You are on page 1of 3

Federal Register / Vol. 72, No.

57 / Monday, March 26, 2007 / Notices 14143

petition. The teleconference was licensee for comment. At the request of NUCLEAR REGULATORY
transcribed and the transcription was the Petitioners, the NRC extended the COMMISSION
treated as a supplement to the petition. end of the comment period from January
Transcripts of the teleconference are 5, 2007, to February 2, 2007. The Notice of Availability Concerning
available via the Agencywide Petitioners submitted comments by Technical Specification Improvement
Documents Access and Management electronic mail on February 2, 2007. The To Add an Action Statement for Two
System (ADAMS) on the agency’s Web comments and the staff’s responses to Inoperable Control Room Air
site at http://www.nrc.gov/reading-rm/ them are available electronically Conditioning Subsystems to the
adams.html, and for inspection at the Technical Specifications Using the
through the NRC’s Public Electronic
NRC Public Document Room, located at Consolidated Line Item Improvement
Reading Room at http://www.nrc.gov/ Process
One White Flint North, Public File Area
reading-rm.html, under docket number
O–1F21, 11555 Rockville Pike (first AGENCY: Nuclear Regulatory
floor), Rockville, Maryland. The petition 07200007.
Commission.
concerns the operation of the The Director of the Office of Nuclear
Material Safety and Safeguards has ACTION: Notice of availability.
independent spent fuel storage
installation (ISFSI) at the Palisades determined that the Petitioners’ request, SUMMARY: Notice is hereby given that
Nuclear Plant. to condemn and stop the use of the two the staff of the Nuclear Regulatory
The Petitioners requested that the ISFSI concrete pads holding dry spent Commission (NRC) has prepared a
NRC take enforcement action against the fuel storage casks at the Palisades site, model Application related to changes to
licensee for the Palisades Nuclear Plant, is denied. The NRC staff has concluded the Standard Technical Specifications
Nuclear Management Company, LLC that the Petitioners’ concerns have been (STS), Section 3.7.5 (STS 3.7.4 for BWR/
(NMC), by condemning and stopping adequately addressed by the licensee’s 6), ‘‘Control Room Air Conditioning
the use of the two independent spent revised slope stability evaluation for the (AC) System’’ for NUREG–1433 (BWR/4)
fuel storage installation (ISFSI) concrete and NUREG–1434 (BWR/6), Rev. 3.0.
newer concrete storage pad. The reasons
pads holding dry spent fuel storage The changes add an Action Statement to
for this decision are explained in the
casks on the plant site. Limiting Condition for Operation (LCO)
As the basis for the petition, the director’s decision [DD–07–02] pursuant
to Title 10 of the Code of Federal (LCO 3.7.5 for BWR/4 and LCO 3.7.4 for
Petitioners stated that the concrete cask BWR/6). The new Action Statement
storage pads do not conform with NRC Regulations (10 CFR), Section 2.206, the
complete text of which is available at allows a finite time to restore one
regulations for earthquake stability, control room AC subsystem to operable
specifically 10 CFR 72.212(b)(2)(i)(B) the Commission’s Public Document
status and requires verification that
and 72.212(b)(3), and, therefore, pose a Room, located at One White Flint North,
control room temperature remains
hazard in case of an earthquake. The Public File Area O–1F21, 11555
< 90°F every 4 hours. The proposed
Petitioners asserted that the licensee’s Rockville Pike (first floor), Rockville, changes would also revise the Bases for
evaluations of the older and newer Maryland, and from the ADAMS Public STS 3.7.5 (STS 3.7.4 for BWR/6).
concrete storage pads did not properly Library component on the NRC’s Web The NRC staff has also prepared a
consider the behavior of the soil beneath site, http://www.nrc.gov/reading- model safety evaluation (SE) and no
the pads in determining the effects on rm.html (the Public Electronic Reading significant hazards consideration
the storage casks as a result of a seismic Room). (NSHC) determination relating to this
event. matter. The purpose of these models is
On April 26, 2006, the NRC staff’s A copy of the director’s decision will
be filed with the Secretary of the to permit the NRC to efficiently process
PRB held a teleconference with the
Commission for the Commission’s amendments that propose to adopt the
Petitioners. The teleconference gave the
review in accordance with 10 CFR 2.206 associated changes into plant-specific
Petitioners an opportunity to provide
of the Commission’s regulations. As technical specifications (TS). Licensees
additional information and to clarify
provided for by this regulation, the of nuclear power reactors to which the
issues raised in the petition. During the
director’s decision will constitute the models apply may request amendments
teleconference, the Petitioners requested
additional time to submit a supplement final action of the Commission 25 days confirming the applicability of the SE
to the petition, and the PRB agreed to and NSHC determination to their
after the date of the decision, unless the
the request, as documented in a letter to reactors.
Commission, on its own motion,
the Petitioners, dated May 4, 2006. institutes a review of the director’s DATES: The NRC staff issued a Federal
However, no supplement was decision in that time. Register Notice (71 FR 75774, December
submitted. On June 27, 2006, the NRC 18, 2006) that provided a model SE and
Dated at Rockville, Maryland, this 20th day a model NSHC determination relating to
staff informed the Petitioners by letter
of March 2007. adding an action statement for two
that the issue regarding the seismic
response of the older ISFSI pad, and the For the Nuclear Regulatory Commission. inoperable control room AC subsystems
issue of soil amplification for the newer Jack R. Strosnider, to the plant specific TS. The NRC staff
pad, had been previously resolved and Director, Office of Nuclear Material Safety hereby announces that the model SE
would not be considered under 10 CFR and Safeguards. and NSHC determination may be
2.206. In that same letter, the staff [FR Doc. E7–5433 Filed 3–23–07; 8:45 am] referenced in plant-specific applications
informed the Petitioners that the issue BILLING CODE 7590–01–P
to adopt the changes. The staff has
regarding the slope stability analysis for posted a model application on the NRC
the newer pad was accepted for review Web site to assist licensees in using the
cprice-sewell on PROD1PC66 with NOTICES

