You are on page 1of 3

15770 Federal Register / Vol. 71, No.

60 / Wednesday, March 29, 2006 / Notices

mechanism for monitoring customer NUCLEAR REGULATORY initiative, grant exemptions from the
satisfaction. In particular, the purpose of COMMISSION requirements of 10 CFR Part 50 when (1)
the proposed National Personnel The exemptions are authorized by law,
Records Center (NPRC) Survey of [Docket No. 50–348] will not present an undue risk to public
Customer Satisfaction is to (1) Southern Nuclear Operating Company; health or safety, and are consistent with
determine customer satisfaction with the common defense and security; and
Joseph M. Farley Nuclear Power Plant,
MPR’s reference service process, (2) (2) when special circumstances are
Unit 1; Exemption
identify areas within the reference present. These special circumstances are
service process for improvement, and 1.0 Background described in 10 CFR 50.12(a)(2)(ii), in
(3) provide MPR management with that the application of these regulations
The Southern Nuclear Operating
customer feedback on the effectiveness is not necessary to achieve the
Company (SNC, the licensee) is the
of BPR initiatives designed to improve underlying purpose of the rule.
holder of Renewed Facility Operating The underlying purpose of Appendix
customer service as they are License No. NPF–2 which authorizes
implemented. In addition to supporting R, Section III.G, is to provide features
operation of Joseph M. Farley Nuclear capable of limiting fire damage so that:
the BPR effort, the proposed National Power Plant (FNP), Unit 1. The license
Personnel Records Center (NPRC) (1) One train of systems necessary to
provides, among other things, that the achieve and maintain hot shutdown
Survey of Customer Satisfaction will facility is subject to all rules,
help NARA in responding to conditions from either the control room
regulations, and orders of the Nuclear or emergency control station(s) is free of
performance planning and reporting Regulatory Commission (NRC, the
requirements contained in the fire damage; and (2) systems necessary
Commission) now or hereafter in effect. to achieve and maintain cold shutdown
Government Performance and Results The facility consists of a pressurized-
Act (GPRA). from either the control room or
water reactor located in Houston emergency control station(s) can be
Dated: March 9, 2006. County, Alabama. repaired within 72 hours.
Martha Morphy,
2.0 Request/Action 3.1 Overview of Approach Used by
Acting Assistant Archivist for Information
Services. Title 10 of the Code of Federal Licensee
[FR Doc. E6–4535 Filed 3–28–06; 8:45 am] Regulations (10 CFR) Part 50, Appendix For this specific fire protection
BILLING CODE 7515–01–P
R, ‘‘Fire Protection Program for Nuclear application, SNC proposes plant
Power Facilities Operating Prior to modifications to use 1-hour fire-rated
January 1, 1979,’’ establishes fire electrical cable in lieu of a 1-hour rated
protection features required to satisfy fire barrier as required by 10 CFR Part
NATIONAL TRANSPORTATION General Design Criterion 3, ‘‘Fire 50, Appendix R, Section III.G.2. Section
SAFETY BOARD protection,’’ of Appendix A to10 CFR III.G.2 of 10 CFR Part 50, Appendix R,
Part 50 with respect to certain generic provides fire protection requirements
Notice of Sunshine Act Meeting issues for nuclear power plants licensed for electrical cables located within the
to operate prior to January 1, 1979. FNP, same fire area whose failure could cause
TIME AND DATE: 9:30 a.m., Tuesday, April Unit 1 was licensed to operate prior to the maloperation of redundant trains of
4, 2006. January 1, 1979. Therefore, FNP, Unit 1 systems necessary to achieve and
PLACE: NTSB Board Room, 429 L’Enfant is directly subject to Appendix R. maintain hot shutdown conditions.
Plaza, SW., Washington, DC 20594. By letter dated January 19, 2005, as These areas are required to have
supplemented by letters dated June 9 protection features such that one of the
STATUS: The one item is open to the (two letters) and November 18, 2005, redundant trains will be free of fire
public. SNC, the licensee for FNP, Unit 1, damage in the event of a fire. One
MATTERS TO BE CONSIDERED: 7770, submitted a request for a permanent method, described in Section III.G.2, for
Marine Accident Report—Fire On Board exemption from 10 CFR Appendix R, ensuring compliance with this
U.S. Small Passenger Vessel Express Section III.G.2, pertaining to FNP, Unit requirement is to enclose the cable and
Shuttle II, Pithlachascotee River, near 1 (SNC letters NL–04–2357, NL–05– equipment and associated non-safety
Port Richey, Florida, October 17, 2004. 0937, NL–05–0960 and NL–05–1975, circuits of one redundant train in a 1-
respectively). Specifically, 10 CFR hour rated fire barrier. In addition, an
NEW MEDIA CONTACT: Telephone: (202)
Appendix R, Section III.G.2, would area-wide automatic fire suppression
314–6100.
require the use of a 1-hour rated fire and detection system shall be installed
Individuals requesting specific barrier for protection of certain safe in the fire area.
accommodations should contact Chris shutdown control circuits located in A postulated fire in Fire Area 1–013
Bisett at (202) 314–6305 by Friday, Fire Areas 1–013 and 1–042. In lieu of or 1–042 could cause loss of offsite
March 31, 2006. providing such 1-hour rated fire power; both fire areas contain cable bus
The public may view the meeting via barriers, the licensee proposes the use of ducts from the startup transformers to
a live or archived webcast by accessing fire-rated electrical cable produced by both redundant trains of the 4 kilovolt
a link under ‘‘News & Events’’ on the Meggitt Safety System, Inc., (previously (KV) Appendix R safe shutdown (SSD)
NTSB home page at http:// known as Whittaker Electronic busses. A postulated fire in either of
www.ntsb.gov. Resources Unit of Whittaker Electronic these fire areas could also potentially
FOR MORE INFORMATION CONTACT: Vicky Systems) for several cables in Fire Areas impact the function of the Train B 4 KV
D’Onofrio, (202) 314–6410. 1–013 and 1–042 associated with safe Emergency Diesel Generator (EDG) 1B
hsrobinson on PROD1PC68 with NOTICES

