9782 Federal Register / Vol. 73, No.

36 / Friday, February 22, 2008 / Notices

DEPARTMENT OF ENERGY would be three miles) and consist of a Also, DOE must obtain the concurrence
single circuit 500-kV transmission line of the Secretary of State and the
[OE Docket No. PP–334]
on either lattice towers or steel Secretary of Defense before taking final
Application for Presidential Permit; monopoles. The proposed facilities action on a Presidential permit
Baja Wind U.S. Transmission, LLC would include a loop-in substation on application.
the SWPL. The proposed loop-in Copies of this application will be
AGENCY: Office of Electricity Delivery substation would be owned and made available, upon request, for public
and Energy Reliability, DOE. operated by SDG&E. From the U.S.- inspection and copying at the address
ACTION: Notice of Application. Mexico border, the proposed provided above. In addition, the
transmission line would continue south application may be reviewed or
SUMMARY: Sempra Generation, on behalf approximately two additional miles to downloaded electronically at http://
of Baja Wind U.S. Transmission, LLC its origination point at a future 230/500- www.oe.energy.gov/permitting/
(Baja Wind), has applied for a kV substation. The proposed electricity_imports_exports.htm. Upon
Presidential permit to construct, transmission line located in Mexico and reaching the Electricity Import/Exports
operate, maintain, and connect an the 230/500-kV substation would be page, select ‘‘Pending Proceedings.’’
electric transmission line across the U.S. constructed, owned, operated, and Issued in Washington, DC., on February 15,
border with Mexico. maintained by a subsidiary of Sempra 2008.
DATES: Comments, protests, or requests Energy Mexico. Ellen Russell,
to intervene must be submitted on or The proposed transmission line Acting Director, Siting and Permitting, Office
before March 24, 2008. would be used to transmit the entire of Electricity Delivery and Energy Reliability.
ADDRESSES: Comments, protests, or electrical output of the La Rumorosa [FR Doc. E8–3333 Filed 2–21–08; 8:45 am]
requests to intervene should be wind generators from Mexico to the
BILLING CODE 6450–01–P
addressed as follows: Office of United States. Energy will not be
Electricity Delivery and Energy exported from the United States to
Reliability (OE–20), U.S. Department of Mexico, except for the small amount of DEPARTMENT OF ENERGY
Energy, 1000 Independence Avenue, electric energy needed for wind turbine
SW., Washington, DC 20585–0350. lubrication, hydraulic, and control Federal Energy Regulatory
systems when the wind generators are Commission
FOR FURTHER INFORMATION CONTACT:
not operating. Any entity exporting such
Ellen Russell (202–586–9624) (Program [Docket No. OR078–18–000, Docket No.
electric energy from the United States
Office) or Michael T. Skinker (Program OR07–19–000]
would require an electricity export
Attorney) 202–586–2793.
authorization issued by DOE under America West Airlines, Inc., Chevron
SUPPLEMENTARY INFORMATION: The section 202(e) of the Federal Power Act
construction, operation, maintenance, Products Company, Continental
(16 U.S.C. 824a(e)). Airlines, Inc., Northwest Airlines, Inc.,
and connection of facilities at the Procedural Matters: Any person Southwest Airlines, Co., US Airways,
international border of the United States desiring to become a party to this and Valero Marketing and Supply
for the transmission of electric energy proceeding or to be heard by filing Company v. Calnev Pipe Line, L.L.C.;
between the United States and a foreign comments or protests to this application ConocoPhillips Co. v. Calnev Pipe
country is prohibited in the absence of should file a petition to intervene, Line, L.L.C. (Not Consolidated); Notice
a Presidential permit issued pursuant to comment, or protest at the address of Amended Complainant
Executive Order (EO) 10485, as provided above in accordance with
amended by EO 12038. §§ 385.211 or 385.214 of the FERC’s February 14, 2008.
On December 20, 2007, Sempra Rules of Practice and Procedures (18 Take notice that on February 11, 2008,
Generation, on behalf of Baja Wind, a CFR 385.211, 385.214). Fifteen copies of America West Airlines, Inc., Chevron
Delaware limited liability corporation each petition and protest should be filed Products Company, Continental
and wholly-owned subsidiary of Sempra with the DOE on or before the date Airlines, Inc., Northwest Airlines, Inc.,
Generation, filed an application with listed above. Southwest Airlines Co., U.S. Airways,
the Office of Electricity Delivery and Additional copies of such petitions to Inc., and Valero Marketing and Supply
Energy Reliability of the Department of intervene, comments, or protests should Company (collectively, Joint
Energy (DOE) for a Presidential permit. also be filed directly with Ms. Joan Complainants), tendered for filing an
Baja Wind requests authority to Heredia, Permitting Manager, Sempra amendment to the Joint Complaint filed
construct, own, operate, and maintain Global, 101 Ash Street, HQ 8B, San by Joint Complainants on August 20,
the U.S. portion of a single-circuit 500- Diego, California 92101. 2007, against Calnev Pipe Line, L.L.C.
kilovolt (500-kV) electric transmission Before a Presidential permit may be Joint Complainants state that, except as
line that crosses the U.S.-Mexico issued or amended, DOE must modified and supplemented by this
international border in the vicinity of determine that the proposed action is in amendment, the allegations and
Jacumba, San Diego County, California. the public interest. In making that supporting evidence contained in the
The proposed transmission line determination, DOE considers the original complaint remain unchanged.
project would connect up to 1,250 environmental impacts of the proposed In the instant filing, Joint Complainants
megawatts of electric power produced project pursuant to the National amend their complaint to include
from wind turbines to be located in the Environmental Policy Act (NEPA) of supplemental analysis.
vicinity of La Rumorosa, Baja California, 1969, determines the project’s impact on Any person desiring to intervene or to
Mexico, to San Diego Gas and Electric electric reliability by ascertaining protest this filing must file in
mstockstill on PROD1PC66 with NOTICES

Company’s (SDG&E) existing Southwest whether the proposed project would accordance with Rules 211 and 214 of
Powerlink (SWPL) 500-kV transmission adversely affect the operation of the U.S. the Commission’s Rules of Practice and
line. The proposed facilities would be electric power supply system under Procedure (18 CFR 385.211, 385.214).
approximately one mile long inside the normal and contingency conditions, and Protests will be considered by the
United States and two miles long inside any other factors that DOE may also Commission in determining the
Mexico (total length of the facilities consider relevant to the public interest. appropriate action to be taken, but will

VerDate Aug<31>2005 16:38 Feb 21, 2008 Jkt 214001 PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 E:\FR\FM\22FEN1.SGM 22FEN1