under 10 CFR 2.206. The transcript of consolidated line item improvement


the teleconference and the letters are process (CLIIP) to revise the Standard
available in ADAMS, as stated above. Technical Specifications (STS), Section
On November 28, 2006, the NRC sent 3.7.5, ‘‘Control Room Air Conditioning
a copy of the proposed director’s (AC) System.’’ The NRC staff can most
decision to the Petitioners and to the efficiently consider applications based

VerDate Aug<31>2005 16:19 Mar 23, 2007 Jkt 211001 PO 00000 Frm 00072 Fmt 4703 Sfmt 4703 E:\FR\FM\26MRN1.SGM 26MRN1
14144 Federal Register / Vol. 72, No. 57 / Monday, March 26, 2007 / Notices

upon the model application if the Control Program by converting to the System (ADAMS) Public Library
application is submitted within one year improved STS or by other means, are component on the NRC Web site (the
of this Federal Register Notice. requested to include the requirements Electronic Reading Room).
FOR FURTHER INFORMATION CONTACT: for a Bases Control Program consistent The NRC staff received no formal
Peter C. Hearn, Mail Stop: O12H2, with the STS in their application for the comments following the notice
Division of Inspection and Regional change. The need for a Bases Control published on December 18, 2006 (71 FR
Support, Office of Nuclear Reactor Program stems from the need for 75774), soliciting comments on the
Regulation, U.S. Nuclear Regulatory adequate regulatory control of some key model SE and NSHC determination
Commission, Washington, DC 20555– elements of the proposal that are related to the TSTF–477 changes. The
0001, telephone 301–415–1189. contained in the Bases upon adoption of staff did receive editorial comments on
TSTF–477. The staff is requesting that the model SE and model application.
SUPPLEMENTARY INFORMATION:
the Bases changes be included with the The comments involving a spacing issue
Background Regulatory Issue Summary
proposed license amendments between words, deleting the extraneous
2000–06, ‘‘Consolidated Line Item
consistent with the Bases in TSTF–477. use of the word Bases, a missing
Improvement Process for Adopting parentheses and replacing the an
To ensure that the overall change,
Standard Technical Specification ‘‘iSTS’’ acronym with ‘‘STS’’ were
including the Bases, includes
Changes for Power Reactors,’’ was incorporated. The comment involving
appropriate regulatory controls, the staff
issued on March 20, 2000. The CLIIP placing a bracket around the Control
plans to condition the issuance of each
includes an opportunity for the public Room Temperature limit of < 90°F was
license amendment on the licensee’s
to comment on proposed changes to not incorporated since it would allow
incorporation of the changes into the
operating licenses, including the Control Room Temperatures of greater
Bases document and on requiring the
technical specifications (TS), after a licensee to control the changes in than 90°F. The comment was retained
preliminary assessment by the NRC staff accordance with the Bases Control involving removing the term ‘‘Changes
and a finding that the change will likely Program. to the Bases or license controlled
be offered for adoption by licensees. The To efficiently process the incoming document are performed in accordance
CLIIP directs the NRC staff to evaluate license amendment applications, the with 10 CFR 50.59’’ in order emphasize
any comments received for a proposed NRC staff requests that each licensee the requirement for a License
generic change to operating licenses and applying for the changes addressed in Amendment and Safety Evaluation
to either reconsider the change or issue TSTF–477 use the CLIIP to submit an when Bases changes affect the Technical
the announcement of availability for the application that adheres to the following Specifications.
change proposed for adoption by model. Any deviations from the model The NRC staff finds that the
licensees. Those licensees opting to application should be explained in the previously published models remain
