You are on page 1of 4

1

Project 25 Documents

Approved Project 25 Standards


Approved 23Oct14

Official Document Title


APCO Project 25 System and Standards Definition
Project 25 Digital Land Mobile Radio - Security
Services Overview
Project 25 Digital Land Mobile Radio - Security
Services Overview - Addendum
Project 25 Digital Land Mobile Radio Block Encryption
Protocol
Project 25 Trunking Overview
Project 25 Trunking Control Channel Formats
Project 25 Trunking Control Channel Messages
Project 25 Trunking Control Channel Messages
Addendum 1
Trunking Procedures

Approved by the P25


Steering Committee as a
P25 Standard
Jun-12

TIA Reference Title


TIA-102 Documentation Suite Overview

TIA Document #
TSB-102-B

ANSI

Published
Jun-12

Re-affirmed

Security Services Overview

TIA-102.AAAB-A

Jan-05

Feb-11

Sec urity Services Overview Addendum 1

TIA-102.AAAB-A-1

Sep-14

Aug-14

Block Encryption Protocol


Trunking, Overview
Trunking Control Channel Formats
Trunking Control Channel Messages
Trunking Control Channel Messages Addendum 1 - TDMA
messages
Trunking Procedures

TIA-102.AAAD-A
TIA-102.AABA-B
TIA/EIA-102.AABB-B
TIA-102.AABC-C

X
X
X
X

Aug-09
Apr-11
July-11
Nov-09

Aug-09
Apr-11
Jul-11
Nov-13

Apr-11
Nov-14

May-11
Oct-14

Mar-11

Jan-11

Jan-13
Apr-09

Sep-12
Apr-09

Nov-14

Oct-14

Project 25 Link Control Word Formats and Messages


Link Control Words, Formats, and Messages
Addendum 1
Project 25 Conventional Control Messages
Project 25 Dynamic Regrouping Messages and
Procedures
Project 25 Digital Radio Over-the-Air Rekeying (OTAR)
Protocol
Conformance Tests for Project 25 Over-the-air
Rekeying (OTAR) Protocol
Project 25 Digital Land Mobile Radio - Key Fill Device
(KFD) Interface Protocol
Project 25 Digital Land Mobile Radio Link Layer
Authentication
Project 25 FDMA - Common Air Interface

Link Control Words, Formats, and Messages

Project 25 Common Air Interface Conformance Test


Project 25 Common Air Interface Reserved Values
Project 25 Conventional Procedures
Project 25 Vocoder Description
Project 25 Vocoder Mean Opinion Score Conformance
Test

Link Control Words, Formats, and Messages Addendum 1


Conventional Control Messages
Dynamic Regrouping Messages and Procedures

TIA-102.AABC-C-1
TIA-102.AABD-B
TIA-102.AABF-C

TIA-102.AABF-C-1
TIA-102.AABG
TIA-102.AABH

Jan-05

OTAR Protocol

TIA/EIA-102.AACA-A

Sep-14

Aug-14

OTAR Conformance

TIA-102.AACC-A

Aug-06

Aug-06

Key Fill Device (KFD) Interface Protocol

TIA-102.AACD-A

Sep-14

Aug-14

Link Layer Authentication


Common Air Interface (CAI)

