Proyecto: Mejoramiento, Ampliacion y Equipamiento de la I.E.P N 10308 - La Ramada, Dist. La Ramada - Cutervo - Cajamarca
Ubicacin: La Ramada - Cutervo - Cajamarca
1 Proyecto
2 Ubicacin
3 Metas
4 Ejecuta
5 Supervisor
6 Residente
7 Financiamiento
RECURSOS PROPIOS
8 Modalidad
Contrata
1,724,690.70
263,088.41
11 Mano de Obra
392,467.59
12 Materiales
783,402.59
13 Equipos
44,165.12
15 Das Ejecutados
16 Plazo Restante
45 Das Calendarios
17 Adicional de obra 1
60 Das Calendarios
60 Das Calendarios
:
21 Deductivo de Plazo 1
0 Nuevos soles
0 Das Calendarios
22 Entrega de terreno
10-Jan-12
20-Jan-12
20-Jan-12
17-Jul-12
30-Nov-12
28 Monto Valorizado
30-Nov-12
166,613.97
9.66%
43.41%
53.07%
134963.35
OBRA EN EJECUCION
PRELIQUIDACION
OBRA
ADP N
EJECUTA
CONTRATISTA
SUPERVISOR DE OBRA
RESIDENTE DE OBRA
PRESUPUESTO
FECHA DE INICIO DE OBRA
ITEM
:
:
:
:
:
:
:
PRESUP.
DESCRIPCIN
UND
01
01.01.
01.02
01.03
02
02.01
02.02
02.03
02.04
02.05
02.06
02.07
02.08
02.09
02.10
02.11
02.12
02.13
02.14
02.15
02.16
03
03.01
03.02
03.03
03.04
03.05
03.06
03.07
03.08
03.09
03.10
03.11
03.12
03.13
04
04.01
04.02
04.03.
04.04
04.05
ESTRUCTURAS
OBRAS PROVISIONALES
ALMACEN OFICINA Y CASETA DE GUARDIANIA
CARTEL DE OBRA 2.40X3.60
AGUA PARA LA CONSTRUCCION
TRABAJOS PRELIMINARES
DESMONTAJE DE PUERTAS
DESMONTAJE DE VENTANAS
DESMONTAJE TIJERAL DE MADERA
DESMONTAJE TECHO DECALAMINA GALVANIZADA
DESMONTAJE DE VIGUETAS DE MADERA
DEMOLICION DE MURO DE ADOBE/PIEDRA
DEMOLICION DE CIMIENTOS DE MURO DE ADOBE/PIEDRA
DEMOLICION DE PISO DE CONCRETO INC.F.P.
DESMONTAJE DE PORTON (2.5X2.1 m) METALICO
DESMONTAJE DE FALSO CIELO RASO
DESMONTAJE DE APARATOS SANITARIOS
DEMOLICION DE CIMIENTOS DE CONCRETO
DEMOLICION DE BEBEDERO Y URINARIO DE CONCRETO
DEMOLICION MUROS DE LADRILLO KK C/MAQUINA
TRANSPORTE DE EQUIPO Y MAQUINARIA
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAV.ZANJAS Y ZAPATA RT=0.7Kg/Cm2 H=1.50M
EXCAV.ZANJAS P/CISTERNA
CORTE DE TERRENO EN FORMA MANUAL
ESCARIFICADO Y COMPACTADO C/RODILLO
ESCARIFICADO Y COMPACTADO C/PLANCHA COMPACTADORA
RELLENO COMPACTADO C/EQUIPO MAT/PROPIO
RELLENO MANUAL CON MATERIAL PROPIO
ACARREO INTERNO, MATERIAL PROCEDENTE DE EXCAVACIONES
ELIMINACION MATERIAL EXCEDENTE C/MAQUINA
NIVELACION INTERIOR Y APISONADO PARA F.PISO,PATIO Y VEREDAS
AFIRMADO DE 3" EN INTERIORES,PATIOS Y VEREDAS
AFIRMADO DE 8" EN INTERIORES,PATIOS Y VEREDAS
BOMBEO NAPA FREATICA
OBRAS DE CONCRETO SIMPLE
SUBCIMIENTO/SUBZAPATAS/SUB-VIGA CIMENT. MEZCLA 1:12 + 30 % P.G.
SOLADO PARA ZAPATAS e=2", 1:12 CEM/HORM
CIMIENTO CORRIDO 1:10 C:H+ 30% P.G.
SOBRECIMIENTO, CONCRETO 1:8 + 25% P.M.
SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO
Residente
METRADO
P.U.
PARCIAL
1,220,035.30
METRADO
MES ANTERIOR
VALOR
517,497.08
METRADO
AVANCES
MES ACTUAL
VALOR
124,162.57
DEPARTAMENTO
DEPARTAMENTO
PROVINCIA
DISTRITO
LUGAR
PLAZO DE EJECU.
METRADO
MES ACUMULADO
VALOR
641,659.65
Cajamarca
Cajamarca
Cutervo
La Ramada
La Ramada
315
SALDOS
%
METRADO
VALOR
578,375.65
GLB
GLB
GLB
1.00
1.00
1.00
775.00
751.64
720.80
775.00
751.64
720.80
1.00
1.00
1.00
775.00
751.64
720.80
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.00
1.00
1.00
775.00
751.64
720.80
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
M2
M2
UND
M2
M2
M2
M3
M2
UND
M2
UND
M3
ML
M2
GLB
M2
33.63
44.66
26.00
754.05
754.05
186.01
59.15
696.92
1.00
310.83
8.00
22.31
6.44
22.84
1.00
1,103.22
3.47
2.09
179.80
1.26
1.26
18.39
18.39
6.28
211.71
2.32
17.36
60.32
17.96
12.35
435.00
1.10
116.70
93.34
4,674.80
950.10
950.10
3,420.72
1,087.77
4,376.67
211.71
721.13
138.88
1,345.74
115.66
282.07
435.00
1,213.54
33.63
44.66
26.00
754.05
754.05
186.01
59.15
696.92
1.00
310.83
8.00
22.31
6.44
22.84
1.00
1,103.22
116.70
93.34
4,674.80
950.10
950.10
3,420.72
1,087.77
4,376.67
211.71
721.13
138.88
1,345.74
115.66
282.07
435.00
1,213.54
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
33.63
44.66
26.00
754.05
754.05
186.01
59.15
696.92
1.00
310.83
8.00
22.31
6.44
22.84
1.00
1103.22
116.70
93.34
4674.80
950.10
950.10
3420.72
1087.77
4376.67
211.71
721.13
138.88
1345.74
115.66
282.07
435.00
1213.54
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
M3
M3
M3
M2
M2
M3
M2
M3
M3
M2
M2
M2
M3
529.69
20.00
135.71
540.00
6.80
112.80
30.61
695.65
695.65
353.39
374.73
542.00
10.40
28.61
33.38
12.51
3.92
2.83
10.28
14.31
12.51
13.67
4.82
7.79
12.92
13.46
15,154.43
667.60
1,697.73
2,116.80
19.24
1,159.58
438.03
8,702.58
9,509.54
1,703.34
2,919.15
7,002.64
139.98
492.45
20.00
135.71
72.52
17.08
624.64
524.12
144.00
144.00
320.00
10.40
14,088.99
667.60
1,697.73
745.51
244.36
7,814.25
7,164.72
694.08
1,121.76
4,134.40
139.98
92.97%
100.00%
100.00%
0.00%
0.00%
64.29%
55.79%
89.79%
75.34%
40.75%
38.43%
59.04%
100.00%
24.24
17.80
13.00
61.00
59.37
80.72
222.00
693.51
0.00
0.00
0.00
0.00
182.98
186.03
763.11
0.00
286.16
628.81
2868.24
0.00
4.58%
0.00%
0.00%
0.00%
0.00%
15.78%
42.47%
8.77%
0.00%
16.80%
21.54%
40.96%
0.00%
516.69
20.00
135.71
0.00
0.00
90.32
30.08
685.64
524.12
203.37
224.72
542.00
10.40
14782.50
667.60
1697.73
0.00
0.00
928.49
430.39
8577.36
7164.72
980.24
1750.57
7002.64
139.98
97.55%
100.00%
100.00%
0.00%
0.00%
80.07%
98.26%
98.56%
75.34%
57.55%
59.97%
100.00%
100.00%
13.00
0.00
0.00
540.00
6.80
22.48
0.53
10.01
171.53
150.02
150.01
0.00
0.00
371.93
0.00
0.00
2116.80
19.24
231.09
7.64
125.23
2344.82
723.10
1168.58
0.00
0.00
2.45%
0.00%
0.00%
100.00%
100.00%
19.93%
1.74%
1.44%
24.66%
42.45%
40.03%
0.00%
0.00%
M3
M2
M3
M3
M2
58.92
223.03
117.74
32.60
457.79
183.96
20.51
188.69
256.17
30.86
10,838.92
4,574.35
22,216.36
8,351.14
14,127.40
208.61
94.28
25.15
363.79
4,278.59
17,789.69
6,442.68
11,226.56
0.00%
93.53%
80.07%
77.15%
79.47%
14.42
-
0.00
295.75
0.00
0.00
0.00
0.00%
6.47%
0.00%
0.00%
0.00%
0.00
223.03
94.28
25.15
363.79
0.00
4574.35
17789.69
6442.68
11226.56
0.00%
100.00%
80.07%
77.15%
79.47%
58.92
0.00
23.46
7.45
94.00
10838.92
0.00
4426.67
1908.47
2900.84
100.00%
0.00%
19.93%
22.85%
20.53%
Sipervisor
PRELIQUIDACION
OBRA
ADP N
EJECUTA
CONTRATISTA
SUPERVISOR DE OBRA
RESIDENTE DE OBRA
PRESUPUESTO
FECHA DE INICIO DE OBRA
ITEM
04.06
05
05.01
05.01.01
05.01.02
05.02
05.02.01
05.02.02
05.02.03
05.03
05.03.01
05.03.02
05.03.03
05.03.04
05.03.05
05.03.06
05.03.07
05.04.00
05.04.01
05.04.02
05.04.03
05.04.04
05.04.05
05.04.06
05.04.07
05.04.08
05.05
05.05.01
05.05.02
05.05.03
05.05.04
05.06
05.06.01
05.06.02
05.06.03
05.07
05.07.01
05.07.02
05.07.03
05.08
05.08.01
05.08.02
:
:
:
:
:
:
:
PRESUP.
DESCRIPCIN
FALSO PISO MEZCLA 1:8 e=4"
OBRAS DE CONCRETO ARMADO
ZAPATAS
ZAPATAS.- CONCRETO 175 KG/CM2
ZAPATAS.- ACERO Fy=4200 kg/cm2
VIGAS DE CIMENT
VIGAS DE CIMENT.- CONC. 175 KG/CM2
VIGAS DE CIMENT.- ENCOF. Y DESENCOF
VIGAS DE CIMENT.- ACERO Fy=4,200 kg/cm2
COLUMNAS
COLUMNAS.- CONCRETO 175 KG/CM2
PLACAS 175 KG/CM2 C/ADIT./PLASTIFICANTE CARAVISTA
PLACAS 210 KG/CM2 C/ADIT./PLASTIFICANTE CARAVISTA
COLUMNAS.- CONCRETO 210 KG/CM2
COLUMNAS.- ENCOFRADO Y DESENCOFRADO
COLUMNAS.- ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVO
COLUMNAS.- ACERO Fy=4200 kg/cm2
VIGAS
GARGOLA DE CONCRETO.-TERMINADO S/DISEO
VIGAS.- CONCRETO 175 KG/CM2
VIGAS.- CONCRETO 210 KG/CM2
VIGAS 175 KG/CM2 C/ADIT./PLASTIFICANTE CARAVISTA
VIGAS 210 KG/CM2 C/ADIT./PLASTIFICANTE CARAVISTA
VIGAS.- ENCOFRADO Y DESENCOFRADO
VIGAS.- ENCOFRADO Y DESENCOFRADO CARAVISTA C/ADITIVO
VIGAS.- ACERO Fy=4200 kg/cm2
LOSA ALIGERADA
LOSA ALIGERADA - CONCRETO 210 KG/CM2
LOSA ALIGERADA.- ENCOFRADO Y DESENCOFRADO
LOSA ALIGERADA.- ACERO Fy=4,200 kg/cm2
LOSA ALIGERADA.- LADR. HUECO 15X30X30
ESCALERA
ESCALERA - CONCRETO 210 KG/CM2
ESCALERA.- ENCOFRADO Y DESENCOFRADO
ESCALERA.- ACERO Fy=4,200 kg/cm2
LOSA MACIZA
LOSA MACIZA - CONCRETO 210 KG/CM2
LOSA MACIZA.- ENCOFRADO Y DESENCOFRADO
LOSA MACIZA.- ACERO Fy=4,200 kg/cm2
CISTERNA
CISTERNA - CONCRETO 210 KG/CM2
CISTERNA.- ENCOFRADO Y DESENCOFRADO
Residente
MES ANTERIOR
METRADO
VALOR
202.88
5,989.02
AVANCES
MES ACTUAL
METRADO
VALOR
19.60
578.59
%
8.24%
MES ACUMULADO
METRADO
VALOR
222.48
6567.61
UND
M2
METRADO
237.88
P.U.