apply for the subject change to operating licensee’s submittal. appropriate references and has chosen
licenses are responsible for reviewing The CLIIP does not prevent licensees not to republish the model SE and
the NRC staff’s evaluation, referencing from requesting an alternate approach or model NSHC determination in this
the applicable technical justifications, proposing changes other than those notice. As described in the model
and providing any necessary plant- proposed in TSTF–477. Variations from application prepared by the NRC staff,
specific information. Each amendment the approach recommended in this licensees may reference in their plant-
application made in response to the notice may, however, require additional specific applications to adopt the TSTF–
notice of availability will be processed review by the NRC staff and may 477 changes, the model SE, NSHC
and noticed in accordance with increase the time and resources needed determination, and environmental
applicable rules and NRC procedures. for the review. Significant variations assessment previously published in the
This notice involves adding an action from the approach, or inclusion of Federal Register on December 18, 2006
statement for two inoperable control additional changes to the license, will (71 FR 75774).
room AC subsystems to the associated result in staff rejection of the submittal.
STS Limiting Condition for Operation Dated at Rockville, Maryland, this 14th day
Instead, licensees desiring significant of March 2007.
(LCO). variations and/or additional changes For the Nuclear Regulatory Commission.
Applicability should submit a LAR that does not
Timothy J. Kobetz,
claim to adopt TSTF–477.
This proposed change to the standard Chief, Technical Specifications Branch,
technical specifications (STS) was Public Notices Division of Inspection and Regional Support,
submitted by the Technical In a Federal Register Notice dated Office of Nuclear Reactor Regulation.
Specifications Task Force (TSTF) in December 18, 2006 (71 FR 75774), the For inclusion on the technical specification
TSTF–477, Revision 3, ‘‘Adding an Web page, the following example of an
NRC staff requested comment on the use application was prepared by the NRC staff to
Action Statement for Two Inoperable of the CLIIP to process requests to adopt facilitate use of the consolidated line item
Control Room Air Conditioning the TSTF–477 changes. In addition, improvement process (cliip). The model
Subsystems.’’ there have been multiple notices provides the expected level of detail and
This proposal to modify technical published for plant-specific amendment content for an application to adopt TSTF–
specification requirements by the requests to adopt changes similar to 477, revision 3, add an action statement for
adoption of TSTF–477 is applicable to those described in this notice. two inoperable control room air conditioning
all licensees of General Electric Boiling The NRC staff’s model SE and model subsystems to the technical specifications
using cliip. Licensees remain responsible for
Water Reactors who have adopted or application may be examined, and/or ensuring that their actual application fulfills
will adopt in conjunction with the copied for a fee, at the NRC’s Public
cprice-sewell on PROD1PC66 with NOTICES

their administrative requirements as well as


change, technical specification Document Room, located at One White nuclear regulatory commission regulations.
requirements for a Bases Control Flint North, 11555 Rockville Pike (first U.S. Nuclear Regulatory Commission,
Program consistent with the TS Bases floor), Rockville, Maryland 20852. Document Control Desk, Washington, DC
Control Program described in Section Publicly available records are accessible 20555–0001
5.5 of the STS. Licensees that have not electronically from the Agencywide SUBJECT: Plant Name, Docket No. 50–,
adopted requirements for a Bases Documents Access and Management Application For Technical Specification

