Professional Documents
Culture Documents
1
3/27/2009
• Predetermined data
system
• Work sampling
1.Analysis
2.Data collection & measurement
3.Synthesis
2
3/27/2009
0perations Nt/(min)
Time and Motion Study
Collar 1.65
Implementation…..
Back & front panels attachment 1.15
Measured cycle time for 1 garment=
First side seam 2.02
Second side seam 1.9 27.97 min
Hand 3.93 To compute the standard time use
th 20% off PFD allowance
the ll factor
f t
Hand attachment 1 3.3
33
Hand attachment 2 2.89
Seams of panels 4.20 ST =Nt(1+PFD Allowance)
Button attach
Bar tag operation
4.68
0.33
=27.97(1+0.2)
Label attach 0.15 =33.56 min
Trimming & Quality 1.8
3
3/27/2009
o Stuttaford, Genevieve, The One Best Way: Fredrick Winslow Taylor & the
Enigma of Efficiency,
Efficiency, Publishers Weekly,
Weekly, New York. March 17, 1997. Vol.
224, Issue 11.