29.52
PARCIAL
7,022.22
M3
KG
131.78
1,785.96
321.75
5.12
42,400.22
9,144.12
131.78
1,785.96
42,400.22
9,144.12
100.00%
100.00%
0.00
0.00
0.00%
0.00%
131.78
1785.96
M3
M2
KG
11.34
153.96
1,863.38
334.98
44.65
5.12
3,798.67
6,874.31
9,540.51
11.34
153.96
1,863.38
3,798.67
6,874.31
9,540.51
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
M3
M3
M3
M3
M2
M2
KG
7.98
27.73
30.71
11.56
121.68
904.72
10,686.17
423.20
439.49
464.51
442.34
47.91
51.60
5.12
3,377.14
12,187.06
14,265.10
5,113.45
5,829.69
46,683.55
54,713.19
5.50
16.72
20.00
9.96
102.00
600.00
9,052.76
2,327.60
7,348.27
9,290.20
4,405.71
4,886.82
30,960.00
46,350.13
68.92%
60.30%
65.13%
86.16%
83.83%
66.32%
84.71%
2.24
8.51
1.00
9.18
54.38
1,499.83
947.97
0.00
3952.98
442.34
439.81
2806.01
7679.13
UND
M3
M3
M3
M3
M2
M2
KG
6.00
2.90
5.41
5.20
36.88
76.01
261.02
5,850.69
56.11
346.04
367.09
362.33
387.35
56.08
58.35
5.12
336.66
1,003.52
1,985.96
1,884.12
14,285.47
4,262.64
15,230.52
29,955.53
2.90
1.20
1.28
17.00
65.00
192.00
2,400.00
1,003.52
440.51
463.78
6,584.95
3,645.20
11,203.20
12,288.00
0.00%
100.00%
22.18%
24.62%
46.10%
85.52%
73.56%
41.02%
3.71
3.28
4.01
7.68
2,075.77
M3
M2
KG
UND
49.00
705.42
3,996.72
5,889.82
365.89
34.89
5.12
2.49
17,928.61
24,612.10
20,463.21
14,665.65
16.00
240.00
1,800.00
1,999.20
5,854.24
8,373.60
9,216.00
4,978.01
32.65%
34.02%
45.04%
33.94%
7.00
249.98
256.31
2,431.12
M3
M2
KG
3.00
23.00
319.00
437.57
71.02
5.12
1,312.71
1,633.46
1,633.28
M3
M2
KG
0.50
2.60
34.00
367.09
48.84
5.12
183.55
126.98
174.08
0.50
2.60
34.00
M3
M2
10.40
50.30
437.64
53.19
4,551.46
2,675.46
10.40
50.30
%
85.29%
DEPARTAMENTO
DEPARTAMENTO
PROVINCIA
DISTRITO
LUGAR
PLAZO DE EJECU.
Cajamarca
Cajamarca
Cutervo
La Ramada
La Ramada
315
SALDOS
%
93.53%
METRADO
15.40
VALOR
454.61
42400.22
9144.12
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
11.34
153.96
1863.38
3798.67
6874.31
9540.51
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
28.07%
0.00%
27.71%
8.65%
7.54%
6.01%
14.04%
7.74
16.72
28.51
10.96
111.18
654.38
10552.59
3275.57
7348.27
13243.18
4848.05
5326.63
33766.01
54029.26
96.99%
60.30%
92.84%
94.81%
91.37%
72.33%
98.75%
0.24
11.01
2.20
0.60
10.50
250.34
133.58
101.57
4838.78
1021.92
265.40
503.06
12917.54
683.93
3.01%
39.70%
7.16%
5.19%
8.63%
27.67%
1.25%
0.00
0.00
1361.90
1188.44
0.00
224.88
448.13
10627.94
0.00%
0.00%
68.58%
63.08%
0.00%
5.28%
2.94%
35.48%
0.00
2.90
4.91
4.56
17.00
69.01
199.68
4475.77
0.00
1003.52
1802.41
1652.22
6584.95
3870.08
11651.33
22915.94
0.00%
100.00%
90.76%
87.69%
46.10%
90.79%
76.50%
76.50%
6.00
0.00
0.50
0.64
19.88
7.00
61.34
1374.92
336.66
0.00
183.55
231.89
7700.52
392.56
3579.19
7039.59
100.00%
0.00%
9.24%
12.31%
53.90%
9.21%
23.50%
23.50%
2561.23
8721.80
1312.31
6053.49
14.29%
35.44%
6.41%
41.28%
23.00
489.98
2056.31
4430.32
8415.47
17095.40
10528.31
11031.50
46.94%
69.46%
51.45%
75.22%
26.00
215.44
1940.41
1459.50
9513.14
7516.70
9934.90
3634.16
53.06%
30.54%
48.55%
24.78%
6.47%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
3.00
23.00
319.00
1312.71
1633.46
1633.28
100.00%
100.00%
100.00%
183.55
126.98
174.08
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.50
2.60
34.00
183.55
126.98
174.08
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
4,551.46
2,675.46
100.00%
100.00%
0.00
0.00
0.00%
0.00%
10.40
50.30
4551.46
2675.46
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
Sipervisor
PRELIQUIDACION
OBRA
ADP N
EJECUTA
CONTRATISTA
SUPERVISOR DE OBRA
RESIDENTE DE OBRA
PRESUPUESTO
FECHA DE INICIO DE OBRA
ITEM
05.08.03
05.09
05.09.01
05.09.02
05.09.03
05.10
05.10.01
05.10.02
05.10.03
06
06.01
06.02
06.03
06.04
07
07.01
01.
01.01
01.02
01.03
01.04
01.05
01.06
01.06
01.07
02.
02.01
02.02
03.
03.01
03.02
03.03
03.04
03.05
03.06
03.07
03.08
04.
04.01
04.02
04.03
:
:
:
:
:
:
:
PRESUP.
DESCRIPCIN
CISTERNA.- ACERO Fy=4,200 kg/cm2
TANQUE ELEVADO
TANQUE ELEVADO - CONCRETO 210 KG/CM2
TANQUE ELEVADO.- ENCOFRADO Y DESENCOFRADO
TANQUE ELEVADO.- ACERO Fy=4,200 kg/cm2
MURO DE CONTENCION
MURO DE CONTENCION - CONCRETO 210 KG/CM2 C/ADIT./PLASTIF./CARAVISTA
MURO DE CONTENCION.- ENCOFRADO Y DESENCOFRADO CARAVISTA
MURO DE CONTENCION.- ACERO Fy=4,200 kg/cm2
MUROS Y TABIQUES DE ALBAILERIA
MURO DE LADRILLO KK TIPO IV CABEZA M:1:1:4 E=1.5 CM (*)
MURO DE LADRILLO KK TIPO IV SOGA M:1:1:4 E=1.5 CM (*)
MURO DE LADRILLO KK TIPO IV CANTO M:1:1:4 E=1.5 CM (*)
ALAMBRE # 8 REFUERZO HORIZONTAL EN MUROS
VARIOS
FLETE TERRESTRE
ARQUITECTURA
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO PRIMARIORAYADO CON CEMENTOARENA
TARRAJEO EN MURO: INTERIOR Y EXTERIOR
TARRAJEO DE COLUMNAS
TARRAJEO DE VIGAS
TARRAJEO DE MUROS DE CONCRETO
TARRAJEO CON IMPERMEABILIZANTE
VESTIDURA DE DERRAMES CON BORDES BOLEADOS M:1:2
BRUAS SEGUN DETALLE
CIELO RASO
CIELO RASO CON MEZCLA C:A 1:5
VESTIDURA DE SUP.FONDO DE ESCALERA
PISOS Y PAVIMENTOS
PISO DE CERAMICA 0.30x0.30M
PISO DE CEMENTO PULIDO Y BRUADO
PATIO Y VEREDA CONCRETO 175 KG/CM2 E=5" FROTACHADO
VEREDA DE CONCRETO 175 KG/CM2,E=4"
SARDINEL EN MODULOS, CONCRETO 175 KG/CM2,TARRAJEADO
SARDINEL , CONCRETO 175 KG/CM2,TARRAJEADO H=0.40 CM
ENCOFRADO DE SARDINEL
CANALETA "MEDIA CAA" EN CIRCULACION
CONTRAZOCALOS
CONTR.S/COLOREAR H=10 cm MZ 1:2 e=1.5 cm
CONTRAZOCALO DE CERAMICA 0.10x0.30
CONTR.S/COLOREAR H=20 cm MZ 1:2 e=1.5 cm
Residente
MES ANTERIOR
METRADO
VALOR
1,037.00
5,309.44
UND
KG
METRADO
1,037.00
P.U.
5.12
PARCIAL
5,309.44
M3
M2
KG
4.10
29.50
251.00
442.34
48.84
5.12
1,813.59
1,440.78
1,285.12
M3
M2
KG
88.91
278.00
4,087.78
387.35
47.48
5.12
34,439.29
13,199.44
20,929.43
M2
M2
M2
KG
223.81
836.00
21.52
167.98
88.53
52.55
44.79
4.78
19,813.90
43,931.80
963.88
802.94
150.00
500.00
135.00
13,279.50
26,275.00
645.30
67.02%
59.81%
0.00%
80.37%
KG
504,546.30
0.18
90,818.33
300,000.00
54,000.00
59.46%
M2
M2
M2
M2
M2.
M2.
ML
ML
81.50
2,054.34
794.88
316.28
14.80
53.20
348.65
2,364.30
18.41
19.21
27.78
39.01
21.96
27.46
14.27
4.91
1,500.42
39,463.87
22,081.77
12,338.08
325.01
1,460.87
4,975.24
11,608.71
651.20
51.95
34.65
34.65
286.20
12,509.55
1,443.17
1,351.70
494.46
1,405.24
0.00%
31.70%
6.54%
10.96%
0.00%
0.00%
9.94%
12.11%
M2
M2
710.62
11.40
31.79
31.08
22,590.61
354.31
M2
M2
M2
M2
ML
ML
M2
ML
453.76
1.90
540.00
138.00
115.34
64.25
84.76
40.22
45.60
28.94
63.95
52.99
56.00
52.53
20.14
11.20
20,691.46
54.99
34,533.00
7,312.62
6,459.04
3,375.05
1,707.07
450.46
ML
ML
ML
186.76
185.20
56.30
6.75
22.48
8.78
1,260.63
4,163.30
494.31
4.10
29.50
251.00
-
540.00
-
1,813.59
1,440.78
1,285.12
-
34,533.00
-
%
100.00%
METRADO
-
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
AVANCES
MES ACTUAL
VALOR
DEPARTAMENTO
DEPARTAMENTO
PROVINCIA
DISTRITO
LUGAR
PLAZO DE EJECU.
MES ACUMULADO
METRADO
VALOR
1037.00
5309.44
Cajamarca
Cajamarca
Cutervo
La Ramada
La Ramada
315
SALDOS
0.00
%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
4.10
29.50
251.00
1813.59
1440.78
1285.12
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
53.81
220.00
21.52
22.98
4763.80
11561.00
963.88
109.84
24.04%
26.32%
100.00%
13.68%
203.81
720.00
21.52
157.98
92,991.11
16,738.40
18.43%
0.00
3457.42
6748.60
3184.39
0.00
0.00
1626.78
2838.47
179.98
242.93
81.63
114.00
578.10
333.99
%
100.00%
METRADO
0.00
VALOR
%
0.00
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
88.91
278.00
4087.78
34439.29
13199.44
20929.43
100.00%
100.00%
100.00%
18043.30
37836.00
963.88
755.14
91.06%
86.12%
100.00%
94.05%
20.00
116.00
0.00
10.00
1770.60
6095.80
0.00
47.80
8.94%
13.88%
0.00%
5.95%
392,991.11
70,738.40
77.89%
111,555.19
20,079.93
22.11%
0.00%
8.76%
30.56%
25.81%
0.00%
0.00%
32.70%
24.45%
0.00
831.18
294.88
116.28
0.00
0.00
148.65
864.30
0.00
15966.97
8191.77
4536.08
0.00
0.00
2121.24
4243.71
0.00%
40.46%
37.10%
36.76%
0.00%
0.00%
42.64%
36.56%
81.50
1223.16
500.00
200.00
14.80
53.20
200.00
1500.00
1500.42
23496.90
13890.00
7802.00
325.01
1460.87
2854.00
7365.00
100.00%
59.54%
62.90%
63.24%
100.00%
100.00%
57.36%
63.44%
10617.54
0.00
47.00%
0.00%
333.99
0.00
10617.54
0.00
47.00%
0.00%
376.63
11.40
11973.07
354.31
53.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
540.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
34533.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
453.76
1.90
0.00
138.00
115.34
64.25
84.76
40.22
20691.46
54.99
0.00
7312.62
6459.04
3375.05
1707.07
450.46
100.00%
100.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
186.76
185.20
56.30
1260.63
4163.30
494.31
100.00%
100.00%
100.00%
Sipervisor
PRELIQUIDACION
OBRA
ADP N
EJECUTA
CONTRATISTA
SUPERVISOR DE OBRA
RESIDENTE DE OBRA
PRESUPUESTO
FECHA DE INICIO DE OBRA
ITEM
04.04
04.05
05.