VerDate Aug<31>2005 15:30 Mar 23, 2007 Jkt 211001 PO 00000 Frm 00073 Fmt 4703 Sfmt 4703 E:\FR\FM\26MRN1.SGM 26MRN1
Federal Register / Vol. 72, No. 57 / Monday, March 26, 2007 / Notices 14145

Change Tstf–477, Add An Action (TSTF) TSTF–477 Revision 3. The The NRC staff has determined that the
Statement For Two Inoperable Control availability of this TS improvement was amendment adopting TSTF–477, Rev 3,
Room Air Conditioning Subsystems To published in the Federal Register on [DATE] involves no significant increase in the
The Technical Specifications Using as part of the consolidated line item amounts and no significant change in the
Consolidated Line Item Improvement improvement process (CLIIP). types of any effluents that may be released
Process offsite, and that there is no significant
Gentlemen: In accordance with the 2.0 Assessment
increase in individual or cumulative
provisions of 10 CFR 50.90 [LICENSEE] is 2.1 Applicability of TSTF–477, and occupational radiation exposure. The
submitting a request for an amendment to the Published Safety Evaluation Commission has previously issued a
technical specifications (TS) for [PLANT proposed finding that TSTF–477, Rev 3,
NAME, UNIT NOS.]. [LICENSEE] has reviewed TSTF–477
involves no significant hazards
The proposed amendment would modify (Reference 1), and the NRC model safety
evaluation (SE) (Reference 2) as part of the considerations, and there has been no public
the TS by adding an action statement for two comment on the finding in Federal Register
inoperable control room AC subsystems to CLIIP. [LICENSEE] has concluded that the
information in TSTF–477, as well as the SE Notice 71 FR 75774, December 18, 2006.
the plant specific TS. Accordingly, the amendment meets the
Enclosure 1 provides a description of the prepared by the NRC staff are applicable to
[PLANT, UNIT NOS.] and justify this eligibility criteria for categorical exclusion
proposed change, the requested confirmation set forth in 10 CFR 51.22(c)(9). Pursuant to
of applicability, and plant-specific amendment for the incorporation of the
changes to the [PLANT] TS. [NOTE: Only 10 CFR 51.22(b), no environmental impact
verifications. Enclosure 2 provides the statement or environmental assessment need
existing TS pages marked up to show the those changes proposed in TSTF–477 are
addressed in the model SE. The model SE be prepared in connection with the issuance
proposed change. Enclosure 3 provides of the amendment.
revised (clean) TS pages. Enclosure 4 addresses the entire fleet of General Electric
provides the existing TS Bases pages marked Boiling Water Reactors. The plants adopting 5.0 References
up to show the proposed change in TSTF–477 must confirm the applicability of
the changes to their plant.] 1. TSTF–477, Revision 3, ‘‘Adding an
accordance with 10 CFR 50.36(a). Action Statement for Two Inoperable Control
[LICENSEE] requests approval of the 2.2 Optional Changes and Variations Room Air Conditioning Subsystems.’’
proposed license amendment by [DATE], 2. NRC Model Safety Evaluation Report.
[LICENSEE] is not proposing any variations
with the amendment being implemented [BY
or deviations from the TS changes described Enclosure 2—Proposed Technical
DATE OR WITHIN X DAYS].
in TSTF–477 or the NRC staff’s model safety Specification Changes (Mark-Up)
In accordance with 10 CFR 50.91, a copy
evaluation dated [DATE]. [NOTE: The CLIIP
of this application, with enclosures, is being Enclosure 3—Proposed Technical
does not prevent licensees from requesting an
provided to the designated [STATE] Official. Specification Pages
alternate approach or proposing changes
I declare under penalty of perjury under
without the requested Bases or Bases control [Clean copies of Licensee specific
the laws of the United States of America that
program. However, deviations from the Technical Specification (TS) pages,
I am authorized by [LICENSEE] to make this
approach recommended in this notice may corresponding to the TS pages changed by
