
31,500.00
181,000.00
201,000.00

35,000.00
1,033,000.00
1,175,000.00
1,466,500.00
121,500.00
173,000.00
38,000.00
48,000.00
130,000.00
37,500.00

10,000.00
292,500.00
700,000.00
7,000.00
30,000.00
60,000.00
260,000.00
550,000.00
20,000.00
1,200,000.00
70,000.00
20,000.00
1,400,000.00
650,000.00
320,000.00
300,000.00
350,000.00

50,000.00
70,000.00
85,000.00

30,000.00

Lembar : 56

11

12
37,500.00
47,500.00
55,000.00
45,000.00
60,000.00
85,000.00
100,000.00
20,000.00
22,500.00
27,500.00

51,500.00
3,688,500.00
4,606,000.00

17,000.00
22,000.00
27,000.00
70,000.00
128,000.00
188,000.00
295,000.00
33,000.00
72,000.00
105,000.00
165,000.00
6,000.00
1,500.00
2,000.00
9,000.00
23,000.00
47,000.00
65,000.00
#DIV/0!
65,000.00
60,000.00
3,000.00
4,000.00
15,000.00

1,000.00
14,500.00
12,000.00
12,000.00
12,000.00
20,000.00
8,000.00

15,000.00
20,000.00

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!

Lembar : 57

11

12
#DIV/0!

Lembar : 58

DAFTAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA


PEMERINTAH KOTA BLITAR TAHUN ANGGARAN 2012
( Triwulan III TAHUN ANGGARAN 2012)
A. DAFTAR HARGA SATUAN BAHAN BANGUNAN

NO.

JENIS BAHAN

UKURAN

SAT.

I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

BAHAN PASANGAN DAN CAMPURAN


BETON
Batu kali belah
15/20, 10/15
Batu kali pecah
5/7
Batu kali pecah
4/6
Batu kali pecah
3/5
Batu kali pecah
2/3
Batu kali pecah Crusser
1/2
Batu kali pecah Crusser
1/1
Batu kali pecah Crusser
0,5/1
Batu krikil (ayakan)
2/3
Krikil sungai
Krikil ayak tanpa pasir
Krikil batu alor (ampyang)
Batu belah (batu gunung)
Pasir beton/cor
Pasir pasang
Pasir urug
Agregat Kasar
Agregat Halus
Filler
Sirtu
Tanah urug biasa
Tanah urug pilihan (campur pupuk utk t
Tanah katelan jalan
Gebalan rumput
Batako
(40x20x10) cm
Batu merah klas I
Batu merah klas II
Batu lempeng (tidak beraturan)
Batu hias (sand stone)
10 x 20
Roster beton
20 x 20
Roster beton
10 x 30
Roster batu alam
20 x 20
Roster batu alam
30 x 30

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
kg
m3
m3
m3
m3
m3
m3
kg
m3
m3
m3
m3
m2
bh
bh
bh
m2
m2
bh
bh
bh
bh

GAPENSI

wijaya mandiri

cipta sarana

Askumindo

115,000.00
120,000.00
125,000.00
130,000.00
135,000.00
140,000.00
145,000.00
150,000.00
130,000.00
95,000.00
100,000.00
115,000.00
75,000.00
70,000.00
65,000.00
145,000.00
85,000.00
57,500.00
45,000.00
50,000.00
55,000.00
12,500.00
1,750.00
500.00
450.00
85,000.00
110,000.00
7,500.00
7,500.00
55,000.00
75,000.00
Lembar : 59

155,000.00
165,000.00
165,000.00
200,000.00
175,000.00
235,000.00
235,000.00
235,000.00
160,000.00
120,000.00
120,000.00
6,000.00
125,000.00
125,000.00
110,000.00
85,000.00
150,000.00
80,000.00
925.00
100,000.00
80,000.00
95,000.00
90,000.00
25,000.00
3,250.00
650.00
550.00
70,000.00
100,000.00
15,000.00
20,000.00
65,000.00
90,000.00

163,000.00
170,000.00
175,000.00
190,000.00
195,000.00
235,000.00
240,000.00
240,000.00
160,000.00
120,000.00
120,000.00
125,000.00
125,000.00
110,000.00
85,000.00

80,000.00
95,000.00
90,000.00
25,000.00
3,250.00
650.00
550.00
70,000.00
100,000.00
15,000.00
20,000.00
65,000.00
90,000.00

133,580.00
146,740.00
150,280.00
179,220.00
189,240.00
194,810.00
205,940.00
213,730.00
144,710.00
94,620.00
100,180.00
7,230.00
100,180.00
94,620.00
72,350.00
122,450.00
211,500.00
1,210.00
86,820.00
66,790.00
72,350.00
73,470.00
16,690.00
2,530.00
550.00
500.00
57,880.00
94,620.00
6,070.00
5,560.00
72,350.00
89,050.00

10 x 20
22cm, t=3 m
28cm, t=3 m
p = 40 cm
50 kg
40 kg
50 kg
40 kg
50 kg
40 kg
20 x 20
20 x 20

m2
bh
bh
bh
m3
ton
m3
zak
zak
zak
zak
zak
zak
kg
kg
bh
bh

80,000.00
650,000.00
850,000.00
12,500.00
350,000.00
700,000.00
145,000.00
65,000.00
55,000.00
60,000.00
50,000.00
63,000.00
75,000.00
7,500.00
20,000.00
17,500.00
20,000.00

90,000.00
1,000,000.00
1,300,000.00
12,500.00
800,000.00
850,000.00
140,000.00
71,000.00
57,000.00
69,000.00
55,000.00

m3

33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49

Batu tempel hijau


Tiang teras batu alam
Tiang teras batu alam
List batu hias
Kapur padam
Gamping
Semen merah
Semen Gresik (PC Gresik)
Semen Gresik (PC Gresik)
Semen Tiga Roda
Semen Tiga Roda
Semen Holcim
Semen putih
PC super nut
Ijuk
Glass block bening
Glass block buram

II

BAHAN KUZEN KAYU DAN KERANGKA


ATAP
Kayu jati balok kualitas II,
6/12, 6/15, 8/12
Ex. Bojonegoro (mutu kayu klas I)
Kayu jati usuk kualitas II,
4/6, 5/7
Ex. Bojonegoro (mutu kayu klas I)
Kayu jati papan kualitas II,
2/20, 3/20, 3/25
Ex. Bojonegoro (mutu kayu klas I)
Kayu jati reng kualitas II,
2/3, 3/5
Ex. Bojonegoro (mutu kayu klas I)
Kayu jati balok kualitas I, lokal
6/12, 6/15, 8/12
(mutu kayu klas I)
Kayu jati usuk kualitas I, lokal
4/6, 5/7
(mutu kayu klas I)
Kayu jati papan kualitas I, lokal
2/20, 3/20, 3/25
(mutu kayu klas I)
Kayu jati reng kualitas I, lokal
2/3, 3/5
(mutu kayu klas I)
Kayu kamper, balok (mutu kayu klas II)6/12, 6/15, 8/12
Kayu kamper, papan (mutu kayu klas II)2/20, 3/20, 3/25
Kayu kamper, usuk (mutu kayu klas II)
4/6, 5/7
Kayu kamper, reng (mutu kayu klas II)
2/3, 3/5
Kayu meranti, balok (mutu kayu klas II)6/12, 6/15, 8/12
Kayu meranti, papan (mutu kayu klas II)
2/20, 3/20, 3/25
Kayu meranti, usuk (mutu kayu klas II) 3/5,4/6,5/7
Kayu meranti, reng (mutu kayu klas II)
2/3, 3/5
Kayu bekisting, papan (mutu kayu klas I 3/20-200
Kayu bekisting, usuk (mutu kayu klas IV) 4/6-200
Kayu tahun, papan (mutu kayu klas IV)2/20, 3/20, 3/25

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

95,000.00
15,000.00
30,000.00
22,000.00
25,000.00

90,000.00
1,000,000.00
1,300,000.00
12,500.00
500,000.00
800,000.00
140,000.00
71,000.00
57,000.00
69,000.00
55,000.00
71,000.00
95,000.00
15,000.00
30,000.00
22,000.00
25,000.00

94,620.00
979,610.00
1,335,840.00
12,140.00
389,620.00
974,050.00
155,840.00
75,900.00
61,220.00
74,880.00
60,110.00
75,140.00
89,050.00
12,240.00
22,260.00
22,260.00
22,260.00

22,500,000.00

30,000,000.00

30,000,000.00

31,119,000.00

m3

18,500,000.00

28,000,000.00

28,000,000.00

29,044,400.00

m3

20,000,000.00

31,000,000.00

31,000,000.00

29,563,050.00

m3

15,000,000.00

28,000,000.00

28,000,000.00

29,044,400.00

m3

24,000,000.00

24,000,000.00

21,264,650.00

m3

18,000,000.00

20,000,000.00

18,152,750.00

m3

25,000,000.00

25,000,000.00

23,857,900.00

m3

16,500,000.00

16,500,000.00

15,559,500.00

10,000,000.00
10,250,000.00
9,000,000.00
8,500,000.00
6,000,000.00
6,250,000.00
5,500,000.00
5,500,000.00
2,000,000.00
2,500,000.00
2,250,000.00

10,000,000.00
10,250,000.00
9,000,000.00
8,500,000.00
6,000,000.00
6,250,000.00
5,500,000.00
5,500,000.00
2,000,000.00
2,500,000.00
2,250,000.00

9,854,350.00
10,373,000.00
9,543,160.00
9,335,700.00
6,016,340.00
6,431,260.00
6,016,340.00
5,393,960.00
1,416,800.00
1,016,550.00
3,006,360.00

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

8,500,000.00
9,000,000.00
8,250,000.00
8,000,000.00
5,750,000.00
6,000,000.00
5,500,000.00
5,200,000.00
1,250,000.00
2,000,000.00
3,750,000.00
Lembar : 60

20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

Kayu tahun, usuk (mutu kayu klas IV) 3/5, 4/6, 5/7
Kayu gelam (mutu kayu klas IV)
10-12 x 300 cm
Kayu kruing, balok (mutu kayu klas III) 6/12, 6/15, 8/12
Kayu kruing, papan (mutu kayu klas III)2/20, 3/20, 3/25
Kayu kruing, usuk (mutu kayu klas III)
4/6, 5/7
Kayu kruing, reng (mutu kayu klas III)
2/3
Kayu balau, balok (mutu kayu klas II) 6/12, 6/15, 8/12
Kayu balau, papan (mutu kayu klas II) 2/20, 3/20, 3/25
Kayu balau, usuk (mutu kayu klas II)
3/5, 4/6, 5/7
Kayu balau, reng (mutu kayu klas II)
2/3
Kayu Albasiah (mutu kayu klas IV)
List kayu tahun
1/4
List kayu profil
4/4
List kayu profil
5/5
Bambu Jawa bongkotan
10-12 x 300cm
Bambu ori
10-12 x 600cm
Bambu apus
6-10 x 600cm
Gedek guling
Daun pintu kayu Balau, kw 1
3,5 x 90 x 210 cm
Daun pintu kayu Jati, kw 1
3,5 x 90 x 210 cm

m3
btg
m3
m3
m3
m3
m3
m3
m3
m3
m3
m1
m1
m1
btg
btg
btg
m2
lbr
lbr

3,500,000.00
17,500.00
6,000,000.00
6,300,000.00
6,000,000.00
6,000,000.00
7,800,000.00
8,000,000.00
7,500,000.00
7,000,000.00
6,500,000.00
5,000.00
8,500.00
9,000.00
12,500.00
17,500.00
10,000.00
10,000.00

2,700,000.00
40,000.00
7,000,000.00
7,250,000.00
6,500,000.00
6,500,000.00
10,000,000.00
10,250,000.00
9,000,000.00
8,500,000.00
4,500,000.00
5,500.00
8,000.00
10,000.00
17,500.00
45,000.00
12,500.00
17,500.00
1,500,000.00
2,500,000.00

2,700,000.00
40,000.00
7,000,000.00
7,250,000.00
6,500,000.00
6,500,000.00
10,000,000.00
10,250,000.00
9,000,000.00
8,500,000.00
4,500,000.00
5,500.00
8,000.00
10,000.00
17,500.00
45,000.00
12,500.00
17,500.00
700,000.00
2,500,000.00

1,970,870.00
20,740.00
7,416,690.00
8,350,260.00
7,157,370.00
7,001,770.00
9,958,080.00
10,891,650.00
9,854,350.00
9,595,020.00
1,504,080.00
6,120.00
8,340.00
8,900.00
17,810.00
24,490.00
13,350.00
7,230.00
1,012,000.00
2,125,200.00

III
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

BAHAN PENUTUP ATAP DAN PLAFON


Asbes gelombang besar tebal 5 mm
1,05 X 3,00
Asbes gelombang kecil tebal 4 mm
1,05 X 3,00
Asbes gelombang kecil tebal 4 mm
1,05 X 1,50
Asbes gelombang kecil tebal 4 mm
1,05 X 1,80
Asbes bubung gelombang besar tebal 5
Asbes bubung gelombang kecil tebal 4
Harflek tebal 4 mm
40 x 200 cm
Harflek tebal 4 mm
50 x 200 cm
Harflek tebal 4 mm
60 x 200 cm
Woodplek tebal 9mm
30x400
Woodplek tebal 9mm
20x300
Eternit (lokal)
Eternit (kerang)
Eternit (Gresik)
Gypsum tebal 9 mm
122 x 244
Gypsum tebal 12 mm
122 x 244
List Gypsum
15 x 200 cm
List Gypsum
10 x200 cm
Genteng flam press Jawa/lokal
Genteng kaca (model Karang Pilang)
Genteng Karang Pilang/Wisma
Genteng bubung Karang Pilang/Wisma
Genteng bubung Jawa/lokal
Genteng Bambe
Genteng kodok ex. Wisma
-

lbr
lbr
lbr
lbr
m1
m1
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
btg
btg
bh
bh
bh
bh
bh
bh
bh

107,500.00
76,500.00
40,000.00
47,500.00
60,000.00
31,500.00
19,000.00
22,000.00
25,000.00
65,000.00
65,000.00
10,000.00
15,000.00
17,500.00
78,000.00
102,500.00
37,500.00
32,000.00
1,350.00
12,500.00
7,500.00
12,500.00
5,000.00
7,500.00
7,000.00

130,000.00
110,000.00
70,000.00
60,000.00
60,000.00
60,000.00
16,000.00
17,500.00
20,000.00

130,000.00
110,000.00
60,000.00
70,000.00
60,000.00
50,000.00
16,000.00
17,500.00
20,000.00

134,690.00
94,620.00
48,980.00
58,440.00
68,460.00
37,840.00
17,140.00
19,480.00
23,370.00

15,000.00
16,000.00
16,000.00
100,000.00
110,000.00
40,000.00
20,000.00
1,500.00
15,000.00
5,500.00
10,000.00
7,000.00
6,500.00
6,500.00

15,000.00
16,000.00
16,000.00
100,000.00
110,000.00
40,000.00
20,000.00
1,500.00
15,000.00
5,500.00
10,000.00
7,000.00
6,500.00
6,500.00

9,200.00
13,350.00
16,690.00
85,710.00
94,620.00
26,710.00
18,360.00
1,410.00
10,570.00
4,850.00
9,710.00
4,450.00
5,560.00

Lembar : 61

1
25
26
27
28
29
30
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
IV
1
2
3
4
5

2
Genteng bubungan Bambe
Genteng prentul ex.Trenggalek
Genteng bubung prentul ex. Trenggalek
Genteng Mantili ex Trenggalek
Genteng bubung Mantili ex Trenggalek
Genteng Biasa
Genteng Beton
Genteng bubung Beton
Genteng Kanmuri Glasur
Genteng Kanmuri bubung Glasur
Genteng KIA Glasur
Genteng KIA bubung Glasur
Genteng Impresso Glasur
Genteng bubung Impresso Glasur
Seng Talang BJLS 30
Seng Talang BJLS 27
Seng Talang BJLS 27
Seng Talang BJLS 30
Seng Datar BJLS 30
Seng Gelombang BJLS 40
Seng Gelombang BJLS 30
Seng Gelombang BJLS 30
Seng Gelombang BJLS 30
Seng Datar BJLS 27
Karet Talang
Karet Talang
Fiber glass "Kano Flash"
Teakwood tebal 3 mm
Teakwood tebal 3 mm
Tripleks tebal 9 mm
Tripleks tebal 3 mm
Plywood tebal 6 mm
Plywood tebal 4 mm
Plywood tebal 4 mm
Plywood tebal 2 mm
Multiplek 12 mm
Formica
Alumunium Coklat Merk YYK
Alumunium Silver Merk YYK
Kalsiboard tebal 4 mm
BAHAN BESI/LOGAM
Besi begel/baut
Besi beton polos
Besi beton ulir
Besi pipa air medium A (warna hijau)
Keni besi (elbouw)

l = 90 cm
l = 90 cm
l = 60 cm
l = 45 cm
80 x 180 cm
80 x 180 cm
80 x 180 cm
80 x 300 cm
80 x 150 cm
80 x 180 cm
l = 60 cm
l = 90 cm
l = 92 cm.
( 4' x 8' )
90 x 210 cm
( 4' x 8' )
( 4' x 8' )
( 4' x 8' )
90 x 210 cm
( 4' x 8' )
( 4' x 8' )
( 4' x 8' )
( 4' x 8' )
?
?
( 4' x 8' )

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m1
m1
m1
m1
lbr
lbr
lbr
lbr
lbr
lbr
m1
m1
m1
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m1
m1
lbr

1" - 6 m.
1,5"

kg
kg
kg
btg
bh

9
1,500.00
6,000.00
1,850.00
7,500.00
5,000.00
7,500.00
10,000.00
22,500.00
9,000.00
21,500.00
8,000.00
20,000.00
45,000.00
37,500.00
28,500.00
22,500.00
87,500.00
95,500.00
82,000.00
135,500.00
78,500.00
72,000.00
12,000.00
14,000.00
60,000.00
125,000.00
83,500.00
185,000.00
67,500.00
116,500.00
65,000.00
97,500.00
67,500.00
224,000.00
220,000.00

18,500.00
12,500.00
17,500.00
162,500.00
28,500.00
Lembar : 62

1,650.00
7,500.00
3,750.00
9,000.00
1,300.00
4,000.00
9,000.00
12,500.00
30,000.00
6,000.00
14,500.00
5,000.00
13,000.00
55,000.00
45,000.00
40,000.00
40,000.00
65,000.00
115,000.00
85,000.00
117,500.00
70,000.00
75,000.00
13,000.00
20,000.00
75,000.00
120,000.00
100,000.00
150,000.00
80,000.00
120,000.00
100,000.00
120,000.00
80,000.00
200,000.00
200,000.00
97,500.00
72,000.00

24,000.00
11,000.00
12,000.00
150,000.00
22,000.00

1,650.00
7,500.00
3,750.00
9,000.00
1,300.00
4,000.00
9,000.00
12,500.00
30,000.00

55,000.00
45,000.00
40,000.00
40,000.00
65,000.00
75,000.00
85,000.00
117,500.00
70,000.00
75,000.00
13,000.00
20,000.00
75,000.00
140,000.00
120,000.00
150,000.00
80,000.00
120,000.00
100,000.00
120,000.00
80,000.00
200,000.00
200,000.00

24,000.00
11,000.00
12,000.00
150,000.00
22,000.00

10,010.00
1,610.00
4,250.00
2,020.00
4,550.00
500.00
2,420.00
4,850.00
7,790.00
20,590.00
7,790.00
20,590.00
7,230.00
19,480.00
52,010.00
36,730.00
33,060.00
26,710.00
89,050.00
113,340.00
89,560.00
146,940.00
75,900.00
74,580.00
12,240.00
15,380.00
68,460.00
128,520.00
91,830.00
165,310.00
61,220.00
110,200.00
76,250.00
91,830.00
85,710.00
202,040.00
121,440.00
121,440.00
72,860.00
56,670.00
19,480.00
10,120.00
11,130.00
138,030.00
21,350.00

1
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52

Pipa besi galvanis medium A (tebal 2,4 1/2" - 6 m.


