Professional Documents
Culture Documents
TRAINING MANUAL
Legal Notice
2
Warning
Switch
Safety
to notes view!
Both lethal and dangerous voltages are present within the equipment. Do not wear conductive jewelry
while working on the equipment. Always observe all safety precautions and do not work on the
equipment alone.
Caution
The equipment used during this course is electrostatic sensitive. Please observe correct anti-static
precautions.
Trade Marks
Alcatel and MainStreet are trademarks of Alcatel.
All other trademarks, service marks and logos (Marks) are the property of their respective holders
including Alcatel-Lucent. Users are not permitted to use these Marks without the prior consent of Alcatel
or such third party owning the Mark. The absence of a Mark identifier is not a representation that a
particular product or service name is not a Mark.
Copyright
This document contains information that is proprietary to Alcatel-Lucent and may be used for training
purposes only. No other use or transmission of all or any part of this document is permitted without
Alcatel-Lucents
written permission, and must include all copyright and other proprietary notices. No
9159 NPO
All Rights Reserved Alcatel-Lucent 2007
otherNPO
use
or transmission
Operation
& Administrationof all or any part of its contents may be used, copied, disclosed or conveyed to
any party in any manner whatsoever without prior written permission from Alcatel-Lucent.
Use or transmission of all or any part of this document in violation of any applicable Canadian or other
legislation is hereby expressly prohibited.
User obtains no rights in the information or in any product, process, technology or trademark which it
includes or describes, and is expressly prohibited from modifying the information or creating derivative
works without the express written consent of Alcatel-Lucent.
Alcatel-Lucent, The Alcatel-Lucent logo, MainStreet and Newbridge are registered trademarks of AlcatelLucent. All other trademarks are the property of their respective owners. Alcatel-Lucent assumes no
responsibility for the accuracy of the information presented, which is subject to change without notice.
2007 Alcatel-Lucent. All rights reserved.
Disclaimer
In no event will Alcatel-Lucent be liable for any direct, indirect, special, incidental or consequential
damages, including lost profits, lost business or lost data, resulting from the use of or reliance upon the
information, whether or not Alcatel has been advised of the possibility of such damages.
Mention of non-Alcatel-Lucent products or services is for information purposes only and constitutes
neither an endorsement nor a recommendation.
Please refer to technical practices supplied by Alcatel-Lucent for current information concerning AlcatelLucent equipment and its operation.
Table of Contents
3
1. NPO GSM
9159 NPO
NPO Operation & Administration
9159 NPO
NPO Operation & Administration
Course Objectives
5
Situate the NPO server in the Network and describe its architecture,
Use the NPO Analysis Desktop,
Monitor and analyze the Quality of Service,
Administrate NPO using Import/Export Management and Data Management interfaces.
9159 NPO
NPO Operation & Administration
9159 NPO
NPO Operation & Administration
Provides you with additional information about the topic being discussed.
Although this information is not required knowledge, you might find it useful
or interesting.
Technical Reference
(1) 24.348.98 Points you to the exact section of Alcatel-Lucent Technical
Practices where you can find more information on the topic being discussed.
Warning
Alerts you to instances where non-compliance could result in equipment
damage or personal injury.
9159 NPO
NPO Operation & Administration
9159 NPO
NPO Operation & Administration
Self-Assessment of Objectives
9
Contract number :
At the end of each section you will be asked to fill this questionnaire
Course title :
Please, return this sheet to the trainer at the end of the training
Language
:
Switch
Dates from :
to notes view!
Number of trainees :
to :
Location :
Instructional objectives
No (or
globally
no)
9159 NPO
NPO Operation & Administration
Yes (or
globally
yes)
Comments
Instructional objectives
No (or
globally
no)
Comments
Other comments
9159 NPO
NPO Operation & Administration
Yes (or
Globally
yes)
11
Section 1
NPO GSM
Module 1
Introduction
3JK11311AAAAWBZZA Edition 05
Blank Page
NPO GSM Introduction
9159 NPO
NPO Operation & Administration
11
Document History
Edition
Date
Author
Remarks
01
YYYY-MM-DD
First edition
Objectives
NPO GSM Introduction
9159 NPO
NPO Operation & Administration
11
Objectives [cont.]
NPO GSM Introduction
9159 NPO
NPO Operation & Administration
11
Table of Contents
NPO GSM Introduction
11
Page
9159 NPO
NPO Operation & Administration
7
8
9
10
12
16
21
22
23
24
25
26
27
31
32
34
36
37
11
9159 NPO
NPO Operation & Administration
All Rights
Reserved
Alcatel-Lucent
2007
This page
is left
blank
intentionally
11
9159 NPO
NPO Operation & Administration
11
9159 NPO
NPO Operation & Administration
optimization data of the data warehouse. It allows creating and displaying reports.
External interfaces allowing an external system to extract QoS information from NPO
B10
B10
MR2
MR2
11
A9157 LASER
B10 MR2
NPA
A9156 RNO
Advantages:
Easier O&M of software and database
Single access point to all radio data
Simple and secure management of LAN
9159 NPO
NPO Operation & Administration
A9159 NPO
1.3 Goals
NPO GSM Introduction
11
Planning
Optimization
Design
NPO
OMC-R
9159 NPO
NPO Operation & Administration
QoS
Monitoring
10
11
Highlight
Detect network misbehaviors and QoS degradations
Rank
Help the optimization team to focus on the most urgent issues
Act
Fix the quality of service problems in a quick and accurate way
Manage
Decide the corrective actions to apply on the network
9159 NPO
NPO Operation & Administration
11
11
3 possible architectures:
1. As an external software application (such as A9156 RNO)
A9159 NPO
Software application
9159 NPO
NPO Operation & Administration
12
B10
B10
MR2
MR2
11
3 possible architectures:
1. As an external software application (such as A9156 RNO)
2. As part of the A1353-MP Multi-Standard OMC Portal (in B10 MR2 : no multistandard)
O&M
O&M
MS NPO
MS SUP
MS PORTAL
WCDMA WNMS
(UA5)
9159 NPO
NPO Operation & Administration
MONO STANDARD. MS PORTAL is used to increase NPO capacity, but for one RAT only.
max GSM cells = 12000 with MS PORTAL with MS NPO + MS SUP
max GSM cells = 24000 with MS PORTAL with MS NPO only and with cluster configuration
max WCDMA cells = 18000 with MS PORTAL with MS NPO only and with cluster configuration
What is MS-PORTAL :
1. Supervision and Management of several OMC-R's (UMTS or GSM) - OPTIONAL
2. Collection of QoS of all OMC-R's (ORACLE database located in the MS PORTAL)
3. Provides all functions of a NPO SERVER (the NPO server located in the MS PORTAL)
13
11
3 possible architectures:
1. As an external software application (such as A9156 RNO)
2. As part of the A1353-MP Multi-Standard OMC Portal (in B10 MR2 : no mulstistandard)
3. Embedded in the OMC-R : NPO embedded (NPOe)
NPOe
9159 NPO
NPO Operation & Administration
OMC-R HMI
14
11
As a standard feature, all OMC-R Master & OMC-R HMI provides basic
NPO functionalities.
MPM
OMC-R Master
9159 NPO
NPO Operation & Administration
It allows access to the analysis desktop (NPO main interface) from an OMC-R HMI.
The OMC-R Master contains a NPO server with its ORACLE database.
MPM Configurations Hosted by OMC configuration name
MPM 250 OMC-R (V880, V490) Small
MPM 500 OMC-R (V880, V490) Standard
MPM 1200 OMC-R (V880, V490) Large-1
MPM 1500 OMC-R (V880) MPM 1800 OMC-R (V490) Large-2
MPM 4000 OMC-R (V880, V490) X-Large
MPM 6000 OMC-R (V490) XX-Large
15
1.5 Configurations
NPO GSM Introduction
11
16
Webstart client
NPO Server
Windows XP SP2
Java Engine
V880/V490 Solaris 10
Oracle Server 10g
LAN
Windows XP SP2
NPO HMI
ML370 series
Windows server 2003
Oracle client 10g
Citrix server 4
IP
WAN/LAN
256 kb/s
Citrix client
Citrix Client 9.0
9159 NPO
NPO Operation & Administration
By compressing data over the network, the HMI server allows to use low bandwidth networks without
decreasing the performances.
- Full clients: these terminals are directly connected to A9159 NPO server without HMI server. A LAN
connection is mandatory for the communication with the server. The NPO client software is installed on
these clients.
- Light clients: these terminals are connected to the NPO server through one or several HMI servers. Only
the Citrix Metaframe client software has to be installed on this terminal. The NPO client software is
running on the HMI server.
The A9159 NPO HMI server is running under a Windows server 2003 environment on a HP hardware machine.
Each HMI server can run up to 10 GUI instances whatever the NPO configuration. Whatever the number of
used HMI servers, the global limit of the number of user sessions of each NPO configuration described in
the table next slide cannot be exceeded in order to keep satisfactory performance.
Configuration items
PC Server
Model
HP Proliant ML 370G4 or G5
Processors
Ram Memory
Hard disk
36 GB
Operating system
B10
B10
MR2
MR2
11
Cells Nb.
MS
PORTAL
needed
Max NPO
Users
Sessions Nb.
Max Users
Sessions
Nb./ HMI
Server
Hosted By
NPOe 250
250
No
1(*)
OMC-R
NPO 2000
2000
No
8 NPO
10
Standalone machine
NPO 5000
5000
No
15 NPO
10
Standalone machine
NPO 8000
8000
No
25 NPO
10
Standalone machine
NPO 10500
10500
No
26 NPO
10
Standalone machine
NPO 12000
12000
No
28 NPO
10
Standalone machine
24000
Yes
48 NPO
10
Cluster (*)
NPO
Configuration
Name
(*) Uses 2 V480 SUN Servers (nodes) that cooperates as a single system. Based
on Oracle Real Application Clusters (RAC).
Available in B10 MR2.
9159 NPO
NPO Operation & Administration
17
NPO Clients
Configuration
Ram Memory
11
>= 1 Gb DDRam
Processor
Hard disk
DVD
Monitor
Operating system
18
21 "
Windows XP Professional 2
9159 NPO
NPO Operation & Administration
In both cases, a 21 screen provides the right resolution for the sophisticated graphical user interface of
A9159 NPO. Each client is equipped with an Ethernet-card for communication purposes.
