You are on page 1of 6

Doha International Airport

Q0073/2

DAR AL-HANDASAH CONSULTANTS


Shair and Partners

DESIGN OF PRECAST PRESTRESSED COMPOSITE BEAMS


CHECK OF CRITICAL SECTION
(All Units are MN and m)

INPUT
A-PROPERTIES OF MID SPAN SECTION

B- LOADING

PRECAST SECTION
DEPTH=
0.525
AREA=
0.361
Y1=
-0.232
Y2=
0.293
INERTIA=
0.01296
Z1=
-0.056
Z2=
0.044

M OWBeam
M OWDeck
M SDL
M LL
Final Losses

Y1

0.429
0.183
0.000
0.488
0.150

Y2

COMPOSITE SECTION
AREA=
0.492
Y1(m)=
-0.160
Y2(m)=
0.365
Y3(m)=
-0.160
Y4(m)=
-0.235
INERTIA=
0.020
Z1=
-0.125
Z2=
0.055
Z3=
-0.125
Z4=
-0.085

C- ALLOWABLE STRESSES

Y4
Y1,Y3

Ftt
Fct
Ftw
Fcw

-3.5
19.2
-3.15
21

Y2

OUTPUT
A- ECCENTRCITIES FOR A PRESTRESSING FORCE
(Pt is prestressing force after initial losses)
Pt
e1
e2
e3
e4
3.6
0.3282
0.2325
0.0426
0.1607

emin
emax
0.1607
0.2325
inside feasible range

B- LIMITING PRESTRESSING FORCES


Ptmin =

1.425 Ptmax =

6.066

1.42465203

C- NORMAL STRESSES
Pt=
input e=
f1
f2
f3
f4

3.6
0.203
St1
4.57
16.80

278779456.xls - Rev. 1.0

St2
8.31
8.68

St3
12.22
-0.22
3.90
5.73

1/6

08/07/2015

278779456.xls - Rev. 1.0

2/6

08/07/2015

II CHECKING CABLE PROFILE


Pt

3.6

Span

19.5

Straining Actions
Sec.
1
Dist.
0.00
Mow
0
Mslab
0
Msdl
0
Mll
0

2
1.00
0.083
0.036
0.000
0.095

3
2.00
0.158
0.067
0.000
0.180

4
3.00
0.223
0.095
0.000
0.254

5
4.00
0.280
0.119
0.000
0.318

6
5.00
0.327
0.140
0.000
0.372

7
6.00
0.366
0.156
0.000
0.416

8
7.00
0.395
0.168
0.000
0.449

9
8.00
0.415
0.177
0.000
0.472

Cable Profile
Sec.
Dist.
#Strands
Force
emin
input e
emax

2
1.00
12
2.160
-0.104
0.230
0.137

3
2.00
14
2.520
-0.047
0.225
0.157

4
3.00
16
2.880
0.003
0.220
0.175

5
4.00
18
3.240
0.046
0.210
0.191

6
5.00
20
3.600
0.083
0.203
0.204

7
6.00
20
3.600
0.112
0.203
0.215

8
7.00
20
3.600
0.135
0.203
0.223

9
8.00
20
3.600
0.150
0.203
0.229

Check of Stresses at Transfer


f1
-2.52
-1.42
f2
14.47
15.33

-0.34
16.23

0.63
17.25

1.80
18.03

2.75
19.10

3.43
18.23

3.96
17.57

4.32
17.11

Check of Stresses after casting of toping slab


f1
-2.14
-0.34
1.34
f2
12.30
11.94
11.74

2.84
11.75

4.42
11.68

5.71
11.97

6.69
10.73

7.44
9.78

7.96
9.13

Check of Stresses at Final Stage


f1
-2.14
0.42
f2
12.30
10.21
f3
0.00
0.76
f4
0.00
1.12

4.88
7.11
2.03
2.99

6.97
5.87
2.55
3.74

8.69
5.18
2.98
4.37

10.02
3.14
3.33
4.89

11.03
1.59
3.59
5.28

11.74
0.51
3.78
5.55

1
0.00
10
1.800
-0.168
0.233
0.113

2.78
8.46
1.44
2.11

2
4

2
4

Sec. At Dist.0

278779456.xls - Rev. 1.0

Sec. At Dist.2

Sec. At Dist.4

3/6

Mid Span

08/07/2015

10
9.75
0.429
0.183
0.000
0.488

10
9.75
20
3.600
0.161
0.203
0.233

4.57
16.80

8.31
8.68

12.22
-0.22
3.90
5.73

2
3

Mid Span

278779456.xls - Rev. 1.0

4/6

08/07/2015

III CHECKING ULTIMATE CAPACITY


b
t
f'c
f's
b1
g*
Astrand

2.05
0.15
40
1860
0.759724
0.28
140
1

Sec.
Dist.
Mult
d
As*
r*
fsu*
Ductility

1
0.00
0.000
0.598
0.0014
0.001142
1823.597
0.052065

Eq stress
Block
Mn

2
1.00
0.361
0.595
0.00168
0.001377
1816.096
0.062534

3
4
2.00
3.00
0.683
0.966
0.590
0.585
0.00196 0.00224
0.001621 0.001868
1808.344 1800.46
0.073261 0.084074

6
7
8
9
5.00
6.00
7.00
8.00
1.210
1.415
1.581
1.707
0.575
0.568
0.568
0.568
0.00252
0.0028
0.0028
0.0028
0.002138 0.002405 0.002405 0.002405
1791.853 1783.348 1783.348 1783.348
0.095768 0.107209 0.107209 0.107209

0.036629 0.043774 0.050852 0.057863 0.064784 0.064784 0.071641 0.071641 0.071641


1.479

1.747

1.999

2.240

9.17 Flexural Strength


9.17.2 Rectangular Sections
a) having Prestressing Steel only

M n = A s f su d 10 . 6

f 'c

f su =f 's [ 1( / 1 )( f 's / f 'c ]


9.18 Ductility Limits
9.18.1 Maximum Prestressing Steel

f
'
c

su

0 . 36 1

278779456.xls - Rev. 1.0

f su

9.17.4 Steel Stress

5
4.00
1.210
0.575
0.00252
0.002138
1791.853
0.095768

)]

2.447

2.447

2.654

2.654

2.654

As*= area of prestressing steel (Art. 9.17).


b = width of flange of flanged member or width of
rectangular member.
d = distance from extreme compressive fiber to
centroid of the prestressing force, or to centroid of
negative moment reinforcing for precast girder
bridges made continuous.
f'c = compressive strength of concrete at 28days.
f*su= average stress in prestressing steel at ultimate
load.
f's = ultimate stress of prestressing steel.
t = average thickness of the flange of a flanged
member (Art. 9.17 and 9.17).
= strength capacity reduction factor (Art. 9.14)
for factory produced precast prestressed concrete
members = 1.0.
for post tensioned cast in place concrete
members = 0.95.
for shear = 0.90.
for anchorage zones = 0.85 for normal weight
concrete.
* = factor for type of prestressing steel (Art. 9.17)
= 0.28 for low relaxation.
= 0.40 for stress relieved steel.
= 0.55 for bars.
* = A*s/bd ratio of prestressing steel.
1 = factor for concrete strength.

5/6

08/07/2015

10
9.75
1.855
0.568
0.0028
0.002405
1783.348
0.107209
0.071641
2.654

.
r width of

fiber to
to centroid of
cast girder
28days.
at ultimate

.
flanged

rt. 9.14)
essed concrete

crete

ormal weight

Art. 9.17)

278779456.xls - Rev. 1.0

6/6

08/07/2015