35736 Federal Register / Vol. 72, No.

125 / Friday, June 29, 2007 / Notices

including whether the proposed rule SUSQUEHANNA RIVER BASIN mgd, 0.350 mgd, 0.325 mgd, and 0.125
change is consistent with the Act. COMMISSION mgd.
Comments may be submitted by any of 3. Project Sponsor and Facility: Far
the following methods: Notice of Actions Taken at June 13, Away Springs—Brandonville, East
2007 Meeting Union and Mahanoy Townships,
Electronic Comments Schuylkill County, Pa. Approval for
AGENCY: Susquehanna River Basin
• Use the Commission’s Internet Commission.
groundwater withdrawal of 0.079 mgd
comment form (http://www.sec.gov/ and consumptive water use of up to
ACTION: Notice of Commission actions. 0.200 mgd.
rules/sro.shtml); or
• Send an e-mail to rule- 4. Project Sponsor and Facility:
SUMMARY: At a public hearing held on
comments@sec.gov. Please include File Hughesville Borough Authority (Well 1,
June 13, 2007 in North East, MD, the
Number SR–BSE–2007–23 on the Well 2, Well 3), Wolf Township,
Susquehanna River Basin Commission
subject line. Lycoming County, Pa. Approval for
approved certain water resources
groundwater withdrawals of 0.260 mgd,
Paper Comments projects, accepted a settlement proposal,
0.260 mgd and 1.440 mgd.
and incorporated two projects into the 5. Project Sponsor: Glenn O.
• Send paper comments in triplicate SRBC Comprehensive Plan, as described Hawbaker, Inc. Project Facility: Pleasant
to Nancy M. Morris, Secretary, in the SUPPLEMENTARY INFORMATION Gap, Spring Township, Centre County,
Securities and Exchange Commission, section below. In other meeting action, Pa. Modification of consumptive water
100 F Street, NE., Washington, DC the Commission heard informational use approval (Docket No. 20050307).
20549–1090. presentations on: (1) The 2007 migratory 6. Project Sponsor and Facility: Centre
All submissions should refer to File fish runs through the fish passage Hills Country Club (Hole #8 Well,
Number SR–BSE–2007–23. This file facilities located at the lower Driving Range Well), College Township,
number should be included on the Susquehanna River hydroelectric Centre County, Pa. Approval for
subject line if e-mail is used. To help the projects, (2) a Coastal Plain Aquifer groundwater withdrawals of 0.316 mgd
Commission process and review your Study being led by the U.S. Geological and 0.316 mgd.
comments more efficiently, please use Survey Maryland District, and (3) 7. Project Sponsor: New Enterprise
only one method. The Commission will hydrologic conditions in the basin Stone & Lime Co., Inc. Project Facility:
post all comments on the Commission’s indicating the occurrence of dry Tyrone Quarry, Warriors Mark and
Internet Web site (http://www.sec.gov/ conditions during the month of May. Snyder Townships, Huntingdon and
rules/sro.shtml). Copies of the The Commission also adopted the FY– Blair Counties, Pa. Modification of
submission, all subsequent 2009 budget, elected Commission surface water and groundwater approval
amendments, all written statements officers for FY–2008, approved/ratified (Docket No. 20031205).
with respect to the proposed rule several grants and contracts, and 8. Project Sponsor: New Enterprise
change that are filed with the presented the SRBC Maurice K. Stone & Lime Co., Inc. Project Facility:
Commission, and all written Goddard Award to William A. Gast of Ashcom Quarry, Snake Spring Valley
communications relating to the the Pennsylvania Dept. of Township, Bedford County, Pa.
proposed rule change between the Environmental Protection. For further Modification of groundwater approval
Commission and any person, other than meeting details, visit the Commission’s (Docket No. 20031204).
those that may be withheld from the Web site at http://www.srbc.net. 9. Project Sponsor and Facility: AES
public in accordance with the DATES: June 13, 2007. Ironwood, LLC, South Lebanon
provisions of 5 U.S.C. 552, will be ADDRESSES: Susquehanna River Basin Township, Lebanon County, Pa.
available for inspection and copying in Commission, 1721 N. Front Street, Modification of surface water and
the Commission’s Public Reference Harrisburg, PA 17102–2391. consumptive use approval and
Room, 100 F Street, NE., Washington, FOR FURTHER INFORMATION CONTACT:
diversion (Docket No. 19980502).
DC 20549, on official business days 10. Project Sponsor and Facility: East
Richard A. Cairo, General Counsel,
between the hours of 10 a.m. and 3 p.m. telephone: (717) 238–0423; ext. 306; fax: Cocalico Township Authority (Well F,
Copies of such filing also will be Well M), East Cocalico Township,
(717) 238–2436; e-mail: rcairo@srbc.net
available for inspection and copying at Lancaster County, Pa. Approval for
or Deborah J. Dickey, Secretary to the
the principal office of BSE. All groundwater withdrawals of 1.150 mgd
Commission, telephone: (717) 238–
comments received will be posted and 1.580 mgd.
0422, ext. 301; fax: (717) 238–2436; 11. Project Sponsor: Golf Enterprises,
without change; the Commission does e-mail: ddickey@srbc.net. Regular mail
not edit personal identifying Inc. Project Facility: Valley Green Golf
inquiries may be sent to the above Course, Newberry Township, York
information from submissions. You address.
should submit only information that County, Pa. Modification of
you wish to make available publicly. All SUPPLEMENTARY INFORMATION: At a consumptive water use approval
submissions should refer to File public hearing on June 13, 2007, the (Docket No. 20021019).
Number SR–BSE–2007–23 and should Susquehanna River Basin Commission 12. Project Sponsor and Facility:
be submitted on or before July 20, 2007. took the following actions: Mount Joy Borough Authority (Well 3),
Mount Joy Borough, Lancaster County,
For the Commission, by the Division of Public Hearing—Projects Approved
Pa. Approval for groundwater
Market Regulation, pursuant to delegated
1. Project Sponsor and Facility: Town withdrawal of 1.020 mgd.
authority.13
of Conklin (Well 5), Broome County, 13. Project Sponsor and Facility: Dart
mstockstill on PROD1PC66 with NOTICES