B10
B10
MR2
MR2
NPO Server
Configuration
NPO 250
NPO 2000
NPO 5000
NPO 8000 (*)
Server
model
11
Processors
SUN V490
Memory
Internal disks
19
SUN V880
SUN V490
2 x 1.35 GHz
8 GB
2 x 146 GB
None
SUN V880
2 x 900 MHz
4 GB
6 x 73 GB
None
SUN V490
2 x 1.35 GHz
8 GB
2 x 146 GB
SUN V880
4 x 900 MHz
8 GB
6 x 73 GB
None
SUN V880
8 x 750 MHz
16 GB
12 x 73 GB
None
NPO 10500
SUN V490
4 x 1.35 GHz
16 GB
2 x 146 GB
NPO 12000
SUN V490
4 x 1.35 GHz
16 GB
2 x 146 GB
NPO 24000
2 x SUN V490
16 GB per
V490
2 x 146 GB per
V490
12x146 GB 15Krpm
1 RAID controlers
V880
9159 NPO
NPO Operation & Administration
V490
(*)NPO 8000 hardware configuration is based on an UltraSparcIII generation hardware and this configuration
is proposed for hardware reuse of previous NPA/RNO configurations.
11
ML370 G4
RAM
Disks
Max Numbers of users
Software
DL360 G5
8 Gb [ 4Gb*]
1 x 36 Gb
1 x 72 Gb
10 [ 5*]
9159 NPO
NPO Operation & Administration
20
11
21
TCP/IP
NPO Client
NPO Server
HTTP
Web Browser
Analysis Desktop
JAVA
CORBA
XML
Tomcat
MAAT
JDBC
JDBC
ORACLE
PL/SQL
JDBC
Crontab / Script
9159 NPO
NPO Operation & Administration
Plug-In
Generic Loader
This view is overly simplified in order to show only the most important mechanisms.
Analysis Desktop: it is the main optimization interface
Web Browser: can be launched from the icon box to access Administration Facilities
Tomcat: Web Server (using JSP and Servlets for dynamic HTTP/XML)
JDBC: Java Database Connectivity is an API for the Java programming language that defines how a client may access a database. It provides methods for
querying and updating data in a database.
PL/SQL: Procedural Language/Structured Query Language is Oracle Corporation's proprietary procedural extension to the SQL database language
MAAT: Muse Analysis Application Tier is a set of cooperating processes, which offer optimization services and allow browsing the data warehouse content
by translating high-level requests into the corresponding SQL queries.
Plug in and Generic loaders are described in the next chapter.
11
9159 NPO
NPO Operation & Administration
22
11
23
X25
X25
IP
IP
NPO / MS-NPO
WCDMA WNMS
IP
IP
RNC
IP
IP
IP
IP
WIMAX OMC-R
WAC
IP
IP
9159 NPO
NPO Operation & Administration
IP
IP
A9155 RNP
Planning
The represented case with multi-RAT data sources is not yet available. NPO would be in the MS-PORTAL.
Data Sources : All the possible NPO data providers (RNP, OMCR)
GSM NPO can interface with:
- Two OMC R releases (B9 / B10)
- The current version of A9155 RNP (A9155 V6.x)
The BSS generates binary PM files and the MFS generates ASCII PM files (QOS). The OMC3 generates ASCII
ACIE configuration files (TOPOLOGY) and stores PM Files in an exchange directory.
The UMTS OMC PM-IM component is in charge of managing RNS PM counter files. Its job consists in
retrieving the RNC and nodeB PM counter files and producing one PM XML gzipped file per GP and per RNC
(A & B types, 3GPP format). It then exports the produced PM A & B XML files into an exchange directory.
The WiMAX OMC generates A&B PM files in a 3GPP-like format.
RNP: The ouputs of a RNP tool are planned data (sites coordinates, planned configuration) and maps
(vectors or rasters).
2.2 Loaders
NPO GSM Introduction
11
24
NPO
Specific
SpecificPlug-Ins
Plug-Ins
Loader
RNP
RNPGeneric
Generic
Loader
Loader
QOS
QOSGeneric
Generic
Loader
Loader
Data
Warehouse
Param
ParamGeneric
Generic
Loader
Loader
CSV files
9159 NPO
NPO Operation & Administration
NPO contains several loaders. Those loaders are composed of two parts: a generic part called generic
loader and a technology specific part (GSM, UMTS, WIMAX) called plug-in.
The generic loader manages only CSV files; it is in charge of loading them into the data warehouse.
The aim of the plug-in is to convert incoming files into CSV files and to deal with specificities. The plug-in
implements an interface defined by the generic loader. There may be several loaders (with different or
same plug-ins) for a given technology for example, in UMTS case, a loader for the RNC files and another
one for the NodeB files.
2.3 Dictionaries
NPO GSM Introduction
11
25
user.
A dictionary is an XML file.
9159 NPO
NPO Operation & Administration
The system dictionaries are delivered with the software and must be imported after the NPO installation
(refer to NPO Administration Guide)
The customer dictionaries are edited in regards to the operator needs (new indicators or new reports, )
11
3 Analysis Desktop
9159 NPO
NPO Operation & Administration
26
3 Analysis Desktop
3.1 Overview
NPO GSM Introduction
11
9159 NPO
NPO Operation & Administration
3. With CITRIX
27
3 Analysis Desktop
11
9159 NPO
NPO Operation & Administration
28
3 Analysis Desktop
11
29
Standards
Modes
Functions
Network object
management
Cartography, Diagnosis,
Tuning Session
& Reports Browser
Views Browser
9159 NPO
NPO Operation & Administration
Standards and Modes Browser Standards define the technologies available on NPO (GSM, UMTS, WiMAX).
Each standard tab has a set of modes. According to the selected mode, the list of displayed counters /
indicators / parameters / reports / views is not the same. It is filtered according to their availability
domain.
Topology Classification Browser Radio resources (cells), as well as physical resources (BTS, NodeB, BSC,
RNC...) are displayed in tree gadgets and can be selected from there. Different tree gadgets are used to
display the network resources by different classification criteria. The classification can be done for
example by LAC, hardware topology, cell type, routing area (for GPRS).
Function Classification Browser Functions belonging to a selected network resource from the topology
browser are also displayed inside tree gadgets and can be selected from there. This area allows the
operator to select: QoS indicators, QoS counters, logical / design parameters, or views / reports
View Browser The view browser is the target place for drag and drop of one or more network resources
It contains views that are used to display values of logical / design parameters, indicators, and
counters.
The displayed data in the view can be exported to Excel for further analysis.
Report Browser The report browser is the target place for drag and drop of one or more network
3 Analysis Desktop
11
Click
Drag and Drop
9159 NPO
NPO Operation & Administration
30
3 Analysis Desktop
11
Navigation
between GSM,
WCDMA, WIMAX
Contextual menu
provides additional
functions.
31
3 Analysis Desktop
11
Contextual menu
provides additional
functions.
9159 NPO
NPO Operation & Administration
32
3 Analysis Desktop
9159 NPO
NPO Operation & Administration
11
33
3 Analysis Desktop
11
34
Contextual menu
recaps the side
menu
Tools for further
analysis
Spreadsheet mode
Graph mode
9159 NPO
NPO Operation & Administration
3 Analysis Desktop
11
35
Export to Excel
Spatial Roll up & Drill down
Graph mode
Spreadsheet mode
The side bar offers different functions depending on the mode (graph or tabular mode).
3 Analysis Desktop
11
9159 NPO
NPO Operation & Administration
36
11
4 Questions
9159 NPO
NPO Operation & Administration
37
11
9159 NPO
NPO Operation & Administration
38
11
9159 NPO
NPO Operation & Administration
39
Summary
NPO GSM Introduction
11
9159 NPO
NPO Operation & Administration
40
11
End of Module
Introduction
9159 NPO
NPO Operation & Administration
41
12
Section 1
NPO GSM
Module 2
Operation
3JK11312AAAAWBZZA Edition 05
Blank Page
NPO GSM Operation
9159 NPO
NPO Operation & Administration
12
Document History
Edition
Date
Author
Remarks
01
YYYY-MM-DD
First edition
Objectives
NPO GSM Operation
9159 NPO
NPO Operation & Administration
12
Objectives [cont.]
NPO GSM Operation
9159 NPO
NPO Operation & Administration
12
Table of Contents
NPO GSM Operation
12
Page
7
8
10
20
21
22
28
29
30
32
33
36
37
39
42
45
51
52
54
56
57
58
59
62
66
71
72
73
74
78
79
83
84
85
88
95
96
100
104
105
12
Page
9159 NPO
NPO Operation & Administration
12
9159 NPO
NPO Operation & Administration
12
network
How many calls in this cell ?
How many handovers ? Etc.
9159 NPO
NPO Operation & Administration
12
Exercise
All counters are counted by the BSC (or MSC in few cases), except
the RMS, which are collected in the BTS
9159 NPO
NPO Operation & Administration
12
9159 NPO
NPO Operation & Administration
10
12
9159 NPO
NPO Operation & Administration
11
raw
Indics
12
hourly
spatial
aggregation
normalisation
hourly
daily
QoS
files
daily
temporal
aggregation
daily
temporal
aggregation
weekly
monthly
monthly
measured object
temporal
aggregation
temporal
aggregation
weekly
9159 NPO
NPO Operation & Administration
hourly
spatial
aggregation
temporal
aggregation
temporal
aggregation
intermediate object
weekly
monthly
network
Measured object : network entity for which is generated the raw indicators (TRX, or cells)
Intermediate object : GPU, BSC, MFS, i.e. it is a spatial aggregation of a subset of "measured objects"
Network : entity of the highest level, i.e. it is a spatial aggregation of all "measured objects"
Consolidation jobs is followed by the purge tasks, which removes older data in order to maintain the
database at a nominal size. Data that are removed can be archived or deleted.
12
12
13
Qi=45
Qi=45
Qi=80
Qi=80
Qi=27
Qi=27
Qi=113
Qi=113
Qi=25
Qi=25
Qi=40
Qi=40
Qi=15
Qi=15
9159 NPO
NPO Operation & Administration
Qi = QoS Indicator
Spatial Aggregation, containing the summarizing data of several network elements into one value that
defines the parent in the network hierarchy. Example: aggregation of cell data to BSC data.
