Federal Register / Vol. 71, No.

40 / Wednesday, March 1, 2006 / Notices 10489

‘‘eLibrary’’ link and is available for The Commission encourages free at (866) 208–3676, or TTY, contact
review in the Commission’s Public electronic submission of protests and (202) 502–8659.
Reference Room in Washington, DC. interventions in lieu of paper using the North Baja requests authority to
There is an ‘‘eSubscription’’ link on the ‘‘eFiling’’ link at http://www.ferc.gov. develop its expansion in three phases.
Web site that enables subscribers to Persons unable to file electronically Specifically, in Phase I, anticipated in-
receive email notification when a should submit an original and 14 copies service October 1, 2007, North Baja
document is added to a subscribed of the protest or intervention to the seeks to:
docket(s). For assistance with any FERC Federal Energy Regulatory Commission, (1) Modify its existing Ehrenburg
Online service, please e-mail 888 First Street, NE., Washington, DC Compressor Station in La Paz County,
FERCOnlineSupport@ferc.gov, or call 20426. Arizona and Ogilby Meter Station in
(866) 208–3676 (toll free). For TTY, call This filing is accessible on-line at Imperial County, California to facilitate
(202) 502–8659. http://www.ferc.gov, using the the bi-directional flow of gas;
Magalie R. Salas, ‘‘eLibrary’’ link and is available for (2) Construct a new meter station and
Secretary.
review in the Commission’s Public a 36-inch diameter pipeline
Reference Room in Washington, DC. interconnection with the facilities of
[FR Doc. E6–2868 Filed 2–28–06; 8:45 am]
There is an ‘‘eSubscription’’ link on the Southern California Gas Company
BILLING CODE 6717–01–P
Web site that enables subscribers to (SoCalGas) at the proposed Blythe Meter
receive email notification when a Station site in Riverside County,
DEPARTMENT OF ENERGY document is added to a subscribed California;
docket(s). For assistance with any FERC (3) Construct a new 42-inch diameter
Federal Energy Regulatory Online service, please e-mail pipeline crossing of the Colorado River
Commission FERCOnlineSupport@ferc.gov, or call to connect the Ehrenberg Compressor
(866) 208–3676 (toll free). For TTY, call Station with the Blythe Meter Station;
[Docket No. RP06–200–001] (202) 502–8659. and
Entrega Gas Pipeline LLC; Notice of Magalie R. Salas,
(4) Construct the new 0.625 mile, 10-
Negotiated Rate inch diameter Blythe Energy
Secretary.
Interconnect Lateral to connect the
February 22, 2006. [FR Doc. E6–2867 Filed 2–28–06; 8:45 am] Blythe Energy Facility I’s existing
BILLING CODE 6717–01–P supply line with the Blythe Meter
Take notice that on February 15, 2006,
Entrega Gas Pipeline LLC (Entrega) Station.
pursuant to 18 CFR 154.7 and 154.203, North Baja states that the proposed
DEPARTMENT OF ENERGY
and in compliance with the facility modifications and additions will
Commission’s letter order issued August Federal Energy Regulatory allow it to deliver up to 609,000 Dth per
9, 2005, in Docket No. CP04–414–000, Commission day of regassified LNG into California
tendered for filing and acceptance and Arizona from Mexico.
certain tariff sheets of Original Volume In Phase I–A, anticipated in-service
[Docket Nos. CP06–61–000; CP01–23–003]
No. 1 of its FERC Gas Tariff to be June 1, 2009, North Baja proposes to
effective February 23, 2006. North Baja Pipeline, LLC; Notice of construct and operate the 45.7 mile, 16-
Entrega states that a copy of this filing Application inch diameter IID Lateral extending
has been served upon all parties to this westward from North Baja’s existing
proceeding, Entrega’s customers, the February 21, 2006. pipeline through Imperial County,
Colorado Public Utilities Commission Take notice that on February 7, 2006, California to the El Centro Generating
and the Wyoming Public Service North Baja Pipeline, LLC (North Baja), Station near El Centro California. North
Commission. 1400 SW Fifth Avenue, Suite 900, Baja states that the IID Lateral will have
Any person desiring to intervene or to Portland, Oregon 97201, filed in Docket a capacity of 110,000 Dth per day.
protest this filing must file in Nos. CP01–23–001 and CP06–61–00, In Phase II, anticipated in-service
accordance with Rules 211 and 214 of applications pursuant to sections 7 and January 1, 2010, North Baja proposes to
the Commission’s Rules of Practice and 3 of the Natural Gas Act (NGA), for a construct and operate about 80 miles of
Procedure (18 CFR 385.211 and certificate of public convenience and 48-inch and 42-inch diameter pipeline
385.214). Protests will be considered by necessity authorizing the expansion of loop, the B-Line, on its existing
the Commission in determining the North Baja’s existing interstate pipeline mainline (A-Line) in Riverside and
appropriate action to be taken, but will system and an amendment to its Imperial Counties, California. North
not serve to make protestants parties to Presidential Permit to allow for the Baja anticipates that upon completion of
the proceeding. Any person wishing to construction of additional facilities at the Phase II facilities the capacity of its
become a party must file a notice of the U.S.-Mexico border to accommodate system will be 2.7 Bcf per day. North
intervention or motion to intervene, as the importation of regassified LNG from Baja estimates that the total cost of all
appropriate. Such notices, motions, or Mexico, all as more fully set forth in the phases of the proposed project will be
protests must be filed in accordance request which is on file with $291 million. North Baja proposes to
with the provisions of Section 154.210 Commission and open to public incrementally price transportation
of the Commission’s regulations (18 CFR inspection. The filing may also be service on the Blythe Energy
154.210). Anyone filing an intervention viewed on the Web at http:// Interconnect Lateral and IID Lateral and
or protest must serve a copy of that www.ferc.gov using the ‘‘eLibrary’’ link. to roll-in the costs of the looping
document on the Applicant. Anyone Enter the docket number excluding the facilities (Line B) into its existing rates.
wwhite on PROD1PC61 with NOTICES

