Professional Documents
Culture Documents
, Delhi
INDEX
Name of Work :ODAGAD TO NAYI ( Stage -I&II) Motor road in 6.450 K.M.
under PMGSY.
S/No.
PARTICULARS
PAGE No.
1
2
3
Title Page
Index
List of Officers / Subordinates
4
5
6
7
8
9
Project Report
Alignment Map & Index Map
Specification
C.B.R. Report
Pavement Design
S.T.A. Format
ESMF
1
2
Analysis of Rate
Schedule Of Rates
Details of Measurement
Environment Protection Works
Bill of Quantity
1
2
Routine Maintenance
Bill of Quantity
SUMMERY OF ABSTRACT
1
Abstract of Cost
2
3
Page 1
S/No
No.
Sr.No.
Unit
Rate
Unit
Rate
Page NO-30
(a)
77634 8-3-5-A
Hard Rock
Per Cum
286.20
(b)
(c)
2
3
77633 8-3-4
77629, 8-3-2-A
77636, 8-4-1
77638, 8-4-3
Ordinary Rock
Soil
Excavation in founadation in all type of soil
Per Cum
Per Cum
Per Cum
155.90
104.70
237.10
Per Cum
3055.80
75479/16-4,
Per Cum
Per Cum
1532.10
590.60
77637/8-4-2
6A
77762/11-4-3-1
7
8 (a)
8
9
10
75504 16-13-3-AR&B
as per analysis
attached
77737, 10-10-(iii)
as per analysis
attached
11
77733, 10-7
11(b)
77731/10-5
12
Schedule Rate
13
15
16
77863, 14-2
77694, 10-1-B
77723, 10-3-A-(i)
17
18
19
20
21
22
23
24
25
26
27
29
30
31
per cu.m
5594.9
PCC M20
PER CUM
6457.60
mt.
Per Rmt.
682.50
0.00
Parapet as per standard drawing with R.R. 1:5 With Base C.C Per Rmt.
P/F of Hectometer Stone
Per No.
#REF!
586.30
Per No.
per cum
#REF!
96.80
99.20
Per Km
Per Cum
Per CM
Per Sqm
0.60
4442.30
Per Sqm
Per Sqm
Per Sqm
Per Cum
Per Cum
Per Cum
Per Sqm
Per Sqm
Per Sqm
Per Sqm
169.70
64.30
16.00
5594.90
2433.90
2421.90
48.60
14.40
197.90
88.40
Per Cum
Per Cum
1544.20
1158.40
13200.00
2007.70
77790, 12-3
F8 ANALYSIS
Per Mtr
19640.30
Per Rmt.
25370.30
Sub Head
S/No
Seeding and Mulching
33
77666, 8-11
34 75506 16-14-a R&B C/O of katcha drain per m
Construction of Embankment with Material Obtained from
35
77424/3-3
Roadway Cutting
36
37
38
77736/10-10 (ii)
77737/10-10 (iii)
77735/10-10-(i)
39
40
41
77740/10-16
77716/10-2-B-(i)
77726/10-3-B
42
77730/10-4-B
43
77757/11-2-2
44
45
77749/11-1-1-1
77877/14-11-1-3
46
77758/11-4-1-1
47
77765/11-4-5
75507 16-15-A
R&B
F8 ANALYSIS
per cum
77780/11-9
Rate
131.70
91.10
62.80
nos
2241.70
nos
586.30
nos
3669.10
nos
12244.70
nos
3716.80
3023.00
nos
3410.20
cum
152.40
cum
cum
48
49
Unit
Per Sqm
per metre
237.10
3,212.70
5594.90
7745.50
2276.10
5568.55
S/No
50
74922/3-7 R&B
51
52
77426/11-2-2
77445 3-16
Sub Head
Removal of Unsuitable Soil with Disposal cu.m
Removal of unsuitable soil including excavation, loading and
disposal upto 1000m lead but excluding compaction ground
supporting embankment subgrade replacement by suitable
soil, which shall be paid separately as per Clause 303.5.2 as
per Technical Specification Clause 302.3.11
Unit
Rate
cum
45.10
cum
111.10
1.90
sqm
53
75482 16-7
Jr. Engineer
PMGSY,Irri Div..P.W.D.
Srinagar , Pauri Garhwal
F8 ANALYSIS
Cement plum masonry with 40% plum & 60% 1:3:7 cement
concrete including supply of all material, labour, T&P etc.
required for proper completion of the work. (As per PWD
Uttarakhand specifications)
Asst. Engineer
PMGSY,Irri Div..P.W.D.