TIA-102.AACE-A
TIA-102.BAAA-A

Apr-11
Sep-03

Apr-11
Sep-03

CAI Conformance Testing


CAI Reserved Values
Conventional Procedures
Vocoder Description

TIA-102.BAAB-B
TIA-102.BAAC-C
TIA-102.BAAD-A
TIA/EIA-102.BABA-A

Vocoder Mean Opinion Score (MOS) Test

TIA/EIA-102.BABB

Jan-13

Mar-05
Apr-11
Feb-10
Feb-14

Jan-13
Apr-11
Feb-10
Oct-13

Feb-14

Nov-13

Nov-13

1/28/2015

Project 25 Documents

Approved 23Oct14

Published
Apr-99
May-96

Re-affirmed
Jul-08

Approved by the P25


Steering Committee as a
P25 Standard
Apr-99
May-96

TSB-102.BABD

May-96

Jul-08

Jul-08

Vocoder Evaluation MOS Test

TSB-102.BABE

May-07

May-07

Vocoder Experiment 3 MOS Test Plan

TSB-102.BABF

Mar-08

Mar-08

Enhanced Vocoder Methods of Measurement

TIA-102.BABG

Mar-10

Mar-10

TIA-102.BACA-B

Nov-12

Oct-12

TIA-102.BACA-B-1
TSB-102.BACC-B

Jul-13
Nov-11

Jul-13
Oct-11

TIA-102.BACD-B

Jul-11

Aug-11

Conventional ISSI Messages and Procedures

TIA-102.BACE

Jun-08

ISSI Messages and Procedures for Packet Data Services

TIA-102.BACF

Oct-09

Jul-12

Jun-13
Jun-12
Sep-14
May-10
Nov-13
May-13

Jun-14
Jan-12
Aug-14
May-10
Nov-13
Jan-14

TIA-102.BAEJ

Sep-13

Aug-14

Network Management Interface Definition


Console Subsystem Interface Overview

TSB-102.BAFA-A
TSB-102.BAGA

Jul-99
Feb-08

Fixed Station Interface Messages and Procedures


Location Services Overview
Tier 1 Location Services
Tier 2 Location Services
TCP/UDP Port Number Assignments
KMF to KMF Interface
Two-Slot TDMA Overview

TIA-102.BAHA
TSB-102.BAJA-A
TIA-102.BAJB-A
TIA-102.BAJC
TIA-102.BAJD
TIA-102.BAKA
TSB-102.BBAA

Jun-06
Feb-10
Nov-14
Oct-11
Oct-10
Apr-12
Mar-10

Jun-06
Feb-10
Oct-14
Oct-10
Oct-10
Jan-12
Mar-10

TIA-102.BBAB

Jul-09

Jul-09

Official Document Title


Project 25 Vocoder Reference Test
APCO Project 25 Vocoder Selection Process

TIA Reference Title


Vocoder Reference Test
Vocoder Selection Process

APCO Project 25 Vocoder Selection Process Tapes


Project 25 Vocoder Evaluation Mean Opinion Score
Test
Experiment 3 MOS Test Plan for Vocoder Technology
for Project 25 Phase 2
Project 25 Enhanced Vocoder Methods of
Measurement for Performance
Project 25 Inter-RF Subsystem Interface Messages
and Procedures for Voice and Mobility Management
Services
Project 25 Inter-RF Subsystem Interface Messages
and Procedures for Voice, Mobility Management, and
RFSS Capability Polling Services - Addendum 1 Group Emergency Behaviors
Project 25 Inter-RF Subsystem Interface Overview

Vocoder Selection Process Tapes

Project 25 Inter-RF Subsystem Interface (ISSI)


Messages and Procedures for Supplementary Data
Project 25 Inter-RF Subsystem Interface (ISSI)
Messages and Procedures for Conventional
Operations
Project 25 Inter-RF Subsystem Interface (ISSI)
Messages and Procedures for Packet Data Services
Project 25 Telephone Interconnect Requirements and
Definitions (Voice Services)
Project 25 Data Overview
Project 25 Packet Data Specification
Project 25 Radio Management Protocols
Project 25 Packet Data Host Network Interface
Project 25 Mobile Data Peripheral Interface
Project 25 Conventional Management Service Packet
Data
Project 25 Network Management Interface Overview
Project 25 Console Subsystem Interface Overview
Project 25 Fixed Station Interface Messages and
Procedures
Project 25 Location Services Overview
Project 25 Tier 1 Location Services
Project 25 Tier 2 Location Services Specifications
Project 25 TCP/UDP Port Number Assignments
APCO Project 25 KMF to KMF Interface
Project 25 Two-slot TDMA Overview
Project 25 Phase 2 Two-Slot Time Division Multiple
Access Physical Layer Protocol Specification

ISSI Messages and Procedures

ISSI Messages and Procedures - Addendum 1 - Group


Emergency Behaviors
ISSI Overview

Supplementary Data ISSI Messages and Procedures

Telephone Int. Reqs and Defs (Voice Service)


Data Overview and Specification
Packet Data Specification
Radio Control Protocol Specification
Packet Data Host Network Interface
Mobile Data Peripheral Interface
Conventional Management Service Packet Data