The spatial aggregation is always done on the normalized data, before the temporal aggregation.
12
14
9159 NPO
NPO Operation & Administration
Temporal Aggregation, containing summarizing data of one network element into one value that defines
the parent in the period hierarchy. Example: aggregation of raw data to daily data.
When the indicator is defined, it is possible to have several aggregation functions; in this case there are
Stored Aggregation
Calculated Aggregation Calculated temporal aggregation can be used to avoid having too much stored
temporal aggregation when it is possible to calculate it using other indicators (on the fly)
Possible temporal aggregations are: SUM, MIN, MAX, BH, 3DAV, ...
12
15
9159 NPO
NPO Operation & Administration
Busy Hour (BH) : For each, indicator is associated to a reference indicator. The maximum hourly value of
this reference indicator determines the busy hour. Then the BH value of an indicator is its value during
the busy hour.
The busy hour is determined:
- per day: highest hourly value for the reference indicator,
- per week: the busy hour of the day with highest value,
- per month: the busy hour of the week with highest value
Busy Hour 3 days (BH3) : average of 3 highest hourly BH values for the considered period. This consolidation
is only available per week and month (the 3 values are got from 3 different days).
Busy Hour 5 days (BH5) : average of 5 highest hourly BH values for the considered period. This consolidation
is only available per week and month (the 5 values are got from 5 different days).
Total (TOT) : total of the values for the considered period
Maximum (MAX) : maximum of the indicator value for the considered period
Minimum (MIN) : minimum of the indicator values for the considered period
Average (AVG) : arithmetic average of the indicator values for the considered period
DELTA
DELTARNO-NPO
RNO-NPO
12
16
Synchronization and
Interpolation to fill
a period (other data
available within this
same period)
Extrapolation to fill
a period which is
entirely empty (no
data within this
period)
9159 NPO
NPO Operation & Administration
Note : interpolation is only performed on demand, during the report execution (and if the dynamic
interpolation is enabled in the User Preferences)
Step 2 : "extrapolation", if there are missing values for a whole period, it is necessary to extrapolate.
A period can be an hour (if the real values are measured "hourly", there can't be interpolation within an
hour : only one value per hour !), or it can be a day, a week, a month () in which case it is possible to
have periods without measurements.
DELTA
DELTARNO-NPO
RNO-NPO
12
17
With the RNO/NPA tool chain we have only two interpolation possibilities
1. Linear
2. Padding by zero
9159 NPO
NPO Operation & Administration
12
18
COUNTERS
ORACLE DB
BASIC
INDICATORS
TEMPORAL AGGREGATION
INDICATORS
TEMPORAL AGGREGATION
INDICATORS
PARAMETERS
CALCULATED
INDICATORS
TEMPORAL AGGREGATION
INDICATORS
Stored in DB
On-the-fly
CALCULATED
INDICATORS
TEMPORAL AGGREGATION
INDICATORS
Session
9159 NPO
NPO Operation & Administration
12
19
Exercise
Click on
5
2
3
9159 NPO
NPO Operation & Administration
12
20
in the network
BCCH : frequency on which is broadcasted the BCCH
# of SDCCH : number of SDCCH subchannels in the cell
L_RXLEV_DL_H : threshold to trigger a handover cause 5 (low level in the
downlink)
EN_DR : flag to activate the directed retry feature
Most of them describe cells, but some can also describe BSC, TRX or
adjacencies
There are two main types of parameters :
Logical Parameters
Design
Exercise
9159 NPO
NPO Operation & Administration
DELTA
DELTARNO-NPO
RNO-NPO
NPO GSM Operation
12
9159 NPO
NPO Operation & Administration
21
DELTA
DELTARNO-NPO
RNO-NPO
12
Modes
Functions
Network object
management
Cartography, Diagnosis,
Tuning Session
& Reports Browser
Views Browser
9159 NPO
NPO Operation & Administration
22
DELTA
DELTARNO-NPO
RNO-NPO
12
23
Exercise
To display reports
In tabular format (Excel-like)
Or in graphical format (one "view" at a time)
9159 NPO
NPO Operation & Administration
A list of functions
A periodicity
A date
(or a period)
DELTA
DELTARNO-NPO
RNO-NPO
12
24
Periodicity
Hour, Day, Week, Month : Standard
1/4h, 1/2h : depends on granularity of PM
Raw : same granularity as PM
At BH : at hour of max value for an indicator
Period
If n entities + n functions : only one day
("FROM")
If 1 entity + n functions : more than 1 day
If n entities + 1 function : more than 1 day
Hour format
0:00 = data from 12:00am to 1:00am
9:00 = data from 9:00am to 10:00am
23:00 = data from 11:00pm to 12:00am
9159 NPO
NPO Operation & Administration
20
21
22
23
07/11/2007
10
18
07/12/2007
19
20
21
22
23
07/14/2007
If n elements and n functions are chose, only one date is available. For instance :
Periodicity = Hourly
Period = From 7/12/2007 00:00
The result will be the value measured between 12am and 1am
20
21
22
23
07/11/2007
10
07/12/2007
07/15/2007
DELTA
DELTARNO-NPO
RNO-NPO
12
month.
Trends (only for Indicators)
9159 NPO
NPO Operation & Administration
1.
2.
3.
4.
25
DELTA
DELTARNO-NPO
RNO-NPO
12
Sampling / Reliability
Sampling : check if sampling is not enough
(gray)
Reliability : check if all data are missing
before aggregation (italic)
Interpolation
Only needed for indicators, and if "dynamic
interpolation" = TRUE (see user preferences)
9159 NPO
NPO Operation & Administration
26
DELTA
DELTARNO-NPO
RNO-NPO
12
27
Forecast values
Select the tuning sessions whom forecast
values to display (Parameters only)
Unavailable objects
Filter out NE that are unavvailable, based on a
criteria applied on a QoS indicator
Event
Overlay events (parameter changes) on a
report (Parameters or Indicators, daily only)
9159 NPO
NPO Operation & Administration
DELTA
DELTARNO-NPO
RNO-NPO
12
Exercise
9159 NPO
NPO Operation & Administration
28
DELTA
DELTARNO-NPO
RNO-NPO
12
Exercise
indicators
Designed by the user (a set of
standard views is proposed by
default)
In the tab "View"
9159 NPO
NPO Operation & Administration
29
Propagation
Roll up / Drill down
Navigation & Display
Toggle back to tabular mode
DELTA
DELTARNO-NPO
RNO-NPO
2.4 Favorites
NPO GSM Operation
12
9159 NPO
NPO Operation & Administration
30
DELTA
DELTARNO-NPO
RNO-NPO
12
Exercise
To organize favorites :
Menu bar : "Data > Favorites > Organize "
Drag and Drop indicators from one group to another group
9159 NPO
NPO Operation & Administration
31
12
9159 NPO
NPO Operation & Administration
32
12
What is a Report ?
Stack of several Views
Displays a set of QoS Indicators
Advanced tools for analysis still available
9159 NPO
NPO Operation & Administration
33
12
Drag and Drop several NE with several reports in the Reports Browser
The Execution Context window appears
Identical to the Execution Context window when using the Views Browser
Refer to "Working with Views Browser"
Exercise
9159 NPO
NPO Operation & Administration
34
12
9159 NPO
NPO Operation & Administration
DELTA
DELTARNO-NPO
RNO-NPO
35
B10
B10
MR2
MR2
DELTA
DELTARNO-NPO
RNO-NPO
12
36
Export to Excel provides a way to share the results with different teams
Specific tools for reports are :
Link cursors
Link zooms
Resize Legends
9159 NPO
NPO Operation & Administration
DELTA
DELTARNO-NPO
RNO-NPO
12
9159 NPO
NPO Operation & Administration
37
DELTA
DELTARNO-NPO
RNO-NPO
12
consolidation of indicators
Naming conventions :
Type of NE's
Cells
Cell Zone
TRX's
TRX Zone
Traffic Zone
Others
Generic Zone
9159 NPO
NPO Operation & Administration
An object zone can be created from any network element ! GPU, BSC, A interface, etc
The traffic zones are AUTOMATICALLY generated by NPO.
38
12
Object zones
9159 NPO
NPO Operation & Administration
DELTA
DELTARNO-NPO
RNO-NPO
39
DELTA
DELTARNO-NPO
RNO-NPO
12
40
4
1
2
3
9159 NPO
NPO Operation & Administration
DELTA
DELTARNO-NPO
RNO-NPO
12
Exercise
Logical operators
INTERSECTION(1,2) = 1 AND 2
UNION(1,2) = 1 OR 2
EXCLUSION(1,2) = 1 XOR 2
9159 NPO
NPO Operation & Administration
41
DELTA
DELTARNO-NPO
RNO-NPO
12
But what if you can't find a common point between several NE's ?
42
?
You need to attribute an additional information to each cell !
9159 NPO
NPO Operation & Administration
Your file is saved as a text file, delimited by semi-colon ( = CSV format). Now you need to "clean-up" the
file.
1. Open this file with notepad
2. Remove the excess of ";" in the first line
3. Save
DELTA
DELTARNO-NPO
RNO-NPO
12
LAC_ID;
3;
3;
3;
3;
3;
3;
43
CELL_ID;
50010;
50011;
50012;
53230;
53231;
53232;
<field1>; <field2>;
<value1>; <value2>;
<value1>; <value2>;
<value1>; <value2>;
<value1>; <value2>;
<value1>; <value2>;
<value1>; <value2>;
File format for "other NE's" free fields (ex. TYPE = GPU)
FREE FIELD;<optionnal comments>; <optionnal comments>;<TYPE>
OXEID;
<field1>;<field2>;
GPU_BSC1/2/16779009;
<value1>; <value2>;
GPU_BSC1/2/16779010;
<value1>; <value2>;
GPU_BSC1/2/16779011;
<value1>; <value2>;
GPU_BSC2/2/16779776;
<value1>; <value2>;
GPU_BSC2/2/16779777;
<value1>; <value2>;
GPU_BSC2/2/16779778;
<value1>; <value2>;
9159 NPO
NPO Operation & Administration
Create "semi colon" delimited files (= CSV files) with the help of Excel, and save as CSV files.
