DETAIL OF FIREWALL

Number of Columns
Number of End column
Number of Middle column
Size of End column above F.G.L
Size of Middle column above F.G.L
Size of End column below F.G.L
Size of Middle column below F.G.L
C/C of columns
Number of Beams
Number of Plinth Beam
Number of Other Beams
Size of Beam
Wall Projection beyond column
Depth of Foundation
Thickness of wall
Number of Panels
Height of Firewall above F.G.L
Length of Fire wall

350
350
350
350

300

3
2
1
600
600
600
600
2625
3
1
2
600
800
2500
250
2
6850
6850

S.No
1
6850
6850
2500
2500

6850

DETAIL OF FOUNDATION
Size of Pad
Size of PCC for Pad
Excavation for Beam
Depth of beam below F.G.L
Size of PCC for Beam
Depth of Foundation
Thickness of PCC
Excavation width for Pad
Excavation width for PCC

1900
2050
300
450

4
2900
3050
125
250
7000
2500
75
300
150

450
75
250
75

CALCULATIONS
DESCRIPTION
VOLUME OF EXCAVATION
For Foundation
For Beam

QUANTITY

2500
125

3500
600

2575
325

22.53125
0.024375

VOLUME OF PCC
PCC for Pad
PCC for for Beam

2050
450

3050
5950

75
75

0.4689375
0.2008125

VOLUME OF RCC BELOW FGL


RCC for Pad
RCC for Middle Column
RCC for End Column
RCC for for Plinth Beam

1900
350
350
300

2900
600
600
250

450
2050
2050
5800

2.4795
0.4305
0.4305
0.435

VOLUME OF RCC ABOVE FGL


RCC for Middle Column
RCC for End Column
RCC for Middle Column
RCC for End Column
RCC for for Plinth Beam
RCC for for Other Beams
RCC for for Walls

350
350
350
350
300
300
5800

600
600
600
600
350
600
5300

350
350
6500
6500
5800
5800
250

0.0735
0.0735
1.365
1.365
0.609
1.044
7.685

1900
350
350
350
350

2900
600
600
600
600

450
6500
2400
6500
2400

4.32
11.27
4.56
11.27
4.56

VOLUME OF SURPLUS REMOVAL


PCC
RCC

VOLUME OF BACKFILLING
Excavation
Surplus Removal
AREA OF SHUTTERING
For Pad
For Middle Column above F.G.L
For Middle Column below F.G.L
For End Column above F.G.L
For End Column below F.G.L

For
For
For
For

Plinth Beam (side)


Other Beams (side)
Other Beams (bottom)
Walls

300
300
50
5800

5800
5800
5800
5300

600
600
250

7.32
7.32
0.29
64.13

SUMMARY
NOS.

TOTAL

3
2

67.59375
0.04875
67.6425

3
1

1.4068125
0.2008125
1.607625

3
1
2
1

7.4385
0.4305
0.861
0.435
9.165

1
2
1
2
1
2
1

0.0735
0.147
1.365
2.73
0.609
2.088
7.685
14.6975

1.607625
9.165
10.772625

67.6425
10.772625
56.869875
3
1
1
2
2

12.96
11.27
4.56
22.54
9.12

1
2
3
4
5
6

VOLUME OF EXCAVATION
VOLUME OF BACKFILL
VOLUME OF SURPLUS REMOVAL
VOLUME OF PCC
VOLUME OF RCC
AREA OF SHUTTERING

67.643
56.87
10.773
1.608
23.863
147.41

1
2
3
1

7.32
14.64
0.87
64.13
147.41

DETAIL OF FIREWALL
Number of Columns
Number of End column
Number of Middle column
Size of End column above F.G.L
Size of Middle column above F.G.L
Size of End column below F.G.L
Size of Middle column below F.G.L
C/C of Middle column
C/C of middle & End column
Number of Beams
Number of Plinth Beam
Number of Other Beams
Size of Beam
Wall Projection beyond column
Depth of Foundation
Thickness of wall
Number of Panels
Height of Firewall above F.G.L
Length of Fire wall

400
400
400
400

300

4
2
2
750
750
750
750
2700
2650
4
1
3
600
850
2500
250
3
9750
9700

9750
9750
2500
2500

9700

DETAIL OF FOUNDATION
Size of Pad
Size of PCC for Pad
Type of Excavation
Excavation for Beam b/n middle col
Excavation for Beam b/n end & mid. Col
Depth of beam below F.G.L
Size of PCC for Beam
Depth of Foundation
Thickness of PCC
Excavation width for Pad
Excavation width for PCC

1650
1800
0
0
450

2500
2650
BULK
0
0
350
9850
2500
75
300
150

400
75
0
0
75

CALCULATIONS
S.No
1

DESCRIPTION
VOLUME OF EXCAVATION
For Foundation
For Beam (b/n middle)
For Beam (b/n middle & end)

10250
0
0

3100
0
0

2575
0
0

VOLUME OF PCC
PCC for Pad
PCC for for Beam

1800
450

2650
8250

75
75

VOLUME OF RCC BELOW FGL


RCC for Pad
RCC for Middle Column
RCC for End Column
RCC for for Plinth Beam

1650
400
400
300

2500
750
750
350

400
2100
2100
8100

VOLUME OF RCC ABOVE FGL


RCC for Middle Column (upto plinth)
RCC for End Column (upto plinth)
RCC for Middle Column
RCC for End Column
RCC for for Plinth Beam
RCC for for Other Beams
RCC for for Walls

400
400
400
400
300
300
8100

750
750
750
750
250
600
7700

250
250
9500
9500
8100
8100
250

1650
400
400
400

2500
750
750
750

400
9500
9500
2350

VOLUME OF SURPLUS REMOVAL


PCC
RCC

VOLUME OF BACKFILLING
Excavation
Surplus Removal

AREA OF SHUTTERING
For Pad
For Middle Column above F.G.L
For End Column above F.G.L
For Middle Column below F.G.L

For
For
For
For
For

End Column below F.G.L


Plinth Beam (side)
Other Beams (side)
Other Beams (bottom)
Walls

400
300
300
50
8100

750
8100
8100
8100
7700

2350
600
600
250

SUMMARY
QUANTITY

NOS.

TOTAL

81.820625
0
0

1
0
0

81.820625
0
0
81.820625

0.35775
0.2784375

4
1

1.431
0.2784375
1.7094375

1.65
0.63
0.63
0.8505

4
2
2
1

6.6
1.26
1.26
0.8505
9.9705

0.075
0.075
2.85
2.85
0.6075
1.458
15.5925

2
2
2
2
1
3
1

0.15
0.15
5.7
5.7
0.6075
4.374
15.5925
32.274

1
2
3
4
5
6

1.7094375
9.9705
11.6799375

81.820625
11.6799375
70.1406875
3.32
21.85
21.85
5.405

4
2
2
2

13.28
43.7
43.7
10.81

87.4
10.81

VOLUME OF EXCAVATION
VOLUME OF BACKFILL
VOLUME OF SURPLUS REMOVAL
VOLUME OF PCC
VOLUME OF RCC
AREA OF SHUTTERING

5.405
10.08
10.08
0.405
128.59

#VALUE!
=

2
1
3
3
1

10.81
10.08
30.24
1.215
128.59
292.425

10.81
109.02
41.535

SUMMARY

ME OF EXCAVATION
ME OF BACKFILL
ME OF SURPLUS REMOVAL
ME OF PCC
ME OF RCC
OF SHUTTERING

81.821
70.141
11.68
1.709
42.245
292.425