Florence E. Harmon,
N.Y. Approval for groundwater Container Corporation of Pennsylvania
Deputy Secretary. withdrawal of 0.350 mgd. (Well B), Upper Leacock Township,
[FR Doc. E7–12604 Filed 6–28–07; 8:45 am] 2. Project Sponsor and Facility: Town Lancaster County, Pa. Approval for
BILLING CODE 8010–01–P of Erwin (ID Well 2, Well 2, Well 3, ID groundwater withdrawal of 0.122 mgd.
Well 1), Steuben County, N.Y. Approval 14. Project Sponsor: Honey Run GIBG
13 17 CFR 200.30–3(a)(12). for groundwater withdrawals of 0.504 LLC. Project Facility: Honey Run Golf

VerDate Aug<31>2005 16:20 Jun 28, 2007 Jkt 211001 PO 00000 Frm 00053 Fmt 4703 Sfmt 4703 E:\FR\FM\29JNN1.SGM 29JNN1
Federal Register / Vol. 72, No. 125 / Friday, June 29, 2007 / Notices 35737

Club, Dover Township, York County, feasibility of improvements to the U.S. species and habitat, land use
Pa. Modification of surface water 50 corridor as well as other alternatives compatibility impacts and impacts to
withdrawal approval (Docket No. for improving mobility and alleviating agricultural lands.
20020827). congestion in the urban area boundary Alternatives: The EA will consider
of North Vernon and in the general alternatives that include the No-Build
Public Hearing—Enforcement Action— (Do Nothing) Alternative as well as a
project vicinity.
Settlement full range of build alternatives ranging
DATES: Comments on the scope of the
South Slope Development EA for the proposed project should be from transportation system management
Corporation (Docket No. 19991103). The forwarded no later than July 30, 2007. improvements to major capital
Commission accepted a settlement ADDRESSES: Address all comments investments on existing and new
proposal from South Slope concerning this notice to Carl D. alignment.
Development Corporation for certain Camacho, P.E., Project Manager, Scoping and Comment: FHWA
docket violations occurring at the Song Bernardin, Lochmueller & Associates, encourages broad participation in the
Mountain Ski Resort in the Town of Inc. (BLA), 6125 South East Street (US EA process and review of the resulting
Preble, Cortland County, New York. 31 South), Indianapolis, IN 46227. He environmental documents. Comments,
can be reached by telephone at (317) questions, and suggestions related to the
Public Hearing—Revision of
222–3880 or by e-mail at project and potential socioeconomic and
Comprehensive Plan
ccamacho@blainc.com. environmental concerns are invited
The Commission revised the SRBC from all interested agencies and the
Comprehensive Plan by including the FOR FURTHER INFORMATION CONTACT: public at large to ensure that the full
following projects: (1) Whitney Point Larry Heil, Environmental Specialist, range of issues related to the proposed
Lake Section 1135 Project Modification; FHWA, at (317) 226–7480; or Steve action and all reasonable alternatives
and (2) Lancashire No. 15 AMD Smith, Indiana Department of are considered and all significant issues
Treatment Plant. Both of these projects Transportation (INDOT) Project are identified. These comments,
will provide releases of water for Manager, at (317) 232–5646. questions, and suggestions should be
environmental improvement and low SUPPLEMENTARY INFORMATION: The forwarded to the address listed above.
flow augmentation. FHWA, in cooperation with INDOT, Early Coordination Letters were sent
Authority: Pub. L. 91–575, 84 Stat. 1509 et will prepare an EA to determine the to the appropriate Federal, State and
seq., 18 CFR parts 806, 807, and 808. need and feasibility of improvements to local agencies on January 31, 2007,
U.S. 50 in Jackson and Jennings describing the proposed action. An
Dated: June 19, 2007.
Counties in Indiana. The U.S. 50 invitation letter was sent to potential
Thomas W. Beauduy, improvement corridor is approximately Participating Agencies inviting the