Pipa besi galvanis medium A (tebal 3 m 1" - 6 m.
Pipa besi galvanis medium A (tebal 3 m 1,25" - 6 m.
Pipa besi galvanis medium A (tebal 3 m 1,5" - 6 m.
Pipa besi galvanis medium A (tebal 3,3 2" - 6 m.
Pipa besi galvanis medium A (tebal 3,3 2,5" - 6 m.
Pipa besi galvanis medium A (tebal 3,6 3" - 6 m.
Pipa besi galvanis medium A (tebal 4 m 4" - 6 m.
Pipa besi galvanis medium A (tebal 4,2 5" - 6 m.
Besi plat 2 mm,
4' x 8'
Besi plat aluminium tebal 2 mm
4' x 8'
Besi plat bordes tebal 3 mm
4' x 8'
Besi plat strip panjang tebal 3 mm
(30x6000)mm
Besi profil WF <= 200 mm
Besi profil WF <= 200 s.d. 400 mm
Besi profil WF <= 200 s.d. 500 mm
Besi siku "Krakatau Stell"
L.60.60.6
Besi siku "Krakatau Stell"
L.50.50.6
Besi siku "Krakatau Stell"
L.30.30.3
Besi canal
C 125,50,3
Kawat harmonika
Kawat ikat beton (bendrat)
Kawat nyamuk kasa alumunium
Kawat ayakan pasir (utk pasang)
Kawat ayakan pasir (utk plesteran)
Kawat duri pagar
Kawat nyamuk kasa plastik
3,2 mm.
Kawat tali Bwg 10
Kawat wire mesh
2", t=120
Tiang pagar BRC/PMG
Pintu dorong BRC/PMG
120 x 300 cm
Pintu swing ganda BRC/PMG
120 x 300 cm
Pagar BRC/PMG A
120 x 240 cm
Bondex
1,5" - 6 m.
Pipa besi putih
Pipa gas/hitam medium A (tebal 2,4 mm) 3/4" - 6 m.
Pipa gas/hitam medium A (tebal 3 mm) 1" - 6 m.
Pipa gas/hitam medium A (tebal 3 mm) 1,25" - 6 m.
Pipa gas/hitam medium A (tebal 3 mm) 1,5" - 6 m.
Pipa gas/hitam medium A (tebal 3,3 mm) 2" - 6 m.
Pipa gas/hitam medium A (tebal 3,6 mm) 3" - 6 m.
Pipa gas/hitam medium A (tebal 4 mm) 4" - 6 m.
Pipa gas/hitam medium A (tebal 4,2 mm) 5" - 6 m.
Pipa gas/hitam medium A (tebal 4,2 mm) 6" - 6 m.
Pintu Alumunium (kualitas II)
70 x 200 cm
Pintu PVC (kualitas baik)
70 x 210 cm
Profil Alumunium
-

4
btg
btg
btg
btg
btg
btg
btg
btg
btg
lbr
lbr
lbr
m1
kg
kg
kg
btg
btg
btg
ljr
m2
kg
m2
m2
m2
m1
m2
kg
kg
btg
unit
unit
unit
m2
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
lbr
lbr
m1

9
110,500.00
200,000.00
256,500.00
322,500.00
445,500.00
616,500.00
730,000.00
1,045,000.00
1,707,500.00
760,000.00
665,000.00
1,140,000.00
35,000.00
17,000.00
17,000.00
17,000.00
210,000.00
128,500.00
95,500.00
428,500.00
37,500.00
16,500.00
42,000.00
25,000.00
28,500.00
6,500.00
20,000.00
16,500.00
32,500.00
18,500.00
1,350,000.00
1,250,000.00
500,000.00
365,000.00
275,000.00
76,500.00
152,500.00
198,500.00
217,500.00
285,000.00
475,000.00
615,000.00
948,000.00
1,138,500.00
750,000.00
650,000.00
Lembar : 63

148,000.00
240,000.00
300,000.00
350,000.00
480,000.00
600,000.00
750,000.00
1,000,000.00
1,350,000.00
550,000.00
650,000.00
759,000.00
45,000.00
12,000.00
10,000.00
10,000.00
330,000.00
200,000.00
85,000.00
375,000.00
44,000.00
24,000.00
40,000.00
23,000.00
25,000.00
14,000.00
15,000.00
20,000.00

750,000.00
240,000.00
177,000.00
51,000.00
101,000.00
132,500.00
145,000.00
190,000.00
316,000.00
411,000.00
632,000.00
759,000.00
900,000.00
549,000.00

148,000.00
240,000.00
300,000.00
350,000.00
480,000.00
600,000.00
750,000.00
1,000,000.00
1,350,000.00
550,000.00
650,000.00
45,000.00

330,000.00
200,000.00
85,000.00
375,000.00
44,000.00
24,000.00
40,000.00
23,000.00
25,000.00
14,000.00
15,000.00
20,000.00

600,000.00

153,060.00
260,480.00
321,710.00
459,190.00
627,840.00
841,570.00
1,040,840.00
1,346,970.00
1,948,100.00
706,400.00
734,710.00
1,346,970.00
32,420.00
13,860.00
13,860.00
13,910.00
367,350.00
214,290.00
92,090.00
487,370.00
30,610.00
20,180.00
39,460.00
22,200.00
22,260.00
9,100.00
15,180.00
20,030.00
15,180.00
85,710.00
1,419,330.00
1,419,330.00
686,840.00
357,330.00
262,100.00
134,590.00
208,160.00
299,550.00
356,220.00
484,240.00
844,910.00
1,079,800.00
1,200,020.00
1,291,310.00
303,340.00
795,930.00

53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73

m1
Slimar alumunium
Sunscreen Alumunium
m2
Ramset/Dina Bolt
bh
Pagar kawat jaring
lbr
Pagar besi ulir komplit dg mainan
m2
m2
Pintu pagar besi ulir komplit dg mainan
Pintu rolling door
m2
m2
Pintu plat harmonika
Atap twin lite rangka pipa stainless steel
m2
m2
Atap twin lite rangka pipa besi
Teralis besi
m2
Teralis aluminium
(80-90) cm x 600 cmm2
Railling stainless steel
m2
2"
m1
Usuk Galvalum
0,8 mm
Reng Galvalum
0,6 mm
m1
Kusen Pintu Aluminium Silver "HC"
4 / 12
m1
m1
Kusen Pintu Aluminium Coklat "YKK"
5 / 10
Kusen Jendela Aluminium Silver "HC"
4 / 12
m1
m1
Kusen Jendela Aluminium Coklat "YKK"
5 / 10
Waterstop "Maspion"
250 mm
m1
Sealent
tube

BAHAN LANTAI
Paving stone per segi abu-abu, cetak ke
Paving stone per segi abu-abu, cetak b
Paving stone 3 berlian abu-abu, cetak k
Paving stone 3 berlian merah, cetak bas
Paving stone segi 6 abu-abu, cetak kerin
Paving stone segi 6 merah, cetak basah
Paving stone persegi merah
Paving stone per segi abu-abu, cetak b
Paving stone per segi abu-abu, cetak ke
Paving stone 3 berlian abu-abu
Paving stone 3 berlian merah
Paving stone segi 6 abu-abu
Paving stone segi 6 merah
Paving stone abu-abu, cetak basah K-3
Paving stone abu-abu, cetak basah K-4
Tegel PC Abu-abu
Tegel PC Abu-abu
Tegel PC Abu-abu
Ubin warna
Ubin warna
Ubin warna
Tegel keramik
Tegel keramik polos
Tegel keramik, Claudia

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

t = 6 cm
t = 6 cm
t = 6 cm
t = 6 cm
t = 6 cm
t = 6cm
t = 6 cm
t = 8 cm
t = 8 cm
t = 8 cm
t = 8 cm
t = 8 cm
t = 8 cm
10x20x8
10x20x8
20 x 20
20 x 30
30 x 30
20 x 20
30 x 30
40 x 40
10 x 20
15 x 15
20 x 25

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

725,000.00
750,000.00
700,000.00
1,250,000.00
850,000.00
650,000.00
550,000.00
850,000.00
950,000.00
45,000.00
25,000.00
145,000.00
175,000.00
165,000.00
185,000.00
25,000.00
35,000.00

550,000.00
650,000.00
750,000.00
1,125,000.00
750,000.00
650,000.00
450,000.00

550,000.00
650,000.00
750,000.00
1,125,000.00
750,000.00
650,000.00
450,000.00

1,000,000.00

1,000,000.00

45,000.00
50,000.00
45,000.00
48,500.00
45,000.00
48,500.00
52,500.00
57,500.00
52,500.00
50,000.00
53,500.00
50,000.00
53,500.00
125,000.00
100,000.00
42,500.00
48,500.00
52,500.00
52,500.00
52,500.00
67,500.00

50,000.00
50,000.00
45,000.00
55,000.00
50,000.00
48,000.00
48,000.00
60,000.00
57,000.00
55,000.00
57,000.00
55,000.00
55,000.00
75,000.00
85,000.00
40,000.00
45,000.00
47,000.00
45,000.00
47,000.00
50,000.00
42,000.00
37,500.00
57,000.00

42,500.00
Lembar : 64

125,000.00
150,000.00
110,000.00
140,000.00

50,000.00
50,000.00
45,000.00
55,000.00
50,000.00
48,000.00
48,000.00
60,000.00
57,000.00
55,000.00
57,000.00
55,000.00
55,000.00
40,000.00
45,000.00
47,000.00

42,000.00
35,000.00
57,000.00

640,090.00
745,840.00
718,010.00
1,280,180.00
748,880.00
612,260.00
504,270.00
630,620.00
909,030.00
31,720.00
25,600.00
134,690.00
160,300.00
126,340.00
160,300.00
209,280.00
41,740.00
45,080.00
64,560.00
45,640.00
63,450.00
45,640.00
62,330.00
53,430.00
65,670.00
63,450.00
57,880.00
64,560.00
57,880.00
64,560.00
66,230.00
85,710.00
38,960.00
44,520.00
46,750.00
50,090.00
51,200.00
66,230.00
58,990.00
46,750.00
51,760.00

25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60

Tegel keramik, Asia


Tegel keramik, berserat
Tegel keramik putih, Asia
Tegel keramik, (kasar), Asia
Tegel keramik, Super Milan
Tegel keramik, Austria Blue
Tegel keramik, Mulia ( Putih )
Tegel keramik, KIA
Tegel keramik, Arwana
Tegel keramik, Asia Tile
Tegel keramik, Classic
Tegel keramik, Essenza
Tegel keramik, Diamond
Tegel teraso
Tegel teraso
Tegel teraso
Tegel keramik, Granito
Tegel keramik, Granito
Tegel keramik Granite Black
Tegel keramik Granite Polish
Tegel galar
Tegel keramik, bermotif/warna
Tegel plint keramik warna
Tegel wafel
Ubin keramik artistik
Ubin keramik artistik
Ubin keramik artistik
Ubin keramik artistik
Lantai vinyl karet kw 1
Marmer ex. Tulungagung
List Keramik/Border
Keramik Granitile 60x60 Polish
Keramik Granitile 60x60 Unpolish
Stepnoiseng 10x40
Stepnoiseng 7x30
Granito ex Cina

20 x 25
30 x 30
30 x 30
20 x 20
40 x 40
30 x 30
30 x 30
30 x 30
30 x 30
30 x 30
30 x 30
40 x 40
20 x 20
20 x 20
30 x 30
40 x 40
30 x 30
40 x 40
40 x 40
40 x 40
20 x 20
40 x 50
10 x 30
20 x 20
5 x 20
10 x 20
15 x 15
20 x 20
30 x 30
40 x 60
10 x 20
60 x 60

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
m2
bh
bh
m2
m2
m2
m2
bh
m2
m2
bh
bh
m2

VI
1
2
3
4
5
6
7
8
9

BAHAN PENGECATAN
Cat besi Emco tanda Bintang
Cat kayu Emco tanda Bintang
Meni besi/kayu, cap Pedang
Thinner A spesial "Altech"
Thinner A biasa "Power"
Thinner B spesial (merek apa?)
Minyak cat/afduner (merek apa?)
Cat tembok eksterior Mowilex
Cat tembok Alcabond

kg
kg
kg
ltr
ltr
ltr
ltr
ltr
kg

52,000.00
67,500.00
55,000.00
55,000.00
42,500.00
52,500.00
67,500.00
165,000.00
63,500.00
37,500.00
45,000.00
55,000.00
225,000.00
310,000.00
60,000.00

13,500.00
22,500.00
45,000.00

47,000.00
52,000.00
40,000.00
50,000.00
60,000.00
45,000.00
37,000.00
46,000.00
42,000.00
42,000.00
50,000.00
180,000.00
38,000.00
43,000.00
46,000.00
50,000.00
180,000.00
250,000.00
180,000.00
45,000.00

66,000.00
300,000.00
10,000.00
100,000.00
160,000.00
15,000.00
11,500.00
110,000.00

50,000.00
50,000.00
18,500.00
22,500.00
14,500.00
10,000.00
8,500.00
150,000.00
45,000.00

52,000.00
55,000.00
30,000.00
32,000.00
30,000.00
22,000.00
20,000.00
90,000.00
23,000.00

64,000.00
60,110.00
46,750.00
55,660.00
74,580.00
64,560.00
45,640.00
53,430.00
50,090.00
45,640.00
61,220.00
248,240.00
55,660.00
48,980.00
50,600.00
54,540.00
211,500.00
283,860.00
296,110.00
263,120.00
48,980.00
38,960.00
40,070.00
11,680.00
21,150.00
50,090.00
57,320.00
79,590.00
303,340.00
11,130.00
140,260.00
214,840.00
20,240.00
15,180.00
166,980.00

33,000.00
10,000.00
17,000.00

67,500.00
345,000.00
9,000.00
135,000.00
234,000.00
22,500.00
17,250.00
110,000.00

Lembar : 65

47,000.00
52,000.00
40,000.00
50,000.00
60,000.00
37,000.00
37,000.00
46,000.00
42,000.00
42,000.00
50,000.00

52,000.00
55,000.00
30,000.00
32,000.00
30,000.00
22,000.00
20,000.00

72,000.00
72,000.00
21,000.00
28,000.00
22,000.00
11,000.00
11,000.00
27,500.00

1
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
VII
1
2
3
4
5
6
7

Cat tembok Alcaplast


Cat tembok Wallsealer
Cat tembok Vinylex
Cat tembok Decolith
Cat tembok Metrolith
Cat tembok Cathylac
Cat tembok Cendana
Cat genteng Matex
Serlak kripik "India"
Politur jadi merk "Impra"
Wood Filler "Impra"
Wood Stain 'Impra"
Sanding Sealer "Impra"
Vernis (Glotex)
Dempul Plitur (Impra)
Dempul Plitur kualitas sedang
Plitur batangan
Teer
Kertas gosok
Waterproof, Aquaproof Pro Seller
Waterproof, Multiroof
Waterproof, Nippon Paint Shield
Plamur tembok
Plamur kayu
Plamur besi
Spiritus
Lem Rajawali untuk kayu
Lem Rajawali untuk tembok
Lem kayu khusus (Vinyl)
Soda Api
Teak Oil
Residu
Kuas Eterna
Kuas Eterna
Kuas Eterna
Kalsium
Coating
Wallpaper "Kansai"

3"
4"
5"
-

kg
kg
kg
kg
kg
kg
kg
kg
kg
ltr
ltr
ltr
ltr
ltr
kg
kg
btg
ltr
lbr
kg
kg
kg
kg
kg
kg
ltr
kg
kg
kg
kg
ltr
ltr
bh
bh
bh
kg
kg
m2

45,000.00
45,000.00
18,500.00
15,000.00
15,500.00
17,500.00
19,000.00
50,000.00

11,500.00
15,000.00
18,500.00
1,500.00
37,500.00
22,500.00

20,000.00
25,000.00
30,000.00
1,300.00
33,000.00

20,000.00
25,000.00

BAHAN PENGGANTUNG DAN PENGUNCI


Engsel H "Stayer"
Engsel Kuningan arch asli "Elitech"
Engsel jendela (kupu - kupu)
Engsel pintu "UNION"
Engsel jendela "UNION"
Espanyolet kualitas I
Grendel AEG "ELT"

4"
4"
3"
4"
3"
-

set
set
set
bh
bh
set
bh

10,000.00
11,250.00
11,250.00
13,500.00
28,500.00
46,500.00
31,500.00

13,000.00
20,000.00
12,000.00
25,000.00
30,000.00
40,000.00
21,000.00

20,000.00
20,000.00
12,000.00
25,000.00
30,000.00

67,500.00
65000
71500
72500
32,500.00
36,000.00
37,500.00
22,500.00
8,500.00
3,000.00
48,000.00
57,000.00
65,000.00
10,000.00
18,500.00
25,000.00
12,500.00
35,000.00
12,500.00
15,000.00
16,500.00
28,500.00

Lembar : 66

30,000.00
54,000.00
24,000.00
17,500.00
22,000.00
22,000.00
16,000.00
32,000.00
76,000.00
66,000.00
24000
49000
31000
50,000.00
38,000.00
20,000.00
20,000.00
10,000.00
3,500.00
60,000.00
65,000.00
75,000.00
13,000.00
27,500.00
44,000.00
16,500.00
44,000.00
13,000.00
35,000.00
20,000.00
30,000.00

24,000.00
17,500.00
22,000.00
22,000.00

66,000.00

50,000.00
38,000.00
20,000.00
20,000.00
10,000.00
3,500.00
60,000.00
65,000.00
75,000.00
13,000.00
27,500.00
44,000.00
16,500.00
44,000.00
35,000.00
20,000.00
30,000.00

1,300.00

30,000.00

8,800.00
19,800.00
20,350.00
18,190.00
19,800.00
19,800.00
17,600.00
48,400.00
114,900.00
48,400.00
26,400.00
72,600.00
52,800.00
38,500.00
38,500.00
33,000.00
23,600.00
11,000.00
5,000.00
59,500.00
57,000.00
58,300.00
10,690.00
20,900.00
35,200.00
14,850.00
40,000.00
18,100.00
15,800.00
16,500.00
29,700.00
11,000.00
16,500.00
20,900.00
1,300.00
44,000.00
135,300.00
12,100.00
18,700.00
11,000.00
19,800.00
16,500.00
48,400.00
31,900.00

1
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
VIII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

Grendel biasa (besar) merek apa?


8"
Grendel biasa (kecil) merek apa?
3"
Grendel kuningan/krom kecil "Belucci"
4"
Grendel tanam kuningan besar "Cavel"
60 cm
Kunci gembok besar, Globe
40 mm
Kunci gembok sedang, Globe
30 mm
Kunci tanam (808)
Kunci tanam cap KUDA (2x putar) besar
Kunci tanam "SES" besar (tanpa handel)
Kunci tanam antik "Miller" (dengan hande
Kunci tanam KM/WC "Miller"
Kunci silinder "SES"
Kunci slot merk "SES" (dengan handel)
Kunci slot 2 putaran "YALE" (dengan ha
Kunci slot 2 putaran "CAVEL" (dengan h
Kunci lemari, Wing
Hak angin biasa (merek apa?)
8"
Hak angin 4 mm (lurus) merek apa?
Hak angin (sikutan) "SES"
Hak angin lurus (bisa disetel maju/mund
Pegangan pintu (model standar) Handel p = 20 cm
Spring knip
Door closer "Belucci"
Door stopper "Belucci"
Rel pintu dorong, biasa
Rel pintu dorong, J4 SES
BAHAN SANITASI
Slang spiral saluran kran wastafel
Kloset duduk porselin komplit (INA)
Kloset duduk porselin komplit (KIA)
Kloset duduk porselin komplit (TOTO)
Kloset jongkok porselin (INA)
Kloset jongkok porselin (TOTO)
Kloset jongkok teraso
1/2"
Kran air stainless steel ( INA )
3/4"
Kran air stainless steel
1/2"
Kran air (DUPONT)
1/2"
Kran air kuningan
3/4"
Kran shower "Toto"
Septic Tank ( 10 pemakai) dan Sumur
Peresapan (dalam 3,00 m)
3/4"
Watermur besi
Wastafel warna muda "ITO"
Wastafel warna tua "ITO"
Rol TBA (seal tape) Jumbo
Siphon Washer, kelas sedang plastik
Water drain dan assesories
-

bh
bh
bh
set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
set
set
set
set
bh
bh
bh
bh
btg
btg

9,750.00
6,000.00
19,500.00
57,500.00
11,250.00
9,750.00
9,000.00
85,500.00
133,500.00
37,500.00
85,500.00
94,500.00
379,900.00
132,750.00
151,500.00
7,500.00
6,000.00
9,750.00
13,500.00
60,000.00
90,000.00

20,000.00
7,500.00
20,000.00
65,000.00
50,000.00
40,000.00
15,000.00
80,000.00
375,000.00
75,000.00
95,000.00
70,000.00
375,000.00
125,000.00
325,000.00
7,500.00
10,000.00
12,000.00
30,000.00
65,000.00

20,000.00
7,500.00
50,000.00
40,000.00
15,000.00
375,000.00
75,000.00
375,000.00
125,000.00
325,000.00
6,000.00
10,000.00
15,000.00
30,000.00

114,000.00
246,000.00

40,000.00
225,000.00
50,000.00
200,000.00
250,000.00

40,000.00
225,000.00
50,000.00
200,000.00
250,000.00

set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
set
bh

48,000.00
1,350,000.00
1,500,000.00
2,400,000.00
135,000.00
195,000.00
65,000.00
48,000.00
57,500.00
123,000.00
19,500.00

65,000.00
1,200,000.00
1,300,000.00
1,500,000.00
150,000.00
200,000.00
75,000.00
50,000.00
60,000.00
25,000.00
25,000.00

55,000.00
1,200,000.00
1,300,000.00
1,500,000.00
150,000.00

5,250,000.00

6,500,000.00

bh
bh
bh
rol
set
set

7,500.00
493,500.00
553,500.00

15,000.00

15,000.00

15,000.00
19,000.00
25,000.00

15,000.00

28,500.00
37,500.00
Lembar : 67

75,000.00
50,000.00
60,000.00
35,000.00

9,900.00
5,500.00
23,100.00
246,400.00
31,350.00
20,900.00
9,350.00
84,700.00
159,500.00
245,300.00
85,800.00
199,650.00
425,700.00
139,700.00
302,500.00
7,700.00
7,200.00
10,700.00
24,700.00
82,500.00
74,800.00
19,800.00
233,200.00
49,500.00
116,600.00
225,500.00
46,200.00
1,210,000.00
1,320,000.00
1,870,000.00
137,500.00
211,200.00
33,000.00
48,400.00
52,800.00
188,650.00
30,250.00
484,000.00
5,250,000.00
9,350.00
316,800.00
378,400.00
12,100.00
46,200.00
36,300.00

1
20
21
22
23
24
25
26
27
28
29
30
31
32
33

0,5 m3
Bak mandi fiberglass
Bak cuci piring stainless steel, besar (do
Bak cuci teraso
Tempat sabun keramik
Urinoir "INA" (komplit)
Floor drain stainless steel
Kurasan (putih) stainless steel
Bak mandi porselin
60 x 60 cm
Tandon air fiberglass "Penyu"
550 ltr
Pompa tangan "Dragon"
Hand shower plastik (termasuk slang)
Wall shower "Toto"
Pompa air "Shimizu 125 W"
Pompa air "Sanyo 125 W"
-

IX
1
2
3
4
5
6
7
8

BAHAN JENIS KACA


Kaca polos
Kaca polos
Kaca rayban
Kaca es/buram
Krapyak kaca nako 15 x 70 cm (includ k
Kaca buram
Kaca cermin
Profil kaca

X
1
2
3
4
5
6
7
8
9
10
11
12
13
14
XI
1
2
3
4
5

4
bh
bh
bh
bh
set
bh
bh
bh
bh
bh
set
set
bh
bh

150,000.00
31,500.00
847,500.00
37,500.00
19,500.00
474,000.00
990,000.00
285,000.00

600,000.00
150,000.00
50,000.00
950,000.00
60,000.00
25,000.00
300,000.00
750,000.00
200,000.00

t = 3 mm
t = 5 mm
t = 5 mm
t = 5 mm
t = 5 mm
t = 3 mm
t = 3 mm
t = 5 mm

m2
m2
m2
m2
daun
m2
m2
m2

67,500.00
82,500.00
90,000.00
123,750.00
18,750.00
78,750.00
112,500.00

65,000.00
82,500.00
99,000.00
120,000.00
38,500.00
99,000.00
120,000.00

BAHAN BETON CETAKAN


Roster klingker warna merah
Buis beton (p = 100 cm)
Buis beton (p = 100 cm)
Buis beton (p = 100 cm)
Buis beton (p = 100 cm)
Buis beton (p = 50 cm)
Buis beton (p = 50 cm)
Buis beton (p = 50 cm)
Buis beton (p = 50 cm)
Buis Beton U (p = 100 cm)
Buis Beton U (p = 100 cm)
Buis Beton U (p = 100 cm)
Got talang R 15 (segmen)
Got talang R 25 (segmen)

