You are on page 1of 3

MUHAMMAD ALI

Date of Birth:15-Oct-1986
Email: engr.ali256@gmail.com
Address:Bhutta Street MohallahGhousia
Jhang Sadar Punjab Pakistan
Mobile:+92-333-6565819

Career Summary
RF Drive Test and Optimization experience (2+ years) on 2G/3G network with Ericsson ZTE & HUAWEI vendor.
Specialties: RF TOOLS & EXPERTISE:
Microsoft Office 2007,2010 Word, PowerPoint, Excel
Map info
Google Earth
RF Optimization Tool/ Drive Testing Tool, like
TEMS 8.0.3 TEMS 14.1 and TEMS 16.1 of Ericson
CNT and CNA of ZTE China
Pilot Pioneer and Pilot Navigator
NEMO Outdoor and NEMO Analyze
M2000, NetNeuman

Projects Summary

Mobilink swap Project Nov 2014 to Present.


Telenor Pakistan ZTE Swap Project April 2013 to March 2014
Zong CMPAK roll out project NORTH Islamabad from October 2012 to March 2013.
Supervision & Maintenance ofElectronics & Communication system (Alcatel Lucent PABX)July 2011 to Sep 2012 in KSA.
CDMA Project Karachi Huawei November 2009 to May2011.

Work Experience
EXCELERON MOBILINK SWAP COMBINED PROJECT 25th November 2014 to Present
2G Optimization and Dimensioning from Initial Cell Plan and Radio Site Verification to Capacity Planning and End to End
Delivery of RF Optimization Tasks, Key KPI Profiling, Redesign and Network Auditing, Traffic Modeling, Forecast,
Distribution and Benchmarking.
2. Troubleshooting and optimizing network, change of parameters in order to improve the major KPIs, CSSR,DCR&MPD.
3. Monitor KPI parameters like SD and TCH Drop, SD and TCH Assignment, HOSR and DLQ and optimize the network to
meet these parameters to threshold level.
4. Parameter tuning for improved KPIs, AMR Handover Parameters, Handover Control Parameters, Power Control
Parameters, Cell Reselection Parameters, Neighbour Optimization etc.
5. Performing re-homing activities, neighbors MARs creation and external LAC plan updating.
6. Post-processing drive test data using Actix, Mapinfo, TEMS Investigation in order to improve the Network Coverage and
Quality.
7. Proposing Physical Redesigns using ASSET Prediction and DT logs (HBA reduction, E/M tilt, Azimuth, antenna type change)
8. TCH and SDCCH dimensioning, HR activation and FR traffic and utilization increase activities.
9. Removal of BCCH/MAIO frequency clashes & fine tuning of neighbors
10. Measuring signal strength, noise floor and identifying sources of external interference using Spectrum Analyzer.
11. Establishing in-house tools on ACCESS 2007 for making daily basis analysis easier to perform..
12. Customer complaints, finding the issues on particular locations of customer and then resolving them.
1.

LCC ZTE TELENOR SWAP PROJECT 11thApril 2013 to March 2014


Vendor Swap Experience on NSNequipment Swap with ZTE. Parameter Harmonization for Swap Preparation, Swap Rollout
planning and implementation, Pre and Post Swap Auditing and Benchmarking Swap Performance.
2G Optimization and Dimensioning from Initial Cell Plan and Radio Site Verification to Capacity Planning and End to End
Delivery of RF Optimization Tasks, Key KPI Profiling, Redesign and Network Auditing, Traffic Modeling, Forecast, Distribution
and Benchmarking.
Troubleshooting and optimizing network, change of parameters in order to improve the major KPIs, CSSR,DCR&MPD.
Monitor KPI parameters like SD and TCH Drop, SD and TCH Assignment, HOSR and DLQ and optimize the network to meet
these parameters to threshold level.
Parameter tuning for improved KPIs, AMR Handover Parameters, Handover Control Parameters, Power Control
Parameters, Cell Reselection Parameters, Neighbour Optimization etc.
Performing re-homing activities, neighbors MARs creation and external LAC plan updating.
Post-processing drive test data using Actix, Mapinfo, TEMS Investigation in order to improve the Network Coverage and Quality.
Proposing Physical Redesigns using ASSET Prediction and DT logs (HBA reduction, E/M tilt, Azimuth, antenna type change)
TCH and SDCCH dimensioning, HR activation and FR traffic and utilization increase activities.

Page 1 of 3

Removal of BCCH/MAIO frequency clashes & fine tuning of neighbors


Measuring signal strength, noise floor and identifying sources of external interference using Spectrum Analyzer.
Establishing in-house tools on ACCESS 2007 for making daily basis analysis easier to perform..
Check SQI, C/I, EDGE and GPRS throughput, speech codec, MAIO (Trx),Rx level sub and full, and Rx qualto meet KPI
targets and pass the network during cluster drive for both pre and post.
Preparer Cluster reports of Pre and Post using MAPINFO to meet KPI targets and pass the network.
Prepare SSV reports using MAPINFO.
Customer complaint resolution. Visited customer place and solve their problems