shutdown control circuits. control circuitry. The majority of the


Dated: March 24, 2006. Train A onsite electrical power system
Vicky D’Onofrio, 3.0 Discussion components required for Appendix R
Federal Register Liaison Officer. Pursuant to 10 CFR 50.12, the SSD are not located in Fire Area 1–013
[FR Doc. 06–3058 Filed 3–24–06; 4:37 pm] Commission may, upon application by or 1–042. The following Train A onsite
BILLING CODE 7533–01–M any interested person or upon its own power system related SSD circuits

VerDate Aug<31>2005 15:39 Mar 28, 2006 Jkt 208001 PO 00000 Frm 00080 Fmt 4703 Sfmt 4703 E:\FR\FM\29MRN1.SGM 29MRN1
Federal Register / Vol. 71, No. 60 / Wednesday, March 29, 2006 / Notices 15771

located in Fire Areas 1–013 and 1–042 protection as would be provided by a 1- minimum IR value recorded during
will be protected by a 1-hour fire-rated hour rated fire barrier as required by 10 testing is acceptable for the specific
electrical cable along with area-wide CFR part 50, Appendix R, Section application at FNP, Unit 1.
automatic fire suppression and III.G.2.
The licensee provided copies of the 3.2.4 Mechanical Damage Protection
detection:
1. Protection of control circuitry that test report, ‘‘Appendix R, One-Hour Fire Rated 1-hour electrical cable raceway
could potentially disable the supply of Resistive Control Cable Test,’’ dated fire barriers are tested in a furnace and
the onsite power from the Train A 4KV August 11, 2004, in its submittal. The subject to a hose stream test that ensures
EDGs 1–2A and 1–C, or disable supply cables in Farley, Unit 1 are used as the raceway and the barriers will stay in
of 7 Train A onsite power due to control circuit applications and are place following a fire exposure. The fire-
inadvertent loading of electronic rated at 125 volts direct-current (VDC). rated electrical cables were tested in a
switching system (ESS) loads onto EDG The licensee’s report, listed above, furnace and subjected to a hose stream.
1–C: includes the fire test performance Since the fire-rated electrical cables
results for 8 Conductor #12 AWG themselves are the barriers, any
(a) The control interlocks for the automatic
alignment of the Train A Swing EDG 1C Meggitt Safety Systems electrical cable mechanical damage that occurs to the
Incoming Breaker 1–DH07 or 2–DH07 to with factory splices and several support cables may cause the cables to fail. The
provide onsite AC power due to loss of offsite systems and attachment methods, when licensee’s letter dated June 9, 2005,
power to the shutdown buses. exposed to the ASTM E–119 time- stated that the areas where the fire-rated
(b) The control interlocks for the automatic temperature heating curve for a period electrical cables are routed are protected
alignment of the Train A Swing EDG 1–2A of 1 hour. with area-wide automatic fire
Incoming Breaker 1–DF08 or 2–DF08 to suppression and detection systems, as
provide onsite AC power due to loss of offsite 3.2.2 Megger Testing required by Appendix R Section
power to the shutdown buses. The fire-rated electrical cables at FNP III.G.2.c. In addition, the routing for
(c) The control interlocks for the automatic were tested for use in low voltage each fire-rated electrical cable was
alignment of Unit 1 600V Load Center 1D control circuits. Megger Testing was
Breaker 1–ED13 or Unit 2 600V Load Center
established by plant walk-downs to
2D Breaker 2–ED13 to MCC 1S (power to the
conducted at 500 VDC, to obtain protect against potential physical
Train A Swing EDG 1–2A auxiliaries) so that conductor-to-conductor and conductor- hazards. The licensee stated that the
the MCC is aligned to the same DG 1–2A. to-ground insulation resistance values, fire-rated electrical cables are also
