65008 Federal Register / Vol. 71, No.

214 / Monday, November 6, 2006 / Notices

in the Generic Environmental Impact Renewal. Copies of the NMP, Units 1 The Board hereby gives notice that the
Statement for License Renewal, and 2, Safety Evaluation Report mandatory hearing will now begin on
Supplement 24 regarding Nine Mile (NUREG–1900) and the Final Wednesday, November 29, 2006, and
Point Nuclear Station, Units 1 and 2. Environmental Impact Statement will continue day-to-day thereafter until
After weighing the environmental, (NUREG–1437, Supplement 24) may be concluded.
economic, technical and other benefits purchased from the National Technical
of the facility against environmental A. Date, Time, and Location of
Information Service, U.S. Department of
costs and considering available Mandatory Hearing
Commerce, Springfield, VA 22161–0002
alternatives, the Commission found that (http://www.ntis.gov), 703–605–6000, or Date: Wednesday, November 29,
the adverse environmental impacts of the Superintendent of Documents, U.S. 2006.
license renewal are not so great that Government Printing Office, P.O. Box Time: Beginning at 9 a.m. EST.
preserving the option of license renewal 371954, Pittsburgh, PA, 15250–7954. Location: ASLBP Hearing Room, Two
would be unreasonable. The (http://www.gpoaccess.gov), 202–512– White Flint North, Third Floor, 11545
Commission also has taken all 1800. All orders should clearly identify Rockville Pike, Rockville, Maryland
practicable measures within its the NRC publication number and the 20852–2738.
jurisdiction to avoid or minimize requester’s Government Printing Office Any members of the public who plan
environmental harm in its decision to deposit account number or a VISA or to attend the mandatory hearing are
renew Operating License Nos. DPR–63 MasterCard number and expiration date. advised that security measures will be
and NPF–69. No license conditions are employed at the entrance to the hearing
imposed in connection with mitigation Dated at Rockville, Maryland, this 31st day facility, including searches of hand-
measures. of October, 2006. carried items such as briefcases or
NMP, Units 1 and 2, are located on For the Nuclear Regulatory Commission. backpacks. The public is further advised
approximately 900 acres along the shore Frank P. Gillespie, that, in accordance with 10 CFR 2.390,
of Lake Ontario, Oswego County, New Director, Division of License Renewal, Office portions of the hearing sessions may be
York. The site is approximately 5 miles of Nuclear Reactor Regulation. closed to the public because the matters
north-northeast of the nearest boundary [FR Doc. E6–18627 Filed 11–3–06; 8:45 am] at issue may involve the discussion of
of the City of Oswego. The licensee’s BILLING CODE 7590–01–P protected information.
application for the renewed licenses
complied with the standards and B. Scheduling Information Updates
requirements of the Atomic Energy Act NUCLEAR REGULATORY Updated/revised scheduling
of 1954, as amended (the Act), and the COMMISSION information regarding the evidentiary
Commission’s regulations. As required hearing can be found on the NRC Web
[Docket No. 52–009–ESP; ASLBP No. 04–
by the Act and the Commission’s 823–03–ESP]
site at http://www.nrc.gov/public-
regulations in 10 CFR Chapter I, the involve/public-meetings/index.cfm or by
Commission has made appropriate Atomic Safety and Licensing Board; calling (800) 368–5642, extension 5036,
findings, which are set forth in each Before Administrative Judges: or (301) 415–5036.
license. Lawrence G. McDade, Chairman, It is so ordered.
Prior public notice of the action Nicholas G. Trikouros, Dr. Richard E. Dated: Rockville, Maryland, October 31,
involving the proposed issuance of the Wardwell; in the Matter of System 2006.
renewed licenses and of an opportunity Energy Resources, Inc.; Early Site For the Atomic Safety and Licensing
for a hearing regarding the proposed Permit for Grand Gulf Site; Revised Board.3
issuance of the renewed licenses was Notice of Hearing Lawrence G. McDade,
published in the Federal Register on
Chairman, Administrative Judge.
July 21, 2004 (69 FR 43633). October 31, 2006.
For further details with respect to this [FR Doc. 06–9075 Filed 11–3–06; 8:45 am]
On October 6, 2006, this Atomic
action, see (1) the Nine Mile Point Safety and Licensing Board issued a BILLING CODE 7590–01–P