SAUDI BINLADIN GROUP (Airports O&M project) 2NDJuly, 2011 to 3rdSep,2012


Job Title:Electronics & Communication Foreman
Location: Najran Airport (NAJRAN KSA)

Responsibilities:
FIREALARMS(Honeywell)
ATC TOWER communication
CCTV cameras(PelcoEndura)
Access Control System(AEOS),
Preventive Maintenance of Security equipments Baggage Scanners (smith heimenn), walk through metal detectors.
FIDs operation and maintenance
Fault rectification of telephones lines, PABX(Alcatel)
Troubleshooting of IT network, Office Equipment.
PM of Explosive Detectors, Voice Recorder
Formation of PM checklists
MA TV system(Hirschman),
BMS System

I HAVE worked at Najran AirPort in electronics & communication Dept, (GACA).Responsible for installation of all electronics,
communication and security equipment of most recent technology using optic fiber as media &
wireless ODU & IDU on
New NAJRAN AIRPORT TERMINAL and attended all on site Trainings for the maintenance and operations of new terminal.

I have complete hand on following Routine Duties at Najran (KSA) Airport Terminal
Operation and Maintenance of Fiber Optics Transmission Network and SDH/DWDM equipment
Liaison with, Sr. Comm engineer and higher management during different activity like troubleshooting, network
optimizing and stability Coordination with NOC (NMS), TTAC, TX Project and vendors regarding troubleshooting of
MDT, TC, Cable cuts and other routine faults to ensure and optimize the network operation and performance.
Troubleshooting, testing and configuration of new Transmission equipments.
Performing PAT of new installation with different venders and checking all the standards and parameters of Network
elements and installation as per method of procedure (MOP).
I have practical experience for Troubleshooting, Configuration, testing and commissioning of SDH/DWDM Transmission
Systems.
Maintaining office record and updating the database on daily bases
Properly and comprehensively updating of work log of problem management system.
Locating break point of fiber cables and analyzing the section loss by using OTDR and coordinating TNOC with cable
team during splicing of FOC.
Performing Preventive Routine Maintenance and preparation of feedback report to higher management regarding
Deficiency and requirements
Preparation of activity report after completion of assigned job.
Netkom Pvt. Ltd. (RF GSM, CDMA): 14th July 2009 to 10th August 2011
GSM Zong CMPAK Huawei Roll Out Project North Islamabad from 14hOctoberber 2012 to 28th March 2013

Indoor/Outdoor drive testing using TEMS 8.0.3 and troubleshooting level & quality issues.
PerformedIndoor surveys & re-homing activities.
EDGE Testing, Connection Stability, FTP Downloading, GPRS Testing and check over RLC Throughput (downlink & uplink).
Prepared Optimization reports using MapInfo 9.0/ACTIX Analyzer.
Checked signal strength, measuring noise floor and identified interference sources using Spectrum Analyzer.
Studied GSM Architecture, MOC&MTC Channel Allocations, Radio Parameters, RF principles and Layer 3 Messages.

Page 2 of 3

CDMA Project Karachi Huawei 14th November 2009 to 3rd May 2010:
Conducted Drive Tests measurements for coverage and quality of service for CDMA 2000.
Performed detailed analysis of Drive Test Logs.
Cluster and Network optimization by detailed analysis of Call Events, PS throughput, RSCP and Ec/Io plots.
Prepared Site and Cluster Optimization report.
Conducted drive test verification to check coverage extent, call quality, sectorization and interRAT system handover performance
of newly integrated sites.
Prepared Site and Cluster Optimization report.
Pre lunched optimization.
Performed optimization for EV-DO and 1X 3G network in Karachi (South Pakistan) and Lahore (central Pakistan) in order to
achieve the KPIs in network level.
Customer complaint resolution. Visited customer place and solve their problems regarding EV-DO.

Education
2005-2009GOVERNMENT COLLEGE UNIVERSITY, FAISALABAD
B.Sc Telecommunication Engineering
PEC# tele1936

2003.2005

FAISALABAD BOARD
F.Sc. Pre-Engineering

1st Division

2001-2003FAISALABAD BOARD
Matriculation, Science
1st Division

2003

NATIONAL B.Z COLLEGE JHANG

Diploma in Computer Application (D.C.A)

Technical And Business Skills


Technical Software:Lab View, Work Bench, Mat lab, PCB wizard, Proteus, Keil.
Programming Languages:C++, JAVA, Assembly, Object Oriented Programming.
Worked On:Micro-controller and Microprocessor
Top in Micro-controller workshop held by IEEE GCUF.

Professional Training
13th April, 2009 TO 6thJune, 2009ReCreation IEEE Club G.C University
Title: CISCO CERTIFIED NETWORKING ASSOCIATE (CCNA)
Location:Faisalabad, Pakistan

19th Aug, 2010 TO 25thAug, 2010MobiservePakistan


(MOBILINK GSM O & M Project)
Title:Telecom Equipment Complete Understanding
Location: RAILWAY BSC, JHANG PAKISTAN

Aim of Training:To Increase

Technical knowledge and professional skills


To reduce
Human errors at sites,
Trouble shooting time,
Number of Repeated Alarms,
Maintenance Cost.

References
Can be furnished on Demand.

Page 3 of 3

You might also like