If NPO is in LAC/CI mode : CELL_MCC;CELL_MNC;LAC_ID;CELL_ID
If NPO is in CI mode : CELL_MCC;CELL_MNC;CELL_ID
(this choice is done at NPO installation)
For other NE's, TYPE = GPU, PVC, CELL3G, N7_SL, etc. (cf different names in the "Mode" pane of NPO)
To know the mode of NPO : read \alcatel\muse\MUSE_COMMON\config\common.properties : CI_MODE=false
(means at installation, the mode LAC/CI have been chosen)
Never edit this file !!!
DELTA
DELTARNO-NPO
RNO-NPO
12
44
Exercise
9159 NPO
NPO Operation & Administration
Details for Free fields import : "NPO Administrator Guide 4.1.16 and 4.2.15"
To load a free field with a script :
Run as root the following commands:
cd /alcatel/muse/MUSE_QOS/topology/bin
./loadFreeFields.sh <fileName>
Where <fileName> is the absolute path and name of the Free Fields file.
Example:
./loadFreeFields.sh /files/FF.txt
The OEXIDs in the free fields file should match the ones imported by either the Qos/Param topology import
of the customer topology import.
DELTA
DELTARNO-NPO
RNO-NPO
12
View (1)
Secondary axis
Primary axis
Legend
9159 NPO
NPO Operation & Administration
45
DELTA
DELTARNO-NPO
RNO-NPO
12
Methodology
1. Define the purpose of this report
2. Define all indicators you need
3. Distribute indicators per view
4. Distribute indicators per axis
5. Create the views
6. Create the report
Click on
Click on
Or "Ctrl + E"
Or "Ctrl + R"
9159 NPO
NPO Operation & Administration
46
12
47
6
2
3
4
5
Existing views
9159 NPO
NPO Operation & Administration
Properties of a view
List of functions
& properties
12
Exercise
4
2
9159 NPO
NPO Operation & Administration
48
12
Exercise
Distribution reports
Based on Matrix or Vector indicators
Related only to RMS and GPRS Distribution indicators
1 view / indicator
User can customize the cosmetics only
9159 NPO
NPO Operation & Administration
49
When creating a matrix, all parameters are already defined (intervals of X and Y axis, for instance)
The user can only define new intervals for the colors (most of the time, it relates to the number of
samples)
12
50
Exercise
Warning reports
Based on a standard views
Additional information for filtering :
Additional info in
"view editor"
Top N : top cells with best or worst values of
"filtering" indicator
Top N variation : top cells with variation of
"filtering" indicator above "variation value"
Color Filtering : all cells with "filtering"
indicator with the color "value filtering on
color"
Variation Filtering : all cells with variation of
"filtering" indicator above "variation value"
Additional info in
"report editor"
9159 NPO
NPO Operation & Administration
Before and After : additional display of "filtering indicator" values for N days before and M days after the
date chosen in execution context window.
Reference period : used to compute the variation value. If reference period = 3 and the periodicity chosen
in execution context window = WEEK, then
1. Absolute variation :
variation(filter indic) = filter indic value(week ref = week_x - 3) - filter indic value(week_x = week chosen
in execution context window)
2. Relative variation :
variation(filter indic) = [filter indic value(week ref = week_x - 3) - filter indic value(week_x = week
chosen in execution context window)] / filter indic value(week ref)
12
4 Parameters Checking
9159 NPO
NPO Operation & Administration
51
4 Parameters Checking
DELTA
DELTARNO-NPO
RNO-NPO
12
52
NPO will keep track of all daily configurations, for a duration of "MAX
PREVIOUS DAYS"
Open NPO Administration Data Management :
Select Configuration > Data Source
Choose an OMC-R, Click on "Update", "Next"
Check the MAX PREVIOUS DAYS field
How long are your daily configurations stored ?
9159 NPO
NPO Operation & Administration
To change the storage duration of your parameters, refer to "NPO ADMINISTRATION GUIDE", p.21 , 3.2.2
"Configure Parameters Storage Duration"
Click on "ADVANCED" button to edit this number of days.
Otherwise :
On NPO server, open a console
Type :
> more /alcatel/muse/MUSE_ADMIN/config/paramStorageDuration.cfg
4 Parameters Checking
12
53
9159 NPO
NPO Operation & Administration
4 Parameters Checking
12
Navigate between
operationnal and
reference values
Drag and Drop
9159 NPO
NPO Operation & Administration
54
4 Parameters Checking
DELTA
DELTARNO-NPO
RNO-NPO
12
reference values :
Green :
Yellow :
Orange :
Red :
OPE = REF
OPE REF boundaries
OPE(day=d) OPE(day=dOPE(day=d-1)
OPE REF boundaries
9159 NPO
NPO Operation & Administration
55
4 Parameters Checking
DELTA
DELTARNO-NPO
RNO-NPO
12
9159 NPO
NPO Operation & Administration
56
4 Parameters Checking
DELTA
DELTARNO-NPO
RNO-NPO
12
9159 NPO
NPO Operation & Administration
57
Exercise
4 Parameters Checking
DELTA
DELTARNO-NPO
RNO-NPO
12
58
settings
Preparatory steps :
Define reference settings per cell type, per frequency band, per cell class,
etc.
Assign cell classes
Cell class : family of cells, user-defined. Give more flexibility to references
than the cell type. For instance :
- DENSE URBAN, URBAN, RURAL, INDOOR (Alcatel default classes)
- RAILWAY, TUNNEL, AIRPORT, COLOCATED, (examples)
9159 NPO
NPO Operation & Administration
Cell type, frequency band, cell class can be combined in order to provide very specific sets of references :
UMBRELLA MULTIBAND URBAN set of parameters A
UMBRELLA GSM900 URBAN set of parameters B
MINI MULTIBAND URBAN set of parameters C
MINI GSM900 URBAN set of parameters D,
4 Parameters Checking
12
9159 NPO
NPO Operation & Administration
DELTA
DELTARNO-NPO
RNO-NPO
59
4 Parameters Checking
12
9159 NPO
NPO Operation & Administration
DELTA
DELTARNO-NPO
RNO-NPO
60
4 Parameters Checking
DELTA
DELTARNO-NPO
RNO-NPO
12
61
3
1
2
9159 NPO
NPO Operation & Administration
4 Parameters Checking
DELTA
DELTARNO-NPO
RNO-NPO
12
settings
All references are contained in the Reference Dictionary
Create an Excel file :
One sheet contains references for one object type
References for one object type can be split over several sheets
The file is mono-release
Reference values are Excel files that express the default value that a parameter
for a given network object should have.
These values depend on the network object configuration, i.e. values of other
parameters (for example, for GSM cells, on the cell type and cell class: urban,
rural, number of TRX).
Alcatel publishes reference values for the parameters of its equipment. Some
operators directly use Alcatel-Lucent reference values, others change them to better
suit their needs.
62
4 Parameters Checking
DELTA
DELTARNO-NPO
RNO-NPO
12
9159 NPO
NPO Operation & Administration
63
4 Parameters Checking
DELTA
DELTARNO-NPO
RNO-NPO
12
64
Default values
Parameters names
9159 NPO
NPO Operation & Administration
Beware, the first sheet does not have the same header in lines 1 3 (cf previous slide)
If a criterion is verified, but there is no reference value associated, then the process continues : the next
criterion is checked, etc, until reaching the "default"
A criterion is an expression that follows a precise grammar. Refer to NPO User Guide 12.1.7.
4 Parameters Checking
DELTA
DELTARNO-NPO
RNO-NPO
12
Exercise
Typical Process
1. Open NPO Import / Export Manager
2. Export the Parameter Reference Values for your release
3. Edit the file with Excel, include your references (then Save, Close)
4. Import the new Excel file thanks to the NPO Import / Export Manager
NPO
NPO
Import
Import//Export
ExportManagement
Management
EXPORT FILE
3
EDITION
Data
DataWarehouse
Warehouse
9159 NPO
NPO Operation & Administration
65
Admin
4 Parameters Checking
4.8 Rules
NPO GSM Operation
12
66
Power control averaging window for signal level has to be short to give a good
reactivity to the Power Control algorithm. Handover averaging window for signal
level has to be long to mean correctly the high fluctuations of the propagation
channel.
This rule checks if the cell is having the right number of SDCCH channels according
to the number of TRXs.
9159 NPO
NPO Operation & Administration
4 Parameters Checking
12
67
Note : you can drag and drop a rule from the tab "rules" to the tabs "logical indicators" or "design". It will
automatically select the parameters that are used in the expression.
As shown on the picture, it is possible to apply the legend.
4 Parameters Checking
DELTA
DELTARNO-NPO
RNO-NPO
12
NPO
NPO
Import
Import//Export
ExportManagement
Management
EXPORT FILE
3
EDITION
Data
DataWarehouse
Warehouse
9159 NPO
NPO Operation & Administration
Admin
Refer to NPO User Guide 13.1 for a full description of the file (file header, column header, content)
68
4 Parameters Checking
DELTA
DELTARNO-NPO
RNO-NPO
12
69
9159 NPO
NPO Operation & Administration
4 Parameters Checking
DELTA
DELTARNO-NPO
RNO-NPO
12
70
Exercise
This rule is checked on
concentric cells only
9159 NPO
NPO Operation & Administration
G The Rule expression. It must validate the grammar given in NPO User Guide 12.1.7 "Expression
Grammar".
H The Rule condition that defines when the rule applies. It must validate the grammar given in Annex.
Starting from column "I", an additional set of conditions, based on CELL TYPE, CELL CLASS, CELL
FREQUENCY RAGE and CELL BSS RELEASE.
If there is any text (such as "X" for example), then the rule will be applied on the cells that fulfill this
condition. No text at all means : the rule is check on all cells.
12
5 Parameters Tuning
9159 NPO
NPO Operation & Administration
71
5 Parameters Tuning
5.1 Benefits
NPO GSM Operation
12
into a PRC
adjacencies, etc.