Srinagar , Pauri Garhwal
cum
4609.5
Ex. Engineer
PMGSY,Irri Div..P.W.D.
Srinagar , Pauri Garhwal
CHAINAGE
LENGTH
WIDTH
QUANTITY
#REF!
992.50
3.00
2977.50
#REF!
995.50
3.00
2986.50
#REF!
977.50
3.00
2932.50
#REF!
965.50
3.00
2896.50
#REF!
995.50
3.00
2986.50
#REF!
985.50
3.00
2956.50
#REF!
173.50
3.00
520.50
TOTAL
#REF!
870.00
0.90
783.00
847.00
0.60
508.20
G.TOTAL
Add
Passing
Places
#REF!
#REF!
#REF!
#REF!
G.TOTAL
#REF!
#REF!
CHAINAGE
LENGTH
WIDTH
QUANTITY
#REF!
992.50
3.00
2977.50
#REF!
995.50
3.00
2986.50
#REF!
977.50
3.00
2932.50
#REF!
965.50
3.00
2896.50
#REF!
995.50
3.00
2986.50
#REF!
985.50
3.00
2956.50
#REF!
173.50
3.00
520.50
TOTAL
#REF!
870.00
0.90
783.00
847.00
0.60
508.20
G.TOTAL
Add
Passing
Places
#REF!
#REF!
G.TOTAL
#REF!
#REF!
#REF!
#REF!
CHAINAGE
LENGTH
WIDTH
QUANTITY
#REF!
992.50
3.00
2977.50
#REF!
995.50
3.00
2986.50
#REF!
977.50
3.00
2932.50
#REF!
965.50
3.00
2896.50
#REF!
995.50
3.00
2986.50
#REF!
985.50
3.00
2956.50
#REF!
173.50
3.00
520.50
TOTAL
#REF!
870.00
0.90
783.00
847.00
0.60
508.20
G.TOTAL
Add
Passing
Places
#REF!
#REF!
#REF!
#REF!
#REF!
G.TOTAL
#REF!
CHAINAGE
LENGTH
WIDTH
QUANTITY
#REF!
992.50
3.00
2977.50
#REF!
995.50
3.00
2986.50
#REF!
977.50
3.00
2932.50
#REF!
965.50
3.00
2896.50
#REF!
995.50
3.00
2986.50
#REF!
985.50
3.00
2956.50
#REF!
173.50
3.00
520.50
TOTAL
#REF!
870.00
0.90
783.00
847.00
0.60
508.20
G.TOTAL
Add
Passing
Places
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
G.TOTAL
Jr. Engineer
#REF!
#REF!
Asst. Engineer
#REF!
#REF!
Ex Engineer
#REF!
#REF!
#REF!
###
PART C COMPENSATION & FORESTATION
Sl.
No.
1
2
3
4
5
Particulars
Qty.
Unit
Rate in Lac
Amount in Lac
________
HEC
____
0.00
0.000
0.000
0.000
Km.
nos
Km.
0.00
---1.00
0.00
0.040
0.00
0.000
Total
Km.
1.00
0.00
0.00
Jr. Engineer
Asst. Engineer
Ex. Engineer
#REF!
#REF!
Jr. Engineer
0
0
Total
Asst. Engineer
0
0
0.20
0.20
0.20
0.15
0.00
0.00
0.00
0.00
0.00
Cum
0.00
0.00
0.00
0.00
0.00
Cum
10
0.00
0.00
0.00
0.00
0.00
Cum
Remark
6
0.15
0.15
0.15
0.25
0.25
0.25
0.30
C.C. 1:2:4
Col
4x0.15
0.00
0.00
0.00
0.00
R.R.Dry
Col
4x0.20
Height-2
4
1.80
1.80
1.80
1.80
Excavatio
n Col 4x7
Height-1
Avg.
Height
(Col
5+6)/2
Area(LxW
) In SqM
2
0.00
0.00
0.00
0.00
Width
1
Km.1.800
Km.3.801
Km. 5.262
Km. 8.262
Length
Location
11
Existing Kutcha
Existing Kutcha
Existing Kutcha
Existing Kutcha
Ex. Engineer
0
0
#REF!
