Federal Register / Vol. 73, No.

9 / Monday, January 14, 2008 / Notices 2237

time on the specified comment date. It Applicants: Bicent (California) protective order that was omitted from
is not necessary to separately intervene Malburg LLC. the 12/21/07 ‘‘Petition for Authority to
again in a subdocket related to a Description: Bicent (California) Sell Power at Market-Based Rates etc.
compliance filing if you have previously Malburg LLC submits a notice of self- Filed Date: 12/31/2007.
intervened in the same docket. Protests certification as a exempt wholesale Accession Number: 20080103–0092.
will be considered by the Commission generator. Comment Date: 5 p.m. Eastern Time
in determining the appropriate action to Filed Date: 12/31/2007. on Tuesday, January 22, 2008.
be taken, but will not serve to make Accession Number: 20080103–0097. Docket Numbers: ER08–385–000.
protestants parties to the proceeding. Comment Date: 5 p.m. Eastern Time Applicants: Pacific Gas and Electric
Anyone filing a motion to intervene or on Tuesday, January 22, 2008. Company.
protest must serve a copy of that Take notice that the Commission Description: Pacific Gas and Electric
document on the Applicant. In reference received the following electric rate Co. submits the Agreements for
to filings initiating a new proceeding, filings: Wholesale Distribution Service and
interventions or protests submitted on Interconnection with McAllister Ranch
Docket Numbers: ER00–2173–006.
or before the comment deadline need Irrigation District.
ER00–3219–006; ER01–1300–007.
not be served on persons other than the Filed Date: 12/28/2007.
Applicant. Applicants: Northern Indiana Public
Service Company; EnergyUSA–TPC Accession Number: 20071231–0141.
The Commission encourages Comment Date: 5 p.m. Eastern Time
electronic submission of protests and Corp.; Whiting Clean Energy, Inc.;
on Friday, January 18, 2008.
interventions in lieu of paper, using the Description: Northern Indiana Public
Service Company, Whiting Clean Docket Numbers: ER08–386–000.
FERC Online links at http:// Applicants: Potomac-Appalachian
www.ferc.gov. To facilitate electronic Energy, Inc et al. submit Original Sheet
1 et al. to FERC Electric Tariff, Original Transmission Highline, LLC.
service, persons with Internet access Description: Potomac-Appalachian
who will eFile a document and/or be Volume 3 in compliance with
Commission’s order issued 11/30/07. Transmission Highline, LLC et al.,
listed as a contact for an intervenor submits Seventh Revised Sheet 26A et
must create and validate an Filed Date: 12/28/2007.
Accession Number: 20080102–0091. al. to FERC Electric Tariff, Sixth Revised
eRegistration account using the Volume 1, effective 3/1/08.
eRegistration link. Select the eFiling Comment Date: 5 p.m. Eastern Time
on Friday, January 18, 2008. Filed Date: 12/28/2007.
link to log on and submit the Accession Number: 20080102–0086.
intervention or protests. Docket Numbers: ER03–329–008; Comment Date: 5 p.m. Eastern Time
Persons unable to file electronically ER07–597–003. on Friday, January 18, 2008.
should submit an original and 14 copies Applicants: NorthWestern
of the intervention or protest to the Docket Numbers: ER08–389–000.
Corporation; Montana Generation, LLC.
Federal Energy Regulatory Commission, Applicants: San Diego Gas & Electric
Description: NorthWestern Corp and
888 First St., NE., Washington, DC Company.
Montana Generation, LLC submits a
20426. Description: San Diego Gas & Electric
non-material change in status, in
The filings in the above proceedings Co. submits Third Revised Sheet 36 et
compliance with the reporting
are accessible in the Commission’s al. to FERC Electric Tariff, Original
requirements adopted in Order 652.
eLibrary system by clicking on the Volume 11, to be effective 1/1/08.
Filed Date: 12/31/2007.
appropriate link in the above list. They Filed Date: 12/28/2007.
Accession Number: 20080103–0094.
are also available for review in the Accession Number: 20071231–0142.
Comment Date: 5 p.m. Eastern Time Comment Date: 5 p.m. Eastern Time
Commission’s Public Reference Room in on Tuesday, January 22, 2008.
Washington, DC. There is an on Friday, January 18, 2008.
Docket Numbers: ER07–1250–002. Docket Numbers: ER08–393–000.
eSubscription link on the Web site that Applicants: PowerGrid Systems, Inc.
enables subscribers to receive e-mail Applicants: PJM Interconnection,
Description: PowerGrid Systems, Inc L.L.C.
notification when a document is added submits a transmittal letter regarding
to a subscribed docket(s). For assistance Description: PJM Interconnection LLC
information requested by the submits an executed interconnection
with any FERC Online service, please e- Commission.
mail FERCOnlineSupport@ferc.gov or service agreement & an executed
Filed Date: 12/21/2007. interconnection construction service
call (866) 208–3676 (toll free). For TTY, Accession Number: 20071221–5149.
call (202) 502–8659. agreement with James River
Comment Date: 5 p.m. Eastern Time Cogeneration Company et al.
Nathaniel J. Davis, on Friday, January 11, 2008. Filed Date: 12/28/2007.
Deputy Secretary. Docket Numbers: ER08–360–001. Accession Number: 20080103–0176.
[FR Doc. E8–408 Filed 1–11–08; 8:45 am] Applicants: Duke Energy Carolinas, Comment Date: 5 p.m. Eastern Time
BILLING CODE 6717–01–P LLC. on Thursday, January 10, 2008.
Description: Duke Energy Carolinas, Docket Numbers: ER08–398–000.
LLC submits an errata to its 12/21/07 Applicants: Pacific Gas and Electric
DEPARTMENT OF ENERGY filing of an Amended Rate Schedule Company.
10A. Description: Pacific Gas and Electric
Federal Energy Regulatory Filed Date: 12/31/2007.
Commission Company submits Service Agreements
Accession Number: 20080103–0093. for Wholesale Distribution Service and
Comment Date: 5 p.m. Eastern Time three Interconnection points and an
Combined Notice of Filings # 1
on Tuesday, January 22, 2008. Interconnection Agreement with Power
rmajette on PROD1PC64 with NOTICES