10 x 20 cm
15 cm
20 cm
30 cm
40 cm
50 cm
60 cm
80 cm
100 cm
15 cm
20 cm
30 cm
-

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

9,000.00
49,500.00
66,000.00
76,500.00
87,000.00
114,000.00

4,200.00
55,000.00
66,000.00
82,500.00
93,500.00
104,500.00
85,000.00
100,000.00
110,000.00
44,000.00
49,500.00
60,500.00
17,000.00
29,000.00

BAHAN PIPA PVC


Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW

1/2" - 400
5/8" - 400
3/4" - 400
1" - 400
2" - 400

btg
btg
btg
btg
btg

27,750.00
30,000.00
33,000.00
42,000.00
84,000.00

49,500.00
60,000.00
25,500.00
43,500.00

Lembar : 68

950,000.00
60,000.00
50,000.00
300,000.00

65,000.00
82,500.00
99,000.00
120,000.00
38,500.00
99,000.00
120,000.00

55,000.00
66,000.00
82,500.00
93,500.00
104,500.00

44,000.00
49,500.00
60,500.00

48,400.00
60,500.00
72,600.00

264,000.00
550,000.00
147,400.00
30,250.00
1,089,000.00
70,400.00
45,650.00
466,400.00
943,800.00
305,800.00
201,300.00
335,500.00
431,200.00
550,000.00
54,450.00
66,550.00
79,650.00
121,000.00
30,250.00
90,750.00
162,200.00

8,800.00
44,550.00
55,000.00
74,800.00
83,600.00
85,800.00
73,700.00
94,600.00
114,400.00
38,500.00
43,450.00
53,900.00
30,800.00
52,800.00
24,200.00
28,600.00
31,350.00
41,250.00
105,600.00

1
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

2
Pipa PVC tipe AW
Pipa PVC tipe AW
Pipa PVC tipe AW
Pipa PVC "Maspion" tipe D
Pipa PVC "Maspion" tipe D
Pipa PVC "Maspion" tipe D
Pipa PVC "Maspion" tipe D
Lem PVC "Wavin"
Keni PVC tipe AW
Keni PVC tipe AW
Keni PVC tipe AW
Keni PVC tipe AW
Keni PVC tipe AW
Keni PVC tipe AW
Klem PVC
Talang PVC U "Maspion"
Talang PVC U
Clam Talang PVC U
Shock Talang PVC U
Tutup Talang PVC U
Corong Talang PVC U

XII
1
2
3
4
5
6
7
8
9
10
11

BAHAN JENIS PAKU


Paku asbes gelombang (paku pancing)
Paku kayu
Paku kayu
Paku kayu
Paku kayu
Paku payung (paku seng gelombang)
Paku sekrup
Paku sumbat
Paku triplek/eternit
Paku beton
Paku kalsiboard

XIII
1
2
3
4
5
6
7
8
9
10
11

BAHAN PERALATAN LISTRIK


Fiting plafon
T doos PVC
Isolator kecil
Stop kontak (Broco)
Skakelar tunggal (Broco)
Skakelar ganda (Broco)
Stop kontak dan skakelar (Broco)
Skakelar/hendel pemindah arus
Zekring lengkap dengan box
Las doof
Panel box

3" - 400
4" - 400
5" - 400
2" - 400
3" - 400
4" - 400
5" - 400
1/2"
3/4"
2"
3"
4"
5"
400 cm
400 cm
400 cm
400 cm
400 cm
400 cm

btg
btg
btg
btg
btg
btg
btg
tube
bh
bh
bh
bh
bh
bh
bh
btg
btg
bh
bh
bh
bh

205,500.00
295,500.00
474,000.00
55,500.00
117,000.00
160,500.00
265,500.00
7,500.00
1,500.00
2,250.00
4,500.00
11,250.00
15,000.00
22,500.00
4,875.00
94,500.00
67,500.00
7,500.00
7,500.00
7,500.00
18,750.00

1"
1,5" - 2"
2,5" - 3"
4"
1"
5 cm
-

bh
kg
kg
kg
kg
kg
dos
dos
kg
bh
kg

900.00
12,500.00
12,500.00
12,000.00
12,000.00
14,000.00
13,000.00
15,000.00
11,500.00
500.00
16,500.00

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

217,800.00
326,700.00
508,200.00
108,900.00
133,100.00
181,500.00
302,500.00

181,500.00
272,800.00
423,500.00
51,700.00
105,600.00
148,500.00
234,300.00
8,800.00
1,500.00
2,200.00
9,900.00
14,850.00
22,000.00
28,600.00
4,950.00
96,800.00
78,650.00
6,600.00
6,600.00
6,600.00
18,150.00

22,000.00
22,000.00
22,000.00
22,000.00
30,000.00
20,000.00
35,000.00
35,000.00
750.00
35,000.00

2,700.00
22,000.00
22,000.00
22,000.00
22,000.00
30,000.00
20,000.00
35,000.00
35,000.00
750.00
35,000.00

2,750.00
19,800.00
19,800.00
19,800.00
15,600.00
22,500.00
12,100.00
22,000.00
22,000.00
550.00
30,250.00

7,500.00
1,500.00
1,000.00
16,500.00
16,500.00

25,000.00
1,500.00
2,000.00
30,000.00
25,000.00

25,000.00
1,500.00
2,000.00
30,000.00
25,000.00

33,000.00
300.00
40,000.00

296,000.00
125,000.00
600.00
150,000.00

125,000.00
600.00
150,000.00

9,900.00
1,650.00
1,450.00
25,300.00
25,300.00
33,000.00
27,500.00
320,000.00
72,500.00
25,300.00
25,300.00

Lembar : 69

1
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
26
27

Meinswitch
bh
Zekring MCB thermis 10 - 16 Amp.
bh
Zekring MCB thermis 10 Amp.
bh
Stater lampu TL
bh
Lampu pijar 25,40,75 / 220 V "Philips"
bh
Bola lampu Armateur "Philips"
250 watt
bh
Lampu hemat energi 18 W / 220 V (Phili
bh
Lampu hemat energi 18 W / 220 V (Osr
bh
Lampu TL 20 W / 220 V, komplit balast
bh
(Philips)
Lampu TL 40 W / 220 V, komplit balast
bh
(Philips)
Kabel NYM. 2 x 2,5
m1
m1
Kabel NYY. 1 x 2,5
Kabel twisted Indonesia
3 x 70 x 5 mm2 m1
Kabel twisted multi kabel
m1
UPS 3,5 Kw
bh
UPS 6,0 Kw
bh
Exhaustfan 8''
bh
Genzet 250 Kva Cartepillar
unit
Instalasi Listrik
titik
Penangkal Petir Lengkap (2 Spit), tinggi
unit
(Tidak termasuk izin dari Depnaker)

9
20,000.00
40,000.00
35,000.00
4,500.00
125,000.00

75,000.00
100,000.00
75,000.00
40,000.00
10,000.00
25,000.00

75,000.00
100,000.00
75,000.00
40,000.00

60,000.00

100,000.00

100,000.00

6,000.00
66,000.00
38,500.00
31,900.00
92,400.00

95,000.00

125,000.00

125,000.00

165,000.00

6,500.00
5,000.00
4,500.00

4,000.00
3,500.00
30,000.00

4,000.00
3,500.00

11,000.00
7,700.00
7,150.00

43,206,000.00
57,608,000.00
443,000.00

50,551,020.00
67,401,360.00
505,310.00
4,884,165,000.00
150,000.00
2,500,000.00

125,000.00

Lembar : 70

150,000.00

33,000.00
38,500.00

43,206,000.00
57,608,000.00
443,000.00
4,174,500,000.00
175,000.00
2,420,000.00

XIV
1
2
3
4
5
6
7
8
9
10
11
12
13
14

BAHAN PIPA GAS MEDIS


Pipa Tembaga 1 1/4" x 1,2 mm
Pipa Tembaga 1" x 1,2 mm
Pipa Tembaga 3/4" x 1,2 mm
Pipa Tembaga 1/2" x 1,2 mm
Pipa Tembaga 3/8" x 1,2 mm
Wall Outlet Oxygen merk C&U Japan
Wall Outlet N2O merk C&U Japan
Wall Outlet Vacuum merk C&U Japan
Ceiling Outlet ONV merk C&U Japan
Box Valve ONV Lokal
Box Valve OV Lokal
Sentral Oxygen Uk. 2 x 5 cyl. Manual Sys
Sentral N2O Uk. 2 x 3 cyl. Manual Syst.
Sentral Mesin Vacuum kap. 1 x 200 1/mn
merk BUSCH
15 Incenerator Nova-500 LFH 0,5 m3/jam
16 Incenerator Nova-800 LFH 0,8 m3/jam
17 Fire Extuinguisher 5 Kg (Ganebo)
18 Fire Extuinguisher 3,5 Kg (Ganebo)
19 Fire Extuinguisher 3,0 Kg (Powder)

XIV
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

BAHAN BBM DAN ALAT BERAT


Bensin
Solar
Minyak tanah
Oli mesin Mesran
Minyak pelumas
Grease (gemuk pelumas)
Aspal panas curah
Aspal panas drum
Biaya operasional wheel loader
Biaya operasional AMP
Biaya operasional dump truck 5 ton
Biaya operasional dump truck 3,5 ton
Biaya operasional asphalt finisher
Biaya operasional asphalt sprayer
Biaya operasional tandem roller
Biaya operasional tire roller
Biaya operasional genset
Biaya operasional alat bantu
Biaya operasional bulldozer
Biaya operasional stone crusher
Biaya operasional compressor
Biaya operasional mesin gilas (wales)
Biaya operasional mesin gilas (wales)

m1
m1
m1
m1
m1
bh
bh
bh
unit
unit
unit
unit
unit
unit

189,000.00
169,000.00
130,000.00
110,000.00
76,000.00
2,277,000.00
2,277,000.00
2,277,000.00
31,310,000.00
5,380,000.00
4,110,000.00
17,080,000.00
23,400,000.00
158,125,000.00

169,000.00
130,000.00
110,000.00
76,000.00
2,277,000.00
2,277,000.00
2,277,000.00
31,310,000.00
5,380,000.00
4,110,000.00
17,080,000.00
23,400,000.00
158,125,000.00

unit
unit
bh
bh
bh

161,920,000.00
271,975,000.00
6,620,000.00
480,000.00
1,010,000.00

161,920,000.00
271,975,000.00
6,620,000.00
4,890,000.00
1,010,000.00

ltr
ltr
ltr
ltr
ltr
kg
kg
kg
jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
hari
hari

4,500.00
4,500.00
11,000.00
27,500.00
42,500.00
28,500.00
9,500.00

4,500.00
4,500.00
8,500.00
33,000.00
37,400.00
31,350.00
9,200.00

1-3 ton
6-8 ton

10,000.00

10,500.00

600,000.00
6,000,000.00
350,000.00

348,800.00
3,525,000.00
307,500.00

325,000.00

300,000.00
54,000.00
224,300.00
347,000.00
240,600.00
5,000.00

300,000.00
385,000.00
5,000.00

200,000.00
250,000.00
Lembar : 71

165,000.00
275,000.00

150,000.00
250,000.00

TUAN BAHAN BANGUNAN DAN UPAH KERJA


KOTA BLITAR TAHUN ANGGARAN 2012
ulan III TAHUN ANGGARAN 2012)

HARGA SURVEI
RATARATA
(Rp.)
10

141,645.00
150,435.00
153,820.00
174,805.00
173,560.00
201,202.50
206,485.00
209,682.50
148,677.50
107,405.00
110,045.00
6,615.00
121,666.67
106,295.00
96,155.00
76,837.50
139,150.00
125,500.00
1,067.50
81,440.00
67,947.50
78,087.50
77,117.50
19,797.50
2,695.00
587.50
512.50
70,720.00
101,155.00
10,892.50
13,265.00
64,337.50
86,012.50
Lembar : 72

10
88,655.00
907,402.50
1,196,460.00
12,410.00
509,905.00
831,012.50
145,210.00
70,725.00
57,555.00
68,220.00
55,027.50
69,713.33
88,512.50
12,435.00
25,565.00
20,940.00
23,065.00

28,404,750.00
25,886,100.00
27,890,762.50
25,011,100.00
23,088,216.67
18,717,583.33
24,619,300.00
16,186,500.00
9,588,587.50
9,968,250.00
8,948,290.00
8,583,925.00
5,941,585.00
6,232,815.00
5,629,085.00
5,398,490.00
1,666,700.00
2,004,137.50
2,814,090.00
Lembar : 73

10
2,717,717.50
29,560.00
6,854,172.50
7,287,565.00
6,539,342.50
6,500,442.50
9,439,520.00
9,847,912.50
8,838,587.50
8,398,755.00
4,251,020.00
5,530.00
8,210.00
9,475.00
16,327.50
32,997.50
12,087.50
13,057.50
1,070,666.67
2,375,066.67
125,547.50
97,780.00
54,745.00
58,985.00
62,115.00
44,835.00
17,035.00
19,120.00
22,092.50
65,000.00
65,000.00
12,300.00
15,087.50
16,547.50
90,927.50
104,280.00
36,052.50
22,590.00
1,440.00
13,267.50
5,837.50
10,552.50
5,862.50
6,515.00
6,666.67
Lembar : 74

10
10,010.00
1,602.50
6,312.50
2,842.50
7,512.50
1,033.33
3,855.00
7,587.50
10,697.50
25,772.50
7,596.67
18,863.33
6,743.33
17,493.33
51,752.50
41,057.50
35,390.00
32,302.50
76,637.50
99,710.00
85,390.00
129,360.00
73,600.00
74,145.00
12,560.00
17,345.00
69,615.00
128,380.00
98,832.50
162,577.50
72,180.00
116,675.00
85,312.50
107,332.50
78,302.50
206,510.00
185,360.00
109,470.00
72,430.00
56,670.00
21,495.00
11,155.00
13,157.50
150,132.50
23,462.50
Lembar : 75

10
139,890.00
235,120.00
294,552.50
370,422.50
508,335.00
664,517.50
817,710.00
1,097,992.50
1,588,900.00
641,600.00
674,927.50
1,081,990.00
39,355.00
14,286.67
13,620.00
13,636.67
309,337.50
185,697.50
89,397.50
416,467.50
39,027.50
21,170.00
40,365.00
23,300.00
25,190.00
10,900.00
16,295.00
19,132.50
23,840.00
52,105.00
1,384,665.00
1,334,665.00
645,613.33
320,776.67
238,033.33
87,363.33
153,886.67
210,183.33
239,573.33
319,746.67
545,303.33
701,933.33
926,673.33
1,062,936.67
638,335.00
664,976.67
Lembar : 76

10

616,272.50
698,960.00
729,502.50
1,195,045.00
774,720.00
640,565.00
488,567.50
740,310.00
964,757.50
38,360.00
25,300.00
134,896.67
161,766.67
133,780.00
161,766.67
117,140.00
38,370.00
47,520.00
53,640.00
45,160.00
55,487.50
47,660.00
51,707.50
50,482.50
60,792.50
57,487.50
54,470.00
58,015.00
54,470.00
57,015.00
88,743.33
90,236.67
40,365.00
45,755.00
48,312.50
49,196.67
50,233.33
61,243.33
47,663.33
39,750.00
52,065.00
Lembar : 77

10
52,666.67
54,703.33
42,250.00
51,915.00
65,520.00
48,853.33
43,660.00
50,107.50
44,147.50
45,535.00
57,180.00
197,746.67
52,386.67
43,160.00
47,200.00
53,180.00
205,500.00
281,286.67
238,055.00
263,120.00
51,326.67
38,960.00
36,535.00
11,726.67
20,216.67
47,545.00
57,320.00
71,030.00
316,113.33
10,043.33
125,086.67
202,946.67
19,246.67
14,643.33
128,993.33
56,500.00
58,000.00
24,875.00
28,625.00
24,125.00
16,250.00
14,875.00
120,000.00
31,833.33
Lembar : 78

10
27,933.33
39,600.00
21,712.50
17,047.50
19,825.00
20,325.00
17,533.33
43,466.67
95,450.00
61,975.00
38,466.67
64,366.67
52,100.00
42,750.00
37,625.00
27,625.00
21,525.00
9,875.00
3,750.00
56,875.00
61,000.00
68,325.00
11,672.50
23,600.00
37,050.00
15,087.50
40,750.00
14,533.33
25,200.00
18,250.00
29,550.00
15,625.00
20,375.00
23,133.33
1,350.00
38,166.67
78,900.00
13,775.00
17,487.50
11,562.50
20,825.00
26,250.00
44,966.67
28,600.00
Lembar : 79

10
14,912.50
6,625.00
20,866.67
122,966.67
35,650.00
27,662.50
12,087.50
83,400.00
260,750.00
119,266.67
85,325.00
121,383.33
388,900.00
130,612.50
276,000.00
7,175.00
8,300.00
11,862.50
24,550.00
69,166.67
82,400.00
33,266.67
227,733.33
49,833.33
157,650.00
242,875.00
53,550.00
1,240,000.00
1,355,000.00
1,817,500.00
143,125.00
202,066.67
62,000.00
49,100.00
57,575.00
92,912.50
24,916.67
484,000.00
5,666,666.67
11,712.50
405,150.00
465,950.00
14,033.33
31,233.33
32,933.33
Lembar : 80

10
264,000.00
575,000.00
149,133.33
37,250.00
959,125.00
56,975.00
35,037.50
385,100.00
894,600.00
263,600.00
201,300.00
335,500.00
431,200.00
550,000.00
62,987.50
78,512.50
91,912.50
121,187.50
31,500.00
91,875.00
128,675.00

7,333.33
51,012.50
63,250.00
79,075.00
89,400.00
102,200.00
79,350.00
97,300.00
112,200.00
42,166.67
47,987.50
58,725.00
24,433.33
41,766.67
33,450.00
29,300.00
41,616.67
51,950.00
94,800.00
Lembar : 81

10
201,600.00
298,333.33
468,566.67
72,033.33
118,566.67
163,500.00
267,433.33
8,150.00
1,500.00
2,225.00
7,200.00
13,050.00
18,500.00
25,550.00
4,912.50
95,650.00
73,075.00
7,050.00
7,050.00
7,050.00
18,450.00
2,116.67
19,075.00
19,075.00
18,950.00
17,900.00
24,125.00
16,275.00
26,750.00
25,875.00
637.50
29,187.50
16,850.00
1,537.50
1,612.50
25,450.00
22,950.00
33,000.00
27,500.00
308,000.00
88,875.00
6,700.00
91,325.00
Lembar : 82

10
50,750.00
69,625.00
61,666.67
40,000.00
6,833.33
91,500.00
38,500.00
31,900.00
88,100.00
127,500.00
6,375.00
4,925.00
13,883.33
45,654,340.00
60,872,453.33
463,770.00
4,529,332,500.00
150,000.00
2,460,000.00

Lembar : 83

10
189,000.00
169,000.00
130,000.00
110,000.00
76,000.00
2,277,000.00
2,277,000.00
2,277,000.00
31,310,000.00
5,380,000.00
4,110,000.00
17,080,000.00
23,400,000.00
158,125,000.00
161,920,000.00
271,975,000.00
6,620,000.00
2,685,000.00
1,010,000.00

4,500.00
4,500.00
9,833.33
30,250.00
39,950.00
29,925.00
9,733.33
474,400.00
4,762,500.00
328,750.00
312,500.00
54,000.00
262,150.00
366,000.00
240,600.00
5,000.00

171,666.67
258,333.33
Lembar : 84

DAFTAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA


PEMERINTAH KOTA BLITAR
Triwulan IV Tahun Anggaran 2011

NAMA LEVELANSIR BAHAN BANGUNAN : ...................................


ALAMAT LEVELANSIR : ...................................

A. DAFTAR HARGA SATUAN BAHAN BANGUNAN

NO.

JENIS BAHAN

UKURAN

SAT.

TRIWULAN IV

I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49

BAHAN PASANGAN DAN CAMPURAN


BETON
Batu kali belah
Batu kali pecah
Batu kali pecah
Batu kali pecah
Batu kali pecah
Batu kali pecah Crusser
Batu kali pecah Crusser
Batu kali pecah Crusser
Batu krikil (ayakan)
Krikil sungai
Krikil ayak tanpa pasir
Krikil batu alor (ampyang)
Pasir beton/cor
Pasir pasang
Pasir urug
Agregat Kasar
Agregat Halus
Filler
Sirtu
Tanah urug biasa
Tanah urug pilihan (campur pupuk utk taman)
Tanah katelan jalan
Gebalan rumput
Batako
Batu merah klas I
Batu merah klas II
Batu lempeng (tidak beraturan)
Batu hias (sand stone)
Roster beton
Roster beton
Roster batu alam
Roster batu alam
Batu tempel hijau
Tiang teras batu alam
Tiang teras batu alam
List batu hias
Kapur padam
Gamping
Semen merah
Semen Gresik (PC Gresik)
Semen Gresik (PC Gresik)
Semen Tiga Roda
Semen Tiga Roda
Semen Holcim
Semen putih
PC super nut
Ijuk
Glass block bening
Glass block buram

I
15/20
5/7
4/6
3/5
2/3
1/2
1/1
0,5/1
2/3
(40x20x10) cm
10 x 20
20 x 20
10 x 30
20 x 20
30 x 30
10 x 20
22cm, t=3 m
28cm, t=3 m
p = 40 cm
50 kg
40 kg
50 kg
40 kg
50 kg
40 kg
20 x 20
20 x 20

Lembar : 85

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
kg
m3
m3
m3
m3
m3
kg
m3
m3
m3
m3
m2
bh
bh
bh
m2
m2
bh
bh
bh
bh
m2
bh
bh
bh
m3
ton
m3
zak
zak
zak
zak
zak
zak
kg
kg
bh
bh

##
##
##
##
##
##
##
##
##
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#

Blitar, .........................
Dibuat oleh :

(.........................)

