You are on page 1of 1

71130 Federal Register / Vol. 72, No.

240 / Friday, December 14, 2007 / Notices

Requests for copies of the proposed seq.), provides that no new base load SUMMARY: The Federal Energy
information collection request may be electric powerplants may be constructed Regulatory Commission (Commission) is
accessed from http://edicsweb.ed.gov, or operated without the capability to use providing notice of its request to the
by selecting the ‘‘Browse Pending coal or another alternate fuel as a Office of Management and Budget
Collections’’ link and by clicking on primary energy source. Pursuant to FUA (OMB) for emergency processing of a
link number 3546. When you access the section 201(d), in order to meet the proposed collection of information in
information collection, click on requirement of coal capability, the connection with steps being taken by
‘‘Download Attachments’’ to view. owner or operator of such facilities the electric industry to address potential
Written requests for information should proposing to use natural gas or cyber vulnerabilities, and is soliciting
be addressed to U.S. Department of petroleum as its primary energy source public comment on that information
Education, 400 Maryland Avenue, SW., shall certify to the Secretary of Energy collection.
Potomac Center, 9th Floor, Washington, (Secretary) prior to construction, or DATES: The Commission and OMB must
DC 20202–4700. Requests may also be prior to operation as a base load electric receive comments on or before January
electronically mailed to powerplant, that such powerplant has 14, 2008.
ICDocketMgr@ed.gov or faxed to 202– the capability to use coal or another
245–6623. Please specify the complete ADDRESSES: Send comments to:
alternate fuel. Such certification
title of the information collection when establishes compliance with FUA (1) Nathan Frey, FERC Desk Officer,
making your request. section 201(a) as of the date it is filed Office of Information and Regulatory
Comments regarding burden and/or with the Secretary. The Secretary is Affairs, Office of Management and
the collection activity requirements required to publish a notice in the Budget. Mr. Frey may be reached by
should be electronically mailed to Federal Register reciting that the telephone at (202) 395–7345.
ICDocketMgr@ed.gov. Individuals who certification has been filed. (2) Michael Miller, Office of the
use a telecommunications device for the The following owners of proposed Executive Director, ED–30, Federal
deaf (TDD) may call the Federal new base load electric powerplants have Energy Regulatory Commission, 888
Information Relay Service (FIRS) at 1– filed self-certifications of coal-capability First Street NE., Washington, DC 20426.
800–877–8339. with DOE pursuant to FUA section Mr. Miller may be reached by telephone
201(d) and in accordance with DOE at (202) 502–8415 and by e-mail at
[FR Doc. E7–24272 Filed 12–13–07; 8:45 am] michael.miller@ferc.gov.
BILLING CODE 4000–01–P
regulations in 10 CFR 501.60, 61:
Owner: Nueces Bay WLE, LP FOR FURTHER INFORMATION CONTACT:
Capacity: 700 MW Jonathan First, Office of the General
Plant Location: Corpus Christi, Nueces Counsel, Federal Energy Regulatory
DEPARTMENT OF ENERGY
County, Texas Commission, 888 First Street NE.,
[Certification Notice–215] In-Service Date: June, 2009 Washington, DC 20426. Mr. First may be
Owner: Laredo WLE, LP reached by telephone at (202) 502–8529
Office Electricity Delivery and Energy Capacity: 200 MW and by e-mail at jonathan.first@ferc.gov.
Reliability; Notice of Filings of Self- Plant Location: Laredo, Webb County,
Certifications of Coal Capability Under SUPPLEMENTARY INFORMATION: A recent
Texas experiment conducted for the
the Powerplant and Industrial Fuel Use In-Service Date: June, 2008
Act Department of Homeland Security by
Owner: Barney M. Davis, LP the Idaho National Laboratory
AGENCY: Office Electricity Delivery and Capacity: 700 MW
Plant Location: Corpus Christi, Nueces demonstrated that under certain
Energy Reliability, DOE. conditions energy infrastructure could
County, Texas
ACTION: Notice of Filings. In-Service Date: June, 2009 be intentionally damaged through cyber
attack. In that experiment, researchers
SUMMARY: On October 23, 2007, The Issued in Washington, DC, on December 3, caused a generator to malfunction
WCM Group, Inc., on behalf of three 2007.
through an experimental cyber attack.
owners and operators of new base load Anthony J. Como, This potential cyber vulnerability,
electric powerplants, submitted coal Director, Permitting and Siting, Office of which was recently broadcast on CNN,
capability self-certifications to the Electricity Delivery and Energy Reliability. was the subject of an October 17, 2007
Department of Energy (DOE) pursuant to [FR Doc. E7–24232 Filed 12–13–07; 8:45 am] hearing before the Homeland Security
section 201(d) of the Powerplant and BILLING CODE 6450–01–P Subcommittee on Emerging Threats,
Industrial Fuel Use Act of 1978 (FUA), Cybersecurity, and Science and
as amended, and DOE regulations in 10 Technology, U.S. House of
CFR 501.60, 61. Section 201(d) of FUA DEPARTMENT OF ENERGY Representatives.
requires DOE to publish a notice of The Commission intends to
receipt of self-certifications in the Federal Energy Regulatory
immediately issue a directive that
Federal Register. Commission
requires all generator owners, generator
ADDRESSES: Copies of coal capability [Docket No. IC08–725C–000] operators, transmission owners, and
self-certification filings are available for transmission operators that are
public inspection, upon request, in the Proposed Information Collection and registered by the North American
Office of Electricity Delivery and Energy Request for Comments Electric Reliability Corporation (NERC)
Reliability, Mail Code OE–20, Room and located in the United States to
December 7, 2007.
8G–024, Forrestal Building, 1000 provide to NERC certain information
Independence Avenue, SW., AGENCY: Federal Energy Regulatory
related to actions they have taken or
rmajette on PROD1PC64 with NOTICES

Washington, DC 20585. Commission, Department of Energy.


intend to take to protect against the
ACTION: Request for Office of
FOR FURTHER INFORMATION CONTACT: potential cyber vulnerability discussed
Ellen Russell at (202) 586–9624. Management and Budget Emergency
above. The Commission will also
Processing of proposed information
SUPPLEMENTARY INFORMATION: Title II of require NERC to make this information
collection and request for comments.
FUA, as amended (42 U.S.C. 8301 et available for Commission review.

VerDate Aug<31>2005 15:31 Dec 13, 2007 Jkt 214001 PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 E:\FR\FM\14DEN1.SGM 14DEN1

You might also like