January 4, 2008. Docket Numbers: ER08–371–001. and Water Resources Pooling Authority.
Take notice that the Commission Applicants: Cooperative Energy Filed Date: 12/31/2007.
received the following exempt Incorporated. Accession Number: 20080102–0090.
wholesale generator filings: Description: Cooperative Energy Comment Date: 5 p.m. Eastern Time
Docket Numbers: EG08–29–000. Incorporated submits its proposed on Tuesday, January 22, 2008.

VerDate Aug<31>2005 15:22 Jan 11, 2008 Jkt 214001 PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 E:\FR\FM\14JAN1.SGM 14JAN1
2238 Federal Register / Vol. 73, No. 9 / Monday, January 14, 2008 / Notices

Docket Numbers: ER08–402–000. eRegistration account using the The EA assesses the potential
Applicants: San Diego Gas & Electric eRegistration link. Select the eFiling environmental effects of the
Company. link to log on and submit the construction and operation of Iroquois’
Description: San Diego Gas and intervention or protests. proposed 08/09 Expansion Project.
Electric Company submits change in Persons unable to file electronically Iroquois proposes to construct its
rates for the Transmission Revenue should submit an original and 14 copies project in three phases which would
Balancing Account Adjustment and its of the intervention or protest to the consist of: looping 1 its existing pipeline
Transmission Access Charge Balancing Federal Energy Regulatory Commission, system at three locations in New York
Account Adjustment. 888 First St. NE., Washington, DC and Connecticut by November 1, 2008
Filed Date: 12/31/2007. 20426. (Phase 1); constructing a new
Accession Number: 20080102–0118. The filings in the above proceedings compressor station in Milford,
Comment Date: 5 p.m. Eastern Time are accessible in the Commission’s Connecticut with 20,620 horsepower of
on Tuesday, January 22, 2008. eLibrary system by clicking on the compression by January 1, 2009 (Phase
Docket Numbers: ER08–403–000. appropriate link in the above list. They 2); and adding a 10,310 horsepower
Applicants: Duke Energy Kentucky, are also available for review in the compressor unit to Iroquois’ Brookfield
Inc. Commission’s Public Reference Room in Compressor Station in Brookfield,
Description: Duke Energy Kentucky, Washington, DC. There is an Connecticut by November 1, 2009
Inc submits an unexecuted Wholesale eSubscription link on the Web site that (Phase 3).2
Distribution Service Agreement with the enables subscribers to receive e-mail The Phase 1 pipeline looping would
City of Williamstown, Kentucky. notification when a document is added include construction of 5.8 miles of 36-
Filed Date: 12/31/2007. to a subscribed dockets(s). For inch-diameter pipeline in Boonville,
Accession Number: 20080103–0095. assistance with any FERC Online New York; 1.0 miles of 36-inch-diameter
Comment Date: 5 p.m. Eastern Time service, please e-mail pipeline in Wright, New York; and 1.6
on Tuesday, January 22, 2008. FERCOnlineSupport@ferc.gov. or call miles of 36-inch-diameter pipeline in
Docket Numbers: ER08–404–000. (866) 208–3676 (toll free). For TTY, call Newtown, Connecticut. The new
Applicants: Midwest Independent (202) 502–8659. pipeline segments would be located
Transmission System. Nathaniel J. Davis, Sr., adjacent to Iroquois’ existing pipeline at
Description: Midwest Independent Deputy Secretary. these locations.
Transmission System Operator, Inc. The EA has been placed in the public
[FR Doc. E8–409 Filed 1–11–08; 8:45 am]
submits proposed revisions to its Open files of the FERC. A limited number of
BILLING CODE 6717–01–P
Access Transmission and Energy copies of the EA are available for
Markets Tariff. distribution and public inspection at:
Filed Date: 12/31/2007. Federal Energy Regulatory Commission,