(d) The control interlocks from Unit 2 ESS before the fire test, during the fire test, safety-related and will be installed to
Sequencer that blocks Unit 1 ESS Sequencer and after the hose stream test. To ensure meet the FNP routing requirements for
on a Unit 2 safety injection actuation signal that the conductor-to-conductor and Class 1E cable protection from physical
(This signal is to prevent inadvertent loading conductor-to-ground insulation hazards. The fire-rated electrical cables
of ESS loads on smaller DG 1C). resistance (IR) readings were obtained are only routed in safety-related Class 1
(e) The control interlock from Unit 1 ESS for all conductor combinations at the structures, and all safety-related and
Sequencer that blocks Unit 2 ESS Sequencer
on a Unit 1 safety injection actuation signal
peak ASTM E–119 1-hour test nonsafety-related equipment and
(This signal is to prevent inadvertent loading temperature, the first test was extended components in these structures are
of ESS loads on smaller DG 1C). for an additional 38 minutes and 12 seismically supported.
seconds with the furnace temperature The NRC staff concludes, based on the
2. Protection of the control circuitry held as close as possible to 1700 degrees information provided, that there is
that could potentially disable the Farenheit until all IR values were adequate protection from mechanical
operation of the 4KV power supply recorded. Obtaining insulation damage to demonstrate equivalence to a
breakers to the Train A Component resistance values during the fire test by raceway fire barrier system for the
Cooling Water Pump 1C, Train A the test method applied provided specific application at FNP, Unit 1.
Charging Pump 1A, and Train A Motor- conservative test results that meet the
Driven Auxiliary Feed-Water Pump 1A. 3.2.5 Galvanized Supports
fire Megger Testing requirements of GL
3. Protection of the control circuitry When in contact with galvanized
86–10, Supplement 1, for the FNP
that could potentially disable the supports, fire-resistive electrical cable
specific 1-hour rated control cable
operation of the 600V load center power produced by Meggitt Safety Systems,
application. The NRC staff finds, based
supply breaker to Train A Pressurizer Inc. has been reported to experience
on the Megger Testing, that the
Heater Group 1A. degradation due to liquid metal
A 1-hour rated fire barrier as insulation resistance values are
acceptable for the specific application at embrittlement. This degradation occurs
described in Section III.G.2 of 10 CFR at the positions where the galvanized
Part 50, Appendix R is not provided. FNP, Unit 1.
supports are in direct contact with the
Instead, these credited Train A 3.2.3 Minimum Insulation Resistance stainless steel cable jacket. Section 4,
components will utilize fire-rated Value subsection j of Meggitt Safety Systems
electrical cables (Mineral Insulated (MI) The licensee completed a plant engineering document, ‘‘Unpacking,
cables). This fire-rated electrical cable circuit-specific analysis and concluded Inspection, Installation and Standard
has been tested in accordance with that the control circuit protective Practices for 8/C #12 AWG Si 2400 Fire-
American Society for Testing Materials devices will not trip during a fire event Rated Cable For J.M. Farley Nuclear
(ASTM) E–119, ‘‘Standard Test Methods with an IR value of 5.7 mega-ohms/foot Plant, Revision D,’’ states that ‘‘Si Fire
for Fire Tests of Building Construction (M′W/ft). The minimum IR value Cable may be routed in cable trays;
Materials.’’ recorded during the fire test was 0.8 Stainless steel trays are recommended.
3.2 Technical Evaluation M′W, and with 24.176 feet of cable Cable should not be installed in
hsrobinson on PROD1PC68 with NOTICES