Lembar : 86

DAFTAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA


PEMERINTAH KOTA BLITAR
Triwulan IV Tahun Anggaran 2011

NAMA TOKO BAHAN BANGUNAN : ...................................


ALAMAT TOKO : ...................................

A. DAFTAR HARGA SATUAN BAHAN BANGUNAN

NO.

JENIS BAHAN

UKURAN

SAT.

TRIWULAN IV

I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
II

BAHAN PASANGAN DAN CAMPURAN


BETON
Batu kali belah
Batu kali pecah
Batu kali pecah
Batu kali pecah
Batu kali pecah
Batu kali pecah Crusser
Batu kali pecah Crusser
Batu kali pecah Crusser
Batu krikil (ayakan)
Krikil sungai
Krikil ayak tanpa pasir
Krikil batu alor (ampyang)
Pasir beton/cor
Pasir pasang
Pasir urug
Agregat Kasar
Agregat Halus
Filler
Sirtu
Tanah urug biasa
Tanah urug pilihan (campur pupuk utk taman)
Tanah katelan jalan
Gebalan rumput
Batako
Batu merah klas I
Batu merah klas II
Batu lempeng (tidak beraturan)
Batu hias (sand stone)
Roster beton
Roster beton
Roster batu alam
Roster batu alam
Batu tempel hijau
Tiang teras batu alam
Tiang teras batu alam
List batu hias
Kapur padam
Gamping
Semen merah
Semen Gresik (PC Gresik)
Semen Gresik (PC Gresik)
Semen Tiga Roda
Semen Tiga Roda
Semen Holcim
Semen putih
PC super nut
Ijuk
Glass block bening
Glass block buram

BAHAN PENUTUP ATAP DAN PLAFON


1 Asbes gelombang besar tebal 5 mm

I
15/20
5/7
4/6
3/5
2/3
1/2
1/1
0,5/1
2/3
(40x20x10) cm
10 x 20
20 x 20
10 x 30
20 x 20
30 x 30
10 x 20
22cm, t=3 m
28cm, t=3 m
p = 40 cm
50 kg
40 kg
50 kg
40 kg
50 kg
40 kg
20 x 20
20 x 20

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
kg
m3
m3
m3
m3
m3
kg
m3
m3
m3
m3
m2
bh
bh
bh
m2
m2
bh
bh
bh
bh
m2
bh
bh
bh
m3
ton
m3
zak
zak
zak
zak
zak
zak
kg
kg
bh
bh

##
##
##
##
##
##
##
##
##
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#

1,05 X 3,00

lbr

III
##

Lembar : 87

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
III
1
2
3
4
5
6
7
8
9
10
11

Asbes gelombang kecil tebal 4 mm


Asbes gelombang kecil tebal 4 mm
Asbes gelombang kecil tebal 4 mm
Asbes bubung gelombang besar tebal 5 mm
Asbes bubung gelombang kecil tebal 4 mm
Harflek tebal 4 mm
Harflek tebal 4 mm
Harflek tebal 4 mm
Woodplek tebal 9mm
Woodplek tebal 9mm
Eternit (lokal)
Eternit (kerang)
Eternit (Gresik)
Gypsum tebal 9 mm
Gypsum tebal 12 mm
List Gypsum
List Gypsum
Genteng flam press Jawa/lokal
Genteng kaca (model Karang Pilang)
Genteng Karang Pilang/Wisma
Genteng bubung Karang Pilang/Wisma
Genteng bubung Jawa/lokal
Genteng Bambe
Genteng bubungan Bambe
Genteng prentul ex.Trenggalek
Genteng bubung prentul ex. Trenggalek
Genteng Mantili ex Trenggalek
Genteng bubung Mantili ex Trenggalek
Genteng Beton
Genteng bubung Beton
Genteng Kanmuri Glasur
Genteng Kanmuri bubung Glasur
Genteng KIA Glasur
Genteng KIA bubung Glasur
Genteng Impresso Glasur
Genteng bubung Impresso Glasur
Seng Talang BJLS 30
Seng Talang BJLS 27
Seng Talang BJLS 27
Seng Talang BJLS 30
Seng Datar BJLS 30
Seng Gelombang BJLS 40
Seng Gelombang BJLS 30
Seng Gelombang BJLS 30
Seng Gelombang BJLS 30
Seng Datar BJLS 27
Karet Talang
Karet Talang
Fiber glass "Kano Flash"
Teakwood tebal 3 mm
Teakwood tebal 3 mm
Tripleks tebal 9 mm
Tripleks tebal 3 mm
Plywood tebal 6 mm
Plywood tebal 4 mm
Plywood tebal 4 mm
Plywood tebal 2 mm
Multiplek 12 mm
Formica
Kalsiboard tebal 4 mm

1,05 X 3,00
1,05 X 1,50
1,05 X 1,80
40 x 200 cm
50 x 200 cm
60 x 200 cm
30x400
20x300
122 x 244
122 x 244
15 x 200 cm
10 x200 cm
l = 90 cm
l = 90 cm
l = 60 cm
l = 45 cm
80 x 180 cm
80 x 180 cm
80 x 180 cm
80 x 300 cm
80 x 150 cm
80 x 180 cm
l = 60 cm
l = 90 cm
l = 92 cm.
( 4' x 8' )
90 x 210 cm
( 4' x 8' )
( 4' x 8' )
( 4' x 8' )
90 x 210 cm
( 4' x 8' )
( 4' x 8' )
( 4' x 8' )
( 4' x 8' )
( 4' x 8' )

lbr
lbr
lbr
m1
m1
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
btg
btg
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m1
m1
m1
m1
lbr
lbr
lbr
lbr
lbr
lbr
m1
m1
m1
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr

BAHAN BESI/LOGAM
Besi begel/baut
Besi beton polos
Besi beton ulir
Besi pipa air medium A (warna hijau)
Keni besi (elbouw)
Pipa besi galvanis medium A (tebal 2,4 mm)
Pipa besi galvanis medium A (tebal 3 mm)
Pipa besi galvanis medium A (tebal 3 mm)
Pipa besi galvanis medium A (tebal 3 mm)
Pipa besi galvanis medium A (tebal 3,3 mm)
Pipa besi galvanis medium A (tebal 3,3 mm)

1" - 6 m.
1,5"
1/2" - 6 m.
1" - 6 m.
1,25" - 6 m.
1,5" - 6 m.
2" - 6 m.
2,5" - 6 m.

kg
kg
kg
btg
bh
btg
btg
btg
btg
btg
btg

Lembar : 88

##
##
##
##
##
##
##
##
##
##
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
IV
##
##
##
##
##
##
##
##
##
#
#

12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
IV
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33

Pipa besi galvanis medium A (tebal 3,6 mm)


Pipa besi galvanis medium A (tebal 4 mm)
Pipa besi galvanis medium A (tebal 4,2 mm)
Besi plat 2 mm,
Besi plat aluminium tebal 2 mm
Besi plat bordes tebal 3 mm
Besi plat strip panjang tebal 3 mm
Besi profil WF <= 200 mm
Besi profil WF <= 200 s.d. 400 mm
Besi profil WF <= 200 s.d. 500 mm
Besi siku "Krakatau Stell"
Besi siku "Krakatau Stell"
Besi siku "Krakatau Stell"
Besi canal
Kawat harmonika
Kawat ikat beton (bendrat)
Kawat nyamuk kasa alumunium
Kawat ayakan pasir (utk pasang)
Kawat ayakan pasir (utk plesteran)
Kawat duri pagar
Kawat nyamuk kasa plastik
Kawat tali Bwg 10
Kawat wire mesh
Tiang pagar BRC/PMG
Pintu dorong BRC/PMG
Pintu swing ganda BRC/PMG
Pagar BRC/PMG A
Bondex
Pipa besi putih
Pipa gas/hitam medium A (tebal 2,4 mm)
Pipa gas/hitam medium A (tebal 3 mm)
Pipa gas/hitam medium A (tebal 3 mm)
Pipa gas/hitam medium A (tebal 3 mm)
Pipa gas/hitam medium A (tebal 3,3 mm)
Pipa gas/hitam medium A (tebal 3,6 mm)
Pipa gas/hitam medium A (tebal 4 mm)
Pipa gas/hitam medium A (tebal 4,2 mm)
Pipa gas/hitam medium A (tebal 4,2 mm)

3" - 6 m.
4" - 6 m.
5" - 6 m.
4' x 8'
4' x 8'
4' x 8'
(30x6000)mm
L.60.60.6
L.50.50.6
L.30.30.3
C 125,50,3
3,2 mm.
2", t=120
120 x 300 cm
120 x 300 cm
120 x 240 cm
1,5" - 6 m.
3/4" - 6 m.
1" - 6 m.
1,25" - 6 m.
1,5" - 6 m.
2" - 6 m.
3" - 6 m.
4" - 6 m.
5" - 6 m.
6" - 6 m.

btg
btg
btg
lbr
lbr
lbr
m1
kg
kg
kg
btg
btg
btg
ljr
m2
kg
m2
m2
m2
m1
m2
kg
kg
btg
unit
unit
unit
m2
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg

#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#

10 x 20
15 x 15
20 x 25
20 x 25
30 x 30
30 x 30
20 x 20
40 x 40
30 x 30
30 x 30
30 x 30
30 x 30
30 x 30
30 x 30
40 x 40
20 x 20
20 x 20
30 x 30
40 x 40
30 x 30
40 x 40
40 x 40
40 x 40
20 x 20
40 x 50
10 x 30
20 x 20
5 x 20
10 x 20
15 x 15
20 x 20
30 x 30
40 x 60

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
m2
bh
bh
m2
m2
m2
m2

V
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#

BAHAN LANTAI
Tegel keramik
Tegel keramik polos
Tegel keramik, Claudia
Tegel keramik, Asia
Tegel keramik, berserat
Tegel keramik putih, Asia
Tegel keramik, (kasar)
Tegel keramik, Super Milan
Tegel keramik, Austria Blue
Tegel keramik, Mulia
Tegel keramik, KIA
Tegel keramik, Arwana
Tegel keramik, Asia Tile
Tegel keramik, Classic
Tegel keramik, Essenza
Tegel keramik, Diamond
Tegel teraso
Tegel teraso
Tegel teraso
Tegel keramik, Granito
Tegel keramik, Granito
Tegel keramik Granite Black
Tegel keramik Granite Polish
Tegel galar
Tegel keramik, bermotif/warna
Tegel plint keramik warna
Tegel wafel
Ubin keramik artistik
Ubin keramik artistik
Ubin keramik artistik
Ubin keramik artistik
Lantai vinyl karet kw 1
Marmer ex. Tulungagung

Lembar : 89

34
35
36
37
38
39

List Keramik/Border
Keramik Granitile 60x60 Polish
Keramik Granitile 60x60 Unpolish
Stepnoiseng 10x40
Stepnoiseng 7x30
Granito ex Cina

10 x 20
60 x 60

bh
m2
m2
bh
bh
m2

#
#
#
#
#
#

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41

BAHAN PENGECATAN
Cat besi Emco tanda Bintang
Cat kayu Emco tanda Bintang
Meni besi/kayu, cap Pedang
Thinner A spesial "Altech"
Thinner A biasa "Power"
Thinner B spesial (merek apa?)
Minyak cat/afduner (merek apa?)
Cat tembok eksterior Mowilex
Cat tembok Alcabond
Cat tembok Alcaplast
Cat tembok Wallsealer
Cat tembok Vinylex
Cat tembok Decolith
Cat tembok Metrolith
Cat tembok Cathylac
Cat tembok Cendana
Cat genteng Matex
Serlak kripik "India"
Politur jadi merk "Impra"
Wood Filler "Impra"
Wood Stain 'Impra"
Sanding Sealer "Impra"
Vernis (Glotex)
Dempul Plitur (Impra)
Dempul Plitur kualitas sedang
Plitur batangan
Teer
Kertas gosok
Waterproof, Aquaproof Pro Seller
Waterproof, Multiroof
Waterproof, Nippon Paint Shield
Plamur tembok
Plamur kayu
Plamur besi
Spiritus
Lem Rajawali untuk kayu
Lem Rajawali untuk tembok
Lem kayu khusus (Vinyl)
Soda Api
Teak Oil
Residu

kg
kg
kg
ltr
ltr
ltr
ltr
ltr
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
ltr
ltr
ltr
ltr
ltr
kg
kg
kg
kg
lbr
kg
kg
kg
kg
kg
kg
ltr
kg
kg
kg
kg
ltr
ltr

VI
##
##
##
##
##
##
##
##
##
##
##
##
##
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#

Lembar : 90

42
43
44
45
46
47
VI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
VII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

Kuas Eterna
Kuas Eterna
Kuas Eterna
Kalsium
Coating
Wallpaper "Kansai"
BAHAN PENGGANTUNG DAN PENGUNCI
Engsel H "Stayer"
Engsel Kuningan arch asli "Elitech"
Engsel jendela (kupu - kupu) merek apa?
Engsel pintu "UNION"
Engsel jendela "UNION"
Espanyolet kualitas I
Grendel AEG "ELT"
Grendel biasa (besar) merek apa?
Grendel biasa (kecil) merek apa?
Grendel kuningan/krom kecil "Belucci"
Grendel tanam kuningan besar "Cavel"
Kunci gembok besar, Globe
Kunci gembok sedang, Globe
Kunci tanam (808)
Kunci tanam cap KUDA (2x putar) besar
Kunci tanam "SES" besar (tanpa handel)
Kunci tanam antik "Miller" (dengan handel)
Kunci tanam KM/WC "Miller"
Kunci silinder "SES"
Kunci slot merk "SES" (dengan handel)
Kunci slot 2 putaran "YALE" (dengan handel)
Kunci slot 2 putaran "CAVEL" (dengan handel)
Kunci lemari, Wing
Hak angin biasa (merek apa?)
Hak angin 4 mm (lurus) merek apa?
Hak angin (sikutan) "SES"
Hak angin lurus (bisa disetel maju/mundur) "SES"
Pegangan pintu (model standar) merek apa?
Spring knip "Picasso"
Door closer "Belucci"
Door stopper "Belucci"
Rel pintu dorong, biasa
Rel pintu dorong, J4 SES
BAHAN SANITASI
Slang spiral saluran kran wastafel
Kloset duduk porselin komplit (INA)
Kloset duduk porselin komplit (KIA)
Kloset duduk porselin komplit (TOTO)
Kloset jongkok porselin (INA)
Kloset jongkok porselin (TOTO)
Kloset jongkok teraso
Kran air stainless steel
Kran air stainless steel
Kran air (DUPONT)
Kran air kuningan
Kran shower "Toto"
Septic Tank ( 10 pemakai) dan Sumur
Peresapan (dalam 3,00 m)
Watermur besi
Wastafel warna muda "ITO"
Wastafel warna tua "ITO"
Rol TBA (seal tape) Jumbo
Siphon Washer, kelas sedang plastik
Water drain dan assesories
Bak mandi fiberglass
Bak cuci piring stainless steel, besar (double)
Bak cuci teraso
Tempat sabun keramik "Sotento"
Urinoir "INA" (komplit)
Floor drain stainless steel
Kurasan (putih) stainless steel
Bak mandi porselin
Tandon air fiberglass "Penyu"
Pompa tangan "Dragon"

3"
4"
5"
-

bh
bh
bh
kg
kg
m2

#
#
#
#
#
#

4"
4"
3"
4"
3"
8"
3"
4"
60 cm
40 mm
30 mm
8"
p = 20 cm
-

set
set
set
bh
bh
set
bh
bh
bh
bh
set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
set
set
set
set
bh
bh
bh
bh
btg
btg

VII
##
##
##
##
##
##
##
##
##
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#

1/2"
3/4"
1/2"
1/2"
3/4"
-

set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
set
bh

VIII
##
##
##
##
##
##
##
##
##
#
#
#
#

3/4"
0,5 m3
60 x 60 cm
550 ltr
-

bh
bh
bh
rol
set
set
bh
bh
bh
bh
set
bh
bh
bh
bh
bh

#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#

Lembar : 91

30
31
32
33
VIII
1
2
3
4
5
6
7
8

Hand shower plastik (termasuk slang)


Wall shower "Toto"
Pompa air "Shimizu 125 W"
Pompa air "Sanyo 125 W"
BAHAN JENIS KACA
Kaca polos
Kaca polos
Kaca rayban
Kaca es/buram
Krapyak kaca nako 15 x 70 cm (includ kerangka)
Kaca buram
Kaca cermin
Profil kaca

set
set
bh
bh

#
#
#
#

t = 5 mm
t = 8 mm
t = 5 mm
t = 5 mm
t = 5 mm
t = 3 mm
t = 3 mm
t = 5 mm

m2
m2
m2
m2
daun
m2
m2
m2

IX
##
##
##
##
##
##
##
##

Lembar : 92

IX
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

BAHAN PIPA PVC


Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW
Pipa PVC tipe AW
Pipa PVC tipe AW
Pipa PVC tipe AW
Pipa PVC "Maspion" tipe D
Pipa PVC "Maspion" tipe D
Pipa PVC "Maspion" tipe D
Pipa PVC "Maspion" tipe D
Lem PVC "Wavin"
Keni PVC tipe AW
Keni PVC tipe AW
Keni PVC tipe AW
Keni PVC tipe AW
Keni PVC tipe AW
Keni PVC tipe AW
Klem PVC
Talang PVC U "Maspion"
Talang PVC U
Clam Talang PVC U
Shock Talang PVC U
Tutup Talang PVC U
Corong Talang PVC U

1
2
3
4
5
6
7
8
9
10
11

BAHAN JENIS PAKU


Paku asbes gelombang (paku pancing)
Paku kayu
Paku kayu
Paku kayu
Paku kayu
Paku payung (paku seng gelombang)
Paku sekrup
Paku sumbat
Paku triplek/eternit
Paku beton
Paku kalsiboard

XI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

BAHAN PERALATAN LISTRIK


Fiting plafon
T doos PVC
Isolator kecil
Stop kontak (Broco)
Skakelar tunggal (Broco)
Skakelar ganda (Broco)
Stop kontak dan skakelar (Broco)
Skakelar/hendel pemindah arus
Zekring lengkap dengan box
Las doof
Panel box
Meinswitch
Zekring MCB thermis 10 - 16 Amp.
Zekring MCB thermis 10 Amp.
Stater lampu TL
Lampu pijar 25,40,75 / 220 V "Philips"
Bola lampu Armateur "Philips"
Lampu hemat energi 18 W / 220 V (Philips)
Lampu hemat energi 18 W / 220 V (Osram)
Lampu TL 20 W / 220 V, komplit balast
(Philips)
Lampu TL 40 W / 220 V, komplit balast
(Philips)
Kabel NYM. 2 x 2,5
Kabel NYY. 1 x 2,5
Kabel twisted Indonesia
Kabel twisted multi kabel
UPS 3,5 Kw
UPS 6,0 Kw
Exhaustfan 8''
Genzet 250 Kva Cartepillar

1/2" - 400
5/8" - 400
3/4" - 400
1" - 400
2" - 400
3" - 400
4" - 400
5" - 400
2" - 400
3" - 400
4" - 400
5" - 400
1/2"
3/4"
2"
3"
4"
5"
400 cm
400 cm
400 cm
400 cm
400 cm
400 cm

btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
tube
bh
bh
bh
bh
bh
bh
bh
btg
btg
bh
bh
bh
bh

XI
##
##
##
##
##
##
##
##
##
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#

1"
1,5" - 2"
2,5" - 3"
4"
1"
5 cm
-

bh
kg
kg
kg
kg
kg
dos
dos
kg
bh
kg

XII
##
##
##
##
##
##
##
##
##
#
#

250 watt
-

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

XIII
##
##
##
##
##
##
##
##
##
##
##
#
#
#
#
#
#
#
#
#

bh

3 x 70 x 5 mm2
-

m1
m1
m1
m1
bh
bh
bh
unit

#
#
#
#
#
#
#
#

Lembar : 93

30 Instalasi Listrik
31 Penangkal Petir Lengkap (2 Spit), tinggi 10 m
(Tidak termasuk izin dari Depnaker)
XII
BAHAN BBM DAN ALAT BERAT
1 Bensin
2 Solar
3 Minyak tanah non subsidi
4 Oli mesin Mesran
5 Minyak pelumas
6 Grease (gemuk pelumas)
7 Aspal panas curah
8 Aspal panas drum
9 Biaya operasional wheel loader 115 H
10 Biaya operasional AMP 30T/h
11 Biaya operasional dump truck 5 T/145 Hp
12 Biaya operasional dump truck 3,5 T/115 Hp
13 Biaya operasional asphalt finisher (penghampar)
14 Biaya operasional pneumetic roller 8-15 T
15 Biaya operasional asphalt sprayer towed 1000 L
16 Biaya operasional tandem roller 6-10 T
17 Biaya operasional roller 3 wheeled 6-8 T/ 8-10 T
18 Biaya operasional genset
19 Biaya operasional alat bantu
20 Biaya operasional bulldozer
21 Biaya operasional stone crusher
22 Biaya operasional compressor air 210 m3
23 Biaya operasional mesin gilas (wales)
24 Biaya operasional mesin gilas (wales)
25 Biaya operasional motor grader
26 Biaya operasional vibro roller
27 Biaya operasional water tanker
28 Biaya operasional coldmiliing
29 Teakcoat
29 Biaya operasional excavator
30 Biaya alat bantu

titik
unit

ltr
ltr
ltr
ltr
ltr
kg
kg
kg
jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
hari
hari
hari
hari
hari
hari
hari
hari
hari
hari

#
#
XV

E.052
E.155
E.212
E.221
E.084
E.153
E.081
E.080
E.301
E.080
-

Blitar, .........................
Dibuat oleh :
(.........................)

Lembar : 94

DAFTAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA


PEMERINTAH KOTA BLITAR
Triwulan IV Tahun Anggaran 2011

NAMA TOKO KAYU : ...................................


ALAMAT TOKO : ...................................

A. DAFTAR HARGA SATUAN BAHAN BANGUNAN

NO.

JENIS BAHAN

UKURAN

SAT.