Nuclear Station, LLC license renewal Notice of Hearing,1 which indicated that
application for Nine Mile Point Nuclear an evidentiary session would be
Station, Units 1 and 2 dated May 26, NUCLEAR REGULATORY
convened beginning on Tuesday,
2004, as amended July 15, 2005; (2) the COMMISSION
November 14, 2006, to receive
Commission’s safety evaluation report testimony and exhibits in the [Docket No. 70–7004–ML, ASLBP No. 05–
(NUREG–1900), published in September ‘‘mandatory hearing’’ portion of this 838–01–ML]
2006; and (3) the Commission’s final proceeding regarding the October 16,
environmental impact statement 2003, application of System Energy Atomic Safety and Licensing Board,
(NUREG–1437, Supplement 24), Resources, Inc. (SERI) for a 10 CFR Part Before Administrative Judges:
published in May 2006. These 52 early site permit (ESP), seeking Lawrence G. McDade, Chairman, Dr.
documents are available at the NRC approval of the site of the existing Peter S. Lam, Dr. Richard E. Wardwell;
Public Document Room, One White Grand Gulf Nuclear Station (GGNS) near In the Matter of USEC, Inc. (American
Flint North, 11555 Rockville Pike, Port Gibson in Claiborne County, Centrifuge Plant); Notice of
Rockville, Maryland 20852, and can be Mississippi, for the possible future Opportunity To Make Oral or Written
viewed from the NRC Public Electronic construction of a new nuclear power Limited Appearance Statements
Reading Room at (http://www.nrc.gov/ generation facility.2 This mandatory October 31, 2006.
reading-rm/adams.html). hearing will concern safety and This proceeding involves the
Copies of Renewed Facility Operating environmental matters relating to the
rwilkins on PROD1PC63 with NOTICES

application of USEC, Inc. (USEC) for


License Nos. DPR–63 and NPF–69 may proposed issuance of the requested ESP, authorization to construct a facility and
be obtained by writing to the U.S. as described in our October 6 Notice.
Nuclear Regulatory Commission, 3 Copies of this Notice were sent this date by
Washington, DC, 20555–0001, 1 See 71 FR 60,583 (Oct. 13, 2006). Internet e-mail transmission to counsel for (1) SERI;
Attention: Director, Division of License 2 See 69 FR 2636 (Jan. 16, 2004). and (2) the NRC Staff.

VerDate Aug<31>2005 17:31 Nov 03, 2006 Jkt 211001 PO 00000 Frm 00089 Fmt 4703 Sfmt 4703 E:\FR\FM\06NON1.SGM 06NON1
Federal Register / Vol. 71, No. 214 / Monday, November 6, 2006 / Notices 65009