05.01
06.
06.01
06.02
07.
07.01
07.02
07.03
07.04
08.
08.01
08.02
08.03
08.04
08.05
08.07
09.
09.01
09.02
09.03
09.04
09.05
09.06
10.
10.01
10.02
10.03
10.04
10.05
10.06
10.07
10.08
11.
11.01
12.
12.01
12.02
12.03
12.04
:
:
:
:
:
:
:
PRESUP.
DESCRIPCIN
CONTR.S/COLOREAR H=30 cm MZ 1:2 e=1.5 cm
CONTR.S/COLOREAR H=50 cm MZ 1:2 e=1.5 cm
ZOCALOS
ZOCALO DE CERAMICA 20X20
REVESTIMIENTO DE GRADAS Y ESCALERA
REVESTIMIENTO CON CEMENTO PASO Y C/PASO
CONTRAZOCALO RECTO EN ESCALERA
CUBIERTAS
CUB.DE LADR.PASTELERO ASENTADO CON BARRO e=2"C/FRAGUA
IMPERMEABILIZACION DE TECHOS CON PINTURA ASFALTICA
JUNTA DE DILATACION CON COBERTURA PASTELERO CON BREA
CUNETA DE MORTERO P/EVACUACION PLUVIAL EN TECHO
CARPINTERIA DE MADERA
PUERTAS DE TABLERO DE MADERA CEDRO
PUERTAS CONTRAPLACADASC/TRIPLAY9MM 1.4X.6SS.HH.
VENTANAS DE MADERACON HOJAS DE CEDRO Y SEGURIDAD 1/2"
JUNTA SELLADORA CON SILICONA e=1CM EN VENTANAS
TISERO DE MADERA TORNILLO (L=5 M) BARNIZADO
TABIQUERIA DE MADERA CEDRO C/TRIPLAY 4MM H=2.10 M
CARPINTERIA METALICA
PASAMANO DE TUBO FGDE 2" EN ESCALERA
CANTONERA DE FIERRO EN ESCALERA
PUERTA DE INGRESO PRINCIPAL C/PERFILES 3/16"
PUERTA CASETA DE ELECTROBOMBA
ESCALERA GATO FG 1 1/2" Y 1" T.ALTO
ESCALERA GATO EMPOTRADA DE ALUMINIO P/CISTERNA
CERRAJERIA
BISAGRA ALUMIN. DE 4" PESADA EN PUERTA
BISAGRA ALUMIN. DE 2.5" PESADA EN VENTANA
BISAGRA ALUMIN. DE 3" PESADA EN PUERTA
CERRADURA DOS GOLPES EN PUERTA
MANIJA DE BRONCE 4" PARA PUERTAS
MANIJA DE BRONCE PARA VENTANAS
CERROJO "SAPITO" SEGURIDAD BAT.VENTANA
PICAPORTE DE 6" DE FIERRO
VIDRIOS CRISTALES Y SIMILARES
VIDRIOS SEMIDOBLES IMPORTADO
PINTURAS
SELLADO DE CONCRETO CARAVISTA
PINTURA LATEX 2 MANOS EN CIELO RASO Y VIGAS
PINTURA LATEX 2 MANOS EN MUROS Y COLUMNA
PINTURA OLEO 2 MANOS EN VIGAS
Residente
UND
ML
ML
ML
METRADO
269.76
268.06
P.U.
14.29
13.11
PARCIAL
3,854.87
3,514.27
81.50
57.26
MES ANTERIOR
VALOR
METRADO
-
%
0.00%
0.00%
METRADO
AVANCES
MES ACTUAL
VALOR
DEPARTAMENTO
DEPARTAMENTO
PROVINCIA
DISTRITO
LUGAR
PLAZO DE EJECU.
SALDOS
MES ACUMULADO
VALOR
0.00
0.00
0.00
0.00
%
0.00%
0.00%
METRADO
269.76
268.06
VALOR
3854.87
3514.27
%
100.00%
100.00%
0.00
0.00
%
0.00%
0.00%
0.00%
0.00
0.00%
0.00
0.00
0.00%
81.50
4666.69
100.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
45.60
17.60
1184.69
233.73
100.00%
100.00%
METRADO
Cajamarca
Cajamarca
Cutervo
La Ramada
La Ramada
315
ML
ML
45.60
17.60
25.98
13.28
4,666.69
0.00
1,184.69
233.73
M2
m
m
m
445.32
445.32
130.00
47.60
29.09
5.68
8.88
20.64
12,954.36
2,529.42
1,154.40
982.46
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
445.32
445.32
130.00
47.60
12954.36
2529.42
1154.40
982.46
100.00%
100.00%
100.00%
100.00%
M2
M2
M2
ML
UND
ML
30.63
6.70
108.10
360.00
7.00
10.10
311.25
194.74
165.50
15.77
132.19
237.10
9,533.59
1,304.76
17,890.55
5,677.20
925.33
2,394.71
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
30.63
6.70
108.10
360.00
7.00
10.10
9533.59
1304.76
17890.55
5677.20
925.33
2394.71
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
ML
ML
M2
UND
ML
UND
12.80
45.60
9.60
1.00
6.20
1.00
62.66
33.88
220.54
229.50
100.18
255.33
802.05
1,544.93
2,117.18
229.50
621.12
255.33
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
12.80
45.60
9.60
1.00
6.20
1.00
802.05
1544.93
2117.18
229.50
621.12
255.33
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
PZA
PZA
PZA
PZA
PZA
PZA
PZA
UND
60.00
636.00
6.00
18.00
22.00
290.00
314.00
2.00
7.32
3.03
4.20
68.12
4.43
4.43
7.12
14.23
439.20
1,927.08
25.20
1,226.16
97.46
1,284.70
2,235.68
28.46
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
60.00
636.00
6.00
18.00
22.00
290.00
314.00
2.00
439.20
1927.08
25.20
1226.16
97.46
1284.70
2235.68
28.46
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
P2
1,224.95
2.58
3,160.37
0.00%
0.00
0.00%
0.00
0.00
0.00%
1224.95
3160.37
100.00%
m
M2
M2
M2
759.54
1,328.89
2,760.41
16.90
5.55
5.66
5.00
9.43
4,215.45
7,521.52
13,802.05
159.37
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
759.54
1328.89
2760.41
16.90
4215.45
7521.52
13802.05
159.37
100.00%
100.00%
100.00%
100.00%
Sipervisor
PRELIQUIDACION
OBRA
ADP N
EJECUTA
CONTRATISTA
SUPERVISOR DE OBRA
RESIDENTE DE OBRA
PRESUPUESTO
FECHA DE INICIO DE OBRA
ITEM
12.05
12.06
12.07
12.08
12.09
12.10
13
13.01
13.02
13.03
13.04
13.05
14.
14.01
14.02
14.03
14.04
14.05
14.06
14.07
14.08
01.
01.01
01.02
01.03
01.04
01.05
02.
02.01
02.02
02.03
02.04
02.05
02.06
02.06
02.07
02.08
02.09
02.10
02.11
:
:
:
:
:
:
:
PRESUP.
DESCRIPCIN
PINTURA OLEO 2 MANOS EN MUROS Y COLUMNA
PINTURA ANTICOR.Y ESMALTE 2 MANOS EN BARRAS DE SEGURIDAD
PINTURA BARNIZ EN CARPINTERIA DE MADERA
PINTURA ESMALTE EN CONTRAZOCALOS DE CEMENTO
PINTURA ESMALTE 2 MANOS EN BORDES BOLEADOS
PINTURA DE DEMARCACION DE LOSA DEPORTIVA
MOBILIARIO Y EQUIPAMIENTO
ESCRITORIOS(INCLUYE ACCESORIOS)
COMPUTADORAS (INCLUYE ACCESORIOS)
MUEBLES PARA COMPUTADORA(INCLUYE ACCESORIOS)
MESA Y SILLAS PARA BIBLIOTECA
MESA Y SILLAS PARA ALUMNOS
VARIOS,LIMPIEZA
LIMPIEZA PERMANENTE DE LA OBRA
JUNTA DE DILATACION EN PISO C/MORTERO ASFALTICO
PIZARRA CEMENTO 5.0x1.20 SIN TISERO
ASTA DE BANDERA TIPICO
CANALETA CONCRETO 175 P/EVAC..PLUVIAL E=10 CM
ARCO Y TABLERO FULBITO-BASQUEK (MET-MAD)
TUBOS C. VOLEY,INC. RED Y DADOS DE CONCRETO
FLETE TERRESTRE
INSTALACIONES SANITARIAS
APARATOS Y ACCESORIOS SANITARIOS
INODORO TANQUE ALTO COLOR BLANCO
INODORO TANQUE BAJOBLANCO
LAVATORIO DE PARED BLANCO 1 LLAVE
URINARIO CORRIDO CON CERAMICA
BEBEDERO CORRIDO CON CERAMICA
SISTEMA DE DESAGUE
SALIDA DE DESAGUE EN PVC
SALIDA PARA VENTILACION EN PVC
SOMBRERO PARA VENTILACION EN PVC
TUBERIA PVC-SAL 2"
TUBERIA PVC-SAL 3"
TUBERIA PVC-SAL 4"
TUBERIA PVC-SAL 6"
REGISTRO DE BRONCE 2"
CAJA SUMIDERO CON REJILLA DE FIERRO
CAJA DE REG.ALB.12"x24" C/TAPA CONCRETO
TUBERIA DE BAJADA PVC-SAL 3" P/LLUVIAS
CANALETA DE FIERRO GALVANIZADO
Residente
MES ANTERIOR
VALOR
UND
M2
M2
M2
ML
ML
UND
METRADO
61.40
423.00
503.40
439.08
68.11
1.00
P.U.
5.23
2.40
14.44
1.47
2.30
104.40
PARCIAL
321.12
1,015.20
7,269.10
645.45
156.65
104.40
METRADO
-
%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
und
und
und
und
und
6.00
12.00
12.00
6.00
88.00
250.00
1,800.00
250.00
350.00
250.00
1,500.00
21,600.00
3,000.00
2,100.00
22,000.00
GLB
ML
PZA
PZA
ML
YND
JGO
KG
1.00
472.84
7.00
1.00
164.45
2.00
1.00
133,352.38
555.94
12.38
187.96
1,117.14
72.29
1,749.59
384.97
0.18
555.94
5,853.76
1,315.72
1,117.14
11,888.09
3,499.18
384.97
24,003.43
UND
UND
UND
UND
ML
8.00
2.00
2.00
2.30
6.04
235.59
308.92
182.35
185.95
297.04
1,884.72
617.84
364.70
427.69
1,794.12
PTO
UND
UND
ML
ML
ML
ML
UND
UND
UND
ML
ML
26.00
4.00
4.00
25.80
4.50
25.00
52.00
1.00
2.00
3.00
6.30
9.14
67.80
56.64
2.97
16.93
19.02
20.80
47.55
24.00
112.69
207.00
20.30
53.34
1,762.80
226.56
11.88
436.79
85.59
520.00
2,472.60
24.00
225.38
621.00
127.89
487.53
33,338.10
6,000.86
METRADO
AVANCES
MES ACTUAL
VALOR
DEPARTAMENTO
DEPARTAMENTO
PROVINCIA
DISTRITO
LUGAR
PLAZO DE EJECU.