Two-Slot TDMA Physical Layer Description

TIA Document #
TIA/EIA-102.BABC
TSB-102.BABD

TIA/EIA-102.BADA-A
TIA/EIA-102.BAEA-B
TIA-102.BAEB-B
TIA-102.BAEE-B
TIA-102.BAEF
TIA-102.BAEG

ANSI
X

X
X
X
X
X

Jan-13

Jan-13
Jan-13

Jan-13

Jan-13
Jan-13

1/28/2015

Project 25 Documents

Approved 23Oct14

Official Document Title


Project 25 Phase 2 Two-slot TDMA Media Access
Control Layer Description
Project 25 Phase 2 Two-slot TDMA Media Access
Control Layer Description Addendum 1
Project 25 Phase 2 Two-Slot Time Division Multiple
Access Trunked Voice Services Common Air Interface
Conformance Specification
Project 25 Phase 2 Two-Slot Time Division Multiple
Access Trunked Voice Services Message and
Procedures Conformance Specification
Project 25 Trunked TDMA Voice Channel
Conformance Profiles
Digital C4FM/CQPSK Transceiver Measurement
Methods
Land Mobile Radio Transceiver Performance
Recommendations Project 25 - Digital Radio
Technology C4FM/CQPSK Modulation
Project 25 Mobile Radio Push-to-Talk and Audio
Interface - Definitions and Methods of Measurement
Project 25 Interoperability Test Procedures
Conventional Voice Equipment
Project 25 Interoperability Test Procedures - Over-theair Rekeying (OTAR)
Project 25 Interoperability Testing for Voice Operation
in Trunked Systems
Project 25 Interoperability Testing for Voice Operation
in Trunked Systems Addendum - TDMA Mode
Project 25 Inter RF Subsystem Interface (ISSI)
Measurement Methods for Voice Services
Project 25 Inter RF Subsystem Interface (ISSI)
Measurement Methods for Voice Services - Addendum
1 Trunked Console ISSI
Project 25 Inter-RF Subsystem Interface (ISSI)
Performance Recommendations for Voice Services
Project 25 Inter-RF Subsystem Interface (ISSI)
Performance Recommendations for Voice Services Addendum 1 Trunked Console ISSI
Project 25 Inter-RF Subsystem Interface Conformance
Test Proectures
Project 25 Inter-RF Subsystem Interface Conformance
Test Proectures Addendum 1 - Supplementary Data
Project 25 Inter-RF Subsystem Interface Interoperability Test Procedures for Trunked Systems
Involving the ISSI
Project 25 Fixed Station Interface Conformance Test
Procedure

TIA Reference Title


Two-Slot TDMA MAC Layer

TIA Document #

ANSI

Published

Re-affirmed

Approved by the P25


Steering Committee as a
P25 Standard

TIA-102.BBAC

Dec-10

Nov-12

TIA-102.BBAC-1

Feb-13

Jan-13

Two-Slot TDMA CAI Conformance

TIA-102.BCAD

Sep-11

Sep-11

Two-Slot TDMA Messages and Procedures Conf Spec

TIA-102.BCAE

Jul-11

Jul-11

Trunked TDMA Voice Channel Conformance Profile

TIA-102.BCAF

Aug-12

Aug-12

Two-Slot TDMA MAC Layer Addendum 1

Transceiver Measurements and Methods

TIA-102.CAAA-D

Apr-13

Apr-13

Transceiver Performance Recommendations

TIA-102.CAAB-D

Feb-13

Dec-12

Mobile PTT and Audio Interface

TSB-102.CAAC

Sep-02

Sep-02

Interoperability Test Procedures, Conventional Voice

TIA-102.CABA

Oct-10

Oct-10

Interoperability Test Procedures, OTAR

TIA-102.CABB

Aug-03

Interoperability Test Procedures, Voice Mode Trunking


Interoperability Test Procedures, Voice Mode TDMA
Trunking
ISSI Measurement Methods

ISSI Measurement Methods - Trunked Console

ISSI Performance Recommendations


ISSI Performance Recommendations Addendum 1 Trunked Consoles
ISSI Conformance Test Procedures

ISSI Conformance Test Procedures - Supplementary Data


ISSI Interoperability Test Procedure for Trunked Voice
Operation
Fixed Station Interface Conformance Test