inside the furnace, that equated to 19.3 galvanized trays and should NOT be in
3.2.1 Test Results M′W/ft. This far exceeds the FNP- direct contact with galvanized or
The NRC staff reviewed this issue specific minimum acceptance value of aluminum trays or structures.’’
with respect to determining that the fire- 5.7 M′W/ft. The NRC staff concludes, based on the
rated electrical cables would be capable The NRC staff concludes that, based information provided in the engineering
of providing an equivalent level of on the information provided, the document, that the installation standard

VerDate Aug<31>2005 15:39 Mar 28, 2006 Jkt 208001 PO 00000 Frm 00081 Fmt 4703 Sfmt 4703 E:\FR\FM\29MRN1.SGM 29MRN1
15772 Federal Register / Vol. 71, No. 60 / Wednesday, March 29, 2006 / Notices

will adequately address the concern human environment (71 FR 12219, FOR FURTHER INFORMATION CONTACT:
with galvanized supports for the March 9, 2006). Information on the hearing may be
specific application at FNP, Unit 1. This exemption is effective upon obtained from Connie M. Downs at (202)
issuance. 336–8438, via facsimile at (202) 218–
3.2.6 Defense-in-Depth
Dated at Rockville, Maryland, this 22nd 0136, or via e-mail at cdown@opic.gov.
The following are the fire protection day of March 2006. Dated: March 27, 2006.
defense-in-depth objectives: (1) To For the Nuclear Regulatory Commission. Connie M. Downs,
prevent fires from starting; (2) to detect Edwin M. Hackett, OPIC Corporate Secretary.
rapidly, control, and extinguish Acting Director, Division of Operating Reactor [FR Doc. 06–3073 Filed 3–27–06; 11:09 am]
promptly those fires that do occur; and Licensing, Office of Nuclear Reactor BILLING CODE 3210–01–M
(3) to provide protection for structures, Regulation.
systems, and components important to [FR Doc. E6–4586 Filed 3–28–06; 8:45 am]
safety so that a fire that is not promptly BILLING CODE 7590–01–P
extinguished by the fire suppression SECURITIES AND EXCHANGE
activities will not prevent the safe COMMISSION
shutdown of the plant. The licensee [Investment Company Act Release No.
OVERSEAS PRIVATE INVESTMENT
stated that Fire Areas 1–013 and 1–042 27265; 812–13199]
CORPORATION
are provided with area-wide automatic
fire suppression and detection systems. Sunshine Act Meeting Notice OppenheimerFunds, Inc., et al.; Notice
The use of fire-rated electrical cables is of Application
a substitute for 1-hour rated fire barriers TIME AND DATE: 2 p.m., Thursday, April March 22, 2006.
that are required by 10 CFR Part 50, 20, 2006. AGENCY: Securities and Exchange
Appendix R, and supports the third PLACE: Offices of the Corporation, Commission (‘‘Commission’’).
defense-in-depth objective. For this Twelfth Floor Board Room, 1100 New ACTION: Notice of an application under
specific application, the licensee has York Avenue, NW., Washington, DC.
demonstrated that the fire-rated section 12(d)(1)(J) of the Investment
STATUS: Hearing Open to the Public at Company Act of 1940 (the ‘‘Act’’) for an
electrical cables used are a suitable 2 p.m.
alternative to the 1-hour rated fire exemption from sections 12(d)(1)(A) and
PURPOSE: Public Hearing in conjunction (B) of the Act, under sections 6(c) and
barrier as required by 10 CFR part 50,
with each meeting of OPIC’s Board of 17(b) of the Act for an exemption from
Appendix R.
Directors, to afford an opportunity for section 17(a) of the Act, and under
4.0 Conclusion any person to present views regarding section 17(d) of the Act and rule 17d–
the activities of the Corporation. 1 under the Act to permit certain joint
The NRC staff concludes that, on the Procedures: Individuals wishing to
bases of the discussions in the sections transactions.
address the hearing orally must provide
