Professional Documents
Culture Documents
(2) Package Title: Chronic Beryllium facilities. That two-year authorization petition and protest should be filed with
Disease Prevention Program. expired on April 8, 2004. On July 8, the DOE on or before the date listed
(3) Type of Review: Renewal. 2004, DOE received an application from above.
(4) Purpose: This information is used EMC to renew its authorization to Comments on the EMC application to
by DOE and DOE contractor employers transmit electric energy from the United voluntarily transfer their export
to manage chronic beryllium disease States to Canada. On October 13, 2004, authorization to EEM should be clearly
VerDate Aug<31>2005 15:15 Aug 23, 2006 Jkt 208001 PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 E:\FR\FM\24AUN1.SGM 24AUN1
Federal Register / Vol. 71, No. 164 / Thursday, August 24, 2006 / Notices 50051
marked with Docket EA–260–B. applications, and perform Front-End National Energy Technology Laboratory,
Additional copies are to be filed directly Engineering Design activities. M/S 922–342C, P.O. Box 10940,
with Lee Bui, Transaction Accounting The Department prepared this draft Pittsburgh, PA 15236. Additional
Assistant, EPCOR Energy Marketing EIS in accordance with the National information about the Draft EIS may
(U.S.) Inc., EPCOR Place, 8th Floor, 505 Environmental Policy Act of 1969 also be requested by telephone at: (412)
2nd Street, SW., Calgary, Alberta T2P (NEPA) (42 U.S.C. 4321 et seq.), the 386–6065, or toll-free at: (888) 322–
1N8, Canada and Sandra E. Rizzo, Esq. Council on Environmental Quality 7436, x6065.
Preston Gates Ellis, & Rouvelas Meeds, (CEQ) regulations that implement the The Draft EIS will be available at
LLP, 1735 New York Avenue, NW., procedural provisions of NEPA (40 CFR http://www.eh.doe.gov/nepa/. Copies of
Suite 500, Washington, DC 20006. parts 1500–1508), and the DOE the Draft EIS are also available for
A final decision will be made on this procedures implementing NEPA (10 review at the locations listed in the
application after the environmental CFR part 1021). SUPPLEMENTARY INFORMATION section of
impacts have been evaluated pursuant DOE’s proposed action (and preferred this Notice. Written comments on the
to the National Environmental Policy alternative) is to provide cost-shared Draft EIS can be mailed to Richard A.
Act of 1969, and a determination is funding to design, construct, and Hargis, Jr., NEPA Document Manager, at
made by the DOE that the proposed operate the Orlando Gasification Project. the address noted above. Written
action will not adversely impact on the Although DOE funding would support comments may also be submitted by fax
reliability of the U.S. electric power only the Orlando Gasification Project to: (412) 386–4775, or submitted
supply system. (i.e., coal gasifier, synthesis gas cleanup electronically to: hargis@netl.doe.gov.
Copies of this application will be systems, and supporting infrastructure), Oral comments on the Draft EIS will be
made available, upon request, for public the project would be integrated with a accepted only during the public hearing
inspection and copying at the address planned, privately funded, combined- scheduled for the date and location
provided above or by e-mailing Odessa cycle unit, which together would provided in the DATES section of this
Hopkins at Odessa.hopkins@hq.doe.gov. constitute the IGCC facilities. The Notice. Requests to speak at the public
facilities would convert coal into hearing can be made by calling or
Issued in Washington, DC, on August 17, synthesis gas to drive a gas combustion writing the EIS Document Manager (see
2006.
turbine, and hot exhaust gas from the ADDRESSES). Requests to speak that have
Anthony J. Como, gas turbine would generate steam in a not been submitted prior to the hearing
Director, Permitting and Siting Office of heat recovery steam generator (HRSG) to will be accepted in the order in which
Electricity Delivery and Energy Reliability. drive a steam turbine. Combined, the they are received during the hearing.
[FR Doc. E6–14044 Filed 8–23–06; 8:45 am] two turbines would generate 285 MW Speakers are encouraged to provide a
BILLING CODE 6450–01–P (megawatts) of electricity. The potential written version of their oral comments
environmental impacts of this action are for the record. Each speaker will be
evaluated in this Draft EIS. DOE also allowed five minutes to present
DEPARTMENT OF ENERGY analyzed the No-Action Alternative (not comments unless more time is requested
funding the demonstration), including a and available. Comments will be
Notice of Availability; Draft
scenario reasonably expected to result recorded by a court reporter and will
Environmental Impact Statement for
as a consequence of the no-action become part of the public hearing
the Orlando Gasification Project
alternative. Without DOE participation, record.
AGENCY: Department of Energy. Southern Company and/or OUC could FOR FURTHER INFORMATION CONTACT: For
reasonably pursue at least one option. further information on the proposed
ACTION: Notice of availability and public
The combined-cycle facilities could be project or the draft environmental
hearings.
built at the Stanton Energy Center impact statement, please contact Mr.
SUMMARY: The U.S. Department of without the gasifier, synthesis gas Richard A. Hargis, Jr., as directed above.
Energy (DOE) announces the availability cleanup systems, and supporting For general information regarding the
of the document, Draft Environmental infrastructure. DOE NEPA process, please contact: Ms.
Impact Statement for the Orlando DATES: DOE invites the public to Carol M. Borgstrom, Director, Office of
Gasification Project (DOE/EIS–0383), for comment on the Draft EIS during the NEPA Policy and Compliance (EH–42),
public comment. The draft public comment period, which ends U.S. Department of Energy, 1000
environmental impact statement (EIS) October 10, 2006. DOE will consider all Independence Avenue, SW.,
analyzes the potential environmental comments postmarked or received Washington, DC 20585, Telephone:
consequences of providing federal during the public comment period in (202) 586–4600, or leave a message at:
funding for the design, engineering, preparing the Final EIS, and will (800) 472–2756.
construction, and operation of facilities consider late comments to the extent SUPPLEMENTARY INFORMATION:
at Orlando Utilities Commission’s practicable.
(OUC’s) existing Stanton Energy Center DOE will hold a public hearing on Description of Alternatives
near Orlando, Florida. The project has September 13, 2006, at Timber Creek DOE analyzed two alternatives in the
been selected by DOE for further High School, 1001 Avalon Park Draft EIS: The proposed action and the
consideration under the Clean Coal Boulevard, Orlando, Florida, 7 p.m. to 9 no-action alternative. Under the
Power Initiative (CCPI) to demonstrate p.m. An informational session will be proposed action, DOE would provide
advanced power generation systems held at the same location from 5 p.m. to cost-shared funding for construction
using Integrated Gasification Combined 7 p.m., preceding the public hearing on and operation of gasification facilities at
the date noted above.
rmajette on PROD1PC67 with NOTICES1
VerDate Aug<31>2005 15:15 Aug 23, 2006 Jkt 208001 PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 E:\FR\FM\24AUN1.SGM 24AUN1