TRIWULAN IV

I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

BAHAN KUZEN KAYU DAN KERANGKA


ATAP
Kayu jati balok kualitas II,
Ex. Bojonegoro (mutu kayu klas I)
Kayu jati usuk kualitas II,
Ex. Bojonegoro (mutu kayu klas I)
Kayu jati papan kualitas II,
Ex. Bojonegoro (mutu kayu klas I)
Kayu jati reng kualitas II,
Ex. Bojonegoro (mutu kayu klas I)
Kayu jati balok kualitas I, lokal
(mutu kayu klas I)
Kayu jati usuk kualitas I, lokal
(mutu kayu klas I)
Kayu jati papan kualitas I, lokal
(mutu kayu klas I)
Kayu jati reng kualitas I, lokal
(mutu kayu klas I)
Kayu kamper, balok (mutu kayu klas II)
Kayu kamper, papan (mutu kayu klas II)
Kayu kamper, usuk (mutu kayu klas II)
Kayu kamper, reng (mutu kayu klas II)
Kayu meranti, balok (mutu kayu klas III)
Kayu meranti, papan (mutu kayu klas III)
Kayu meranti, usuk (mutu kayu klas III)
Kayu meranti, reng (mutu kayu klas III)
Kayu bekisting, papan (mutu kayu klas IV)
Kayu bekisting, usuk (mutu kayu klas IV)
Kayu tahun, papan (mutu kayu klas IV)
Kayu tahun, usuk (mutu kayu klas IV)
Kayu gelam (mutu kayu klas IV)
Kayu kruing, balok (mutu kayu klas III)
Kayu kruing, papan (mutu kayu klas III)
Kayu kruing, usuk (mutu kayu klas III)
Kayu kruing, reng (mutu kayu klas III)
Kayu balau, balok (mutu kayu klas II)
Kayu balau, papan (mutu kayu klas II)
Kayu balau, usuk (mutu kayu klas II)
Kayu balau, reng (mutu kayu klas II)
Kayu Albasiah (mutu kayu klas IV)
List kayu tahun
List kayu profil
List kayu profil
Bambu Jawa bongkotan
Bambu ori
Bambu apus
Gedek guling
Daun pintu kayu Balau, kw 1
Daun pintu kayu Jati, kw 1

II
6/12, 6/15, 8/12

m3

##

4/6, 5/7

m3

##

2/20, 3/20, 3/25

m3

##

2/3, 3/5

m3

##

6/12, 6/15, 8/12

m3

##

4/6, 5/7

m3

##

2/20, 3/20, 3/25

m3

##

2/3, 3/5

m3

##

6/12, 6/15, 8/12


2/20, 3/20, 3/25
4/6, 5/7
2/3, 3/5
6/12, 6/15, 8/12
2/20, 3/20, 3/25
3/5,4/6,5/7
2/3, 3/5
3/20-200
4/6-200
2/20, 3/20, 3/25
3/5, 4/6, 5/7
10-12 x 300 cm
6/12, 6/15, 8/12
2/20, 3/20, 3/25
4/6, 5/7
2/3
6/12, 6/15, 8/12
2/20, 3/20, 3/25
3/5, 4/6, 5/7
2/3
1/4
4/4
5/5
10-12 x 300cm
10-12 x 600cm
6-10 x 600cm
3,5 x 90 x 210 cm
3,5 x 90 x 210 cm

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
btg
m3
m3
m3
m3
m3
m3
m3
m3
m3
m1
m1
m1
btg
btg
btg
m2
lbr
lbr

##
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#

Blitar, .........................
Dibuat oleh :

Lembar : 95

(.........................)

Lembar : 96

DAFTAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA


PEMERINTAH KOTA BLITAR
Triwulan IV Tahun Anggaran 2011

NAMA TOKO ALUMINIUM : ...................................


ALAMAT TOKO : ...................................

A. DAFTAR HARGA SATUAN BAHAN BANGUNAN

NO.

JENIS BAHAN

UKURAN

SAT.

TRIWULAN IV

?
?

m1
m1

70 x 200 cm
70 x 210 cm
(80-90) cm x 600 cm
2"
0,8 mm
0,6 mm
4 / 12
5 / 10
4 / 12
5 / 10
250 mm
-

lbr
lbr
m1
m1
m2
bh
lbr
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
tube

BAHAN PENUTUP ATAP DAN PLAFON


1 Alumunium Coklat Merk YYK
2 Alumunium Silver Merk YYK

II
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

BAHAN BESI/LOGAM
Pintu Alumunium (kualitas II)
Pintu PVC (kualitas baik)
Profil Alumunium
Slimar alumunium
Sunscreen Alumunium
Ramset/Dina Bolt
Pagar kawat jaring
Pagar besi ulir komplit dg mainan
Pintu pagar besi ulir komplit dg mainan
Pintu rolling door
Pintu plat harmonika
Atap twin lite rangka pipa stainless steel
Atap twin lite rangka pipa besi
Teralis besi
Teralis aluminium
Railling stainless steel
Usuk Galvalum
Reng Galvalum
Kusen Pintu Aluminium Silver "HC"
Kusen Pintu Aluminium Coklat "YKK"
Kusen Jendela Aluminium Silver "HC"
Kusen Jendela Aluminium Coklat "YKK"
Waterstop "Maspion"
Sealent

Blitar, .........................
Dibuat oleh :
(.........................)

Lembar : 97

III
###
###
IV
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#

DAFTAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA


PEMERINTAH KOTA BLITAR
Triwulan IV Tahun Anggaran 2011

NAMA TOKO MATERIAL : ...................................


ALAMAT TOKO : ...................................

A. DAFTAR HARGA SATUAN BAHAN BANGUNAN

NO.

JENIS BAHAN

UKURAN

SAT.

TRIWULAN IV

I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46

BAHAN PASANGAN DAN CAMPURAN


BETON
Batu kali belah
Batu kali pecah
Batu kali pecah
Batu kali pecah
Batu kali pecah
Batu kali pecah Crusser
Batu kali pecah Crusser
Batu kali pecah Crusser
Batu krikil (ayakan)
Krikil sungai
Krikil ayak tanpa pasir
Krikil batu alor (ampyang)
Pasir beton/cor
Pasir pasang
Pasir urug
Agregat Kasar
Agregat Halus
Filler
Sirtu
Tanah urug biasa
Tanah urug pilihan (campur pupuk utk taman)
Tanah katelan jalan
Gebalan rumput
Batako
Batu merah klas I
Batu merah klas II
Batu lempeng (tidak beraturan)
Batu hias (sand stone)
Roster beton
Roster beton
Roster batu alam
Roster batu alam
Batu tempel hijau
Tiang teras batu alam
Tiang teras batu alam
List batu hias
Kapur padam
Gamping
Semen merah
Semen Gresik (PC Gresik)
Semen Gresik (PC Gresik)
Semen Tiga Roda
Semen Tiga Roda
Semen Holcim
Semen putih
PC super nut

I
15/20
5/7
4/6
3/5
2/3
1/2
1/1
0,5/1
2/3
(40x20x10) cm
10 x 20
20 x 20
10 x 30
20 x 20
30 x 30
10 x 20
22cm, t=3 m
28cm, t=3 m
p = 40 cm
50 kg
40 kg
50 kg
40 kg
50 kg
40 kg
-

Lembar : 98

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
kg
m3
m3
m3
m3
m3
kg
m3
m3
m3
m3
m2
bh
bh
bh
m2
m2
bh
bh
bh
bh
m2
bh
bh
bh
m3
ton
m3
zak
zak
zak
zak
zak
zak
kg

##
##
##
##
##
##
##
##
##
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#

47 I j u k
48 Glass block bening
49 Glass block buram
II
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

BAHAN LANTAI
Paving stone per segi abu-abu, cetak kering
Paving stone per segi abu-abu, cetak basah
Paving stone 3 berlian abu-abu, cetak kering
Paving stone 3 berlian merah, cetak basah
Paving stone segi 6 abu-abu, cetak kering
Paving stone segi 6 merah, cetak basah
Paving stone persegi merah
Paving stone per segi abu-abu, cetak basah
Paving stone per segi abu-abu, cetak kering
Paving stone 3 berlian abu-abu
Paving stone 3 berlian merah
Paving stone segi 6 abu-abu
Paving stone segi 6 merah
Paving stone abu-abu, cetak basah K-300
Paving stone abu-abu, cetak basah K-400
Tegel PC Abu-abu
Tegel PC Abu-abu
Tegel PC Abu-abu
Ubin warna
Ubin warna
Ubin warna

III
1
2
3
4
5
6
7
8
9
10
11
12
13
14

BAHAN BETON CETAKAN


Roster klingker warna merah
Buis beton (p = 100 cm)
Buis beton (p = 100 cm)
Buis beton (p = 100 cm)
Buis beton (p = 100 cm)
Buis beton (p = 50 cm)
Buis beton (p = 50 cm)
Buis beton (p = 50 cm)
Buis beton (p = 50 cm)
Buis Beton U (p = 100 cm)
Buis Beton U (p = 100 cm)
Buis Beton U (p = 100 cm)
Got talang R 15 (segmen)
Got talang R 25 (segmen)

20 x 20
20 x 20

kg
bh
bh

#
#
#

t = 6 cm
t = 6 cm
t = 6 cm
t = 6 cm
t = 6 cm
t = 6cm
t = 6 cm
t = 8 cm
t = 8 cm
t = 8 cm
t = 8 cm
t = 8 cm
t = 8 cm
10x20x8
10x20x8
20 x 20
20 x 30
30 x 30
20 x 20
30 x 30
40 x 40

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

V
##
##
##
##
##
##
##
##
##
#
#
#
#
#
#
#
#
#
#
#
#

10 x 20 cm
15 cm
20 cm
30 cm
40 cm
50 cm
60 cm
80 cm
100 cm
15 cm
20 cm
30 cm
-

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

X
##
##
##
##
##
##
##
##
##
#
#
#
#
#

Blitar, .........................
Dibuat oleh :

(.........................)

Lembar : 99

DAFTAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA


PEMERINTAH KOTA BLITAR
Triwulan IV Tahun Anggaran 2011

NAMA TOKO KERAMIK : ...................................


ALAMAT TOKO : ...................................

A. DAFTAR HARGA SATUAN BAHAN BANGUNAN

NO.

JENIS BAHAN

UKURAN

SAT.

TRIWULAN IV

bh
bh
bh
bh
bh
bh

III
###
###
###
###
###
###

10 x 20
15 x 15
20 x 25
20 x 25
30 x 30
30 x 30
20 x 20
40 x 40
30 x 30
30 x 30
30 x 30
30 x 30
30 x 30
30 x 30
40 x 40
20 x 20
20 x 20
30 x 30
40 x 40
30 x 30
40 x 40
40 x 40
40 x 40
20 x 20
40 x 50
10 x 30
20 x 20
5 x 20
10 x 20
15 x 15
20 x 20
30 x 30
40 x 60
10 x 20
60 x 60

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
m2
bh
bh
m2
m2
m2
m2
bh
m2
m2
bh
bh
m2

V
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#

I
1
2
3
4
5
6
II
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

BAHAN PENUTUP ATAP DAN PLAFON


Genteng Kanmuri Glasur
Genteng Kanmuri bubung Glasur
Genteng KIA Glasur
Genteng KIA bubung Glasur
Genteng Impresso Glasur
Genteng bubung Impresso Glasur
BAHAN LANTAI
Tegel keramik
Tegel keramik polos
Tegel keramik, Claudia
Tegel keramik, Asia
Tegel keramik, berserat
Tegel keramik putih, Asia
Tegel keramik, (kasar)
Tegel keramik, Super Milan
Tegel keramik, Austria Blue
Tegel keramik, Mulia
Tegel keramik, KIA
Tegel keramik, Arwana
Tegel keramik, Asia Tile
Tegel keramik, Classic
Tegel keramik, Essenza
Tegel keramik, Diamond
Tegel teraso
Tegel teraso
Tegel teraso
Tegel keramik, Granito
Tegel keramik, Granito
Tegel keramik Granite Black
Tegel keramik Granite Polish
Tegel galar
Tegel keramik, bermotif/warna
Tegel plint keramik warna
Tegel wafel
Ubin keramik artistik
Ubin keramik artistik
Ubin keramik artistik
Ubin keramik artistik
Lantai vinyl karet kw 1
Marmer ex. Tulungagung
List Keramik/Border
Keramik Granitile 60x60 Polish
Keramik Granitile 60x60 Unpolish
Stepnoiseng 10x40
Stepnoiseng 7x30
Granito ex Cina

Lembar : 100

III
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
IV
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
V

BAHAN PENGGANTUNG DAN PENGUNCI


Engsel H "Stayer"
Engsel Kuningan arch asli "Elitech"
Engsel jendela (kupu - kupu) merek apa?
Engsel pintu "UNION"
Engsel jendela "UNION"
Espanyolet kualitas I
Grendel AEG "ELT"
Grendel biasa (besar) merek apa?
Grendel biasa (kecil) merek apa?
Grendel kuningan/krom kecil "Belucci"
Grendel tanam kuningan besar "Cavel"
Kunci gembok besar, Globe
Kunci gembok sedang, Globe
Kunci tanam (808)
Kunci tanam cap KUDA (2x putar) besar
Kunci tanam "SES" besar (tanpa handel)
Kunci tanam antik "Miller" (dengan handel)
Kunci tanam KM/WC "Miller"
Kunci silinder "SES"
Kunci slot merk "SES" (dengan handel)
Kunci slot 2 putaran "YALE" (dengan handel)
Kunci slot 2 putaran "CAVEL" (dengan handel)
Kunci lemari, Wing
Hak angin biasa (merek apa?)
Hak angin 4 mm (lurus) merek apa?
Hak angin (sikutan) "SES"
Hak angin lurus (bisa disetel maju/mundur) "SES"
Pegangan pintu (model standar) merek apa?
Spring knip "Picasso"
Door closer "Belucci"
Door stopper "Belucci"
Rel pintu dorong, biasa
Rel pintu dorong, J4 SES
BAHAN SANITASI
Slang spiral saluran kran wastafel
Kloset duduk porselin komplit (INA)
Kloset duduk porselin komplit (KIA)
Kloset duduk porselin komplit (TOTO)
Kloset jongkok porselin (INA)
Kloset jongkok porselin (TOTO)
Kloset jongkok teraso
Kran air stainless steel
Kran air stainless steel
Kran air (DUPONT)
Kran air kuningan
Kran shower "Toto"
Septic Tank ( 10 pemakai) dan Sumur
Peresapan (dalam 3,00 m)
Watermur besi
Wastafel warna muda "ITO"
Wastafel warna tua "ITO"
Rol TBA (seal tape) Jumbo
Siphon Washer, kelas sedang plastik
Water drain dan assesories
Bak mandi fiberglass
Bak cuci piring stainless steel, besar (double)
Bak cuci teraso
Tempat sabun keramik "Sotento"
Urinoir "INA" (komplit)
Floor drain stainless steel
Kurasan (putih) stainless steel
Bak mandi porselin
Tandon air fiberglass "Penyu"
Pompa tangan "Dragon"
Hand shower plastik (termasuk slang)
Wall shower "Toto"
Pompa air "Shimizu 125 W"
Pompa air "Sanyo 125 W"

4"
4"
3"
4"
3"
8"
3"
4"
60 cm
40 mm
30 mm
8"
p = 20 cm
-

set
set
set
bh
bh
set
bh
bh
bh
bh
set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
set
set
set
set
bh
bh
bh
bh
btg
btg

VII
##
##
##
##
##
##
##
##
##
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#

1/2"
3/4"
1/2"
1/2"
3/4"
-

set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
set
bh

VIII
##
##
##
##
##
##
##
##
##
#
#
#
#

3/4"
0,5 m3
60 x 60 cm
550 ltr
-

bh
bh
bh
rol
set
set
bh
bh
bh
bh
set
bh
bh
bh
bh
bh
set
set
bh
bh

#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#

BAHAN JENIS KACA

IX

Lembar : 101

1
2
3
4
5
6
7
8

Kaca polos
Kaca polos
Kaca rayban
Kaca es/buram
Krapyak kaca nako 15 x 70 cm (includ kerangka)
Kaca buram
Kaca cermin
Profil kaca

t = 3 mm
t = 5 mm
t = 5 mm
t = 5 mm
t = 5 mm
t = 3 mm
t = 3 mm
t = 5 mm

m2
m2
m2
m2
daun
m2
m2
m2
Blitar, .........................
Dibuat oleh :

(.........................)

Lembar : 102

##
##
##
##
##
##
##
##

DAFTAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA


PEMERINTAH KOTA BLITAR
Triwulan IV Tahun Anggaran 2011

NAMA ASOSIASI :
ALAMAT
:

: .............................................................
: .............................................................

A. DAFTAR HARGA SATUAN BAHAN BANGUNAN


NO.

JENIS BAHAN

UKURAN

HARGA SURVEI

SAT.
Triwulan IV

I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45

BAHAN PASANGAN DAN CAMPURAN


BETON
Batu kali belah
Batu kali pecah
Batu kali pecah
Batu kali pecah
Batu kali pecah
Batu kali pecah Crusser
Batu kali pecah Crusser
Batu kali pecah Crusser
Batu krikil (ayakan)
Krikil sungai
Krikil ayak tanpa pasir
Krikil batu alor (ampyang)
Pasir beton/cor
Pasir pasang
Pasir urug
Agregat Kasar
Agregat Halus
Filler
Sirtu
Tanah urug biasa
Tanah urug pilihan (campur pupuk utk taman)
Tanah katelan jalan
Gebalan rumput
Batako
Batu merah klas I
Batu merah klas II
Batu lempeng (tidak beraturan)
Batu hias (sand stone)
Roster beton
Roster beton
Roster batu alam
Roster batu alam
Batu tempel hijau
Tiang teras batu alam
Tiang teras batu alam
List batu hias
Kapur padam
Gamping
Semen merah
Semen Gresik (PC Gresik)
Semen Gresik (PC Gresik)
Semen Tiga Roda
Semen Tiga Roda
Semen Holcim
Semen putih

15/20
5/7
4/6
3/5
2/3
1/2
1/1
0,5/1
2/3
(40x20x10) cm
10 x 20
20 x 20
10 x 30
20 x 20
30 x 30
10 x 20
22cm, t=3 m
28cm, t=3 m
p = 40 cm
50 kg
40 kg
50 kg
40 kg
50 kg
40 kg

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
kg
m3
m3
m3
m3
m3
kg
m3
m3
m3
m3
m2
bh
bh
bh
m2
m2
bh
bh
bh
bh
m2
bh
bh
bh
m3
ton
m3
zak
zak
zak
zak
zak
zak

Lembar : 103

(Rp.)

2
46
47
48
49

PC super nut
Ijuk
Glass block bening
Glass block buram

20 x 20
20 x 20

kg
kg
bh
bh

Lembar : 104

II
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
III
1
2
3
4
5
6
7
8
9
10
11
12
13

BAHAN KUZEN KAYU DAN KERANGKA


ATAP
Kayu jati balok kualitas II,
Ex. Bojonegoro (mutu kayu klas I)
Kayu jati usuk kualitas II,
Ex. Bojonegoro (mutu kayu klas I)
Kayu jati papan kualitas II,
Ex. Bojonegoro (mutu kayu klas I)
Kayu jati reng kualitas II,
Ex. Bojonegoro (mutu kayu klas I)
Kayu jati balok kualitas I, lokal
(mutu kayu klas I)
Kayu jati usuk kualitas I, lokal
(mutu kayu klas I)
Kayu jati papan kualitas I, lokal
(mutu kayu klas I)
Kayu jati reng kualitas I, lokal
(mutu kayu klas I)
Kayu kamper, balok (mutu kayu klas II)
Kayu kamper, papan (mutu kayu klas II)
Kayu kamper, usuk (mutu kayu klas II)
Kayu kamper, reng (mutu kayu klas II)
Kayu meranti, balok (mutu kayu klas III)
Kayu meranti, papan (mutu kayu klas III)
Kayu meranti, usuk (mutu kayu klas III)
Kayu meranti, reng (mutu kayu klas III)
Kayu bekisting, papan (mutu kayu klas IV)
Kayu bekisting, usuk (mutu kayu klas IV)
Kayu tahun, papan (mutu kayu klas IV)
Kayu tahun, usuk (mutu kayu klas IV)
Kayu gelam (mutu kayu klas IV)
Kayu kruing, balok (mutu kayu klas III)
Kayu kruing, papan (mutu kayu klas III)
Kayu kruing, usuk (mutu kayu klas III)
Kayu kruing, reng (mutu kayu klas III)
Kayu balau, balok (mutu kayu klas II)
Kayu balau, papan (mutu kayu klas II)
Kayu balau, usuk (mutu kayu klas II)
Kayu balau, reng (mutu kayu klas II)
Kayu Albasiah (mutu kayu klas IV)
List kayu tahun
List kayu profil
List kayu profil
Bambu Jawa bongkotan
Bambu ori
Bambu apus
Gedek guling
BAHAN PENUTUP ATAP DAN PLAFON
Asbes gelombang besar tebal 5 mm
Asbes gelombang kecil tebal 4 mm
Asbes gelombang kecil tebal 4 mm
Asbes gelombang kecil tebal 4 mm
Asbes bubung gelombang besar tebal 5 mm
Asbes bubung gelombang kecil tebal 4 mm
Harflek tebal 4 mm
Harflek tebal 4 mm
Harflek tebal 4 mm
Woodplek tebal 9 mm
Woodplek tebal 9mm
Eternit (lokal)
Eternit (kerang)

6/12, 6/15, 8/12

m3

4/6, 5/7

m3

2/20, 3/20, 3/25

m3

2/3, 3/5

m3

6/12, 6/15, 8/12

m3

4/6, 5/7

m3

2/20, 3/20, 3/25

m3

2/3, 3/5

m3

6/12, 6/15, 8/12


2/20, 3/20, 3/25
4/6, 5/7
2/3, 3/5
6/12, 6/15, 8/12
2/20, 3/20, 3/25
3/5,4/6,5/7
2/3, 3/5
3/20-200
4/6-200
2/20, 3/20, 3/25
3/5, 4/6, 5/7
10-12 x 300 cm
6/12, 6/15, 8/12
2/20, 3/20, 3/25
4/6, 5/7
2/3
6/12, 6/15, 8/12
2/20, 3/20, 3/25
3/5, 4/6, 5/7
2/3
1/4
4/4
5/5
10-12 x 300cm
10-12 x 600cm
6-10 x 600cm
-

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
btg
m3
m3
m3
m3
m3
m3
m3
m3
m3
m1
m1
m1
btg
btg
btg
m2

