17220 Federal Register / Vol. 72, No.

66 / Friday, April 6, 2007 / Notices

Ultrasonic examinations of welds on Petroleum Institute Standard 620 (API against a calibration standard shall be
metal containers shall comply with 620), ‘‘Design and Construction of Large, eight hours or less. If the ultrasonic
section 7.3.1.2 of NFPA Standard 59A, Welded, Low-Pressure Storage Tanks equipment is found to be out of
2006 Edition and 59A TIA06; (2) the (Appendix Q).’’ The Eighth Edition of calibration, all previous weld
owner/operator shall retain all API 620 requires inspection according examinations determined by the
ultrasonic examination records for the to Appendix Q which calls for a full operator shall be reexamined by
life of the facility and these records radiographic examination of all vertical ultrasonic equipment within a week.
shall be retained in a manner so they and horizontal butt welds associated Issued in Washington, DC on April 2, 2007.
may not be altered; and (3) the interval with the container.
Jeffrey D. Wiese,
for verifying the examination of welds FLNG proposes to use the Tenth
Edition, 2002, Addendum 1 of the 2004 Acting Associate Administrator for Pipeline
against a calibration standard shall be Safety.
eight hours or less. If the ultrasonic edition of API 620 at its Quintana
Terminal LNG facility. The Tenth [FR Doc. 07–1705 Filed 4–2–07; 4:52 pm]
equipment is found to be out of
calibration, all previous weld Edition allows ultrasonic examination BILLING CODE 4910–60–P

examinations determined by the as well as radiography as an acceptable


operator shall be reexamined by alternative non-destructive testing
method. FLNG proposes to use DEPARTMENT OF TRANSPORTATION
ultrasonic equipment within a week.
ultrasonic examination, which consists
Issued in Washington, DC on April 2, 2007. Surface Transportation Board
of full semi-automated and manual
Jeffrey D. Wiese, ultrasonic examination using shear [STB Finance Docket No. 35007]
Acting Associate Administrator for Pipeline wave probes. The examination will also
Safety. consist of a volumetric ultrasonic Union Pacific Railroad Company-
[FR Doc. 07–1706 Filed 4–2–07; 4:52 pm] examination using a combination of Temporary Trackage Rights
BILLING CODE 4910–60–P creep wave probes and focused angled Exemption-BNSF Railway Company
longitudinal wave probes. To allow Pursuant to a written trackage rights
ultrasonic examination in accordance agreement dated March 15, 2007, BNSF
DEPARTMENT OF TRANSPORTATION with the most recent NFPA Standard Railway Company (BNSF) has agreed to
59A, 2006 Edition, a waiver is required. grant temporary overhead trackage
Pipeline and Hazardous Materials PHMSA considered FLNG’s waiver
Safety Administration rights to Union Pacific Railroad
request and published a notice in the
Company (UP) over approximately 2
[Docket No. PHMSA–06–25734; Notice 2] Federal Register inviting interested
miles of BNSF’s lines extending
persons to comment on whether a
between Basta, CA (milepost 163.15),
Pipeline Safety: Grant of Waiver; waiver should be granted (71 FR 56583;
and Fullerton, CA (milepost 165.23).
Freeport LNG September 27, 2006). No comments
The transaction is scheduled to be
were received.
AGENCY: Pipeline and Hazardous The NFPA issued a Tentative Interim consummated on April 27, 2007. The
Materials Safety Administration Amendment to NFPA Standard 59A, temporary trackage rights are intended
(PHMSA); U.S. Department of 2006 Edition, effective February 14, to expire on or about August 28, 2007.1
Transportation 2006 (59A TIA06). The amendment The purpose of the temporary
ACTION: Grant of Waiver; Freeport LNG. incorporates API 620, Tenth Edition, trackage rights is to facilitate
2002, Addendum 1, 2004. The Tenth maintenance work on UP lines.
SUMMARY: Freeport LNG (FLNG) Edition adds ultrasonic examination as As a condition to this exemption, any
requested a waiver of compliance from an acceptable non-destructive testing employee affected by the acquisition of
the Federal pipeline safety regulation method of examination for welds. The the temporary trackage rights will be
that requires liquefied natural gas (LNG) proposed wording of the Tenth Edition, protected by the conditions imposed in
facilities constructed after March 31, Addendum 1, 2004 of API 620 deletes Norfolk and Western Ry. Co.-Trackage
2000 to comply with the National Fire ‘‘radiographic’’ inspection and replaces Rights-BN, 354 I.C.C. 605 (1978), as
Protection Association’s Standard 59A it with ‘‘complete’’ examination and modified in Mendocino Coast Ry., Inc.-
(NFPA 59A), 2001 Edition. The waiver defines ‘‘complete’’ examination as Lease and Operate, 360 I.C.C. 653
specifically requested permission to use radiographic or ultrasonic examination. (1980), and any employee affected by
ultrasonic examination as an acceptable Decision: PHMSA finds that the use of the discontinuance of those trackage
alternative non-destructive testing ultrasonic examination in accordance rights will be protected by the
method for welds on LNG tanks. with NFPA Standard 59A, 2006 Edition conditions set out in Oregon Short Line
SUPPLEMENTARY INFORMATION: and 59A TIA06 is not inconsistent with R. Co.-Abandonment-Goshen, 360 I.C.C.
pipeline safety and achieves an 91 (1979).
Background equivalent level of safety. Therefore, This notice is filed under 49 CFR
FLNG requested a waiver from FLNG’s request for waiver of 1180.2(d)(8). If it contains false or
compliance of the Federal pipeline compliance with § 193.2301 is granted, misleading information, the exemption
safety requirements at 49 CFR 193.2301 subject to the following conditions: (1) is void ab initio. Petitions to revoke the
for its facility at Quintana Terminal, Ultrasonic examinations of welds on exemption under 49 U.S.C. 10502(d)
Texas. This regulation requires each metal containers shall comply with may be filed at any time. The filing of
LNG facility constructed after March 31, section 7.3.1.2 of NFPA Standard 59A, a petition to revoke will not
2000 to comply with 49 CFR part 193 2006 Edition and 59A TIA06; (2) the automatically stay the effectiveness of
and NFPA Standard 59A, 2001 Edition. owner/operator shall retain all the exemption. Any stay petition must
pwalker on PROD1PC71 with NOTICES

NFPA Standard 59A, 2001 Edition ultrasonic examination records for the
1 In accordance with the trackage rights
requires that welded containers life of the facility and these records
agreement, UP indicates that it will utilize its
designed for not more than 15 pounds shall be retained in a manner so they trackage rights from April 27, 2007, through May
per square inch gauge comply with the may not be altered; and (3) the interval 19, 2007, and from August 7, 2007, through August
Eighth Edition, 1990, of American for verifying the examination of welds 28, 2007.

VerDate Aug<31>2005 18:39 Apr 05, 2007 Jkt 211001 PO 00000 Frm 00130 Fmt 4703 Sfmt 4703 E:\FR\FM\06APN1.SGM 06APN1