PART -B MAINTENANCE
Analysis of Routine Maintenance
(Per Km for one year)
S/No
Pariculars
qty
unit
Rate
3600.00
3600.00
100.00 sqm
12.8
1280
50.00 sqm
16.00
800
14.00 sqm
1821.7
25503.8
15.00 cum
243.2
3648
1.00 km
808.9
808.9
1.00 km
700
700
50.00 nos
70.3
3515
1.00 km
597.9
597.9
10
KM
amount
Providing and fixing displaced edge stone etc (once) Lump sum
Cutting branches of trees and shrubs from the road way or with
R.O.W includingdisposal of wood and leaves to suitable location
as per technical specification clause 1914 item no 62205/15-12-1
maintenance of 200 meter km stone by the way of refitting of tiled
atone repairing with cement mortor cleaning reparing and lettering on
200 meter km stone and 5 km stone as per drawing and technical
specificetion clause 1012/62204/15-11
TOTAL
Rs
40453.60
#REF!
#REF!
PART A
S.No.
Making Rain Water Harvesting Pits on Down Stream Side of the Scuppers as per standard drawing & design including all material labour T&P all taxes and royalties
etc.required for proper completion of the work.
(A)
Excavation in foundation in all types of soils I/C leads & lifts and disposal of all excavated material
as per direction of Engg.in charge.
6.56 Cum.
Qty. as per standard drawing = 1x2
2.5
0.875
1.5
=
2.63 Cum.
1x2
1
0.875
1.5
=
9.19 Cum.
Total
237.10
2178.36 (A)
Cost of Excavation
9.19
(B)
R.R.Stone Masonry laid dry including all material labour T&P etc.as required for proper completion
of work I/C all royalties and Taxes etc.
5.16 Cum.
Qty. as per standard drawing 1x2/2
2.50
1.375
1.5
=
5.16 Cum.
1x2/2
2.50
1.375
1.5
=
10.31 Cum.
Total
10.31
Cost of R.R.Stone Masonry laid Dry.
1532.10
15799.78 (B)
Total of A+B =
17978.14
17978.10 Each
Say. Rs.
#REF!
PART A
Jr. Engineer
#REF!
#REF!
Amount
Remark
0.00
0.00
0.00
Asst. Engineer
#REF!
#REF!
Rs.
131.70
TOTAL
Say
0.00
0.00
Lac
Ex Engineer
#REF!
#REF!
Name of Work- Costruction of PAITHANI TO MALUND Motor Road (stage 1&II) under P.M.G.S.Y. SRINAGAR,
Length Km 6.175 Km
Block - THALISAIN
DETAIL OF PAVEMENT DESIGN
Distt. - PAURI
AS PER IRC : SP : 72 - 2007
KM
KM-1
KM-2
KM-3
KM-4
KM-5
KM-6
C.B.R.
VALUE
(%)
8.40
8.45
7.89
8.20
8.59
8.20
Cumulativ
Traffic
e ESAL
Category applicatio
n
T3
T3
T3
T3
T3
T3
101223
101223
101223
101223
101223
101223
Sub
grade
strength
classes
S4
S4
S4
S4
S4
S4
Modified
soil /
Final
Initial
Graval
Convert
improved
base
base
Base
sub subgrade thickness WBM G-II
thickness
thickness
base
(C.B.R. WBM G(mm)
(mm)
thickness
not less
III
then 10)
225.00
225.00
225.00
225.00
225.00
225.00
75.00
75.00
75.00
75.00
75.00
75.00
225.000
225.000
225.000
225.000
225.000
225.000
225.00
225.00
225.00
225.00
225.00
225.00
G.S.B.
Layer - I
(mm)
125.00
125.00
125.00
125.00
125.00
125.00
G.S.B.
G.S.B.
Layer - II Layer - III
(mm)
(mm)
100.00
100.00
100.00
100.00
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0.00
BILL OF QUANTITY
#REF!
###
S/No
Reference to
MORD
Specification
A
B
C
77679, 8-3-2-A
77633 8-3-4
77634 8-3-5-A
#REF!
3A
#REF!
Item of Work
HILL SIDE CUTTING
Earth work in hill road (hill side cutting/filling):Excavation in hilly area for construction of road in all types of
soils & rocks with E&B and BLB as met at site true to lines
as per plan, X section, L section camber, super elevation as
required also including uprooting & cutting of bushes
dressing of road surface to the required level and slopes
with all lead, lifts and safe disposal of surplus excavated
material at suitable dumping places by mechanical means/
manual means indicated in the drawing with out damaging
forest and forest land including slip clearance during hill side
cutting as directed by Engineer-in-charge. (For Passing
Places)
Qty
Unit
Rate
Amount
Soil
Ordinary Rock
Hard Rock
Sub-Total
Cartage for excavated materials (Soil) at a suitable dumping
places for environmental protection of Khud side land of the
road and as as per Clause 303.5.2 as per Technical
Specification Clause 302.3.11
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Cum
104.70
155.90
286.20
#REF!