1,05 X 3,00
1,05 X 3,00
1,05 X 1,50
1,05 X 1,80
40 x 200 cm
50 x 200 cm
60 x 200 cm
30x400
20x300
-

lbr
lbr
lbr
lbr
m1
m1
lbr
lbr
lbr
lbr
lbr
lbr
lbr

Lembar : 105

2
14
15
16
17
18
19
20
21
22
23

Eternit (Gresik)
Gypsum tebal 9 mm
Gypsum tebal 12 mm
List Gypsum
List Gypsum
Genteng flam press Jawa/lokal
Genteng kaca (model Karang Pilang)
Genteng Karang Pilang/Wisma
Genteng bubung Karang Pilang/Wisma
Genteng bubung Jawa/lokal

122 x 244
122 x 244
15 x 200 cm
10 x200 cm
-

lbr
lbr
lbr
btg
btg
bh
bh
bh
bh
bh

Lembar : 106

2
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63

IV
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Genteng Bambe
Genteng bubungan Bambe
Genteng prentul ex.Trenggalek
Genteng bubung prentul ex. Trenggalek
Genteng Mantili ex Trenggalek
Genteng bubung Mantili ex Trenggalek
Genteng Beton
Genteng bubung Beton
Genteng Kanmuri Glasur
Genteng Kanmuri bubung Glasur
Genteng KIA Glasur
Genteng KIA bubung Glasur
Genteng Impresso Glasur
Genteng bubung Impresso Glasur
Seng Talang BJLS 30
Seng Talang BJLS 27
Seng Talang BJLS 27
Seng Talang BJLS 30
Seng Datar BJLS 30
Seng Gelombang BJLS 40
Seng Gelombang BJLS 30
Seng Gelombang BJLS 30
Seng Gelombang BJLS 30
Seng Datar BJLS 27
Karet Talang
Karet Talang
Fiber glass "Kano Flash"
Teakwood tebal 3 mm
Teakwood tebal 3 mm
Tripleks tebal 9 mm
Tripleks tebal 3 mm
Plywood tebal 6 mm
Plywood tebal 4 mm
Plywood tebal 4 mm
Plywood tebal 2 mm
Multiplek 12 mm
Formica
Alumunium Coklat Merk YYK
Alumunium Silver Merk YYK
Kalsiboard tebal 4 mm
BAHAN BESI/LOGAM
Besi begel/baut
Besi beton polos
Besi beton ulir
Besi pipa air medium A (warna hijau)
Keni besi (elbouw)
Pipa besi galvanis medium A (tebal 2,4 mm)
Pipa besi galvanis medium A (tebal 3 mm)
Pipa besi galvanis medium A (tebal 3 mm)
Pipa besi galvanis medium A (tebal 3 mm)
Pipa besi galvanis medium A (tebal 3,3 mm)
Pipa besi galvanis medium A (tebal 3,3 mm)
Pipa besi galvanis medium A (tebal 3,6 mm)
Pipa besi galvanis medium A (tebal 4 mm)
Pipa besi galvanis medium A (tebal 4,2 mm)
Besi plat 2 mm,
Besi plat aluminium tebal 2 mm
Besi plat bordes tebal 3 mm
Besi plat strip panjang tebal 3 mm
Besi profil WF <= 200 mm
Besi profil WF <= 200 s.d. 400 mm

l = 90 cm
l = 90 cm
l = 60 cm
l = 45 cm
80 x 180 cm
80 x 180 cm
80 x 180 cm
80 x 300 cm
80 x 150 cm
80 x 180 cm
l = 60 cm
l = 90 cm
l = 92 cm.
( 4' x 8' )
90 x 210 cm
( 4' x 8' )
( 4' x 8' )
( 4' x 8' )
90 x 210 cm
( 4' x 8' )
( 4' x 8' )
( 4' x 8' )
( 4' x 8' )
?
?
( 4' x 8' )

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m1
m1
m1
m1
lbr
lbr
lbr
lbr
lbr
lbr
m1
m1
m1
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m1
m1
lbr

1" - 6 m.
1,5"
1/2" - 6 m.
1" - 6 m.
1,25" - 6 m.
1,5" - 6 m.
2" - 6 m.
2,5" - 6 m.
3" - 6 m.
4" - 6 m.
5" - 6 m.
4' x 8'
4' x 8'
4' x 8'
(30x6000)mm
-

kg
kg
kg
btg
bh
btg
btg
btg
btg
btg
btg
btg
btg
btg
lbr
lbr
lbr
m1
kg
kg

Lembar : 107

2
21
22
23
24
25
26
27
28
29
30
31

Besi profil WF <= 200 s.d. 500 mm


Besi siku "Krakatau Stell"
Besi siku "Krakatau Stell"
Besi siku "Krakatau Stell"
Besi canal
Kawat harmonika
Kawat ikat beton (bendrat)
Kawat nyamuk kasa alumunium
Kawat ayakan pasir (utk pasang)
Kawat ayakan pasir (utk plesteran)
Kawat duri pagar

L.60.60.6
L.50.50.6
L.30.30.3
C 125,50,3
-

kg
btg
btg
btg
ljr
m2
kg
m2
m2
m2
m1

Lembar : 108

2
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73

Kawat nyamuk kasa plastik


Kawat tali Bwg 10
Kawat wire mesh
Tiang pagar BRC/PMG
Pintu dorong BRC/PMG
Pintu swing ganda BRC/PMG
Pagar BRC/PMG A
Bondex
Pipa besi putih
Pipa gas/hitam medium A (tebal 2,4 mm)
Pipa gas/hitam medium A (tebal 3 mm)
Pipa gas/hitam medium A (tebal 3 mm)
Pipa gas/hitam medium A (tebal 3 mm)
Pipa gas/hitam medium A (tebal 3,3 mm)
Pipa gas/hitam medium A (tebal 3,6 mm)
Pipa gas/hitam medium A (tebal 4 mm)
Pipa gas/hitam medium A (tebal 4,2 mm)
Pipa gas/hitam medium A (tebal 4,2 mm)
Pintu Alumunium (kualitas II)
Pintu PVC (kualitas baik)
Profil Alumunium
Slimar alumunium
Sunscreen Alumunium
Ramset/Dina Bolt
Pagar kawat jaring
Pagar besi ulir komplit dg mainan
Pintu pagar besi ulir komplit dg mainan
Pintu rolling door
Pintu plat harmonika
Atap twin lite rangka pipa stainless steel
Atap twin lite rangka pipa besi
Teralis besi
Teralis aluminium
Railling stainless steel
Usuk Galvalum
Reng Galvalum
Kusen Pintu Aluminium Silver "HC"
Kusen Pintu Aluminium Coklat "YKK"
Kusen Jendela Aluminium Silver "HC"
Kusen Jendela Aluminium Coklat "YKK"
Waterstop "Maspion"
Sealent

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

BAHAN LANTAI
Paving stone per segi abu-abu, cetak kering
Paving stone per segi abu-abu, cetak basah
Paving stone 3 berlian abu-abu, cetak kering
Paving stone 3 berlian merah, cetak basah
Paving stone segi 6 abu-abu, cetak kering
Paving stone segi 6 merah, cetak basah
Paving stone persegi merah
Paving stone per segi abu-abu, cetak basah
Paving stone per segi abu-abu, cetak kering
Paving stone 3 berlian abu-abu
Paving stone 3 berlian merah
Paving stone segi 6 abu-abu
Paving stone segi 6 merah
Paving stone abu-abu, cetak basah K-300
Paving stone abu-abu, cetak basah K-400
Tegel PC Abu-abu
Tegel PC Abu-abu
Tegel PC Abu-abu

3,2 mm.
2", t=120
120 x 300 cm
120 x 300 cm
120 x 240 cm
1,5" - 6 m.
3/4" - 6 m.
1" - 6 m.
1,25" - 6 m.
1,5" - 6 m.
2" - 6 m.
3" - 6 m.
4" - 6 m.
5" - 6 m.
6" - 6 m.
70 x 200 cm
70 x 210 cm
2"
0,8 mm
0,6 mm
4 / 12
5 / 10
4 / 12
5 / 10
250 mm
-

m2
kg
kg
btg
unit
unit
unit
m2
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
lbr
lbr
m1
m1
m2
bh
lbr
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
m1
m1
m1
m1
m1
m1
tube

t = 6 cm
t = 6 cm
t = 6 cm
t = 6 cm
t = 6 cm
t = 6 cm
t = 6 cm
t = 8 cm
t = 8 cm
t = 8 cm
t = 8 cm
t = 8 cm
t = 8 cm
10x20x8
10x20x8
20 x 20
20 x 30
30 x 30

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

Lembar : 109

2
19
20
21
22
23
24
25
26
27

Ubin warna
Ubin warna
Ubin warna
Tegel keramik
Tegel keramik polos
Tegel keramik, Claudia
Tegel keramik, Asia
Tegel keramik, berserat
Tegel keramik putih, Asia

20 x 20
30 x 30
40 x 40
10 x 20
15 x 15
20 x 25
20 x 25
30 x 30
30 x 30

m2
m2
m2
m2
m2
m2
m2
m2
m2

Lembar : 110

2
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60

VI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

Tegel keramik, (kasar)


Tegel keramik, Super Milan
Tegel keramik, Austria Blue
Tegel keramik, Mulia
Tegel keramik, KIA
Tegel keramik, Arwana
Tegel keramik, Asia Tile
Tegel keramik, Classic
Tegel keramik, Essenza
Tegel keramik, Diamond
Tegel teraso
Tegel teraso
Tegel teraso
Tegel keramik, Granito
Tegel keramik, Granito
Tegel keramik Granite Black
Tegel keramik Granite Polish
Tegel galar
Tegel keramik, bermotif/warna
Tegel plint keramik warna
Tegel wafel
Ubin keramik artistik
Ubin keramik artistik
Ubin keramik artistik
Ubin keramik artistik
Lantai vinyl karet kw 1
Marmer ex. Tulungagung
List Keramik/Border
Keramik Granitile Polish
Keramik Granitile Unpolish
Stepnoiseng
Stepnoiseng
Granito ex Cina

20 x 20
40 x 40
30 x 30
30 x 30
30 x 30
30 x 30
30 x 30
30 x 30
40 x 40
20 x 20
20 x 20
30 x 30
40 x 40
30 x 30
40 x 40
40 x 40
40 x 40
20 x 20
40 x 50
10 x 30
20 x 20
5 x 20
10 x 20
15 x 15
20 x 20
30 x 30
40 x 60
10 x 20
60 x 60
60 x 60
10x 40
7 x 30
60 x 60

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
m2
bh
bh
m2
m2
m2
m2
bh
m2
m2
bh
bh
m2

BAHAN PENGECATAN
Cat besi Emco tanda Bintang
Cat kayu Emco tanda Bintang
Meni besi/kayu, cap Pedang
Thinner A spesial "Altech"
Thinner A biasa "Power"
Thinner B spesial
Minyak cat/afduner
Cat tembok eksterior Mowilex
Cat tembok Alcabond
Cat tembok Alcaplast
Cat tembok Wallsealer
Cat tembok Vinylex
Cat tembok Decolith
Cat tembok Metrolith
Cat tembok Cathylac
Cat tembok Cendana
Cat genteng Matex
Serlak kripik "India"
Politur jadi merk "Impra"
Wood Filler "Impra"
Wood Stain 'Impra"
Sanding Sealer "Impra"
Vernis (Glotex)
Dempul Plitur (Impra)
Dempul Plitur kualitas sedang
Plitur batangan
Teer

kg
kg
kg
ltr
ltr
ltr
ltr
ltr
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
ltr
ltr
ltr
ltr
ltr
kg
kg
kg
kg

Lembar : 111

2
28
29
30
31
32
33
34
35
36
37
38

Kertas gosok
Waterproof, Aquaproof Pro Seller
Waterproof, Multiroof
Waterproof, Nippon Paint Shield
Plamur tembok
Plamur kayu
Plamur besi
Spiritus
Lem Rajawali untuk kayu
Lem Rajawali untuk tembok
Lem kayu khusus (Vinyl)

Lembar : 112

lbr
kg
kg
kg
kg
kg
kg
ltr
kg
kg
kg

2
39
40
41
42
43
44
45
46
47

VII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33

3"
4"
5"
-

kg
ltr
ltr
bh
bh
bh
kg
kg
m2

4"
4"
3"
4"
3"
8"
3"
4"
60 cm
40 mm
30 mm
8"
p = 20 cm
-

set
set
set
bh
bh
set
bh
bh
bh
bh
set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
set
set
set
set
bh
bh
bh
bh
btg
btg

1/2"
3/4"
1/2"
1/2"
3/4"
-

set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
set
bh

3/4"
-

bh
bh

Soda Api
Teak Oil
Residu
Kuas Eterna
Kuas Eterna
Kuas Eterna
Kalsium
Coating
Wallpaper "Kansai"
BAHAN PENGGANTUNG DAN PENGUNCI
Engsel H "Stayer"
Engsel Kuningan arch asli "Elitech"
Engsel jendela (kupu - kupu)
Engsel pintu "UNION"
Engsel jendela "UNION"
Espanyolet kualitas I
Grendel AEG "ELT"
Grendel biasa (besar) merek apa?
Grendel biasa (kecil) merek apa?
Grendel kuningan/krom kecil "Belucci"
Grendel tanam kuningan besar "Cavel"
Kunci gembok besar, Globe
Kunci gembok sedang, Globe
Kunci tanam (808)
Kunci tanam cap KUDA (2x putar) besar
Kunci tanam "SES" besar (tanpa handel)
Kunci tanam antik "Miller" (dengan handel)
Kunci tanam KM/WC "Miller"
Kunci silinder "SES"
Kunci slot merk "SES" (dengan handel)
Kunci slot 2 putaran "YALE" (dengan handel)
Kunci slot 2 putaran "CAVEL" (dengan handel)
Kunci lemari, Wing
Hak angin biasa
Hak angin 4 mm (lurus)
Hak angin (sikutan) "SES"
Hak angin lurus (bisa disetel maju/mundur) "SES"
Pegangan pintu (model standar)
Spring knip "Picasso"
Door closer "Belucci"
Door stopper "Belucci"
Rel pintu dorong, biasa
Rel pintu dorong, J4 SES

VIII

BAHAN SANITASI
Slang spiral saluran kran wastafel
Kloset duduk porselin komplit (INA)
Kloset duduk porselin komplit (KIA)
Kloset duduk porselin komplit (TOTO)
Kloset jongkok porselin (INA)
Kloset jongkok porselin (TOTO)
Kloset jongkok teraso
Kran air stainless steel
Kran air stainless steel
Kran air (DUPONT)
Kran air kuningan
Kran shower "Toto"
Septic Tank (10 pemakai) dan Sumur
Peresapan (dalam 3,00 m)
14 Watermur besi
15 Wastafel warna muda "ITO"
1
2
3
4
5
6
7
8
9
10
11
12
13

Lembar : 113

2
16
17
18
19
20
21
22
23
24

Wastafel warna tua "ITO"


Rol TBA (seal tape) Jumbo
Siphon Washer, kelas sedang plastik
Water drain dan assesories
Bak mandi fiberglass
Bak cuci piring stainless steel, besar (double)
Bak cuci teraso
Tempat sabun keramik "Sotento"
Urinoir "INA" (komplit)

0,5 m3
-

bh
rol
set
set
bh
bh
bh
bh
set

Lembar : 114

2
25
26
27
28
29
30
31
32
33

IX
1
2
3
4
5
6
7
8
X
1
2
3
4
5
6
7
8
9
10
11
12
13
14
XI
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

60 x 60 cm
550 ltr
-

bh
bh
bh
bh
bh
set
set
bh
bh

t = 5 mm
t = 8 mm
t = 5 mm
t = 5 mm
t = 5 mm
t = 3 mm
t = 3 mm
t = 5 mm

m2
m2
m2
m2
daun
m2
m2
m2

BAHAN BETON CETAKAN


Roster klingker warna merah
Buis beton (p = 100 cm)
Buis beton (p = 100 cm)
Buis beton (p = 100 cm)
Buis beton (p = 100 cm)
Buis beton (p = 50 cm)
Buis beton (p = 50 cm)
Buis beton (p = 50 cm)
Buis beton (p = 50 cm)
Buis Beton U (p = 100 cm)
Buis Beton U (p = 100 cm)
Buis Beton U (p = 100 cm)
Got talang R 15 (segmen)
Got talang R 25 (segmen)

10 x 20 cm
15 cm
20 cm
30 cm
40 cm
50 cm
60 cm
80 cm
100 cm
15 cm
20 cm
30 cm
-

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

BAHAN PIPA PVC


Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW "Maspion"
Pipa PVC tipe AW
Pipa PVC tipe AW
Pipa PVC tipe AW
Pipa PVC tipe AW
Pipa PVC "Maspion" tipe D
Pipa PVC "Maspion" tipe D
Pipa PVC "Maspion" tipe D
Pipa PVC "Maspion" tipe D
Lem PVC "Wavin"
Keni PVC tipe AW
Keni PVC tipe AW
Keni PVC tipe AW
Keni PVC tipe AW
Keni PVC tipe AW
Keni PVC tipe AW
Klem PVC
Talang PVC U "Maspion"
Talang PVC U
Clam Talang PVC U
Shock Talang PVC U
Tutup Talang PVC U

1/2" - 400
5/8" - 400
3/4" - 400
1" - 400
2" - 400
3" - 400
4" - 400
5" - 400
2" - 400
3" - 400
4" - 400
5" - 400
1/2"
3/4"
2"
3"
4"
5"
400 cm
400 cm
400 cm
400 cm
400 cm

btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
tube
bh
bh
bh
bh
bh
bh
bh
btg
btg
bh
bh
bh

Floor drain stainless steel "Onde"


Kurasan (putih) stainless steel
Bak mandi porselin
Tandon air fiberglass "Penyu"
Pompa tangan "Dragon"
Hand shower plastik (termasuk slang)
Wall shower "Toto"
Pompa air "Shimizu 125 W"
Pompa air "Sanyo 125 W"
BAHAN JENIS KACA
Kaca polos
Kaca polos
Kaca rayban
Kaca es/buram
Krapyak kaca nako 15 x 70 cm (includ kerangka)
Kaca buram
Kaca cermin
Profil kaca

Lembar : 115

2
26 Corong Talang PVC U

XII
1
2
3
4
5
6
7
8
9
10
11

BAHAN JENIS PAKU


Paku asbes gelombang (paku pancing)
Paku kayu
Paku kayu
Paku kayu
Paku kayu
Paku payung (paku seng gelombang)
Paku sekrup
Paku sumbat
Paku triplek/eternit
Paku beton
Paku kalsiboard

400 cm

bh

1"
1,5" - 2"
2,5" - 3"
4"
1"
5 cm
-

bh
kg
kg
kg
kg
kg
dos
dos
kg
bh
kg

Lembar : 116

XIII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

XV
1
2
3
4
5
6
7
8
9
10
11

BAHAN PERALATAN LISTRIK


Fiting plafon
T doos PVC
Isolator kecil
Stop kontak (Broco)
Skakelar tunggal (Broco)
Skakelar ganda (Broco)
Stop kontak dan skakelar (Broco)
Skakelar/hendel pemindah arus
Zekring lengkap dengan box
Las doof
Panel box
Meinswitch
Zekring MCB thermis 10 - 16 Amp.
Zekring MCB thermis 10 Amp.
Stater lampu TL
Lampu pijar 25,40,75 / 220 V "Philips"
Bola lampu Armateur "Philips"
Lampu hemat energi 18 W / 220 V (Philips)
Lampu hemat energi 18 W / 220 V (Osram)
Lampu TL 20 W / 220 V, komplit balast
(Philips)
Lampu TL 40 W / 220 V, komplit balast
(Philips)
Kabel NYM. 2 x 2,5
Kabel NYY. 1 x 2,5
Kabel twisted Indonesia
Kabel twisted multi kabel
Instalasi Listrik
Penangkal Petir Lengkap (2 Spit), tinggi 10 m
(Tidak termasuk izin dari Depnaker)

250 watt
-

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

bh

3 x 70 x 5 mm2
-

m1
m1
m1
m1
titik
unit

ltr
ltr
ltr
ltr
ltr
kg
kg
kg
jam
jam
jam

BAHAN BBM DAN ALAT BERAT


Bensin
Solar
Minyak tanah
Oli mesin Mesran
Minyak pelumas
Grease (gemuk pelumas)
Aspal panas curah
Aspal panas drum
Biaya operasional wheel loader
Biaya operasional AMP
Biaya operasional dump truck 5 ton

Lembar : 117

2
12
13
14
15
16
17
18
19
20
21
22
23

XVI
1
2
3
dst

Biaya operasional dump truck 3,5 ton


Biaya operasional asphalt finisher
Biaya operasional asphalt sprayer
Biaya operasional tandem roller
Biaya operasional tire roller
Biaya operasional genset
Biaya operasional alat bantu
Biaya operasional bulldozer
Biaya operasional stone crusher
Biaya operasional compressor
Biaya operasional mesin gilas (wales)
Biaya operasional mesin gilas (wales)

1-3 ton
6-8 ton

jam
jam
jam
jam
jam
jam
jam
jam
jam
jam
hari
hari

BAHAN LAINNYA
SETIAP ITEM BARU DAPAT DITAMBAHKAN
DENGAN DISERTAI PRICELIST HARGA PABRIKAN
DAN SPEC YANG JELAS

Blitar,
Dibuat oleh :

)
Jabatan

Lembar : 118

DAFTAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA


PEMERINTAH KOTA BLITAR
Triwulan IV Tahun Anggaran 2011

NAMA ASSOSIASI : ........................................................

A L A M A T : ........................................................

B. DAFTAR UPAH KERJA HARIAN


NO.

HARGA SURVEI

JENIS BAHAN

UKURAN

SAT.
TRIWULAN (Rp.)