SALDOS
MES ACUMULADO
VALOR
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
METRADO
61.40
423.00
503.40
439.08
68.11
1.00
VALOR
321.12
1015.20
7269.10
645.45
156.65
104.40
%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
6.00
12.00
12.00
6.00
88.00
1500.00
21600.00
3000.00
2100.00
22000.00
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
25.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
6300.90
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
26.25%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
68343.10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12301.76
-
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
51.25%
1.00
472.84
7.00
1.00
164.45
2.00
1.00
65009.28
555.94
5853.76
1315.72
1117.14
11888.09
3499.18
384.97
11701.67
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
48.75%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
8.00
2.00
2.00
2.30
6.04
1884.72
617.84
364.70
427.69
1794.12
100.00%
100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
26.00
4.00
4.00
25.80
4.50
25.00
52.00
1.00
2.00
3.00
6.30
9.14
1762.80
226.56
11.88
436.79
85.59
520.00
2472.60
24.00
225.38
621.00
127.89
487.53
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
35,005.00
METRADO
Cajamarca
Cajamarca
Cutervo
La Ramada
La Ramada
315
Sipervisor
PRELIQUIDACION
OBRA
ADP N
EJECUTA
CONTRATISTA
SUPERVISOR DE OBRA
RESIDENTE DE OBRA
PRESUPUESTO
FECHA DE INICIO DE OBRA
ITEM
:
:
:
:
:
:
:
PRESUP.
DESCRIPCIN
UND
03.
03.01
03.02
03.03
03.04
03.05
03.06
03.07
03.08
03.09
03.10
03.11
03.12
03.13
03.14
03.15
03.16
03.17
03.18
03.19
03.20
04.
04.01
01.
01.01
01.02
01.03
01.03
01.04
02.
02.01
03.
03.01
04.
04.01
04.02
05.
05.01
06.
06.01
06.02
Residente
PTO
ML
ML
ML
ML
ML
ML
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
UND
KG
METRADO
28.00
29.00
65.00
3.20
14.50
1.60
16.80
3.00
3.00
3.00
1.00
1.00
2.00
1.00
1.00
2.00
1.00
1.00
8.00
15.00
2,993.00
PTO
PTO
PTO
PTO
UND
46.00
26.00
2.00
33.00
1.00
ML
P.U.
PARCIAL
MES ANTERIOR
VALOR
METRADO
METRADO
AVANCES
MES ACTUAL
VALOR
DEPARTAMENTO
DEPARTAMENTO
PROVINCIA
DISTRITO
LUGAR
PLAZO DE EJECU.
METRADO
MES ACUMULADO
VALOR
Cajamarca
Cajamarca
Cutervo
La Ramada
La Ramada
315
SALDOS
%
METRADO
VALOR
87.40
8.77
12.51
9.72
16.30
18.18
26.96
56.40
64.40
69.22
145.80
131.09
94.25
52.59
2,519.52
81.56
45.73
45.56
35.91
18.10
2,447.20
254.33
813.15
31.10
236.35
29.09
452.93
169.20
193.20
207.66
145.80
131.09
188.50
52.59
2,519.52
163.12
45.73
45.56
287.28
271.50
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
28.00
29.00
65.00
3.20
14.50
1.60
16.80
3.00
3.00
3.00
1.00
1.00
2.00
1.00
1.00
2.00
1.00
1.00
8.00
15.00
2447.20
254.33
813.15
31.10
236.35
29.09
452.93
169.20
193.20
207.66
145.80
131.09
188.50
52.59
2519.52
163.12
45.73
45.56
287.28
271.50
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.18
538.74
0.00%
0.00
0.00%
0.00
0.00
0.00%
2993.00
538.74
100.00%
80.69
101.88
80.07
92.21
640.13
3,711.74
2,648.88
160.14
3,042.93
640.13
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
46.00
26.00
2.00
33.00
1.00
3711.74
2648.88
160.14
3042.93
640.13
100.00%
100.00%
100.00%
100.00%
100.00%
441.66
11.29
4,986.34
0.00%
0.00
0.00%
0.00
0.00
0.00%
441.66
4986.34
100.00%
UND
4.00
25.90
103.60
0.00%
0.00
0.00%
0.00
0.00
0.00%
4.00
103.60
100.00%
UND
UND
4.00
1.00
248.21
440.32
992.84
440.32
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
4.00
1.00
992.84
440.32
100.00%
100.00%
ML
150.00
19.71
2,956.50
0.00%
0.00
0.00%
0.00
0.00
0.00%
150.00
2956.50
100.00%
UND
UND
45.00
26.00
132.50
127.65
5,962.50
3,318.90
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
45.00
26.00
5962.50
3318.90
100.00%
100.00%
Sipervisor
PRELIQUIDACION
OBRA
ADP N
EJECUTA
CONTRATISTA
SUPERVISOR DE OBRA
RESIDENTE DE OBRA
PRESUPUESTO
FECHA DE INICIO DE OBRA
ITEM
06.03
06.04
07.
07.01
:
:
:
:
:
:
:
PRESUP.
DESCRIPCIN
BRAQUET REFLECTOR C/LAMP. 2X18 AHORADORES SIM. JOSFEL RSP-2
ART. BRAQ. C/SOCATE DE PORCELANA Y LAMPARA DE 50W
VARIOS
FLETE TERRESTRE
UND
UND
UND
METRADO
2.00
2.00
P.U.
97.65
241.73
KG
26,277.05
0.18
COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
SUBTOTAL
FACTOR DE RELACION
IMPUEST (IGV)
TOTAL PRESUPUESTO
PORCENTAJE DE AVANCE
Residente
10.00%
9.80%
1.000
18.00%
PARCIAL
195.30
483.46
4,729.87
MES ANTERIOR
VALOR
METRADO
-
1,220,035.30
517,497.08
122,003.53
119,563.46
1,461,602.29
1,461,602.29
263,088.41
1,724,690.70
51,749.71
50,714.71
619,961.51
619,961.51
111,593.07
731,554.58
42.42%
%
0.00%
0.00%
METRADO
AVANCES
MES ACTUAL
VALOR
0.00
0.00
DEPARTAMENTO
DEPARTAMENTO
PROVINCIA
DISTRITO
LUGAR
PLAZO DE EJECU.
%
0.00%
0.00%
0.00%
0.00
0.00%
42.42%
124,162.57
10.18%
12,416.26
12,167.93
148,746.76
148,746.76
26,774.42
175,521.17
10.18%
METRADO
MES ACUMULADO
VALOR
0.00
0.00
0.00
0.00
0.00
Cajamarca
Cajamarca
Cutervo
La Ramada
La Ramada
315
SALDOS
%
0.00%
0.00%
METRADO
2.00
2.00
0.00
0.00%
26277.05
641,659.65
52.59%
64,165.97
62,882.65
768,708.26
768,708.26
138,367.49
907,075.75
52.59%
VALOR
195.30
483.46
%
100.00%
100.00%
4729.87
100.00%
578,375.65
47.41%
57,837.56
56,680.81
692,894.03
692,894.03
124,720.92
817,614.95
47.41%
Sipervisor
VALORIZACION N 06
(01 de Octubre - 31 de Octubre del 2012)
OBRA
FORMULA
:
:
MEJORAMIENTO, AMPLIACION Y EQUIPAMIENTO DE LA I.E.P N 10308 - LA RAMADA, DISTRITO LA RAMADA - CUTERVO - CAJAMARCA
ESTRUCTURAS
EJECUTA
DEPARTAMENTO
Cajamarca
SUPERVISOR
RESIDENTE(E)
:
:
PROVINCIA
DISTRITO
Cutervo
La Ramada
PRESUPUESTO
FECHA DE INICIO DE OBRA
:
:
LUGAR
PLAZO DE EJECUCION
La Ramada
315
ITEM
s/. 1,724,690.70
20-Jan-12
AVANCES
PRESUP.
DESCRIPCIN
UND
METRADO
P.U.
ESTRUCTURAS
MES ANTERIOR
PARCIAL
METRADO
VALOR
748,322.31
MES ACTUAL
%
METRADO
470,598.11
VALOR
SALDOS
MES ACUMULADO
%
METRADO
89,388.48
VALOR
METRADO
559,986.59
VALOR
188,335.72
01
01.01.
OBRAS PROVISIONALES
ALMACEN OFICINA Y CASETA DE GUARDIANIA
GLB
1.00
775.00
775.00
1.00
775.00
100.00%
0.00
0.00
0.00%
1.00
775.00
100.00%
0.00
0.00
01.02
GLB
1.00
751.64
751.64
GLB
1.00
720.80
720.80
751.64
720.80
100.00%
100.00%
0.00
01.03
02
1.00
1.00
0.00
0.00
0.00%
0.00%
1.00
1.00
751.64
720.80
100.00%
100.00%
0.00
0.00
0.00
0.00
02.01
02.02
DESMONTAJE DE PUERTAS
DESMONTAJE DE VENTANAS
M2
M2
33.63
44.66
3.47
2.09
116.70
93.34
33.63
116.70
100.00%
0.00%
33.63
116.70
100.00%
0.00
0.00
02.03
02.04
02.05
02.06
02.07
02.08
02.09
02.10
02.11
02.12
02.13
02.14
02.15
02.16
03
03.01
03.02
03.03
03.04
03.05
03.06
03.07
03.08
03.09
03.10
03.11
03.12
03.13
04
04.01
04.02
04.03.
04.04
26.00
754.05
754.05
186.01
59.15
696.92
1.00
310.83
8.00
22.31
6.44
22.84
1.00
1,103.22
179.80
1.26
1.26
18.39
18.39
6.28
211.71
2.32
17.36
60.32
17.96
12.35
435.00
1.10
4,674.80
950.10
950.10
3,420.72
1,087.77
4,376.67
211.71
721.13
138.88
1,345.74
115.66
282.07
435.00
1,213.54
93.34
4,674.80
950.10
950.10
3,420.72
1,087.77
4,376.67
211.71
721.13
138.88
1,345.74
115.66
282.07
435.00
1,213.54
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
44.66
26.00
754.05
754.05
186.01
59.15
696.92
1.00
310.83
8.00
22.31
6.44
22.84
1.00
1,103.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
44.66
26.00
754.05
754.05
186.01
59.15
696.92
1.00
310.83
8.00
22.31
6.44
22.84
1.00
1103.22
93.34
4674.80
950.10
950.10
3420.72
1087.77
4376.67
211.71
721.13
138.88
1345.74
115.66
282.07
435.00
1213.54
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
M3
M3
M3
M2
M2
M3
M2
M3
M3
M2
M2
M2
M3
529.69
20.00
135.71
540.00
6.80
112.80
30.61
695.65
695.65
353.39
374.73
542.00
10.40
28.61
33.38
12.51
3.92
2.83
10.28
14.31
12.51
13.67
4.82
7.79
12.92
13.46
15,154.43
667.60
1,697.73
2,116.80
19.24
1,159.58
438.03
8,702.58
9,509.54
1,703.34
2,919.15
7,002.64
139.98
492.45
20.00
135.71
72.52
17.08
624.64
524.12
144.00
144.00
320.00
10.40
14,088.99
667.60
1,697.73
745.51
244.36
7,814.25
7,164.72
694.08
1,121.76
4,134.40
139.98
92.97%
100.00%
100.00%
0.00%
0.00%
64.29%
55.79%
89.79%
75.34%
40.75%
38.43%
59.04%
100.00%
693.51
0.00
0.00
0.00
0.00
182.98
186.03
763.11
0.00
286.16
628.81
2868.24
0.00
4.58%
0.00%
0.00%
0.00%
0.00%
15.78%
42.47%
8.77%
0.00%
16.80%
21.54%
40.96%
0.00%
516.69
20.00
135.71
0.00
0.00
90.32
30.08
685.64
524.12
203.37
224.72
542.00
10.40
14782.50
667.60
1697.73
0.00
0.00
928.49
430.39
8577.36
7164.72
980.24
1750.57
7002.64
139.98
97.55%
100.00%
100.00%
0.00%
0.00%
80.07%
98.26%
98.56%
75.34%
57.55%
59.97%
100.00%
100.00%
13.00
0.00
0.00
540.00
6.80
22.48
0.53
10.01
171.53
150.02
150.01
0.00
0.00
371.93
0.00
0.00
2116.80
19.24
231.09
7.64
125.23
2344.82
723.10
1168.58
0.00
0.00
M3
M2
M3
M3
58.92
223.03
117.74
32.60
183.96
20.51
188.69
256.17
10,838.92
4,574.35
22,216.36
8,351.14
58.92
208.61
94.28
25.15
10,838.92
4,278.59
17,789.69
6,442.68
100.00%
93.53%
80.07%
77.15%
0.00
295.75
0.00
0.00
0.00%
6.47%
0.00%
0.00%
58.92
223.03
94.28
25.15
10838.92
4574.35
17789.69
6442.68
100.00%
100.00%
80.07%
77.15%
0.00
0.00
23.46
7.45
0.00
0.00
4426.67
1908.47
UND
M2
M2
M2
M3
M2
UND
M2
UND
M3
ML
M2
GLB
M2
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
24.24
0.00
0.00
0.00
0.00
17.80
13.00
61.00
0.00
59.37
80.72
222.00
0.00
0.00
0.00
14.42
0.00
0.00
ITEM
UND
04.05
04.06
05
05.01
AVANCES
PRESUP.