PRC or not
9159 NPO
NPO Operation & Administration
72
5 Parameters Tuning
DELTA
DELTARNO-NPO
RNO-NPO
5.2 Process
NPO GSM Operation
12
@
@ NPO
NPO Analysis
Analysis Desktop
Desktop
9159 NPO
NPO Operation & Administration
@
@ OMC-R
OMC-R
73
5 Parameters Tuning
DELTA
DELTARNO-NPO
RNO-NPO
5.3 Interface
NPO GSM Operation
12
Tuning Operation
Tuning Session
9159 NPO
NPO Operation & Administration
74
5 Parameters Tuning
DELTA
DELTARNO-NPO
RNO-NPO
12
Functions
9159 NPO
NPO Operation & Administration
75
5 Parameters Tuning
DELTA
DELTARNO-NPO
RNO-NPO
12
9159 NPO
NPO Operation & Administration
76
5.3 Interface
DELTA
DELTARNO-NPO
RNO-NPO
How to Do It
NPO GSM Operation
12
77
1.
2.
9159 NPO
NPO Operation & Administration
5 Parameters Tuning
DELTA
DELTARNO-NPO
RNO-NPO
12
78
9159 NPO
NPO Operation & Administration
"not tuneable" : the cell cannot be tuned in a tunning session. Of course, it can still be tuned in the OMC-R.
5 Parameters Tuning
DELTA
DELTARNO-NPO
RNO-NPO
5.5 Post-its
NPO GSM Operation
12
9159 NPO
NPO Operation & Administration
79
5.5 Post-its
DELTA
DELTARNO-NPO
RNO-NPO
How to Do It
NPO GSM Operation
12
9159 NPO
NPO Operation & Administration
To remove a relationship, do not use drag and drop, but rather the contextual menu. Select "Remove"
You can also choose the direction of the adjacency : from cell A to cell B, cell B to cell A, or both ways.
80
5.5 Post-its
DELTA
DELTARNO-NPO
RNO-NPO
How to Do It
NPO GSM Operation
12
9159 NPO
NPO Operation & Administration
81
5.5 Post-its
DELTA
DELTARNO-NPO
RNO-NPO
How to Do It
NPO GSM Operation
12
82
Exercise
9159 NPO
NPO Operation & Administration
BSIC : The BSIC field displays the list of current forecast BSIC of the cell, or the
operational value if the BSIC has not been changed. This list proposes the
possible values that can be used.It is obtained using the following formula:
BSIC = BCC + 8 x NCC , where:
BCC varies from 0 to 7
NCC can take all the values indicated by the NCC_Permitted parameter.
ZONES / SPLITS : There will be one set of frequencies per zone (inner or outer or normal) and per split
(main or secondary). Indeed, each zone/split has specific TRXs and specific hopping groups.
HOPPING :
Non-hopping (NH) : refer to the slide. User can change frequency allocated to each TRX independantly
Baseband Hopping (BBH) : User can change the ARFCN's in the list, but the allocation of FHS group is
transparent
all timeslots use all frequencies, except
* timeslot "0" of TRX 1, using BCCH frequency
* timeslots "0" of other TRX's, using all frequencies BCCH frequency
Synthetized Hopping (RH/NH) : TRX 1 is not hopping, other TRX's are. Therefore there is a new choice in
the first cell, instead of TRX : "TRX or FHS".
User can change the frequency of the TRX1, choosing "TRX"
User can change the ARFCN's in the FHS, choosing "FHS"
Allocation of FHS per TRX and per TS is performed automatically by the OMC-R.
All Rights Reserved 2007, Alcatel-Lucent
3JK11312AAAAWBZZA Edition 05
Section 1 Module 2 Page 82
12
9159 NPO
NPO Operation & Administration
83
6.1 Schedule
NPO GSM Operation
12
Monitoring
Check log files of indicators and
parameters import
Generate a "WORST 20" warning
report on KPI's
Generate a daily report of the
network (or weekly, on Monday)
Generate a detailed spreadsheet
report for all cells
Check reliability of the problems
Dispatch worst cells to relevant
teams
Update monitoring database
9159 NPO
NPO Operation & Administration
84
Exercise
Optimization
Tackle worst cells one by one
Check RMS & detailed indicators
Check interference and
frequencies reuse
Check adjacencies definition
Find the cause of the problem
Propose corrective action
Update troubleshooting database
Monitoring and Troubleshooting database are created by operator, to keep track of all worst cells and
previous actions performed on the network.
12
85
Maps, planning,
interference matrix
NPO
RNP
9159 NPO
NPO Operation & Administration
Beside previous slide, supplementary information should flow between optimization team and other teams.
12
Operational
Operational
Operational
Operational
frequencies
adjacencies
capacities
cell layer / type
NPO
RNP
9159 NPO
NPO Operation & Administration
86
12
To Dimensioning teams :
Provide traffic information
Provide operational configuration
To Design teams :
Provide operational parameters for all cells
Provide QoS reports related to new settings
Cells with optimized/different settings than their references
9159 NPO
NPO Operation & Administration
87
DELTA
DELTARNO-NPO
RNO-NPO
12
generated by NPO :
9159 NPO
NPO Operation & Administration
88
DELTA
DELTARNO-NPO
RNO-NPO
12
89
DELTA
DELTARNO-NPO
RNO-NPO
12
9159 NPO
NPO Operation & Administration
90
DELTA
DELTARNO-NPO
RNO-NPO
12
91
9159 NPO
NPO Operation & Administration
12
9159 NPO
NPO Operation & Administration
DELTA
DELTARNO-NPO
RNO-NPO
92
12
9159 NPO
NPO Operation & Administration
DELTA
DELTARNO-NPO
RNO-NPO
93
DELTA
DELTARNO-NPO
RNO-NPO
12
94
9159 NPO
NPO Operation & Administration
12
7 NPO Customization
9159 NPO
NPO Operation & Administration
95
7 NPO Customization
DELTA
DELTARNO-NPO
RNO-NPO
7.1 Classification
NPO GSM Operation
12
Topology Classification
9159 NPO
NPO Operation & Administration
96
7 NPO Customization
DELTA
DELTARNO-NPO
RNO-NPO
12
4
2
9159 NPO
NPO Operation & Administration
97
7 NPO Customization
DELTA
DELTARNO-NPO
RNO-NPO
12
4
2
9159 NPO
NPO Operation & Administration
98
7 NPO Customization
12
Display/Remove the
classification from the tabs
9159 NPO
NPO Operation & Administration
DELTA
DELTARNO-NPO
RNO-NPO
99
Exercise
7 NPO Customization
DELTA
DELTARNO-NPO
RNO-NPO
12
100
9159 NPO
NPO Operation & Administration
These settings apply only to the user currently logged on Analysis Desktop. They do not affect settings made
by any other user when that user is logged. These settings can be changed by regular users, as well as
administrator user.
Once these settings are saved, each time the operator re-opens Analysis Desktop, the chosen preferences
are used.
Note : Objects that are marked as soft deleted for more than three years will be removed from the
database (hard deleted).
7 NPO Customization
DELTA
DELTARNO-NPO
RNO-NPO
12
101
9159 NPO
NPO Operation & Administration
7 NPO Customization
DELTA
DELTARNO-NPO
RNO-NPO
12
102
9159 NPO
NPO Operation & Administration
7 NPO Customization
DELTA
DELTARNO-NPO
RNO-NPO
12
9159 NPO
NPO Operation & Administration
103
12
8 Annex
9159 NPO
NPO Operation & Administration
104
8 Annex
9159 NPO
NPO Operation & Administration
12
105
8 Annex
12
Temporal Aggregations :
9159 NPO
NPO Operation & Administration
The "Reference Ext" is just a string of characters, to identify this temporal aggregated indicator.
The "Reference Ext" should be included in the "Name"
Temporal Aggregation Method :
Sum
Count
Average
Minimum
Maximum
BusyHour
BHPos (returns the hour of the busy hour, i.e. "1:00pm")
Dav3 (average of the 3 previous busy hours)
Dav5 (average of the 5 previous busy hours)
106
8 Annex
12
9159 NPO
NPO Operation & Administration
107
12
End of Module
Operation
9159 NPO
NPO Operation & Administration
108
13
Section 1
NPO GSM
Module 3
Operation Advanced
3JK11314AAAAWBZZA Edition 05
Blank Page
NPO GSM Operation Advanced
9159 NPO
NPO Operation & Administration
13
Document History
Edition
Date
Author
Remarks
01
YYYY-MM-DD
First edition
Objectives
NPO GSM Operation Advanced
9159 NPO
NPO Operation & Administration
13
Objectives [cont.]
NPO GSM Operation Advanced
9159 NPO
NPO Operation & Administration
13
Table of Contents
NPO GSM Operation Advanced
13
Page
9159 NPO
NPO Operation & Administration
7
8
11
14
15
16
17
23
24
26
28
29
30
36
42
44
46
48
53
54
13
Page
9159 NPO
NPO Operation & Administration
13
1 Distribution Reports
9159 NPO
NPO Operation & Administration
1 Distribution Reports
1.1 Overview
NPO GSM Operation Advanced
13
60
90
50
80
70
40
60
50
30
% PB distrib
Nb PB Samples
40
20
30
20
10
10
0
0
[-110,-50[
[-50,-30[
[-30,-20[
[-20,-10[
[-10,0[
[0,10[
[10,20[
[20,30[
[30,50[
[50,110]
Path Balance ( dB )
Matrices
9159 NPO
NPO Operation & Administration
1 Distribution Reports
13
9159 NPO
NPO Operation & Administration
1 Distribution Reports
13
10
By increasing the size of some steps & decreasing the sizes of other
9159 NPO
NPO Operation & Administration
In this example, the previous report couldn't show a problem. The new thresholds highlight a high number
of calls with path balance between +9 and +12 !
In previous slide : most problems between 0 and 10
In current slide, we see that most problems are actually above 9 dB !!
1 Distribution Reports
DELTA
DELTARNO-NPO
RNO-NPO
1.2 Method
NPO GSM Operation Advanced
13
9159 NPO
NPO Operation & Administration
11
1 Distribution Reports
DELTA
DELTARNO-NPO
RNO-NPO
13
Now the new template will be used by the cell for the next RMS
campaign !