request and that the foregoing is true and
require additional review by the NRC staff TSTF–477, Rev 3, are to be included in
correct. (Note that request may be notarized
and may increase the time and resources Enclosure 3]
in lieu of using this oath or affirmation
needed for the review. Significant variations
statement). Enclosure 4—Proposed Changes to Technical
from the approach, or inclusion of additional
If you should have any questions regarding Specification Bases Pages
changes to the license, will result in staff
this submittal, please contact [NAME,
rejection of the submittal. Instead, licensees
TELEPHONE NUMBER] [FR Doc. E7–5434 Filed 3–23–07; 8:45 am]
desiring significant variations and/or
Sincerely,
additional changes should submit a LAR that BILLING CODE 7590–01–P
[Name, Title] does not claim to adopt TSTF–477.]
Enclosures:
1. Description and Assessment 3.0 Regulatory Analysis
SECURITIES AND EXCHANGE
2. Proposed Technical Specification 3.1 No Significant Hazards Consideration COMMISSION
Changes Determination
3. Revised Technical Specification Pages [Release No. 34–55491; File No. SR–CBOE–
[LICENSEE] has reviewed the proposed no
4. Marked up Existing TS Bases Changes 2006–95]
significant hazards consideration
cc: NRC Project Manager determination (NSHC) published in the
NRC Regional Office Federal Register as part of the CLIIP. Self-Regulatory Organizations;
NRC Resident Inspector [LICENSEE] has concluded that the proposed Chicago Board Options Exchange,
State Contact NSHC presented in the Federal Register Incorporated; Notice of Filing and
Enclosure 1—Description and Assessment notice is applicable to [PLANT] and is hereby Order Granting Accelerated Approval
incorporated by reference to satisfy the of Proposed Rule Change as Modified
1.0 Description requirements of 10 CFR 50.91(a). by Amendment Nos. 1 and 2 Thereto
The proposed amendment would modify 3.2 Verification and Commitments To List for Trading Options on the
technical specifications by adding an Action Vanguard Emerging Markets
Statement to the Limiting Condition for As discussed in the notice of availability
published in the Federal Register on [DATE] Exchange Traded Fund
Operation (LCO). The new Action Statement
allows a finite time to restore one control for this TS improvement, plant-specific
verifications were performed as follows: March 19, 2006.
room AC subsystem to operable status and Pursuant to Section 19(b)(1) of the
requires verification that control room In addition, [LICENSEE] has proposed TS
temperature remains < 90 °F every 4 hours.1 Bases consistent with TSTF–477 which Securities Exchange Act of 1934
The changes are consistent with Nuclear provide guidance and details on how to (‘‘Act’’),1 and Rule 19b–4 thereunder,2
Regulatory Commission (NRC) approved implement the new requirements. Finally, notice is hereby given that on November
Industry/Technical Specification Task Force [LICENSEE] has a Bases Control Program 30, 2006, the Chicago Board Options
consistent with Section 5.5 of the Standard
cprice-sewell on PROD1PC66 with NOTICES

Exchange, Incorporated (‘‘CBOE’’ or


1 [In conjunction with the proposed change,
Technical Specifications (STS). ‘‘Exchange’’) filed with the Securities
technical specifications (TS) requirements for a 4.0 Environmental Evaluation and Exchange Commission
Bases Control Program, consistent with the TS
Bases Control Program described in Section 5.5 of The amendment changes requirements (‘‘Commission’’) the proposed rule
the applicable vendor’s standard TS (STS), shall be with respect to the installation or use of a
incorporated into the licensee’s TS, if not already facility component located within the 1 15 U.S.C. 78s(b)(1).
in the TS.] restricted area as defined in 10 CFR part 20. 2 17 CFR 240.19b–4.

VerDate Aug<31>2005 15:30 Mar 23, 2007 Jkt 211001 PO 00000 Frm 00074 Fmt 4703 Sfmt 4703 E:\FR\FM\26MRN1.SGM 26MRN1

You might also like