#REF!
#REF!
#REF!
#REF!
Cum
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Cum
#REF!
#REF!
#REF!
Cum
1158.40
Total
#REF!
#REF!
#REF!
Cum
237.10
#REF!
#REF!
Cum
3055.80
#REF!
#REF!
Cum
1532.10
#REF!
#REF!
#REF!
#REF!
PROTECTION WORK
77636, 8-4-1
77638, 8-4-3
S/No
Reference to
MORD
Specification
75479/16-4,
Item of Work
Providing & laying filter media as Hand packed stone filling
in the back of retaining walls, abutments, wing walls etc. by
locally available approved stone including supply of all
material, labour, T&P etc. required for proper completion of
the work as directed by Engineer in charge.
A
9
AS PER
ANALYSIS
ATTACHED
10
10A
11
75507 16-15-A
77863, 14-2
Qty
Unit
Rate
Amount
#REF!
Cum
590.60
#REF!
#REF!
Per No.
#REF!
#REF!
#REF!
Per
Rmt.
#REF!
#REF!
#REF!
METER
2276.10
#REF!
2007.70
#REF!
#REF! Mtr
91.10
#REF!
#REF! Rmt.
682.50
#REF!
4609.50
#REF!
#REF! Cum
12
12A
12B
Cement plum masonry with 40% plum & 60% 1:3:7 cement
concrete including supply of all material, labour, T&P etc.
75482 16-7 R&b required for proper completion of the work.(As per PWD
Uttarakhand specifications)
#REF!
Cum
PAVEMENT WORK
13
14
15
77455 4-1-A-1
77474, 4-7-3-B
77496, 5-1-2
#REF!
Cum
1544.20
#REF!
#REF!
Cum
2421.90
#REF!
#REF!
Sq.Mtr.
48.60
#REF!
S/No
16
17
18
Reference to
MORD
Specification
Qty
Unit
Rate
Amount
#REF!
Sq.Mtr.
14.40
#REF!
#REF!
Sq.Mtr.
197.90
#REF!
#REF!
Sq.Mtr.
88.40
#REF!
#REF!
Sq.Mtr.
#REF!
Total
#REF!
#REF!
77500, 5-2-3
77540, 5-9-2-1
Item of Work
Providing and applying Tack coat with bitumenous emulsion
( RS-I) using emulsion distributor @ 0.25 to 0.30 Kg per
Sqm on the prepared bituminous surface treated with primer
& cleaned with hydraulic broom as per MORD Specification.
#REF!
#REF!
19
77424/3-3
#REF!
Mtr
25370.30
#REF!
77749/11-1-1-1
#REF!
cum
237.10
#REF!
Cum
3212.70
#REF!
#REF!
Cum
5594.90
#REF!
#REF!
Cum
7745.50
#REF!
#REF!
#REF!
qtl
nos
#REF!
1.00
#REF!
#REF!
Total
#REF!
77758/11-4-1-1
77765/11-4-5
62076/11-9
S/No
Reference to
MORD
Specification
Item of Work
Qty
Unit
Rate
Amount
7
#REF!
nos
nos
2241.70
586.30
15691.9
#REF!
#REF!
nos
3669.10
#REF!
#REF!
nos
#REF!
#REF!
#REF!
Nos
#REF!
#REF!
ROAD FURNITURE
20
21
22
23
24
25
26
27
28
29
77737/10-10 (iii)
77735/10-10-(i)
AS PER
ANALYSIS
77740/10-16
77740/10-16
#REF!
Nos
12244.70
#REF!
77730/10-4-B
#REF!
nos
3716.80
#REF!
77730/10-4-B
#REF!
3410.20
#REF!
#REF!
nos
Per
Km.
#REF!
#REF!
#REF!
Per
Km.
13200.00
#REF!
#REF!
#REF!
#REF!
Lac
#REF!
Lac
#REF!
Lac
#REF!
As per PWD
specification
#REF!
Prepairing the Plane Table survey & Levelling for completion
Plan as per Engineer-in-Charge & as per P.W.D.
specification.
Total
G/Total
Say
#REF!
Grand Total
FORMAT F - 6
FORMAT F - 7
NET TOTAL
Jr. Engineer
Asst. Engineer
Rs.
#REF!
Lac
#REF!
Lac
#REF!
Lac
Ex. Engineer