DEPARTMENT OF ENERGY
Accession Number: 20080103–0096. Public Reference Room, 888 First Street,
Comment Date: 5 p.m. Eastern Time Federal Energy Regulatory NE., Room 2A, Washington, DC 20426,
on Tuesday, January 22, 2008. Commission (202) 502–8371.
Any person desiring to intervene or to Copies of the EA have been mailed to
[Docket No. CP07–457–000]
protest in any of the above proceedings federal, state, and local agencies, public
must file in accordance with Rules 211 Iroquois Gas Transmission System, interest groups, interested individuals,
and 214 of the Commission’s Rules of L.P.; Notice of Availability of the newspapers, and parties to this
Practice and Procedure (18 CFR 385.211 Environmental Assessment for the proceeding.
and 385.214) on or before 5 p.m. Eastern Proposed Iroquois 08/09 Expansion Any person wishing to comment on
time on the specified comment date. It Project the EA may do so. To ensure
is not necessary to separately intervene
consideration prior to a Commission
again in a subdocket related to a January 4, 2008.
decision on the proposal, it is important
compliance filing if you have previously The staff of the Federal Energy that we receive your comments before
intervened in the same docket. Protests Regulatory Commission (FERC or the date specified below. Please
will be considered by the Commission Commission) has prepared an carefully follow these instructions to
in determining the appropriate action to environmental assessment (EA) on the ensure that your comments are received
be taken, but will not serve to make natural gas facilities proposed by in time and properly recorded:
protestants parties to the proceeding. Iroquois Gas Transmission System, L.P.
Anyone filing a motion to intervene or (Iroquois) in the above-referenced • Send an original and two copies of
protest must serve a copy of that docket. The Iroquois 08/09 Expansion your comments to: Kimberly D. Bose,
document on the Applicant. In reference Project would expand Iroquois’ existing Secretary, Federal Energy Regulatory
to filings initiating a new proceeding, system to deliver up to 200,000 Commission, 888 First St., NE., Room
interventions or protests submitted on dekatherms per day of natural gas 1A, Washington, DC 20426;
or before the comment deadline need transportation service to KeySpan Gas • Reference Docket No. CP07–457–
not be served on persons other than the East Corporation at South Commack, 000;
Applicant. Long Island.
The Commission encourages The EA was prepared to satisfy the 1 A loop is a segment of pipeline that is usually

electronic submission of protests and requirements of the National installed to an existing pipeline and connected to
it at both ends. The loop allows more gas to be
interventions in lieu of paper, using the Environmental Policy Act of 1969. The moved through the system.
FERC Online links at http:// staff concludes that approval of the
rmajette on PROD1PC64 with NOTICES

2 The Brookfield Compressor Station was

www.ferc.gov. To facilitate electronic proposed project, with appropriate approved by the Commission on December 21,
service, persons with Internet access mitigating measures, would not 2006, as part of Iroquois’ Market Access Project in
Docket No. CP02–31–002. Construction of the
who will eFile a document and/or be constitute a major federal action Brookfield Compressor Station commenced in the
listed as a contact for an intervenor significantly affecting the quality of the October 2007 and operation of the station is
must create and validate an human environment. scheduled to commence in the fall of 2008.

VerDate Aug<31>2005 15:22 Jan 11, 2008 Jkt 214001 PO 00000 Frm 00027 Fmt 4703 Sfmt 4703 E:\FR\FM\14JAN1.SGM 14JAN1