1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

2
MANDOR
KEPALA TK. BATU
KEPALA TK. KAYU
KEPALA TK. BESI
KEPALA TK. CAT
KEPALA TK. LISTRIK
KEPALA TK. PIPA
TUKANG BATU
TUKANG KAYU
TUKANG BESI
TUKANG CAT
TUKANG PLITUR
TUKANG ASPAL
TUKANG PIPA
TUKANG LISTRIK
TUKANG GALI TANAH
PENJAGA MALAM/ PENJAGA
MASINIS
PEMBANTU MASINIS
MEKANIK
PEMBANTU MEKANIK
OPERATOR (TERAMPIL)
PENGEMUDI/SOPIR
PENJAGA API
PEMBANTU TUKANG / PEKERJA/BURUH TERAMPIL
PEKERJA TIDAK TERLATIH/BURUH TAK TERAMPIL
PEMBANTU SOPIR
PEKERJA PENGISI BATU
TUKANG GALI
OPERATOR SEMI TERAMPIL/PEMBANTU OPERATOR

8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari
8 jam/hari

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr

Blitar,

- 2011

( Nama Assosiasi Jasa Konstruksi / Konsultansi )


K e t u a,

tanda tangan

Lembar : 119

REKAPITULASI BIAYA
Nama Program
Nama Kegiatan
Pekerjaan
Lokasi
Sumber Dana
Tahun Anggaran
No
1
2
3
4
5
6
7

: Program Peningkatan Keberdayaan Masyarakat


: Fasilitasi Pelaksanaan Program Pemberdayaan Masyarakat
: Perencanaan Program Pemberdayaan Masyarakat Kelurahan ( PPMK )
: Kelurahan Tlumpu
: Dana Alokasi Umum ( DAU )
: 2015
Nama Pekerjaan

Lokasi

Pembangunan Pagar Tembok Makam


RT.4 RW. I
Lanjutan Pembangunan Jalan Rabat Dan Saluran Jl. Widuri
RT.2 RW. III
Pembangunan Saluran Air Jl. Nangka
RT.2 RW. II
Pembangunan Saluran Air Jl. Bambu
RT.2 RW. IV
Pembangunan Talud Makam
RT.4 RW. I
Pembangunan Talud Timur
Timur Bp. Suparni - Bp. Joko
Lanjutan Pembangunan Kamar Mandi
Lapangan Ki Ageng
JUMLAH REKAPITULASI BIAYA

Pejabat Pembuat Komitmen ( PPK )


LURAH TLUMPU

MOH. HASIR
Penata
NIP. 19630112 198903 1 014

Volume
P = 35,72 m
P = 60,67 m
P = 7,70 m
P = 34,24 m
P = 46,56 m
P = 33,50 m
-

Biaya Anggaran
20,000,000.00
40,000,000.00
25,000,000.00
22,000,000.00
30,000,000.00
25,680,000.00
15,000,000.00
177,680,000.00
Blitar,
2015
Konsultan Perencana
CV. SINAN

ENIK IKA ANGGRAINI, ST


Direktur

Formulir Rencana Kegiatan

Nama Pekerjaan
Lokasi Kegiatan
PPTK Kegiatan
Nama Pengelola
Nama KMPS
1. Ketua
2. Bendahara
3. Tim Pelaksana
Sumber Dana
Jenis Indikator
Capaian
Masukan
Keluaran
Hasil
Kelompok Sasaran

:
:
:
:
:
:
:
:

:
:
:
:
:

RINCIAN PROGRAM PEMBERDAYAAN MASYARAKAT KELURAHAN ( PPMK )


BIDANG KEGIATAN FISIK KONTRUKSI
Pembangunan Pagar Tembok Makam
RT.4 RW. I
TOMY SETYAWAN
Program Pemberdayaan Masyarakat Kelurahan ( PPMK )

PPMK 2015

JATMIKO

Dana Alokasi Umum ( DAU )


INDIKATOR & TOLAK UKUR KINERJA
Tolak Ukur Kinerja
PROGRAM PENINGKATAN KEBERDAYAAN MASYARAKAT
DANA
Terlaksananya Fasilitasi Pelaksanaan Program Pemberdayaan Masyarakat
Bermanfaat Bagi Lingkungan Masyarakat Sekitar Kelurahan RT/RW
KELURAHAN TLUMPU
RINCIAN PELAKSANAAN ANGGARAN

Target Kinerja
100%
20,000,000.00
1 Jenis
100%

NO.

URAIAN PEKERJAAN

SATUAN

ANALISA

VOLUME

HARSAT

JUMLAH HARGA

Pembangunan Pagar Tembok Makam


Pekerjaan Persiapan
1 Uitzet / pengukuran
2 Pembersihan lokasi
3 Pas. Bowplank

Ls
Ls
Ls

1.00
1.00
1.00

200,000.00
250,000.00
200,000.00

200,000.00
250,000.00
200,000.00
650,000.00

Pekerjaan Pasangan
1 Pas. Bata merah 1/2 bata 1pc : 4ps
2 Plesteran 1pc : 4ps

m2
m2

IV.5.6.9
V.3.6.4

45.80
231.97

108,430.00
37,390.00

4,966,362.73
8,673,320.71
13,639,683.44

m3
kg
m2

VII.2.6.5
VII.8.6.17.a
OL.V.2

0.80
120.00
10.71

1,054,630.00
16,050.00
86,600.00

847,499.35
1,926,065.48
927,888.69

m3
kg
m2

VII.2.6.5
VII.8.6.17.a
OL.V.9

0.62
43.36
7.74

1,054,630.00
16,050.00
85,545.00

650,566.41
695,949.83
662,383.49
5,710,353.25

Kode Rekening
5.2.2.23.01

II

III

Belanja Hibah Barang Atau Jasa Yang


Diserahkan Kepada Pihak Ketiga/Masyarakat

Pekerjaan Beton
1 Sloof 15/15
- Cor K-175
- Pembesian
- Begisting
2 Kolom 15/15
- Cor K-175
- Pembesian
- Begisting

Jumlah Total
Dibulatkan
Terbilang
:
Err:511
Rencana Penarikan Dana
Pencairan I
:
Pencairan II
:
Pencairan III
:
Jumlah :

8,000,000.00
6,000,000.00
6,000,000.00
20,000,000.00

20,000,036.69
20,000,000.00

Blitar,
2015
Konsultan Perencana
CV. SINAN

ENIK IKA ANGGRAINI, ST


Direktur
Pejabat Pembuat Komitmen ( PPK )
LURAH TLUMPU

MOH. HASIR
Penata
NIP. 19630112 198903 1 014

KMPS KELURAHAN TLUMPU

JATMIKO

Formulir Rencana Kegiatan

Nama Pekerjaan
Lokasi Kegiatan
PPTK Kegiatan
Nama Pengelola
Nama KMPS
1. Ketua
2. Bendahara
3. Tim Pelaksana
Sumber Dana
Jenis Indikator
Capaian
Masukan
Keluaran
Hasil
Kelompok Sasaran

:
:
:
:
:
:
:
:

:
:
:
:
:

RINCIAN PROGRAM PEMBERDAYAAN MASYARAKAT KELURAHAN ( PPMK )


BIDANG KEGIATAN FISIK KONTRUKSI
Lanjutan Pembangunan Jalan Rabat Dan Saluran Jl. Widuri
RT.2 RW. III
TOMY SETYAWAN
Program Pemberdayaan Masyarakat Kelurahan ( PPMK )

PPMK 2015

JATMIKO

Dana Alokasi Umum ( DAU )


INDIKATOR & TOLAK UKUR KINERJA
Tolak Ukur Kinerja
PROGRAM PENINGKATAN KEBERDAYAAN MASYARAKAT
DANA
Terlaksananya Fasilitasi Pelaksanaan Program Pemberdayaan Masyarakat
Bermanfaat Bagi Lingkungan Masyarakat Sekitar Kelurahan RT/RW
KELURAHAN TLUMPU
RINCIAN PELAKSANAAN ANGGARAN

Target Kinerja
100%
40,000,000.00
1 Jenis
100%

NO.

URAIAN PEKERJAAN

SATUAN

ANALISA

VOLUME

HARSAT

JUMLAH HARGA

Lanjutan Pembangunan Jalan Rabat Dan Saluran Jl. Widuri


Pekerjaan Persiapan
1 Uitzet / pengukuran
2 Pembersihan lokasi
3 Pas. Bowplank

Ls
Ls
Ls

1.00
1.00
1.00

200,000.00
250,000.00
200,000.00

200,000.00
250,000.00
200,000.00
650,000.00

Pekerjaan Tanah
1 Galian tanah
2 Urugan pasir
3 Pembuangan tanah

m3
m3
m3

II.1.6.1
II.11.6.11
OL.I.2

25.48
3.64
25.48

38,620.00
145,770.00
29,030.00

984,010.57
530,588.22
739,664.08
2,254,262.87

Pekerjaan Pasangan
1 Pas. Bata merah 1/2 bata 1pc : 4ps
2 Plesteran 1pc : 4ps
3 Pas. Buis beton U-30 cm

m2
m2
m'

IV.5.6.9
V.3.6.4
X.8.6.15.a

60.67
36.40
60.67

108,430.00
37,390.00
206,400.00

6,577,905.95
1,360,958.61
12,521,256.00
20,460,120.56

m3
kg
m2

VII.2.6.5
VII.8.6.17.a
OL.V.8

3.64
512.98
18.20

1,054,630.00
16,050.00
56,235.00

3,838,747.74
8,233,381.00
1,023,448.88

m3

VII.1.6.4

4.25

833,640.00

3,540,093.94
16,635,671.56

Kode Rekening
5.2.3.21.01

II

III

IV

Belanja Modal Pengadaan


Konstruksi Jalan

Pekerjaan Beton
1 Plat beton t = 10 cm
- Cor K-175
- Pembesian
- Begisting
2 Rabat beton t = 5 cm
- Cor K-100

Jumlah Total
Dibulatkan
Terbilang
:
Err:511
Rencana Penarikan Dana
Pencairan I
:
Pencairan II
:
Pencairan III
:
Jumlah :

16,000,000.00
12,000,000.00
12,000,000.00
40,000,000.00

40,000,054.99
40,000,000.00

Blitar,
2015
Konsultan Perencana
CV. SINAN

ENIK IKA ANGGRAINI, ST


Direktur
Pejabat Pembuat Komitmen ( PPK )
LURAH TLUMPU

MOH. HASIR
Penata
NIP. 19630112 198903 1 014

KMPS KELURAHAN TLUMPU

JATMIKO

Formulir Rencana Kegiatan

Nama Pekerjaan
Lokasi Kegiatan
PPTK Kegiatan
Nama Pengelola
Nama KMPS
1. Ketua
2. Bendahara
3. Tim Pelaksana
Sumber Dana
Jenis Indikator
Capaian
Masukan
Keluaran
Hasil
Kelompok Sasaran

:
:
:
:
:
:
:
:

:
:
:
:
:

RINCIAN PROGRAM PEMBERDAYAAN MASYARAKAT KELURAHAN ( PPMK )


BIDANG KEGIATAN FISIK KONTRUKSI
Pembangunan Saluran Air Jl. Nangka
RT.2 RW. II
TOMY SETYAWAN
Program Pemberdayaan Masyarakat Kelurahan ( PPMK )

PPMK 2015

JATMIKO

Dana Alokasi Umum ( DAU )


INDIKATOR & TOLAK UKUR KINERJA
Tolak Ukur Kinerja
PROGRAM PENINGKATAN KEBERDAYAAN MASYARAKAT
DANA
Terlaksananya Fasilitasi Pelaksanaan Program Pemberdayaan Masyarakat
Bermanfaat Bagi Lingkungan Masyarakat Sekitar Kelurahan RT/RW
KELURAHAN TLUMPU
RINCIAN PELAKSANAAN ANGGARAN

Target Kinerja
100%
25,000,000.00
1 Jenis
100%

NO.

URAIAN PEKERJAAN

SATUAN

ANALISA

VOLUME

HARSAT

JUMLAH HARGA

Pembangunan Saluran Air Jl. Nangka


Pekerjaan Persiapan
1 Uitzet / pengukuran
2 Pembersihan lokasi
3 Pas. Bowplank
4 Bongkaran

Ls
Ls
Ls
Ls

1.00
1.00
1.00
1.00

200,000.00
250,000.00
200,000.00
344,400.00

200,000.00
250,000.00
200,000.00
344,400.00
994,400.00

Pekerjaan Tanah
1 Galian tanah
2 Urugan tanah
3 Pembuangan tanah

m3
m3
m3

II.2.6.2
II.9.6.9.a
OL.I.2

10.74
0.69
10.05

47,470.00
12,870.00
29,030.00

509,899.01
8,918.91
291,707.96
810,525.87

Pekerjaan Pasangan
1 Pas. Batu kali 1pc : 4ps
2 Plesteran 1pc : 4ps
3 Pas. Buis beton Dia. 40 cm

m3
m2
m'

III.2.6.2
V.3.6.4
X.8.6.15.b

6.49
13.09
1.00

744,530.00
37,390.00
246,770.00

4,832,818.68
489,435.10
246,770.00
5,569,023.78

m3
kg
m2

VII.2.6.5
VII.8.6.17.a
OL.V.8

0.32
42.25
2.16

1,054,630.00
16,050.00
56,235.00

341,700.12
678,048.30
121,467.60

m3
kg
m2

VII.2.6.5
VII.8.6.17.a
OL.V.2

0.35
78.97
2.31

1,054,630.00
16,050.00
86,600.00

365,429.30
1,267,487.76
200,046.00

m3
kg

VII.2.6.5
VII.8.6.17.a

0.77
110.37

1,054,630.00
16,050.00

812,065.10
1,771,385.00

m3
kg
m2

VII.2.6.5
VII.8.6.17.a
OL.V.6

0.17
43.24
1.00

1,054,630.00
16,050.00
186,025.00

178,232.47
694,016.98
186,025.00
6,615,903.63

m'
m'
m'
m'

X.11.6.24.a
X.11.6.24.b
X.11.6.24.c
X.11.6.24.d

221,640.00
116,710.00
129,610.00
66,180.00

4,565,784.00
5,835,500.00
311,064.00
297,810.00
11,010,158.00

Kode Rekening
5.2.3.21.01

II

III

IV

Belanja Modal Pengadaan


Konstruksi Jalan

Pekerjaan Beton
1 Plat Duiker t = 15 cm
- Cor K-175
- Pembesian
- Begisting
2 Balok Andas 15/15
- Cor K-175
- Pembesian
- Begisting
3 Plat Injak t = 10 cm
- Cor K-175
- Pembesian
4 Bak Kontrol
- Cor K-175
- Pembesian
- Begisting
Pekerjaan Besi
1 Pas. Besi C 125.50.3
2 Pas. Besi C 75.40.3
3 Pas. Besi Siku L.50.50.6
4 Pas. Besi Siku L.30.30.3

Jumlah Total
Dibulatkan
Terbilang
:
Err:511
Rencana Penarikan Dana
Pencairan I
:
Pencairan II
:
Pencairan III
:
Jumlah :

10,000,000.00
7,500,000.00
7,500,000.00
25,000,000.00

20.60
50.00
2.40
4.50

25,000,011.28
25,000,000.00

Blitar,
2015
Konsultan Perencana
CV. SINAN

ENIK IKA ANGGRAINI, ST


Direktur
Pejabat Pembuat Komitmen ( PPK )
LURAH TLUMPU

MOH. HASIR
Penata
NIP. 19630112 198903 1 014

KMPS KELURAHAN TLUMPU

JATMIKO

Formulir Rencana Kegiatan

Nama Pekerjaan
Lokasi Kegiatan
PPTK Kegiatan
Nama Pengelola
Nama KMPS
1. Ketua
2. Bendahara
3. Tim Pelaksana
Sumber Dana
Jenis Indikator
Capaian
Masukan
Keluaran
Hasil
Kelompok Sasaran

:
:
:
:
:
:
:
:

:
:
:
:
:

RINCIAN PROGRAM PEMBERDAYAAN MASYARAKAT KELURAHAN ( PPMK )


BIDANG KEGIATAN FISIK KONTRUKSI
Pembangunan Saluran Air Jl. Bambu
RT.2 RW. IV
TOMY SETYAWAN
Program Pemberdayaan Masyarakat Kelurahan ( PPMK )

PPMK 2015

JATMIKO

Dana Alokasi Umum ( DAU )


INDIKATOR & TOLAK UKUR KINERJA
Tolak Ukur Kinerja
PROGRAM PENINGKATAN KEBERDAYAAN MASYARAKAT
DANA
Terlaksananya Fasilitasi Pelaksanaan Program Pemberdayaan Masyarakat
Bermanfaat Bagi Lingkungan Masyarakat Sekitar Kelurahan RT/RW
KELURAHAN TLUMPU
RINCIAN PELAKSANAAN ANGGARAN

Target Kinerja
100%
22,000,000.00
1 Jenis
100%

NO.

URAIAN PEKERJAAN

SATUAN

ANALISA

VOLUME

HARSAT

JUMLAH HARGA

Pembangunan Saluran Air Jl. Bambu


Pekerjaan Persiapan
1 Uitzet / pengukuran
2 Pembersihan lokasi
3 Pas. Bowplank

Ls
Ls
Ls

1.00
1.00
1.00

200,000.00
250,000.00
200,000.00

200,000.00
250,000.00
200,000.00
650,000.00

Pekerjaan Tanah
1 Galian tanah
2 Urugan pasir
3 Pembuangan tanah

m3
m3
m3

II.1.6.1
II.11.6.11
OL.I.2

16.44
2.05
16.44

38,620.00
145,770.00
29,030.00

634,755.23
299,483.01
477,134.76
1,411,373.00

Pekerjaan Pasangan
1 Pas. Bata merah 1/2 bata 1pc : 4ps
2 Plesteran 1pc : 4ps
3 Pas. Buis beton U-30 cm

m2
m2
m'

IV.5.6.9
V.3.6.4
X.8.6.15.a

41.09
27.39
34.24

108,430.00
37,390.00
206,400.00

4,455,367.01
1,024,231.75
7,067,445.60
12,547,044.36

Pekerjaan Beton
1 Plat beton t = 10 cm
- Cor K-175
- Pembesian
- Begisting

m3
kg
m2

VII.2.6.5
VII.8.6.17.a
OL.V.8

2.05
289.55
10.27

1,054,630.00
16,050.00
56,235.00

2,166,726.79
4,647,215.29
577,671.23
7,391,613.30

Kode Rekening
5.2.3.23.09

II

III

IV

Belanja Modal Pengadaan


Konstruksi Saluran Air/Drainase/Gorong-gorong

Jumlah Total
Dibulatkan
Terbilang
:
Err:511
Rencana Penarikan Dana
Pencairan I
:
Pencairan II
:
Pencairan III
:
Jumlah :

8,800,000.00
6,600,000.00
6,600,000.00
22,000,000.00

22,000,030.66
22,000,000.00

Blitar,
2015
Konsultan Perencana
CV. SINAN

ENIK IKA ANGGRAINI, ST


Direktur
Pejabat Pembuat Komitmen ( PPK )
LURAH TLUMPU

MOH. HASIR
Penata
NIP. 19630112 198903 1 014

KMPS KELURAHAN TLUMPU

JATMIKO

Formulir Rencana Kegiatan

Nama Pekerjaan
Lokasi Kegiatan
PPTK Kegiatan
Nama Pengelola
Nama KMPS
1. Ketua
2. Bendahara
3. Tim Pelaksana
Sumber Dana
Jenis Indikator
Capaian
Masukan
Keluaran
Hasil
Kelompok Sasaran

:
:
:
:
:
:
:
:

:
:
:
:
:

RINCIAN PROGRAM PEMBERDAYAAN MASYARAKAT KELURAHAN ( PPMK )


BIDANG KEGIATAN FISIK KONTRUKSI
Pembangunan Talud Makam
RT.4 RW. I
TOMY SETYAWAN
Program Pemberdayaan Masyarakat Kelurahan ( PPMK )

PPMK 2015

JATMIKO

Dana Alokasi Umum ( DAU )


INDIKATOR & TOLAK UKUR KINERJA
Tolak Ukur Kinerja
PROGRAM PENINGKATAN KEBERDAYAAN MASYARAKAT
DANA
Terlaksananya Fasilitasi Pelaksanaan Program Pemberdayaan Masyarakat
Bermanfaat Bagi Lingkungan Masyarakat Sekitar Kelurahan RT/RW
KELURAHAN TLUMPU
RINCIAN PELAKSANAAN ANGGARAN

Target Kinerja
100%
30,000,000.00
1 Jenis
100%

NO.

URAIAN PEKERJAAN

SATUAN

ANALISA

VOLUME

HARSAT

JUMLAH HARGA

Pembangunan Talud Makam


Pekerjaan Persiapan
1 Uitzet / pengukuran
2 Pembersihan lokasi
3 Pas. Bowplank

Ls
Ls
Ls

1.00
1.00
1.00

200,000.00
250,000.00
200,000.00

200,000.00
250,000.00
200,000.00
650,000.00

Pekerjaan Tanah
1 Galian tanah
2 Urugan tanah
3 Pembuangan tanah

m3
m3
m3

II.2.6.2
II.9.6.9.a
OL.I.2

25.61
10.44
25.61

47,470.00
12,870.00
29,030.00

1,215,718.80
134,388.53
743,465.70
2,093,573.04

Pekerjaan Pasangan
1 Pas. Batu kali 1pc : 4ps
2 Plesteran 1pc : 4ps
3 Siaran 1pc : 2ps

m3
m2
m2

III.2.6.2
V.3.6.4
OL.III.3

33.99
18.63
52.15

744,530.00
37,390.00
24,010.00

25,307,909.64
696,412.68
1,252,164.53
27,256,486.85

Kode Rekening
5.2.3.23.10

II

III

Belanja Modal Pengadaan


Konstruksi Talud Jaringan Air/Sungai

Jumlah Total
Dibulatkan
Terbilang
:
Err:511
Rencana Penarikan Dana
Pencairan I
:
Pencairan II
:
Pencairan III
:
Jumlah :

12,000,000.00
9,000,000.00
9,000,000.00
30,000,000.00

30,000,059.89
30,000,000.00

Blitar,
2015
Konsultan Perencana
CV. SINAN

ENIK IKA ANGGRAINI, ST


Direktur
Pejabat Pembuat Komitmen ( PPK )
LURAH TLUMPU

MOH. HASIR
Penata
NIP. 19630112 198903 1 014

KMPS KELURAHAN TLUMPU

JATMIKO

Formulir Rencana Kegiatan

Nama Pekerjaan
Lokasi Kegiatan
PPTK Kegiatan
Nama Pengelola
Nama KMPS
1. Ketua
2. Bendahara
3. Tim Pelaksana
Sumber Dana
Jenis Indikator
Capaian
Masukan
Keluaran
Hasil
Kelompok Sasaran

:
:
:
:
:
:
:
:

:
:
:
:
:

RINCIAN PROGRAM PEMBERDAYAAN MASYARAKAT KELURAHAN ( PPMK )


BIDANG KEGIATAN FISIK KONTRUKSI
Pembangunan Talud Timur
Timur Bp. Suparni - Bp. Joko
TOMY SETYAWAN
Program Pemberdayaan Masyarakat Kelurahan ( PPMK )

PPMK 2015

JATMIKO

Dana Alokasi Umum ( DAU )


INDIKATOR & TOLAK UKUR KINERJA
Tolak Ukur Kinerja
PROGRAM PENINGKATAN KEBERDAYAAN MASYARAKAT
DANA
Terlaksananya Fasilitasi Pelaksanaan Program Pemberdayaan Masyarakat
Bermanfaat Bagi Lingkungan Masyarakat Sekitar Kelurahan RT/RW
KELURAHAN TLUMPU
RINCIAN PELAKSANAAN ANGGARAN

Target Kinerja
100%
25,680,000.00
1 Jenis
100%

NO.