DESCRIPCIN
M2
M2
METRADO
457.79
237.88
P.U.
30.86
29.52
MES ANTERIOR
PARCIAL
14,127.40
7,022.22
METRADO
MES ACTUAL
VALOR
363.79
202.88
11,226.56
5,989.02
79.47%
85.29%
METRADO
0.00
19.60
VALOR
SALDOS
MES ACUMULADO
%
METRADO
0.00
578.59
0.00%
8.24%
VALOR
METRADO
VALOR
363.79
222.48
11226.56
6567.61
79.47%
93.53%
94.00
15.40
2900.84
454.61
0.00
0.00
M3
131.78
321.75
42,400.22
131.78
42,400.22
100.00%
0.00
0.00
0.00%
131.78
42400.22
100.00%
0.00
0.00
KG
1,785.96
5.12
9,144.12
1,785.96
9,144.12
100.00%
0.00
0.00
0.00
0.00%
1785.96
9144.12
100.00%
0.00
0.00
M3
M2
11.34
153.96
334.98
44.65
3,798.67
6,874.31
11.34
153.96
3,798.67
6,874.31
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
11.34
153.96
3798.67
6874.31
100.00%
100.00%
0.00
0.00
0.00
0.00
KG
1,863.38
5.12
9,540.51
1,863.38
9,540.51
100.00%
0.00
0.00
0.00%
1863.38
9540.51
100.00%
0.00
0.00
05.03
COLUMNAS
05.03.01 COLUMNAS.- CONCRETO 175 KG/CM2
M3
7.98
423.20
3,377.14
5.50
2,327.60
68.92%
0.00
2.24
947.97
28.07%
7.74
3275.57
96.99%
0.24
101.57
M3
M3
27.73
30.71
439.49
464.51
12,187.06
14,265.10
16.72
20.00
7,348.27
9,290.20
60.30%
65.13%
0.00
8.51
0.00
3952.98
0.00%
27.71%
16.72
28.51
7348.27
13243.18
60.30%
92.84%
11.01
2.20
4838.78
1021.92
M3
11.56
442.34
5,113.45
M2
M2
121.68
904.72
47.91
51.60
5,829.69
46,683.55
9.96
102.00
4,405.71
4,886.92
86.16%
83.83%
1.00
442.34
439.81
8.65%
7.54%
10.96
111.18
4848.05
5326.73
94.81%
91.37%
0.60
10.50
265.40
502.96
KG
10,686.17
5.12
54,713.19
600.00
9,052.76
30,960.00
46,350.12
66.32%
84.71%
2806.01
7679.13
6.01%
14.04%
654.38
10552.59
33766.01
54029.25
72.33%
98.75%
250.34
133.58
12917.54
683.94
6.00
2.90
5.41
5.20
36.88
76.01
261.02
5,850.69
56.11
336.66
2.90
1.20
1.28
17.00
65.00
192.00
2,400.00
1,003.52
440.51
463.78
6,584.95
3,645.20
11,203.20
12,288.00
100.00%
22.18%
24.62%
46.10%
85.52%
73.56%
41.02%
0.00%
0.00%
68.58%
63.08%
0.00%
5.28%
2.94%
35.48%
0.00
2.90
4.91
4.56
17.00
69.01
199.68
4475.77
0.00%
1,003.52
1,985.96
1,884.12
14,285.47
4,262.64
15,230.52
29,955.53
0.00
0.00
1361.90
1188.44
0.00
224.88
448.13
10627.94
0.00
346.04
367.09
362.33
387.35
56.08
58.35
5.12
1003.52
1802.41
1652.22
6584.95
3870.08
11651.33
22915.94
100.00%
90.76%
87.69%
46.10%
90.79%
76.50%
76.50%
6.00
0.00
0.50
0.64
19.88
7.00
61.34
1374.92
336.66
0.00
183.55
231.89
7700.52
392.56
3579.19
7039.59
49.00
705.42
3,996.72
5,889.82
365.89
34.89
5.12
2.49
17,928.61
24,612.10
20,463.21
14,665.65
16.00
240.00
1,800.00
1,999.20
5,854.24
8,373.60
9,216.00
4,978.01
32.65%
34.02%
45.04%
33.94%
2561.23
8721.80
1312.31
6053.49
14.29%
35.44%
6.41%
41.28%
23.00
489.98
2056.31
4430.32
8415.47
17095.40
10528.31
11031.50
46.94%
69.46%
51.45%
75.22%
26.00
215.44
1940.41
1459.50
9513.14
7516.70
9934.90
3634.16
3.00
23.00
319.00
437.57
71.02
5.12
1,312.71
1,633.46
1,633.28
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
3.00
23.00
319.00
1312.71
1633.46
1633.28
0.50
2.60
34.00
367.09
48.84
5.12
183.55
126.98
174.08
0.50
2.60
34.00
183.55
126.98
174.08
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.50
2.60
34.00
183.55
126.98
174.08
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
10.40
50.30
1,037.00
437.64
53.19
5.12
4,551.46
2,675.46
5,309.44
10.40
50.30
1,037.00
4,551.46
2,675.46
5,309.44
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
10.40
50.30
1037.00
4551.46
2675.46
5309.44
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
4.10
29.50
251.00
442.34
48.84
5.12
1,813.59
1,440.78
1,285.12
4.10
29.50
251.00
1,813.59
1,440.78
1,285.12
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
4.10
29.50
251.00
1813.59
1440.78
1285.12
100.00%
100.00%
100.00%
0.00
0.00
0.00
0.00
0.00
0.00
88.91
278.00
4,087.78
387.35
47.48
5.12
34,439.29
13,199.44
20,929.43
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
88.91
278.00
4087.78
34439.29
13199.44
20929.43
05.04.01
05.04.02
05.04.03
05.04.04
05.04.05
05.04.06
05.04.07
05.04.08
05.05
05.05.01
05.05.02
05.05.03
05.05.04
05.06
05.06.01
05.06.02
05.06.03
05.07
05.07.01
05.07.02
05.07.03
05.08
05.08.01
05.08.02
05.08.03
05.09
05.09.01
05.09.02
05.09.03
05.10
05.10.01
05.10.02
05.10.03
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
9.18
54.38
1,499.83
0.00
0.00
0.00
3.71
3.28
0.00
4.01
7.68
2,075.77
0.00
7.00
249.98
256.31
2,431.12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
ITEM
AVANCES
PRESUP.
DESCRIPCIN
UND
METRADO
P.U.
MES ANTERIOR
PARCIAL
METRADO
VALOR
06
06.01
M2
223.81
88.53
19,813.90
150.00
13,279.50
06.02
06.03
M2
M2
836.00
21.52
52.55
44.79
43,931.80
963.88
500.00
-
26,275.00
-
06.04
KG
167.98
4.78
802.94
135.00
645.30
07
07.01
VARIOS
FLETE TERRESTRE
KG
COSTO DIRECTO
504,546.30
0.18
MES ACTUAL
%
METRADO
VALOR
SALDOS
MES ACUMULADO
%
METRADO
VALOR
METRADO
VALOR
67.02%
0.00
53.81
4763.80
24.04%
203.81
18043.30
91.06%
20.00
1770.60
59.81%
0.00%
220.00
21.52
11561.00
963.88
26.32%
100.00%
720.00
21.52
37836.00
963.88
86.12%
100.00%
116.00
0.00
6095.80
0.00
80.37%
22.98
109.84
13.68%
157.98
755.14
94.05%
10.00
47.80
54,000.00
59.46%
0.00
92,991.11
16,738.40
18.43%
392,991.11
70,738.40
77.89%
111555.19
20079.93
748,322.31
470,598.11
62.89%
89,388.48
11.95%
559,986.59
74.83%
90,818.33
300,000.00
188,335.72
GASTOS GENERALES
10.00%
74,832.23
47,059.81
8,938.85
55,998.66
UTILIDAD
9.80%
73,335.59
46,118.61
8,760.07
54,878.69
18,456.90
896,490.13
563,776.53
107,087.40
670,863.93
225,626.20
225,626.20
SUBTOTAL
18,833.57
FACTOR DE RELACION
1.000
896,490.13
563,776.53
107,087.40
670,863.93
IMPUEST (IGV)
18.00%
161,368.22
101,479.78
19,275.73
120,755.51
40,612.72
1,057,858.35
665,256.31
126,363.13
791,619.44
266,238.91
62.89%
11.95%
74.83%
25.17%
TOTAL PRESUPUESTO
PORCENTAJE DE AVANCE
SALDOS
%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
2.45%
0.00%
0.00%
100.00%
100.00%
19.93%
1.74%
1.44%
24.66%
42.45%
40.03%
0.00%
0.00%
0.00%
0.00%
19.93%
22.85%
SALDOS
%
20.53%
6.47%
0.00%
0.00%
0.00%
0.00%
0.00%
3.01%
39.70%
7.16%
5.19%
8.63%
27.67%
1.25%
100.00%
0.00%
9.24%
12.31%
53.90%
9.21%
23.50%
23.50%
53.06%
30.54%
48.55%
24.78%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
SALDOS
%
8.94%
13.88%
0.00%
5.95%
22.11%
25.17%
VALORIZACION N 06
(01 de Octubre - 31 de Octubre del 2012)
OBRA
MEJORAMIENTO, AMPLIACION Y EQUIPAMIENTO DE LA I.E.P N 10308 - LA RAMADA, DISTRITO LA RAMADA - CUTERVO - CAJAMARCA
FORMULA
EJECUTA
:
:
ARQUITECTURA
MUNICIPALIDAD DISTRITAL DE LA RAMADA
DEPARTAMENTO
Cajamarca
SUPERVISOR
PRESUPUESTO
FECHA DE INICIO DE OBRA
:
:
:
PROVINCIA
DISTRITO
LUGAR
Cutervo
La Ramada
La Ramada
PLAZO DE EJECUCION
ITEM
180
AVANCES
PRESUP.
DESCRIPCIN
UND METRADO
P.U.
ARQUITECTURA
MES ANTERIOR
PARCIAL
METRADO
416,024.81
01.
01.01
01.02
01.03
M2
M2
M2
81.50
2,054.34
794.88
18.41
19.21
27.78
1,500.42
39,463.87
22,081.77
01.04
01.05
TARRAJEO DE VIGAS
TARRAJEO DE MUROS DE CONCRETO
M2
M2.
316.28
14.80
39.01
21.96
12,338.08
325.01
01.06
01.06
M2.
ML
53.20
348.65
27.46
14.27
1,460.87
4,975.24
01.07
02.
ML
2,364.30
4.91
11,608.71
02.01
02.02
M2
M2
710.62
11.40
31.79
31.08
22,590.61
354.31
03.
03.01
PISOS Y PAVIMENTOS
PISO DE CERAMICA 0.30x0.30M
M2
453.76
45.60
20,691.46
03.02
03.03
M2
M2
1.90
540.00
28.94
63.95
54.99
34,533.00
03.04
03.05
M2
ML
138.00
115.34
52.99
56.00
7,312.62
6,459.04
03.06
03.07
ML
M2
64.25
84.76
52.53
20.14
03.08
04.
04.01
ML
40.22
ML
04.02
04.03
ML
ML
04.04
04.05
05.
05.01
ZOCALOS
ZOCALO DE CERAMICA 20X20
06.
06.01
ML
06.02
07.