9159 NPO
NPO Operation & Administration
12
1.2 Method
DELTA
DELTARNO-NPO
RNO-NPO
Exercise
NPO GSM Operation Advanced
13
15 minutes
9159 NPO
NPO Operation & Administration
13
13
9159 NPO
NPO Operation & Administration
14
2.1 Overview
NPO GSM Operation Advanced
13
15
9159 NPO
NPO Operation & Administration
13
A project is composed of
Planned Data
Text files containing the list of cells and all related information for
plotting them on a georeferenced map (coordinates, azimuth)
= COF FILES
Background Maps
be located anywhere.
9159 NPO
NPO Operation & Administration
16
13
3 mandatory files
CEL.COF : Description of the cell (CGI, coordinates, azimuth, omni/sector)
FRQ.COF : Description of the TRXs
ADJ.COF : Description of the Adjacencies
9159 NPO
NPO Operation & Administration
17
DELTA
DELTARNO-NPO
RNO-NPO
13
When saving a file as "CSV" with Excel, the files will be in the correct
format
Each file starts with 2 identical lines :
9159 NPO
NPO Operation & Administration
18
13
19
CEL.COF
Line 3 : column headers
Line 4 n : 1 line per cell
1.
READ_ONLY
EXTERNAL
RNP_CELL_ID
CI
LAC
FREQUENCY_RANGE
MNC
MCC
CELL_CLASS
CELL_TYPE
2.
3.
4.
5.
6.
7.
8.
9.
10.
11. TRX_NUMBER
12. BCCH
13. HOPPING_MODE
14. X_SITE_LOC
15. Y_SITE_LOC
16. ANTENNA_ORIENTATION
17. ANTENNA_TYPE (not mandatory)
18. ANTENNA_HEIGHT (not mandatory)
19. ANTENNA_TYPE_FLAG
9159 NPO
NPO Operation & Administration
RNP_CELL_ID : key field, to link this cell with its TRXs in frq.cof and its adjacencies in adj.cof
CI : CELL ID, LAC : Location Area Code
FREQUENCY_RANGE : GSM850, GSM900, GSM1800,EGSM900, GSM1900,MULTIBAND, EMULTIBAND,GSM850GSM1800, GSM850-GSM1900
MNC : mobile network code (3 digits) MCC : mobile color code (3 digits)
CELL_CLASS : URBAN, DENSE_URBAN, SUBURBAN, RURAL, INDOOR
CELL_TYPE : SINGLE, UMBRELLA, UMBRELLA_CONCENTRIC, MINI, MINI_CONCENTRIC, MICRO_CONCENTRIC,
INDOOR, INDOOR_CONCENTRIC, CONCENTRIC, MICRO, EXTENDED_INNER, EXTENDED_OUTER
TRX_NUMBER : from 1 to 16 (tip : for fast file creation, put 1)
BCCH : ARFCN of the BCCH (tip : for fast file creation, put 1)
HOPPING_MODE : NH, BBH or SFH
X_SITE_LOC : geographical Longitude WGS 84 decimal degrees in interval [-180.0, 180.0]
Y_SITE_LOC : geographical Latitude WGS 84 decimal degrees in interval [-90.0, 90.0] (positive values in
northern hemisphere)
ANTENNA_ORIENTATION : azimuth of the antenna in degrees (from 0.0 to 360.0)
ANTENNA_TYPE (not mandatory) : string
ANTENNA_HEIGHT (not mandatory) : integer
ANTENNA_TYPE_FLAG : 0 : panel antenna (the cell will be represented using the ANTENNA ORIENTATION), 1
: omnidirectionnal antenna (cell will be represented without orientation)
13
20
FRQ.COF
Line 3 : column headers
Line 4 n : 1 line per TRX (depends on TRX_NUMBER defined in
CEL.COF)
Mandatory headers :
1.
RNP_CELL_ID
TRX_INDEX
ARFCN
ZONE_TYPE
BCCH_FLAG
PREFERENCE_MARK
2.
3.
4.
5.
6.
9159 NPO
NPO Operation & Administration
13
21
ADJ.COF
Line 3 : column headers
Line 4 n : 1 line per adjacency (it can be empty)
Mandatory headers :
1.
RNP_CELL_ID
NC_RNP_CELL_ID
HO_MARGIN
LINK_FACTOR
HO_MARGIN_LEV
HO_MARGIN_QUAL
HO_MARGIN_DIST
PRIORITY
2.
3.
4.
5.
6.
7.
8.
9159 NPO
NPO Operation & Administration
9. NEIGHBOUR_RXLEV
10. EN_TRAFFIC_HO
11. L_RXLEV_CPT_HO
12. OUTDOOR_UMB_LEV
This file can be empty (only the lines 1, 2 and 3 must be written)
In case adjacencies are imported, only the 2 RNP CELL ID fields are important. Other
fields can use a dummy value.
RNP_CELL_ID : key field, serving cell of the adjacency, to link this serving cell with its
cell definition in cel.cof
NC_RNP_CELL_ID : key field, target cell of the adjacency, to link this target cell with
its cell definition in cel.cof
HO_MARGIN : GSM parameter, in dB
LINK_FACTOR : GSM parameter, in dB
HO_MARGIN_LEV: GSM parameter, in dB
HO_MARGIN_QUAL: GSM parameter, in dB
HO_MARGIN_DIST: GSM parameter, in dB
PRIORITY : GSM parameter, from 0 to 5
NEIGHBOUR_RXLEV: GSM parameter, in dBm
EN_TRAFFIC_HO: GSM parameter, 0 : DISABLE, 1 : ENABLE
L_RXLEV_CPT_HO: GSM parameter, in dBm
OUTDOOR_UMB_LEV: GSM parameter, in dBm
13
22
Create these files using EXCEL, and "Save As " CSV format
Open the 3 files with NOTEPAD and remove the final semi-colons of line
1 and line 2
9159 NPO
NPO Operation & Administration
DELTA
DELTARNO-NPO
RNO-NPO
13
9159 NPO
NPO Operation & Administration
23
DELTA
DELTARNO-NPO
RNO-NPO
2.5 Import
NPO GSM Operation Advanced
13
Background file
1. Open the Import/Export Management
2. Select Import > Raster File or Vector
3.
4.
5.
6.
7.
File
Choose the layer name
Choose layer type = Background
Select the file
Click "OK"
Select the georeference file (for
Raster file only)
9159 NPO
NPO Operation & Administration
24
DELTA
DELTARNO-NPO
RNO-NPO
13
Planned Data
1. Open the Import/Export
2.
3.
4.
5.
Management
Select Import > Planned Data
Select the appropriate format
(GENERIC)
Select the 3 COF files for import
Choose DELTA or NON DELTA
6. Click "OK"
9159 NPO
NPO Operation & Administration
25
13
9159 NPO
NPO Operation & Administration
26
13
/alcatel/muse/technologies/GSM/cartography/config/
CartographyConfiguration.xml
/alcatel/muse/technologies/GSM/plannedData/specificloader/config
fileNameObjectTypeMapping.cfg
9159 NPO
NPO Operation & Administration
27
13
9159 NPO
NPO Operation & Administration
28
3.1 Presentation
NPO GSM Operation Advanced
13
Cartography
Interference
QoS mapping and distribution (thematic layers)
Adjacencies management
Layer management
Diagnosis
Automatic investigation of poor QoS
Based on standard scenarios and operator-customized scenarions
9159 NPO
NPO Operation & Administration
29
DELTA
DELTARNO-NPO
RNO-NPO
Activation
13
2
Select all the cells
9159 NPO
NPO Operation & Administration
30
DELTA
DELTARNO-NPO
RNO-NPO
13
Description
Viewport
Toolbar
Mini Map
Layer
Management
Information
Bar
9159 NPO
NPO Operation & Administration
31
DELTA
DELTARNO-NPO
RNO-NPO
13
32
9159 NPO
NPO Operation & Administration
Lock density : the layer density remains the same whichever the zoom chosen.
Layer density = 1 : objects are not displayed on the map
2 : one dot per site
3 : one line per sector
4 : colocalized cells or not (double lined or single lined)
5 : same as 4, but larger view
6 : each cell has its own icon
7 : cells are grouped per sector (one sector can contain one WCDMA cell, one GSM900 cell, one DCS1800 cell
and one WIMAX cell !)
DELTA
DELTARNO-NPO
RNO-NPO
13
Cell Icons :
Collapsed cell
9159 NPO
NPO Operation & Administration
33
DELTA
DELTARNO-NPO
RNO-NPO
13
Other icons :
Sector 1
Micro cell in sector 1
(to display the technology standard (G)
G cf
User Preferences)
Sector 2
Layer density = 7
9159 NPO
NPO Operation & Administration
34
DELTA
DELTARNO-NPO
RNO-NPO
13
Toolbar
Navigation
Adjacency wizard
Ruler
Selection
Viewport Mngt
Zoom in/out
Center on selection
Information bar
9159 NPO
NPO Operation & Administration
Distance
(ruler tool)
Scale of
viewport
35
DELTA
DELTARNO-NPO
RNO-NPO
13
Basic Functions
Open cell properties
Show adjacencies
Show co-sector cells
Propagate selection towards the
Network elements pane
9159 NPO
NPO Operation & Administration
36
DELTA
DELTARNO-NPO
RNO-NPO
13
Highlight :
All Parents / Children Objects
BSC
nts
BTS
en
re
pa
Cell 2
ch
il
dr
Cell 1
TrafZ outer
TrafZ inner
TrafZ outer
TrafZ inner
TRX 1 TRX 2
TRX 3
TRX 1 TRX 2
TRX 3 TRX 4
9159 NPO
NPO Operation & Administration
TrafZ = traffic zone (subset of TRX that belong to same BTS, same frequency band and same zone)
37
13
Highlight
All incoming / All Outgoing /All Adjacencies
9159 NPO
NPO Operation & Administration
DELTA
DELTARNO-NPO
RNO-NPO
38
13
39
Highlight
Interfering / Interfered
Interference
Matrix
NPO
CARTOGRAPHY
Import/Export Mngt
13
40
Highlight
Frequency Reuse Checking
Selected cell
9159 NPO
NPO Operation & Administration
The current exemple shows that many surrounding cells are using the same frequencies. It might be a case
of SFH 1x1.