to possess and use source, byproduct, Oral limited appearance statements D. Submitted Written Limited
and special nuclear material in order to will be entertained during the hours Appearance Statements
enrich natural uranium to a maximum specified above, or such lesser time as A written limited appearance
of ten percent uranium-235 (U235) by the might be necessary to accommodate the statement may be submitted to the
gas centrifuge process. USEC proposes speakers who are present. In this regard, Board regarding this proceeding at any
to do this at a facility—denominated the if all scheduled and unscheduled time, either in lieu of or in addition to
American Centrifuge Plant (ACP)—to be speakers present at the session have any oral statement. Such statements
constructed near Piketon, Ohio. made a presentation, the Licensing should be sent to the Office of the
More specifically, on August 23, 2004, Board reserves the right to terminate the Secretary using the methods prescribed
USEC filed an application with the session before the ending time listed above, with a copy to the Licensing
Nuclear Regulatory Commission (NRC) above. During the limited appearance Board Chairman.
to obtain a thirty-year license under 10 session no signs or banners will be
CFR Parts 30, 40, and 70 to operate its permitted in the room. E. Availability of Documentary
proposed ACP. Thereafter a public In order to allow all interested Information Regarding the Proceeding
interest group, the Portsmouth/Piketon persons an opportunity to address the Documents relating to this proceeding
Residents for Environmental Safety and Board, the time allotted for each are available for public inspection at the
Security (PRESS) and an individual, statement normally will be no more Commission’s Public Document Room
Geoffrey Sea (Sea), filed petitions to than five (5) minutes, but may be (PDR), located at One White Flint North,
intervene. Based on the pleadings limited, or expanded, depending on the 11555 Rockville Pike (first floor),
submitted, and after hearing argument number of written requests to make oral Rockville, Maryland, or electronically
from the putative intervenors, this statements that are submitted in from the publicly available records
Board determined that neither Petitioner accordance with Section C below, and/ component of NRC’s document system
had presented an admissible contention. or the number of persons present at the (ADAMS). ADAMS is accessible from
LBP–05–28, 62 NRC 585 (2005). Both designated time. At the outset of each the NRC Web site at http://www.nrc.gov/
PRESS and Sea appealed the Board’s statement, the speaker should identify reading-rm/adams.html (Electronic
Order and, on April 3, 2006, the himself or herself by stating their name, Reading Room). Persons who do not
Commission affirmed the Board’s city and state of residence, and stating have access to ADAMS or who
rulings as to both Petitioners. CLI–06– whether they have any affiliation (such encounter problems in accessing the
09, 63 NRC 433 (2006); CLI–06–10, 63 as employment, consultancy, or documents located in ADAMS should
NRC 451 (2006). Therefore, the only membership) with any of the parties contact the NRC PDR reference staff by
matter remaining before this Board is (USEC or the NRC). telephone at (800) 397–4209 or (301)
satisfaction of the Mandatory Hearing 415–4737, or by e-mail to pdr@nrc.gov.
requirement with regard to USEC’s C. Submitting a Request To Make an
License Application (LA). 42 U.S.C. Oral Limited Appearance Statement F. Scheduling Information Updates
2243(b)(1); 10 CFR 70.23a, 70.31(e). Updated/revised scheduling
This Atomic Safety and Licensing Persons wishing to make an oral
statement who have submitted a timely information regarding the limited
Board hereby gives notice that, in appearance session can be found on the
accordance with 10 CFR 2.315(a), the written request to do so will be given
priority over those who have not filed NRC Web site at http://www.nrc.gov/
Board will entertain oral limited public-involve/public-meetings/
appearance statements from members of such a request. To be considered timely,
a written request to make an oral index.cfm or by calling (800) 368–5642,
the public in connection with this extension 5036, or (301) 415–5036.
proceeding at the date, time, and statement must either be mailed, faxed,
location specified below. or sent by e-mail so as to be received by Dated: October 31, 2006.
5 p.m. EST on December 5, 2006. For the Atomic Safety and Licensing
A. Date, Time, and Location of Oral Written requests to make an oral Board.1
Limited Appearance Statement Session statement should be submitted to: Lawrence G. McDade, Chairman
The session will be held on the Mail: Office of the Secretary, Administrative Judge.
following date at the specified location Rulemakings and Adjudications Staff, [FR Doc. 06–9076 Filed 11–3–06; 8:45 am]
and time: U.S. Nuclear Regulatory Commission, BILLING CODE 7590–01–P
Date: Tuesday, December 12, 2006. Washington, DC 20555–0001.
Time: 6 p.m. EST until 9 p.m. EST.
Fax: (301) 415–1101 (verification
Location: Ohio State University NUCLEAR REGULATORY
(301) 415–1966).
Endeavor Center, Training Room 160, COMMISSION
1862 Shyville Road, Piketon, Ohio E-mail: hearingdocket@nrc.gov.
45661. In addition, using the same method of [Docket Nos. 50–259, 50–260, and 50–296]

B. Participation Guidelines for Oral service, a copy of the written request to


make an oral statement should be sent Tennessee Valley Authority, Browns
Limited Appearance Statements Ferry Nuclear Plant, Units 1, 2 and 3;
to the Chairman of this Licensing Board
Any person not a party, or the as follows: Draft Environmental Assessment and
representative of a party, to the Finding of No Significant Impact
Mail: Administrative Judge Lawrence Related to the Proposed License
proceeding will be permitted to make an
G. McDade, c/o: Debra Wolf, Esq. Law Amendment To Increase the Maximum
oral statement setting forth his or her
Clerk, Atomic Safety and Licensing Reactor Power Level
position on matters of concern relating
Board Panel, Mail Stop T–3 F23, U.S.
to this proceeding. Although these
rwilkins on PROD1PC63 with NOTICES

Nuclear Regulatory Commission, AGENCY:U.S. Nuclear Regulatory


statements do not constitute testimony
Washington, DC 20555–0001. Commission.
or evidence in the proceeding, they
nonetheless help the Board and/or the Fax: (301) 415–5599 (verification
1 Copies of this Notice were sent this date by
parties in their consideration of the (301) 415–6094). Internet electronic mail transmission to counsel for
issues. Email: daw1@nrc.gov. (1) USEC; and (2) the NRC Staff.

VerDate Aug<31>2005 17:31 Nov 03, 2006 Jkt 211001 PO 00000 Frm 00090 Fmt 4703 Sfmt 4703 E:\FR\FM\06NON1.SGM 06NON1