You are on page 1of 1

45106 Federal Register / Vol. 71, No.

152 / Tuesday, August 8, 2006 / Notices

www.regulations.gov. Follow the online November 2005. S5.2 of FMVSS No. be considered to the extent possible.
instructions for submitting comments. 218, penetration, requires that ‘‘when a When the petition is granted or denied,
The petition, supporting materials, penetration test is conducted in notice of the decision will be published
and all comments received before the accordance with S7.2, the striker shall in the Federal Register pursuant to the
close of business on the closing date not contact the surface of the test authority indicated below.
indicated below will be filed and will be headform.’’ When this test was Comment closing date: September 7,
considered. All comments and conducted on the subject helmets, the 2006.
supporting materials received after the striker contacted the surface of the test Authority: (49 U.S.C. 30118, 30120:
closing date will also be filed and will headform. Fulmer has corrected the delegations of authority at CFR 1.50 and
be considered to the extent possible. problem that caused these errors so that 501.8).
When the petition is granted or denied, they will not be repeated in future
Issued on: August 3, 2006.
notice of the decision will be published production.
Fulmer believes that the Claude H. Harris,
in the Federal Register pursuant to the
noncompliance is inconsequential to Director, Office of Vehicle Safety Compliance.
authority indicated below.
Comment closing date: September 7, motor vehicle safety and that no [FR Doc. E6–12878 Filed 8–7–06; 8:45 am]
2006. corrective action is warranted. Fulmer BILLING CODE 4910–59–P
states that it asked Harry Hurt, ‘‘a
Authority: (49 U.S.C. 30118, 30120:
delegations of authority at CFR 1.50 and
leading expert in helmet testing and
motorcycle accident research * * * DEPARTMENT OF TRANSPORTATION
501.8).
[whose] experience is more than 50
Issued on: August 3, 2006. years,’’ to review the test results. Fulmer Pipeline and Hazardous Materials
Claude H. Harris, further states, Safety Administration, Office of
Director, Office of Vehicle Safety Compliance. Hazardous Materials Safety
[Harry Hurt’s] opinion is that the
[FR Doc. E6–12879 Filed 8–7–06; 8:45 am] noncompliance on the penetration test is Notice of Delays in Processing of
BILLING CODE 4910–59–P inconsequential because the helmets
Special Permit Applications
performed exceptionally well on all impact
attenuation tests. In his experience, there has AGENCY: Pipeline and Hazardous Safety
DEPARTMENT OF TRANSPORTATION never been any correlation between the Administration, DOT.
penetration test and accident performance,
and damage like the penetration test is never ACTION: List of applications delayed
National Highway Traffic Safety
seen in crash involved motorcycle helmets. more than 180 days.
Administration
Mr. Hurt’s full statement is available in SUMMARY: In accordance with the
[Docket No. NHTSA–2006–25525; Notice 1]
the docket. requirements of 49 U.S.C. 5117(c),
Fulmer Helmets, Inc., Receipt of Interested persons are invited to PHMSA is publishing the following list
Petition for Decision of submit written data, views, and of special permit applications that have
Inconsequential Noncompliance arguments on this petition. Comments been in process for 180 days or more.
must refer to the docket and notice The reason(s) for delay and the expected
Fulmer Helmets, Inc. (Fulmer) has number cited at the beginning of this completion date for action on each
determined that certain helmets it notice and be submitted by any of the application is provided in association
produced in 2001 through 2006 do not following methods. Mail: Docket with each identified application.
comply with S5.2 of 49 CFR 571.218, Management Facility, U.S. Department FOR FURTHER INFORMATION CONTACT: Ann
Federal Motor Vehicle Safety Standard of Transportation, Nassif Building, Mazzullo, Office of Hazardous Materials
(FMVSS) No. 218, ‘‘Motorcycle Room PL–401, 400 Seventh Street, SW., Special Permits and Approvals, Pipeline
Helmets.’’ Fulmer has filed an Washington, DC 20590–0001. Hand and Hazardous Materials Safety
appropriate report pursuant to 49 CFR Delivery: Room PL–401 on the plaza Administration, U.S. Department of
part 573, ‘‘Defect and Noncompliance level of the Nassif Building, 400 Transportation, 400 Seventh Street,
Reports.’’ Seventh Street, SW., Washington, DC. It SW., Washington, DC 20590–0001, (202)
Pursuant to 49 U.S.C. 30118(d) and is requested, but not required, that two 366–4535.
30120(h), Fulmer has petitioned for an copies of the comments be provided.
exemption from the notification and The Docket Section is open on Key to ‘‘Reason for Delay’’
remedy requirements of 49 U.S.C. weekdays from 10 a.m. to 5 p.m. except 1. Awaiting additional information
Chapter 301 on the basis that this Federal Holidays. Comments may be from applicant.
noncompliance is inconsequential to submitted electronically by logging onto 2. Extensive public comment under
motor vehicle safety. the Docket Management System Web review.
This notice of receipt of Fulmer’s site at http://dms.dot.gov. Click on 3. Application is technically complex
petition is published under 49 U.S.C. ‘‘Help’’ to obtain instructions for filing and is of significant impact or
30118 and 30120 and does not represent the document electronically. Comments precedent-setting and requires extensive
any agency decision or other exercise of may be faxed to 1–202–493–2251, or analysis.
judgment concerning the merits of the may be submitted to the Federal 4. Staff review delayed by other
petition. eRulemaking Portal: go to http:// priority issues or volume of special
Affected are a total of approximately www.regulations.gov. Follow the online permit applications.
32,052 helmets which Fulmer certified instructions for submitting comments.
as complying with FMVSS No. 218. The petition, supporting materials, Meaning of Application Number
These consist of approximately 26,762 and all comments received before the Suffixes
jlentini on PROD1PC65 with NOTICES

Modular Motorcycle Helmets AF–M close of business on the closing date N—new applications.
produced between January 2002 and indicated below will be filed and will be M—Modification request.
April 2006, and approximately 5,290 considered. All comments and X—Renewal.
Modular Snowmobile Helmets SN–M supporting materials received after the PM—Party to application with
produced between November 2001 and closing date will also be filed and will modification request.

VerDate Aug<31>2005 20:06 Aug 07, 2006 Jkt 208001 PO 00000 Frm 00113 Fmt 4703 Sfmt 4703 E:\FR\FM\08AUN1.SGM 08AUN1

You might also like