13
41
Highlight
CCA (Cell Contour Area, also known as "Best Server Area")
9159 NPO
NPO Operation & Administration
DELTA
DELTARNO-NPO
RNO-NPO
13
42
Adjacency Wizard
Added relation
Removed relation
Untouched relation
9159 NPO
NPO Operation & Administration
The Adjacency Wizard can work with or without a tuning session opened.
To open the Adjacency Wizard, you must select one cell.
Low usage is defined in a configuration file located in NPO server :
\alcatel\muse\technologies\GSM\cartography\config\CartographyConfiguration.xml
lowTrafficThreshold="0.1"
It means all adjacencies relationships that account for less than 10% of the overall handovers are
considered "low".
This threshold might be considered a little high, especially in urban areas with a lot of overlap and traffic
sharing mechanisms.
DELTA
DELTARNO-NPO
RNO-NPO
13
43
9159 NPO
NPO Operation & Administration
DELTA
DELTARNO-NPO
RNO-NPO
13
customized criteria.
Example :
Thematic layer based on parameter "FREQUENCY BAND"
9159 NPO
NPO Operation & Administration
It is possible to create a thematic layer for any kind of object that can be mapped in the cartography
module (mostly BSC, BTS)
Adjacency thematic layers are not supported in this version.
44
DELTA
DELTARNO-NPO
RNO-NPO
13
45
Intervals
distribution
method
Criterion Graphical Properties : graphical property which is common for all cells. It will not be changed
depending in which interval the cell is.
When using two criteria, the second criteria cannot reuse the graphical properties used in the first criteria.
Auto-Background works only if the graphical properties of EACH interval have been pre-defined.
13
9159 NPO
NPO Operation & Administration
In google earth, it is possible to visualize buildings and streets at very high resolution.
It is useful to analyze surrounding terrains and obstacles, check roads which are passing by a site, etc.
46
DELTA
DELTARNO-NPO
RNO-NPO
Exercise
NPO GSM Operation Advanced
13
400m, and remove relations with "No Usage" (import in the Tuning Session)
Create a thematic layer for CELL2G, based on
Apply this thematic layer for different hours during the day
30 minutes
9159 NPO
NPO Operation & Administration
47
3.7 Diagnosis
NPO GSM Operation Advanced
13
48
TCH congestion
above threshold ?
NO
No diagnosis
YES
YES
TRX frozen ?
YES
YES
TRX w/ no traffic
YES
Loss of TCH
ressources ?
YES
Cant't check
YES
FDR acticated ?
YES
Queue is full ?
YES
Wrong
BTS_Q_LENGTH ?
Queue expires ?
YES
Wrong TQHO ?
Bad queue
settings ?
YES
YES
YES
9159 NPO
NPO Operation & Administration
Wrong T11 ?
The link between nodes is based on causality : the 1st node can be a consequence of those causes, etc.
In the end, the diagnosis will output all possible "root" causes.
For each node, there are :
a) 1 or several tests such as :
IF ("qos indicator 1" > threshold 1) AND ("qos indicator 2" > threshold 2)
THEN Problem Found
ELSE Problem Not Found
b) 3 possible outputs : problem is found, problem is not found or test is impossible (hardware check, OMC-R
alarms check, or qos data unavailable)
When creating a diagnosis, the two longest steps are :
- Designing the tree of test nodes
- Finding the relevant indicators & parameters to use in each test
DELTA
DELTARNO-NPO
RNO-NPO
13
49
Activation
Synthetic Mode
Drag and drop NE + Diagnosis in the Spreadsheet browser
Or
From the menu bar "Diagnosis > Execute Diagnosis"
Detailed Mode
Synthetic Result
Detailed Result
9159 NPO
NPO Operation & Administration
13
50
Different diagnosis
V3_CDR : version 3 of "call drop rate" diagnosis
V4_CDR : version 4 of "call drop rate" diagnosis
V4_CDR_180 : already included in V4_CDR
V4_CDR_TRX : includes V4_CDR + 3 additional tests per TRX
9159 NPO
NPO Operation & Administration
V4 CDR vs V3 CDR : V4 includes one additional node : test if call duration is different among the TRXs of the
cell.
V4 CDR TRX : same as V4 CDR + TRX remote transcoder problem + TRX handover problem + TRX radio
problem
13
51
Detailed Output
9159 NPO
NPO Operation & Administration
3.7 Diagnosis
DELTA
DELTARNO-NPO
RNO-NPO
Exercise
NPO GSM Operation Advanced
13
10 minutes
9159 NPO
NPO Operation & Administration
52
13
4 Topology Customization
9159 NPO
NPO Operation & Administration
53
4 Topology Customization
DELTA
DELTARNO-NPO
RNO-NPO
13
54
between equipments
Mostly defined by their parents/children relations
This customized objects will be treated like the other network objects :
Available in Analysis Desktop
pa
re
nt
GERAN
New Object
ch
ild
re
MSC A
MSC B
New Relation
BSC 1
9159 NPO
NPO Operation & Administration
BSC 2
BSC 3
BSC 4
Usually, each new object should be associated with 2 new relations : object parent & object children
4 Topology Customization
DELTA
DELTARNO-NPO
RNO-NPO
13
9159 NPO
NPO Operation & Administration
55
4 Topology Customization
DELTA
DELTARNO-NPO
RNO-NPO
13
0 MSC
MSC_ID
GSM
GERAN
X_Coord
1 MSC_BSC
MSC_ID/BSC_ID
GSM
MSC
BSC
G
string
H
Y_Coord
I
string
9159 NPO
NPO Operation & Administration
Col A : relation flag : when equals to 1, it defines a relationship. When equals to 0, it defines a network
object type.
Col B : name of the object (e.g. MSC) or relationship (e.g. MSC_BSC)
Col C : External ID label e.g. MSC_ID (object) or MSC_ID/BSC_ID (relationship)
Col D : Technology standard (GSM)
Next columns, if it is a line defining a network object :
Col E : Father Type (e.g. GERAN)
Col F : attribute 1 name (e.g. Longitude, name, address, etc.) (optionnal)
Col G : attribute 1 type (e.g. string, integer, ) (optionnal)
Col H : attribute 2 name (e.g. Longitude, name, address, etc.) (optionnal)
Col I : attribute 2 type (e.g. string, integer, ) (optionnal)
Etc.
Next columns, if it is a line defining a relationship :
Col E : Source Type (e.g. MSC)
Col F : Target Type (e.g. BSC)
56
4 Topology Customization
DELTA
DELTARNO-NPO
RNO-NPO
13
57
How to create a new topology object (i.e. "MSC 1" and "MSC 2")
1. Copy & rename the sample file
"/alcatel/muse/MUSE_QOS/topology/files/CustomerData.txt"
2. Edit the copied file with excel :
MSC
MSC 1
GERAN
X_coord W 03 59 31 Y_coord N 05 18 08
MSC
MSC 2
GERAN
X_coord W 03 57 26 Y_coord N 05 01 46
MSC_BSC 1/VNR_BSC1
MSC
BSC
VNR_BSC1
MSC_BSC 1/VNR_BSC2
MSC
BSC
VNR_BSC2
9159 NPO
NPO Operation & Administration
4 Topology Customization
DELTA
DELTARNO-NPO
RNO-NPO
13
"/alcatel/muse/MUSE_QOS/topology/files/"
Open Import/Export Management > Import > Customer Objects Type
9159 NPO
NPO Operation & Administration
58
4 Topology Customization
DELTA
DELTARNO-NPO
RNO-NPO
13
"/alcatel/muse/MUSE_QOS/topology/files/"
Open Import/Export Management > Import > Customer Topology Objects
9159 NPO
NPO Operation & Administration
59
DELTA
DELTARNO-NPO
RNO-NPO
Exercise
NPO GSM Operation Advanced
13
10 minutes
9159 NPO
NPO Operation & Administration
60
13
9159 NPO
NPO Operation & Administration
61
13
End of Module
Operation Advanced
9159 NPO
NPO Operation & Administration
62
14
Section 1
NPO GSM
Module 4
Administration
3JK11315AAAAWBZZA Edition 05
Blank Page
NPO GSM Administration
9159 NPO
NPO Operation & Administration
14
Document History
Edition
Date
Author
Remarks
01
YYYY-MM-DD
First edition
Objectives
NPO GSM Administration
9159 NPO
NPO Operation & Administration
14
Objectives [cont.]
NPO GSM Administration
9159 NPO
NPO Operation & Administration
14
Table of Contents
NPO GSM Administration
14
Page
9159 NPO
NPO Operation & Administration
7
8
11
12
14
15
16
19
20
21
22
23
24
27
28
29
30
32
35
14
9159 NPO
NPO Operation & Administration
All Rights
Reserved
Alcatel-Lucent
2007
This page
is left
blank
intentionally
14
1 Data Loading
9159 NPO
NPO Operation & Administration
1 Data Loading
DELTA
DELTARNO-NPO
RNO-NPO
14
OMC-R
NPO SERVER
CRONTAB :
Directory : /alcatel/omc3/omc3rno/script/
Script : run_periodicExport all
/alcatel/var/share/AFTR/ACIE
/alcatel/var/share/AFTR/ACIE
/ACIE_NlExport_Dir1
/ACIE_NlExport_Dir1
LOADER :
Directory : /alcatel/muse/MUSE_PARAM/loader/bin/
Script : run_gl.sh
Using the plug-in :
Directory : /alcatel/muse/technologies/GSM/Parameter/specificloader/lib/
File : MuseGSMRTPPlugIn.jar
PURGE :
Directory : /alcatel/muse/MUSE_PARAM/consolidation/bin/
Script : run_consolidation.sh
Based on :
Directory : /alcatel/muse/MUSE_ADMIN/config/
File : paramStorageDuration.cfg
DICTIONARY
/alcatel/muse/technologies/GSM/Parameter/specificloader/dictionary/
MSNPO_GSM_RP_M2S2.xml
9159 NPO
NPO Operation & Administration
TRACE
\alcatel\muse\data\trace/
RTP_Loader_0.traces
1 Data Loading
DELTA
DELTARNO-NPO
RNO-NPO
14
15/08/2007
14/08/2007
RTP_Loader_0.traces
9159 NPO
NPO Operation & Administration
1 Data Loading
DELTA
DELTARNO-NPO
RNO-NPO
14
10
9159 NPO
NPO Operation & Administration
ACIE : Alcatel-Lucent Configuration Import/Export (set of files containing all radio configuration of the
network equipments)
The "run_gl" script will import the contents of directory "alcatel/var/share/AFTR/ACIE/ACIE_Nlexport_Dir1"
from OMC-R.