URAIAN PEKERJAAN

SATUAN

ANALISA

VOLUME

HARSAT

JUMLAH HARGA

Pembangunan Talud Timur


Pekerjaan Persiapan
1 Uitzet / pengukuran
2 Pembersihan lokasi
3 Pas. Bowplank

Ls
Ls
Ls

1.00
1.00
1.00

200,000.00
250,000.00
200,000.00

200,000.00
250,000.00
200,000.00
650,000.00

Pekerjaan Tanah
1 Galian tanah
2 Pembuangan tanah

m3
m3

II.2.6.2
OL.I.2

23.17
23.17

47,470.00
29,030.00

1,099,929.78
672,655.60
1,772,585.39

Pekerjaan Pasangan
1 Pas. Batu kali 1pc : 4ps
2 Plesteran 1pc : 4ps
3 Siaran 1pc : 2ps

m3
m2
m2

III.2.6.2
V.3.6.4
OL.III.3

27.80
16.75
80.40

744,530.00
37,390.00
24,010.00

20,700,853.30
626,258.20
1,930,329.09
23,257,440.59

Kode Rekening
5.2.3.21.01

II

III

Belanja Modal Pengadaan


Konstruksi Talud Jaringan Air/Sungai

Jumlah Total
Dibulatkan
Terbilang
:
Err:511
Rencana Penarikan Dana
Pencairan I
:
Pencairan II
:
Pencairan III
:
Jumlah :

10,272,000.00
7,704,000.00
7,704,000.00
25,680,000.00

25,680,025.97
25,680,000.00

Blitar,
2015
Konsultan Perencana
CV. SINAN

ENIK IKA ANGGRAINI, ST


Direktur
Pejabat Pembuat Komitmen ( PPK )
LURAH TLUMPU

MOH. HASIR
Penata
NIP. 19630112 198903 1 014

KMPS KELURAHAN TLUMPU

JATMIKO

Formulir Rencana Kegiatan

Nama Pekerjaan
Lokasi Kegiatan
PPTK Kegiatan
Nama Pengelola
Nama KMPS
1. Ketua
2. Bendahara
3. Tim Pelaksana
Sumber Dana
Jenis Indikator
Capaian
Masukan
Keluaran
Hasil
Kelompok Sasaran

:
:
:
:
:
:
:
:

:
:
:
:
:

RINCIAN PROGRAM PEMBERDAYAAN MASYARAKAT KELURAHAN ( PPMK )


BIDANG KEGIATAN FISIK KONTRUKSI
Lanjutan Pembangunan Kamar Mandi
Lapangan Kiageng
TOMY SETYAWAN
Program Pemberdayaan Masyarakat Kelurahan ( PPMK )

PPMK 2015

JATMIKO

Dana Alokasi Umum ( DAU )


INDIKATOR & TOLAK UKUR KINERJA
Tolak Ukur Kinerja
PROGRAM PENINGKATAN KEBERDAYAAN MASYARAKAT
DANA
Terlaksananya Fasilitasi Pelaksanaan Program Pemberdayaan Masyarakat
Bermanfaat Bagi Lingkungan Masyarakat Sekitar Kelurahan RT/RW
KELURAHAN TLUMPU
RINCIAN PELAKSANAAN ANGGARAN

Target Kinerja
100%
15,000,000.00
1 Jenis
100%

NO.

URAIAN PEKERJAAN

SATUAN

ANALISA

VOLUME

HARSAT

JUMLAH HARGA

Lanjutan Pembangunan Kamar Mandi


Pekerjaan Persiapan
1 Uitzet / pengukuran
2 Pembersihan lokasi
3 Pas. Bowplank

Ls
Ls
Ls

1.00
1.00
1.00

100,000.00
114,500.00
64,000.00

100,000.00
114,500.00
64,000.00
278,500.00

Pekerjaan Sumur Bor


1 Pengeboran Sumur + Pipa PVC Komplit
2 Pas. Buis Beton Dia. 50 cm

unit
bh

harsat

1.00
1.00

3,000,000.00
114,100.00

3,000,000.00
114,100.00
3,114,100.00

Pekerjaan Pasangan
1 Pas. Dinding Roster 1pc : 4ps
2 Plesteran 1pc : 4ps
3 Acian Beton

m2
m2
m2

IV.13.6.23
V.3.6.4
V.16.6.27

5.27
4.01
4.01

512,400.00
37,390.00
21,960.00

2,697,786.00
149,746.95
87,949.80
2,935,482.75

m3
kg
m2

VII.2.6.5
VII.8.6.17.a
OL.V.2

0.09
13.60
1.26

1,054,630.00
16,050.00
86,600.00

99,662.54
218,340.99
109,116.00

m3
kg
m2

VII.2.6.5
VII.8.6.17.a
OL.V.9

0.15
27.38
3.04

1,054,630.00
16,050.00
85,545.00

160,171.93
439,416.90
259,842.94

m3
kg
m2

VII.2.6.5
VII.8.6.17.a
OL.V.2

0.07
12.85
0.95

1,054,630.00
16,050.00
86,600.00

74,746.90
206,198.76
81,837.00
1,649,333.96

Pekerjaan Lantai
1 Pas. Lantai Keramik 20x20

m2

XIII.9.6.36

4.51

145,070.00

653,540.35
653,540.35

Pekerjaan Sanitasi
1 Septictank ( l = 1,00 x 1,50 x 2,50 ) m
2 Tandon air "Penguin"

unit
bh

1.00
1.00

5,494,100.00
875,000.00

5,494,100.00
875,000.00
6,369,100.00

Kode Rekening
5.2.3.26.12

II

III

IV

VI

Belanja Modal Pengadaan


Konstruksi Bangunan Air Gedung/Tandon Gedung

Pekerjaan Beton
1 Sloof 15/20
- Cor K-175
- Pembesian
- Begisting
2 Kolom 15/15
- Cor K-175
- Pembesian
- Begisting
3 Ringbalk 15/15
- Cor K-175
- Pembesian
- Begisting

Jumlah Total
Dibulatkan
Terbilang
:
Err:511
Rencana Penarikan Dana
Pencairan I
:
Pencairan II
:
Pencairan III
:
Jumlah :

6,000,000.00
4,500,000.00
4,500,000.00
15,000,000.00

15,000,057.06
15,000,000.00

Blitar,
2015
Konsultan Perencana
CV. SINAN

ENIK IKA ANGGRAINI, ST


Direktur

Pejabat Pembuat Komitmen ( PPK )


LURAH TLUMPU

MOH. HASIR
Penata
NIP. 19630112 198903 1 014

KMPS KELURAHAN TLUMPU

JATMIKO

RINCIAN PERHITUNGAN VOLUME


( BACK UP DATA )
Nama Program

: Program Peningkatan Keberdayaan Masyarakat

Nama Kegiatan
Pekerjaan

: Fasilitasi Pelaksanaan Program Pemberdayaan Masyarakat

Lokasi
Sumber Dana
Tahun Anggaran

: Perencanaan Program Pemberdayaan Masyarakat Kelurahan ( PPMK )


: Kelurahan Tlumpu
: Dana Alokasi Umum ( DAU )
: 2015

NO
1
I

II

URAIAN PEKERJAAN

PERHITUNGAN

VOLUME

Pembangunan Pagar Tembok Makam


PEKERJAAN PERSIAPAN
1 Utzet / Pengukuran

1.00

Ls

2 Pembersihan Lokasi Start & Finish

1.00

Ls

3 Pas. Bowplank

1.00

Ls

45.80

m2

PEKERJAAN PASANGAN
1 Pas. Bata merah 1/2 bata 1pc : 4ps
V1=

1.15

0.80

V2=

0.95

35.72

13

11.87 m2

=
=

33.93 m2
45.80 m2

78.57 m2

2 Plesteran 1pc : 4ps


V=

III

2.20

35.72

3.45

1.00

13

44.52 m2

0.80

1.00

13

10.32 m2

0.60

0.28

13

2.17 m2

0.70

0.40

13

3.61 m2

0.30

x
2

0.60

13

=
=

1.16 m2
231.97 m2

231.97

m2

0.15

35.72

0.80 m3

0.80

m3

35.72

0.62

88.57 kg

0.60

0.22

31.43 kg
120.00 kg

120.00

kg

10.71

m2

0.62

m3

43.36

kg

PEKERJAAN BETON
1 Sloof 15/15
- Cor K-175
V=
- Pembesian
V1=
V2=

0.15
410
4.00
6-150
35.72
0.15

- Begisting
V1=

0.30

35.72

10.71 m2

V1=

0.15

0.15

1.00

13

0.29 m3

V2=

0.30

0.30

0.07

13

0.08 m3

V3=

0.35

0.35

0.10

13

0.16 m3

V4=

0.30

x
2

0.15

0.30

13

=
=

0.09 m3
0.62 m3

1.00

0.62

13

32.00 kg

0.60

0.22

13

11.36 kg
43.36 kg

2 Kolom 15/15
- Cor K-175

- Pembesian
V1=
V2=

410
4.00
6-150
1.00
0.15

- Begisting
IV

2
I

V1=

0.60

1.00

13

7.74 m2

7.74

m2

V=

0.90

2.75

12

29.47 m2

29.47

m2

V=

0.32

2.76

12

10.50 m2

10.50

m2

PEKERJAAN BESI
1 Pagar Besi Hollow

PEKERJAAN PENGECATAN
1 Pengecatan Besi Hollow

Lanjutan Pembangunan Jalan Rabat Dan Saluran Jl. Widuri


PEKERJAAN PERSIAPAN

II

1 Utzet / Pengukuran

1.00

Ls

2 Pembersihan Lokasi Start & Finish

1.00

Ls

3 Pas. Bowplank

1.00

Ls

4 Bongkaran

1.00

Ls

PEKERJAAN TANAH
1 Galian tanah
V=

0.70

0.60

60.67

25.48 m3

25.48

m3

V=

0.10

0.60

60.67

3.64 m3

3.64

m3

V=

0.70

0.60

60.67

25.48 m3

25.48

m3

V=

1.00

60.67

60.67 m2

60.67

m2

V=

0.60

60.67

36.40 m2

36.40

m2

V=

60.67

60.67 m2

60.67

m2

V=

0.10

3.64 m3

3.64

m3

512.98

kg

2 Urugan Pasir
3 Pembuangan tanah
III

PEKERJAAN PASANGAN
1 Pas. Bata merah 1/2 bata 1pc : 4ps
2 Plesteran 1pc : 4ps
3 Pas. Buis beton U-30 cm

IV

PEKERJAAN BETON
1 Plat beton t = 10 cm
- Cor K-175

- Pembesian
V1=
V2=

10-100
6.00
12-150
60.67
0.15

0.60

60.67

60.67

0.62

225.67 kg

0.80

0.888

287.31 kg
512.98 kg

- Begisting
V=

0.30

60.67

18.20 m2

18.20

m2

V=

1.40

0.05

4.25 m3

4.25

m3

Pembangunan Saluran Air Jl. Nangka


PEKERJAAN PERSIAPAN
1 Utzet / Pengukuran

1.00

Ls

2 Pembersihan Lokasi Start & Finish

1.00

Ls

3 Pas. Bowplank

1.00

Ls

10.74

m3

2 Rabat beton t = 5 cm
- Cor K-100

3
I

II

60.67

PEKERJAAN TANAH
1 Galian tanah
V1=

0.95

1.30

7.70

V2=

0.20

0.40

7.70

2.00

9.51 m3

=
=

1.23 m3
10.74 m3

2 Urugan tanah
V1=

0.10

x
2

0.60

7.70

2.00

0.46 m3

V2=

0.10

0.15

7.70

2.00

=
=

0.23 m3
0.69 m3

0.69

m3

10.05 m3

10.05

m3

3 Pembuangan tanah

III

V= Vol. Galian

Vol. Urugan tanah

10.74

V1=

0.15

+
2

0.18

0.15

7.70

0.19 m3

V2=

0.33

+
2

0.40

0.45

7.70

1.26 m3

V3=

0.40

0.40

7.70

1.23 m3

V4=

0.15

0.15

7.70

=
=

0.17 m3
2.86 m3

5.72 m2

0.77 m3

0.69

Pekerjaan Pasangan
1 Pas. Batu kali 1pc : 4ps

V5= (V1,V2,V3,V4)
2.86
V6=

0.20

2.00

2.00
0.50

7.70

V7=

V5

V6

5.72

0.77

6.49 m3

6.49

m3

V=

1.70

7.70

13.09 m2

13.09

m2

V=

1.00

1.00

1.00 m'

1.00

m'

V=

0.15

0.80

2.70

0.32 m3

0.32

m3

2.70

0.888

28.77 kg

1.90

0.394

13.47 kg
42.25 kg

42.25

kg

2 Plesteran 1pc : 4ps

3 Pas. Buis beton Dia. 40 cm

IV

PEKERJAAN BETON
1 Plat Duiker t = 15 cm
- Cor K-175

- Pembesian
V1=
V2=

1212
12.00
8-150
2.70
0.15

- Begisting
V=

0.80

2.70

2.16 m2

2.16

m2

V=

0.15

0.15

7.70

0.35 m3

0.35

m3

7.70

0.888

54.70 kg

0.60

0.394

24.27 kg
78.97 kg

78.97

kg

2.31

m2

2 Balok Andas 15/15


- Cor K-175

- Pembesian
V1=
V2=

412
4.00
8-150
7.70
0.15

- Begisting
V=

0.15

7.70

2.31 m2

3 Plat Injak t = 10 cm
- Cor K-175
V=
- Pembesian
V1=
V2=

0.10
612
6.00
8-150
7.70
0.15

0.50

7.70

0.77 m3

7.70

0.888

82.05 kg

0.70

0.394

28.32 kg
110.37 kg

0.77

m3

110.37

kg

0.17

m3

43.24

kg

1.00

m2

4 Bak Kontrol
- Cor K-175
V1=

0.10

0.60

2.40

0.14 m3

V2=

0.10

0.50

0.50

=
=

0.03 m3
0.17 m3

- Pembesian
V1=
V2=

1610
16.00
8-150
2.90
0.15

2.90

0.62

28.77 kg

1.90

0.394

14.47 kg
43.24 kg

- Begisting

V=

0.50

2.00

1.00 m2

V=

5.00
0.15

0.60

20.60 m'

20.60

m'

V=

10.00

5.00

50.00 m'

50.00

m'

V=

0.60

4.00

2.40 m'

2.40

m'

V=

0.50

9.00

4.50 m'

4.50

m'

Pembangunan Saluran Air Jl. Bambu


PEKERJAAN PERSIAPAN
1 Utzet / Pengukuran

1.00

Ls

2 Pembersihan Lokasi Start & Finish

1.00

Ls

3 Pas. Bowplank

1.00

Ls

PEKERJAAN BESI
1 Pas. Besi C 125.50.3

2 Pas. Besi C 75.40.3

3 Pas. Besi Siku L.50.50.6

4 Pas. Besi Siku L.30.30.3

4
I

II

PEKERJAAN TANAH
1 Galian tanah
V=

0.80

0.60

34.24

16.44 m3

16.44

m3

V=

0.10

0.60

34.24

2.05 m3

2.05

m3

V=

0.80

0.60

34.24

16.44 m3

16.44

m3

V=

1.20

34.24

41.09 m2

41.09

m2

V=

0.80

34.24

27.39 m2

27.39

m2

V=

34.24

34.24 m2

34.24

m2

V=

0.10

2.05 m3

2.05

m3

289.55

kg

10.27

m2

Pembangunan Talud Makam


PEKERJAAN PERSIAPAN
1 Utzet / Pengukuran

1.00

Ls

2 Pembersihan Lokasi Start & Finish

1.00

Ls

2 Urugan Pasir
3 Pembuangan tanah
III

PEKERJAAN PASANGAN
1 Pas. Bata merah 1/2 bata 1pc : 4ps
2 Plesteran 1pc : 4ps
3 Pas. Buis beton U-30 cm

IV

PEKERJAAN BETON
1 Plat beton t = 10 cm
- Cor K-175

- Pembesian
V1=
V2=

10-100
6.00
12-150
34.24
0.15

0.60

34.24

34.24

0.62

127.38 kg

0.80

0.888

162.17 kg
289.55 kg

- Begisting
V=
5
I

0.30

34.24

10.27 m2

3 Pas. Bowplank
II

1.00

Ls

PEKERJAAN TANAH
1 Galian tanah
V1=

1.20

x
2

0.50

46.56

13.97 m3

V2=

0.50

0.50

46.56

11.64 m3
25.61 m3

25.61

m3

10.44 m3

10.44

m3

25.61

m3

2 Urugan tanah
V=

0.22

+
2

V1=

1.20

x
2

V2=

0.50

0.43

0.69

46.56

0.50

46.56

13.97 m3

0.50

46.56

11.64 m3
25.61 m3

3 Pembuangan tanah

III

Pekerjaan Pasangan
1 Pas. Batu kali 1pc : 4ps
V1=

0.30

+
2

0.50

1.20

V2=

0.50

0.50

46.56

46.56

22.35 m3

11.64 m3
33.99 m3

33.99

m3

2 Plesteran 1pc : 4ps


V=

0.40

46.56

18.63 m2

18.63

m2

V=

1.12

46.56

52.15 m2

52.15

m2

Pembangunan Talud Timur


PEKERJAAN PERSIAPAN
1 Utzet / Pengukuran

1.00

Ls

2 Pembersihan Lokasi Start & Finish

1.00

Ls

3 Pas. Bowplank

1.00

Ls

23.17

m3

23.17

m3

3 Siaran 1pc : 2ps

6
I

II

PEKERJAAN TANAH
1 Galian tanah
V1=

0.66

x
2

1.49

33.50

16.47 m3

V2=

0.40

0.50

33.50

6.70 m3
23.17 m3

3 Pembuangan tanah

III

V1=

0.66

x
2

1.49

33.50

16.47 m3

V2=

0.40

0.50

33.50

6.70 m3
23.17 m3

Pekerjaan Pasangan
1 Pas. Batu kali 1pc : 4ps
V1=

0.30

+
2

0.40

1.80

V2=

0.40

0.50

33.50

33.50

21.10 m3

6.70 m3
27.80 m3

27.80

m3

2 Plesteran 1pc : 4ps


V=

0.50

33.50

16.75 m2

16.75

m2

V=

2.40

33.50

80.40 m2

80.40

m2

Lanjutan Pembangunan Kamar Mandi


PEKERJAAN PERSIAPAN
1 Utzet / Pengukuran

1.00

Ls

2 Pembersihan Lokasi Start & Finish

1.00

Ls

3 Pas. Bowplank

1.00

Ls

1.00

unit

3 Siaran 1pc : 2ps

7
I

II

PEKERJAAN SUMUR BOR


1 Pengeboran Sumur + Pipa PVC Komplit
V=
2 Pas. Buis Beton Dia. 50 cm

III

V=

1.00

1.00

V=

1.35

1.95

V1=

0.70

3.15

V2=

0.30

2.00

1.00

bh

1.00

bh

5.27

m2

5.27

m2

2.21

m2

=
=

1.80
4.01

m2
m2

4.01

m2

2.21

m2

=
=

1.80
4.01

m2
m2

4.01

m2

0.09

m3

PEKERJAAN PASANGAN
1 Pas. Dinding Roster 1pc : 4ps
2.00

2 Plesteran 1pc : 4ps

6 Acian Beton

IV

PEKERJAAN BETON
1 Sloof 15/20
- Cor K-175
- Pembesian

V1=

0.70

3.15

V2=

0.30

2.00

V=
V=
410 =
8-150 =

3.00

3.00

0.15

0.20

3.15

0.09

m3

4.00
3.15
0.15

x
x

3.15
0.70

x
x

0.62
0.394

=
=

7.81
5.79

kg
kg

- Begisting
2 Kolom 15/15
- Cor K-175
- Pembesian

13.60

kg

13.60

kg

1.26

m2

1.26

m2

V=

0.40

3.15

V1=

0.15

0.15

2.25

3.00

0.15

m3

0.15

m3

4.00
2.25
0.15

x
x

2.25
0.60

x
x

0.62
0.394

x
x

3.00
3.00

=
=
=

16.74
10.64
27.38

kg
kg
kg

27.38

kg

V=
410 =
8-150 =

- Begisting

V1=

0.45

2.25

3.00

3.04 m2

3.04

m2

3 Ringbalk 15/15
- Cor K-175

V=

0.15

0.15

3.15

0.07

0.07

m3

m3

- Pembesian

- Begisting
V

VI

V=
410 =
8-150 =

4.00
3.15
0.15

x
x

3.15
0.60

x
x

V=

0.30

3.15

V1=

2.85

1.30

V2

0.50

0.80

0.62
0.394

=
=

7.81
4.96

kg
kg

12.85

kg

12.85

kg

0.95

m2

0.95 m2

1.00

3.71

m2

2.00

=
=

0.80
4.51

m2
m2

4.51

m2

1.00

unit

1.00

unit

1.00

bh

1.00

bh

PEKERJAAN LANTAI
1 Pas. Lantai Keramik 20x20

PEKERJAAN SANITASI
1 Septictank ( l = 1,00 x 1,50

V=

1.00

2 Tandon air "Penguin"

V=

1.00

1.00

You might also like