ML
07.01
07.02
M2
m
VALOR
MES ACTUAL
%
METRADO
59,071.87
VALOR
METRADO
28,473.19
12,509.55
1,443.12
0.00%
31.70%
6.54%
1,351.70
-
10.96%
0.00%
34.65
494.46
0.00%
9.94%
286.20
1,405.24
SALDOS
MES ACUMULADO
VALOR
METRADO
87,545.06
VALOR
328,479.75
0.00
3457.42
6748.60
0.00%
8.76%
30.56%
0.00
831.18
294.88
0.00
15966.97
8191.71
0.00%
40.46%
37.10%
81.50
1223.16
500.00
1500.42
23496.90
13890.06
100.00%
59.54%
62.90%
3184.39
0.00
25.81%
0.00%
116.28
0.00
4536.08
0.00
36.76%
0.00%
200.00
14.80
7802.00
325.01
63.24%
100.00%
114.00
0.00
1626.78
0.00%
32.70%
0.00
148.65
0.00
2121.24
0.00%
42.64%
53.20
200.00
1460.87
2854.00
100.00%
57.36%
12.11%
578.10
2838.47
24.45%
864.30
4243.71
36.56%
1500.00
7365.00
63.44%
0.00%
0.00%
333.99
10617.54
0.00
47.00%
0.00%
333.99
0.00
10617.54
0.00
47.00%
0.00%
376.63
11.40
11973.07
354.31
53.00%
100.00%
0.00%
0.00
0.00%
0.00
0.00
0.00%
453.76
20691.46
100.00%
0.00%
100.00%
0.00
0.00
0.00%
0.00%
0.00
540.00
0.00
34533.00
0.00%
100.00%
1.90
0.00
54.99
0.00
100.00%
0.00%
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
138.00
115.34
7312.62
6459.04
100.00%
100.00%
3,375.05
1,707.07
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
64.25
84.76
3375.05
1707.07
100.00%
100.00%
11.20
450.46
0.00%
0.00
0.00%
0.00
0.00
0.00%
40.22
450.46
100.00%
186.76
6.75
1,260.63
0.00%
0.00
0.00%
0.00
0.00
0.00%
186.76
1260.63
100.00%
185.20
56.30
22.48
8.78
4,163.30
494.31
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
185.20
56.30
4163.30
494.31
100.00%
100.00%
ML
ML
269.76
268.06
14.29
13.11
3,854.87
3,514.27
0.00%
37.96%
0.00
0.00
0.00%
0.00%
0.00
101.75
0.00
1333.94
0.00%
37.96%
269.76
166.31
3854.87
2180.32
100.00%
62.04%
ML
81.50
57.26
4,666.69
0.00%
0.00
0.00%
0.00
0.00
0.00%
81.50
4666.69
100.00%
45.60
25.98
0.00
1,184.69
0.00%
0.00
0.00%
0.00
0.00
0.00%
45.60
1184.69
100.00%
17.60
13.28
233.73
0.00%
0.00
0.00%
0.00
0.00
0.00%
17.60
233.73
100.00%
445.32
445.32
29.09
5.68
12,954.36
2,529.42
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
445.32
445.32
12954.36
2529.42
100.00%
100.00%
651.20
51.95
34.65
540.00
101.75
34,533.00
1,333.94
179.98
242.93
81.63
ITEM
AVANCES
PRESUP.
DESCRIPCIN
UND METRADO
P.U.
MES ANTERIOR
PARCIAL
METRADO
VALOR
MES ACTUAL
%
METRADO
VALOR
SALDOS
MES ACUMULADO
%
METRADO
VALOR
METRADO
VALOR
07.03
130.00
8.88
1,154.40
0.00%
0.00
0.00%
0.00
0.00
0.00%
130.00
1154.40
100.00%
07.04
08.
47.60
20.64
982.46
0.00%
0.00
0.00%
0.00
0.00
0.00%
47.60
982.46
100.00%
08.01
08.02
M2
M2
30.63
6.70
311.25
194.74
9,533.59
1,304.76
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
30.63
6.70
9533.59
1304.76
100.00%
100.00%
08.03
08.04
M2
ML
108.10
360.00
165.50
15.77
17,890.55
5,677.20
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
108.10
360.00
17890.55
5677.20
100.00%
100.00%
08.05
08.07
UND
ML
7.00
10.10
132.19
237.10
925.33
2,394.71
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
7.00
10.10
925.33
2394.71
100.00%
100.00%
09.
09.01
CARPINTERIA METALICA
PASAMANO DE TUBO FGDE 2" EN ESCALERA
ML
12.80
62.66
802.05
0.00%
0.00
0.00%
0.00
0.00
0.00%
12.80
802.05
100.00%
09.02
09.03
ML
M2
45.60
9.60
33.88
220.54
1,544.93
2,117.18
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
45.60
9.60
1544.93
2117.18
100.00%
100.00%
09.04
09.05
09.06
UND
ML
UND
1.00
6.20
1.00
229.50
100.18
255.33
229.50
621.12
255.33
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
1.00
6.20
1.00
229.50
621.12
255.33
100.00%
100.00%
100.00%
10.
10.01
CERRAJERIA
BISAGRA ALUMIN. DE 4" PESADA EN PUERTA
PZA
60.00
7.32
439.20
0.00%
0.00
0.00%
0.00
0.00
0.00%
60.00
439.20
100.00%
10.02
10.03
PZA
PZA
636.00
6.00
3.03
4.20
1,927.08
25.20
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
636.00
6.00
1927.08
25.20
100.00%
100.00%
10.03
10.04
PZA
PZA
18.00
22.00
68.12
4.43
1,226.16
97.46
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
18.00
22.00
1226.16
97.46
100.00%
100.00%
10.05
10.06
PZA
PZA
290.00
314.00
4.43
7.12
1,284.70
2,235.68
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
290.00
314.00
1284.70
2235.68
100.00%
100.00%
10.07
11.
UND
2.00
14.23
28.46
0.00%
0.00
0.00%
0.00
0.00
0.00%
2.00
28.46
100.00%
11.01
12.
P2
1,224.95
2.58
3,160.37
0.00%
0.00
0.00%
0.00
0.00
0.00%
1224.95
3160.37
100.00%
12.01
12.02
m
M2
759.54
1,328.89
5.55
5.66
4,215.45
7,521.52
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
759.54
1328.89
4215.45
7521.52
100.00%
100.00%
12.03
12.04
M2
M2
2,760.41
16.90
5.00
9.43
13,802.05
159.37
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
2760.41
16.90
13802.05
159.37
100.00%
100.00%
12.05
12.06
12.07
M2
M2
M2
61.40
423.00
503.40
5.23
2.40
14.44
321.12
1,015.20
7,269.10
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
61.40
423.00
503.40
321.12
1015.20
7269.10
100.00%
100.00%
100.00%
12.08
12.09
ML
ML
439.08
68.11
1.47
2.30
645.45
156.65
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
439.08
68.11
645.45
156.65
100.00%
100.00%
12.10
13
UND
1.00
104.40
104.40
0.00%
0.00
0.00%
0.00
0.00
0.00%
1.00
104.40
100.00%
13.01
13.02
ESCRITORIOS(INCLUYE ACCESORIOS)
COMPUTADORAS (INCLUYE ACCESORIOS)
und
und
6.00
250.00
12.00 1,800.00
1,500.00
21,600.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
6.00
12.00
1500.00
21600.00
100.00%
100.00%
13.03
13.04
und
und
12.00
6.00
250.00
350.00
3,000.00
2,100.00
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
12.00
6.00
3000.00
2100.00
100.00%
100.00%
13.05
14.
und
88.00
250.00
22,000.00
0.00%
0.00
0.00%
0.00
0.00
0.00%
88.00
22000.00
100.00%
14.01
14.02
GLB
ML
1.00
472.84
555.94
12.38
555.94
5,853.76
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
472.84
555.94
5853.76
100.00%
100.00%
ITEM
AVANCES
PRESUP.
DESCRIPCIN
MES ANTERIOR
UND METRADO
P.U.
PZA
7.00
187.96
1,315.72
0.00%
0.00
0.00%
0.00
0.00
0.00%
7.00
1315.72
100.00%
14.04
14.05
PZA
ML
1.00
164.45
1,117.14
72.29
1,117.14
11,888.09
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
164.45
1117.14
11888.09
100.00%
100.00%
14.06
14.07
YND
JGO
2.00 1,749.59
1.00
384.97
3,499.18
384.97
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
2.00
1.00
3499.18
384.97
100.00%
100.00%
14.08
FLETE TERRESTRE
6,000.86
25.00%
0.00
0.00%
33338.10
6000.86
25.00%
100014.29
18002.57
75.00%
416,024.81
59,071.87
14.20%
28,473.19
6.84%
87,545.06
21.04%
328,479.75
78.96%
COSTO DIRECTO
133,352.38
0.18
24,003.43
METRADO
33338.10
VALOR
METRADO
VALOR
SALDOS
MES ACUMULADO
14.03
KG
PARCIAL
MES ACTUAL
%
METRADO
VALOR
METRADO
VALOR
GASTOS GENERALES
10.00%
UTILIDAD
9.80%
41,602.48
40,770.43
5,907.19
5,789.04
2,847.32
2,790.37
8,754.51
8,579.42
32,847.98
32,191.02
FACTOR DE RELACION
1.000
498,397.72
498,397.72
70,768.10
70,768.10
34,110.88
34,110.88
104,878.98
104,878.98
393,518.74
393,518.74
IMPUEST (IGV)
18.00%
89,711.59
588,109.31
12,738.26
83,506.35
6,139.96
40,250.84
18,878.22
123,757.20
70,833.37
464,352.12
6.84%
21.04%
78.96%
SUBTOTAL
TOTAL PRESUPUESTO
PORCENTAJE DE AVANCE
14.20%
RESUMEN DE VALORIZACION N 06
(01 de Octubre - 31 de Octubre del 2012)
EJECUTA
Modalidad
OBRA
:
:
:
UBICACIN
FECHA
:
:
Costo
Directo
s/.