filing an intervention or protest on or last three digits in the docket number Any questions regarding this
before the intervention or protest date field to access the document. For application should be directed to Carl
need not serve motions to intervene or assistance, please contact FERC Online M. Fink, Associate General Counsel,
protests on persons other than the Support at North Baja Pipeline, LLC, 1400 SW Fifth
Applicant. FERCOnlineSupport@ferc.gov or toll Avenue, Suite 900, Portland, Oregon,

VerDate Aug<31>2005 18:25 Feb 28, 2006 Jkt 208001 PO 00000 Frm 00028 Fmt 4703 Sfmt 4703 E:\FR\FM\01MRN1.SGM 01MRN1
10490 Federal Register / Vol. 71, No. 40 / Wednesday, March 1, 2006 / Notices

97201 at (503) 833–4256 or Comments, protests and interventions authorization for a change in Eagle’s
Carl_Fink@TransCanada.com. may be filed electronically via the ownership in which LBMB will acquire
There are two ways to become Internet in lieu of paper. See, 18 CFR limited partnership interests in Eagle
involved in the Commission’s review of 385.2001(a)(1)(iii) and the instructions and limited liability company
this project. First, any person wishing to on the Commission’s web site under the membership interests in Eagle
obtain legal status by becoming a party ‘‘e-Filing’’ link. Management. The Applicants have
to the proceedings for this project Comment Date: March 13, 2006. requested privileged treatment of certain
should, on or before the comment date information and documentation
Magalie R. Salas,
stated below, file with the Federal submitted with the application.
Energy Regulatory Commission, 888 Secretary.
Comment Date: 5 p.m. Eastern Time
First Street, NE., Washington, DC 20426, [FR Doc. E6–2872 Filed 2–28–06; 8:45 am] on March 10, 2006.
a motion to intervene in accordance BILLING CODE 6717–01–P
with the requirements of the 4. Duquesne Conemaugh, LLC
Commission’s Rules of Practice and [Docket No. EG06–28–000]
Procedure (18 CFR 385.214 or 385.211) DEPARTMENT OF ENERGY
Take notice that on February 7, 2006,
and the Regulations under the NGA (18 Duquesne Conemaugh, LLC tendered for
CFR 157.10). A person obtaining party Federal Energy Regulatory
Commission filing additional information to its EWG
status will be placed on the service list filing submitted on January 30, 2006.
maintained by the Secretary of the [Docket Nos. EC05–122–000, et al.] Comment Date: 5 p.m. Eastern Time
Commission and will receive copies of on March 6, 2006.
all documents filed by the applicant and Vermont-Hydro-electric Power
by all other parties. A party must submit Authority, et al.; Notice of Application 5. KGen Enterprise LLC
14 copies of filings made with the [Docket No. EG06–37–000]
February 23, 2006.
Commission and must mail a copy to
The following filings have been made Take notice that on February 10, 2006,
the applicant and to every other party in
with the Commission. The filings are KGen Enterprise LLC submitted a Notice
the proceeding. Only parties to the
listed in ascending order within each of Self-Recertification of Exempt
proceeding can ask for court review of
docket classification. Wholesale Generator Status.
Commission orders in the proceeding.
However, a person does not have to Comment Date: 5 p.m. Eastern Time
1. Vermont-Hydro-Electric Power
intervene in order to have comments on March 3, 2006.
Authority
considered. The second way to 6. BlueRock Energy, Inc.
[Docket No. EC05–122–000]
participate is by filing with the
Take notice that on February 13, 2006, [Docket No. ER06–606–001]
Secretary of the Commission, as soon as
possible, an original and two copies of Vermont Hydro-electric Power Take notice that on February 17, 2006,
