Professional Documents
Culture Documents
(PERAK)
DQS184
ASSIGNMENT 1
COURSE
BUILDING SERVICES I
COURSE CODE
DQS184
GROUP
AAP114 2
LECTURER
NORHAFIZAH YUSOP
DATE OF ISSUE
WEEK 5
SUBMISSION
WEEK 7
During class on .
PRESENTATION
WEEK 7
During class on .
ASSIGNMENT OUTCOMES
1. To demonstrate the ability to illustrate and explain the treatment processes, the
principles involved in the installation of water supply, above and below ground
drainage, sewage and refuse disposal systems involved in medium-rise buildings
(outcome - CO1)
2. To demonstrate the ability to recognize and apply the constructional implication of
plumbing system, sewage and refuse disposal systems in medium-rise buildings
(outcome - CO2)
3. To demonstrate the ability to recognize and apply the importance of proper selection
of systems and good layout of building services installations in medium-rise buildings
and the knowledge of building services in quantity surveying practice (outcome CO3)
1
ASSESSMENT RUBRICS
WRITTEN REPORT AND PRESENTATION ASSIGNMENT (rubric scale of 10)
a. Introduction = 5 marks
b. Content = 55 marks
c. Conclusion = 5 marks
d. References = 2 marks
e. Communication skills CS1 - written = 3 marks
f. Communication skills CS1, CS2, CS3 & CS4 presentation skills = 5 marks
g. Communication skills CS5 & CS7 responding skills = 3 marks
h. Leadership skills LS1 & LS2 = 2 marks
i. Teamwork skills TS1, TS2, TS3, TS4 & TS5 peer assessment = 20 marks
a) Introduction = 5 marks
a. Exemplary 5 : Insightful introduced and overview the topic, with examples of
current issues
b. Excellent 4 : Insightful introduced and overview the topic
c. Good 3 : Clear introduced and overview the topic
d. Average 2 : Introduction is introduced and somewhat discussed.
e. Poor 1 : Introduction is introduced and somewhat is irrelevant.
f. Very poor 0 : No introduction.
b) Content = 55 marks
a.
b.
c.
d.
e.
f.
c) Conclusion = 5 marks
b. Exemplary 5 : Conclusion is presented outstandingly clear, and demonstrated the
ability to related to the whole work to course outcome
c. Excellent 4: Conclusion is presented clearly, and demonstrated the ability to relate
to the introduction part of the work
c. Good 3 : Conclusion is presented clearly
d. Average 2: Conclusion is moderately presented.
e. Poor 1: Conclusion is irrelevant.
f. Very poor 0: No conclusion is presented
d) References = 2 marks
a. Good 2 : references is presented with a good and acceptable format, and cross
referred to the whole Work.
b. Poor 1 : references is presented with poor format, and not all are cross referred
c. Very poor: 0 No references is presented.
2
INSTRUCTIONS TO Assignment 1
1. This assignment is to be done in group of maximum 5 students.
2. All submission must be in ENGLISH
3. Drawings and sketches are to be done manually and NOT to be done in pencils.
4. Delay in submission shall be treated as NON-SUBMISSION
5. Plagiarism is a serious offence and will render offenders liable to disciplinary action as
set out in the UiTM rules and regulation
6. Your proposal must consider the integrated environment, ambiance, rules and culture of
the location specified for your group task
ASSIGNMENT 1 - QUESTIONS
You are a building services consultant for commercial and administrative building development.
Your new client, NHY Properties Bhd, wishes to invest in high rise residential development as
briefed in Appendix A. As the appointed consultant, you are to make a proposal and your tasks
are as follows:
A. Produce a simple introduction of your company profile, outlining the objectives of your
proposals. (C1, C2, P1, P2, A1, CTPS1, CTPS2, LS1, LS2)
Tips : You may Google search for company profile to see examples of company profile available
throughout the world, but you must cite the website you referred in your reference.
(5 marks)
B. Produce a proposal report that analyzes the water treatment and water supply process to
the development. Your report must consist of (but not limited to) the following:
Tips : You may Google search for technical proposal report for help, but you must cite
the website you referred in your reference.
1. Propose a suitable site location plan for your client, relevant to the function of the
intended building. Your proposal must show the nearest raw water resources that
could be used for the users of this development. (C1, C2, P1, P2, A1, CTPS1,
CTPS2, CTPS3)
Tips : You may Google image search for site location plan and Google map search for the
available raw water resources for that particular location, but you must cite the website you referred
in your reference.
(2 marks)
2. Propose the most suitable and cost effective method to treat and provide clean
treated water to the development, with the aid of sketches from the proposed raw
water resource to the development. (CO1, CO2, CO3, C1, C2, P1, P2, P3, A1,
CTPS1, CTPS2, and CTPS3). Your proposal must include :
a. Methods of selecting suitable raw water
(6 marks)
b. Methods of purifying raw water
(10 marks)
c. Methods of distributing purified water to the development
(10 marks)
d. Justification on why your proposed methods are suitable and cost effective
(4 marks)
Tips : You may Google search for water treatment or water purification for more information, you
may refer to reference books, but you must cite the website and the books you referred in your
reference.
3. Based on that sketch design, propose handwritten design and layout of hot water
(HW) and cold-water (CW) supply plumbing for the building. Your proposal must
include (CO1, CO2, CO3, C1, C2, P1, P2, P3, A1, CTPS1, CTPS2, CTPS3)
a. Schematic drawing of CW supply from Meter to water tanks, and to
distribution outlets. Indicate all sizes and materials of all the water tanks and
pipes
(10 marks)
b. A schematic drawing of HW supply from Meter to water tanks to heaters, and
to distribution outlets. Indicate all sizes and materials of all the water tanks,
water heaters and pipes
(10 marks)
c. A detailed drawing of the water tank.
(3 marks)
Tips : You may Google image search schematic layout, and you may refer to any reference books,
but you must cite the website and the books you referred in your reference.
C. Conclude your proposal for the whole water treatment and water supply process to this
development. (C1, C2, P1, P2, P3, A1, CTPS1, CTPS2, CTPS3)
(5 marks)
~ END OF ASSIGNMENT 1 ~