You are on page 1of 1

77414 Federal Register / Vol. 71, No.

247 / Tuesday, December 26, 2006 / Notices

Type of Response: Reporting.

RESPONDENT HOUR BURDEN FOR THE APPRENTICESHIP EVALUATION


Average
Total
Activity Frequency minutes Burden hours
respondents per response

Survey of Sponsors ................................................................. 1,144 One time ................................ 18.5 353


Site Visits:
State apprenticeship directors and staff .......................... 19 One time ................................ 360 114
Providers of related education (community college and 29 One time ................................ 60 29
training program administrators).
One-stop Center Directors and Staff ............................... 14 One time ................................ 60 14
Sponsors .......................................................................... 37 One time ................................ 60 37
Other: WIB chairs and staff ............................................. 15 One time ................................ 60 15
Apprentices ...................................................................... 80 One time ................................ 45 60

Totals ........................................................................ 1,338 ................................................ ........................ 622

Total Annualized Capital/Startup Responsible Federal Agency, are DC 20013–7012; Phone 202–633–6549;
Costs: 0. confirming the date of the public Fax: 202–633–6233.
Total Annual Costs (operating/ scoping meeting for the Environmental
John E. Huerta,
maintaining systems or purchasing Impact Statement (EIS) for the proposed
services): 0. construction of the Smithsonian General Counsel, Smithsonian Institution.
Description: This is a one-time National Museum of African American Dated: December 18, 2006.
information collection consisting of a History and Culture. Notice of the date Lois Schiffer,
survey of sponsors of registered of the public meeting was provided in General Counsel, National Capital Planning
apprenticeship programs, using a the Washington Post on December 5, Commission.
stratified random sample with over 2006. The Notice of Intent to Prepare an [FR Doc. 06–9852 Filed 12–20–06; 12:45 pm]
sampling of sponsors in high growth EIS initially published in the Federal BILLING CODE 8030–03–P
industries who have recently begun Register/Volume 71, No. 223/Monday,
apprenticeship programs. The survey November 20, 2006 did not include the
will be conducted by phone or Internet meeting information. In addition, the NUCLEAR REGULATORY
at the respondent’s choice. The findings comment period, Web site URL, and COMMISSION
from the survey will fill a gap in contact information have changed.
[Docket No. 50–313]
knowledge by providing, for the first SUPPLEMENTARY INFORMATION: The EIS
time, systematic information on the scoping meeting will be held on January Arkansas Nuclear One, Unit 1; Notice
views of sponsors’ views re: Costs and 4, 2007 from 6 p.m. to 9 p.m. at the of Consideration of Issuance of
benefits and on interactions with other National Music Center at the City Amendment to Renewed Facility
parts of the workforce development Museum building, located at 801 K Operating License, Proposed No
system. Street, NW. (Mount Vernon Square), Significant Hazards Consideration
Ira L. Mills, Washington, DC. Consultants Determination, and Opportunity for a
Departmental Clearance Officer/Team representing the SI and NCPC will be Hearing
Leader. available to answer questions and
receive comments about the scope of the The U.S. Nuclear Regulatory
[FR Doc. E6–22056 Filed 12–22–06; 8:45 am] Commission (the Commission) is
BILLING CODE 4510–30–P
EIS. Announcements about the meeting
are provided on the NCPC Web site at considering issuance of an amendment
www.ncpc.gov, and in other media. to Renewed Facility Operating License
No. DPR–51 issued to Entergy
SMITHSONIAN INSTITUTION The public comment period is Operations, Inc. (the licensee), for
extended through February 4, 2007 to operation of the Arkansas Nuclear One,
NATIONAL CAPITAL PLANNING ensure sufficient time for submittal of Unit 1 (ANO–1), located in Pope
COMMISSION comments following the meeting. County, Arkansas.
Comments are invited at the meeting, in The proposed amendment would
Revised Notice of Intent To Prepare an writing, by e-mail to info@louisberger- revise Technical Specification (TS)
Environmental Impact Statement for nmaahceis.com, or on the project Web 3.7.14, ‘‘Spent Fuel Pool Boron
Proposed Construction of the site at http://www.louisberger- Concentration,’’ TS 3.7.15, ‘‘Spent Fuel
Smithsonian National Museum of nmaahceis.com. Written comments Pool Storage,’’ and the associated Figure
African American History and should be sent to Jill Cavanaugh at the 3.7.15–1, and TS 4.3, ‘‘Fuel Storage,’’
Culture—Public Scoping Meeting on Louis Berger Group, Inc., 2445 M Street, and the associated Figure 4.3.1.2–1. In
January 4, 2007 NW., 4th Floor, Washington, DC 20037– addition, this amendment would add TS
1445. 5.5.17, ‘‘Metamic Coupon Sampling
AGENCIES: Smithsonian Institution (SI),
National Capital Planning Commission FOR FURTHER INFORMATION CONTACT: Jane Program,’’ and Surveillance
sroberts on PROD1PC70 with NOTICES

(NCPC). Passman, Senior Facilities Planner, Requirement 3.7.15.2 that directs the
ACTION: Notice. Smithsonian Institution, Office of performance of the coupon sampling
Facilities Engineering and Operations, program.
SUMMARY: The SI and NCPC, as joint P.O. Box 37012, 600 Maryland Ave., The proposed TS changes support a
lead agencies with NCPC as the SW., suite 5001, MRC 511, Washington, modification to the ANO–1 spent fuel

VerDate Aug<31>2005 16:15 Dec 22, 2006 Jkt 211001 PO 00000 Frm 00049 Fmt 4703 Sfmt 4703 E:\FR\FM\26DEN1.SGM 26DEN1

You might also like