comments in support of or in opposition Authority tendered for filing a notice of BlueRock Energy, Inc. submitted an
to this project. The Commission will withdrawal for an Application under amendment to their Petition for
consider these comments in section 203 of the Federal Power Act, Acceptance of Initial Rate Schedule,
determining the appropriate action to be submitted on August 22, 2005. Waivers and Blanket Authority filed
taken, but the filing of a comment alone Comment Date: 5 p.m. Eastern Time February 2, 2006.
will not serve to make the filer a party on March 6, 2006. Comment Date: 5 p.m. Eastern Time
to the proceeding. The Commission’s 2. Liberty Electric Power, LLC on March 1, 2006.
rules require that persons filing Standard Paragraph
comments in opposition to the project [Docket No. EC06–11–000]
provide copies of their protests only to Take notice that on February 16, 2006, Any person desiring to intervene or to
the party or parties directly involved in Liberty Electric Power, LLC (Liberty) protest this filing must file in
the protest. tendered for filing a supplement to their accordance with Rules 211 and 214 of
Persons who wish to comment only October 21, 2005 Application by asking the Commission’s Rules of Practice and
on the environmental review of this for an additional 60-day period in order Procedure (18 CFR 385.211, 385.214).
project should submit an original and to allow the parties to close the Protests will be considered by the
two copies of their comments to the Transaction on or before April 28, 2006. Commission in determining the
Secretary of the Commission. Comment Date: 5 p.m. Eastern Time appropriate action to be taken, but will
Environmental commenters will be on March 3, 2006. not serve to make protestants parties to
placed on the Commission’s the proceeding. Any person wishing to
3. Eagle Energy Partners I, L.P.; Eagle
environmental mailing list, will receive become a party must file a notice of
Energy Management, LLC; LBMB
copies of the environmental documents, intervention or motion to intervene, as
Partners AIV I, L.P.; LBMB Fund (B)
and will be notified of meetings appropriate. Such notices, motions, or
AIV I, L.P.; LBMB Fund AIV I, L.P.;
associated with the Commission’s protests must be filed on or before the
LBMB Capital Partners V AIV I, L.P.;
environmental review process. comment date. Anyone filing a motion
LB I Group Inc.
Environmental commenters will not be to intervene or protest must serve a copy
required to serve copies of filed [Docket No. EC06–84–000] of that document on the Applicant and
documents on all other parties. Take notice that on February 17, 2006, all the parties in this proceeding.
However, the non-party commenters Eagle Energy Partners I, L.P., Eagle The Commission encourages
will not receive copies of all documents Energy Management, LLC and LBMB electronic submission of protests and
filed by other parties or issued by the Partners AIV I, L.P. LBMB Fund (B) AIV interventions in lieu of paper using the
wwhite on PROD1PC61 with NOTICES

Commission (except for the mailing of I, L.P., LBMB Fund AIV I, L.P., LBMB ‘‘eFiling’’ link at http://www.ferc.gov.
environmental documents issued by the Capital Partners V AIV I, L.P. and LB I Persons unable to file electronically
Commission) and will not have the right Group Inc (collectively, Applicants) should submit an original and 14 copies
to seek court review of the submitted an application pursuant to of the protest or intervention to the
Commission’s final order. section 203 of the Federal Power Act for Federal Energy Regulatory Commission,

VerDate Aug<31>2005 18:25 Feb 28, 2006 Jkt 208001 PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 E:\FR\FM\01MRN1.SGM 01MRN1