TIA-102.CABC-B

Nov-10

TIA-102.CABC-B-1

Jul-11

Aug-03
Nov-10
Jul-11

TIA-102.CACA

Apr-07

Mar-13

Jan-13

TIA-102.CACA-1

Dec-08

Jan-13

Dec-08

TIA-102.CACB

Apr-07

Mar-13

Jan-13

TIA-102.CACB-1

Dec-08

Jan-13

Dec-08

TIA-102.CACC

Jan-09

Aug-11

TIA-102.CACC-1

Aug-11

Aug-11

TIA-102.CACD-B

Feb-10

Jan-13

TIA-102.CADA

Apr-07

Jan-13

Jan-13

1/28/2015

Project 25 Documents

Approved 23Oct14

Official Document Title


Project 25 Conformance Profile Level One - Basic
Conventional Operation
Project 25 Conformance Profile Level Two - Advanced
Conventional Operation
Project 25 Conformance Profile Level Three - Basic
Trunked Operation
Project 25 Conformance Profiles for Advanced
Trunked Operations
Project 25 Compliance Assessment Overview
Project 25 Compliance Assessment Program Supplier
Declaration of Compliance Template
Project 25 Compliance Assessment Summary Test
Report Guidelines - Transceiver Performance
Project 25 Compliance Assessment Summary Test
Report Guidelines - Trunking Interoperability
Project 25 Compliance Assessment Tests Transceiver Performance - Conventional Mode
Subscriber
Project 25 Compliance Assessment Tests Transceiver Performance - Conventional Mode Fixed
Station
Project 25 Recommended Compliance Assessment
Tests - Conventional Operation
Project 25 Recommended Compliance Assessment
Tests - Transceiver Performance - Trunking Mode
Subscriber
Project 25 Recommended Compliance Assessment
Tests - Performance - Trunked Mode Fixed Station
Transceiver and Related Infrastructure
Project 25 Recommended Compliance Assessment
Tests - Trunking Interoperability
Project 25 Recommended Compliance Assessment
Tests - Trunking ISSI
Project 25 Recommended Compliance Assessment
Tests for TDMA Trunking Voice Channel Air Interface
Two-Slot Time Division Multiple Access Transciever
Measurement Methods
Two-Slot Time Division Multiple Access Transciever
Performance Recommendations

Withdrawn Documents

Conformance Test for the Project 25 DES Encryption


Protocol

TIA Reference Title

TIA Document #

ANSI

Published

Re-affirmed

Approved by the P25


Steering Committee as a
P25 Standard

Conformance Profile One - Basic Conventional Operation


Conformance Profile Two - Advanced Conventional
Operation

TIA-102.CAEA

Apr-09

Apr-09

TIA-102.CAEB

Dec-09

Dec-09

Conformance Profile Basic Trunked Operation

TIA-102.CAEC

Dec-12

Oct-12

Conformance Profile Four - Advanced Trunked Operations


P25 CAP Overview

TIA-102.CAED
TSB-102.CBAA

Nov-13
Oct-10

Nov-13
Oct-10

P25 CAP SDoC Template


Summary Test Report Guidelines Transceiver
Performance

TSB-102.CBAB

Jun-09

Jun-09

TSB-102.CBAC

Apr-09

Apr-09

Summary Test Report Guidelines Trunking Interoperability

TSB-102.CBAF

Apr-09

Apr-09

P25 CAP Conventional Mode Subscriber Performance

TSB-102.CBBA

Feb-09

Feb-09

P25 CAP Conventional Mode Fixed Station Performance

TSB-102.CBBC

Feb-09

Feb-09

P25 CAP Conventional RCAT

TSB-102.CBBE

Sep-11

Aug-11

P25 CAP Trunked Mode Subscriber Performance

TSB-102.CBBF

Feb-09

Feb-09

P25 CAP Trunked Mode Fixed Station Performance

TSB-102.CBBH

Jan-09

Jan-09

P25 CAP Trunked Interoperability RCAT

TSB-102.CBBJ-B

Sep-11

Aug-11

P25 CAP Trunked ISSI RCAT

TSB-102.CBBK-A

Mar-10

Mar-10

P25 CAP RCAT TDMA Voice Channel Air Interface

TSB-102.CBBL

Jun-12

Jun-12

Two-Slot TDMA Transceiver Measurement Methods


Two-Slot TDMA Transceiver Performance
Recommendations

TIA-102.CCAA

Aug-11

Aug-11

TIA-102.CCAB-A

Mar-14

Jan-14

Withdrawn Documents
DES Encryption Protocol
Circuit Data Specification

Document #
TIA/EIA-102.AAAA-A
TIA/EIA-102.BAEC

DES Encryption Conformance

TIA/EIA-102.AAAC

ANS
X
X

Withdrawn Date
Oct-15
Jan-15

Status

Feb-01

Apr-07

1/28/2015

You might also like