To export a radio configuration:
1. Login as administrator in OMC-R, open a console and type :
/alcatel/omc3/omc3rno/script/run_periodicExport all
OR
1. In the RNUSM: PRC or SC main window, select Configuration -> Export.
The RNUSM: Export Operation window opens.
2. Select the required directory.
To perform an export, the directory status must be Idle.
The default value of [CGI mode used for Cell Identification] is 'No'. If you need to activate it, set it to
'Yes'. The result is that the CSV files resulting from the export will contain the CellGlobalIdentity
instead of the reference used to identify the cell.
If the Directory Status is... Click on...
Idle
Ready
[Export].
[Free], and then [Export].
1 Data Loading
DELTA
DELTARNO-NPO
RNO-NPO
14
11
OMC-R
NPO SERVER
LOADER :
/alcatel/muse/MUSE_QOS/loader/genericloader/scripts/
run_gl.sh
Using the plug-in :
/alcatel/muse/MUSE_QOS/loader/genericloader/lib
genericloader.jar
CONSOLIDATION & PURGE :
/alcatel/muse/MUSE_QOS/consolidation/bin/
consolidation.sh
Based on :
/alcatel/muse/MUSE_COMMON/config/
StorageDuration.csv
DICTIONARY
\alcatel\muse\technologies\GSM\QoS\dictionary/
QID.xml, B10_QCD.xml, QRD.xml
9159 NPO
NPO Operation & Administration
TRACE
Data Management > Administration > Import Follow-up
Scheduler : the time of NPO import is defined in NPO Administration / Data Management / Configuration > System
Scheduling
Dictionaries :
QID : indicators
QCD : counters
QRD : views & reports
To change storage duration :
To configure the indicator storage duration perform from the server as root the following steps:
1. Copy and rename the Storage duration file into a saved location.
Example:
cp /alcatel/muse/MUSE_COMMON/config/StorageDuration.csv
/alcatel/muse/MUSE_ADMIN/bin/NewStorageDuration.csv
2. Modify as apropiate the duration values in the new configuration storage duration file.
Do not modify the first two lines of the file NewStorageDuration.csv file.
3. Run the /alcatel/muse/MUSE_ADMIN/bin/ConfigIndDuration.sh script, giving as argument the full pathname of the
file that contains the duration values.
Example:
/alcatel/muse/MUSE_ADMIN/bin/ConfigIndDuration.sh /alcatel/muse/MUSE_ADMIN/bin/NewStorageDuration.csv
In case the new values are smaller than the Evolium recommendations (recommended min values: Raw/Daily 5days,
Weekly 1 week, Monthly 1 month), a warning is displayed. The administrator is not allowed to change the storage
duration to a less than zero value. An error is displayed in case of setting a negative value. Only a positive or null
value is allowed.
The storage duration values are then updated in the database and the status of the operation is displayed to the
administrator.
1 Data Loading
DELTA
DELTARNO-NPO
RNO-NPO
1.3 Consolidations
NPO GSM Administration
14
12
Example: WEEKLY_CONSOLIDATION_ON=MONDAY
- Save
9159 NPO
NPO Operation & Administration
change the WEEKLY_CONSOLIDATION_ON attribute to the day when you want the weekly consolidation to
begin (usually the date when the weekly consolidation used to start on NPA).
1 Data Loading
DELTA
DELTARNO-NPO
RNO-NPO
14
13
Example: working hours between 9 AM and 7 PM, the file should contain the
following values
RELEVANT_HOUR_BEGINS_ON=9
RELEVANT_HOUR_ENDS_ON=19
- Save
9159 NPO
NPO Operation & Administration
1 Data Loading
DELTA
DELTARNO-NPO
RNO-NPO
14
parameter activities :
9159 NPO
NPO Operation & Administration
It is also possible to disable / enable a job, but this is NOT recommended ! All jobs should be available.
14
1 Data Loading
DELTA
DELTARNO-NPO
RNO-NPO
14
It is mandatory to select the same time zone between NPO Server and
9159 NPO
NPO Operation & Administration
15
1 Data Loading
B10
B10
MR2
MR2
14
16
QoS Import
Root Loading Object = BSC in GSM (entity that generates the PM files)
Datasource = OMCR in GSM
File type : 1 file per counter type (PM110, PM180, PM31,)
9159 NPO
NPO Operation & Administration
The value shown is the number of files collected by NPO. In this example :
1 file each 15 minutes = 48 files collected in the day
Less than this (orange or red), and NPO detects there are missing files.
(Note for future release : the value displayed might be in format xx/yy, it means xx files collected and yy
files failed)
1 Data Loading
14
Parameters Import
9159 NPO
NPO Operation & Administration
B10
B10
MR2
MR2
17
1 Data Loading
B10
B10
MR2
MR2
14
18
QoS Consolidation
Re-consolidation of
QoS with the
recovered data
9159 NPO
NPO Operation & Administration
Recovered Data : data that was recovered in the OMCR but after the consolidation was done.
14
2 Data Management
9159 NPO
NPO Operation & Administration
19
2 Data Management
DELTA
DELTARNO-NPO
RNO-NPO
2.1 Overview
NPO GSM Administration
14
20
Most functions have already been explained. This chapter will recap all
of them.
9159 NPO
NPO Operation & Administration
2 Data Management
DELTA
DELTARNO-NPO
RNO-NPO
2.2 Configuration
NPO GSM Administration
14
9159 NPO
NPO Operation & Administration
21
2 Data Management
DELTA
DELTARNO-NPO
RNO-NPO
2.3 Administration
NPO GSM Administration
14
22
14
9159 NPO
NPO Operation & Administration
23
DELTA
DELTARNO-NPO
RNO-NPO
3.1 Overview
NPO GSM Administration
14
24
9159 NPO
NPO Operation & Administration
DELTA
DELTARNO-NPO
RNO-NPO
9159 NPO
NPO Operation & Administration
14
25
DELTA
DELTARNO-NPO
RNO-NPO
Exercise
NPO GSM Administration
14
10 minutes
9159 NPO
NPO Operation & Administration
It is redundant to perform a import again : the most important imports have been done in the previous
chapters already.
26
14
4 Recovery Tasks
9159 NPO
NPO Operation & Administration
27
4 Recovery Tasks
DELTA
DELTARNO-NPO
RNO-NPO
4.1 Presentation
NPO GSM Administration
14
9159 NPO
NPO Operation & Administration
28
4 Recovery Tasks
DELTA
DELTARNO-NPO
RNO-NPO
4.1 Scenario A
NPO GSM Administration
14
No PM Files received
time
09:00
12:00
15:00
18:00
21:00
00:00
03:00
06:00
09:00
12:00
06:00
09:00
12:00
Consolidation
scheduled time
= 1:00am
Files automatically
retrieved
time
09:00
12:00
15:00
18:00
21:00
00:00
03:00
The PM files are kept in OMC-R for five days, whether they are imported by NPO or not.
As soon as the link is resumed, NPO imports all data not yet imported automatically.
NO ACTION FROM THE USER IS NEEDED
9159 NPO
NPO Operation & Administration
29
4 Recovery Tasks
DELTA
DELTARNO-NPO
RNO-NPO
4.2 Scenario B
NPO GSM Administration
14
No PM Files received
time
09:00
12:00
15:00
18:00
21:00
00:00
03:00
06:00
09:00
12:00
06:00
09:00
12:00
Consolidation
scheduled time
= 1:00am
Files automatically
retrieved
time
09:00
12:00
15:00
18:00
21:00
00:00
03:00
9159 NPO
NPO Operation & Administration
30
4 Recovery Tasks
DELTA
DELTARNO-NPO
RNO-NPO
14
31
9159 NPO
NPO Operation & Administration
"Recovered data" : data that have been imported by NPO after a PM files outage, if the outage was fixed
after the consolidation time.
If the outage was fixed before the consolidation, refer to scenario A.
4 Recovery Tasks
DELTA
DELTARNO-NPO
RNO-NPO
4.2 Scenario C
NPO GSM Administration
14
Outage for many days, but less than 5 days (120 hours).
No PM Files received
time
18:00
21:00
00:00
03:00
06:00
09:00
12:00
Consolidation
scheduled time
= 1:00am
Files automatically
retrieved
time
10:00
Day 1
18:00
21:00
00:00
03:00
06:00
09:00
12:00
Day 6
Between "Day 1" 10:00am and "Day 6" 9:00am, there is 119 hours.
All PM files are stored in OMC-R, and the retrieval process starts at 9:00am on day 6.
Therefore, only one thing to do : Consolidate Restored Data (cf. previous slide)
Scenario B and C = same solution
9159 NPO
NPO Operation & Administration
32
4 Recovery Tasks
DELTA
DELTARNO-NPO
RNO-NPO
14
33
automatically.
Possible problem : the time to retrieve all the data takes too much
time, and all data of Day 6 are not imported before the consolidation of
Day 6.
Files automatically 00:00
retrieved
time
03:00
Day 6
06:00
09:00
12:00
Day 7
Consolidation of Day 6
scheduled time
= 1:00am
9159 NPO
NPO Operation & Administration
4 Recovery Tasks
14
Manual Consolidation :
9159 NPO
NPO Operation & Administration
DELTA
DELTARNO-NPO
RNO-NPO
34
4 Recovery Tasks
DELTA
DELTARNO-NPO
RNO-NPO
4.3 Scenario D
NPO GSM Administration
14
35
Alternative solution :
1. Get a back-up from the OMC-R, no more than 5 days old
2. Extract the PM files between the start of the outage of the end of the
outage
3. Re-import the data in NPO
9159 NPO
NPO Operation & Administration
Re-importing PM files in NPO consists in loading the files in the ORACLE database, thanks to NPO loaders.
14
9159 NPO
NPO Operation & Administration
36
14
End of Module
Administration
9159 NPO
NPO Operation & Administration
37
DRAFT
@@SECTION - @@MODULE - 1
@@SECTIONTITLE - @@MODULETITLE
@@PRODUCT
@@COURSENAME