Deputy Director. 18 miles in length, running from the agencies to be Participating Agencies in
[FR Doc. E7–12618 Filed 6–28–07; 8:45 am] western terminus at I–65, near Seymour the study, encouraging agency
BILLING CODE 7040–01–P in Jackson County, to the eastern comments and suggestions concerning
terminus near the Jennings/Ripley the proposed project, and further
County Line, east of North Vernon. defining the roles of Participating
DEPARTMENT OF TRANSPORTATION Issues prompting this study include Agencies. Existing and future conditions
high through traffic volumes (especially and issues within the project area have
Federal Highway Administration trucks) on U.S. 50 through downtown been identified and presented to the
North Vernon, high crash frequency public in a widely advertised Public
Environmental Assessment: Jackson along U.S. 50 from U.S. 31 to the east Information Meeting held in North
and Jennings Counties, IN urban boundary of North Vernon, access Vernon, Indiana, on Thursday, February
AGENCY: Federal Highway to existing and potential commercial 8, 2007. The draft purpose and need for
Administration (FHWA), DOT. and industrial economic growth areas, the project has been developed and
ACTION: Notice of Intent (NOI). statewide and regional transportation preliminary alternatives identified. The
system mobility and development of the purpose and need and preliminary
SUMMARY: The Federal Highway Muscatatuck Urban Training Center alternatives are currently available for
Administration (FHWA) is issuing this (MUTC) east of North Vernon near public review and comment. A Public
notice to advise the public that FHWA Butlerville. The objectives of this study Information Meeting was held on June
will prepare an Environmental are to assess the feasibility of 26, 2007 and a Resource Agency
Assessment (EA) to determine the need improvements to the U.S. 50 corridor, as Meeting was held on June 29, 2007.
and feasibility of improvements to U.S. well as other alternatives, for improving Agencies and the public will also have
50 in Jackson and Jennings Counties in mobility and alleviating congestion in an opportunity to comment when the
Indiana. This project will adhere to the the urban area boundary of North preliminary alternatives have been
requirements of Section 6002 of Vernon and in the general project evaluated and screened and again upon
SAFETEA–LU so that the steps vicinity. This study will conform to identification of the preferred
completed during the EA process will Indiana’s Streamlined EIS Procedures alternative(s).
not need to be revisited if the project is and the new SAFETEA–LU Section Notices of availability for the purpose
elevated to an Environmental Impact 6002 requirements. and need and identification of
Statement (EIS) in the future. The U.S. Environmental Issues: Possible preliminary alternatives, evaluation and
50 improvement corridor is environmental impacts include screening of preliminary alternatives,
approximately 18 miles in length, displacement of commercial and and identification of preferred
mstockstill on PROD1PC66 with NOTICES

running from the western terminus at residential properties, increased noise alternative(s) are being provided
I–65, near Seymour in Jackson County, in some areas, decreased noise in other through direct mail, e-mail, the project
to the eastern terminus near the areas, effects to historical properties or Web site at http://
Jennings/Ripley County Line, east of archaeological sites, viewshed impacts, www.us50northvernon.org and other
North Vernon. The objectives of this impacts to water resources, wetlands, media. Notification is also being sent to
study are to assess the need for and prime farmland, sensitive biological Federal, State, local agencies, persons

VerDate Aug<31>2005 16:20 Jun 28, 2007 Jkt 211001 PO 00000 Frm 00054 Fmt 4703 Sfmt 4703 E:\FR\FM\29JNN1.SGM 29JNN1