ESPECIALIDAD
ESTRUCTURAS
ARQUITECTURA
INSTALACIONES SANITARIAS
INSTALACIONES ELECTRICAS
TOTAL
10.00%
9.80%
1.00000
18.00%
Anterior
Monto
Valorizado
748,322.31
416,024.81
21,314.73
34,373.45
470,598.11
59,071.87
-
1,220,035.30
122,003.53
119,563.46
1,461,602.29
1,461,602.29
263,088.41
529,669.98
52,967.00
51,907.66
634,544.63
634,544.63
114,218.03
1,724,690.70
748,762.66
PRESUPUESTO
Supervisin
Residente
Fecha de Inicio
Plazo de Ejecucin
1ra ampliacin de plazo
2da ampliacin de plazo
Mes Actual
%
62.89%
14.20%
0.00%
0.00%
Monto
Valorizado
89,388.48
28,473.19
-
Acumulado
%
11.95%
6.84%
0.00%
0.00%
117,861.67
11,786.17
11,550.44
141,198.28
141,198.28
25,415.69
43.41%
166,613.97
S/. 1,724,690.70
Ing. Joel Rodriguez Pereira
Arq. Cesar H. Saldaa Idrogo
1/20/2012
180 DC
60 DC
75 DC
Monto
Valorizado
559,986.59
87,545.06
-
Saldo
%
74.83%
21.04%
0.00%
0.00%
647,531.64
64,753.16
63,458.10
775,742.91
775,742.91
139,633.72
9.66%
915,376.63
Monto
Valorizado
188,335.72
328,479.75
21,314.73
34,373.45
%
25.17%
78.96%
100.00%
100.00%
572,503.66
57,250.37
56,105.36
685,859.38
685,859.38
123,454.69
53.07%
809,314.07
46.93%
DETALLE DE VALORIZACION N 06
ADP N
001-2011-MDLR/CEP
CONTRATISTA
FECHA
OBRA
ITEM
01
DESCRIPCION
CONTRACTUAL (V)
ESTRUCTURAS
ARQUITECTURA
CONTRATO
S/IGV
896,490.13
498,397.72
MONTO
563,776.53
107,087.40
70,768.10
34,110.88
670,863.93 74.83
104,878.98
225,626.20
25.17
393,518.74
78.96
25,535.05 100.00
INSTALACIONES ELECTRICAS
41,179.39
41,179.39 100.00
1,461,602.29
634,544.64
141,198.28
775,742.91
43.41
9.66
53.07
22.18%
2.59%
24.77%
3,335.97
2,682.39
1,268.25
3,950.64
7,363.51
8,860.24
16,223.75
627,834.71
134,396.74
762,231.44
536.48
192.37
728.85
3,211.46
499.98
3,711.44
624,623.25
133,704.39
758,520.00
47,490.45
28,239.66
75,730.11
VALORIZACION N 04
17,534.08
43,360.67
60,894.75
TOTAL AMORTIZACIONES
65,024.53
71,600.33
136,624.86
VAL. BRUTA (V + R)
3,326.95
6,662.92
DEDUCCIONES
VALORIZACION 04
POR ADELANTO DIRECTO
VALORIZACION 04
POR ADELANTO DE MATERIALES
292,320.46
20.00
VALORIZACION N 04
ADELANTO PARA MATERIALES SIN IGV
292,320.46
05
21.04
MONTO
04
SALDO
25,535.05
03
ACUMULADO
ACTUAL
INSTALACIONES SANITARIAS
TOTAL CONTRACTUAL
02
VALORIZACION
ANTERIOR
559,598.72
559,598.72
62,104.06
621,895.14
I.G.V. (18.00%)
100,727.77
11,178.73
111,941.13
660,326.49
62,104.06
73,282.79
73,282.79
621,895.14
733,836.27
53.07
685,859.38
46.93
:
:
:
Ubicacin
Fecha
:
:
Presupuesto
Supervisin
Residente(E)
Fecha de Inicio
Plazo de Ejecucin
1ra ampliacin de plazo
2da ampliacin de plazo
1,724,690.70
Ing. Joel Rodriguez Pereira
Ing. Eduardo O. Aquino Aquino
1/20/2012
180 DC
60.00 DC
75.00 DC
427,168.16
166,613.97
593,782.13
>
<
ANALISIS DE AVANCE
427,168.16
321,594.51
748,762.67
OBRA ATRASADA
GRAFICA
% PROGRAMADOS MENS UALES VS % EJECUTADO ME NS UA
P ORCE NTAJE S
ENE-AGOSTO
SETIEMBRE
AVANCE PROGRAMADO
35.00%
30.00%
25.00%
20.00%
15.00%
10.00%
5.00%
0.00%
1
4
5
P ERIODO
% P RO G RA MA D O S
% E JE CU TAD O S
:
:
:
Ubicacin
Fecha
:
:
50
150
200
1,724,690.70
Ing. Joel Rodriguez Pereira
Arq. Cesar H. Saldaa Idrogo
1/20/2012
180.00 DC
60.00 DC
75.00 DC
Presupuesto
Supervisin
Residente(E)
Fecha de Inicio
Plazo de Ejecucin
ampliacin de plazo
ampliacin de plazo
250
02
300
350
1.2
8; 100.00%
1
PROGRAMADO
0.8
TERCERA VALORIZACIN
0.6
4; 24.77%
CUARTA VALORIZACIN
QUINTA VALORIZACIN
SEXTA VALORIZACIN
7; 53.08%
3; 22.18%
PRIMERA VALORIZACIN
SEGUNDA VALORIZACIN
7; 69.70%
6; 43.42%
EJECUTADO
0.4
5; 24.77%
0.2
2; 14.97%
1; 9.04%
DIAS PLAZO
102d
133d
163d
194d
225d
255d
286d
315d
NUEVOS SOLES
PARCIAL
ACUMULADO
155,863.83
155,863.83
102,332.96
258,196.79
124,329.82
382,526.61
44,642.62
427,168.16
427,168.16
321,594.51
748,762.67
453,248.72
1,202,011.39
522,581.28
1,724,592.67
1,724,593.74
PORCENTAJES
PARCIAL
ACUMULADO
9.04%
9.04%
5.93%
14.97%
7.21%
22.18%
2.59%
24.77%
0.00%
24.77%
18.65%
43.42%
26.28%
69.70%
30.30%
100.00%
100.00%
MES
abril
mayo
junio
julio
agosto
setiembre
octubre
29-Nov
DIAS PLAZO
102d
133d
163d
194d
225d
255d
286d
315d
NUEVOS SOLES
PARCIAL
ACUMULADO
78,828.15
155,863.83
102,332.96
258,196.79
124,329.82
382,526.61
44,642.62
427,168.16
0.00
427,168.16
321,594.51
748,762.67
166,613.97
915,376.64
838,342.03
PORCENTAJES
PARCIAL
ACUMULADO
9.04%
9.04%
5.93%
14.97%
7.21%
22.18%
2.59%
24.77%
0.00%
24.77%
18.65%
43.42%
9.66%
53.08%
53.08%
:
:
:
Ubicacin
Fecha
:
:
1,724,690.70
Ing. Joel Rodriguez Pereira
Ing. Jose Carlos Chayan Coloma
1/20/2012
180 DC
0 DC
PORCENTAJES
AVANCE EJECUTADO
36,138.13
40,897.56
78,828.15
166,613.97
322,477.80
AVANCE PROGRAMADO
172,469.07
172,469.07
258,703.60
517,407.21
###
<
<
<
<
ANALISIS DE AVANCE
OBRA ATRASADA
OBRA ATRASADA
OBRA ATRASADA
OBRA ATRASADA
GRAFICA
% PROGRAMADOS MENSUALES VS % EJECUTADO MENSUA
30.00%
25.00%
20.00%
15.00%
10.00%
5.00%
0.00%
1
3
4
PE RIODO
% PR O G R A MA D O S
% E JECU TAD O S
:
:
:
Ubicacin
Fecha
:
:
1,724,690.70
Ing. Joel Rodriguez Pereira
Ing. Jose Carlos Chayan Coloma
1/20/2012
180 DC
0 DC
AVANCE PROGRAMADO
ANALISIS DE AVANCE
:
:
:
Ubicacin
Fecha
:
:
20
40
80
100
120
140
160
1,724,690.70
Ing. Joel Rodriguez Pereira
Arq. Cesar H. Saldaa Idrogo
1/20/2012
180.00 DC
60.00 DC
Presupuesto
Supervisin
Residente(E)
Fecha de Inicio
Plazo de Ejecucin
ampliacin de plazo
OBRA
180
02
200
1.2
7; 100.00% 1
6; 90.00%
0.8
5; 65.00%
0.6
0.4
4; 35.00%
3; 20.00%
2; 10.00%
2; 2.10%
1; 0.00%
3; 4.47%
NUEVOS SOLES
PARCIAL
ACUMULADO
0.00
0.00
172,469.07
172,469.07
172,469.07
344,938.14
258,703.60
603,641.74
517,407.21
1,121,048.95
431,172.67
1,552,221.63
172,469.07
1,724,690.70
1,724,690.70
0.2
5; 18.70%
4; 9.04%
DIAS PLAZO
0d
41d
72d
102d
133d
163d
180d
PROGRAMADO
EJECUTADO
PRIMERA VALORIZACIN
SEGUNDA
VALORIZACIN
TERCERA
VALORIZACIN
CUARTA VALORIZACIN
QUINTA VALORIZACIN
SEXTA VALORIZACIN
PORCENTAJES
PARCIAL
ACUMULADO
0.00%
0.00%
10.00%
10.00%
10.00%
20.00%
15.00%
35.00%
30.00%
65.00%
25.00%
90.00%
10.00%
100.00%
100.00%
MES
febrero
marzo
abril
mayo
junio
julio
DIAS PLAZO
0d
41d
72d
102d
133d
163d
180d
NUEVOS SOLES
PARCIAL
ACUMULADO
0.00
0.00
36,138.13
36,138.13
40,897.56
77,035.68
78828.1496 155,863.83
166,613.97
322,477.80
322,477.80
PORCENTAJES
PARCIAL
ACUMULADO
0.00%
0.00%
2.10%
2.10%
2.37%
4.47%
4.57%
9.04%
9.66%
18.70%
18.70%
:
:
:
Ubicacin
Fecha
:
:
20
40
80
100
120
140
160
1,724,690.70
Ing. Joel Rodriguez Pereira
Arq. Cesar H. Saldaa Idrogo
1/20/2012
180.00 DC
60.00 DC
Presupuesto
Supervisin
Residente(E)
Fecha de Inicio
Plazo de Ejecucin
ampliacin de plazo
180
OBRA
02
200
1.2
7; 100.00% 1
6; 90.00%
0.8
5; 65.00%
0.4
4; 35.00%
3; 20.00%
2; 10.00%
1; 0.00%
2; 2.10%
3; 4.47%
0.6
5; 18.70%
0.2
4; 9.04%
0
PROGRAMADO
EJECUTADO
PRIMERA VALORIZACIN
SEGUNDA
VALORIZACIN
TERCERA
VALORIZACIN
CUARTA VALORIZACIN
QUINTA VALORIZACIN
SEXTA VALORIZACIN
MEJORAMIENTO, AMPLIACION Y EQUIPAMIENTO DE LA I.E.P N 10308 - LA RAMADA, DISTRITO LA RAMADA - CUTERVO - CAJAMARCA
ADP N
ENTIDAD
CONTRATISTA
FECHA PPTO. BASE
001-2011-MDLR/CEP
MUNICIPALIDAD DISTRITAL DE LA RAMADA
Consorcio Lima
Abril del 2011
PRESUPUESTO
Supervisin
Residente
Fecha de Inicio
1,724,690.70
Ing. Joel Rodriguez Pereira
Arq Cesar Hernan Saldaa Idrogo
1/20/2012
VALORIZACION DE OBRA N 06
ESTRUCTURAS
K = 0.238*(Jr / Jo) + 0.227*(Cr / Co) + 0.141*(Ar/Ao) + 0.124*(Agr/Ago)+0.091*(DMr / DMo) + 0.179*(GGr / GGo)
SIMBOLO CODIGO
DESCRIPCION
COEF. DE
% DE
INCIDENCIA INCIDENCIA
IND. BASE
ABRIL 2011
COEFIC.
SETIEMBRE 2012
MES
COEFIC.
Ir/Io
47
MANO DE OBRA
0.238
100.000%
427.68
427.680
470.79
470.790
1.101
0.262
21
0.227
100.000%
415.90
415.900
438.98
438.980
1.055
0.240
03
0.141
100.000%
586.47
586.470
429.12
429.120
0.732
0.103
AG
05
AGREGADO GRUESO
0.124
100.000%
429.97
429.970
428.01
428.010
0.995
0.123
MD
43
0.091
100.000%
579.69
579.690
602.54
602.540
1.039
0.095
GG
39
0.179
100.000%
362.38
362.380
381.48
381.480
1.053
0.188
AREA GEOGRAFICA :1
K=
1.011
MEJORAMIENTO, AMPLIACION Y EQUIPAMIENTO DE LA I.E.P N 10308 - LA RAMADA, DISTRITO LA RAMADA - CUTERVO - CAJAMARCA
001-2011-MDLR/CEP
PRESUPUESTO
1,724,690.70
MUNICIPALIDAD DISTRITAL DE LA RAMADA
Supervisin
Ing. Joel Rodriguez Pereira
Consorcio Lima
Residente
Ing. Eduardo O. Aquino Aquino
Abril del 2011
Fecha de Inicio
1/20/2012
VALORIZACION DE OBRA N 06
ARQUITECTURA
K = 0.305*(Jr / Jo) + 0.123*(Cr / Co) + 0.122*(APr / APo) + 0.204*(DMr / DMo) + 0.246*(GGr / GGo)
SIMBOLO CODIGO
DESCRIPCION
COEF. DE
% DE
INCIDENCIA INCIDENCIA
IND. BASE
ABRIL 2011
COEFIC.
SET 2012
MES
COEFIC.
Ir/Io
47
MANO DE OBRA
0.305
100.000%
427.68
427.680
470.79
470.790
1.101
0.336
21
0.123
100.000%
415.90
415.900
438.98
438.980
1.055
0.130
AP
04
54
AGREGADO FINO
PINTURA LATEX
0.122
75.410%
24.590%
100.000%
440.75
330.58
332.370
81.290
413.659
489.19
363.77
368.898
89.451
458.349
1.108
0.135
40.196%
59.804%
100.000%
579.69
366.61
233.012
219.247
452.260
602.54
349.36
242.197
208.931
451.128
0.997
0.203
100.000%
362.38
362.380
381.48
381.480
1.053
0.259
DM
GG
43
30
39
AREA GEOGRAFICA :1
0.204
0.246
K=
1.063
MEJORAMIENTO, AMPLIACION Y EQUIPAMIENTO DE LA I.E.P N 10308 - LA RAMADA, DISTRITO LA RAMADA - CUTERVO - CAJAMARCA
ADP N
001-2011-MDLR/CEP
ENTIDAD
CONTRATISTA
SUPERVISOR
FECHA DE INICIO
1/20/2012
RESIDENTE
PLAZO DE EJECUCION
240 Dias
VALORIZACION DE OBRA N 06
DESCRICPCION
ESTRUCTURAS
VALORIZACION ARQUITECTURA
N 06
INST. SANITARIA
OCTUBRE
INST. ELECTRIC.
(1)
TOTAL S/IGV
ADELANTO
(S/IGV)
(2)
(3)
(4)
(1x4)
Kr
Ka
(Kr/Ka) - 1
S/. 107,087.40
S/. 34,110.88
S/. 0.00
S/. 292,320.46
K
(Jun/12)
1.011
1.002
0.009
S/. 961.86
K
1.063
(Enero/1
2)
1.002
0.061
S/. 306.39
S/. 0.00
TOTAL
292,320.46
MONTO CONTRATO
1,461,602.29
VALORIZACION
S/. 141,198.28
DEDUCCION Estr.
192.37
DEDUCCION Arq.
415.32
607.69
S/. 1,268.25
MEJORAMIENTO, AMPLIACION Y EQUIPAMIENTO DE LA I.E.P N 10308 - LA RAMADA, DISTRITO LA RAMADA - CUTERVO - CAJAMARCA
ADP N
001-2011-MDLR/CEP
ENTIDAD
CONTRATISTA
SUPERVISOR
FECH DE INICIO
RESIDENTE
PLAZO DE EJECUCION
MATERIAL
IU
1/20/2012
ADELANTO OTORGADO
Imo
Ima
Imr
S/.