above, for the specific application of advance notice to OPIC’s Corporate Summary of Application: Applicants
this material, the licensee has Secretary no later than 5 p.m., Friday, request an order to permit certain
adequately demonstrated that this fire- April 14, 2006. The notice must include registered open-end management
rated electrical cable will perform in an the individual’s name, title, investment companies to invest
equivalent manner when compared to a organization, address, and telephone uninvested cash and cash collateral in
rated barrier for this use. The NRC staff number, and a concise summary of the affiliated money market funds in excess
also concludes that the use of the MI subject matter to be presented. of the limits in sections 12(d)(1)(A) and
cable for these purposes, meets the Oral presentations may not exceed ten (B) of the Act.
underlying purpose of Appendix R and, (10) minutes. The time for individual Applicants: OppenheimerFunds, Inc.
that, therefore special circumstances are presentations may be reduced (‘‘OFI’’), Centennial Asset Management
present. Accordingly, the Commission proportionately, if necessary, to afford Corp. (‘‘CAMC,’’ and OFI , together, the
has determined that, pursuant to 10 CFR all participants who have submitted a ‘‘Adviser’’), Bond Fund Series,
50.12(a), the exemption is authorized by timely request to participate an Oppenheimer AMT-Free Municipals,
law, will not present an undue risk to opportunity to be heard. Oppenheimer Fund AMT-Free New
the public health and safety, and is Participants wishing to submit a York Municipals, Oppenheimer
consistent with the common defense written statement for the record must Balanced Fund, Oppenheimer California
and security. Therefore, the Commission submit a copy of such statement to Municipal Fund, Oppenheimer Capital
hereby grants Southern Nuclear OPIC’s Corporate Secretary no later than Appreciation Fund, Oppenheimer
Operating Company an exemption from 5 p.m., Friday, April 14, 2006. Such Capital Income Fund, Oppenheimer
the requirements to 10 CFR Part 50, statements must be typewritten, double- Cash Reserves, Oppenheimer Champion
Appendix R, Section III.G.2, to the spaced, and may not exceed twenty-five Income Fund, Oppenheimer Developing
extent that it requires protection of (25) pages. Markets Fund, Oppenheimer Discovery
cables of one redundant train of safe Upon receipt of the required notice, Fund, Oppenheimer Dividend Growth
shutdown equipment by a 1-hour rated OPIC will prepare an agenda for the Fund, Oppenheimer Equity Fund, Inc.,
fire barrier, for Fire Areas 1–013 and 1– hearing identifying speakers, setting Oppenheimer Emerging Growth Fund,
042. The fire-rated electrical cables forth the subject on which each Oppenheimer Emerging Technologies
provide an equivalent level of participant will speak, and the time Fund, Oppenheimer Enterprise Fund,
protection necessary to achieve the allotted for each presentation. The Oppenheimer Global Fund,
hsrobinson on PROD1PC68 with NOTICES

underlying purpose of the rule for agenda will be available at the hearing. Oppenheimer Global Opportunities
Joseph M. Farley Nuclear Plant, Unit 1. A written summary of the hearing will Fund, Oppenheimer Gold & Special
Pursuant to 10 CFR 51.32, the be compiled, and such summary will be Minerals Fund, Oppenheimer Growth
Commission has determined that the made available, upon written request to Fund, Oppenheimer High Yield Fund,
granting of this exemption will not have OPIC’s Corporate Secretary, at the cost Oppenheimer Integrity Funds,
a significant effect on the quality of the of reproduction. Oppenheimer International Bond Fund,

VerDate Aug<31>2005 15:39 Mar 28, 2006 Jkt 208001 PO 00000 Frm 00082 Fmt 4703 Sfmt 4703 E:\FR\FM\29MRN1.SGM 29MRN1