ANNEXURE - I

Techincal Parameters
Sr.
No.

Parameters

Requirements from M/s Heritage Creation

Construction Age

Completeness Certificate

Built Up Area & Floors offered

Approx. 82,000 Sq.Feet.

Load sanctioned, connected &


Transformer availabity from DHBVNL
(kVA)

Not Available

DG installed Capacity available at site &


its running condition (kVA & year of
Not Available
mfg / installation, Hrs run already)

LT panel, AVR / Servo, Change Over,


Earthing Pits & other Electrical
Installations

6
7

Entry / Exit Gates for Staff & Material


movement
Ceiling Height (From lower end of the
Beam-Slab) / each floor

Floor Load Bearing Capacity (Kg / Sq.


Mtrs)

Water Based Fire Extinguishing system

10 Elevator / Lift
Water proofing on roof, walls, window/
11 door frames required to prevent
seepage
12

Kota stone flooring to be done on 2nd


floor

Paint, White wash, inside & outside, all


13 other repairs, seepage & other
damages as needed in Building
14

Not Available

Water storage tank capacity - roof top &


underground

Min reqd 600 Kg, may require


further increase

Provision for 2 Lifts is there, Lifts to


be installed

15 LAN Cabling etc


Not Done
Trench Covers of Concrete needs to be
16
replaced by Solid Iron Covers
17 Boundry wall on all sides to be raised
Source of Water for toilets, Pantry,
horticulture etc & Drinking
All the toilets on each floor & water
19
harvesting shall be made functional
18

Submersible pump / boring is


required

ANNEXURE - I

s from M/s Heritage Creation

Owner to confirm & share


updated CAD layout drgs of
all the floors including office
area build at GF front side &
all Electrical drgs

Owner's / M/s MS
Furnishers Pvt. Ltd.
comments as on 20.07.2015
Competion Cetificate
Obtained, we shall produce
the same, as and when
needed..

ok

Shall provide you the same

ok

500 KVA Transformer, Min


Agreed, We shall bear
Connected load 300 KVA
Connection Cost, Transformer
immediate & 200KVA within 2Cost and Installation Cost
3 months to be done by
only.
Owner
Landlord to confirm

Comments of
M/s Heritage Creation
/ Prospective Tenant

agreed

As discussed, we shall not


provide the same,
LESSEE can install at their
own cost

agreed

LESSEE shall install at their


own cost

agreed

To be done by landlord

Agreed

ok

Landlord to confirm

Agreed

ok

580 Kg / Sq Mtrs as per


Architect email

we shall provide the As built


drawing as per provided by
HSIDC

ok

Landlord to confirm & make


this fully functional

Agreed

agreed

Prefer to have one Goods Lift we shall install only ONE LIFT

agreed

To be done by landlord within


Agreed
fitout period

agreed

To be done by landlord within


Agreed if Needed
fitout period

agreed

To be done by landlord within Agreed.As per working


fitout period
condition
Already provided

ok
agreed

Not applicable

ok

To be done by landlord within


Agreed
fitout period

ok

Height of Boundary wall is as


To be done by landlord within per HSIIDC Norms, we can
fitout period
install Barbed wires, if
required

ok

To be done by landlord within


Already provided
fitout period
To be done by landlord within Agreed for Ground and First
fitout period
Floor

ok
ok