(fecha base)
(fech. Adelan.)
(fech. actual)
ADELANTO
REAJUSTADO S/.
CEMENTO
21
97,440.15
415.90
415.90
438.98
-5,407.35
AGRE. GRUESO
04
97,440.15
429.97
424.20
428.01
863.43
ACERO
03
97,440.15
586.47
526.73
429.12
16,217.60
292,320.46
MATERIAL
IU
11,673.67
DEFLACTACION
MONT. UTILIZABLE
DE VALORIZACION
ANALISIS
DEDUCCION
CEMENTO
21
97,440.15
32,052.01
MU< CONFORME
1,778.70
AGRE. GRUESO
04
98,765.54
17,508.59
MU< CONFORME
155.15
ACERO
03
108,491.50
19,908.96
MU< CONFORME
3,313.58
304,697.19
69,469.55
5,247.42
VALORIZACION DE OBRA N 06
OBRA
MEJORAMIENTO, AMPLIACION Y EQUIPAMIENTO DE LA I.E.P N 10308 - LA RAMADA, DISTRITO LA RAMADA - CUTERVO - CAJAMARCA
ADP N
001-2011-MDLR/CEP
ENTIDAD
CONTRATISTA
SUPERVISOR
FECH DE INICIO
RESIDENTE
PLAZO DE EJECUCION
1/20/2012
METRADO
UTILIZADO
PRECIO BASE
AMORTIZACION
PRE. BASE
FECH ADEL.
1000.00 BLS
17.80
17,800.00
17800.00
80.00 M3
176.00
14,080.00
13891.05
3419.25 KG
3.80
12,993.15
11669.62
44,873.15
43,360.67
AMORTIZACION
ANTERIOR
REAJUSTE DE VALORIZACION N 06
OBRA
MEJORAMIENTO, AMPLIACION Y EQUIPAMIENTO DE LA I.E.P N 10308 - LA RAMADA, DISTRITO LA RAMADA - CUTERVO - CAJAMARCA
ADP N
ENTIDAD
CONTRATISTA
FECHA PPTO. BASE
Supervisin
Residente
001-2011-MDLR/CEP
MUNICIPALIDAD DISTRITAL DE LA RAMADA
Consorcio Lima
Abril del 2011
Ing. Joel Rodriguez Pereira
Arq Cesar Hernan Saldaa Idrogo
VALORIZACION N 06
DESCRICPCION
ESTRUCTURAS
VALORIZACION N 05
SET
ARQUITECTURA
INST. SANITARIAS
(1)
TOTAL S/IGV
(2)
K
107,087.40
34,110.88
K (Junio/2012)
(3)
K-1
(1x3)
REAJUSTE
1.011
0.011
1177.96
1.063
0.063
2148.99
INST. ELECTRIC.
3326.95
VALORIZACION N 06 03
(01 de Abril 30 de Abril del 2012)
OBRA
MEJORAMIENTO, AMPLIACION Y EQUIPAMIENTO DE LA I.E.P N 10308 - LA RAMADA, DISTRITO LA RAMADA - CUTERVO - CAJAMARCA
FORMULA
EJECUTA
:
:
INSTALACIONES SANITARIAS
MUNICIPALIDAD DISTRITAL DE LA RAMADA
DEPARTAMENTO
Cajamarca
SUPERVISOR
PRESUPUESTO
FECHA DE INICIO DE OBRA
:
:
:
PROVINCIA
DISTRITO
LUGAR
Cutervo
La Ramada
La Ramada
PLAZO DE EJECUCION
ITEM
180
UND METRADO
P.U.
INSTALACIONES SANITARIAS
01.
AVANCES
PRESUP.
DESCRIPCIN
MES ANTERIOR
PARCIAL
METRADO
VALOR
21,314.73
0.00
MES ACTUAL
%
METRADO
VALOR
SALDOS
MES ACUMULADO
%
METRADO
0.00
VALOR
METRADO
VALOR
21,314.73
01.01
01.02
01.03
UND
UND
UND
8.00
2.00
2.00
235.59
308.92
182.35
1,884.72
617.84
364.70
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
8.00
2.00
2.00
1884.72
617.84
364.70
100.00%
100.00%
100.00%
01.04
01.05
UND
ML
2.30
6.04
185.95
297.04
427.69
1,794.12
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
2.30
6.04
427.69
1794.12
100.00%
100.00%
02.
02.01
SISTEMA DE DESAGUE
SALIDA DE DESAGUE EN PVC
PTO
26.00
67.80
1,762.80
0.00%
0.00
0.00%
0.00
0.00
0.00%
26.00
1762.80
100.00%
02.02
02.03
UND
UND
4.00
4.00
56.64
2.97
226.56
11.88
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
4.00
4.00
226.56
11.88
100.00%
100.00%
02.04
02.05
ML
ML
25.80
4.50
16.93
19.02
436.79
85.59
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
25.80
4.50
436.79
85.59
100.00%
100.00%
02.06
02.06
ML
ML
25.00
52.00
20.80
47.55
520.00
2,472.60
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
25.00
52.00
520.00
2472.60
100.00%
100.00%
02.07
02.08
UND
UND
1.00
2.00
24.00
112.69
24.00
225.38
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
2.00
24.00
225.38
100.00%
100.00%
02.09
02.10
UND
ML
3.00
6.30
207.00
20.30
621.00
127.89
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
3.00
6.30
621.00
127.89
100.00%
100.00%
02.11
03.
ML
9.14
53.34
487.53
0.00%
0.00
0.00%
0.00
0.00
0.00%
9.14
487.53
100.00%
03.01
03.02
03.03
PTO
ML
ML
28.00
29.00
65.00
87.40
8.77
12.51
2,447.20
254.33
813.15
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
28.00
29.00
65.00
2447.20
254.33
813.15
100.00%
100.00%
100.00%
03.04
03.05
ML
ML
3.20
14.50
9.72
16.30
31.10
236.35
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
3.20
14.50
31.10
236.35
100.00%
100.00%
03.06
03.07
TUBERIA DE FG 11/4"
TUBERIA DE FG 2"
ML
ML
1.60
16.80
18.18
26.96
29.09
452.93
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
1.60
16.80
29.09
452.93
100.00%
100.00%
03.08
03.09
UND
3.00
UND
3.00
56.40
64.40
169.20
193.20
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
3.00
3.00
169.20
193.20
100.00%
100.00%
03.10
03.11
UND
UND
3.00
1.00
69.22
145.80
207.66
145.80
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
3.00
1.00
207.66
145.80
100.00%
100.00%
03.12
03.13
UND
UND
1.00
2.00
131.09
94.25
131.09
188.50
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
2.00
131.09
188.50
100.00%
100.00%
03.14
03.15
UND
UND
1.00
1.00
52.59
2,519.52
52.59
2,519.52
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
1.00
52.59
2519.52
100.00%
100.00%
ITEM
AVANCES
PRESUP.
DESCRIPCIN
UND METRADO
P.U.
MES ANTERIOR
PARCIAL
METRADO
VALOR
MES ACTUAL
%
METRADO
VALOR
SALDOS
MES ACUMULADO
%
METRADO
VALOR
METRADO
VALOR
03.16
UND
2.00
81.56
163.12
0.00%
0.00
0.00%
0.00
0.00
0.00%
2.00
163.12
100.00%
03.17
03.18
UND
UND
1.00
1.00
45.73
45.56
45.73
45.56
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
1.00
1.00
45.73
45.56
100.00%
100.00%
03.19
03.20
ROMPE AGUA
ABRAZADERA DE FIJACION DE TUBO
UND
UND
8.00
15.00
35.91
18.10
287.28
271.50
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
8.00
15.00
287.28
271.50
100.00%
100.00%
04.
04.01
VARIOS
FLETE TERRESTRE
2,993.00
0.18
538.74
0.00%
0.00
0.00%
0.00
0.00
0.00%
2993.00
538.74
100.00%
0.00
0.00%
0.00
0.00%
0.00
0.00%
21,314.73
100.00%
KG
COSTO DIRECTO
21,314.73
GASTOS GENERALES
10.00%
2,131.47
0.00
0.00
2,131.47
UTILIDAD
9.80%
2,088.84
25,535.05
0.00
0.00
0.00
0.00
2,088.84
25,535.05
FACTOR DE RELACION
1.000
IMPUEST (IGV)
18.00%
25,535.05
4,596.31
30,131.35
0.00
0.00
0.00
0.00
0.00
0.00
25,535.05
4,596.31
30,131.35
0.00%
0.00%
100.00%
SUBTOTAL
TOTAL PRESUPUESTO
PORCENTAJE DE AVANCE
VALORIZACION N 06 03
(01 de Abril 30 de Abril del 2012)
OBRA
MEJORAMIENTO, AMPLIACION Y EQUIPAMIENTO DE LA I.E.P N 10308 - LA RAMADA, DISTRITO LA RAMADA - CUTERVO - CAJAMARCA
FORMULA
EJECUTA
:
:
INSTALACIONES ELECTRICAS
MUNICIPALIDAD DISTRITAL DE LA RAMADA
DEPARTAMENTO
Cajamarca
SUPERVISOR
PRESUPUESTO
FECHA DE INICIO DE OBRA
:
:
:
PROVINCIA
DISTRITO
LUGAR
Cutervo
La Ramada
La Ramada
PLAZO DE EJECUCION
ITEM
180
AVANCES
PRESUP.
DESCRIPCIN
UND METRADO
P.U.
INSTALACIONES ELECTRICAS
MES ANTERIOR
PARCIAL
METRADO
VALOR
34,373.45
MES ACTUAL
%
METRADO
VALOR
SALDOS
MES ACUMULADO
%
METRADO
0.00
VALOR
METRADO
0.00
VALOR
34,373.45
01.
INSTALACIONES ELECTRICAS
01.01
01.02
01.03
PTO
PTO
PTO
46.00
26.00
2.00
80.69
101.88
80.07
3,711.74
2,648.88
160.14
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00%
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00
0.00
0.00%
0.00%
0.00%
46.00
26.00
2.00
3711.74
2648.88
160.14
100.00%
100.00%
100.00%
01.03
01.04
PTO
UND
33.00
1.00
92.21
640.13
3,042.93
640.13
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
33.00
1.00
3042.93
640.13
100.00%
100.00%
02.
02.01
ML
441.66
11.29
4,986.34
0.00%
0.00
0.00%
0.00
0.00
0.00%
441.66
4986.34
100.00%
03.
03.01
UND
4.00
25.90
103.60
0.00%
0.00
0.00%
0.00
0.00
0.00%
4.00
103.60
100.00%
04.
04.01
TABLEROS Y LLAVES
TAB.AUT. 2-2X20, 2-2X15A
UND
4.00
248.21
992.84
0.00%
0.00
0.00%
0.00
0.00
0.00%
4.00
992.84
100.00%
04.02
05.
UND
1.00
440.32
440.32
0.00%
0.00
0.00%
0.00
0.00
0.00%
1.00
440.32
100.00%
05.01
06.
ML
150.00
19.71
2,956.50
0.00%
0.00
0.00%
0.00
0.00
0.00%
150.00
2956.50
100.00%
06.01
06.02
UND
UND
45.00
26.00
132.50
127.65
5,962.50
3,318.90
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
45.00
26.00
5962.50
3318.90
100.00%
100.00%
06.03
06.04
2.00
2.00
97.65
241.73
195.30
483.46
0.00%
0.00%
0.00
0.00
0.00%
0.00%
0.00
0.00
0.00
0.00
0.00%
0.00%
2.00
2.00
195.30
483.46
100.00%
100.00%
07.
07.01
VARIOS
FLETE TERRESTRE
26,277.05
0.18
4,729.87
0.00%
0.00
0.00%
0.00
0.00
0.00%
26277.05
4729.87
100.00%
34,373.45
0.00
0.00%
0.00
0.00%
0.00%
34,373.45
100.00%
KG
COSTO DIRECTO
GASTOS GENERALES
10.00%
UTILIDAD
9.80%
3,437.35
3,368.60
0.00
0.00
0.00
0.00
3,437.35
3,368.60
FACTOR DE RELACION
1.000
41,179.39
41,179.39
0.00
0.00
0.00
0.00
41,179.39
41,179.39
IMPUEST (IGV)
18.00%
7,412.29
48,591.68
0.00
0.00
0.00
0.00
7,412.29
48,591.68
0.00%
0.00%
100.00%
SUBTOTAL
TOTAL PRESUPUESTO
PORCENTAJE DE AVANCE